HomeMy WebLinkAbout12/31/97 B A K E R S F I E 'L D CITY MANAGER'S OFFICE MEMORANDUM December 31, 1997 TO: HONORABLE MAYOR AND CITY COUNCIL FROM.'-~ALAN TANDY, CITY MANAGER SUBJECT: GENERAL INFORMATION 1. An update on the Bakersfield Pedestrian Overcrossing is enclosed. The initial indication from Cai Trans is that they would probably not be willing to expend any funding towards rehabilitation of the structure, but we have submitted a request to the District Director, which is also enclosed. According to CalTrans, if no action is taken on the structure, the State will order its demolition and try to recoup their costs by placing a lien on the property. 2. The CIP Status Report for December is enclosed. 3. Last May, the Council approved an agreement with the County for a City-operated pilot program for bulky item recycling and disposal. As of this date, the County has not taken the agreement forward. However, staff recommends that we move forward with a pilot program for City residents only. The attached memo provides further details. AT:rs cc: Department Heads Pamela McCarthy, City Clerk Trudy Slater, Administrative Analyst BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul M. Rojas, Public Works Director DATE: December 24, 1997 SUBJECT: Bakersfield Pedestrian Overcrossing Today my staff discussed the Bakersfield Pedestrian Overcrossing with Kevin Brody, Chief Permit Engineer for CalTrans District 6. Mr. Brody felt it was very unlikely that CalTrans would expend funds for the rehabilitation of this structure, but directed us to send our request for funding to Bart Bond, District Director. Upon learning that Dr. Patel had deeded the structure.to a non-profit foundation, Mr. Brody informed staff that the encroachment permit is invalid, since the permits are in individual's names and do not run with the land. However, he indicated that CalTrans would probably not take any action about this for a while. He did tell staff that if no action regarding this structure is forthcoming, then the State will order the demolition of the structure and will try to recoup their costs by liening the property. S:\PROJECTS\BPOC\update3.~pd RMR:mps xc: Reading File Project File Jacques R. La Rochelle Marian P. Shaw BAKERSFIELD PUBLIC WORKS DEPARTMENT 1501 TRUXTUN AVENUE BAKERSFIELD. CALIFORNIA 93301 (80~) 326-3724 RAUL M. ROJAS, DIRECTOR · CITY ENGINEER December 24, 1997 Department of Transportation P.O. Box 12616 Fresno, CA 93778-2616 Attention: Bart Bond District Director Subject: KER-204-3.05 Bakersfield Pedestrian Overcrossing Dear Mr. Bond: The City has had several meetings recently with Dr. Patel, the former owner of the Bakersfield Pedestrian Overcrossing as a result of the engineering study recently completed by Minner and Associates (enclosed). Mr. Minner's report gives a rehabilitation cost of approximately $70,000 (not including engineering or inspection). Dr. Patel has informed the City that neither he nor the Save Our Sign Foundation can afford this cost (Dr. Patel recently deeded the sign to the Save Our Sign Foundation, a non-profit foundation). At the most the Foundation would be able to raise $20,000 to $30,000. On behalf of the Save Our Sign Foundation, we would like to explore whether the State would contribute any funds to the rehabilitation of this structure. I would welcome your thoughts on this matter. If you could contact Marian Shaw of our office at (805) 326-3579, perhaps our respective staff could meet and discuss possible options. Very truly yours, R L M. ROJAS2 9 Public Works Director I99 Attachment G:\GROUPDA'P, CT Fund Request.wpd cc: City Manager Alan Tandy Kevin Brody, Chief - Office Permits Mark Der Matoian, District Division Chief - Maintenance and Operations STRUCTURAL & CIVIL ENGINEERS October 24, 1997 ENGINEERING STUDY BAKERSFIELD PEDESTRIAN OVERCROSSING OF UNION AVENUE AT EAST 11TM STREET BAKERSFIELD, CALIFORNIA JOB NO. 97-057 CONTENTS ITEM PAGE Purpose ............................................................................................................ 1 Conclusions ...................................................................................................... 1 Recommendations ....................................................................................... 2-3 Cost Estimates ................................................................................................ 3 Summary ........................................................................................................... 3 Appendix West Tower Foundation Plan ................................................................. 1 Sheet East Abutment ................................................................................................ 1 Sheet West Tower Section ..................................................................................... 1 Sheet Typical Bridge Section .................................................... i ........................... 1 Sheet Cost Estimates ................................................................................................ 2 Pages Photographs : ............................................... .~ ~,.._.~?.., ...................................... 4 Pages ~-'~'";-. ~ ~ ?'~ Exp. Date 12-31-00 1716 Oak Street, Suite 21 · Bakersfield, California 93301 · (805)324-9724 · FAX (805) 324-3416 ENGINEERING STUDY Page 2 Mr. Raul Rojas, Ms. Marian Shaw October 24, 1997 RECOMMENDATION We recommend the following to retrofit and restore the bridge to meet current Caltrans standards and to minimize future maintenance cost. · Seismic Retrofit Removethe "inn" sign above the west tower (Photograph 3). This sign is visually obstructed by the trees adjacent to the tower. The sign is likely not properly anchored to the tower. It is hazardous in the event of an earthquake. 2 Remove the stairway at the west tower. Since the east end of the bridge is blocked off (Photograph 7), access to the bridge deck is not required. The bridge is no longer used as a pedestrian overcrossing. Removal of the stairway also helps minimize vandalism to the bridge and reduce maintenance cost in the long run. 3 Remove the severely deteriorated bridge deck (light weight concrete and metal decking). The deck has deteriorated beyond repair. Several broken and loose pieces are hazardous to the motorists and pedestrians below (Photographs 8 and 9). 4 Add new angle X braces to provide lateral support for the top chords of the bridge trusses after the deck is removed. Refer to Typical Bridge Section in the Appendix. s Pour a new concrete footing adjacent to the existing pile cap at the west tower. Properly dowel the new footing to the existing. Refer to West Tower Foundation Plan in the Appendix. s Add new concrete shear walls at the first floor level of the west tower. 7Add a new concrete shear wall infill at the east abutment. Refer to East Abutment in the Appendix. · Bridge Maintenance and Repair Remove all plywood and metal panels at the underside (soffit) of the bridge. Refer to Typical Bridge Section in the Appendix. 2 Remove B A K E R S F I E L D letter signs on both faces of the bridge. Save and reuse. 3 Remove vertical metal siding (both inside and outside faces). ENGINEERING STUDY Paqe 3 Mr. Raul Rojas, Ms. Marian Shaw October 24, 1997 4 Clean and sand blast the existing structural steel members to remove rust and expose bare metal. Replace severely corroded members with new equivalent ones as required. Paint the members to meet current Caltrans standards. s Install and paint new galvanized vertical siding (outside face only) to match the color and texture of the original. 6 Remount the letter signs on both faces. Repair or replace wiring as needed. COST ESTIMATES We estimated the cost to perform the seismic retrofit and restore the bridge structure is approximately $ 70,000. The cost of engineering and field supervision is estimated to be $ 20,000. Refer to Cost Estimate in the Appendix. Complete removal of the bridge would cost approximately $ 31,000. SUMMARY The Bakersfield pedestrian overcrossing is inferior in its seismic resistance. The overcrossing has been poorly maintained. The decking and siding have been subjected to severe deterioration and corrosion. The main structural members appeared in fair condition. The bridge can be feasibly strengthened and restored to present Caltrans and Uniform Building Code standards. Cost estimates are included above. Very truly yours, WARREN A. MINNER & ASSOCIATES Kok (David) b Koo Structural Engineer WAM:KLK:jmj APPENDIX ITEM PAGES West Tower Foundation Plan .................................. 1 Sheet East Abutment .......................................................... I Sheet West Tower Section ................................................. I Sheet Typical Bridge Section ............................................. I Sheet Cost Estimates ......................................................... 2 Pages Photographs ............................................................. 4 Pages I ('N~ CONC. SHEAR WALL INFILL-TYP. F ('£,) 20"~ PILE FOOT/NO TS 6X6 COLUMN FOUNDATION PLAN 1716 OAK ~R[~. BAKERSFIE~, ~FORNIA 93301 FILE SCAL~' 1/1% 1" o[sm.[~ ~ s.[..~ or 4 I [N,) CONC. SHEAR V/ALL INFILL / N (E) FOOl/NO / (E) 20"~ PILE FOOl/NO ('E,) : EX/SlING FILE SCALE: 1/1 "-- 1" .csm.~. J~:,9~<>o- s.~..es oF 4 r "~- REMOVE ~£.) "INN" SIGN ~// ~ -- TYP. £R/DOE (NJ CONe SH~R ~':1 '" .. ~ (~) CONC. SH~  :':':' WALL ONLY A T ~ST ABUTMENT ,"~ i'l J J l ":/ ~(E) 18~ STEEL (N) CONe FOOT/NO. ~ , ~m~, ~ , ~ ~ PILE- ~P. (N) : NE~ ~E) = EXISDNG ,' 1716 OAK ~R[~, i ~ PHONE (805) ~24-9724 F~ {:805) 324-3416 I R£MOV£(£)CONC. D£CHINGAND METAL DECKING ~E~BERS' ARE S/D/N~ AND RE~OUNT L~E~ SIGNS ~0 BE OL~NED. ~ND B~TED AND PMNTED A~ER PMNT/NO OF STRUOL WEWBERS ~0 OURREN7 ~L~NS S~ANDARDS. IS COWPLE~ ~N~ : NE~ ~E} : EXIS~/NO , PHOHE (80~) ~24-9724 ;~ (80~) ~24-~416 FILE S~L~' l/l ~ I" ~s,~ ~ s.~. ~ ~r ~ Bakersfield Pedestrian Overcrossing ~ Cost Estimate - Seismic Rehab, and Maintenance I Repair No. Item Unit Unit Cost Ext. Cost Subtotal 1 Mobilization lump sum 1 $3,000.00 $3,000.00 $3,000.00 2 Demolition Remove sign at west tower lump sum 1 $1,500.00 $1,500.00 Remove stairway at west tower lump sum I $2,000.00 $2,000.00 Remove conc. bridge deck sqff. 862 $3.00 $2,586.00 $6,086.00 3 Concrete Shear Wall Inflll West tower East Wall c.y. 1.62 West tower West Wall c.y. 3.15 West tower North Wall c.y. 2.56 West tower South Wall c.y. 2.56 East abutment, shear wall c.y. 3.07 12.96 $800.00 $10,368.00 $10,368.00 4 New Concrete Footing West tower, new footing c.y. 4.63 $500.00 $2,315.00 $2,315.00 5 New X-braces at each bay L4x4x1/4, 21' long each bay 138.6 lb. 16 2218 $4.00 $8,870.40 $8,870.40 6 Bridge Maintenance I Repair Sand blast & paint per Caltrans Std.: LL6x4x3/4 -top, bot. chord ~ mid 3.33 sq.ff. 172.04 573 $3.60 $2,062.42 LL6x4x5/8 -top, bot. chord - end 3.33 sq.ft. 345.17 1149 $3.60 $4,137.90 LL4x4x5/16-vert. strut 2.67 sq.ff. 327.48 874 $3.60 $3,147.74 LL4x4x5/8 - vert. diag. brace 2.67 sq.ft. 266.66 712 $3.60 $2,563.14 LL6x4x3/8 - vert. diag. brace-end 3.33 sq.ff. 50.65 169 $3.60 $607.19 S3x5.7 - floor beam - top 1.29 sq.ff. 84 108 $3.60 $390.10 S3x5.7 - floor beam - bot 1.29 sq.ff. 84 108 $3.60 $390.10 S3x5.7 - vert. x brace 1.29 sq.ff. 204.54 264 $3.60 $949.88 S3x5.7 - horiz, x brace 1.29 sq.ff. 315.09 406 $3.60 $1,463.28 $15,711.73 New vert. siding 1077.50 sq.ft. 2 2155 $3.00 $6,464.97 $6,464.97 Misc. lump sum I $3,000.00 $3,000.00 $3,000.00 7 Contingency lump sum 10% 1 $5,581.61 $5,581.61 $5,581.61 8 Overhead & Profit lump sum 15% 1 $8,372.42 $8,372.42 $8,372.42 GRAND TOTAL (RETROFIT & REPAIRS): $70,000 ENGINEERING & FIELD SUPERVISION: $20,000 DK - 10/24/97 Page 1 97-057 BFL pedestrian oc- cost estimatel.xls Bakersfield Pedestrian Overcrossing ,, Cost Estimate - Complete Bridge and Tower Removal .. No. Item Unit Unit Cost Ext. Cost 1 Mobilization lumpsum 1 $2,000.00 $2,000.00 2 Demolition Bridge lb. 60720 $0.35 $21,252.00 West Tower, 9'x9', 2 stories and 1 roof sq.ft. 243 $2.50 $607.50 3 Contingency lump sum 15% 1 $3,578.93 $3,578.93 4 Overhead & Profit lump sum 15% 1 $3,578.93 $3,578.93 GRAND TOTAL: $31,000 DK - 10/24/97 ' ' Page I 97-057 BFL ped oc- cost estimate-total removal.xls Note ??,./ood ~a,neis ~.x ...... SS!:q,'Sj Access ~o O~,sii~:~mg v,/as ~,~OCK~Q L~,,= 900. 8. ',Hole ir: bridge deck. ,Note se'vereiy corroded steei members. The broken and loose concrete '~= O~-,~vs are hazardous to ,, ,e motorists ancl secles;rlans be!dy,/. Missing trea,d ac =~_~,.-~ ~:"d-, of, or~ge cieck %ore bro¼ein and se'v'ere!y corroded stee: .Bakersfield Pedestrian Overcrossing Union Avenue Bakersfield, GA 10. Light weight concrete bridge deck. Note spelling and exposed wire reinforcing. 1 1. "v'erticat siding. Note sever corrosion at base of siding. \ \ !2. Structura!steeimembers bebveen sidings.. Note rust Photographs- Page BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: ALAN TANDY, City Manager FROM: THEODORE D. WRIGHT, Civil Engineer IV ~ THROUGH: RAUL M. ROJAS, Public Works Director '~ DATE: December 24, 1997 SUBJECT: CIP STATUS REPORT- DECEMBER, 1997 Attached is the latest status report for the Capital Improvement Program. This CIP status report is comprised of the following sections: 1. Notices of Completion filed and Plans and Specifications approved. 2. Status of FY 1997-98 and pre-FY 97-98 carried-over CIP projects. 3. Construction Inspection Status Report. The following plans have been approved since the last CIP status report: P5C002 Median Improvements, North/Northeast T8K068 Signal, New - Ridgeview High School P8H003 Roof Replacement - Firestation No. 2 PSH005 Replace Ramp - Firestation No. 1 T8K053 Signal, New - Hageman Road at Fruitvale Drive T8K029 Signal, New - Coffee Road at Olive Drive P8C009 Median Island Landscaping - Stockdale Highway The following projects have had Notices of Completion tiled since the last CIP status report: T6K071 Street Improvements - Alta Vista Area T6K066 Street Improvements - Miscellaneous Chip/Cape Seal E6K013 Sewer Rehabilitation, Main - South Chester E7K010 Storm Drain Construction, Main - Ashe Road T7K003 Signal, New - Flower Street At Owens Street City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule 12/17/97 City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - 12/17/97 August 1997 I September 1997 I October 1997 I November 1997 I December 1997 I January 1998 February 1998 March t998 ~ Apri11998 I May 1998 I June 1998 I July 1 Ward Proj. No. Description 3 1101171241311 7 114121 1281 5 1121191261 2 I 9 116123130t 7 114121 1281 4 Ill llsl25 1 I 8 115122 1 I 8 1151221 91 5 1121191261 3 1101171241311 7 114121,1281 5 112 2,5 TSK071 STREET IMPROVEMENTS - ALTA VISTA AREA ~ ~ i ~ ~ Design ...... Bid Reque;~A~a~d .......... Bid :i ....... i ................................................................. Construction . ~ i i . ' i . i ....... Notice.to Proceed ~?~~,~;~- ~, ~ Notice of Completion i ~,5 T6K073 STREET IMPROVEMENTS- CALIFORNIA/OAK i i :: i i :: :: Project bid 9/16. Bids received exceeded budget. Project will rebid ...... D;si,~n .............................................................. ~'"i ..................................... i ..................... late December pending plan and specification modifications. Ii ...................... i ................................. i ................................ i ............... i ........... I ~ ~'~,r~.~-~ Plan Approval i i I: : Bid Request/Award =.rtise for Bids ~*~;~:;~'~ Award of Bid i i i Construction :: Notice to Proceed ~ , ' ' ~ I~ otice of Completion 2,5 TOK076 STREET IMPROVEMENTS -TRUXTUN/OAK i i t Project bid 9/16. Bids received exceeded budget. Project will rebid Ii .......................... i ............... i ............... i. ............................ i ..................... i .......... ........ r~,~,~,,r, '~"? .................................. i .......................... Ilate December pending plan and specification modifications. .... ~" ~ ~,~ ~!~,~gl~ :.Plan Approval i I : : : Bid Request/Award ~.rtise for Bids ~~~ Award of Bid i i Construction Notice to Proceed ~ ! I I il ~ f~ otice of Completion 2,5 T6K066 STREET IMPROVMENTS - MISC. CHIP/SLURRY i i i ~ i Design ~-~.,~ Plan APProval i i i Bid Request/Award Bids ~. '.~: ~ ~_~:,, ~; /:;i Award of Bid : Construction NotiCe to Proceed . : ..... iNotice o; CompletiOn IMPROVEMENTS -WHITE/MTN. VISTA ~ ~ ~ ~ 4 TSK039 STREET i Project awarded at City Council meeting of September 10, :: ~ .............. 1997. Construction start pending utility pole relocation ..... i ................................. :~ .................... i ..................... i ..................... ! ....................... ! ........... i : Design i',~'~? :;~ Plan APProval. scheduled for mid December. Bid Request/Award Bids ~~~ Award of Bid i ! i Construction Notice to Proceed ~ ~_ I I I II ~ Notice of Co~ ,letion ~ 4 T8K082 SIGNAL, NEW- ENDEAVOR SCHOOL i i ~ ~ Plan APProval Construction to Proceed ' . :. ' Notice of ComPletion .: i ALL TSK056 SIDEWALK RECONST. PROJECT - PHASE III :: :: :. :: :: Design i i ~;~,~ plan Approval i i ............ Bid"R;'~;;t~A~J ............................................................................................. ~ ....... Advertise i ............,,~__.* ~_._~ . i ............................. .;~: i ............ ward i ................................. i~ ................ i .................... 1 ....................... ~i ............ i .......................... i ............. for Bids --. ,~ A of Bid i !i i Notice to F 'oceed C -, · ~ TSK054 SIGNAL, NEW- HAGEMAN/RIVERLAKES :i ii i i i Design ~~ PlanAppr°val i i B~d Request/Award i Advertise for Bids ~~~ '~ Aware of Bid i Construction Notice to Pro ~eed ~ : I I I I I II ~iNotice of Completion aaboil01 Page 1 of Design I City of Bakersfield Public Works Department '1997-98 Capital Improvement Program Schedule - '12/`17/97 Description August 1997 I September 1997 I October 1997 2611 November 1997 I December 1997 I January 1998 I February 1998 March 1998 1~ April 1998 I May 1998 I June 1998 Ward Proj. No. 31~ol~7J2413~lTl~412t128151~21~91 2191~6'123130171~412~i2sJ41~1~8}25 t lsl~5122 ~ Is115122129151~21~9126J31~ol~7124J3~1711412~l 2,3 P$C002 MEDIAN IMPROVEMENTS-NORTH/NORTHEAST i i ~ i i : i Bid Request/Award i: i i Advertise ~or Bids ~ ~~~) Award ofBid ! Construct,on i :. i ii No,ice to Proceed ~'~; I I; 6 TdK068 SIGNAL, NEW- RIDGEVIEW HIGH SCHOOL i :: i i i i :i Construction ~ ~ :~ Notice to F ~oceed ~ II :: I Ir I ~ ~ Notice of Completion ~ ~ ~ No,ce to Proceed ~ ~ NoUce of Completion ~ 2 T4K005 ~KE STREET AREA IMPROVEMENTS ~ ~ ~ ~ ~ ~ ~ Construction ~ Notice Proceed r ' ~ ' I1~ I a Notice of Comple~on ......................... ~'~i ~ ................................. ~ ................. ~ .............. ~ ................... [W°rk being Pe~°rmed1 Construction ~ ~ = 4 TdK053 SIGNAL, NEW- HAGEMAN/FRUI~ALE ~ ~ ~ ~ ' ~ ~ ~ Design ~ ~ Plan Approval ~ ~ ~ ~ :. == Bid RequesFAward := A~e~ise'for Bids ~ ~ Award of Bid ~ Construction ~ " NOtice to Proceed ~' I I I I~ ~.. IIIII I : ~ Notice of Completion 4 TdK029 SIGNAL, NEW-COFFEE/OLIVE ~ ~ ~ ~ ~ [ B~d RequesFAward A a~ Bid ' . ~ ~ Adve~ise~forBids ~~ w dOf ~ ~ Construction ~ ~ ~ ~ Notice to Proceed ~ ~ ' 7 EdK027 SEWER REHAB., PUMP STA. - P~NZ/BENTON ' ~ ~ [ ~ ~ ~ ~ Bid RequesFAward :: :: [ ~ A~e~ise for Bids ~ J ~ ~ Award of Bid Construction , , ~ ~ ~ ~ ~ ~ Notice to prOceed ~ aaboil01 Page 2 of Design 1 City of Bakersfield Public Works 'Department 1997-98 Capital Improvement Program Schedule 12/17197 A'ugust 1997 t September 1997I October 1997 261l November 1997 I December 1997 I January 1998 February 1998I March 1998 !9 April 1998 I May 1998 I June 1998 Ward Proj. No. Description 31101171241311711412112815112119[ 219[161231301711412112814111118125 118115122 118115122I 15112119126131101171241311711412112815112 5 E7K009 SEWER REHAB., PUMP STA. - 19TH sTREET i i i i : ~ Design i i i r~-~:,~,,= I ~ i~ '~ Plan Approval i ' :. i Bid Request/Award i i i i Advertise for Bids ~ Award of Bid ........................ ~onstrucii0n .................... i i i i i Notic~ to Proceed ~ -- $ EaK037 STORM DRAIN REHAB., PUMP STA.- TRUXTUN i: i! :i ii i: i: i SidRequest/Award :i :: :: !i AdvertiSe for Bids ~ =. I I III ~ AwardofBid ................................................................................................. Construction :.i .......................................................... i "i ..... i ............ ii ............................ i:: ................. Notice to Pr°ceedi ......................... ~ 5 EaK038 SEWER REHAB., PUMP STA. - OFFICE PARK DR. i ~ ~ ~ ! ~ :~ Bid Request/Award i i i i idvertise for aids ~ Award of Bid ', i i ii . :, Notice ~o Proceed ~ IIi 7 TaKOO2 BRIDGE IMPROV. -WHITE LANE/99 (PAR) ~ ~. i :: i i i [ i :: i i rStafr will now be completing PSR in-lieu of~:onsultant. Work on ................................. co~suitan~ P;c~;~'n'i ................................................ i -~ .................. i ........ ~i,i ....... i .................... , -i ................. ~- ..... i ....................... [study will be on-going through FY 97-98 an~ into FY 98-99.J ' ................................................ ~~' =~;~-.~.~:1 I I I .~ Award of Contract ~ Study i == == :~ IIIII ' I I II ' I ' ~ ~,L ESK00~ SEWER CO,STRUCT~ON. TELEME'rR¥-r'H, ~ ~ ~ ~' i ~ ' i ! i i :: Project Specifications for Pha~e II delayed until Phase I J , .i i :; .~-~ ~ ~ ~ plan Approval i L . :_ . B~d Request/Award ................................................................................... Construction i .......................................................................... . ~i ........................ Notice to~i ......................... Proceed ~ I ii ...................... III I I ~i .................... I I II I ~ Notice:i ................ of Completion:,i: ....................... $ E8K028 SEWER REHABILITATION, MAIN - STOCKDALE ~ ~ ~ ~ i ~ i i i ~t~c_: ': ............ : ' ~ Plan Approval i B~d Request/Award Construct,oni i i Notice to Pr°ceed Notice 6 E8K039 STORM D~IN cONST., MAIN - WILSON RD ~ ~ : ~ ~ ~ ~ Design : *. : : ~ ' ~ : : ~ ~.~' I I IJ I ~ Plan Approval Bid RequesFA~rd : : : : : ~ : Construction ~ ~ : ~ ~ No~ce to Proceed ~'11 II I : II1: ~ Notice of Completio 6 E8K036 STORM D~IN CONST., MAIN - STINE~ILSON ~ ~ ~ ~ ~ ~ ~ Bid RequesFAward ~: A~e~isef°rBids ~111 ~ IIII II I II ............................ C~nstrucfi~ ......................................................................... ~ ....................... ~ .............................................................................. ~ ................... ~ ........................... ~ .................. ~ Notice to Pro'ced ~ III I I II ~ Notice aaboi~01 Page 3 of Design I City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - 12/17/97 August 1997 I September 1997IOctober 1997 2611 November 1997 I December 1997 I January 1998 February 1998II March 1998 '1 April 1998 I May 1998 I June 1998 I July 1 Ward Proj. No. Description 31101171241311711412112815112119I 2191161231301711412112814111118125 118115122 118lt51221291511211912613llOl17124131.1711412112815112 7 TSK001 BRIDGE IMPROVEMENTS -WHITE LANE : : ~ Desgn i i i i: ' : ' ~ ' '~ ' ~ i i :: ~ 1 I ~/ Plan Approval : i ! : ! , ! ii ! i. Notice to Proceed ~'r',,'ll ~' II ~.~ Notice of ComPletion 4 T8K043 STREET IMPROVEMENTS - HAGEMAN SUMP i ~ ~ ~ ~ ~ ~ t ~ ~ : Design :' ~ Plan Approval Bid Request/Award i i i i AdVert/se for Bids ~ : ~ Award of Bid i :: Construction i i i i i i Notice to Proceed ~ 'I i ...... ~ NotiCe of Completion 4 TSK042 STREET IMPROV.- "AGEMAN/CALLOWAY ii ii ii ' ii :i ii :: i : -- i :. Design i i i i i : : '. i :: :: =- ~":.. ' ' ........... ~ Plan Approval :: i i i Bid Request/Award i } i i Advertise for Bids ~ I: I ~ Award of Bid i i i ............................... Construction ~ .................................. ~ ................................... i .... :: ............................. :: .......... i ............................. :: ........... ~ ............................................................... :: : : : Notice to Proceed ~ ¢ I I I' I I ~ NotiCe of Completion 1 E7K005 SEWER REHABILITATION, MAIN - S. CHESTER ~ ~ : Design i i i ::~:i' I :: ~ Plan Approval i i i . B~d Request/Award Construction Notice to Proceed ~,,~Jm~,. I ~ Notice of Completion VAR. T8K072 STREET RESURFACING i ii ii i ! i! i i ~ g i t,~-,~i~ ~,~. ' I I I ' " I ' ~ Plan Approval :: :: :: B~d Request/Award i : i i i AdvertiSe forBids ~" : '% ~wardofBid i i Construction : : . , Notice to Proceed~ I I 3 P7H002 REPAVING FIRESTATIONS i:~ il ii ii ~ i i~ i: :i !i B~d Request/Award ..... I ' ' ....................................................................................................... ii ~i ................................. ii ....................... i ...................... i .................... ii ........................ ~ertise forB!d~..~ AW~d o~.Bid .... ~! ..................................... Construcbon · :: i :: i ! ii :: I Notice toProce'ed ~'1 I' I i ' I I '111i I r'~ No 5 P8C009 MEDIAN ISLAND LANDSCAPING - STOCKDALE i i ii : ' i i ,---,L i ~ ! i i i i i i i I?re.e~.. and Rock Surfacing beingI i i i i [ ~~.11~ Plan Approval ~ i i i i ! i i i Notice to Proceed {~ : ~ Notice of completion 4- T8K057 SIGNAL, NEW- WHITE/MOUNTAIN VISTA i ii :i ii i i :i ?' ! :i Design i i '. :: '' ":: ' ' i.'' "~PlanAppr°val i i i Bid Request/Award ii ii [ ii ii Advertise fOrBids ~ : ~ Award of Bid il :i Construcbon · i i i i i i! i Notice t~ Proceed ~ : aaboil01 Page 4 of Design 1 City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - 12/17/97 August 1997 I September 1997 I October 1997 261i November 1997 I December 1997 I January 1998 February1998 March 1998 ]i April 1998 I May 1998 I June 1998 I July 1 Ward Proj. No.Description 311011712413117114121128151 21191 21911812313017114121128141 1118125 118115122 1181 51221 9151121t9126131101 71241311711412112815112 2,3 T8K055 SIGNAL, NEW - PANORAMA/RIVER i : : :: :: :: ~ , i i, i Original consultani proposal rejected. New proposal '" received and being reviewed by staff. · ' Bid RequesvA~-d .................................................................. i ........................... i ........ ii ...................... i .......... i Advertise for Bids Award' 1,2 TSK004 SIGNAL, NEW - CALIFORNIA/N ~ ~ ~ i : i ~' . . . [ ............... i .................................... i ............ i ...... i ii i Original consultant proposal rejected. New proposal ................................................................................................ Design i ii i iI I :' ........................ ' r ii ...... '~",~ ............ Plan Approval! ................... ii~ .................... :,i'" received and being reviewed by staff. Bid Request/Award ...................ii ........................... i .................................. :. ........... :: .................. i Advertise forBids ~ I~ ~ Award ~fBid i: Construction i i Notice to Proceed I I I i I 6,7 TSK035 STREET IMPROVEMENTS. PANAMA LANE i ~ i~ :~ ii ~ i~ 1 : ....................................................................................................................................................................................................... Bid Request/Award ii .............. Advertise! .............................. forbids ~ [1:! ............. II ~ Award! ............................... of Bid Construction : .. i i i Notice to Proc~ed ~ Illin III I: I I'lr : I ii I,~ NotiCe of Compl 2 P8D001 REPAIR PARKING GARAGE i i ~ ~ i ~ ~ ~ Bid Request/Award i~ i ! i AdvertiSe forbids ~ : I '~ A~ard of Bid i ............................ Construction : i Notice to Proceed ~ .:~.~ ~.~ i ~ Notice of Completion 6 T8K049 CORRIDOR STUDY - WHITE LANE i ~ ~ ~ ~ i ~ : 6 T8K040 SIG. MOD. (CHANNELIZATION)-WHITE/AKERS i :i ii i i! :: :i ! Design I I III ~ Plan ~pproval B~d Request/Award Construction i i i .. i i Notice to Proceed I I I I I 3 TSK065 SIGNAL, NEW - COLLEGE/FAIRFAX i i i i i ! i ; : :: :. B~d Request/Award 2,5 T8K081 SIGNAL, NEW - BEECH/24TH i :, :: :: :. i :: ..................................................................................................... i ............................... i ..................................................... ']'~inalreceived consultant and being proposalreviewed rejected.by staff. New proposal ] ............. ~! ............................ ii ................................... !~:i ................................ ill ......... aaboil01 Page 5 of Design 1 City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - 12/17/97 August 1997 I September 1997 ~ October 19972811November 1997 December 1997 ] January 1998 February 1998 March 1998 I April 1998 ~ May 1998 ll3t June 1998 [ July 1 Ward Proj. No.Description 311011712413117114J211 815112119] 219116123130 711412tl2814111118125 118115122 118}15122129]511211912 1311q117124 17{1412tl2815112 1 TSK05S SIGNAL, NEW-ES SR $8/MT VERNON :: i! :: i. ~i !: :i i" ]Original cor~sultant prop';sal rejected. New p~oposal ................... E~'~i'g~ ~ ............................. i ..................... i ..................... i ..................... :. ........................ i ............................. i- .................... i received and being reviewed by staff. ' :: i i i III I ': I ' I :1 ' I : II1'1 .:__~pi.a~lApp~o~a!.;'~ I : _ : : Construction .................. i .................... :: ........................... i .................... ': ............... i ..................... i ............................. !" ~ .......... ~' .... ~"~~ .... ." :: i i i i ': i nmz.,ce to ~'roceea E8K004 WWTP #~ - REPLACE WELL ~ ~ ~ ~ ~ i ; i : ~ .......... 1 .................. Design ....................................... ii ii i ~ " Plan Approval !i i ............................................................................................................................. Construction i ................................................................. i! ...................... ii ................. i!~ .......................... !'*i ..................................... Notice to prOceed ~"'1 ' I Ii~ ............................. I I I 4 TSK050 I SIGNAL, NEW - WHITE/BUENA VISTA ~ ~ ~ ~ ~ ~ ! Design i! ~ i u~~ I ' i / ~ r =, ~'~r¥/I ~ Plan APproval ~ Bid Request/Award i i ! i *r i i Advertise for Bids ~ Award of Bid ! ................. ! ....................... ! ....................... ! ................. ! ........................... i ...................... ! .................... !,' .................... i'": .................. ! ........................... ! ............ Construction i : i i i i i NotiCe to Proceed Ii I 4 T8K052 SIGNAL, NEW - BUENA VISTA/MING i i i ~ ~ ~ ~ i i ~ Design i i i i ~'~'~;'~ .... I ':1 I I i I I r,~::"l~PlanAPprova, i Bid Request/Award i i i i i i i Advertise~OrBids ~ AwardofBid i , Construction Nolice to Proceed ~ '~1 I r' 1 T8K079 STREET IMPROVEMENTS -CASA LOMA ~6 i i i i !: i! i. PiiinA rev. i :: Bid Request/Award infrastr~c~,re'~tudy c0mpl~tel 'street Lig'h'ting and'i .................... :":'"'i~'~ '~'""~ 'j'"'~ ....... ': . ' ........... ~"]~ ..... :'"'~..~ j ........... i ................ .... I ~overuse ferules ~ I Aware or u~a : i ....................... : ............................................... Water System Upgrades comprise ~mtlal phase. : i ,~2 : Construction i ! ! i ,. :, : Notice to Proceed ~ , ~,r, , 2 T8K080 STREET IMPROVEMENTS -CHESTER #3 ANNEX. ~ ~ i ~ i :~ ~ ............................................................................................Design i ....................... i ........................................................................................ i: ~-~...~,.~_~: ................... ~ ............... ~:: .......................................... I ~ Plan: Approval ~i ....................... Bid Request/Award i ....................... ii ..................................................... Infrastructure Study Complete. Street Llght.ng' ' and I ........................ ~ovemse- ~ ! ....... ........................ rot u,as /~ I Ir'" :! ................ '~ ~wam!" ........................ ..... or,,, !i ......... ' Water System Upgrades comprise initial phase. I ......... ~.. ~ ~ :: ::~..;;~.. ~ ~ . i ............. Construction i i : : :1 ! i NoticetoProceed~~, I I: 6 T8K070 CORRIDOR STUDY - MING AVENUE ~ i ~ : ~ ! i i i i ........ ! ................ ~ .................... ! ................. ~ .................... i .......................... ! .............. ! ............... Study . : II : il ~ studY Complete i i' J i Design i i i i i I II :11 I : I i II I~ Plan Approval i Design i ....................... i; ................ ii ......................... :i: ......................... i:! .......................... ~i ...................... i: .......................... !:t .............. 'i ....................... i' ...................... Bid Request/Award i i i i i i i AdVertise for Bids ~ Award of Bid Constructioni i i. :~ i: i i Notice to Proceed ~ I III I III aaboil01 Page 6 of Design 1 · City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - 1 2117/97 'August 1997 I September 1997 I October 1997 I November 1997 I December 1997 I January 1998 February 1998 March 1998 1~ April1998 I May 1998 I June 1998 ~ July 1 WardProj. No. Description 3 1101171241311 7 114121 1281 5 1121191261 2 19 1161231301 7 114121 1281 4 Ill 118125 1 18 115122 1 I 8 J1512212.,~1 5 1121191261 3 1~01171241311 7 1141211 81 5 112 4 T8K077 STREET CONSTRUCTION - MTN VISTA/SJVRR i i i ~ i', i Design i i .................................. i i ............. ii, ............................ i .................... i ........................ i ................ ~ i ! ~ .... ! ~ Plan Approval 4 T8K076 STREET CONSTRUCTION - OLD RIVER/SJVRR :::i ............. i ............................. :i ............ ii ............................... ........................... Design ............................ i ................................. :i ......... il .................................ii ...................... iii ........ : .... !i ......................... ... ::i .............. 'ii .......................... i:i ....................... Pian Appr°vai ii 4 T8K078 SIGNAL, NEW-'ALLEN/BRIMHALL ; i i i i i i it i 7 T8K058 SIGNAL, NEW- PLANZ/SANDRA ii ii ;i [ ii i, ii ' i; ;! ......................... Design ............................................................................. ii ........................ i ............. " ................................ i ..................... [ ...................... i ................... Z ........ , ................... ?: ................................................ ii ..................................... ~i .......... i i i i ! i ~,~';';: : '~' _ ~ Plan Approval ................... Bi~l"Req ~eSt/A~:~ ................................................................. i .................. i ..................... i ......................... i ................. i ................................. i ........... i .................................. ? ................. i ......................... i i i i i i i i Advertise forBids ~ Award of Bid Construction :: i i :. ' 'i .................................... i ..... i ............................... i" ....................... i .... ~'"'~'"'"~'"'~"! ......... ~"'~ ............... :: i : : : : ,, : : : ,'vorlce [o P'roceea $ T8K064 BRIDGE CONSTRUCTION - MOHAWK STREET ~ i ii :i ~ i :~ ii ~ Study i i i i i ::t~; ' I i .... _~/, .............. ' ' ~! ~ · ~ Study Complete :: 6 T8K046 STREET IMPROVEMENTS -ASHE/HARRIS i i i : i i i ', i Design i ~ ~ ~ ~ ~ ~ ...... ~"~: :l ~: ~ ~ I I .... ~'l'rI r'I ':' ~planAppr°val ....................... Bid Re'C~e~St~,~d ..................................................... i ................................ i ........... i ..................... i ............................ i .................. i ............................... i .......................... i ............. i .................................. :: ! :: :: :: i i i Advertise for Bids ~ Award of Bi ........... Constructio~ i i i i :: i i i, i 2 TTK006 SIGNAL MODIFICATION- DOWNTOWN i i i i i i i ii i i: i! il ii II IIII : ~ Plan Approval Bid Request/Award i ...... i i i i [ [ : Advertise for Bids ~ ~ ': ~ ~ ~ ~ 'r ~ :~ ~ Notice to PrOceed <~Construction 6 T8K003 SIG. MOD. (CHANNELIZATION)-STOCKDALE ................ Designii i i !- t Plan Approval aaboil01 Page 7 of Design I City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule 12/17/97 City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule - 12/17/97 August 1997 September1997 ~ October 1997 2611 November 1997 Ward Proj. No. Description 311o117124 31 7 141211 8151121191 2J91t61231301711412112 14114118125 ~ 1811sl22 118115122J 7 TSK038 Bridge Widening - Panama Ln. at SR 99 i " Bid Request/Award i ................................ Construction i i i : 2 T6L001 Chester Avenue Streetscape i 4 E6K018 Sewer Rehabilitation - Main (Buena Vista Ph I) Bid Request/Award ' Construction Notice to P ceed I I I I I I I I ETK011 Wastewater Treatment Plant No. 2 Reservoir ~ ~ ~ ~ i i i .......... I ........... '~'"". ............................................................................................................. :: ............................ ueslgn : : ' ............................................................................................................... ii ...................................... iI ............ I flows. Project has been reinitiated and is 98% complete. Bid Request/Award Construct on ~ ~ · N°t/ce°fC°mpleti°n 3 T6K008 Channelization SR 178- Fairfax Rd. to 1000' W. i Construcbon · i NOtice to Proceed I E7K005 Sewer Rehabilitation - Main (S. Chester/Planz) :: Design i .............................................................................I Construchon ~ Notice of Completion 2,5 E6K013 Sewer Rehabilitation - Main (Westchester) i Construcbon 1,2,3 TTK012 Resurfacing Streets (ISTEA& Gas Tax) Pro c i ................................................ I Je t temporarily suspended due to weather TTK013 Design I considerations. Project to restart early spring of 1998· I:: :: :: :: :. Construction II rnult969b Page I of Design 2 City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule - 12/17/97 August1997 I September1997 I October1997 I November1997 I' December1997 [ January1998 Ward Proj. No. Description 3 1101171241311 7 114121 128l 5 [12119126I 2 19 116J23130l 7 114121 12~ I 4 I~ l~8125 5 E6K01$ Sewer Rehabilitation - Red Lion Area i : : i i Project was temporarily held pending review of potential ~ ........................................................................................................................................ Design ~" area.annexati°nSprojectandplansresultingnow beingimpaCtSprepared.t° sewer service for : =, ................................................................................................................................................................ Bid Request/Award ~ ~ "i ....... i Construction  Notice of Completion All QTK003 Pavement Management System i ~ ~ ~ ..... I ....... Consultant Procurement - i ........... i ................................. i ...................... ! ........ Implementation .... ~ ." Construction 1,5,6 Q7K014 RemovalofFuelTanks-Stations3,6&9 ii ii Design i Construction Notice to proceed ~ ~%' ~¢~~ ~:~'*'~.,~ N ,rice of COmpletion 7 T7K023 Street Widening (Panama Ln - Wible to SR 99) i i i ~ i : Design .... Construcbon Notice to Proceed ~.~ Notice of Co, ?pletion i 5 E7K010 Storm Drain Construction - Main (Ashe Road) i ~ i ~ ~ Construct on . : i ! ,~ . : . :: i tice to Proceed ~ ; ~---~ Notice of C~mpletion i $ E6K012 Sewer Rehabilitation- Lilt Station (Bank St.) i :i ii i. i! ...................................... 'D;~'i'"~ .............................................................................................................. i ..................... :: ~ ............ i ........ t Notice to Proceed to be issued upon arrival g ,:: ,::~,:: ,:: I of Contractor ordered equpment (pumps, etc) Bid Request/Award i i ii ii i Construction C :! !i i, Notice to Proceed i:r I P7C016 MLK Center Improvements ii il :i !i i ............ 0e;g, .......................................................................................................... B~d Request/Award · i Advertise for Bids ~ : I ,~ AWard of Bid i 5 Q7K015 Corporation Yard Wash Rack Upgrade : ,. i ..................................................................................................................................................... i ....................... i Project will be r~commended for l...i .................. i ............. ............................................................................................................................. Construction Notice to Proceed ~ .............................................................................I II I ~ Noti(., of comP., letion ....................................................................... mult969b Page 2 of Design 2 City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule 12117/97 " August1997 I September19971 October1997 INovember1997 December1997 January1998 IFebruary1998 March1998 ~ April1998 I May1998 1134 Uune1998 Ward Proj. No. Description 3]lO117124131J7J141211281511211912612j9116123 3o 7114121l'2814]41148125 1 [8115122 1181451221 9i 514214912613140117124 17114]21128 7 E7K006 Sewer Rehabilitation - Panama Lane Lift Sta. i : i ! : i i i ......... =: ............................. ~ ......... i ......... ~. . i ............. i ................................... i ............................. i .......... i .................. i ............................ Design i i i :: i i i i i i Bid Request/Award i ~ :: :: [ i ', :: :: ...................... constr~'~ii;~ .................................................. i .............................. ii ............ i .............................. i ......... i ............................ i ...................... :: ......................... i ............. ' .................... ' ....................... ! .... i i ! Notice to Proceed ~ ! : I I I : I I ~ Notice of Completi?n i i 2 TSK057 Downtown St. Improv. Phase II (Fox Theatre) i :i :! : i i i i ! i i ................................................................................... Design ii .................................. il .......... I between IAwaiting City finalization and Fox of Theatre agreement Group. 'II'"i i ................................. ::i .... i:: ........................ ili~ ............................... ii ........................... !! ........................ ii" ................ 'B ~"R;~lUeSt/A~rd .......................................................... i ......................... ~! ...................................................................... i ................................. i ...... i ........... i .............................. i ...................... i ................... Construction i i i i :: i i ::i :: :: 4 E7K001 Sewer Construction - Main (Allen Road) : Des gn~,.~..~, .,~,~ ...... ~ ~ --~'~.~-'--'--'"~ ~ ~ .i ~ta~..~:'-:"--%~:' ?n:: ............................. III i ..................... ~ Plan} Approval .............................................................. : : i! ...................................... : : i .................. i ....................... ~ ................................. ! ......... ! ................................ i ............ i ........ !"~ .............................. ! ............... ! ............... i .... Bid Request/Award ii ii i i Advertise for Bids ~ :1 ' ~ Award of Bid :~ i : : ~ ~ ~ ............... ! i ! ............ ! ........ ! ...... :: ~2;n';t;-~(~ti;~ i i i i :. i i i ' Notice to Proceed ~ I : I : ' 4 E7K002 Sewer Const. - Main (Buena Vista Phase II) ~ ~ ~ : ~ ~ ~ ': [ i ~ Design ¢,"'~r~,~v~..~-- ..... .~'"~,~,,¢~,?~..~¢,-~?~;~,~- ...... ~,~, ,~¢¢ II I I I ' I I I ~ Plan Approval : i Bid Request/Award ii ............ ii ............................... ii ...................... ii .................. i -ii Advertise~ ......... i .............................. for Bids ~ :'i ..... , .,,,, :,~'i~1 ............. Award °f Bid il ........................ i! ................................. · Construction i i i :: :. i i i i! ............ Notice to Proceed! ................................... ~!'' 2 T7K003 Signal, New - Flower St at Owens St : Bid Request/Award ........................................................................................................................................................ Construction Notice to Proceed ,, i i - -~4~ No'ice! .......................................................................................................... of Con ~pietion i i [ i i ...... ii: .............. ..................... 5 ETK009 Storm Drain Rehab. - Lift Station (Beach Park) i i i : i i : ........................... ;. ' · ...................................................... i ................................ i ............ i"'l Notice to Proceed to be issued upon arrival of I ................. i - ' :: ........................ ::'i .................... i ..................... : ........................ ues~gn i :i i I Contractor ordered equipment (pumps, etc.). I ii ii ii i i :. ..................... '~;'~';ti~tion ......................................................... ii ................. i! ...................... i ............................ i i ....................... i .................... i ...... i'l ............................... i ......................... i ...................... '~--- i i Notice to Pr°ceed ~ ; :~ ~ Notice of Completion [[ iii ': [[ ..................... [ i Notice to Proceed to be issued upon completion of review by ................................................... Design ;i ' i ....................... Icity staff and c°nsultant °f c°ntract°r equipment submittals' ' ................................................................ i ................................................ ! .................. ! ..................................... ! ...................... ! ........... : ................................. !-~ ............... ~ ........................ ! ............... :.. Request/Award : : II ~ NotiCe of Completion i i' i i Construction : : Notice tO Proceed ~ : I ........ : ................................. ' ........ : ..................................... :'i ................................................................................ : I E6K004 WWT Plant 2 Upgrade/Expansion i ~ i i i i ~ ! i ................................................................................................................................................................ Design i i .......................... : ................ i Construction , · i :: A ,tice to proceed ~/~ I i i i i i II mult969b Page 3 of Design 2 City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule - 12/17/97 W~ard Proj. No. Description A,ugus! 1997 I September 1997 October 1997 November 1997 - December 1997 January 1998 February 1998 March 1998 ~ April 1998 May 1998 June 1998 31~01171241311711412~1:8151121~912612191161231~0171~412~128141~118125 1181~5122 ~ 1811~1221~151~21~912el31~0117124 341711412~1281 6 E7K012 WVVT Plant 3 Upgrade/Expansion .i: i~i i,~.~ i ~ii~ : i~ ] i~i N°ticii( .......................... I ......... 'o~'i~ ................................ I. '" Bi~"R~q'L~t/AWard ................................. . . . . . ........................... ' ~o~tructc)n ............................ i i i , i , mult969b Page 4 of Design 2 Construction Inspection Project Stares Subdivision CONSTRUCTION INSPECTION PROJECT STATUS SUBDIVISION 12/04/97 P.M. OR DEVELOPER/ % TRACT #'S LOCATION CONTRACTOR INSPECTOR COMP. BUENA VISTA RD. RECONSTRUCTION CASTLE & COOKE LESH 30% COFFEE RD. LINEAR PARK FRUITVALE PROPERTIES LESH 100% VALLEY PLAZA STORM DRAIN COLOMBO CHOATE 70% PM 9329 STOCKDALE HWY, CSUB - OLD RIVER CASTLE & COOKE LESH 100% PM 10191 AUBURN STREET PIERCE 95% TR 5290 GRAND LAKES & CHAMBER-OFFSITES CASTLE & COOKE LESH 100%1 TR 5369 MONITOR & PACHECO AMERICAN HOME ALLIANCE MITCHELL 30% TR 5372-111 VERDUGO & REINA CENTEX LESH 99%: TR 5386-D S/O BRIMHALL, E/O CALLOWAY TURMAN LESH 90% TR 5418-6 VERDUGO & NORIEGA KYLE CARTER LESH 40% TR 5425 C GRANDLAKES - N/O MING AVE. CASTLE & COOKE LESH 100% TR 5426-A HOWELL & OLD RIVER CASTLE & COOKE LESH 99% TR 5426-B&C S/O STOCKDALE, W/O OLD RIVER CASTLE & COOKE LESH 80% TR 5427 OLD RIVER & MING AVE. CASTLE & COOKE LESH 10% TR 5436-2&3 RIVERLAKES COLEMAN LESH 30% TR 5489-C BRIMHALL & OLD FARM CASTLE & COOKE LESH 100% TR 5528-5 S/O PANAMA - E/O AKERS DELFINO DEV. MITCHELL 100% · R 5544-D1 BRIMHALL & VERDUGO CASTLE & COOKE LESH 70% TR 5544-D2 BRIMHALL & VERDUGO CASTLE & COOKE LESH 70% TR 5544-D3 BRIMHALL ROAD & VERDUGO LANE CASTLE & COOKE LESH 99% T"R 5552-A&B RENFRO RD. & STOCKDALE HWY. WEST KERN DEVELOPMENT LESH 30% TR 5600-B E/O AKERS, S/O HOSKING J.L. DANDY MITCHELL 100% TR 5646-2 FAIRFAX RD (~ VALLEYVIEW DR W.D.J. CORPORATION MITCHELL 75% TR 5650-B HARRIS & RELIANCE CASTLE & COOKE MITCHELL 100% TR 5650-C HARRIS & RELIANCE CASTLE & COOKE MITCHELL 100% TR 5664-2&3 PANAMA & RELIANCE ~IORMAL DEVELOPMENT CORP MITCHELL 100% TR 5670 SEASONS SUMP STAINER MITCHELL 100% TR 5673-3&4 HARRIS & RELIANCE CASTLE & COOKE MITCHELL 100% TR 5688 I N/O HARRIS, ASHE - STINE KYLE CARTER MITCHELL 100% TR 5699-A PANAMA (~ FARMER'S CANAL COLEMAN MITCHELL 100% TR 5716-3 MAIN PLAZA/GRANITE FALLS DEWALT LESH 20% TR 5728-2 JEWETTA & HAGEMAN DEWALT LESH 80% TR 5809-3 PANAMA LN. & UNION WATTENBARGER MITCHELL 20% TR 5835-A&B HARRIS & SPRING CREEK CASTLE & COOKE MITCHELL 100% TR 5836-A CALLOWAY S/O BRIMHALL CASTLE & COOKE LESH 85% TR 5838-A&B OLD RIVER & HOWELL CASTLE & COOKE LESH 99% TR 5838-C OLD RIVER & STOCKDALE CASTLE & COOKE LESH 40% TR 5841-A BROOKSIDE & N. LAURELGLEN TURMAN MITCHELL 100% TR 5846-A HARRIS & ASHE CASTLE & COOKE MITCHELL 40% TR 5848 CAMPUS PARK/OLD RIVER CASTLE & COOKE ~MITCHELL 0% ]'R 5861-A AKERS & HOSKING DANDY & ASSOCIATES I MITCHELL 100% TR 5863-A-G BUENA VISTA & MING AVENUE CASTLE & COOKE LESH 40% TR 5869-1 BRIMHALL & VERDUGO BURLINGTON HOMES LESH 35% TR 5872 WHITE LN. & MOUNTAIN VISTA MIKE SOPER LESH 60% 5873-1 PANAMA LN. & MONITOR ST. 5873-2&3 PANAMA LN. & MONITOR ST. ALMOND TREE DEVELOPMENT MITCHELL 30%1 ~ · CONSTRUCTION INSPECTION PROJECT STATUS CAPITAL IMPROVEMENTS 12/04/97 START EST. COM % PROJECTS TYPE CONTRACTOR INSPECTOR DATE DATE COMP ALTA VISTA AREA CURB AND GUTTER KERN ASPHALT MAHAFFEY 10/06/97 12/11/97 75% BANK STREET SEWER LIFT STATION PATSCHECK ELECTRIC 0% BEACH PARK STORM DRAIN LIFT STATION W.M. LYLES 0% BUENA VISTA ROAD I~EPLACE TRUNK SEWER UTAH PACIFIC CONST. BOLANOS 12/15~97 0%1 CHESTER AVENUE HARDSCAPE CONSTRUCTION GRANITE CONSTRUCTION FICK 09~22~97 01106198 45% CHESTER AVENUE LANDSCAPE CONSTRUCTION ELITE CONSTRUCTION FICK 09~22~97 01/21/98 35%: FIRE STN. NOS. 3, 6, 9, 13 REMOVE & REPLACE FUEL TANKS LUTREL SERVICES MOORE 10/06/97 12/29/97 95% FIRE STN. NOS. 4, 5, 6, 7 & 8 PAINTING S.K. PAINTING PATTERSON 09/09/97 11/05/97 15% PANAMA LANE (~ SOUTH "H" ST. REPLACE SWR LIFT STATION PACIFIC RESOURCES 12/22/97 0% PANAMA LN., HVVY 99 TO WlBLE RD. STREET WIDENING GRANITE CONSTRUCTION CHOATE 10/01/97 12/05/97 85% PANAMA ~ HWY 99 BRIDGE WIDENING RASMUSSEN, INC. HUMMEL 02~25~97 12/23/97 74% SEWER TREATMENT PLANT NO. 2 STORAGE RESERVOIR STURGEON & SON ALLEN 08/01/97 11/20/97 99% STATE RTE. 178 (~ FAIRFAX RD. ROAD WIDENING GRANITE CONSTRUCTION MOORE 11/03/97 01130198 80% TRUXTUN AVE., EMPIRE DR. TO OAK TRAFFIC SIGNAL INTERCONNECT TIDWELL EXCAVATING HACKNEY 12/15/97 01/27/98 0% VARIOUS LOCATIONS SWR LIFT STN. IMPROVEMENTS FLO-SYSTEM, INC. 0% VARIOUS STREETS BIKE LANE STRIPING SAFETY STRIPING ALLEN 07/14/97 12/01/97 90% VARIOUS STREETS SIGNAL INTERCONNECT TIDWELL EXCAVATING HACKNEY 07/15/97 12/05/97 100% VARIOUS STREETS RESURFACING GRIFFITH COMPANY BOLANOS 08/18/97 05~30~98 32°./0 WESTCHESTER AREA - FINAL PHASE SEWER REHABILITATION INSITUFORM SOUTHWEST ALLEN 11/10/97 01/06/98 5% WHITE LANE STREET WIDENING STURGEON & SON 0% BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM To: Alan Tandy, City Manager From' Raul M. Rojas, Public Works Director~ Date: December 30, 1997 Subject: Bulky Item Recycling/Disposal Program In May 1997, the City Council approved an agreement with the County for a City-operated pilot program for bulky item recycling and disposal to reduce illegal dumping. The proposed program was to allow City and County residents to drop off their bulky items at a designated location on the first Saturday of each month. The pilot program will use the Mt. Vernon Recycling Center for a six-month trial. City operating costs of $20,000 for the pilot program were budgeted for in FY 97-98. The County was to contribute $5,000 and waive landfill fees in return for the City's operation of the program. However, County staff has not taken the agreement forward as promised. In spite of the County's delay on this program, during talks on mandatory collection and illegal dumping Supervisor Patrick has publicly noted concern that Bakersfield has no bulky item pickup. Mayor Price responded on record and in writing that the City is waiting for the County to participate in a Metro Area program, yet County staff has still not taken the agreement forward. Staff has introduced the proposed Metro Area program to County staff more than one year ago, and the need for City residents to have a bulky item program following automation of City trash pickup. Consequently, staff recommends the following: 1. Proceed with the Pilot Program to include only City residents. 2. The program will begin in February 1998. 3. Participants will be required to show proof of residency. This will give City residents the program they need, while drawing greater attention to the lack of proper disposal practices in County areas.