HomeMy WebLinkAbout08/15/03 BAKERSFIELD 03/~l!~; 15 PH k,: 01 CITY MANAGER'S OFFICE MEMORANDUM August 15, 2003 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager SUBJECT: General Information 1. Staff is doing follow up work on the transportation development fee proposals. The Planning and Development Committee, Councilmembers, and the BIA had left open questions and concerns. We are seeing if the fee can be reduced below $7,000 per home, while not slowing our capability to meet traffic needs. More information will follow later. 2. Next Wednesday is the council meeting which has been set up, specifically, to hear about the plans for the power plant off Rosedale Highway. We realize that some of you may not be able to attend, due to other commitments you made before the hearing was scheduled. 3. The old food bank behind the Holiday Inn is being demolished. It is, of course, to become a part of our parking lots for the Garden. 4. Raul Rojas and I toured the west side fire and police station project this week. It seems to be coming along very well and is, generally, on schedule. The buildings are now taking shape, both inside and out. 5. Success breeds success! The Eagles show is helping us to keep signing quality acts - Fleetwood Mac will be the next major concert at the Garden. 6. The County, apparently, fully funded the proposed budget for their animal control program, including additional staff for the kennel we have been leasing. That may make it harder for us to reach agreement on consolidated service. We continue to work on that as a goal, however. 7. As of this week, I have been here for 11 years as City Manager. I am happy to report we have not run out of issues or challenges! 8. Appreciation is extended to the Planning Department staff members who provided assistance to the local Off-Highway-Vehicle committee in their efforts to successfully obtain a State grant for their project. A K E R S F I E L D tt3AUG15 PH b,:OI CITY MANAGER'S OFFICE MEMORANDUM August 15, 2003 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager SUBJECT: General Information 1. Staff is doing follow up work on the transportation development fee proposals. The Planning and Development Committee, Councilmembers, and the BIA had left open questions and concerns. We are seeing if the fee can be reduced below $7,000 per home, while not slowing our capability to meet traffic needs. More · information will follow later. 2. Next Wednesday is the council meeting which has been set up, specifically, to hear about the plans for the power plant off Rosedale Highway. We realize that some of you may not be able to attend, due to other commitments you made before the hearing was scheduled. 3. The old food bank behind the Holiday Inn is being demolished. It is, of course, to become a part of our parking lots for the Garden. 4. Raul Rojas and I toured the west side fire and police station project this week. It seems to be coming along very well and is, generally, on schedule. The buildings are now taking shape, both inside and out. 5. Success breeds success! The Eagles show is helping us to keep signing quality acts - Fleetwood Mac will be the next major concert at the Garden. 6. The County, apparently, fully funded the proposed budget for their animal control program, including additional staff for the kennel we have been leasing. That may make it harder for us to reach agreement on consolidated service. We continue to work on that as a goal, however. 7. As of this week, I have been here for 11 years as City Manager. I am happy to report we have not run out of issues or challenges! 8. Appreciation is extended to the Planning Department staff members who provided assistance to the local Off-Highway-Vehicle committee in their efforts to successfully obtain a State grant for their project. Honorable Mayor and City Council August 15, 2003 Page 2 9. The groundbreaking ceremony for the McMurtrey Aquatic Center will take place on Wednesday, August 20'h at 10 a.m. The press release announcing the event is enclosed. 10. The August 14th Rockin' by the River concert featured Iron Butterfly, and staff estimates that attendance was over 5,500. Next week will be the last concert for this year, with Jefferson Starship. 11. In 2001, the California Regional Water Quality Control Board reissued the discharge permit for Wastewater Treatment Plant 3, with a provision that would require plant upgrades costing $6 to $8 million dollars. During the last year, City staff asked the regional board to reconsider the issue. The regional board has not been willing to remove the permit requirement, but they have agreed to delay the implementation for 5 years, which means that the City can delay the required plant upgrades until the expansion of Plant 3 in 2010. 12. The Police Department Special Enforcement Gang Violence report for July is enclosed. 13. The quarterly activity report from EDCD for on-going housing, economic and community development projects is enclosed. 14. A response to a Council request is enclosed, as follows: Councilmember Couch · Blocked access to Old Farm Road. AT:rs cc: Department Heads Pam McCarthy, City Clerk Trudy Slater, Administrative Analyst B A K E R S' F I E L D City Manager's Office PRESS RELEASE FOR IMMEDIATE RELEASE CONTACT: Rhonda Smiley Thursday, August 14, 2003 ' City Manager's Office Public Relations (661) 326-3753 GROUNDBREAKING CEREMONY SET FOR McMURTREY AQUATICS, CENTER A special event to recognize the beginning of construction for the new downtown aquatics facility will be held on Wednesday, August 20, 2003 at 10:00 a.m. The offiCial groundbreaking for the McMurtrey Aquatics Center, named for the local family that has donated major financial support to the project, will be held at 13th and P Streets, just south of the Centennial Garden and Convention Center. Mayor Harvey L. Hall, Councilmember Sue Benham, and representatives of the local aquatic center fundraising group will be present to commemorate the occasion. Special guests from the' Boys and Girls Club and members of local swim groups have also been invited to participate. The multi-purpose swim facility will be built next to the Ice Sports Center of Bakersfield, which is currently under construction and scheduled to open in November, 2003. The McMurtrey Aquatics Center will have an 8,551 square foot recreation pool and a 50-meter competition pool. It will include amenities such as a double water slide, interactive wet play equipment, and water volley ball area. ' The estimated completion date is May 2004. Rossetti and Associates Architects handled the project design of the new aquatics facility and construction will be done by S.C. Anderson. For more information, please contact Rhonda Smiley at 326-3753. City of Bakersfield · City Manager's Office ° 1501 Truxtun Avenue Bakersfield, California · 93301 (661) 326-3751 · Fax (661) 324-1850 Date: August 11,2003 To: Alan Tandy, City Manager From: Eric W. Matlock, Chief of Police ~ Subject: Special Enforcement Gang Violence Report I have enclosed the Special Enforcement Unit's monthly report for July. Please call me if you have any questions. EWM/vrf Bakersfield Police Department Special Enforcement Unit Monthly Report - July 2003 The following is a compilation of the performance of the Special Enforcement Unit and significant incidents / investigations for July 2003. 27 Felony Arrests 5 Guns Seized 33 Special Reports General Offense 12 Misdemeanor Arrests 61 Fl's 22 Reports 5 Felony Warrant Arrests 2 Citations 4 Vehicle Reports Misdemeanor Warrant 4 Arrests 10 Prob./Par. Searches 0 Search Warrants 7 2003 Shootings Hrs. Assisting Other 4 2002 Shootings 90 Hours In Training 2296 Department 0 2001 Shootings , Sections 3 2000 Shootings 10 1999 Shootings Year to Date Statistics January - July 2003 409 FelonY Arrests 38 Guns Seized 380 Special Reports General Offense 154 Misdemeanor Arrests 995 Fl's 123 Reports 87 Felony Warrant Arrests 45 Citations 78 Vehicle Reports '130 Misdemeanor Warrant 384 Prob./Par. Searches 12 Search Warrants Arrests 23 2003 Shootings Hrs. Assisting Other 17 2002 Shootings 1835 Hours In Training 3670 Department 20 2001 Shootings Sections 31 2000 Shootings 73 1999 Shootings B A K E R S F I E L D MEMORANDUM TO: ALAN TANDY, CITY MANAGER FROM: ~;,~¥ANLEY C. GRADY, PLANNING DIRECTOR DATE: August 14, 2003 SUBJECT: BLOCKED ACCESS TO OLD FARM ROAD Council Referral No. REF000488- COUNCILMEMBER COUCH REFERRED TO THE PLANNING DEPARTMENT A LETTER FROM RAYMOND BISHOP ADDRESSED TO BRUCE FREEMAN DATED MAY 22, 2003, REGARDING BLOCKED ACCESS TO OLD FARM ROAD AND REQUESTED STAFF ADVISE IF THERE ARE ANY OPTIONS FOR ADDRESSING THE ACCESS ISSUE DESCRIBED IN THE LETTER. PROVIDE WRITTEN RESPONSE TO COUNCILMEMBER COUCH ON ALTERNATIVES. Old Farm Road is not planned to cross the Westside Parkway. Subdivision development has been approved both north and south of the Westside Parkway, south of Brimhall Road. However, Jewetta Avenue, located one-half mile east of Old Farm Road, will cross the Westside Parkway and Rio Bravo Canal, curve westerly and intersect with Stockdale Highway north of the Kern River. As part of the 70-acre Rio vista Park project, easy access will be provided for both automobiles (parking lot) and pedestrians to the river corridor. Jewetta Avenue will be nicely landscaped. Although this route will be about one-half mile longer walking distance, it will terminate into a beautiful park site and river environment. Unfortunately, it is just not ec. onomically feasible to extend smaller streets such Old Farm Road across the WestSide Parkway. Improvements to Jewetta Avenue will begin shortly to provide access to Castle and Cooke subdivisions. BACKGROUND In 1997, the City Council approved Resolution No. 68-97 which deleted the collector street designation on Old Farm Road, south of Brimhall. This action was part of Castle and Cooke Development's General Plan Amendment, Zone Change and EIR known as the "South of Brimhall" project (file number GPA/ZC 96-0521). Alan Tandy August 14, 2003 Page 2 Since Old Farm Road is no longer designated as a collector street, the developer may design Old Farm Road as a local street and if desired, may design the subdivision over the Old Farm Road alignment. Tract 5882 was approved in 2001, depicting old Farm Road terminating approximately 500 feet north of the Westside Parkway (formerly known .as the Kern River Parkway). As shown on the attached map, lots were approved and now have been recorded that effectively eliminate access from Old Farm Road south to the Kern River. JH:djl Attachment CC: Rhonda Smiley, Office Administrator/Public Relations , ' :' ',':"',~'.":- I -" I~ .......... ' ' ' . ,. , . ,,. ,,. ,,. ,. ,, . ', SCALE: SCALE: 1 CASTLE & COOKE CALIFORNIA, INC owo.,3622s~l~q-rn.qN CASTLE & COOKE CALIFORNIA, INC. o~.,36220ATE: 41041 ' DATE: 4/04/0~11 TM · vv. · CAST DRAWN BY: P THIRD REVISED VESTING TENTATIVE TRACT NO. 5882 °R~,WNOW~ER: B¥:cAs~uAee~^'n:e,.~'"~m',.~-'~ r.o THIRD REVISED VESTING TENTATIVE TRACT NO. 588g STREET NAMES MAP REv. 7/24/01 ........ S'rREET NAMES WP BAKERSFIELD Economic and Community Development Department MEMORANDUM August 14, 2003 TO: Alan Tandy, City Manager FROM: Donna Kun~Xcono~elopment Director V SUBJECT: Economic and Community Development Department Activity Report This memo will serve as an update for Fiscal Year 2002-03, 4th quarter (April 1 to July 1) on-going housing, economic and community development projects. CAPITAL IMPROVEMENT PROJECTS 1. Automated Chemical Controllers at Three Swimminq Pools Funds in the amount of $46,500 (FY 02-03) are budgeted to install automated chemical controllers at Jefferson, Martin Luther King Jr. and Wayside Parks. The controllers are scheduled to be installed when Jefferson and MLK Jr. pools are rehabilitated between January and June of 2004. 2. Baker St. Streetscape Project (EDI Grant) Streetscape construction is underway along four blocks of Baker Street between Niles and Jackson. Federal funding in the amount of $490,000 came through HUD's Special Economic Development Initiative (EDI) program. The money is being used to revitalize the district by installing trees, decorative light poles with banners, and pedestrian furniture. The City Council awarded the construction contract on April 30, 2003. Construction started on June 30th and is scheduled to be completed by September 2003. An additional $250,000 of FY 2003-04 CDBG funds for the City of Bakersfield's Baker Street Corridor has been targeted to expand public streetscape improvements south of the tracks. 3. Brundaqe Lane Streetscape Funds in the amount of $413,500 of Section 108 funds (FY 02-03) were budgeted to install median streetscape, sidewalk and lighting improvements from Chester Avenue to Union Avenue. Funds should become available in August 2003. Design is scheduled to be completed in September 2003, and construction should start in December 2003 and be completed by January 2004. S:\VZ\Quarterly~Final4thQuarter2002-03.doc 4. California Avenue Streetscape Project Funds in the amount of $413,500 of Section 108 funds (FY 02-03) were budgeted for median streetscape, sidewalk and lighting improvements in the public right-of- way of California Avenue from Chester Avenue to the railroad tracks east of Washington Avenue. Funds should become available in August 2003. Design is scheduled to start in September and to be completed by December 2003. Construction should start in March 2004 and be completed by May 2004. 5. Casa Loma #6 Street Li.qht Improvement Project Funds in the amount of $32,500 (FY 01-02) were budgeted for installation of approximately 19 new street lights in the Casa Loma #6 Area to improve pedestrian and traffic safety. Construction was completed on June 10, 2003. 6. Casa Loma #6 Street Improvement Project (Ph. V) Funds in the amount of $200,000 (FY 02-03) were budgeted for street improvements in the Casa Loma #6 area. Construction was completed on June 5, 2003. 7. Chester Avenue Streetscape (Pt. II) Funds in the amount of $250,000 (FY 02-03) were budgeted for design and installation of streetscape improvements on Chester Avenue from 34th Street to West Columbus Street. Bids were opened on June 6, 2003 and found to be in excess of the engineer's estimate. The City Council rejected all bids on July 30, 2003. Public Works will reduce costs though project redesign. Project is to be re- bid after traffic signal modification on the project is completed in September. Bids should be opened in November and construction should start by December 2003. 8. 14t" Street Aquatic Center Project Funds in the amount of $3,591,000 (FY's 01-02 and 02-03) have been budgeted for construction of a 8,000 +/- sq. ft. swimming pool with zero depth entry area, water slide, and lap lanes on a 2.3 acre site bounded by 14th, "P", and "Q" streets ($3,300,000 is coming from Section 108 funds). Additional CDBG funds budgeted from FY 03-04 became available in July 2003. The 108 application has been approved and funds are now available. Project design was completed on June 18, 2003. Construction is expected to start by mid-August and be completed by May 2004. 9. Jefferson Park Basketball Court Improvement Project Funds in the amount of $31,000 (FY 01-02) were budgeted to create two additional basketball courts from existing tennis courts at Jefferson Park. Bids were rejected on June 11,2003, because of the need to change construction specifications. The consultant should finish new specifications by the end of August. The construction bid is expected to be awarded in October and completed by November 2003. S:\VZ~Quarterly~Final4thQuarter2002-03.doc 10. Jefferson Park Play.qround Improvement Project Funds in the amount of $143,000 (FY 02-03) were budgeted to remove old playground equipment and to replace it with handicap accessible equipment. Construction design should be completed in September 2003 with installation scheduled to start in January 2004. Project to be completed in February 2004. 11. Jefferson Park Swimmin.q Pool Rehabilitation Funds in the amount of $500,000 (FY 01-02) were budgeted for rehabilitation of the swimming pool at 801 Bernard Street. Funding will be from Section 108 and CDBG entitlement funds. The project was approved by Council in May and the Section 108 application was submitted to HUD last June for review and approval. The Section108 loan funds are now available. It is anticipated that construction will begin in January and be completed by June 2004. 12. Lake Street Area Street Reconstruction Project (Phase X) Funds in the amount of $90,560 (FY 01-02) were budgeted for the reconstruction of Lake Street from Brown Street to Williams Street to facilitate traffic flow and drainage of the area. Construction started in March and was completed on May 8, 2003. 13. Lowell Park Community Center Improvement Funds in the amount of $126,000 (FY 02-03) were budgeted to install two modular units on a foundation in Lowell Park for a community center. Specifications to purchase the modular units are being reviewed by Public Works. The units should be acquired in December 2003 and installed in March 2004. 14. Martin Luther Kin.q Jr. Swimmin.q Pool Rehabilitation Project Funds in the amount of about $470,400 (FY 01-02, FY 02-03,) were budgeted for the rehabilitation of the swimming pool at 1000 South Owens Street. $300,000 will be from Section 108 funds. The Section 108 funds have become available. It is anticipated that construction will start in January and be completed by June 2004. 15. Pacheco #10 Area Sewer Installation Project (Phase I - Desi.qn) Funds in the amount of $35,000 (FY 00-01) were budgeted for design of sewer line installation in an area bordered by Pacheco Road on the north, one block east of Elysium Street on the east, Faith Avenue on the south and one block west of Centaur Street on the west. Design was completed May 15, 2003. 16. Pacheco #10 Area Sewer Installation Project (Phase II - Construction) Funds in the amount of $196,415 (FY 02-03 and 01-02) were budgeted for installation of sewer line in an area bordered by Pacheco Road on the north, one block east of Elysium Street on the east, Faith Avenue on the south and one block west of Centaur Street on the west. Additional funds budgeted from FY 03-04 became available in July 2003. The City Council awarded the project construction bid on July 30th. Construction should start by end of August and be completed by October 2003. S:~VZ~Quarterly~Fina14thQuarter2002-03.doc 17. Planz Park Pla¥.qround Improvement Project Funds in the amount of $134,536 (FY 01-02 and 96-97) were budgeted to replace the playground equipment and install rubberized surfacing to make playground equipment at Planz Park handicap accessible. Installation began in December 2002 and was completed in May 2003. 18. Southeast Bakersfield Street Liqht Improvement Project Funds in the amount of $43,500 (FY 01-02) were budgeted to upgrade street lighting in two areas in southeast Bakersfield. Area #1 is bordered by California Avenue on the north, City limits and Washington Street on the east, Brundage Lane on the south, and Union Avenue on the west. Area #2 is bordered by Casa Loma Drive on the north, Cottonwood Road and Hale Street on the east, White Lane on the south, and Union Avenue on the west. Project is scheduled to start in October and be completed by December 2003. 19. Union Avenue Area Street Li.qht Improvement Project Funds in the amount of $17,500 (FY 01-02) were budgeted for installation of 15 new street lights and the upgrading of 11 existing street lights in an area bordered by California Avenue on the north, Martin Luther King Jr. Boulevard on the east, Brundage Lane on the south, and Union Avenue on the west. Installation is scheduled to start in September and to be completed in October 2003. 20. Union Avenue Area Street Project (3rd to 4th streets) Funds in the amount of $100,000 were budgeted (FY 02-03) to provide street improvements in an area bounded by 4th Street on the north, Union Avenue on the east, 3r~ Street on the south and "V" Street on the west. The street improvements on "V" Street were completed last June, 2003. PG&E has to move four power poles on 3r~ Street before the 3r~ Street improvements can be installed. 21. Union Avenue Street Improvement Project Funds in the amount of $61,500 of Section 108 funds (FY 02-03) were budgeted for installation of median streetscape, sidewalk, and lighting improvements on Union Avenue from California Avenue to Belle Terrace. The Section 108 loan funds are now available. Design started in June and should be completed in August. Construction should start in November 2003 and be completed by January 2004. 22. Rio Vista Park Improvement Project Staff received approval notice of their application for $314,822 in grant funds to the California Department of Housing and Community Development. Grant funds were available through the Jobs-Housing Balance Incentive Grant Program. Funding was considered based on the increase of home building permits during 2001. The grant requires funds will go towards constructing the children's playground for Rio Vista Park. S:\VZ\Quarterly~Final4thQuarter2002-03.doc NON-PROFIT/PUBLIC FACILITY PROJECTS Economic and Community Development staff is assisting the following various non-profit organizations to acquire or improve their public facilities. 1. CAP of Kern Food Bank Acquisition Project In 2001, CAP of Kern used City CDBG funds ($255,000; FY 99-00) to purchase 18.79 acres of vacant property for their new food bank facility. The City Council approved a 2nd agreement with CAP of Kern to grant $475,000 in additional FY 2001-02 CDBG funds to construct the food bank, and $80,000 non-CDBG funds to assist with moving expenses and architectural design fees. CAP of Kern moved its food bank operations to the new facility in mid July, 2003. 2. MOVE (Superintendent of Schools) Project In December 15, 2000, the City submitted a grant application to HUD for $370,000 of Economic Development Initiative (EDI) funds from the Mobility Opportunities via Education (MOVE) program monies. These funds were part of a pass through to the Kern County Superintendent of Schools (KCSOS) to benefit their Claude W. Richardson Child Development Center School site at 1515 Feliz Drive. The center is a converted school site that serves about 366 children from birth to age five with child development, state preschool and special education needs. Phase I was the construction of 6,000 + sq. ft. of modular classrooms and related site improvements for a total cost is approximately $1,000,000 which also included costs for design, site preparation, landscaping, utilities, and parking. The remaining funds came from KCSOS matching funds. The project was completed in June. 3. Construction of Facility to House Career/Training Center Funds in the amount of $200,000 (FY 01-02) were budgeted for construction of a career counseling/training center. Funding will be from Section 108 funds. The project was approved by Council in May. The Housing Authority of the County of Kern (HACK) owns a 2.5 acre parcel of commercial property, adjacent to their Oro Vista housing complex. HACK proposes to build a 32,000 square foot commercial development, with 10,000 square feet of office space, a small restaurant (3,500 sq. ft.), a 10,000 square foot computer training facility, and a 7,500 square foot child care center. A federal environmental review has been completed and release of funds has been received from HUD. HACK is exploring funding options and potential tenants for the commercial portion of the project. 4. The Bakersfield Police Activities League (BPAL) BPAL expects to use $108,000 of FY 2002-03 CDBG funds to locate modular building units at its 301 E. 4th Street to be used as classroom and office space for an after school tutorial program. This project is another phase in BPAL's development of the youth center. The total construction cost is estimated to be $155,000. BPAL will receive approximately $13,000 from the County of Kern CDBG program and make up the rest with private funds. S:~VZ\Quarterly~Final4thQuarter2002-03.doc 5. Bakersfield Police Department Southeast Satellite Office The Bakersfield Police Department will use $150,000 of FY 2002-03 CDBG funds to lease and staff a satellite office in southeast Bakersfield. The site is located on Lakeview in the Oro Vista public housing complex. The office is open from 8am to 5pm, Monday through Friday. A full time officer, a Crime Prevention Specialist and a technician are assigned to the office. Lieutenant Dave Haskins will be in the office several days each week. Public services from the office are ongoing. 6. Bakersfield Senior Center The Bakersfield Senior Center located at 530 4th Street will use $50,000 (FY 2001- 02 CDBG funds) to continue its current level of services to seniors in southeast and central Bakersfield. The services provided include: noon time meals, recreational activities, physical fitness activities, senior advocacy, human services referrals, and transportation for clients. Public services from the Senior Center are ongoing. 7. Employment Reports We continue to review employment reports for businesses that have CDBG-funded loans. Recently we have received reports from Stiers RV, Sangera Automotive, and Bakersfield Civic Light Opera Association (dba Bakersfield Music Theatre). Each of these loans is current and employment goals have been met or exceeded. Emergency Shelter Grant Funded 1. Bakersfield Homeless Center An agreement between the City and Bethany Services (dba The Bakersfield Homeless Center) requesting approval for ESG funds (FY 2002-03 - $50,500) was approved by the City Council at the September 18, 2002 meeting. The Bakersfield Homeless Center will continue operation and services at the facility using ESG funds. Services are on-going. No new information to report at this time. 2. Bakersfield Rescue Mission An agreement between the City and the Bakersfield Rescue Mission requesting approval for ESG funding (FY 2002-03 - $50,500) was approved by the City Council at the September 18, 2002 meeting. The Bakersfield Rescue Mission will continue operation and services at the facility using ESG funds. Services are on-going. No new information to report at this time. HOUSING AND NEIGHBORHOOD REVITALIZATION PROJECTS Economic and Community Development staff is assisting the following private and non- profit organizations to acquire or improve their housing projects and neighborhood/commercial facilities. S:\VZ\Quarterly~Final4thQuarter2002.03.doc 1. Habitat for Humanity Habitat for Humanity is currently working under an agreement that allows them to borrow up to $85,000 as a CHDO to assist in the purchase of in-fill housing properties and the construction of single-family homes. These homes will be sold to families whose income is between 30% and 50% of the area's median income. The selected Habitat family and volunteers provide the needed sweat equity labor to construct the homes. In addition to assisting with acquisition costs, the loan to Habitat will assist in paying for such construction costs as school fees, building permits, appraisal fees and construction supervision. To date, the City has assisted with the purchase of four properties. Construction of a single-family home has now been completed on three of the properties and a construction is underway on the property located at 219 Daniels Street. The completion of the home at 219 Daniels will close out the old agreement and the execution of a new agreement will be completed once all funds from the current agreement are expended. 2. Tax Defaulted Properties The County of Kern compiled a list of real properties for which property taxes have not been paid for a minimum of five years. Pursuant to the County selling these properties at auction, the City objected to the sale and offered to buy five of the properties for the cost of back taxes, any liens and expenses associated with the auction. EDCD staff was successful in gaining the right to purchase two of the five properties located at 19 Milham and 301 South Owens. The properties will be purchased by the Redevelopment Agency utilizing Southeast Housing Set-Aside funds for the purpose of constructing affordable single-family homes. The City is anticipating using these properties in its SE Infill Housing Program. The objection to the sale has been completed, the purchase agreements are in the process of being completed and then will be sent to the County and the State for final processing. 3. The Parkview Cottages Housing Project The City was awarded a $1.4 million HELP grant that is targeted for the Parkview Cottages housing project near Central Park. The HELP funds will be used to acquire a portion of the old foundry site. The project will consist of 74 single-family housing units, ranging from 1350 to 1750 square feet a unit. Each unit will be two stories and have a two Car garage. On June 9 the DDA agreement with Parkview Cottages LLC was approved by the RDA. Staff has revised the recapture language to include an equity sharing provision which will eliminate the possibility of any undue enrichment. The amendment will be submitted to the RDA at their September 8th meeting. The estimated total project cost is $ 9.4 million. 4. Southeast Bakersfield Infill Housing Project The City was awarded a $500,000 CHFA loan to build affordable housing on scattered lots in southeast Bakersfield. Seven homes have been constructed to date. The RDA assumed all rights and obligations of the CHFA HELP Loan on February 26, 2003. Currently developers are preparing for a second round of building. S:\VZ~Quarterly~Final4thQuarter2002-03.doc 5. Maranatha Corporation At the February 6, 2002, City Council meeting, Maranatha Corporation received City Council approval to use $100,000 in HOME funds to purchase property in the Southeast Infill Project area and build up to 14 affordable homes for Iow income households. The HOME funds were from project savings from several HOME activities and from various years: FY's 98199, 99~00, and 00/01. Maranatha received $126,000 from the Bank of America and the Federal Home Loan Bank of San Francisco to subsidize the mortgages and make the homes affordable. To date, Maranatha has signed purchase options on seven properties in the project area. Maranatha reported delays in property purchases as the reason they have not moved forward with the project. Project is currently underway. Estimated completion date is February 2004. 6. Sin.qle-family Rehabilitation (SFR) Pro.qram During this quarter, housing rehabilitation staff completed three single family rehabilitation projects. Six rehabilitation projects are in various stages of construction and eight applications are under review for approval. Nine SFR rehabilitation applications were received during the quarter. 7. Home Accessibility (HA) Pro.qram An annual HA contract with Muxlow Construction was approved October 2002 for $77,000. Seven physically challenged clients were assisted, and staff is working on another eleven applications. The public demand for this program continues to be high with over 61% of the funds expended to date. 8. Housin,q Rehabilitation Marketin.q Staff received approximately 175 inquiries about our various programs and mailed information for assistance to potential clients. Staff continues to distribute housing brochures to potential clients by mail, walk-ins, neighborhood marketing and through various community events and fairs. Staff also enhances marketing by installing Home Improvement Program marketing signs in front of all current construction projects. 9. Fair Housin.q Quarterly statistics compiled from reporting data collected from April through June indicate approximately 272 calls on the fair housing hotline. There were 41 substantial service calls that dealt with fair housing issues. There were four formal complaints filed this quarter. One complaint has been referred to DFEFI and the other three are still open and active. The fair housing discrimination complaints and inquires to the Fair Housing Hotline breakdown as follows: Race - 50%; Disability- 25%; and Familial Status - 25%. S:\VZ~Quarterly~Final4thQuarter2002-03.doc 10. Business Assistance Pro.qram Approximately $743,000 in CDBG funds for assistance to private for-profits has been budgeted. The funds have been earmarked to assist commercial, retail, industrial businesses in the southeast community. Staff sent a Statement of Interest letter last fall to property owners, businesses and developers within the major southeast commercial corridors offering potential financial assistance in the form of CDBG loans. Submittals will be evaluated by staff in 2003 as to CDBG eligibility and job creation requirements. The letter encouraged written submittal of potential commercial projects. The statement of interest reflected that the City may be able to assist them with gap financial loans using the set aside CDBG funds for economic development. To date, staff has received 10 written requests for financial assistance. Staff is in the process of contacting those requesting assistance to define their funding need and outlining the City's requirements in using CDBG funds. HACK has requested, and staff is considering, additional assistance for their East California Avenue Career Training Facility in the form of a $300,000 loan from the SE Business Loan Fund (if this occurs a Council amendment to the Action Plan would be required since HACK is not a private for-profit). EDCD is the lead agency for the business loan fund. l l. *California Avenue Senior Housin~ (CVE) Project Capital Vision Equities (CVE) is in the process of developing a 180 senior housing unit (one-bedroom) project in the southeast Bakersfield redevelopment project area. The CVE project consists of property acquisition, clearance, relocation, and new construction. CVE's total cost for the project is about $12 million. They are receiving City loan assistance of about $2.7 million ($1.7 million HOME and $1 million in tax increment financing) in the form of a loan - 3% simple interest over a 40 year period. The remainder of funds for the senior housing project will come from tax credit and developer equity/fee sources. CVE was successful in their tax credit funding application and was awarded $13.7 million. A groundbreaking ceremony took place in March and construction is set to begin by late summer. 12. Kozee Apartment Complex Project The Kozee project consists of the construction of 38 housing units. In addition to the 40,000 square foot apartment complex, Mr. Lee will construct 30,000 square feet of commercial/retail buildings adjacent to the apartment complex. The Agreement was a forgivable loan for clearance of existing structures in the amount of $183,000 in Redevelopment Agency tax increment funds. Construction of the affordable housing phase has begun. S:~VZ~Quarterly~Final4thQuarter2002-03.doc 13. Bakersfield Senior Center Housinq Project The Bakersfield Senior Center (BSC) was awarded $932;000 in CHDO HOME funds to assist in the development of 80 housing units for very Iow income seniors at "R" and 5th street. The project is a joint venture between the Bakersfield Senior Center and the Retirement Housing Foundation which was federally approved with a HUD 202 funding reservation of about $6.7 million. The foundation is complete and framing is underway. 14. Restoration Community Project INC., Youth Buildin.q Bakersfield (YBB) An agreement has been approved that will allow RCPI to receive $195,000 in CHDO HOME funds for the purchase and rehabilitation of deteriorated housing in the Lakeview Avenue area. RCPI will employ at-risk youth from 16-24 years of age to do the rehabilitation work. YBB will have a training component for the youth, an educational component to secure a GED, and other counseling and referral services. The program will last for three years after which, graduates will receive a $1,000 bonus and referral to apprenticeship programs or higher education. The rehabilitated homes will be sold to Iow income families and the sales proceeds will be used to purchase and rehabilitate other properties in the target area. RCPI closed escrow on its first project property, located at 1306 Potomac, and interviews for students and an office assistant has been completed. Actual training and construction will begin by late summer. 15. Baker Street Revitalization Project (Old Town Kern Mixed Use Project) The proposed project is the development of a mixed-use project that includes 30,000 square feet of new retail, and the construction of 60 units of senior citizen housing. The project will also include the construction of a public plaza area and a small cultural theater. Total cost of the project is projected to be about $13,765,256. The City is considering using $1,000,000 in Section 108 Loan funds and $250,000 in competitive Brownsfield Economic Development Initiative (BEDI) funds to assist in land acquisition, relocation and the rehabilitation of a 22,000 square foot retail building into new office space. The BEDI application went to HUD Washington in June. The application has been approved and the escrow for the purchase of the CSO building will close in August. The purchase of multiple additional properties is currently underway. Also, relocation of three families has been completed and the demolition of the three homes is underway. Finally, staff completed the federal environmental review process for the project and a release of funds has been received. The Council approved the Section 108 loan contract and the federal funds have been received. Acquisition is now underway. S:~VZ\Quarterly~Final4thOuarter2002.03.doc 16. Baker Street Corridor Economic Development Strate.qy State funds have been earmarked to develop an ED strategy for the Baker Street corridor (Old Town) area. The strategy will enable the community to create a community vision and urban design component integrated with action plan steps for Baker Street revitalization. A week-end community design charrette was held in May. After the community identified a vision for the area and developed revitalization concepts, city staff and consultants focused on strategies to improve specific sites along Baker Street. These refined designs were discussed during a second community forum June 26. Based on community feedback, the strategies were further refined and synthesized into an Economic Development Strategy. Community members had the opportunity to provide feedback on the recommendations during a third forum July 23. The final product will be presented to the City Council at a September workshop. 17. Southeast Business Workshops The southeast small business workshops which staff received funding of $4,400 from PG & E ended in April. The Small Business Development Center put on the workshops and provided direct counseling for small businesses and individuals in southeast Bakersfield. Over 100 people attended the workshops. Through follow- up counseling three new businesses were started, eight were assisted with loan applications, and approximately 12 jobs were created or retained. 18. 24th and "M" Street Development Staff, through the Redevelopment Agency, is working with a local developer to acquire a vacant Caltrans parcel at 24th and M street. The developer plans to construct an upscale mixed use project at the long vacant (formerly Sangera BuickNoIvo) auto sales site across the street. Staff has received Caltrans approvals to purchase their parcel, which the Agency will in turn sell to the developer. The additional parking will allow the development to provide adequate parking for the future tenants. 19. Union Avenue Improvements Union Avenue continues to improve. Staff is working with two new businesses currently. A restaurant/music hall is being proposed at 802 Union Avenue, with renovation of the building currently underway. The other is a newly constructed 7,500 sq. ft. commercial/retail building at 600 Union Avenue, that staff is assisting with the off-site improvements. 20. Mill Creek Walkway Work continues on pursuing grant funds for improvements along the canal between Golden State and California avenues. Representatives from six departments are meeting regularly to finalize the scope, design, and costs of the canal improvements. Following this, they will be pulling the various elements together for grant submittals to the California Department of Parks and Recreation. S:~VZ~Quarterly~Final4thQuarter2002-03.doc 21. EPA Brownfield Grant Work continues on the paperwork associated with our $1 million Brownfields grant from U.S. EPA. One of the requirements is a very detailed work plan outlining the goals and objectives of our program as well as a detailed budget. Based upon the draft work plan and budget submitted to EPA, we have been told they have been recommended for conditional approval, contingent upon the receipt and approval of a final work plan within 30 days after notice of award funding. The award is not expected before the beginning of the federal fiscal year, October 1. S:~VZ\Quarterly~Final4thQuarter2OO2-O3.doc