Loading...
HomeMy WebLinkAbout11/18/05 B A K E R S F I E L D CITY MANAGER'S OFFICE MEMORANDUM November 18, 2005 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager /-~7-/z¥ SUBJECT: General Information 1. Several members of staff met to attempt to run Ward boundary scenarios which attempt to incorporate the Council discussion from November 9th. A very loose translation from that discussion was that none of the scenarios we had run were a "home run", and we were asked to look at disparities in ward boundaries of more than ten percent, with justification for the short term. That was to be coupled with longer term solutions, such as going to an eighth ward and/or seeing if "contiguity" was mandated by State law. Enclosed you will find two new runs at "new solutions" with the short term issues in mind. By increasing the percentages of disparity, we think we lessen, though do not eliminate, some of the councilmembers' concerns. That would mean, however, redistricting would again be necessary before the 2008 election. Also enclosed is a draft of an eighth ward configuration. The idea of an eighth ward, while it does not resolve things for the 2006 election, seems to be a logical long term solution, though it requires a Charter election and not all the legal issues have been fully researched. The City Attorney is researching the contiguity issue. This item will be back on the November 30th agenda for further consideration. 2. You may have noticed that the Kern River near Beach Park has recently gone dry. This is a normal occurrence for this time of year. The excellent 2005 water year is drawing to a close, the City has reached the carry-over limit at Lake Isabella and river operations involving Kern River water are over. However, there is a very strong possibility of periodic flows to occur over the next few months if State water supplies become available or there is storm activity over the Kern water shed. 3. The Kern County Water Agency Board of Directors has extended the Kern River Parkway Water Agreement for the holiday period in 2005 through the July 4th holiday period in 2006. The KCWA had sent a letter terminating the agreement at the end of 2005, but City staff and the Water Board Chair, David Couch met with KCWA staff and board members and the result was the extension of the agreement. It was agreed that City and KCWA staff would work diligently to have Honorable Mayor and City Council November 18, 2005 Page 2 a new agreement in place prior to the end of the extension period. The goal of the new agreement is to stabilize a long term program to continue to have water in the Kern River channel through Bakersfield during Memorial Day through Labor Day holidays. 4. Chief Rector has prepared the enclosed report on the Police Department's plan of action for enhancing their gang enforcement enforcements. 5. A report is enclosed from Recreation and Parks Director Dianne Hoover concerning the City's tree trimming practices and costs for a systematic city-wide pruning program. The information is provided in response to a request from the Planning and Development Committee. 6. The Economic and Community Development Activity Report for the first quarter of this fiscal year, July through October, is enclosed for your information. 7. Per the enclosed memo, the McMurtrey pool will undergo the annual draining and maintenance work during the week of November 28th through December 5th. Those dates were chosen to cause as little inconvenience as possible to the users of the facility. 8. The October activity report from Recreation and Parks is enclosed. 9. The Public Works Street Division work schedule for next week is enclosed. 10. Responses to Council requests are enclosed, as follows: Councilmember Carson · Status report on the Stockdale Highway sewer service project; Councilmember Benham · Supplemental information provided on the City's website regarding the Veterans' Memorial Foundation; Councilmember Couch · Status on the County's efforts to construct Verdugo Lane from Brimhall to Shellabarger; · Report on the feasibility of using roundabouts in future development projects; · Repair of damaged traffic signs on River Run and Camino Media; Councilmember Sullivan · Staff report on the effectiveness of speed bumps. AT:rs cc: Department Heads Pamela McCarthy, City Clerk BAKERSFIELD POLICE MEMORANDUM Date: November 16, 2005 To: Alan Tandy, City Manager From: W.R. Rector, Chief. of Police`/'['' Subject: Gang Enforcement Strategy Over the scope of the last year we have seen a significant increase in gang related activity and specifically gang related shootings and homicides. Based on this increase we are enhancing our enforcement efforts inthe following ways: · On December 1,2005 we will be adding six officers and one sergeant to the gang unit, which will now total 20 officers and three sergeants. We haven't had an increase in personnel since 1999 yet City population has increased and gang activity has become more diverse in various areas in Metropolitan Bakersfield. This will also allow for better coverage each day of the week. · Continue to work with the community and neighborhoods affected by gang activity. We want to build those relationships in neighborhoods to gain information to prevent gang related crime and to solve investigations. · The Narcotics Unit will focus more time on street level sales of narcotics; which is a major source of revenue for gang members. · Continue to work closely and share information with the Kern County Sheriff's Department, Kern County Probation Department gang units and Kern County District Attorney's Office. We have also established a liaison with our local state parole office. · Through the media,.encourage the community to use the Secret Witness and Gang Tip Hot-line to confidentially report gang activity. · Continue to place focus on youth intervention programs such as P.A.L./School Resource Officer Programs; to impact youth prior togetting involved in gangs. · Utilize the resources of the local FBI and DEA offices in .investigations. · Evaluate the use of emerging technology such as video cameras to prevent crime and identify suspects. · Evaluate'the use of civil injunctions against gang members in certain areas of the community and use existing abatement statutes to impact specific residences or businesses where gang/narcotic activity is occurring. Again, the above listed plan of action is an enhancement of our current gang enforcement strategy. Department staff will have on going dialogue with other law enforcement agencies to identify what was successful in other cities in combating gang crime. Please call if you have any questions. WRR/vrf 1 5 2005 .... . . ....~. ~ B A K E R $ F I E L D Department of Recreation and Parks Date: November 14, 2005 To: Alan Tandy, City Manager From: Di f Recreation & Parks Subject: Attached At the previous Planning and Development Council Committee meeting', Councilmember's Benham and Couch requested information on our tree trimming practices and recommendations for a systematic city-wide pruning program. The attached includes: · Current staffing and equipment for tree maintenance Cost of staffing and equipment for 8 year city wide pruning program · Contractual systematic pruning costs · Staff recommendation and associated costs Please let me know if you need additional information. Estimated Pruning Cycle Parks Division November 8, 2005 CURRENT EXPENSES Staffing of(7) at step 5: (3) Tree ll's, (4) SMW's, (1) Supervisor 1 and (1) Supervisor 11. Staffing '05-06 Annual Cost $558,678 All staffing expenses are noted at step 5 with a current benefit package estimate. Our current personnel comprise a combination of only two full crews. Normal operations consist of street, alley and sign clearance, removals, safety trimming, emergencies, green waste collection, fallen trees and branches, plantings, residential, council request and intermediate pruning cycle work. With significant building activity comes tremendous requirement to address new tree issues. In 2004, developers planted an estimated 2,100 trees. Currently, we have inventoried approximately 42,000 trees located within of all parks and all Maintenance District streetscapes and medians throughout the city as of March 2005. We estimate this number to approach 100,000 - 120,000 trees upon the additional count of city easements/rights of way trees 'Our culmination of data over the last two years reflects close to 50% of our time spent within the General Fund and Maintenance District performing our various Urban Forestry activities. Existing Equipment 2004-05 Annual M&O 55' Aerial Truck #4299 $ 16,357 55' Aerial Truck #4300 16,357 Chipper #4305 5,469 Converted Chipper (Dump) Truck 7,433 Stump Grinder #4303 3,278 Loader #4370 15,012 Brush Truck #4390 11,753 Brush Truck #4391 8,944 Brush Truck # 4136 8,700 Brush Truck #4140 6,404 Brush Truck #4382 10,116 Brush Truck #4383 10,116 Dump Truck-Bobtail #4340 10,733 '04-05 Actual Annual M&O Cost $130,672 Existing Staff and Annual M & O Cost $ 689,350 ADDITONAL CREWS AND EQUIPMENT TO MEET 8 YEAR PRUNING CYCLE Additional Equipment Purchase Costs (1 Time costs) (7) 55' Aerial Lift Trucks $105,000 x 7 = $ 735,000 (7) Brush Chippers 30,000 x 7 = 210,000 (7) Chipper Box Trucks 55,000 x 7 = 385,000 (2) Walk-Behind Stump Grinders 19,000 x 2 = 38,000 $1,368,000 One Time Acquisition Costs $1,368,000 Estimated Annual Maintenance and Operation Costs (7) 55' Aerial Lift Trucks $16,357 x 7 = $114,449 . (7) Brush Chippers 5,469 x 7 = 38,283 (7) Chipper Box Trucks 10,733 x 7 -- 75,131 (2) Walk Behind Chippers 3,000 x 2 -- &000 $233,863 Annual M&O Estimate $ 233,863 Additional Personnel (7) Tree Maintainer II $421,667 (14) SMW 720~740 $1,142,407 New Additional Annual Personnel Costs $1,142,407 Estimated Annual M & O Costs 233~863 $1,376,270 One Time New Equipment Acquisition Costs $1,368,000 New Annual Additional Personnel and M & O Costs 1~376~270 $2,744,270 CONTRACT SERVICES (West Coast Arborist) Estimated unit price $55.00 per tree (average cost) 100,000 Trees 5 year cycle cost = $1.1 million annually 8 year cycle cost = $700,000 annually Additional work to provide an audit only, no G.I.S. map, at time of pruning is an additional $2 per tree. G.I.S. mapping services, compatible to City software, can be provided for $4 per tree. RECOMMENDATION Contract out a substantial portion of our annual tree pruning work load. Budget the estimated $700,000 cost towards block pruning activities. Add one (3) person crew to assist with existing tree pruning activities. In conjunction with city staff, the combination will help achieve our target of an 8 year pruning cycle for all trees within the city's streetscape, medians, parks and easement/right of ways. The summary below also addresses a key element of continual tracking of our Urban Forest assets via a recommendation to hire a person at Park Technician comparable rates. This person would have botanical and computer knowledge sufficient to keep the asset inventory updated. Again, all City labor rates are adjusted to include current benefit package estimates. Annual Acquisition Cost M&O Cost (1) 75' Aerial Lift Truck (Taller) $140,000 $19,000 (1) Brush Chipper 30,000 5,469 (1) Chipper Box Truck 55,000 10,733 (1) Walk Behind Stump Grinder 19~000 3,000 $244,000 $38,202' (1) Tree Maintainer II $ 60,238 (2) SMW 102,962 (1) Park Tech (G.I.S.) 78,069 $241,269 One Time Acquisition Cost = $244,000 (not included below) Annual M & O Estimate = $ 38,202 New Additional Annual Personnel Cost = $241~269 Annual M & O + New Labor Cost = $279,471 SUMMARY OF RECOMMENDED COSTS Existing Urban Forestry '04-05 M & O and Labor $ 689~350 Recommended: New Crew & G.I.S. Technician $ 241,269 New Equipment Acquisition 244,000 New Annual M & O 38,202 New Contracted Services 700~000 Recommended Revisions to Urban Forestry $1,223,471 Existing U.F. Labor, Annual M & O Plus Recommendations $1,912,821 S:\Urban ForestryX2005~Estimated Pruning Cycle 111 U0¥ 1 6 D05 B A K E R S F I E L t Economic and Gommunity Development Department MEMORANDUM November 16, 2005 TO: Alan Tandy, City Manager FROM: Donna Kunz, Economic Development Director ~ (:~ff~ SUBJECT: Economic and Community Development Department Activity Report This memo will serve as the first update for Fiscal Year 2005-06, 1st quarter (July 1 to October 1) concerning on-going housing, economic and community development projects. CAPITAL IMPROVEMENT PROJECTS (Public Works is the lead department) l. Acquisition and Demolition Proqram Funds in the amount of $423,853 (FY03-04, FY 04-05 and FY05-06) are available from for acquisition and demolition of deteriorated industrial, commercial and residential properties in economically distressed areas for economic development projects. EDCD Staff has selected specific sites potentially eligible for these funds in the Baker Street corridor in connection with the Old Town Kern Mixed Use Project. The acquisition process is near completion and demolitions have been scheduled for the remaining multiple commercial sites and will be completed by December. 2. Baker Street Streetscape Improvement Project (Phase II) Final approval of HUD's Special Economic Development Initiative (EDI) has been received. As part of award, the City will have $277,760 for use towards the Baker Street Corridor, streetscape improvement project. Project funding includes $531,000 (FY03-04 and FY05- 06) of CDBG funds. The project includes streetscape improvements on Baker Street, from Truxtun Avenue to the south and Jackson Street to the north. Streetscape elements are to include the installation of trees, tree grates, automatic irrigation, lights with banners, and trash cans. The project will reconstruct the railroad crossing; install curbs, gutters, sidewalks and streetlights between Sumner to Jackson streets. This location was designated by staff as the best suited site for the use of these monies since Phase 1 was composed of blocks between Jackson and Niles streets. Additionally, the railroad tracks act as a natural divider for Baker Street. City Staff is still waiting for the Union Pacific Railroad to provide a preliminary schedule in order for the City to put a final project schedule together. S:\DEBBIE'S\lst quarter final update 2005-06.doc 1 3. Fire Station #5 Construction Prolect Funds in the amount of $4,124,000 (Southeast tax increment- $1,090,000; CDBG funds - $1,024,000 FY04-05 and 05-06; State Supplemental Law Enforcement Safety grant - $410,000; and pending approval of a Section 108 Loan - $1,600,000) were budgeted for acquisition, design and construction of a new Fire Station No. 5 to be located at 102 East White Lane. Property management completed site acquisition in December 2004. The agreement for project design with RRM Design Group was approved April 2005. Design is expected to be completed by January 2006. Construction is scheduled to start by June 2006 and is targeted to be completed by no later than April 2007. 4. 19th Street and Eye Street Streetscape Improvement Project Funds in the amount of $344,000 (FY03-04 and 04-05) were budgeted for streetscape improvements on 19th Street from H to Eye streets and on Eye Street between 18th and 19th streets. Construction was delayed due to area drainage problems which have been resolved. City staff is currently working on the redesign. With the redesign, new landscaping and street lighting and other improvements will be added. Construction is scheduled to start in 2006. 5. The Park at Riverwalk Improvement Project Staff received a Jobs Housing Balance Incentive Grant in the amount of $314,822 from the California Department of Housing and Community Development. The grant requires funds to go towards construction of the children's playground at the park. The park is located at the southeast corner of the intersection of Stockdale Highway and the Kern River. Construction is underway is expected to be completed by early 2006. 6. Southeast Bakersfield Street Improvement Project Funds in the amount of $300,651 (FY 02-03) were budgeted to install curb and gutter and to rehabilitate sidewalks in an area bordered by California Avenue on the north, Pershing Street on the east, Brundage Lane on the south and Q Street on the west. Construction is now complete. 7. Southeast Bakersfield Street Light Improvement Project Funds in the amount of $81,621 (FY01-02) were budgeted to upgrade street lighting in southeast Bakersfield. Due to a shortage of City forces and/or funds available to complete the project, the project will have to go out to bid to a private contractor. The Engineer's estimate for the project is $140,500. General Services is deciding whether or not to downsize the project to fit the available budget, or to cancel the project at this time. 8. P Street Area Sewer Project Funds in the amount of $250,114 (FY05/06) were budgeted for the installation of sewer lines on P Street between the Kern Island Canal and 2nd-street and on 2nd Street between P and N streets. Public Works has completed the bidding process and the bid was awarded to Nicholas Construction in the amount of $238,114. The agreement was approved by Council last month and a pre-construction meeting was held on October 19th with construction starting no later than November. Construction is anticipated to be completed by December, 2005. S:\DEBBIE'S\Ist quarter final update 2005-06.doc 2 9. Street Reconstruction Project- Wards 3, 6, and 7 Funds in the amount of $700,000 (FY05/06) are budgeted for street reconstruction and · · th sidewalk mstallabon on the follow ng areas: 38 Street from Jewett Avenue to K Street; San Dimas Street from West Columbus to 38th Street; portions of eleven streets in area bordered by Parker Avenue on the north, Real Road on the east, Wilson Road on the south and Old Stine Road on the west; and portions of nine streets in an area bordered by Beryl Drive on the north, Monitor Street on the east, Ivan Avenue on the south and Balboa Drive on the west. The Purchasing Division has recently gone out to bid on the City's annual Curb, Gutter and Sidewalk contract. Bids have been received and staff is reviewing the bids for responsiveness. Street reconstruction projects will begin after an annual contract is executed this year. 10. Chester Avenue Streetscape - Phase II in OTK-P In January 2005 staff submitted a Transportation Enhancement Activities (TEA) application requesting $653,300 to continue enhancements along the public right-of-way along Chester Avenue between 24th Street and Garces Circle. The TEA funds will be combined with $312,000 CDBG funds (FY05-06), $310,300 Gas Tax funds, $490,000 Capital Outlay funds, $148,458 Workforce Housing Incentive grant, and $200,000 tax increment funds for an estimated total project cost of $2,114,058. The project is approximately one half mile in length by 110 feet wide encompassing a total of 6.7 acres. The project includes installation of street trees and shrubs along the center median and parkway, new kiosks, decorative benches, tree grates, automatic irrigation, bollards, decorative lights and trash receptacles. Project construction is anticipated to begin Spring of 2006, and completed in Fall 2006. CITY PUBLIC SERVICE PROJECTS (Projects implemented by the Fire Department and Bakersfield Police Department) 1. Fire Protection Services City of Bakersfield Fire Department will utilize $252,000 in FY05-06 CDBG funds to pay for salaries and benefits for three firefighters for Station #5 at 700 Planz Road, which will continue full strength crews of four persons per shift. Services are underway and on-going. 2. East and Southeast Crime Prevention The Bakersfield Police Department is using $227,000 of FY05-06 CDBG funds pay for salaries and benefits for four police officers for increased police coverage in East and Southeast Bakersfield which provides a higher level of public safety for this Iow income area. This activity will benefit 23,162 citizens of Bakersfield within the boundaries of Highway 178 north, Oswell Street and* City Limits east, White Lane south, and Union Avenue west. Services are on-going. S:\DEBBIE'SVI st quarter final update 2005-06.doc 3 NON-PROFIT/PUBLIC FACILITY PUBLIC SERVICE PROJECTS The following various non-profit organizations are being assisted by staff to improve, the level of service for operating their public facilities. 1. Bakersfield Senior Center An Agreement with the Bakersfield Senior Center (BSC) located at 530 4th Street was approved by City Council on October 26th for $50,000 (FY05-06 CDBG funds). BSC will use the funds to continue its current level of services to seniors in southeast and central Bakersfield. The services provided include: noon time meals, recreational activities, physical fitness activities, senior advocacy, human services referrals, and transportation for clients. Services at the center are on-going. 2. Bakersfield Homeless Center Agreement #05-340 between the City and the Bakersfield Homeless Center was approved for ESG funds for $60,875 by the City Council on September 28, 2005. The approved FY05-06 funds will be used for operation and maintenance. 3. Bakersfield Rescue Mission Agreement #05-341 between the City and the Bakersfield Rescue Mission was approved for ESG funds for $60,875 by the City Council on September 28, 2005. The approved FY05-06 funds will be used for operation and maintenance. 4. Alliance Against Family Violence and Sexual Assault Agreement #05-354 with Alliance Against Family Violence was approved for $15,000 in ESG funds by the City Council on October 7, 2005. The approved FY 05-06 funds will be used for operational expenses. HOUSING, ECONOMIC AND NEIGHBORHOOD REVITALIZATION PROJECTS The following private and non-profit organizations are being assisted by staff to acquire, develop or improve their housing and neighborhood/commercial facilities. 1. Habitat for Humanity An agreement was executed that allows Habitat to utilize a total of $100,000 in CHDO HOME funds to build five affordable single family homes. These homes will be sold to families whose income is between 30% and 50% of the area's median income. The selected Habitat family and volunteers provide the needed sweat equity labor to construct the homes. In addition to assisting with acquisition costs, the loan to Habitat assists in paying for such construction costs as school fees, building permits, appraisal fees and construction supervision. Habitat initially has access to $50,000 to expend within 18 months. If they perform satisfactorily, Habitat may access the additional $50,000 to expend also in 18 months. Habitat currently has the property located at 337 Haley in escrow and is clearing up title problems so that the property may be legally purchased. S:\DEBBIE'S\lst quarter final update 2005-06.doc 4 2. Tax Defaulted Properties The County of Kern compiled a list of real properties for which property taxes have not been paid for a minimum of five years. Pursuant to the County selling these properties at auction, the City can object to the sale of the properties and purchase them for future public use. EDCD staff has been successful in gaining the right to purchase six properties over the past few years. The current tax sale took place in August of this year and EDCD staff objected to the sale of 13 properties. Of the 13 properties, 11 were available to purchase and two were redeemed by the property owners. Four of the properties located on Union Avenue and zoned commercial are part of the 11 with the remaining properties all residential empty lots in the Southeast Redevelopment Area. A resolution by the RDA to purchase the properties has been executed and the purchase agreements and other necessary paperwork have been forwarded to the County of Kern for the final steps in the purchase process. Processing by the County and the State of California should be completed by the end of the year. 3. The Parkview Cotta.qes Housin.q Project The City was awarded a $1.2 million HELP loan which was used to acquire a portion of the old foundry site located at 21st and "R" streets. The project consists of 74 single-family housing units, ranging from 1,280 to 1,820 square feet. Each unit will be two stories and have a two/three car garage. The estimated total project cost is $10.4 million of which $1.4 in HOME and $970,000 in RDA funds have been set aside for the City's Down Payment Assistance program. Nine homes are currently under construction. Three units have been completed as models. A ribbon cutting was held on October 20th. The anticipated completion date for the entire project is November 2006. New home owners are expected to be moving in by no later than the first of the year. 4. Southeast Bakersfield Infill Housin.q Project The City was awarded a $500,000 CalHFA loan to build affordable housing on scattered lots in southeast Bakersfield. The RDA assumed all rights and obligations of the loan on February 26, 2003. Round four of the infill housing project is expected to begin in January 2006. A RFP for licensed builders was sent out. Hybrid Construction and Fallgatter Construction were selected participate. Key round four changes include: increasing the loan amount from $100K to $200K; providing down payment assistance up to $40,000; providing a lot rebate to the builder of $20,000; and increasing the project area boundary to include the entire Southeast Redevelopment Project area. These changes are necessary due to rising construction and lot costs. The agreement time frame will be in place for two years and the contractors will be obligated to complete at least four homes within the two- year period which expires July 2007. To date a total of sixteen new homes have been constructed. When the program was first initiated lots were available in the price range of $ 7000 to $10,000. Currently this range has increased to $65,000. 5. Bakersfield Colle.cle Foundation Construction Alliance for Student Achievement (CASA) Pro.qram The Redevelopment Agency approved the donation of three residential lots to Bakersfield College Foundation (BCF) to build infill affordable homes in the Southeast. Bakersfield College (BC) was awarded approximately $500,000 in HUD 2004 funding under the Hispanic Serving Institutions Assisting Communities (HSIAC) program. This grant will be used to fund the Construction Alliance for Student Achievement (CASA) project. S:~DEBBIE'S\lst quarter final update 2005-06.doc 5 BCF has collaborated with Bakersfield College, Coleman Homes (Lennox currently) and other agencies to train students in the construction trades. The CASA program will enhance job opportunities among Iow income residents while assuring developers and construction firms have an adequate skilled labor pool to meet market demands for affordable housing. This activity would address the demand for skilled craftsmen/women in the construction field, and provide job training skills among minority populations within older impoverished neighborhoods of Bakersfield. Bakersfield College has 10 students enrolled in its CASA program and attending classes currently. The CASA program will be participating in the Southeast Bakersfield Infill Housing Project. The three lots are currently being transferred to Bakersfield College and they are preparing to begin construction on the first lot. BC will also receive an infill housing loan from the CalHFA funds for $100,000. Staff anticipates construction to commence by November 30, 2005. 6. Single-family Rehabilitation (SFR) Pro.qram The remaining funding for FY04-05 is being used for those applications that were in various stages of the process of approval. Current rehabilitation is underway on seven home improvement projects. Staff will continue to process the applications received prior to the program ending on July 1, 2005 until the funding is depleted. Approximately 25 housing rehabs will be completed with the available funding. 7. Home Accessibility (HA) Grant Pro.qram At the end of FY04-05 23 disabled families were assisted with home access improvements. An Agreement for $55,000 in HOME funds was approved by City Council on October 12, 2005. Currently, approximately 8 physically challenged families are awaiting use of the funding. Another 16 are in various stages of approval for use of the program pending their response to documentation requests. 8. LINC Housinq - West Columbus Apartments LINC Housing, Corporation (LINC) has requested $500,000 in HOME CHDO funds from the City of Bakersfield to assist in the construction of 50 units of multi-family housing. The funds would be used for the acquisition of the property and pre-development costs for the proposed two and three bedroom townhouse style units. A purchase agreement is in place between LINC Housing and the property owner for the purchase of the project property located at 500 West Columbus Avenue. The 50 units will consist of 30 three-bedroom units and 20 four-bedroom units, 1,000 and 1,200 square feet respectively. Future rents will be subject to federal, HOME restricted rent schedules. The total project cost is approximately $15 million and is proposed to be financed using various funding sources including TCAC funds. The Environmental Assessment has been completed and is currently under the public comment period. A Request for Release of Funds will be requested from HUD in early November. The agreement between LINC and the City of Bakersfield for the $500,000 in HOME CHDO funds is currently being drafted and is anticipated to be executed by the end of the year. The funds will come from FY04 and FY05 HOME CHDO funds. S:\DEBBIE'S\lst quarter final update 2005-06.doc 6 9. Fair Housin.q Quarterly statistics compiled from reporting data collected from July through October indicate approximately 212 calls on the fair housing hotline. There were 23 substantial service calls that dealt with fair housing issues. There were four complaints filed this quarter. One complaint was forwarded to DFEH and the remaining three were handled by staff. The fair housing discrimination complaints and inquires to the Fair Housing Hotline breakdown as follows: Familial Status - 25%, Race- 50%, Religion- 25%. 10. Restoration Community Proiect lnc., (RCPI) Youth Buildin.q Bakersfield (YBB) An agreement with RCPI was approved in 2002 that provided up $195,000 in CHDO HOME funds for the purchase and rehabilitation of deteriorated housing in the Lakeview Avenue area. The agreement required RCPI to employ at-risk youth from 16-24 years of age to do the rehabilitation work. YBB would have a training component for the youth, an educational component to secure a GED, and other counseling and referral services. The program was to last for three years after which, graduates would receive a monetary bonus and referral to apprenticeship programs or higher education. The rehabilitated homes were to be sold to Iow income families and the sales proceeds used to purchase and rehabilitate other properties in the target area. A property, located at 1306 Potomac, was acquired and rehabilitated through the Youth Building program and sold on March 23, 2005. Since that time RCPI has not purchased another property. The agreement with RCPI expired in September 2005. Staff met with RCPI and prepared a letter formally canceling the program and requesting remittance of the escrow proceeds from 1306 Potomac (approximately $50,000). 11. Baker Street Revitalization Project (Old Town Kern Mixed Use Project) The revised development proposal with Triumph Companies for the Baker Street Village includes 49,200 square feet of new retail, the rehabilitation of a 20,000 square foot, 2 story building/with a basement that has been vacant for a number of years, 28 lofts to be built over several new retail buildings on Baker Street, a separate 20 condominium unit complex and 30 new town homes. Staff has negotiated with Triumph Companies and a DDA will be prepared for RDA and City Council consideration in January 2006. The site has been assembled and demolition will be complete by December 31, 2005. Estimated total project value is about $21 million. The City has utilized multiple funding sources including a $1,000,000 Section 108 loan, $250,000 Brownsfield Economic Development Initiative (BEDI), $408,000 tax increment funds, and $696,000 CDBG funds to assist in land acquisition and relocation of existing businesses/tenants. 12. Employment Reports Staff continues to review annual (performance) employment reports for businesses that received CDBG funds. S:\DEBBIE'S\lst quarter final update 2005-06.doc 7 13. Community Family Center Ramp Construction Community Family Center (CFC) is receiving CDBG funding assistance for a ramp to a modular building owned by Praise Tabernacle Church to accommodate 34th Street Collaborative Meetings and other community service organizations. CFC's estimate to construct a ramp and overhead cover is about $10,000. Staff was able to allocate savings from a completed project for this activity through an amendment to the City's FY04-05 Action Plan. A federal environmental review was completed last March. The City Council project agreement for the ramp was executed last June and Praise Tabernacle has procured Alex's Mobile Home Services to build the handicap accessibility ramp and other improvements. 14. 24th and "M" Street Development (The Village at Towne Centre) Staff, through the Redevelopment Agency, worked with a local developer to acquire a vacant Caltrans parcel at 24th and M street. Staff received Caltrans approvals to purchase their parcel, which the Agency transferred to the developer for the same purchase price. The developer is currently constructing an upscale mixed use project at the long vacant (formerly Sangera Buick/Volvo) auto sales site across the street. The acquired Caltrans parcel will allow adequate parking for the future tenants. The project will contain over 40,000 square feet of commercial space at an estimated cost of $6 Million and is expected to be completed by 2006. 15. Mill Creek District Project The City has developed the Mill Creek conceptual improvement plan for the downtown canal from just north of Central Park to California Avenue. The improvement plan includes canal improvements, exercise areas, art areas, walking paths, designed to enhance the commercial/residential potential for downtown. The City was awarded a grant for $282,400 from the Kern Council of Governments (KernCOG) to help fund a segment of the trail and pedestrian bridges along the 1.5 mile linear park. In December 2004, the City submitted an application for 2002 ResoUrces Bond Act funding in the amount of $250,000 to the California Department of Parks and Recreation for the construction of canal walk hardscape in the first phase of the project. The City has secured the necessary funding to begin the first phase of construction design plans for the Mill Creek project. The design phase of the project is anticipated to go out to bid during 2006. Staff is continuing to search out additional grant opportunities for the project. 16. Bakersfield Redevelopment Areas Cleanup Effort (BRACE) This revolving loan program, funded by a $1 million grant from the U.S. Environmental Protection Agency (EPA), funded its first project. A subgrant of $51,050 was made to the Assistance League of Bakersfield to fund the cleanup of asbestos from its new location at 1924 "Q" Street. This first project assists the relocation of the Assistance League in order to make room for private development around the new Aquatics Center and Ice Sports facility. In the coming months, a major marketing effort will begin to promote the availability of-these funds in the three redevelopment areas. S:\DEBBIE'S\I st quarter final update 2005-06.doc 8 17. SW Bakersfield Chardonnay Tract Down Payment Assistance Pro.qram Last June, Council approved a resolution authorizing the application for $1,560,000 in State grant funds and participation in the Building Equity and Growth in Neighborhoods (BEGIN) Program to secure funding from the California Department of Housing and Community Development (HCD). These funds will be used to provide mortgage assistance to 52 Iow income first-time homebuyer families interested in purchasing a home within Tract Map 6170 which is a 260 lot residential development near Ridgeview High School (between Ryzona Dr. alignment and McKee Rd.). The Matthews Company, which owns the land, will develop 208 market rate homes. The development received a density bonus provision under Chapter Fifteen of the BMC (Section 15.79), and 20% of the total lots (52) are required to be constructed for lower income households with continued affordability for thirty years. The regulatory relief measures approved were modification of density and zoning standards. The density bonus lots of Tract Map 6170 will be purchased by Self- Help Enterprises and they have agreed to be the affordable housing developer for the 52 lots that will be receiving the BEGIN down payment assistance. The down payment assistance will be a 30 year (silent second) loan (deferred) at 1% simple interest. An award notification from State HCD was made in August and an agreement has been processed for the $1,560,000 grant. Construction is expected to be started by Self Help Enterprises by Spring of 2006. 18. Park Real Apartment Rehabilitation - KAH Kern Affordable Housing, Inc. (KAH) is a non-profit 501 (c)(3) charitable organization sponsored by the Housing Authority of the County of Kern. Their purpose is to develop, acquire, operate and maintain affordable housing through programs that are not available to the Housing Authority itself. KAH qualified to be a community housing development organization (CHDO) last fiscal year. An agreement was signed with the City of Bakersfield last June that grants to KAH approximately $300,000 in HOME CHDO funds for the rehabilitation on one of its converted HUD Section 236 projects. The project is known as the Park Real Apartments and they are located at 414 Real Road. KAH purchased the project property in 1991 to keep it as affordable housing units as it was in danger of converting to market rate. There are a total of 16 units in the Project, eight one bedroom units and eight two bedroom units. They are currently occupied by Iow-income families whose incomes are below 60% of the area median for family size. The $300,000 (FY02-03, $80,034; FY03-04, $191,487; and FY04-05, $28,479)in CHDO funds will be used exclusively for rehabilitation costs including: water heater replacement; painting; bathroom fixture replacement; kitchen fixture replacement; roof replacement; fence repairs and installation; flooring replacement; termite work; and other City approved rehabilitation items. KAH has 18 months from the date of the execution of the agreement to expend the funds. They are currently working on the bid package for the rehabilitation and should go out to bid by November, with rehabilitation work anticipated to start by the first of next year. S:\DEBBIE'S\lst quarter final update 2005-06,doc 9 19. Mill Creek South The proposed Mill Creek South project is the redevelopment of an area along California Avenue, south of 13th Street, between Q Street and on the east side of the canal from the railroad tracks to Union Avenue (50+ AC). Lennar has proposed 65,000 SF of commercial space to include retail, restaurants, community events and neighborhood service space and recreational areas and a residential component that will include 100 units of affordable rental housing and 600 units of various types of affordable and market rate urban style for- sale housing. In June 2005 staff submitted to HUD a Section 108 loan request of $3,750,000 and a Brownfields Economic Development Initiative (BEDI) grant request of $750,000 to assist with the development of the $33.3 million mixed-use Mill Creek South project. The project is a mixed-use commercial and residential plan that will include 100 units of affordable town-home style high rise two and three bedroom rental units along with 65,000 square feet of commercial development. The project is Phase 1 and is located in the Southeast Redevelopment Project Area, alongside the southern tip of Mill Creek. The restaurants in the planned retail development will have outdoor patio seating overlooking Mill Creek, a 1.5 mile stretch of agriculture canal which is being redeveloped into a major recreational amenity with a white water look and will travel through the heart of downtown Bakersfield. The planned $33.3 million, 8 acre mixed-use project will replace a contaminated auto wrecking yare and an auto repair and body shop. In addition, it will replace a dilapidated empty warehouse and a predominantly vacant commercial dilapidated building with several abandoned partial structures. On July 11,2005 the Bakersfield Redevelopment Agency (Agency) approved an exclusive negotiation agreement between the Bakersfield Redevelopment Agency and Lennar Communities, Bakersfield Division for the construction of the Mill Creek South project. The Agreement covers a period of 360 days from the date of execution to allow Lennar and the Agency to reach a Disposition and Development Agreement that will include the specific scope of the development and any Agency financial participation. S:\DEBBIE'S\lst quarter final update 2005-06.doc 1 0 CITY OF BAKERSFIELD Recreation &Parks DATE: November 16, 2005 TO: Alan Tandy, City Manager FROM: Dianne Hoover, Director of Recreation and ParksL#'/~,~/~ SUBJECT: McMurtrey- Annual Draining of Pool McMurtrey had experienced a high build up of salt in the water during its first years of operation. Staff had the chemical controller tested and re-calibrated along with a water specialist reviewing the chemicals being used. This specialist recommended we use , some "conditioners" to reduce the high salt count. It has reduced the problem in all areas of the complex but a once a year draining of the pool is necessary to minimize the salt levels and damage it may do to the pool equipment. We will drain the pool and perform maintenance during the week of November 28 thru December 5, 2005. While the pool is empty, we will be deep cleaning all of the tile and grout areas, re-painting the play structures in the splash area, waxing the slides and pressure washing the locker room areas. This period was chosen so it would inconvenience the least amount of groups and individuals. NOV 1 5 ~005 i Department of Recreation and Parks Date: November 15, 2005 To: Alan Tandy, City Manager From: Dianne Hoover,' Director of Recreation and Parks Subject: Monthly Report for October Attached are the monthly activity reports for each division. If you have any questions or require additional information, please let me know. B A K E R S F I E L D Department of Recreation and Parks Parks Division October aoos, Report PARK RESERVATIONS An estimated 22,969 people encompassing 149 different reserved events kept Park interest on a high note during the month of October. Pleasant temperatures helped promote vibrant usage of our park system. This of course does not include the thousands of people who utilize one or more of our many park settings each month in a nOon-reservable activity. NEW ACREAGE October saw 5 parcels awarded a Final Acceptance letter totaling an estimated 3.30 acres. Included within these parcels, 270 trees, 1,838 shrubs and several areas of turf/ground cover Were installed. There were no General Fund parcels to be considered for acceptance. There were no Maintenance Period parcels begun in either the Combined Maintenance District or General Fund locations. WET PLAYGROUNDS Cooling temperatures due to our onset of fall season signaled an end of our wet playground operations. Wayside, Dr. Martin Luther King, Jr., Beale, Planz and Jefferson Parks all closed their seasonal operation on Friday, October 28, 2005. After monitoring usage for declining numbers, notices were posted in advance advising users of the eminent closers. We plan on opening these locations late next spring for another, well received and refreshing season. HAUNTED TRAIL SUCCESS Following an unexpected weather situation forcing closure before we opened two years ago and a second difficult budget season, the Recreation and Parks Department was once again pleased to offer a "Haunted Trail" event to the public. The response was a resounding positive response from the community as approximately 3,000 people turned out for the event. A special word of thanks to the volunteers who transformed themselves into various characters to staff the numerous scenes depicted within the event. MEDIAN IMPROVEMENTS Public Works staff requested Parks assistance in completing several median projects. The initial focus will be upon medians located on Brimhall, Jewetta west of Liberty Park, and between Jenkins and Renfro. The other set of medians is located upon Hageman fronting Centennial High School and west of Calloway to Verdugo. Preliminary estimates were generated from field measurements. Staff is in the midst of finalizing site investigations into existing services including control wires, irrigation water supply, irrigation clocks and power availability to same. -Contact has been made with contractors to provide necessary hardscape · and landscape improvements. B A K E R S F I E L D Dep~rtment of Recreation ~nd P~rks Date: November 14, 2005 To: Allen Abe, Assistant Recreation and Parks Director From: Ken Trone, Park Construction and Facilities Planner Subject: Parks Department Planning and Construction Activity (October) The new Park Technician position was filled with current city employee Gary Weaver. A committee of city staff with representatives from public works, planning, traffic, and parks has been developed to research pedestrian circulation opportunities and connectivity utilizing road, utility, rail and water corridors. B A K E R S F I E L D Department of Recreation and Parks Monthly Report October 2005 ·, Dr Martin Luther Kinq Jr. Community Center Monthly Attendance Fitness room 394 Game room 238 Gym 332 Quilting Class 42 Aerobics 272 Tennis 59 Youth Activities Flag Football Our Shell Oil youth football program is under way. Our third through fifth grade team is still forming and will have its first official game on Tuesday November 8. It is our focus in our program to teach each player the important skills needed to be successful in life. Each participant is required to spend two hours a week in class on Monday and Wednesday discussing the importance of team work, leadership and attitude on and off the field, these classes are mandatory to be a part of the program. Our sixth through eight grade team played its first game October 27, beating PAL 30 to 18. Adult Activities Basketball We are anticipating being involved with the annual 30 years and older adult basketball league to be played on Sundays starting November 20, here at the center. Special event Car Show This year's program was a huge success. It was estimated that over 30,000 people passed through the downtown area during the event. The final count was 622 cars registered which is up from last year of 524. Dean Jones Page 1 11/1/2005 3:19 PM Leisure Classes Computer Lab We are in the process of preparing the new computers in the lab here at MLK for our upcoming Computer class. Dean Jones Page 1 11/1/2005 3:19 PM B A K E R S F I E L D Department of Recreation and Parks Date: November 3, 2005 To: Allen Abe, Assistant Director From: Linda McVicker, Recreation Supervisor Subject: Monthly Report for October BROCHURE · The Winter Brochure went out the week of October 17th. · We are starting work on the Spring Brochure which will be out the 2nd week of January. ADULT SOFTBALL · The Fall Softball league began September 6th with 91 teams registered. · We conduct approximately 48 games a week. · Each week we have approximately 80 participants & spectators at each game. · We have approximately 15,360 'people enjoying playing or watching softball on a monthly basis. · Total revenue for the year is $131,850. FLAG FOOTBALL · Our Flag Football program began September 24 at Silver Creek. · We have 45 players registered. · The league will end November 5. CROSS COUNTRY MEET · The Cross Country Meet was held.at Yoktus Park on October 1% · We had 150 participants and approximately 100 spectators. · The meet began at 10:00 am and ended at 2:30 pm. · Children from ages 5 to15 participated in the race. HALLOWEEN HAUNTED TRAIL AND STORYBOOK LAND · All full-time staff participated in the Halloween event. · My job was costumes and make up for all of the staff and volunteers working the event. We put make-up and costumes on approximately 50 people. · The event ran very smoothly. We heard raving reviews from the participants. LMC B A K E R S F I E L D DATE: November 2, 2005 TO: Dianne Hoover, Director Recreation & Parks FROM: Holly Larson, Supervisor RE: October Monthly Report Aquatic Attendance: See attached statistics for aquatic attendance at McMurtrey Please note that overall monthly attendance is up from last year at the same time with lap swim numbers that are double the amount of last October. Groups currently using the facility include Bakersfield Swim Club, Kern River Divers, lap swim, water walking (new program),, youth water polo and event rentals. There is also an agreement currently in process for Garces High to begin using the facility as soon as it clears. In addition, one other swim club is on the waiting list if lanes become available during the prime evening hours. We are beginning to rent the facility for corporate events as well. The Downtown Business Association rented the facility on October 13 for an event attended by 150 participants. Reviews of the facility were very positive. Special Events: The Halloween Haunted Trail took place on October 29. The event featured the Haunted Trail, Storybook Land, entertainment, costume contest, games and food booths. Approximately 4,000 children and adults attended the event aimed at providing a safe and fun alternative to trick or treating. Evaluations were very positive. $2,839 was collected from wristbands and vendors in addition to in kind donations from many sponsors. C:\DOCUME~ I ~sforsyth\LOCALS- 1 \Temp\monthly report_ 1 .docC:\IX)CUM E- 1Lsforsyth\LOCALS- 1 \Temp\monthly report_l .doc 11/2/200511:43 AM 2005 ~;~:~ '- 149~~2011119 . 6 6' 18 10~ 12 2~ ~ 23 ~2 ~2 ~ 12 17 15 9 ~4 ~ ~2 16 11 15 ~ ~ ~,: 316 ¢ ~ 53 853 ] October200$ 32 13 0 0 12 18 6 6 0 0 8 13 4 0 0 19 13 6 5 0 0 9 15 5 3 5 0 0 13 12 19 0 0 35 7 0 0 0 0 15 18 10 5 3 0 0 11 13 5 3 0 0 10 16 10 7 0 6 8 21 0 4 0 150 0 12 12 19 0 0 14 0 0 0 0 13 20 10 4 3 0 0 7 7 8 3 0 0 13 17 9 6 0 10 11 7 5 3 0 0 13 13 15 0 2 15 0 0 0 0 12 16 6 6 3 0 3 8 11 6 3 0 0 7 13 9 6 0 0 10 14 5 0 3 0 1 12 0 11 0 0 34 5 0 0 0 0 17 2 5 3 0 0 B A K E R S F I E L D Department of Recreation and Parks Date: November 2, 2005 To: Dianne Hoover, Director From: Terri Elison, Recreation Supervisor Subject: October 2005 Monthly Report ATTENDANCE FIGURES Silver Creek After School Program ........................ 710 Attendance ....................... 36 Average Daily Attendance The Silver Creek After School Program held a very successful "Lights On Afterschool" event on October 21st from 4:00 to 5:00 pm. This event is part of a national event which focuses on how important after school programs are to children. We celebrated our After School Program by having the children perform several musical numbers, make special crafts with their parents, and play some games. We also had artwork the children made decorating the room and served refreshments. In addition, we participated in the Greenfield Union School District's "Lights On Afterschool" event held on October 20th from 5:00 to 8:00 pm at Ollivier Middle School. This successful celebration is dedicated to ensuring that all children have access to after school programs by 2010. Other highlights this month included several Halloween crafts, nature activities, and outdoor games. Silver Creek Rentals ................................................... $1,753.00 (F,gur. does.or ,nc~ud, d.,o$~t=> The Silver Creek multi-purpose room and/or pavilion were rented four times during the month of October. The center was rented for three company picnics and a birthday party. Total attendance was approximately 735. Classes at Silver Creek: # Registered Total Attendance Ballet & Gym (6 -11 ) 4 16 Ballet & Gym (3-5) 5 20 Belly Dancing 7 15 I 1/15/2005 C:\DOCUM E-1 \sforsyth\LOCALS-I \Temp\Terri October 2005 Report.doc by TE Calligraphy Workshop no class no class Clogging 19 76 Dance & Gym (4-5) combined class combined class Dance & Gym (2-3) combined class combined class Dog Obedience 8 32 · Guitar (Beg.) 5 20 Guitar (Inter.) 3 12 Kardio Kick 13 52 Karate 45 360 Pilates 9 54 Tai Chi 10 40 Tennis (Child-Beg) 5 40 Tennis (Adults) 6 48 Upholstery 5 20 Yoga 12 48 TOTAL 156 853 Classes at Other Facilities # Registered Total Attendance Siemon Park Tennis (Child) 6 48 Tennis (Adult) no class no class All Star Dance Studio Dance & Gym (2 ¼ - 4) no class no class Dance & Gym (4 - 5) no class no class American Academy of Gymnastics Gymnastics (Mom & Me) 1 4 Gymnastics (K-6 Girls) I 4 Gymnastics (K-6 Boys) 2 8 Corp Yard Lunch Room Conversational Spanish (Beg.) 7 21 Latin Dance no class no class Creative Pursuits Knitting and Crocheting no class no class Bead Connection Jewelry Making-Beading 1 1 Helfrich's Jewelry Creations Jewelry Creations 1 4 Bikes Rides City Bike Path Rides 6 12 Stars Gymnastics Gymnastics (Tots) 1 4 Gymnastics (Gymbees) 1 4 Gymnastics (Girls/Boys 6 - 12 yrs) 4 16 Tumbling & Trampoline 1 4 TOTAL 32 130 11/I 5/2005 C:\DOCUM E-l\sforsyth\LOCALS- l\Temp\Terri October 2005 Report.doc by TE Attendance Silver Creek Center: Rentals ........................................ 735 Classes ........................................ 853 Registration Transactions: 170 After School Program ............... 710 # of Guests Served: 320 Flag Football Games ................ 780 (The # of Guests served does not include registration) TOTAL ..................... 3,078 11/15/2005 C:\DOCUME-I\stbrsyth\LOCALS-I\TempWerfi October 2005 Report.doc by TE PUBLIC WORKS STREET MAINTENANCE SECTION - WORK SCHEDULE WEEK OF NOVEMBER 21, 2005 Continue msurfacing alleys in the area north of Monterey Street, between Union Avenue and Alta Vista Drive ' Continue reconstructing streets in the area north .of Auburn Street, east of Oswell Street :~ Continue work on the Fox Clock installation project Installing sideWalk ~in the area north of 24th Street, east of Chester Avenue (CDBG FUNDED) . Continue Video inspection of the sewer line on Gosford Road B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Paul Rojas, Public Works Director DATE: November 17, 2005 SUBJECT: STOCKDALE HWY SEWER REPORT Referral No. 1271 (Meeting- 9/28/05) COUNCILMEMBER CARSON REQUESTED A PROGRESS REPORT. REGARDING THE SEWERS IN THE STOCKDALE HWY AREA. The Iow bid of $1,586,294 received on December 15, 2004 exceeded the budget for this project which will provide sewer service to 256 houses in the project-area. To help ' "~ reduce the cost of the project and the resultant charges to th~'pr-operty owners, 'staff recommends that the pavement reconstruction be done by City crews and that additional time be allotted for construction of the sewer improvements. The cost of the pavement reconstruction in the previous bidding was $270,000; having that work done by City crews will reduce each property owners' share of the project by at least $1,000. Also in an effort to reduce the charge to the property owners, staff researched potential grant funding for this project. Staff found some grant funds for sanitary sewer collection systems; however, those programs are limited to small rural communities. So those funds cannot be used for this project. It is unlikely that HUD grants, such as Community Development Block Grants (CDBG), could be used for all the construction of this project since a majority of the residents / property owners of the project area do not meet the requirements for Iow income. So that funding source is also not available to fund 100 percent of this project. Economic Community Development staff has, however, verified that those property owners who do meet the CDBG .requirements would be able to use CDBG grants to pay for 1) their share of the capital improvement construction costs, 2) their payment of the City's sewer hook-up fee, and 3) their costs associated with abandonment of their septic system and hook-up (installation of sewer line to the City's lateral at the property line) depending on the amount of CDBG funds made available for this activity. To qualify for those CDBG funds, the property owner must meet the Iow income requirements and must occupy the property as. their primary residence. An intake questionnaire and income screening Will take place by EDCD staff subsequent to a timely submittad application by the interested resident. In the event residents who may qualify choose not to apply for City CDBG assistance in a timely fashion, there can be no CDBG share of the sewer collection system for their property. In addition, City staff will be required to prepare an environmental study as required by the National Environmental Policy Act. G:\GROUPDAT~Referrals~2005\09-28\Ref#1271 Stockdale Hwy Sewer Report.doc Page I of 2 The City's construction contract will have to include all of the federal labor standards even though federal funds would not be part of the actual compensation to the contractor. Those federal standards include contractor's compliance with Davis Bacon wage rates and the Minority and Women Owned Business Affirmative Action Plan. Those HUD requirements tend to result in higher construction costs compared to projects funded with local monies which do not impose those requirements. Funding options for this project are limited. Options for the project do include the following: Do not build the sanitary sewer collection system; let the property owners continue to provide their own sewer service through their individually owned and maintained septic systems. OR Construct the project and then charge the property owners their full share of the construction cost when the property owner connects to the system. (The property owners' share per parcel was estimated at $7,100 based on the last bidding of the project. To help reduce that amount, the project will be modified to allot more time for construction of the sewer system and to have the pavement resurfacing portion of the project done by City crews.) Note that in addition to their share of the construction cost, property owners will also be required to pay for abandonment of their existing septic system and the City's sewer connection fee current at the time they connect. These three charges could easily exceed_ a total of $10,000 for each of these property owners. It has been the City's policy to allow the prope~rty owner to spread out their payment to the City over three years via their property taxes; this will be offered for this project. A block grant allocatiOn of $3,300 (estimated) per qualifying property per year for each of the three years will ~"e-m, quired to cover the costs for those property owners who qualify for the CDBG funding. That allocation amount would need to be adjusted based on the re-bidding of the project should the City determine to go forward with the project. G:\GROUPDAT~Referrals~2005\09-28\Ref#1271 Stockdale Hwy Sewer Report,doc Page 2 of 2 B A K E R S F I E L D OFFICE OF THE CITY MANAGER MEMORANDUM November 15, 2005 TO: Alan Tandy, City Manager FROM: Alan Christensen, Assistant City Manager~ SUBJECT: Veterans Memorial Foundation Council Referral #001332 Councilmember Benham requested staff to provide supplemental information on the website with newly provided information; create a link from the City site to the Kern Veterans Memorial Foundation site; and suggest to Kern Veterans Memorial Foundation that they include on their website an opportunity for donations to be made on line. Staff has set up a link from the City's main website to the Veterans Memorial website. Staff has also added an invitation and address for those who would like to donate to the Veterans Memorial Monument project. With regard to credit card payments, City staff will make contact with the Veterans Memorial Foundation and discuss with them creating a facility for receiving credit card payments. B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager ? FROM: Raul Rojas, Public Works Director ~ DATE: November 8, 2005 SUBJECT: CONSTRUCTION OF VERDUGO LANE Referral No. 1328 (11/08/05) COUNCILMEMBER COUCH REQUESTED PUBLIC WORKS DEPARTMENT PROVIDE THE STATUS OF THE COUNTY'S EFFORTS TO CONSTRUCT VERDUGO LANE FROM BRIMHALL TO SHELLABARGER. City staff has contacted County of Kern staff who is in charge of the County's project to construct Verdugo Lane from Brimhall Road to Shellabarger Road. County staff has stated that their schedule is to advertise their project for construction bids in March 2006. G:\GROUPDAT~Referrals~005\I 1-8 Couch\Reft1328 Construction of Verdugo Lane.doc B K R S L r) 'i 14 Z005i CITY OF BAKERSFIELD i ..... PUBLIC WORKS DEPARTMENT MEMO~NDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: November 9, 2005 SUBJECT: ANALYZE FEASlBILI~ OF ROUND ABOUTS Referral No. 1315 H0/2u0s) COUNClLMEMBER COUCH REQUESTED THAT STAFF ANALYZE THE FEASIBILITY OF USING ROUND ABOUTS IN FUTURE DEVELOPMENT PROJECTS AND REPORT BACK TO COUNCIL. Roundabouts, sometimes called rotaries, are used throughout the United States, and the world, for intersection management of the traffic. At roundabouts, the entering traffic yields the right-of-way to the circulating traffic. This yield-at-entry rule allows free-flow movement for circulating vehicles and reduces vehicle backup at the intersection. The splitter and center islands of a roundabout deflect entering traffic and reinforces driving speeds lower than 25 mph in the approaches and the roundabout itself. Roundabouts equally serve vehicles from every approach simultaneously, which may reduce delay. Unlike Traffic Circles, roundabouts are used on medium volume streets to allocate right-of-way between competing movements. Traffic Circles are created by constructing a small circular island in a neighborhood intersection and leaving the existing curbing in place. They are primarily used for traffic calming and speed control on Iow volume local streets. The "Garces Traffic Circle" is actually an old style Roundabout and not a Traffic Circle. Some new developments in Bakersfield are proposing the use of Roundabouts, and/or Traffic Circles, within their private street subdivisions. Thus far, there are no developments using Roundabouts on public streets and intersections. Roundabouts are primarily single lane in configuration. Two lane Roundabouts are used for larger streets, such as a Collector class street. They are not used for Arterial class roads, as we have in Bakersfield, which are 3 lanes wide for each direction and high volume. Single lane Roundabouts can accommodate only up to about 20,000 vehicles per day entering the intersection. Two lane Roundabouts will handle only about 35,000 to 40,000 vehicles per day. C:\DOCUME~1\Iskinner~LOCALS~1\Temp\Ref#1315 Round Abouts.doc Roundabouts are also difficult for large vehicles, such as Fire trucks and refuse vehicles, to circumnavigate. Crosswalks are not used within a Roundabout, so Pedestrian traffic must cross in advance of the Roundabout. This causes confusion to the vision impaired pedestrian and is a disadvantage. A Roundabout also takes considerably more land to develop, as opposed to a standard intersection. Estimates of about 50 percent more area is required to develop a Roundabout. This makes it difficult to retrofit in a Roundabout at a 'standard existing intersection because of the additional property to be acquired along approaches to the Roundabout and within the intersection area. Roundabout work best where there is abundant right of way available. Some of the advantages of Roundabouts are: - They can handle large volumes of U-turn type traffic They work well at intersections with irregular approach geometry Traffic speeds are generally moderated since vehicles must slow to enter a Roundabout They are generally aesthetically pleasing, if well landscaped They can minimize queuing of vehicles at the approaches to the intersection - They are less expensive to operate, compared to a traffic signal Some disadvantages of Roundabouts are: - They require the elimination of all parking on the approaches - They must be designed so that the circulating lane does not encroach on the crosswalks - Vision impaired pedestrians have difficulty in crossing at Roundabouts - They can be difficult for large vehicles (such as Fire Trucks or Refuse Trucks), as well as other emergency vehicles or police vehicles, to circumnavigate - They require an abundant amount of right of way area, making them costly and difficult to retrofit at an intersection due to the expense of acquiring more right of way - Multi-lane roads are difficult to implement with a Roundabout - Bicycle lanes cannot be continued through a Roundabout Currently, there are no proposals to construct a new Roundabout intersection or to retrofit an existing intersection in the City of Bakersfield. Due to problems identified for Police, Fire, other Emergency Vehicles and refuse trucks, the Public Works department cannot recommend their use in the City at this time. C:\DOCUME-1\lskinner~LOCALS-1\Temp\Reffi1315 Round Abouts.doc B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Directo~_~.~ DATE: November 8, 2005 SUBJECT: DAMAGED TRAFFIC SIGNS Referral No. 1329 (11/08/05) COUNCILMEMBER COUCH REQUESTED THE PUBLIC WORKS DEPARTMENT FIX DAMAGED TRAFFIC SIGNS: 1) IN THE MEDIAN ON RIVER RUN, WEST OF BUENA VISTA AND; 2) ON SOUTH SIDE OF CAMINO MEDIA, EAST OF THE MARKETPLACE. The signs in both of the locations were repaired by the Signs and Marking section of General Services. G:\GROUPDAT~Referrals\2005\I 1-8 Couch\Reft1329 Damaged Traffic Signs.doc B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director ~ DATE: November 10, 2005 SUBJECT: SPEED BUMPS Referral No. 1335 (t1/09105 Meeting) COUNCILMEMBER SULLIVAN REQUESTED STAFF REVIEW THE BENEFIT OF ADDITIONAL SPEED BUMPS AND PROVIDE INFORMATION REGARDING THE LOCATION AND EFFECTIVENESS OF CURRENT SPEED BUMPS IN RESIDENTIAL AREAS NEAR RIDGEVlEW. At present, there are no speed bumps, or pavement undulations, in the area east of Ridgeview High School. There are three areas of the City with speed bumps in place, in conformance to the City Council's adopted policy on speed bumps. One is on Kleinpell Avenue, located north of Stockdale Highway and east of Rio Bravo Drive. Another is located on Toluca Drive, south of Stockdale Highway and east of Renfro Road. The third set of speed bumps is located on El Toro Drive, south of Belle Terrace and east of South Chester Avenue. Past studies show that a minor amount of speed reduction and diversion of traffic may be attributed to speed bumps in Bakersfield. In general, the neighborhood perceives a benefit to having speed bumps on the residential street although the quantifiable speed reductions are small. Per City Council policy, the residents requesting the speed bumps are responsible for all costs of installation. Residents desiring speed bumps on their neighborhood street can obtain a copy of the City Council Policy with petition and an informational brochure via the internet on the City's website at: http://www, bakersfieldcity, us/cityservices/pubwrks/TrafficEn.q/speed bumps.htm. Residents may also contact the Traffic Engineer and a copy will be mailed to them, upon request. C:\DOCUME~l\lskinner~LOCALS~1Wemp\Reff11335 Speed Bumps.doc