MEMORANDUM
December 24, 1997
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: ALAN TANDY, CITY MANAGE~
SUBJECT: GENERAL INFORMATION
1. During the last Council statements, Bill Cooper requested a fee waiver on a BZA
appeal. Information on that subject is enclosed. We do not waive these fees,
generally. If members of City Council wished to pay them on behalf of an applicant
it would require a Council motion and vote.
2. The engineering report on the Bakersfield sign over Union is in, so we will put that
back on the Budget and Finance Committee agenda. The cost to rehabilitate the sign
is $100,000. The cost to demolish is $35,000. We have been advised that ownership
has been moved to a not-for-profit corporation.
3. Responses to Council referrals are enclosed, as follows:
· Review site line and parking on west side of H Street between 27th and 28th
Streets;
· Schedule repair work on El Potrero Lane and resurfacing on El Caballo and El
Berrendo;
· Contact railroad company regarding repair work of N Street crossing;
· Bring back freeway alignment proposed by CalTrans to place revised
specifications in City maps to January 14th Council meeting.
· Possible coordination of traffic signals along Old River Road between Ming
Avenue and Stockdale Highway.
4. An update on the Panorama Burn Dump project is enclosed. The DTSC will approve
the Remedial Action Plan on December 29th
Honorable Mayor and City Council
December 24, 1997
Page 2
5. Enclosed is a letter from the County CAO regarding the site they are considering for
a replacement facility for the Public Health Department. The location is on County
owned property at the Kern Medical Center campus. Our reply, also enclosed,
indicates that the City may be willing to make a monetary contribution to the project,
but it would be contingent upon the County annexing the subject property into the
City.
6. As a reminder, I will be on vacation next week. The office will have my number,
should there be an emergency. Dolores Teubner will be in charge.
AT:rs
cc: Department Heads
Pamela McCarthy, City Clerk
Trudy Slater, Administrative Analyst
Ha?.py Hollday. s!
BAKERSFIELD
Alan Tandy · City Manager
December 23, 1997
Mr. Scott Jones
COunty Administrative Officer
County of Kern
1115 Truxtun Avenue
Bakersfield, CA 93301
Dear Scott:
Thank you for your letter of December 17th which provides a status report on the County's
effort to move along construction of a building for the Health Department.
City staff is willing to recommend use of $350,000 in Housing and Community Development
funds as an element of our 1998/99 budget as a contribution to this project, contingent
upon the County annexing the County owned property of the Kern Medical Center complex
and Heritage Park into the City. The only factor different here from our earlier proposal is
the annexation. The earlier sites discussed were already in the City of Bakersfield - not
contiguous, non-annexed properties like the KMC complex.
As you know, it is possible that the City Council may have differing views on this
contribution, so I can only assure you of what the City staff will recommend.
Please let me know. We are entering our budget cycle.
Sincerely,
Cl~~ ~nd~Y~o.~
ager
AT:rs
City of Bakersfield · City Manager's Office · 1501 Truxtun Avenue
Bakersfield · California · 93301
Telephone 805-868-3198 · FAX 805.868-3190 · 'I-FY Relay 800~735.2929 Coun~ ^dmini~J~tiYe C)~cer
December 17, t997
Alan Tandy, City Manager
City of Bakersfielcl
1501 Truxtun Avenue
Bakersfield, CA 93301
Re: Con~l~'mation of City of Bakersfield Contribution to a Replacement Facility
for the Depm'tment of Public Health
Dear Alan:
With the assistance of the City of Bakersfield, the County ha~ been evaluating various l~otential sites for
a replacement facility for the Kern County Department of Public Health. You have previously indicated
that if the County selected a site other than the Bakersfield Federal Building that you would recommend
a City financial contribution to this project. Originally, our discussions were centered around the 14th
and "Q" Street site. l~uring those discussions and subsequent writ-ten confirmation your office indicated
that you were willing to recommend that the City acquire, clear and donate to the County, hal~ of the site
with an estimated value of $350,000. You also indicated in your October 9 letter that thi~ amount could
be contributed to the project at another suitable location, subject to City Council approval.
The County Administrative Office is prepared to recommend to the Board of Supervisors that the site of
the replacement facility for the Department of Public Health be on the Kern Medical Center campus,
contingent upon the City financial contribution previously discussed. This site is located on County-
owned property bordering Mt. Vernon Avenue, between the existing County Mental Health Building and
the existing County Juvenile Justice Center. However, prior to presenting this recommendation to the
Board, we need confirmation of the CityCouncil's commitment to the contribution of the $350,000 toward
the project. Our cost comparisom of the various site alternatives have assumed this level of City financial
support.
The County sincerely appreciates the assistance provided by the City thus far. I believe that with a joint
effort between the Gity and the County to complete this project, we ca~ provicte public health services
at an enhanced level for all residents of the Bakersfield metropolitan area. If you have any questions or
require further information, please do not hesitate to call me. I look forward to your Council's favorable
comideration of this proposal.
Sincerely,
County Admi~trative Officer
SEl /lK/ c§/ memos:97123
cc: Dr. B.A. ]'inadu, Department of Public Health
Kern River
Parkway Committee
P.O. Box 1861 · Bakersfield. CA 93303
o:~i~-.~,.~ 12/19/97
TO: Bakersfield City Council
Ref: Appeal of BZA P97-0794
Applicant Jeff Andrews
Council Member~f
With your receipt of this letter, the Kern River Parkway committee is
appealing the CUP granted by BZA on December 9, 1997. (Ref P9~-0794).
Our concerns is that this approval of-J~ff Andrews application negatively
im~p~-~h~ ~j~c~n~ ~bli~ proper~~- ~o~ed ~s~ d~celerati~ lane.
Furthermore, as a public interest group, the Kern River Parkway Committee,
with a vested interest in this adjacent and affected public property demands a
waiver of appeal fees.
Thank you for your cooperation.
WilliA~ Cooper
President, Kern River Pa~rkway C~mmittee
393-0763 or 248-6426 (w)
cc: Upon request3 _ .~
MEMORANDUM
December 18, 1997
TO: ALAN TANDY, CITY MANAGER ~,,,~
FROM: JACK HARDISTY, DEVELOPMENT SERVICES DIRE~~,-~'J-,
SUBJECT: BILL COOPER'S REQUEST TO WAIVE APPEALzF'EE
You have asked what Bill Cooper would appeal.
On December 9, 1997, the Board of Zoning Adjustment approved a Conditional Use
Permit to establish a jewelry store at 6251 Truxtun Avenue. A map showing the location
and a site plan are attached for your reference.
Mr. Cooper's objection is that the plan for access to this property includes a deceleration
lane and driveway over adjacent city property zoned single family residential which was
recently landscaped with trees and shrubs. His letter to the BZA is attached. He would
like to preserve these recent plantings.
JH:pjt
Attachments (3)
m\mat 12-18
EXHIBIT A
CONDITIONAL USE PERMIT
P97-0794
EXHIBIT B
12/01/97 15:54 KERN S.O. ** FRAZIER PARK, CA 001
EXHIBIT C
Kern River
Parkway Committee
P.O. Box 1861 · Bakersfield, CA 93303
December 1, 1997
TO: Louise Palmer
Developmental Services
City o£ Bakers£ield
1715 Chester Ave.
Baker~i~ld, CA 93301
~: Kern River ~ark~7 Comities
Bill Cooper
e.O.~x 1861
Bak~rafield~ ~ 9330]
(SO~) 393-0~63
SUM: C.U.~.
Apglican~
~kers~lald, CA
The Kern Klver Parkvay Committee and associated groups are opposed to the requested
C.U.Fo as proposed~, Specifically, we are op!-~sed to the proposed appropriation
public ~percy adjacent co the applicant's propert~ in order to provide him ~ith
a more convenien~ access into his propertY, ~ey Clt~ oi ~kersfield is under no
oblitation to trot such a C.U
~e public property on ~ich the applicant pro~ses to consCruc~ his "deceleration
lane" ~s identilled over ~w ~ears a~o by our group as public pro~rt7
landscappin~ tn order to approve the aesthetics along Tr~ Ave. and to iaprove
the Parkay ar~, ~e Kern liver Far~y Foundation invested over ~t~O0
scappin~ desi~ ieee and tress plus ~ter~als. ~e City c~ntrlbuted e~ent and
~rk~y volunteers, T~aco Employees, ~y Scouts and others planted the trees
shrubs, Clearly che c~unity ~s a vested interest in chi~ proper:y,
aa the public in:ended.
I~ the City~ throu&h~', the ~ard o~ ~nin8 Adjustment approve· the C.U.~.
appeal to the public and the City Council.
~e applic~nt ~as fully a~eare o[ the zonin~ a~d develo~e~t j~rameter8 ~hen he purchased
the pro~rty located on Tr~tun Ave, He should develop within those ~rametero
not t~ to appropriate public ~operty that has already been deve~ by c~muni.:y
at.pa to improve Tr~un Ave.
~a ur&e the ~ard oE ~nt~ Adjustment co p:ptect our project by denyini
r~quest that ~ould encro~h on public property,
Kern River Parkay Co~.
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: DECEMBER 19, 1997
TO: ~ALAN¥ TANDY, CITY MANAGER
?uBOj~M :C~ ~/~O~ ~I ~R OREJ AFES, PRRA~L L; CWi~~ ~8~ DIRECTOR
PARKING ON H STREET
As you may recall, a BZA decision was made to eliminate all on-street parking on the west side
of H Street between 27* Street and 28~h Street. When the applicant who filed for the BZA action
began to comply with the condition to place "No Parking" signs, several business owners
complained about the parking restrictions which lead to the Council referral.
After meeting with property owners in the area, staff determined that if a small amount of parking
were restricted near the intersection only, adequate site lines would be achieved. This was agreed
upon and a work order to place the necessary "No Parking" signs was prepared.
At this time, no other action is necessary.
cc Jack LaRochelle
saved under P:ref17800.mem
City of Bakersfield *REPRINT*
WORK REQUEST PAGE 1
REQ/~0~: WF0017800 / 001 PROJECT: DATE PRINTED: 11/25/97
REQUEST DATE: 11/05/97
CREW: SCHEDULE DATES
START: ii/05/97
LOCATION: COMPLETION: 11/17/97
GEN. LOC: WARD2 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - DEMOND ORIGIN: CITY COUNCIL REFERRAL
USER ID: PLAWRENCE WORK TYPE: REFERRAL
DESCRIPTION: PARKING ON H STREET
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
DEMOND REQUESTED STAFF REVIEW THE SITE LINE AND
PARKING ON H STREET BY SAN JOAQUIN HOSPITAL.
Job Order Description: PARKING ON H STREET
at~gory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL ROJAS, PUBLIC WORKS DIRECTOR ~~//~
DATE: DECEMBER 19, 1997
SUBJECT: STREET REPAIR/RESURFAClNG
Council Referral WF0017830 1 001
Councilmember Salvaggio requested staff look into the possibility of repair/patchwork being scheduled
on El Potrero Lane, between Planz and White Lane, including Mesa Grande; and schedule El Caballo
and El Berrendo for resurfacing.
The following streets will be crack sealed during the month of January 1998:
EL POTRERO LANE, LOS CARNEROS LANE, and MESA
GRANDE STREET,
The following streets will also be crack sealed in January 1998 and resurfaced during
the summer (July/August)of 1998:
EL CABALLO AVENUE, EL BERRENDO AVENUE, McCALL
AVENUE, DELL AVENUE, DELL COURT AND JORIE
AVENUE.
G:\GROUPDAT~STREETSkELPOTRETRO.PATCH
City of Bakersfield *REPRINT*
WORK REQUEST PAGE 1
REQ/JOB: WF0017830 / 001 PROJECT: DATE PRINTED: 12~18~97
REQUEST DATE: 12/17/97
CREW:~ SCHEDULE DATES
START: 12~17~97
LOCATION: COMPLETION: 1/05/98
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
USER ID: PLAWRENCE WORK TYPE: REFERRAL
DESCRIPTION: STREET REPAIR/RESURFACING
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
SALVAGGIO REQUESTED STAFF LOOK INTO THE
POSSIBILITY OF REPAIR/PATCHWORK BEING SCHEDULED
ON' EL POTRERO LANE, BETWEEN PLANZ AND WHITE LANE,
INCLUDING MESA GRA/~DE; AND SCHEDULE EL CABALLO AND
EL BERRENDO FOR RESURFACING.
Job Order Description: STREET REPAIR/RESURFACING
Cat~gory: PUBLIC WORKS
Task: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: DECEMBER 19, 1997
TO: ALfi2q TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTO~//~~ /
SUBJECT: COUNCIL REFERRAL gWF0017814
REPAIR OF THE N STREET AT-GRADE RAILROAD CROSSING
Over the past several months,, staff, together with a consultant has been working with the
Burlington Northern Sante Fe Railroad on several projects. Other than the Amtrak Station and
Q Street grade separation, we have been actively pursuing permission to construct a "Sky Bridge"
over the tracks at N Street to connect the new arena with existing parking south of the tracks. In
addition, we have offered to pay for an improved robber or concrete at-grade crossing at N Street.
This work would be in conjunction with to other work being performed and or planned in the area
to provide a total and complete improved complex.
BNSF has been receptive to the idea and is expected to respond in a positive manner in the near
furore. We anticipate this approval to occur within the first month of 1998. We will keep you
informed of our progress.
cc Jack LaRochelle
saved under P:ref17814.mem
City of Bakersfield *REPRINT*
WORK REQUEST PAGE 1
REQ/~DB: ~ WF0017814 / 001 PROJECT: DATE PRINTED: 11/25/97
REQUEST DATE: 11/19/97
CREW: SCHEDULE DATES
START: 1i/19/97
LOCATION: COMPLETION: 12/01/97
GEN. LOC: WARD4 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL ~TmT~
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - MCDERMOTT ORIGIN: CITY COUNCIL REFERRAL
USER ID: PLAWRENCE WORK TYPE: REFERRAL
DESCRIPTION: N STREET RAILROAD CROSSING
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
MCDERMOTT REQUESTED STAFF CONTACT THE RAILROAD
COMPANY REGARDING REPAIR OF THE N STREET CROSSING.
Job Order Description: N STREET RAILROAD CROSSING
atpgory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL ROJAS, PUBLIC WORKS DIRECTOR /_.-~/'"-~ j
DATE: December 22, 1997
RE: Freeway Alignment Maps
Council Referral WFO017832/001
Councilmember McDermott requested staff bring back the freeway alignment proposed by
Caltrans to place the revised specifications in City maps to the council meeting of January
14, 1998
This item will be included in the Reports section of the January 14, 1998
Council meeting. Representatives from Caltrans will also be invited to
attend this Council meeting.
c: Jacques LaRochelle, Engineering Services Manager
City of Bakersfield *REPRINT*
WORK REQUEST PAGE 1
REQ/JOB: WF0017832 / 001 PROJECT: DATE PRINTED: 12~18~97
REQUEST DATE: 12/17/97
CREW: SCHEDULE DATES
START: ±~17~97
LOCATION: COMPLETION: 1/05/98
GEN. LOC: WARD4 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL STM'rS
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - MCDERMOTT ORIGIN: CITY COUNCIL REFERRAL
USER ID: PLAWRENCE WORK TYPE: REFERRAL
DESCRIPTION: FREEWAY ALIGNMENT MAPS
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
MCDERMOTT REQUESTED STAFF BRING BACK THE FREEWAY
ALIGNMENT PROPOSED BY CALTRANS TO PLACE THE
REVISED SPECIFICATIONS IN CITY MAPS TO THE COUNCIL
MEETING OF JANUARY 14, 1998.
Job Order Description: FREEWAY ALIGNMENT MAPS
at~gory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul Rojas, Public Works Director
DATE: December 18, 1997
SUBJECT: PANORAMA BURN DUMP PROJECT UPDATE
The Department of Toxic Substances Control (DTSC) completed the 30 day public review
period for the Remedial Action Plan (RAP) on December 15'. The DTSC has indicated no
substantive comments were received from other agencies or members of the public, and that
they intend to approve the RAP on December 29, 1997. This will allow Kleinfelder to proceed
with submittal of the final Engineering Plan in early January as scheduled. The DTSC expects
about a two week delay in approving the Engineering Plan due to reluctance of two
homeowners over the placement of a fence on the City's property line. This means that field
work should begin in early February instead of mid-January.
KB:smp
C 2_ 2 lOg'T'
S:\WPDATA\BDUPD1297.wpd
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, City Manager
FROM: RAUL ROJAS, Public Works Director
DATE: DECEMBER 23, 1997
SUBJECT: COORDINATION OF SIGNALS ALONG OLD RIVER ROAD BETWEEN
MING AVENUE AND STOCKDALE HIGHWAY
Icouncilmember Kevin McDermott requested staff to look into possible coordination of the
subject corridor.
Presently the signals along Old River Road are running independently in a fully actuated
non-coordinated mode. Our staff is already in the process of studying the corridor from
Ming Avenue to Stockdale Highway for possible coordination. Count data has been
collected for each intersection and we have started to model possible timing plans.
Based on our preliminary review of the data only the P.M. and A.M. peak periods have high
enough volumes to warrant coordination so we will be focusing our efforts on those two
periods. Traffic during the remainder of the day is too light to warrant coordination and
would result in a less efficient operation.
Staff will complete the study and implement the new timing plans once the holidays are
'over and we are back to full staff level. I would expect this to be complete sometime in
January 1998.
BJD:bd
G:~eng~SHARED\REFERRAL~MCDERMOT~oldrivercoord