HomeMy WebLinkAbout11/21/97 BAKERSFIELD
CITY MANAGER'S OFFICE
MEMORANDUM
November 21, 1997
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ALAN TANDY, CITY MANAGER ~7-/_,~.~/
SUBJECT: GENERAL INFORMATION
1. We received three insurance quotes on the proposed sewer revenue bond issue.
The Iow quote is from a company which is considered very conservative in the
industry and only insures the best bond issues. A summary is attached. The issue
is insured with an A-1 rating.
2. The consultant has completed the engineering study of the Bakersfield pedestrian
overcrossing on Union Avenue. Per the enclosed memo from Public Works, the
approximate cost for rehabilitation is $100,000. Please recall that the structure is
privately owned, and CalTrans believes it isn't safe.
3. GST Telecom, the utility company that did the fiber optic work on Truxtun, will not be
able to repave the outside lane of Truxtun Avenue until next spring, because PG&E
has been delayed in repairing their potholes from the gas line replacement. GST is
to commence work next spring, after the inclement weather has passed.
4. The department head retreat report is enclosed.
5. Tentatively, the GSA may bid the Federal Building in March of 1998.
6. A response to a Council referral regarding sidewalks along Laurel Drive is enclosed.
AT:rs
cc: Department Heads
Pamela McCarthy, City Clerk
Trudy Slater, Administrative Analyst
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
~//
FROM: GREGORY J. KLIMKO, FINANCE DIRECTOR ,,~/'~--
DATE: NOVEMBER 14, 1997 /
SUBJECT: BOND INSURANCE - SEWER REVENUE BONDS-PROPOSED
I am pleased to advise you we have received quotes from three bond insurance
companies on our proposed $13+ million sewer revenue bond issue. Doug Houston
with George K. Baum & Company Bond Underwriters, advises me the quotes were very
aggressive and the Iow quote was submitted by FGIC.
FGIC is considered very conservative in the industry, does very little insuring on
California bond issues and usually insures the best bond issues. The quotes submitted
are detailed below.
Financial Guaranty Insurance Company (FGIC)
Bond Insurance (0.12%) $20,411
Revenue Fund Surety (1.20%) 22,589
Total $43,000
American Municipal Bond Assurance Company (AMBAC)
Bond Insurance (0.14%) $23,813
Reserve Fund Surety (1.80%) 33,882
Total $57,695
Municipal Bond Insurance Association (MBIA)
Bond Insurance (0.16%) $27,215
Reserve Fund Surety (1.75%) 32,940
Total $60,155
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works Director
DATE: November 18, 1997
SUBJECT: Bakersfield Pedestrian Overcrossing
On November 12, 1997, Warren Minner of Warren A. Minner & Associates presented the results of his
engineering study on the Bakersfield Pedestrian Overcrossing to myself and Dr. Girish Patel, the property
owner. The options presented were to rehabilitate the structure for a cost of approximately $100,000 or
to demolish it for a cost of $31,000. Rehabilitation would include sandblasting to remove the existing
corrosion and the addition of bracing to the bridge structure and shear walls to the abutments:
Dr. Patel indicated that he cannot affbrd the pay for the rehabilitation himself and would be looking to the
City and the County for whatever financial aid they might contribute. I have instructed my staff to set up
a meeting with Jake Wager of Economic and Community Development to see if the City can aid in the
procurement of grant money, but I informed Dr. Patel that the City would be unable to direct any City
funds to this project unless specifically directed to do so by the City Council.
S:\PROJECTS\BPOC\update2. wpd
RMR:mps
xc: Reading File
Project File
Jacques R. La Rochelle
Mari~xt P. Shaw
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR~~
DATE: November 19, 1997
RE: G.S.T. Repaving of Truxtun Avenue from Mohawk Street to "H" Street
G.S.T. has been unable to fulfill their obligation to repave the outside lane of Truxtun Avenue
due to delays by P.G.&E. in repairing their potholes, which was required subsequent to the
replacement of the gas line in Truxtun Avenue.
The project has been delayed until Spring 1998 as a result of the expected inclement weather
which has been forecast this winter. The City will continue to retain the bond for this project.
G:\engXSHAREDhMEMOS\ 1997~TRUXTUN.GS T
BAKERSFIELD
CITY MANAGER'S OFFICE
MEMORANDUM
NOVEMBER 17, 1997
TO: HONORABLE MAYOR AND CITY COUNCIL
MANAGER
SUBJECT: REPORT ON DEPARTMENT HEAD RETREAT
The Department Heads, Assistant City Managers and I recently conducted our annual
retreat to discuss issues facing the City, plan for the upcoming budget process and
develop approaches to address problems or concerns that have come up during the
previous year. In addition, this year's retreat including a workshop by Dr. Sonia Powers
on team building and making internal communications among department heads more
effective.
The retreat agenda focused on five main subject areas: Management Issues,
Annexations, Budget Process, Emergency Preparedness Planning and Team Building.
Each subject area had a facilitator to brief the group on the issues, lead the discussion
and take notes on the outcomes. Following is a report on these issues and the action
plans that were developed to address them. As a result of our work at the retreat we
have set up several committees to work on development and implementation of certain
recommended action plans for specific items.
If you would like any further information on the retreat, please let me know.
S:'~DOLORES\dhrreport.wpd
Department Head Retreat Report
November 17, 1997
Page 2
Retreat Issues and Action Plans
I. MANAGEMENT ISSUES
A. ISSUE: Management Information Services should continually strive to be
more responsive to the changing computer needs of the departments and
to identify resources for them to meet the increasing demand for services.
ACTION PLAN:
1. A MIS Advisory Committee will be formed which will include
representation from all departments. The purpose of the Advisory
Committee will be to provide a formalized means for Departments to give
input and direction for the planning and implementation of new hardware
and software, addressing computer upgrades, identifying and discussing
potential computer problems and/or concerns and representing the
computer needs of the departments. Implementation Date: 11/97
2. Implementation of City-wide E-Mail shall occur by December 31, 1997.
A general use guide and policy shall be distributed to all users for the use
of E-Mail which delineates what is and is not appropriate for E-Mail.
Employees shall be reminded that there is no right of privacy when using
E-Mail on City owned computers and that communications through E-Mail
are subject to the same rules for other types of communications under the
Public Information Act. Implementation Date: 12/97
3. All Department Heads will have the option to get a computer and be
trained in the Use of E-Mail, Internet Access and other basic applications.
MIS will accelerate connection to E-Mail for all Department Heads and
provide one-on-one training for them. Implementation Date: 11/97
4. To address improvements in communication with their customers, MIS
will develop a work order system with receipts to leave with the customer
to keep them informed of the status of their problem and when it will be
fixed. At least one person in each department will be trained to handle
simple problems and software questions which will allow MIS to
concentrate on the more difficult computer issues. Finally MIS should
move forward with a request to hire additional technical people to handle
the growing work load. Implementation Date: 2~98
B. ISSUE: For the last two years a Committee of Employees has been
working towards development of a plan to implement an Employee
Incentive Award Program. A draft has been produced however, it has
S:XDOLOKES\dhrreport. wpd
Department Head Retreat Report
November 17, 1997
Page 3
several operational and administrative shortcomings. These
shortcomings should be addressed so the plan can be implemented.
ACTION PLAN:
1. The draft plan requires a budget commitment that is greater than what
is reasonable and which also may be difficult to maintain in tight fiscal
times. The Incentive Plan where possible should provide for non-
monetary incentives such as recognition both internally and throughout
the community, increments of time off or inclusion in special events.
Implementation Date: 1/98 (to kick-off phasing of plan)
2. The draft plan does not do enough to recognize team-based
accomplishments. The Incentive Plan should recognize and encourage
effective teamwork among employees both within departments and across
departmental lines. Recognizing teams will stimulate cooperation rather
than competition over good ideas. This will add value for both the
employees and the organization by promoting organizational teamwork,
improved operations, better morale and increased employee skill levels.
Implementation Date: 1/98 (to kick-off phasing of plan)
3. A component of the draft plan proposes an annual appreciation
breakfast where non management employees are served breakfast by
management employees as a way of thanking them for their hard work.
This concept can be expanded to make the breakfast an added
opportunity for non-monetary recognition of employees. This could
include the announcement of those that achieved City service milestones,
introduction of employees that were recognized during the year for
exemplary customer service and/or showcasing winning ideas for cost
saving and service improving measures by employee teams.
Implementation Date: 1/98 (to kick-off phasing of plan)
4. The draft plan is proposed to be implemented all at once. In order to
insure effective implementation of each component of the plan,
implementation should be phased over a two year period with different
components being announced to employees and phased into operations
at intervals throughout the phase-in period. Implementation Date: 1/98 (to
kick-off phasing of plan)
C. ISSUE: The organization needs to develop a wider variety of options for
employee development both to facilitate the upward movement of
employees into available management position whenever possible and to
expand the knowledge and understanding of interested employees on the
operations and functions of the entire City.
S:",DOLOP, ES\dhrreport.wpd
Department Head Retreat Report
November 17, 1997
Page 4
ACTION PLAN:
1. Utilization of cross-functional teams has been very successful over the
last two years. Currently, several teams of employees are working on
different issues such as the annexation strategy, grant writing assistance,
budget streamlining, the employee incentive plan, etc. Cross-functional
teams are an effective way to expand the knowledge of employees
beyond their job and the task of their department. SEED Training also
uses the concept of cross-functional teams by bringing employees from
across the organization together for training and group projects. We will
continue to use this method to work on special project or address specific
issues. Implementation Date: Ongoing
2. Set up familiarization tours of various city operations for new
employees and key front-line personnel. Each tour should focus on
orienting the employees to a specific task within or level of the
organization. The tours should include exposure to the various
organizational cultures within the City. Implementation Date: 1/98
3. Develop a voluntary exchange program to allow employees at similar
organizational levels to trade department assignments to learn other
functions and roles within the organization. The length of the exchange
period would vary depending on the job types and department functions.
This will give employees the opportunity to broaden their skills and
knowledge within their chosen career path. Implementation Date: 1/98
4. A team of Department Heads was formed to develop the specifics of
the programs and implement them. Implementation Date: 12/97
II. ANNEXATIONS
A. ISSUE: As annexations occur, thereby increasing the population and size
of the City, it is critical to maintain service levels in both the new and
existing City areas.
ACTION PLAN:
1. Anticipate resource needs. A review of all areas contemplated for
annexation over the next two years was done and an assessment of the
potential resource needs associated with each area. The phasing of the
areas and the point at which they would come into the City boundaries
was estimated. The impact of the added population and area to the
S :XDOLORES\dhrreport.wpd
Department Head Retreat Report
November 17, 1997
Page 5
services provided was assessed. The needs for increased staff and
equipment as a result of these annexations will be addressed during the
budget process as areas are added. Implementation Date: Ongoing
B. ISSUE: While annexations are occurring the process is very slow. Even
though the annexation education campaign is successful, the actual
annexation process is often so lengthy that it creates a need to repeat
some of the informational efforts.
ACTION PLAN:
1. Continue the annexation educational efforts. While the process seems
slow, this'is because changing public perception is a very time-consuming
and challenging process. Also by implementing the strategy in several
areas at once, it does sometimes slow the whole effort because of limited
staff resources. Bringing in additional staff to assist with resident
meetings and development of information materials will speed up the
process. Implementation Date: Ongoing
2. The time line for the actual annexation process is not within the City's
control. The timing of the process depends on the timing of LAFCO in
processing and approving the annexation application. Methods of
decreasing the time lines for the application process should be pursued
such as combining areas requesting annexation into one application
rather than several and starting the pre-zoning process early are
underway. Implementation Date: Ongoing
III. BUDGET ISSUES
A. ISSUE: The budget process has become somewhat cumbersome and
requires to many forms and to much paper going back forth between
departments. The process should be streamlined.
ACTION PLAN:
1. A committee of budget managers will be working on streamlining the
various components of the budget process including the new personnel
request process, the internal service request process and the
reimbursable expense request process. These requests will be integrated
into the current HTE budget system which will reduce paperwork and the
need for multiple forms. Implementation Date: 11/97 (to begin committee)
2. The merits of a two year budget cycle rather than the current annual
S 5DOLORE S\dhrreport.wpd
Department Head Retreat Report
November 17, ~997
Page 6
cycle, were reviewed. The advantage of a two year cycle, particularly for
departments who's budget don't fluctuate or change dramatically, is a
decrease in the staff time needed to prepare the budget. The
disadvantage is that the second year of the two year cycle is usually less
specific and is based on assumptions for revenue growth and spending
which may not come true. It was determined that a two year cycle would
not be advantageous for the City at this time but may be reviewed later if
other budget streamlining efforts prove to be unsuccessful.
Implementation Date: Ongoing
3. Assumptions to be used in the budget process regarding population
growth, the use of grants and other special revenues and anticipated
increases in General Fund revenues should be determined as early as
possible and should be agreed on and used by all departments.
Particularly important is getting early consensus on the population
increase data since that is often used to determine service levels and
needed staffing increases to cover the anticipated increases in demand
for service. Implementation Date: 1/98
B. ISSUE: The format for goals and objectives used in the budget document
needs to be improved to make it more informative and meaningful for the
public. The current format provides too much detail on individual tasks
and not enough detail about the overall direction of the proposed budget
and the proposed changes.
ACTION PLAN:
1. The Department Goals Sections of the Budget should be separate
from the internal goals and objectives that are formulated to give the City
Manager and City Council a clear concept of what the Departments will be
focusing on for the coming year. Currently these two are combined and
presented in the Budget Document. The format for the Budget Document
will be an overview focusing on prior fiscal year accomplishments, next
fiscal year action plan and a summary of the changes proPosed for the
budget. In addition, an annual internal goals and objectives process will
be initiated to formulate the more detailed operational goals and
objectives for the Manager and Council. Implementation Date: 1/98
2. The Department Goals Section should include service level indicators
that provide comparison statistics over a three to four year period for key
tasks. The format for these performance indicators can be in chart or
graph form. Implementation Date: 1/98
S:'xDOLORES\dhrreport.wpd
Department Head Retreat Report
November 17, 1997
Page 7
IV. EMERGENCY PREPAREDNESS PLANNING
A. ISSUE: The oncoming El Nino brings with it the potential for significant
rainfall and possible flooding and property damage. The City should
review its Emergency Preparedness efforts to insure that we are ready for
this or any other emergency situation.
ACTION PLAN:
1. Fully implement the components of the Standardized Emergency
Management System which incorporates an incident command system,
multi/inter-agency coordination, a system for mutual aid and the
operational area concept. Department Heads were given an overview of
the SEMS system and discussed appropriate implementation.
Implementation Date: Ongoing
2. Coordinate with other agencies to insure that they have also
implemented SEMS to facilitate sharing of resources and information
coordination during an emergency. Implementation Date: Ongoing
3. Provide for training of all staff on the introduction to SEMS and provide
training in field operations, emergency operations center and executive
emergency management to appropriate staff. Implementation Date:
Ongoing
B. ISSUE: Giving the public adequate information to be prepared in the event
of an emergency precipitated by El Nino or some other occurrence without
needlessly scaring them, is a critical function.
ACTION PLAN:
1. Keep track of the El Nino weather pattern and when it might effect the
City. This will help us to keep the public informed and to help us prepare
for specific occurrences of rainfall that may lead to flooding.
Implementation Date: Ongoing
2. Update and/or prepare information for residents and businesses on
how they can prepare for an emergency and what to do if one occurs.
Implementation Date: Ongoing
V. TEAM BUILDING
A. ISSUE: There should be continuing efforts to improve and encourage
S ADOLORES\dhrreport.wpd
Department Head Retreat Report
November 17, 1997
Page 8
effective team work between departments.
ACTION PLAN:
1. A team building workshop was held to insure continued good
communication and team work among Department Heads and their
departments. Additional opportunities to solidify and promote continued
effective working relations between departments will be provided at
Department Head meetings and through the development of committees
of Department Heads to work on specific issues. Implementation Date:
Ongoing.
S:'xDOLORES\dhrreport. wpd
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, City Manager
L FROM: RAUL ROJAS, Public Works Director ~~.~..
DATE: November 20, 1997
SUBJECT: COUNCIL REFERRAL WF0017802/001, SALVAGGIO
LAUREL DRIVE SIDEWALKS
The correspondence from Monica Ramsey regarding sidewalks along Laurel Drive was responded to
November 20, 1997 (see.,~,,,.,.,~ ~'*~.,.~,,./. No c~,..~,,~L,.~ ~.,.. action is currently necessary regarding this referral.
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
1501 TRUXTUN AVENUE
BAKERSFIELD, CALIFORNIA 93301
(805) 326-3724
November 20, 1997 RAUL M. ROJAS, DIRECTOR · CITY ENGINEER
Monica Ramsey
2613 Laurel Drive
Bakersfield, CA 93304
RE: Sidewalks
Dear Ms. Ramsey:
This is in response to your letter addressed to Councilmember Mark Saivaggio dated June 24, 'i997
requesting the installation of sidewalks in your neighborb~ood.
Sidewalks in newly developing areas are instal~ed and paid tbr by the developer as part of the
required subdivision tract improvements. When an existing structure has a major adclition or remodel,
sidewalks are also required (if not already existing) and are paid for by the business or
homeowner/property owner.
The City of Bakersfield untbrmnately does not have the funds available to pay .for the installation
of new sidewalks along existing City streets. However, the City does have a program whereby if the
property owner requests and agrees to pay for the sidewalk; the City will have the side~valk installed at.
the current price per square foot the City pays its contractors for sidewalk installation. Due to volume,
the City price ma>, be cheaper than you could obtain fxom a contractor. Currently, the cost' per square foot
the City pays for sidewalk is $2.45, and the cost per square foot for drive approaches is $2.95. A total
cost of $876.38 would result based on the 75' strut frontage of your lot (Lot 76, Tract 1541), the required
4.5' sidewalk width, and the installation of one 22' wide drive approach. This program would also be
available to your neighbors should they desire sidewalk installation.
"Should you be interested in pursuing this option or should you have additional questions, please contact
Ted Wright of this Department at 326-3724.
Sincerely,
RAUL M. ROJAS
Public Works Director
aRochelle
ngineering Services Manager
cc: Honorable Mark Salvaggio, Councilmember Ward 7
Alan Tandy, City Manager
Theodore Wright, Civil Engineer IV
TDW: I~U REI~T
City of Bakersfield .!. *REPRINT*
_~ ~-% WORK REQUEST PAGE 1
REQ/JOB: WF0017802 / 001 PROJECT: DATE PRINTED: 11/07/97
REQUEST DATE: 11/05/97
CREW: SCHEDULE DATES
START: ii/05/97
LOCATION: COMPLETION: 11/17/97
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: SIDEWALKS ON LAUREL DRIVE
CONTACT
MONICA RAMSEY Phone 1 - I
2613 LAUREL DRIVE Phone 2 -
BAKERSFIELD, CA 93304
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
SALVAGGIO REFERRED TO STAFF CORRESPONDENCE FROM
MONICA RAMSEY REQUESTING CONSTRUCTION OF SIDEWALKS
ON LAUREL DRIVE***
(CORRESPONDENCE IS BEING SENT BY INTEROFFICE MAIL)
Job Order Description: SIDEWALKS ON LAUREL DRIVE
atggory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /