HomeMy WebLinkAbout04/24/98 BAKERSFIELD CITY MANAGER'S OFFICE MEMORANDUM April 24, 1998 TO: HONORABLE MAYOR AND CITY COUNC / FROM: ALAN TANDY, CITY MANAGER IY SUBJECT: GENERAL INFORMATION -II/ 1. The ClP Status Report for March is enclosed. 2. Also attached is Progress Report #1 on the Wastewater Treatment Plant #2 Expansion Project. 3. We have been informed that a meeting on the High Speed Rail project will be held in Bakersfield on Wednesday, May 20th and will get more details to you when we receive them. Engineering Services Manager, Jack LaRochelle, has been asked to be a member of the Kern Transportation Foundation sub-committee on high speed rail. 4. For the last eighteen years, Community Construction has maintained landscaping that they planted on White Lane and on Saddle Drive as a means of beautifying the entrance to their housing development, Tevis Ranch. With the construction of Tract 5872, a new wall and landscaping area is being constructed on Saddle Drive. The conditions placed on this tract required an additional landscape easement to accommodate the existing landscaping. However, the easement received from the developer's engineer has proved insufficient to allow for construction of the required sidewalk without encroaching into the trees and has necessitated the trees removal. Although the residents of Tevis Ranch will lose some mature trees, they will be gaining a new, larger landscaped area and a sidewalk so they won't have to walk on the grass or in the street. 5. We will be proposing that the Community Services Department be renamed the Recreation and Parks Department. Since Ogden will be managing the Convention Center and Centennial Garden, the changed name for Stan Ford's operation seems more accurate. AT:rs cc: Department Heads Pamela McCarthy, City Clerk Trudy Slater, Administrative Analyst BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy,.. City Manager FROM: Theodore D. Wright, Civil Engineer I~ THROUGH: Raul M. Rojas, Public Works Director DATE: April 20, 1998 SUBJECT: CIP STATUS REPORT o MARCH 1998 Attached is the status report for the Capital Improvement Program. The CIP status report is comprised of the following sections: 1. Notices of Completion filed and Plans and Specifications approved; 2. Status of FY 1997-98 and pre-FY 1997-98 carried-over CIP projects; and 3. Construction Inspection Status Report. The following plan has been approved since the last CIP status report: E7K009 Sewer Rehabilitation, Pump Station - 19~h Street E8K037 Storm Drain Rehabilitation, Pump Station - Truxtun Avenue The following Notices to Proceed were issued since the last report: P7K012 Demolition of Storage Buildings at the old City Corporation Yard - and P6C001 Phase 2 E6K008 Telemetry Improvements for Various Sewer Lift Stations - FY 1996/97 T6K076 Fence Relocation Plan - Southwest Corner of Truxtun Avenue and Oak Street TSK068 Flashing Yellow Beacon on Stine Road at Ridgeview High School The following projects have had Notices of Completion filed since the last status report: T6K063 Traffic Command Center - Annex 1't Floor T6L001 Irrigation & Landscape Portion of Chester Avenue Streetscape Improvements from Truxtun Avenue to 24t~ Street T5K056 Reconstruction of Sidewalks & Drive Approaches - Phase III cc: D. Haynes T. Slater D. Teubner J. LaRochelle G:\GROUPDAThMemo\CIP~viarchApril.wl~l CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT 1997-98 CAPITAL IMPROVEMENT PROGRAM SCHEDULE · , City of Bakersfield Public Works Department I, 1997-98 Capital Improvement Program Schedule - Fri 3/20198 September 1997 ~ October 1997 2611 November 1997 I December 1997 I. January 1998I I I February1998 I March 1998 I April1998 I i May1998 I June1998 I Ju,¥1998 I Augu Ward Proj. No. Description 311 7 1141211 81 5 112119I 2 I 9 1161231301 7 1141211281 4 111118125 1 I 8 115122 11 8 1151221291 5 1121191261 3 )101171241311 7 1141211281 5 1121191261 2 I 9 2,5 T6K073 STREETIMPROVEMENTS-CALIFORNIA/OAK i i i i i ! { Design :?lanApproval : " " " i i i ii Bid Request/Award " ' ' ' ' ' '; P ' -- *':iAward of Bi Construction i i : ~ : I i : i: Notice !o Proceed ~ I Not/ce of Completion 2, T6K076 STREET IMPROVEMENTS-TRUXTUN/OAK i i ~ i : i i Construction = Notice ~o Proceed ~ i I I I ~ Notice of'Completion 4 T8K039 STREET IMPROVEMENTS - WHITE/MTN. VISTA ~ ~ ~ = Bid Request/Award Award of Bid : : : ' " : I Construction ii ii i i Notice to Proceed ,. i I I~ N?t/ce of Completion :: ALL T~0~ 'S,~EWAL~ RECONST. PRO~ECT-PHASE,,, ; i ~ :~ Oes~gn i~ plan Approval i i i i i i ' i ~ Bid Request/Award : . . ~ i i ': . i :: i ! i i Advertise for Bids ~ ..~__ i ~, AwardofBId [ i :: i i i Construction : i Notice to Proceed ~:.~:..~r~ ~ Notice of Complet/o~ !i ii 4 TSK054 SIGNAL, NEW-HAGEMAN/RIVERLAKES ~ i i i ~ ~ i i I i ~ q i Advert/se for Bids ' ' Award of Bid i i ! i i ~ i :: Construction L · i i i i No~ice to Proceed ~- :- ~ -~- ! ........ Not/Ce of Completion i ! : : Advertise for Btds ---~ , :Award of B~d : : : , : : : Construction i : : : ' " : "~ : : ~ i i i ! i ! :i Notice to Proceed Notice of completion 6 T8K068 S GNAL, NEW - RIDGEV EW H GH SCHOOL i :: . i i :: :: i :: :: I Contracts signed· Contractor is expecting to receive I i ' .......................................................................................................................... ~ .......... ~. ........ ~ .............................. i ................................. i ................................ i ....................... I materials 4/24/98 then Notice to Proceed will be issued. I ................. :: ...... ! ......................... ! ................................ i .............................. Design ~ Plan Approval i i i I ' I ! i i ! Bid Request/Award i . . i ,,~ i ,~ ' . ! ~ i ! ~ i i ' Advertise for B~d~ I . Award orBed ' Construction ~ i : Notice to Proceed Notice of Completion 2 T4K055 LAKE STREET AREA IMPROVEMENTS :~ i ~ ~ i~ ~ ! i ~ ~ Plan Approval Bid Request/Award i i i ! ', ~. ! i ! i i Advertise for Bids .-~ ,Award of Bid ,, i Construction i : : ' ~ ~ N n i i : Notice t¢ Proceed otice of Completio aaboil01 Page 1 of Design 1 · ' City of Bakersfield Public Works Department : 1997-98 Capital Improvement Program Schedule - Fri 3/20/98 I September1997 I October1997 [ November1997I December1997 I January1998 I February1998I March1998 I Apri11998 I I/lay1998 I Uune1998 I July1998 I Augu Ward Proj. No. Description 311 7 114121 1281 s 1121191261 2 I 9 1161231301 7 114121 128;I 4 Ill 118i25I ll I 8 115122 1 18 115122129J 5 112119{261 3 ill0 17 241311 7 114121 128l 5 1121191261 2 I 9 2 PSH005 REPLACE RAMP - STATION t i :. i ~ . : '. : i i i ~ : : ~ ' Plans have been : : i .............................. :: .................................. :: ........................... ! ............................ completed. Work being ......................... ii ................................. i .................................::i ................................... ! .................................................. Design : ~ iPlan Approval : performed by Streets i ............................ i .............................. :: .................................:i .................................. Division. . ........................ i ................................... i ............................................................ i Bid Request/Award i i : ' i.i i 4 T8K053 SIGNAL, NEW- HAGEMAN/FRUITVALE ~ ~ i i i ~ ~ ~ i ~ i : Design i ~ Plan Approval i : Bid Request/Award [ i Advertise for Bids ~ Award of Bid i := [ :: i :~ i Construction :i : = !Notice to Pt )ceed ~ i I -? ~ Notice. of Cotnpletion:: 4 T8K029 SIGNAL. NEW-COFFEE/OLIVE :i i :i i :i :i iI i ~l i i j Design ..................................................................... i'"' ............................. i ................................ ii .................................. ii .................................. i .......................... i ........................... i ............................. i .................................... ii .................................~.) :: .................................... :; ................... ! i ~ Plan Approval i :: i :: i i i .......... J .............. Bid"R'e'~;~A~-~ ................................................... i ....................... i ......... .......... ! .................................. i .......................... i ............................ i ............................ i ................................. i .......... i Advert/se'for Bids ~ Awardof Bid :: i i :: :: i 7 E8K027 SEWER REHAB., PUMP STA.- PLANZ/BENTON i i ii ii !! :i ~ ! I :i ~ Des,gn ' ....i ............... : ' ' ' , ...... ........... i ......... :I ..................... i ............................. i .............................. i .............. Bid Request/Award : : ~ . : ~t Award orbid i .: : .: i :i Advertise . for B, ~ls I ~ , : Construction i i i Not/ce to Proceed ~ ~ NOtice of C $ ETK009 SEWER REHAB., PUMP STA. - 19TH STREET i i ~ [ ~ i , Receivedproposal. Staff is I !, i ................................ il ................................. i ............................... i' '~ .............................. i ........................... i ............. I preparing agreement.J !t'i Design .... : : ~--~!ar~AP~rO~a-~ ................................ i ............................... i .......... :l'"": ............... i ............................ ii ................................ i ............... Construction i i i i i ! i i i Noticelto PrOceed ~ I; ~ Notice of Co $ E8K037 STORMDRAINREHAB.,PUMPSTA.-TRUXTUN i i i i i i i i 'l IW°rki°beperf°rmedbyPublicW°rkscrews' Ji ............... ........................ ~'~ i ................................... i ................................ i .............................. f'~' ........................... i ........................ '~ .............................. ~ ............ ,: ............ i ......... il' .......... .... i ~ Plan Approv~ al ' i ' i :: i ~ i ! i i ~otice m ~riceed : : Notice of Co $ E8K038 SEWER REHAB., PUMP STA. - OFFICE PARK DR. i ~~ ~ r ~ . ~ ~ ~ ~ : ~ ~ :~ :: :: i , Received pr0 ~osaL Staff I i i ................................. ! ............................ i ............................ ~ ................................. i .......................... ~ ............... ,~' ................ :: ....................... is prepar nIi ................................. Design i i I~ .... ~ ..... :~'---: '-- ' ' ~ ' ~,~ Plan Approval I g lreement.!' .................................................. 7 TSK002 BRIDGE IMPROV. - WHITE LANE/99 (PSR) i i I Staif will now be completing PSR in-lieu of consultant. Work on I i ............................ '~3'~S~ii~'F~';0C~n~ni ......................................................... i ............................. !i ................................ i .......................... I study wi l be on-going through FY 97-98 and nto FY 98-99. ' ...... ! ........................ i .................................... ! .................................. i ............... Study ..... ,' I I I ........................ ' ....................................................................... : : : :' : i i ........ ~ ............. : : ........... aaboil01 Page 2 of Design 1 City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - Fri 3/20/98 September 1997 I October 1997 I November 1997 I December 1997 ~ January 1998 February 1998 March 1998 I April 1998 t May 1998 I June 1998 I July 1998 26 I Au~u 'Ward Proj. No. 'Description 31171~412~12sl51~21~912612191~6123130171~412~12 141~1~8125 11s115t22 1181~5122129151~2J~9126131!~o11712413~1711412~12s151~21191 219 ALL E6K008 SEWER CONSTRUCTION, TELEMETRY - PH II ~ ~ ~ ~ ~ ~ ~ ~ Design ~ ........................... ::~ ................................. ., ....... ~ ...................................... ~-~'-~ .................................... '~ ..... -.-.-~: '-;: :~ .................. -~,;:~:','.-'-'.'~. '- .... ~ ............ :'. ................................ :~ .......... ; ............. ~ Plan' ............ Appro.~ ...... ~1 .................................................... :: ~: .................................. ~ ................ ............. ' ................ B:d"R~'"~;;~;d .............................................................................. ~: .................................. ~ ...... [Project Specifications for Phase II delayed until Phase I of project 1............ ~ ....................... ~ ............ ~ ..................................... ~ ........... ~ ..................... ~ ......................... ~ ................................ ~ ................ ~ q ~ ~ ~ unde~y. Anticipate bidding Phase Il'upon completion of first phase.. .............. ~ .............................. :: .......... ~ ........................... ~ ............................ Construction ~ ~ ~ : ~ ~ ~ Not~ce to Proceed ~ : : ' , E8K028 SEWER REHABILITATION, MAIN -STOCKDALE :~ :~ ~ ~ ~ ~:{~ ;P~0;;'~ .............................. : ~ .................................. :: ................................... =: ................................... :: .................................. ~ ............................. ~ ............................ [ .............................. ~ ........... ~ ........................ ; ............................. : ............................ B~d RequesFAward :~ :~ :~ :~ :~ :~ ~: Adve~ise. for B~ds ~ II II : ~ Award of Bid : ......................................... : .......................................................................................................... ,= ............................. :: ............................ ~ ............................ == ..................................... ~ ..................... ~ ................................ ~ ................................ ~ ................................... ~ .............................. ~ 6 ESKO39 STORM D~IN CONST., MAIN -WILSON RD ~:: ~ ~: ~ ~ ~ ~ :~ ~ ~ ~: ............................................ · . : ; ~ D.sig. ......................................... ~::: ~ ................................. ::~ ........................... ~~~~~ .................................... ~ ................................ ~ .................................. ~ .......................... ~ ~a. ~ova~ ............. ~ ....................... ~ ~ ~ ............... ~ ................................... ~ ................................. :: ........................... ~ ................................. ~ ................................. ~ ....................... { ............................... [ ................................ ~ ........... ~ ..................... ~ ...................... ~ ..................................... ~ .................. B~d R~q~sFA~rd ~ ~ ~ ~ ~ Adve~isefo'Bids~ AwardofBid ~ ConstrUction ' ~ ~ ~ ~ ' ~ ~ ~ ~o~. to~o...~ ~ : ~ : 6 ESK036 STORM D~IN CONST., MAIN- STINE~ILSON ~ =: :~ , ~ ~ :~ ~ ~ l Pro~ect being bid a~ pa~ ........................................................................................................................................................... ~ ................................... ~ ............................... ~ ................................ [ ..................................... ~ .............................. ~ .................................. ~ .................... ~.--I of r~sudacing project. (T8K072) ......................... Design : ' ................................ ; ............................................................................ ~ ........................... ~ .................................. ~ ............................. ~ ....................................... ~ ............................. ~ ...................... ~ ................................ : ..................................... : .................................... ; ........................... ; ................................. ; ............... Bid RequesFAward ~ ~ ~: ' ~ ~ . ~ A~e~ise for Bids ~ ~ I '~ Award of Bid . ~ Construction . ~ ~ ~ ~ ~ ~ ~ No'Ce to ~roceed ~ ; ; ~ ~No~ce of 7 T8K001 BRIDGE IMPROVEMENTS -WHITE ~NE ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ...................................................................................................................... : .............................. ~ ..................... ~ ............................. ~ .................................. ~ ............................... ~ ...................... ~ ............................. ~ ................................. [ ............ .~ ...................... ~ ............................ ~ ......................... ~ ................. Design ~ ~ [ [ ..... ---- -~~ ~. : ~ Plan Approval " ~ [ Bid RequesUAward ~ ~ ~ ~ ~ ~ Adve~is, , forbids ~ I: ~; Award of Bid ~ ........................... ~0',~;~'~o, ~ .......................... ~ ................................ ~ ..................................... ~ ................................ ~ .................................. ~ ..................................................................... ~ ......... ~ ........... ~",'"~'"',, ............................................................ ~ .................. ~ Notice to Proceed ~' ~ Notice of Completion 4 TSK043 STREET IMPROVEMENTS - HAGEMAN SUMP ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~: ................................ ~ ............................... ~ ............................... ~ ............................... ~ ..................... .~ ........................... ~ ........................ : ~ .............................. ~ ................................. ~ ................. Design Prelimina~ design completed and under ~,~ ....... ~ ~ --~ '--", ~ ' :~ ~ ~ ~ Plan~Approval' ~ ~ review by City staff and Developer. ' ............... : ............................. ~ ............................. : ................................ ~ ............................ : ..................................... : ........... ; ................... ~ .......................... : ................................... Bid RequesFA~rd Riverlakes Developer will be constructing ~ ~ ~ [ A~e~/se for Bids ~ Award of Bid ~ ................. ~ ....................................... ~ ............................ ~ .................................. ~ .................................. ~ ................................. : ............ .[ ....................... ~ ................................. ~ ........................... : ................ project for TDF credits. Agreement is being ~ ~ ~ ~ ~ ~ ~.~ = ~ Construction prepared. ~ ~ := ~ :: ~ ? Notice to Proceed ~' 4 TSK042 STREET IMPROV. - HAGEMAN/CALLOWAY ~ . .............................. ~ ............................. ~ ................................. ~ .......................... ~ ................................ ~ ............................ ~ .................................. ~ ............................... ~ ........................... ~ ................................ ~ ................................ , ................. Design ~ ~ :-. ....................... :~--- ~ .............. ~'~ ................... :~--~- ..... ~ : '~ Pla, Approval ~ ~ ......................... %"R;q~eS~ ~ ................................ ~ ............................. ~ ....................................... ~ .................................... ~ ............................... ~ ................................. ~ ............................. ~ ........... ..................... ~ ................................ ~ .................................................... : ~ : A~e~iseforBids ~ ~,' I:.~ AwardofBid ~  ............ ~ ................................ ~ ......... ~ ...................... ~ ................................ ; ................. , Construction I ............................. ~: ~ ~ ....................... ~ ....................................... ~ ~ ................................................................ ~ ~:: .................... [ ~ ~ Notice to Proceed ~ ~ .................. 1 E7K006 SEWER REHABILITATION, MAIN - S. CHESTER ~ ~ ~ ~ ~ ~ ~ ............ Design ~ ~ , ~ ~'~ .- "'" .:: ::. "'::. ......................... ~ ....... ~' .............. .[ ~ ......... Pla,, ~'~' ~'~"~ ~pp, uv,, .............. ~ .................. ................................ ~'B ~"R~'~d ............................................................ ~ ................................... ~ ................................... ~ ......................... ~ ..................................... ~" Project being redesigned as a replacement (in lieu of rehabilitation), ~ .................. ~ ........ ~ .................... ~ .................................. ~ ..................... ~ ......... ~ :: :: :: :: andw be constructed Fy 98-99 with add tional budgeted fundsI . A.~e~se.~o~B~d~ ~11 , i ....................................................................................................................... Construction ................................ : ~: ~ ................................ ~ ............................... ~ : :: ............................ :. ' ~ ............ : ~ I : ~ ~ ............................. ~ :: ~ .......................... N~' : aaboil01 Page 3 of Design I City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - Fri 3/20/98 I September1997 I October1997 I November1997 I December1997 I January1998 I February1998 March1998 I April1998 Ii May1998 I June1998 I July1998 I Augu Ward Proj. No. Description 3117 1141211281 5 112119J26] 219 I~6123130I 7 114t21.128I 4 Ill 118125J 1 18 ]15122 1 ]8 115122129I 5 112{191261 ~ 110117]241311 7 1~412~ 1281 5 112119]261.2 I 9 Design : i ! i i i ~%/ Plan Approval ..... I Bid Request/Award ii ................................ i~i ............................... . iil .....................................il ..................................... il ............................ Advertise f°r; ........ Bids% ...................................... ~ ~ ...................... A'~a;d .... ; ............................................................................ ,'" Construction . ' Notice to Procted 3 PTH002 REPAVING FIRESTATIONS i ! =: i Advertise for Bids ~ . ~ Award of Bid Oonstruc,o. ........................................................................................ i I i No.ce to Proceed ¢ 4 T8K057 SIGNAL, NEW- WHITE/MOUNTAiN VISTA Design . .. ,' '. ~ =. -- ? = -~. Plan Approval * i :i ! i i i Advertise fo 'Bids ~ Award of Bid Bid Request/Award . . : .... ~ v: 'I : : : Construction :: i := i i i Notice to PrOceed : : 2,3 TBK055 SIGNAL, NEW - PANORAMA/RIVER :i ~i i i ~ i ~ ~ i :: :: :: i :: Ac vertise forbids ~ Award of Bid i :: Construction ................ i ....... ~ .............. 1,2 TBK004 SIGNAL, NEW- CALIFORNIA/N ~ i i~ i i i :~ i ,I Bid Request/Award i ..... i ................................ i ................................... i ........................... i ...................... i .............. A( ~e~i;~";f~r'~;d;"~"Awardo~'Bi~ ..................... i Notice to Proceed 6,7 TBK035 STREET IMPROVEMENTS - PANAMA LANE i i il !! ! i : ' ...... : ' ' . ~ :Plan Approval : : Bid Request/Award ~ Advertise forBids ~ 1 I ~:: Award of Bid Construction ii i i ii i i i i i Notice to Proceed ~'1 : :1 2 P8D001 REPAIR PARKING GARAGE ,. i i i ~ ~ ! i Bid Request/Award ' i !i i !i ' ii Adv,,rtise forBids ~ Award of Bid Constructioni i i N°tiCeit° Proceed ¢ ii ~ iNotice: of 6 TSK049 CORRIDOR STUDY - WHITE LANE ~ :~ i~ ii :i i :i 1' ~ Plan Appro aaboi[01 Page 4. of Design 1 - City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - Fri 3/20/98 September 1997I October 1997 I November 1997 I December 1997 I January 1998 I February m98I March 1998 I April 1998 Ii May 1998 I luna 1998 I July 1998 Ward Proj. No. Description 3~1 7 1~412~ 1281 5 1121~91261 2 I 9 1~61231301 7 1~412~ 1281 4 rll 118125~ ~1 I 8 (15122 1 18 115{22129i 5 112119{26~, 3 110117124131 {'7 114121 $ T8K040 SIG. MOD. (CHANNELIZATION)-WHITE/AKERS ~ ~ ~ ~ ** ~ ~ ~ ~ BidRequest/Award ii i i i i i ~dverti~eforBids ~ :11 II ~ AWardofBid 3 T8K065 SIGNAL NEW-COLLEGE/FAIRFAX.. : ::i: : i i i ii/ ! g I:: :: :: :: , ~ ..... ~ .... ~-'~' ....... ~-~=;~ ............ ~, ' ~ Plan ~pproval' :: :: , Bid Request/Award I!i ii i i i ii i ~dvertise forbids ~ Award Of Bid Construction i i i i i i ' i i}~'~i~'"'~'~'~'"'l~tice to Proceed ~:~ ....................................................................................................... .i ............................... i .................................. :: ................................ i .............................. i .............................. i ............................ Original consultant proposal rejected. New proposa~ .......... i .............................. i i i i i i received and being reviewed by staff. DiscuSsions are ii i ................................. i ............................... :: ................................ :~ .......................... :; ............... ' ............ continuing with Cai Trans. :i ......................................................................... I TSK056 SIGNAL, NEW - EB SR 58/MT VERNON i :i i i i i i ii ii i i :: :: :: i ~ ~-ncroacnment ~' rm~t. Advertise for: ~- ...t..:-.-.---.. - -- .....--.--~..-.:-. Award of Bid Construction ,: : i : i ii¢ Notice t; Proceed ~ i · 4 ESK004 WWTP ¢/3 - REPLACE WELL i i i i i i i t i Due to recent acquisition of air-cooled pump ........................... [~..-..------.--..-.i ................................... ! ............................... project is on hold until determination is made as to ! ~i Plan Approval Design i .................................... i ............................ i .................... whether or not new well is required. Bid Request/Award ! i i [ Advertise for Bids ~ [Award · - :: i ! :: i :: i ::' i Notice to Proceed ~' 4 TSK050 SIGNAL, NEW -WHITE/BUENA VISTA . 4 TSK052 SIGNAL, NEW- BUENA VISTA/MING i :: i i :: :: i [ ;I i :: .......... BidRequest/Award i! IF"rstsubm"t a''sunderrev"ew' I Awardo)Bid ....................... i ............................... I TSK079 STREET IMPROVEMENTS. -CASA LOMA ¢¢6 ~~ ~~ ~ i ii i i i;l i going· Water System installation agreement between the City ........... i .............................. :: ............................ i ..................... III ~ Plan Approval i Design and Cai Water being prepared· Final design and construction i ~-_- __~ ~ : ~ .... ........... :: ................................. i"i ............................... schedule for water system to be determined by Cai Water· ; ........ ~ ..................................... ! ................................ ! .................................... i ................................... i.-~ ................................. ! .................................... B~d Request/Award Construction aaboil01 Page 5 of Design 1 City of Bakersfield Public Works Department 1997-98 Capital Improvement Program Schedule - Fri 3/20/98 1997 October 1997 November 1997 December 1997 March 1998 1998 1998 June 1998 1998 STREET IMPROVEMENTS -CHESTER #3 ANNEX. ~ ~ Study Complete. Street Lighting installation on- Design going. Water System installation agreement between the City and Cai Water being prepared. Final design and construction Approval Bid Request/Award schedule for water system to be determined by Cai Water. Advertise for Bids Award of Bid Construction Notice to Proceed CORRIDOR STUDY - MING AVENUE Study ~ Study Complete Design i ! TOC INTERCONNECT ~ ~ Design I : I : :: ~ PlanAppro Bid Request/Award AdVertise for Bids Construction Notic SIGNAL, NEW - ALLEN/BRIMHALL First submittal is under review. Design Plan Approval SIGNAL, NEW - BRIMHALL/JEWETTA Design Plan Approval SIGNAL, NEW - PLANZ/SANDRA / Design Plan Approval Bid Request/Award Advertise for Bid~ Award of Bid Construction Notice to Proceed BRIDGE CONSTRUCTION - MOHAWK STREET ~ Study ~ Study Complete STREET IMPROVEMENTS - ASHE/HARRIS Design Plan Approval SIG. MOD. (CHANNELIZATION)-STOCKDALE : Design I i II ~ Plan Approval aaboil01 Page 6 of Design I CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT 1996-97 CAPITAL IMPROVEMENT PROGRAM SCHEDULE " City of Bakersfield Public Works Department 1996-97 Capital Improvement program Schedule - Fri 3/20/98 ~ September1997I October1997 I N°vember1997 I December1997 I January1998 I February1998 March1998 I April1998 ,I May1998 113~ June1998 I July1998 .__Ward Proj. No. Description 3117]1412112815112119126121911612313017114121}2814111118125 ~181~$122 11811Sl22129151121191261311o117124 1711412112815112119126 7 T5K038 Bridge Widening - Panama Ln. at SR 99 i i i i .. i i Bid Request/Award ! ~ ~ Construction i i' ' i ':~ Notice of Completion : 2 T6L001 Chester Avenue Streetscape ~ ~ ~ i i i i Design Bid Request/Award : i i : Construction oceed i i i ! . i ! ~ > NotiCe of Completion 4 E6K018 Sewer Rehabilitation- Main (Buena Vista Ph I) :i i i ,' i } } } Design Construction i i i Notice to pr°ceed ~ ...... :~-:~::~ ...... "' :: " ~ r: :: ' :: ~ Notice o~ Completion I E7K011 Wastewater Treatment Plant No. 2 Reservoir ii :i ! ii :i il :i Design i : : Bid Request/Award i : i : ~ : :~ Notice of Completion Construction Notice to Proceed ~ ~ 2,5 E6K013 Sewer Rehabilitation - Main (Westchester) i i i ~ i i i Bid Request/Award ~ ~ ! i : Construction Notice to Proceed : - .~ Notice of Completion 1,2,3 T7K012 Resurfacing Streets (ISTEA & Gas Tax) ::i :i ::i . :i i.. ::i i: Bid Request/Award i i i i i Construction ii ................................... i .......................... i i ................................ i i .................................. i .................. ..... ,1'] I I ~ Notice of Completion $ E6K015 Sewer Rehabilitation- Red Lion Area ::: i i i i i :i i ............................... i' i. rProject temporarily suspended due to weather ~ .............................. i ................. i ............................... Design i i :: I considerations P~ restart early spring of 1998. J :: i ,~,1i :: :: :: B d Request/Award ! i i i i i i i Construcbon mult969b Page 1 of Design 2 " City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule - Fri 3120/98 September 1997 I October 1997 November 1997 December 1997 January 1998 February 1998 March 1998 April 1998 May 1998 June 1 998 I July 1998 __WWard Proj. No. IDescription 3117J14J2112815112119J2612191161231301711412112814Jll 18 25 1 8115122 1 8J15J22J29J5 12119 26J3 10J17}2413117J14 21J2815J12119126 All QTK003 Pavement Management System :: i J Project was temporarily held pending review of potential annexations and resulting impacts to sewer service for area. New project being ........................... i i budgeted for FY 98/99 which will construct gravity sewer to area allowing elimination of pump station and h~gh ~aintenance sewer hnes. Implementation .................................... i ..................................... i ................................... i .................................... i .................................. i ................................. i ................... '/~ Notice of completion ~,. ~ . , .,,,,~ L . '" --~?~- . ,'~?~.~ ~,rl . - ~ ,/ 1,5,6 Q7K014 Removal of Fuel Tanks - Stations 3, 6 & 9 ! i i i i i Initial pavement data recei~ ed and I bein,q reviewed by Staff.I Construction Notice ,o P~oceed ' :: ~w~ NotiCe of Completion i i $ E6K012 Sewer Rehabilitation - Lift Station (Bank St.) i i i i i i i Design ii Construction i ~ : i Notice to Pr~ )ceed ~ "1 ~ Notice of Completion I P7C016 MLKCenter Improvements ~ ~ i : i i i ~~ Plan Approval i :: :: i i :: . :: Bid Request/Award Advertise for Bids : ~ AWard of Bid i i i i Construction ' ii i Notice ,o Proceed ~ ~ ::-- ~~ Notice of C )mplet'°, ~ii '*~ $ Q7K01$ Corporation Yard Wash Rack Upgrade ! ! i i ! i i [iii Bid Request/Award : : : ?'-- ~ . : ': [~ AW ~rd of Bid 'Ii Construction ii i i i i ! Nog ce to Proceed ~ ' ; ~ Notice of Completion 7 ETK006 Sewer Rehabilitation- Panama Lane Lift Sta. ;. :: i i :: :i i :i i ii :: .................................. D~'i"'~ .................................................................. Ii'. .......................... i ....................... i ................................... i .............. [Notice to PrOceed to be issued up(;n arrival ] .... i .................... i ......................... !'~ ................................................................. g I i i of Contractor ordered-~q~i~-n~n~(pumps, etc.). J i i I Bid Request/Award ii i i i i i i i iI~Ii i i i No.cetoPreceed,. i i ,i Noiceo :ompletion 2 TSK057 Downtown St. Improv. Phase II (Fox Theatre) i i i i :i ii i · :: i :: :: :: i Final phase parking ...................................... *D~i~'l~ ................................................................................................ i ................................. ~i ........................... i .................................. i! .................................. i ................................ ii ....................... lot to award at Council '.! .............................. i : ,. : meeting of 4/8/98. Bid Request/Award i : : : Construction : ~ ~ ~ ~ ~ ~ ........ i ................................ 4 E7K001 Sewer Construction - Main (Allen Road) i ~ i . :i :~ i ~ ,'i. i I ~ Plan Approval ;i Bid Request/^ward i ............................... ~: ................................. : ................................. ~ ..................................................................... ............. ........................................................................................................................................... Construction i ........................... i ................................... i .................................... i ....................................... i ............................. i .................... ................................... {i ................................... mult969b Page 2 of Design 2 City of Bakersfield Public Works Department 1996-97 Capital Improvement Program Schedule - Fri 3/20198 ~ September1997I October1997 I November1997I December1997 I January1998 February1998t March1998 I April1998 t May1998 I June1998 I Ju1¥1998 ..W. ardProj. No. Description 3117 144121 12SI 5 1~21~91261 2 19 1161231301 7 1~4121 1281 4 I1~ Ilsl25 1 18 1~51~I ~ iS IlSl221291 5 11211912~ 13 I101171241311 7 1~4121 1281 5 1~2119t26 4 E7K002 Sewer Const. - Main (Buena Vista Phase II) i i != i Design .... ................................................. = ......................... ~ ................ ,~ ~ ..... , ....... ~ .... 'J ............................ ~,- ~ ,:-~- ....... -=z~ ..... Plan Approval : Bid Request/Award i i ii i i i i i Advertise for Bidsi ~ , : ~ Award of Bi 5 E7K009 Storm Drain Rehab. - Lift Station (Beach Park) Ii i i,' ....................... i ...................... [Awaiting finalization of agreement ........ i ............................... Design ,i i [between City and Fox Theatre Group. Bid Request/Award i : ~ I : Construction i Notice to Proceed ~,.~ I I ~ Notice o{ Completion ALL E6K008 Sewer Construction - Telemetry City Wide i ~ ~ .. Design : : : : : : Bid Request/Award :: i :: ' :: :: :: Construction ii i i ! ii Notice to Pro, ~.ed ~ i I ii ~ Notice of Completion 1 E6K004 WWT Plant 2 Upgrade/Expansion ~ ~ ~ i Design i i i ............................. i ................................. i .................................. :: ............................... i .................................. i ................................ ! .................................. i i iBid Request/Award Construction , .~ i .. Notice to Proceed 6 E7K012 WWT Plant 3 Upgrade/Expansion :: ~ ~ ! Construction .......... ~.L.. .............................................................. ~ ~ f ---1~ i i ' ~"~ "~ ! i i i :: !: ~ Notice o: Completion .... . ................................. } ........ [Notice to ~roceed to be issued upon completion of review ....... :: LCity staff and consultant of Contractor equipment submittals. mult969b Page 3 of Design 2 CONSTRUCTION INSPECTION PROJECT STATUS SUBDIVISION CONSTRUCTION INSPECTION PROJECT STATUS -- SUBDIVISION 04/01/98 P.M. OR DEVELOPER/ % TRACT #'S LOCATION CONTRACTOR INSPECTOR COMP. BUENA VISTA RD. RECONSTRUCTION CASTLE & COOKE LESH 40% VALLEY PLAZA STORM DRAIN COLOMBO CHOATE 90% PM 9329 STOCKDALE HWY, CSUB - OLD RIVER CASTLE & COOKE LESH 100% PM 10406 CALLOWAY DR. N/OF STOCKDALE GLENWOOD GARDENS LESH 0% PM 10456 COFFEE RD @ ROSEDALE HVVY HOPPER PROPERTIES PIERCE 50% TR 5369 MONITOR & PACHECO AMERICAN HOME ALLIANCE MITCHELL 30% TR 5386-D S/O BRIMHALL, E/O CALLOWAY TURMAN LESH 95% TR 5418-4 VERDUGO & NORIEGA KYLE CARTER LESH 40% TR 5418-6 VERDUGO & NORIEGA KYLE CARTER LESH 60% TR 5426-A HOVVELL & OLD RIVER CASTLE & COOKE LESH 99% TR 5426-B & C S/O STOCKDALE, W/O OLD RIVER CASTLE & COOKE LESH ' 90% TR 5426-D STOCKDALE & OLD RIVER CASTLE & COOKE LESH 90% TR 5426-GI'S/OF STOCKDALE & W/OF OLD RIVER CASTLE & COOKE LESH 30% TR 5427 'OLD RIVER & MING AVE. CASTLE & COOKE LESH 10% TR 5429-A - F WHITE LANE & OLD RIVER -- PRIVATE TRACT CASTLE & COOKE-PRIVATE MITCHELL 40% TR 5433-2 i BERKSHIRE & AKERS ENNIS DEVELOPMENT MITCHELL 35% TR 5436-2 & 3 I RIVERLAKES & NORTH SHORE DRIVE COLEMAN LESH 65% TR 5478-2 & 3 COFFEE RD S/O OLIVE DRIVE LESH 30% TR 5479-1 S/O OLIVE DR & W/O COFFEE ROAD COLEMAN LESH 40% TR 5489-C BRIMHALL & OLD FARM CASTLE & COOKE LESH 100% TR 5544-D1 BRIMHALL & VERDUGO CASTLE & COOKE LESH 95% TR 5544-D2 BRIMHALL & VERDUGO CASTLE&COOKE LESH 95% tR 5544-D3 BRIMHALL ROAD & VERDUGO LANE CASTLE&COOKE LESH 99% TR 5552-A & B I RENFRO RD. & STOCKDALE HWY. WEST KERN DEVELOPMENT LESH 30% TR 564~2 FAIRFAX RD @ VALLEYVIEW DR W.D.J. CORPORATION MITCHELL 75% TR 5650-D HARRIS & RELIANCE CASTLE & COOKE MITCHELL 10% TR 5664-1 PANAMA & RELIANCE NORMAL DEVELOPMENT COR MITCHELL 95% TR 5680-E E/OF CALLOWAY S/OF BRIMHALL CASTLE & COOKE LESH 5% TR 5688-J HARRIS & SUMMER SPRING KYLE CARTER MITCHELL 30% TR 5699-2 i PANAMA @ FARMER'S CANAL COLEMAN MITCHELL 70% TR 5716-3 I MAIN PLAZA/GRANITE FALLS DEWALT LESH 55% TR 5716-6 MEACHAM & MAIN PLAZA DEWALT LESH 35% TR 5809-C PANAMA LN. & UNION WATTENBARGER MITCHELL 30% TR 5835-C HARRIS & ASHE CASTLE & COOKE MITCHELL 30% TR 5836-A CALLOWAY S/O BRIMHALL CASTLE & COOKE LESH 85% ;TR 5838-C OLD RIVER & STOCKDALE CASTLE & COOKE MITCHELL 95% TR 5838-D & E OLD RIVER & STOCKDALE CASTLE & COOKE LESH 20% TR 5841-A I BROOKSIDE & N. LAURELGLEN TURMAN PIERCE 100%1 TR 5845 A&B PANAMA LN. & RELIANCE CASTLE & COOKE MITCHELL 0%: TR 5846-A i HARRIS & ASHE CASTLE & COOKE MITCHELL 40% TR 5846-B - D HARRIS & ASHE CASTLE & COOKE MITCHELL 0% TR 5848A,B&C CAMPUS PARK/OLD RIVER CASTLE & COOKE MITCHELL 60% TR 5859 NW CORNER PANAMA & UNION CARRIAGE HOMES MITCHELL 30% TR 5863-A-G BUENA VISTA & MING AVENUE CASTLE & COOKE LESH 90% TR 5869-1 CALLOWAY S/O BRIMHALL BURLINGTON HOMES LESH 65% TR 5872-1 WHITE LN. & MOUNTAIN VISTA MIKE SOPER MITCHELL 90% TR 5873-1 PANAMA LN. & MONITOR ST. ALMOND TREE DEVELOPMEN1 MITCHELL 95% TR 5873-2&3 PANAMA LN. & MONITOR ST. ALMOND TREE DEVELOPMEN1 MITCHELL 30% TR 5876-B MING & OLD RIVER CASTLE & COOKE LESH 25% TR 5877-B MING & OLD RIVER CASTLE & COOKE LESH 5% CONSTRUCTION INSPECTION PROJECT STATUS CAPITAL IMPROVEMENTS 04~01/98 START EST. COM % PROJECTS TYPE CONTRACTOR INSPECTOR DATE DATE COMP BAKERSFIELD CONVENTION CENTER BLOCK 350 PARKING LOT KERN ASPHALT 05/01/98 0% BAKERSFIELD CONVENTION CENTER BLOCK 370/371 PARKING LOT KERN ASPHALT 05/01/98 0% BANK STREET SEWER LIFT STATION PATSCHECK ELECTRIC 04/15/98 0% BEACH PARK STORM DRAIN LIFT STATION W.M. LYLES ALLEN 04/01/98 0% BUENA VISTA ROAD REPLACE TRUNK SEWER UTAH PACIFIC CONST. BOLANOS 12/17/97 05/08/98 61% CALIFORNIA AVE @ OAK ST STREET WIDENING GRIFFITH COMPANY 04/15/98 0% CHESTER AVENUE HARDSCAPE CONSTRUCTION GRANITE CONSTRUCTION FICK 09/22/97 04/15/98 95% CHESTER AVENUE LANDSCAPE CONSTRUCTION ELITE CONSTRUCTION FICK 09/22/97 03/18/98 99% COFFEE ROAD (~ OLIVE DRIVE TRAFFIC SIGNAL AC ELECTRIC 04/30/98 0% FIRE STN. NOS. 4, 5, 6, 7 & 8 PAINTING S.K. PAINTING PATTERSON 09/09/97 11/05/97 15% FRUITVALE AVENUE @ HAGEMAN RD TRAFFIC sIGNAL AC ELECTRIC 04/30/98 0% HAGEMAN ROAD @ RIVERLAKES DR. TRAFFIC SIGNAL LOOP ELECTRIC ALLEN 01/28/98 03/19/98 100% LAKE ST. BEALE TO ROBINSON STREET RECONSTRUCTION GRIFFITH COMPANY 05/01/98 0% PANAMA LANE @ SOUTH "H" ST. REPLACE SWR LIFT STATION PACIFIC RESOURCES CHOATE 03/16/98 05/13/98 5% PANORAMA DRIVE MEDIAN SURFACE RE-CONSTR. GRIFFITH COMPANY MILLWEE 03/15/98 05/01/98 0% 'SIEMON PARK ,RESURFACE TENNIS COURTS GRANITE CONSTRUCTION 05/01/98 0% S~INE ROAD @ RIDGEVIEW H.S. FLASHING BEACONS SPRING MOUNTAIN INC FICK 04/06/98 0% OLD CORPORATION YARD I DEMO STORAGE BUILDINGS I STURGEON & SON ALLEN 04/01/98 0% TRUXTUN AVE @ OAK ST STREET WIDENING GRIFFITH COMPANY 04115/98 0% VARIOUS LOCATIONS I SWR LIFT STN. IMPROVEMENTS I FLO-SYSTEM, INC. MILLWEE 04/06/98 40% VARIOUS STREETS BIKE LANE STRIPING SAFETY STRIPING ALLEN 07/14/97 04/30/98 90% VARIOUS STREETS 'RESURFAClNG ~GRIFFITH COMPANY BOLANOS 08/18/97 05/30/98 32% VARIOUS STREETS REPLACE SIDEWALKS GRIFFITH COMPANY MILLWEE 02/11/98 04/10/98 98% WHITE LANE STREET WIDENING STURGEON & SON CHOATE 03/16/98 05/01/98 10% BOYLE A Part~~Pr~~ CONSTRUCTION PROGRESS SUMMARY February 9, 1998 through March 31, 1998 CONSTRUCTION PROGRESS: Kiewit Pacific Co. completed the following work: Site: Completed perimeter fencing modifications. Primary Clarifier: Completed the excavation for Primary Clarifier #3. Trickling Filters: Completed excavation of the three (3) new Trickling Filters. Started the foundation footings on all three of the Trickling Filters. Placed concrete for the slab on grade and the lower walls of the Recirculation Pump Station. Secondary Clarifiers: Excavation is complete for the Secondary Clarifiers. Digesters: Excavation for the Digester Control Building, and the two (2) new Digesters, is nearly complete. Site Electrical: Performed preliminary pot holing of existing electrical ductworks. PLANNED ACTIVITIES FOR APRIL 1998 Primary Clarifier: Install piping below the structure. Trickling Filters: Continue with concrete foundation walls and piping on the Trickling Filters. Continue with the walls on the Recirculation Pump Station. Secondary Clarifiers: Install the influent piping and start the perimeter footings. Digesters: Begin the slab on grade for the Digester Control Building. Site: Begin installing conduit racks in the Primary Sludge Pump Station. COVER PHOTOS: Upper Left: Sludge Pump Station Walls. Protective "T-Lock" Liner shows white on interior wall surface. Lower Left: Secondary Influent Splitter Box. This structure "splits" or divides the flow evenly to the three (3) Secondary Clarifiers. Lower Right: "Parmering" banner installed on site. Page 1 SIGNIFICANT ACCOMPLISHMENTS · A formal PARTNERING session was held on February 25, 1998. The Session was facilitated by FMI Management Consultants. The Session was attended by The City of Bakersfield, Boyle Engineering Corporation, Kiewit Pacific Company and Black & Veatch. Major sub-contractors to Kiewit Pacific Company included DYK Incorporated (Digesters), Murphy Industrial Coatings (Coating and Paint), Sachs Electric (Electrical) and Tri-Steel Corporation (Reinforcing Steel) also attended. The session was extremely successful. The partnerships created continue to preserve a team attitude on the project. A copy of the Partnering Charter is attached. · A Value Engineering session was held immediately following Partnering. The session was held on February 26 and 27 and was attended by Kiewit Pacific Company, their major subcontractors, The City of Bakersfield, Boyle Engineering and Black & Veatch. The format followed generally accepted value engineering practices and principles and was facilitated by Black & Veatch. The major items identified are currently under review, design and pricing. Despite major rainfall events, work proceeded well. The work in progress was secured before the rain events and minimal damage occurred. No damage occurred to any of the permanent work. This was a significant accomplishment given the fi-equency and severity of the storms. AREAS OF CONCERN · None PROPOSED CHANGE ORDERS · Relocate Communication Lines · Repair 6" Water Line at Primary Clarifier No. 3 · Repair Communication Lines south of Septage Receiving Station · Rain Day Time Extensions · Trailer set up changes · Conduit for future power to the Trickling Filter distributors. Page 2 VALUE ENGINEERING PROPOSALS · Existing Digester Modifications · Existing and new Co-Generation Modifications · Piping changes to the Sludge Drying Beds · Miscellaneous smaller items REQUEST FOR INFORMATION · 22 RFIs processed as of March 31, 1998 · 4 Days on average turn around. SHOP DRAWINGS · 83 Shop Drawings have been processed as of March 31, 1998 · 9 Days on average turn around. Page 3 CONSTRUCTION PROGRESS SUMMARY DESCRIPTION STATUS Notice to Proceed Dated February 9, I998 Contract Time, Calendar Days 730 Original Completion Date February 8, 2000 Substantial Completion Date May 7, 1998 Time Extensions Approved -0- Weather Delay Days Requested 7 Revised Completion Date February 8, 2000 Original Contract Amount $29,239,800 Change Orders Approved -0- Revised Contract Amount $29,239,800 Amount Earned This Period $1,158,873 Amount Earned to Date $1,158,873 Percent Complete, $ 3.96 Calendar Days Used 51 Percent Complete, Calendar Days 4.10 98-011 Page 4 BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM DATE: APRIL 21, 1998 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR SUBJECT~- - HIGH SPEED RAIL We have just been informed by Dale Hawley that a meeting on the High Speed Rail project will be held in Bakersfield on May 20, 1998. No other information is currently available as to location or time. As those details are made available, we will immediately inform you. In a related matter, Jack LaRochelle of Public Works has been asked to be a member of a sub- committee to the Kern Transportation Foundation on High Speed Rail matters. Sub-committee members include LaRochelle, Roy Wegand of Kern Tax, Ron Brummett of KernCOG and Roger McIntosh. One of the main goals of the sub-committee is to establish an area-wide consensus on the High Speed Rail terminal location. As directed, we will lobby for a downtown site. BAKERSFIELD pUBLIC WORKS DEPARTMENT TO: Alan Tandy, City Manager FROM: Raul M. Rojas, Public Works Director ~~~ DATE: April 20, 1998 SUBJECT: Trees on Saddle Drive Tract 5872 is a 55 lot single family residential tract located on Panama Lane between Saddle Drive and Mountain Vista Drive, north of Tevis Ranch. The trees in question were planted several years ago by Community Construction as a means of beautifying the entrance to their housing development. Until recently, this landscaping was maintained by Community Construction. It will now be maintained by the Consolidated Maintenance District. Community Construction also planted trees and grass and built a rail fence along White Lane - this area will remain under Community Construction's maintenance. The existing landscaping consists of lawn and mature trees. Some of these trees are one and one half to two feet in diameter. The landscaped area was originally graded to slope upwards from the street. In order to accommodate this landscaping, the developer gave an additional easement to the City so that the required block wall could be installed adjacent to Saddle Drive. The standard sidewalk placement was modified for this tract and will be placed next to the wall in some areas, rather than next to the curb. However, the additional easement is not enough to construct a sidewalk and not encroach into the trees. Also, since the trees had extensive surface rooting, it proved impossible to either install the block wall or place the sidewalk anywhere near the trees without cutting the trees roots. The City's arborist has inspected these trees and has determined that they must be removed, since the root damage renders the trees liable to falling over and will affect the trees' health. The developer will be required to replace these trees and fix the landscaping. S:\MEMOS\T5872 Trees.wpd RMR:mps xc: Reading File Project File Jacques R. La Rochelle Marian P. Shaw