Loading...
HomeMy WebLinkAbout09/05/03 B A K E R S F I E L D CITY MANAGER'S OFFICE MEMORANDUM September 5, 2003 TO: Honorable Mayor and City Co/~ / FROM: Alan Tandy, City Manager SUBJECT: General Information 1. The San Joaquin Valley Air Pollution Control District held meetings with Planning Directors this week to discuss their program to develop an indirect source revenue fee. Enclosed is a memo from Development Services which details the proposed plan. They predict they will have such a fee in two years. 2. It appears that the search firm working on the City Attorney recruitment will be ready to meet with the Council at the regular meeting of September 24th in closed session. That, theoretically, would result in the need for a special meeting for interviews, within a couple of weeks thereafter. Council members should be thinking about what would be the most acceptable time for such a session, which could run three to five hours, depending on the number selected for interview. Please call if you have questions. / 3. For the last three years, the League of California Cities has been evaluating the feasibility of sponsoring a statewide ballot measure to help insulate city revenues from state raids. During the Annual Conference in Sacramento next week, representatives will be asked to approve a resolution to sponsor such a measure. A recent poll indicates 76% are in support. When approved, it will be filed with the Attorney General's office in September, with signature gathering tentatively to begin in November. 4. The latest update from the League is attached. The reprieve from the legislature going after our money appears to have been short-lived. A new effort to capture redevelopment money appears to be underway. 5. SMG and Holiday Inn staff announced their intention to bid on the 2004 USA Boxing Western Trials. These athletes are the top amateur boxers of USA boxing in route to the summer Olympics in 2004. We wish them the best of luck in their quest to bring this exciting sporting event to Bakersfield. 6. Attached is a chart showing which cities in the United States received grants from the COPS in Schools program. As you can see, we get $1.0 million of the $1.5 million allocated to California. Honorable Mayor and City Council September 5, 2003 Page 2 7. We met with the SPCA this week. With the passage of time, they may now have interest in selling us animal control vehicles and equipment, and perhaps cooperating in other ways. It was preliminary and there will be follow-up. We continue to meet with Kern County on merged services. 8. Enclosed is a 'memo from Public Work regarding the status of the White Lane Bridge Widening at SR 99 and construction of the Pacheco #10 Sewer. 9. Attached is a copy of the Annexation Status Report as of September 2003. 10. We are working with corporate officials of the Holiday Inn Select to get concession services to the Convention Center turned over to Aramark. Aramark specializes in that, while it is not a usual hotel function. 11. Attached is the September CIP status report. 12. At the request of Councilmember Benham, staff met with Chester Moland of GET, and reached an agreement, subject to their Board's approval, on how to resolve the bus routing issue for the Homeless Center. A memo from Public Works is enclosed. 13. Responses to Council requests are enclosed, as follows: Councilmember Benham · Report on feasibility of bike area at Centennial Garden; · Response to citizen regarding green waste and drainage issues; Councilmember Carson · Report on status of P Street sewers; Councilmember Hanson · Status of completion of curb and sidewalk repairs on the southwest corner of Ming and Ashe; Councilmember Maggard · Report on allocations of the TIF program and input from community developers; Councilmember Salvaggio · Update regarding the alley clearance project; · Assessment of need for a traffic signal at Berkshire and Monitor; · Feasibility of stop signs at South H and Berkshire, and Union and Berkshire. AT:al cc.' Department Heads Pam McCarthy, City Clerk Trudy Slater, Administrative Analyst B A K E R S F I E L D MEMORANDUM August 28, 2003 TO: Jack Hardisty, Development Services Director SEP 2 2003 FROM'..~,'"'"~Stanley C. Grady, Planning Director ..: SUBJECT: Proposed SJVAPCD Indirect Source Review Fee The San Joaquin Valley Air Pollution Control District held meetings with Planning Directors this week to discuss their program to develop an indirect source review fee. I met with them on Wednesday, August 27th, along with Ted James and the acting Director from Wasco. The District is on a two year time frame to develop and adopt an indirect source fee program. They plan to conduct public scoping meetings in October 2003, workshops in December 2003 and February and May 2004, and begin program development and environmental process in mid 2004. As planned, industrial, commercial, and residential development will be required to pay a fee based on new trips generated by the project. Because this was a pre-scoping meeting no real details were available regarding fee amount or structure of the program. However, there was a handout that outlined three options for implementing the program which had either the District or cities and counties conducting reviews and assessing fees. It isn't clear if the District will develop the program as a CEQA mitigation fee to reduce project emissions or a mitigation fee using Section 66000 of the Government Code to develop a funding mechanism to support emissions reduction efforts already ongoing within the air basin. Although presented as necessary to achieve emissions reductions stipulated in their State Implementation Plan, District staff couldn't conclusively state that with this new program the District will reach attainment or that it will have a significant impact on emissions reduction. One aspect I found troubling was the idea of allowing credits for what I termed soft mitigation, items such as bigger trees, bus stops, and street trees. These items and others represent good urban design but do not reduce emissions. They may encourage walking or use of buses but not for the category of trips that need to be eliminated to have quantifiable emissions reductions. I suggested that the structure of the program focus on hard mitigation, the kind that result in measurable emission reduction such as removing gross polluters, retrofitting diesel engines, fleet conversion to Iow emission vehicles or other similar efforts. If they are going to go through the process to develop a fee program the end result should be improved air quality not just improved street appearance and access to transit. These urban design, land use and development elements can be implemented by cities and counties without a new fee using existing authority contained in the California Government Code. We are on the Districts email and mailing list to be notified of upcoming meetings and to receive drafts of documents as they are prepared. I will keep you informed as information becomes available. CC: Alan Tandy, City Manager P:\Memos\lSF air quality SG.doc Program Options for Indirect Source Review District Permit Pro.qram · This option would have the District perform a detailed analysis and impose conditions of approval and/or assess a fee. · The ISR permit process could start during CEQA review or during the permit application process for the land use project. · The District would collect the fee under this option. City/County Review · This option would have the cities and counties conduct a review and/or assess a fee based on certain criteria. · The entities could start the review process during CEQA or during the permit application process. · The entity would collect the fee with other permit fees and transfer the funds to a District account. District Review · This option would have the District conduct a review and assess a fee based on certain criteria. · The District could start the review process during CEQA review or during the permit application process for the land use project. · The fee amount could be based on a simple checklist and assessed by the entity, or the District could notify the city or county of the fee amount. · The city or county would collect the fee with the other permit fees. Fee · This option would allow cities and counties to charge a fee based on certain criteria, such as size or number of units. · The cities or counties could assess and collect the fees under this option. Under all options, any fees collected would be used to mitigate emissions in a cost- effective manner. Development Process I /IIncomplete and ISR Preliminary--1 Highlighted items indicate Review .... ~ ...... i-- AdditiOnal i InformatiOn possible areas for __ I PrOvided ISR involvment [i Application Complete I Project Exempt Neg Dec or EIR i Required from CEQA i ................ Permit Application Over the Counter Plan Check Permit ~ Review [ . ~r ~plicant seeks I Plan Checker' I City DepartmentsI oa{~ia~'agency Review , . Review aPproval i ..... !~,l ,...'"' Corrections %',,., ................. ~ Yes ' Needed? '~' .................. ~1 and ,~ssess Fees ! San Joaquin Valley Unified Air Pollution Control District August 25. 2003 eagueo a orniaCities "~~~ ~ 1400 K Street Sacramento, CA 95814 FAX 916.658.8240 Better Cities -A Better Llfe ~.cacities.org TO: Mayors and Ci~ Managers Members of League Board of Directors Members of League Policy Committees Members of General Resolutions Committee FROM: Jo~ Russo, Presidem and City Attorney, Oakland ~ ' C~is McKe~ie, Executive Director DATE: August 26, 2003 SUB,CT: Supplemental Info~ation on New Petitioned Resolution for 2003 A~ual Conference on Initiative Ballot Meas~e PLEASE DUPLICATE AND DISTRIBUTE TO ALL OFFICIALS ATTENDING THE ANNUAL CONFERENCE. Purpose: On July 30, 2003 the League sent to you the meeting notice and resolution packet for the 2003 Annual Conference. That packet contained two resolutions that will be considered by the General Resolutions Committee (meets September 9) and the General Assembly of the League (meets September 10). The purpose of this supplemental packet of information is to alert you to a petitioned r6solution that the Board of Directors plans to submit for consideration in the League's resolution policy process. Background: For the last three years the League has been evaluating the feasibility of sponsoring a statewide ballot measure to help insulate city revenues from state raids. Until recently League policy makers had questions about the viability of such a campaign with the voters..-Recent political developments, however, hav. e_underscored_ the level of public dissatisfaction of state government and their preference for local government and services. Current polling suggests cities have a historic opportunity to propose a measure that will curtail the power of the state to take local revenues to balance the state budget. Aware of this opportunity, at its July 2003 meeting the League Board of Directors voted unanimously to sponsor such an initiative. Given the upcoming Annual Conference, the Board also voted to submit the proposal to the General Assembly of the League so the will of the membership can be expressed by cities directly.. Proposed Petitioned Resolution: The proposed petitioned resolution is attached. It recites the history of state raids on local revenues of the last 12 years and ratifies the Board's action in July to sponsor a statewide ballot initiative that empowers the voters to limit the ability of state government to confiscate local tax funds to fund state government. Status of the Initiative Campaign: Using its nonpublic resources, the League has retained attorneys and political consultants to draft the initiative and to plan the campaign. Efforts are underway to build a coalition of participating organizations, and the first, the California State Association of Counties (CSAC), joined us recently. Over the next month, additional polling will be done to test various alternative approaches, but each is expected to incorporate some kind of voter approval before the state can take local funds to finance state projects or programs. This approach yielded the highest level of public support during our poll earlier this year -- 76%. The actual language of the initiative is being drafted and refined at this time. Once it is approved, it will be filed with the Attorney General for title and summary in ~September;witl~-signature-gathering-tentativelyscheduled to begin in Ni~vembe~r 6f thi'~ year if things proceed as planned. Campaign Funding: Ballot measure campaigns must be funded from non-public sources. The League has saved enough non-public funds to help pay for part of the cost of the campaign, but the rest will have to be raised with the help of our coalition partners and city officials on their personal time. City officials or other donors may contribute to the cause through the League's new ballot measure PAC, called CITIPAC (see http://www.citipac.org/). Some city officials and employees are making similar contributions by payroll deduction to the Save Our Services (SOS) fund (http://www.bettercities.org/sos fund program.htm). Money raised for both funds will be devoted to the ballot measure. Additional information on these options will be provided at the conference. Process: The Board of Directors will review the proposed resolution on Sunday, September 7. Members of the Board who are registered voting delegates may sign the petition, but Board members will then fan out to secure additional signatures from city delegates until the required number of forty-eight (ten percent of the designated voting delegates registered with the Credentials Co_mmi___~e_e)_ are attained. On Tuesday, September 9, at 10:15 a.m. the General Resolutions Committee will review the petitioned resolution and other resolutions. The final stop for the resolution will occur when the registered voting delegates of the League General Assembly consider it for final action during the Annual Business Meeting on Wednesday morning, September 10. If approved, the action will reflect the depth of member commitment. Questions? City officials with questions are invited to contact Chris McKenzie, Executive Director, at (916)658-8275 or mckenzie~cacities.org 2 RESOLUTION SUPPORTING A STATEWIDE BALLOT INITIATIVE TO REQUIRE VOTER APPROVAL BEFORE STATE GOVERNMENT MAY CONFISCATE LOCAL TAX FUNDS~ Source: Board of Directors Recommendation of General Resolutions Committee: WHEREAS, the state currently seizes $824 million of city property tax funds (ERAF), seriously reducing resources available for local public safety and other services and increasing pressure on cities to raise fees on new housing developments, increasing the cost of housing; and WHEREAS, in adopting the FY 2003-04 state budget the Legislature and Governor confiscated local vehicle license fee backfill and redevelopment property tax ' ufffff'd~-th-fif ~d~-d-to-fi-~a~n~ce-critical-city-servi-ces-such-as~public-safetyr-hOUsing~and- economic development; and WHEREAS, the FY 2003-04 budget also relies on a deficit bond financing program opposed by the League that is predicated on a local property and sales tax swap that leaves cities vulnerable to future losses if the state's economic condition fails to improve; and WHEREAS, the adopted budget assumes the state will continue to face an ongoing structural budget deficit of at least $8 billion, putting local government financial resources at risk in future years; and WHEREAS, it is abundantly clear that state leaders will continue to use local tax funds to balance the state budget unless the voters limit the power of the legislature and governor to do so; and WHEREAS, research conducted by the League in recent years indicates that an initiative that requires voter approval before the state government can confiscate local tax funds would likely be supported by an overwhelming number of voters; and WHEREAS, the voters of California are ~he best judges-of whether funds traditionally used to finance valuable community services should be diverted, confiscated, shifted or otherwise taken by the legislature to finance an ever expanding state government; and WHEREAS, the Board of Directors of the League of California Cities by unanimous roll call vote at its July 2003 meeting voted to sponsor a statewide ballot initiative to empower the voters to limit the ability of state government to confiscate local tax funds to fund state government; and ~ This draft is being submitted to the Board of Directors of the League for consideration and action on Sunday, September 7. It may be amended by the Board before being circulated for signatures. WHEREAS, the League Board of Directors has established a political action committee, known as CITIPAC, to raise private funds to finance part of the cost of such statewide initiative campaign; and WHEREAS, the Board has requested that city officials across the state participate in this private fundraising to finance such a ballot measure campaign; now, therefore be it RESOLVED, by the General Assembly of the League of California Cities assembled in Annual Conference in Sacramento, September 10, 2003, that the action of the Board of Directors to sponsor such an initiative be ratified; and be it further RESOLVED, that the Board invite the city councils of the member cities of the League to adopt similar resolutions, supporting such an initiative and encouraging city officials and others to dedicate their personal time to the campaign to secure voter approval of the initiative; and be it further RESOLYED, that all city officials are called upon to unite and lend their valuable personal time and financial support to this campaign to provide the voters of California the power to reestablish limitations on the power of the legislature and governor to seize local tax funds that finance vital local services. 2883 19:18:53 ~;ia l~,,x -> 3Z~18i ALAN TANDY CITY MANAGER League of California Cities 1400 K Street, Suite 400 · Sacramento, California 95814  Phone: (916) 6fig-g200 Fax: (916) 65g-8240 ,~r~rw.cacities.or~ Page 1 of 2 September 4, 2003 TO: Mayors, Council Members and City Managers FROM: Chris McKenzie, Executive Director Dwight Stenbakken, Legislative Director RE: Call your Assembly Members and Senators TODAY! Additional RDA Cut Rumored It is rumored that a bill might be "gutted and amended" to expand the amount of the ERAF shift from Redevelopment Agencies to fund some additional public safety progran~..s that the Assembly included in their version of the budget, but which were not included in the budget passed by the Senate. This action could take place at any moment so calls are urgently recommended. Let your legislators know: WE OPPOSE ANY ADDITIONAL CUTS TO RDAs! As you may be aware, in coming to a final agreement on the 2003-2004 budget, the Assembly committed to restore a series of public safety programs that would cost the state a.total of $40.1 million in additional expenditures (beyond the Senate version of the budget). These programs include training reimbursements for the Standards for Training and Corrections (STC) program, funding for the Rural and Small County Local Assistance program for Sheriffs, and restoration of the Multi-Jurisdictional Methamphetarnine Enforcement Team (CAL-MET). The Senate has refused to support these programs without identifying funding for them. AS a result, the Senate is looking to "gut and amend" a measure that would expand the RDA cuts to cover the cost of some or all of these programs. While the League of California Cities is supportive of restoring these programs, we feel the, state should use its own money, not local money, to fund them. Call and tell your Senators and Assembly members that any additional cuts to, redevelopment revenues are unacceptable. The reduced cut of $135 million to =.~ECEIVED: 9/ 4/03 4:24PM; ->CITY OF BAKERSFIELD; #443; PAGE 2 Sep 84 2883 15:11:1B i/ia Fax -> 3241858 Alan E. Tandy Page 88Z O[ 882 redevelopment (v. the $250 cut in the SenaZe-passed version offlae budget) was part of the Assembly budget deal. The Assembly needs ~o stand by the deal that they made. For questions, con~act your local Regional Representative, or Jean Korinke, ikorinke~cacities.org. SUGGRSTRD KRy MRSSAGRS The state should finance these important county public safety programs and not use local mx funds from one local government to finance s~ate grants to other local govemmen~s. · Deeper cuts to RDA funding will put public safety programs in some cities at potential risk if their city general fund has to "baclcfil1" their RDA shift, as some will have to do even at the $135 million cut level. · The budget deal should be honored. Today's Date: September 3rd, 2003 Contact: Shawn Brandon, Centennial Garden 661-852-7307 .FOR IMMEDIATE RELEASF CENTENNIAL GARDEN TO BID ON 2004 USA BOXING WESTERN TRIALS Bakersfield, CA- SMG announced today, its intention to bid on the 2004 USA Boxing Western Trials. Scheduled for February 2004, the Western Trials will feature some of the top amateur boxers of USA Boxing in route to the summer Olympics in 2004. The Eastern / Western Tdals are the final qualification events for boxers that have their sights on being a member of the U.S. Boxing team at the 2004 Olympic Games in Athens, Greece. The five day event will feature between 175 and 225 of the top amateur boxers in the country in eleven weight classes. The gold medalist in each weight class will advance to the U.S. Olympic Trials about a month later. The bid developed through a joint effort between SMG, the management company that operates the Centennial Garden, and the Holiday Inn Select. "The Centennial Garden complex with the Holiday Inn Select is a natural for this type of event. It enables us to put a competitive bid together with rooms, meals, and event facility all at the same location." Stated Jim Foss, Centennial Garden's general manager. '~/Ve have had great success with our Fight Night At The Garden boxing series and look forward to the same success with the Western Trials." As of yet, no deadline or award date has been set for the Western Trials. USA Boxing officials will conduct a site review at the September 19th Fight Night At The Garden followed by meetings with representatives of Centennial Garden, The Holiday Inn Select, and The Convention and Visitors Bureau. Office of Community Oriented Poli'cing Services -. ~COPS'IN SCHOOLS August 28,2003 AK Haines Police Department $125,000 1 AK Sitka, City and Borough of $125,000 1 $250,000 , 2 CA Bakersfield Police Department $1,000,000 8 CA Ontario, City of $125,000 1 CA Oxnard Police Department $250,000' . 2 CA Riverside County Sheriff's Department $125,000 1 $1,500,000 12 FL Ft. Lauderdale, City of $125,000 1 FL Orlando, City of $125,000 1 FL Polk, County of $625,000 5 $875,000 7 IA Des Moines, City of $875,000 7 KY Jefferson County Sheriff's Office $945,801 9 KY Louisville Metro Police Department $1,125,000 9 $2,070,801 18 MD Baltimore County Police Department $1,'125,000 9 ME Brewer, City of $125,000 1 ME Farmin~ton Police Department $125,000 1 $250,000 2 MT Laurel Police Department $125,000 1 MT Sanders County Sheriff's Department $250,000 2 $375,0OO 3 ND Bismarck Police Department $250,000 2 NE Omaha Police Department $1,375,000 11 NJ Bergen County Police Department $375,000 3 NJ New Jersey Department of Law and Public Safety $1,000,000 8 $1,375,000 11 NM De Baca County Sheriff's Office $78,543 1 NM Taos, Town of $125,000 1 $203,543 2 NY Monroe Count)/Sheriff's Office $125,000 1 OH Cleveland, City of $1,250,000 10 RI Providence Police Department $750,000 6 ~" '~ ' Office ~)f Community ·oriented Policing Services -.. · 'COPS IN SCHOOLS AuguSt 28,2003 RI West Warwick, Town of $125,000 1 ' $875,000 7 SC Richland, County of $1,231,087 · 11 SD Huron Police Department $122,307 TN Knox County Sheriffs Department $1,218,800' 10 TX Dallas lSD Police and Security Department $1,841,760 16 UT Salt Lake, City of $125,009 1 VA Prince William County $250,000 2 VA Virginia Beach, City of $2,250,000 18 $2,500,000 20 VT Windsor Police Department $124,999 WA Pierce County Sheriffs Department $375,000 3 WA Spokane Police Department $750,000 6 $1,125,000 9 WY Buffalo Police Department, City of $125,000 1 WY Rawlins Police Department $125,000 1 WY Riverton, City of $121,366 1 $371,366 3 SEP 3 2005 B A K E R $ F I E L D CITY OF BAKERSFIELD. PUBLIC WORKS DEPARTMENT MEMORANDUM September 3, 2003 TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director ~_._. / SU BJ ECT: Status of Projects: 1. WHITE LANE BRIDGE WIDENING AT SR 99, and 2. PACHECO #10 SEWER CONSTRUCTION Construction of the Pacheco # 10 Sewer Project started Monday, August 25, 2003. There are 170 working days in this construction contract making the completion date May 3, 2004. Construction started September 2, 2003, on the White Lane Bridge Widening project. There are 245 working days for completion of construction putting the completion date at August 25, 2004. Both of these completion dates are based on no delays, changes, or extra work added to the contract. c: Jacques R. LaRochelle, Assistant Public Works Director Stuart Patteson, Construction Superintendent Rick Millwee, Construction Supervisor G:\GROUPDAT~ConstructionWlemosX2001~Entry Sign Lettering 11-26-01.wpd B A K E R S F I E L D CITY MANAGER'S OFFICE MEMORANDUM TO: Alan Tandy, City Manager September 5, 2003 FROM: Alan Christensen, Assistant City Managcr/~ SUBJECT: Annexation Status Report Attached is a copy of the Annexation Status Report as of September 2003. Nineteen (19) annexations are currently in progress, meaning that the Council has formally approved them and they will be considered by LAFCo in the coming months. Requests for annexations, especially on the west side of town, continue to be brisk. Of those in progress, the total area is approximately 1836 acres. In addition to uninhabited annexations, we have received a request for information about annexation from an inhabited residential area west of Allen Road near Palm Avenue in Ward 4. The neighborhood is called Froelich Palms. Some of them were very vocal regarding the multi-family project directly to the north that was approved by the Planning Commission and the City Council about a year ago that is now under construction. Based upon requests from some individuals in the neighborhood, we sent a letter explaining some of the advantages of annexation along with an interest card that they could return to us. We sent 86 letters to residents this summer. We received 51 cards back. Twenty-six were interested in having an informational meeting. Nine others wanted more information either by phone or in writing. Six stated they were not interested. Based upon the response, we are planning to have an informational meeting sometime in October. We will be working with the neighbors to fred a suitable location. All this is in conformance with the annexation policy that was adopted by the Council a year or two ago. More information will be provided to the Council as we progress. ANNEXATION - STATUS REPORT SEPTEMBER 2003 ANNEXATIONS ESTIMATED LAFCO ACRES COMMENTS COMPLETE POPULATION RESOLUTION NUMBER I. Oswell No. 8- Wible No. 12 Annex. 435 94.39 0 ( I ) south of' State Route 58, east of Oswell & & 02-046 January 9, 2003 Street to Sterling Road & (2) northeast 40.01 0 corner of McKee Road and Wible Road. 2. Stockdale No. 14- Blomquist No. 1 Annex. 436 3.26 0 ( I ) Along Stockdale Highway, west of & & 02-047 January 9, 2003 Ashe Road & (2) south side of Blomquist, 0.48 2 to Belle Terrace west of McDonald Way. 3. Springdale No. I - Allen Road No. 7 Annex. 438 0.5 0 ( I ) Northwest corner oi" Springdale Drive & & 03-l 1 August 19, 2003 and Sunflower Way & (2) along the east 80.00 0 side of' Allen Road, between Snow Road 'and Olive Drive. ANNEXATIONS IN EST. RE: ACRES STATUS COMMENTS PROGRESS POP. ZC 4. Renfro No. 5 - Pacheco No. 12 Res. of App. to CC Annex. 437 20.00 0 02-0939 9/4/02. Submitted Planning Commission will review ( 1 ) North side of Stockdale Highway, west & & 3/I 2 application to LAFCO GPA/ZC for the Pacheco site on June of Renf?o Road & (2) southwest comer of 100.00 0 on 1/8/03. LAFCO 19, 2003. Pacheco Road and Cottonwood Road. 03-0362 approved 5/27/03, 8/27 subject to ZC by City. 5. Allen Road No. 8 Annex. 439 Res. of App to CC Reorganization includes annex, to West side of Allen Road, between 80.00 0 03-0014 1/29/03. Submitted NOR Sanitation Dist. and detachment Kratzmyer/Olive Dr. north of Reina Road. application to LAFCO from North Kern Water Storage Dist. 8/27 on 3/18/03. Williamson Act Contract cancellation. 6. Panama No. 14 Annex. 440 Res. of App to CC Hold to Submit to LAFCO. West side of Gosfbrd Road, south of 302.00 4 gpa/gc 2/12/03. Waiting for Williamson Act Cancellation, EIR Panama Lane to McCutchen Road. ? KC Surveyor to sign for GPA/ZC required. maps and legal. 7. Allen Road No. 9 Annex. 441 Rcs. of App to CC Reorganization includes detachment West side of Allen Road, north of Noriega 89.00 0 02-1248 2/12/03. Waiting for from North Kern Water Storage Dist. Road. 5/28 KC Surveyor to sign maps and legal. 8. Oswell No. 9 Annex. 442 Res. of App to CC East side of Oswell Street, south of' State 80.00± 0 03-0343 2/26/03. Submitted to Route 58. 8/27 LAFCO 6/2/03. Tax split on 9/03. 9. Jewetta No. 3 - Jefferson Park Res. of App to CC Annex. 443 5 2 03-0047 2/26/03. Submitted to West side of Jewetta Avenue 200 feet & 5/28 LAFCO on 7/30/03. south of Birchhaven Avenue. Southwest 0.0005 corner of Bernard and Beale Avenue. 10. Hosking No. 6 Annex. 444 Res. of App to CC Reorganization that includes North sklc of Hosking Avenue, west of 28.00 0 03-0002 3/12/03. Submitted to annexation to Greenfield County South Union Avenue. 5/28 LAFCO 6/27/03. Tax Water Dist. split on 9/03. Annexation - Status Report September 2003 Page 2 EST. RE: ANNEXATION ACRES STATUS COMMENTS POP. ZC IN PROCESS 11. McCutchen No. I Annex. 445 Resolution of App to East side of Gosford Road to Ashe Road, 320.00 2 N/A CC on 3/12/03. north of McCutchen Road. Submitted to LAFCO on 7/30/03. Tax split on 9/03. 12. Oswell No. 10 Annex. 446 Resolution of App to K.C. Sewer Facility. West side of Oswell Street, south of State 160.00 0 N/A CC on 3/26/03. Route 58. Submitted to LAFCO on 8/8/03. 13. Callowa.~ No. 7 Annex. 447 Resolution of App to Hold to Submit to LAFCO. North side of Snow Road, east and west 60.00+ ~ ') CC on 3/26/03. GPA/ZC required. side of Calloway Drive. Waiting for KC Surveyor to sign maps and legal. 14. Coffee No. 2 Annex. 448 Resolution of App to Southeast corner of Coffee Road and 40.00± 2 N/A CC on 4/9/03. Downing Road. Submitted to LAFCO on 8/8/03. 15. Union No. 11 Annex. 449 Resolution ofApp to East of South Union Avenue, generally 6.90+ 9 N/A CC on 6/I 1/03. south of Panama Lane. Waiting tbr KC Surveyor to sign maps and legal. 16. McKee No. I Annex. 450 03-0341 Resolution of App to South of McKee Road, generally between 40.002: 0 PC CC on 8/27/03. State Route 99 and Wible Road. 9/I 8/03 17. Calloway No. 8 Annex. 451 Applicant to prepare Annexation to NOR Sanitary District West of Calloway Drive, north of Snow 505.54 9 ge.9 map and legal and detachment ~?om North Water Road to Seventh Standard Road. description. Storage Dist. 18. Mohawk No. ~ Annex. 452 Resolution of App to North of the Kern River, along the West- 0 CC on side Parkway, along and east of Mohawk Street. 19. Henry Ln. No. I Annex. 453 Resolution of App to East of Henry Lane, north of Rosedale 2 CC on Highway. PSASR-YEAR.NOW\two thous3\SEPT 9-2003.DOC B A K E R S F I E L D CITY OF BAKERSFIELD MEMORANDUM September 4, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~.7.__ SUBJECT: CIP REPORT Attached please find our monthly report reflecting the status of Public Works CIP projects. If you have any questions, please call me at 326-3596. C:\Documents and Settings\dtrammeI.BAKERSFIELD\Local Settings\Temp\memo Sep 03.doc Ci£ o[ Ba ersfJe[ Pl / /ic Wor/ $ Ca ita[ Improvement Prooram Scbeb.[e Fisca/Y r oo3- oo4 Au PROJ PROJECTTI~E WARD COMMENTS DESIGN PHASE CONSTRUCTION PHASE ~, NUM NUM BEGIN (esl.) END lest.) BEGIN {est.) END (est.) Pr~t c~struction is Rlmost c~plele. Final conslruclion elemenl is T3K056 ~TH STRE~ PARKING MALL 2 In~allatlon of ~lards which have ~en purchased M~r-03 May-03 Jul-03 Sep-03 _ AIRPORT T4K139 PAYMENT REHAB 1 in de~ Jul-03 Oct-03 Mar-04 A~-04 Not Yel Not Yel Not Yet T3K047 AKERS ROAD CONSTRUCTION 6 awaiting a~al for railr~d'cmssing Jan-03 Scheduled Scheduled ~h~ul~ Not Yet Not Yet Nol Yet T3K014 AKERS ROAD RR XING~RIDGE 6,7 awaiting Public Utilities Commission a~oval Jan-03 Scheduled Sch~uled Schedul~ BIKE PATH WIDENING E2J~21 CSUB TO MANOR 2,3,4 underc~struction Sep-02 May-03 Aug-03 N~-03 BRIDGE CONSTRUCTION - HAGEMAN Not Yet Nol Yet TOK012 FLYOVER ~ SR99 2 PSR'a~al anlici~led for Septem~r Jul-01 Dec-03 Scheduled Schedul~ BRIDGE CONSTRUCTION ~ 03-04 funding is ~ly [or environmental sludy. Environmenlal suldy is in Not Yel Not Yet T4K142 ALLEN ROAD ~ KERN RIVER 4 ~ress. Jul-03 . Jun-04 Scheduled Scheduled BRIDGE CONSTRUCTION ~vel~r of adjacent pro.tN is ~e~ring deign. Cily ~11 reimbur~ T3K051 BERKSHIRE RD ~ KERN IS~ND CANAL 7 Devel~r for Ciys share of pr~ect. Mar-03 Sep-03 N~-03 ~c-03 BRIDGE CONSTRUCTION D~el~r of adjacenl pro~r~ is preparing design. Ci~ will reim~r~ T3K050 HOSKING ~ KERN ISLAND CANAL 7 D~el~r f~ Ciys share of ~ojecL Mar-03 Sep-03 N~-03 Dec-03 BRIDGE CONSTRUCTION Not Yel Not Yet T3K041 SR ~ ~ HOSKING AVENUE 6, 7 ~-gdng; this current project is f~ Feliminary design only. May-03 Dec-03 Scheduled Scheduled BRIDGE WIDENING T8K~2 WHITE LANE ~ SR ~ 7 un~r c~ructi~ Mar-02 A~-03 Aug-03 Aug-04 T3L~03 BRUNDAGE LANE STRE~SCAPE 1 N~-03 Feb.4 A~-04 Jun-04 Not Yet Not Yet T4K121 CENTENNIAL CORRIDOR 2, 5 N~-03 N~-06 ~h~uled ~hedul~ D~INAGE IMPROVEMENTS E4KI~ ~WNTOWN 2 ~ 03-04 funding is ~ly for pr~r~ acquisition for storm drain facililies. Sep-03 Jun-04 Not A~icable Not A~icaMe DRAINAGE IMPROVEMENTS E3K011 TEVlS RANCH 5 in ~gn Aug-03 Sep-03 N~-03 Jan-04 Not Yet Not Yel T4K113 EAST BEL~AY ADVANCED P~NNING 3 ~is is ~oject is f~ a sluW only. Oct-03 Jun~4 Sch~ul~ Schedul~ ~ST CALIFORNIA AVE. STRE~SCAPE 1 Jul-03 ~3 Mar-04 Jun~4 FIRE STATION ~1 , P2H~3 REWIRE 3 in ~gn, 75% compete Jan-03 Sept3 N~3 Jan-04 FIRE STATION ~15 'P8H~I WSPS 4 un~r ~sffucti~ Aug-01 Jan~3 Mar-03 ~-03 GOSFORD LI~ STATION O~R E4K105 CONSOL 5 in ~ Jul-03 Oct.3 Fe~4 Mar~4 G~DE SEPA~TION Not Yet Not Yet T4KI~ 24TH ~ OAK 2 N~-03 N~5 ~h~uled ~h~l~ HVAC UPG~DE P1K~3 CI~ HALL 2 ~n final ~a~s of cmstruclim May-02 Jun~2 ~3 Not Yel Not Yet Not Yet Not Yet T3KI~ ~Y 58 ENTRY MONUMENT 1 ,~ h~d ~h~uled ~h~ul~ ~h~ul~ ~h~ul~ P3C~2 ICE SPORTS OF BAKERSF~F~ n 2 un~r ~ucti~ JuI-O2 ~2 Fe~3 N~3 Updated ^U.ClUst 29, 2003 PROJ PROJECT TITLE WARD COMMENTS DESIGN PHASE CONSTRUCTION PHASE ,_, NUM NUM BEGIN {est.) END (;est.) BEGIN (;est.) END lest.) INTERCHANGE 3roject report submitted to Caltrans. consultant has begun T7K021' SR t78 @ FAIRFAX 3 final desiu- Jul-99 Dec-03 Jun-04 Nov-05 Not Yel Nol Yel INTERSECTION EXPANSION T1K034 MING - ASHE TO NEW STINE 3 in design; currently on hold pending identification of funding source Dec-00 Aug-03 Scheduled Scheduled INTERSECTION EXPANSION design complete; project's construction will be combined with Truxlun Ave right T2K022 MING @ SR99 4 turn lane projecl; State may withhold construction funding Nov-01 Sep-03 Nov-O3 Mar-04 INTERSECTION EXPANSION design 90% complete; utility companies are relocating Iheir facilties; State may T3K045 RIGHT TURN LANE - MING/TRUXTUN 5,7 withhold construction funding Oct-02 Sep-03 Nov-03 Mar-04 P3C084 JEFFERSON & M[~K PARKS o POOL P3C085 REHAB & WET PLAY AREAS f,2 in design Jul-03 Oct-03 Jan-04 Jun-04 LANDSCAPING Staff is finalizing design options to be Presented to Council Member for T3K052 NEW STINE ROAD 5 determination of which option to implement. Feb-03 Nov-03 Feb-04 Apr-04 P3C08 f McMUHTI~EY AQUATIC CENTER 2 construction contract awarded 7/30/03 Aug-02 May-03 Aug-03 May-04 design concepts not yet prepared. Schedule will be prepared upon finalizalion Not Yet Not Yet Not Yet Not Yet P3K002 MT VERNON FACILITY AC PAD I of design concepts by staff. Scheduled Scheduled Scheduled Scheduled T4KI07 NORTH EAST BIKE PATH II 3 Oct-03 Jan-04 Apr-04 Jun-04 PARKING LOT EXPANSION design complete; currently demolishing existing structures (Food Bank); POB001 P &14TH $~R~-E r 2 waiting for indentification of funds for construction of project APr-03 Jul-03 Sep-03 Nov-03 PARKING POCKETS T4K118 WHITE LANE 6 in de$1,~ Aug-03 Jan-04 - Mar-04 Jun-04 P3K003 REPLACE FIRE ALARM SYSTEM 2 in final stages of construction Sep-02 Dec-02 Mar-03 Sep-03 RETAINING WALL T4Kt tO COLLEGE AVENUE 3 Nov-04 Mar-04 Jun-04 Aug-04 rough grading of park site complete, stream bed is u~-~,~er construction; P1C020 RIO VISTA PARK 4 remaining portions of Phase I are in design Mar-01 Sep-03 Nov-03 Apr-04 T8K083 T8K084 SEISMIC REV ROFIT OF 4 CITY BRIDGES 2,3 Jnder construction Jan-98 Sep-02 Mar~03 Jan-04 SEISMIC RETROFIT OF MANOR BRIDGE waiting on environmental clearance, design complete. State funding Not Yet Not Yet T8K083 .EFT AND RIGHT 3 withdrawn. Jan-98 Sep-02 Scheduled Scheduled ~EISMIC RETROFIT OF NORTH T8K085 .;HEST~=H BRIDGE 3 in design Apr-02 Sep-03 Nov-03 Nov-04 SEWER CONSTRUCTION Jan-04 Apr-04 Jun-04 Sep-04 E2K102 MCDONALD WAY 5 SEWER IMPROVEMENT E4K104 ALLEN ROAD 4 in design Aug-03 Apr-04 Jun-04 Nov-04 SEWER IMPROVEMENT ELK003 PACHECO #10 7 construction contract awarded July 30, 2003. ' Mar-02 May-03 Aug-03 Apr-04 SEWER IMPROVEMENTS - P STREET E4K110 AND 2ND STREET 1 in design Aug-03 Sep-03 Oct-03 Dec-03 SEWER IMPROVEMENTS E4KI0g STOCKDALE HWY 4 'rhis is a multi-year project - design FY03-04; construct FY 04-05. in design Aug-03 Jul-04 Oct-04 Feb-05 SEWER REHAB E3K010 L ~ R~'~ 1 in design May-03 Nov-03 Feb-04 Jul-04 SEWER REHAB MAIN - PLANZ ROAD, staff is finalizing design options to be presented to Council Member for ETK005 CHES~I::R TO WWTP#2 1 determination of which option to implement. Nov-02 Apr-04 Jun-04 Oct-O4 G.\~ROI iPF)ATW)an~C,,IP~FY 03-04\CIP FY 0,3-04 AtJG.~ds 2 of 4 Updated~ DESIGN PHASE CONSTRUCTION PHASE PROJ PROJECT TITLE WARD COMMENTS NUM NUM BEGIN lest. I END {est.) BEGIN (est.~) END {est.) _ SEWER REHAB May-03 Nov-03 Feb-04 Jul-04 E3K009 BRUNDAGE LANE 1 in design ISEWER REHAB Mar-04 Aug-04 Oct-04 Jan-05 E4K101 Q $i1~E~-f 2 Not Yet Not Yet SEWER STUDY Scheduled E4K102 SW - iN~i:~CEPTOR 4, 5, 6 Projecl funded only for study - no conslruction. Oct-03 Jun-04 Scheduled _ SIGNAL NEW BUCK OWENS @ RIO Oct-03 Jan-04 A~-04 May-04 T4K125 iMIRADA 2 ;SIGNAL NEW BUENA VISTA @ DEER T3K060 PEAK 4 construction complete Dec-02 Mar-03 Jun-03 Jul-03 4 SIGNAL NEW CALLOWAY @ OLIVE 4 under construction completed completed Jul-03 Oct-03 T3K063 SIGNAL NEW HAGEMAN AT PATRON WAY 4 under construction Jan-03 Mar-03 Jul-03 Oct-03 SIGNAL NEW Aug-03 Oct-03 Dec-03 Feb-04 T4K131 BRIMHALL @ OLD FARM 4 in design SIGNAL NEW bids were received August 20. Anticipate award at Seplember 24, 2003 City T2K028 BRUNDAGE @ WASHINL~ I ON 1 Council Meeting. Feb-02 Jul-03 Sep-03 Nov-03 SIGNAL NEW Mar-O0 Mar-02 ' Nov-02 Jul-03 T9K015 COMANCHE @ SR 178 3 construction complete SIGNAL NEW in design, 65% complete; project on hold pending resolution of right-of-way Not Yet Not Yet Not Yet T3K055 HAGEMAN @ JEW~ ~ ~ A 4 and funGii~g issues Mar-03 Scheduled Scheduled Scheduled SIGNAL NEW Sep-03 Dec-03 Feb-04 Ai~-04 T3K012 IEWI=~- @ 34TH 2,3 SIGNAL NEW Aug-03 Oct-03 Jan-04 Mar-04 T4K134 PANAMA @ MONITOR 7 in de$1g~ SIGNAL NEW Jan-02 Nov-02 May-03 Jul-03 T2K023 PLANZ @ REAL 6. construc~io~ complete SIGNAL NEW Feb-02 Nov-02 May-03 Jul-03 T2K027 PLANZ @ WILSON 5, 6 construction complete SIGNAL NEW ~ Oct-03 Dec-03 Mar-04 May-04 T4K135 SAN DIMAS @ WEST COLUMBUS 2 SIGNAL NEW Sep-03 Nov-U3 T2K043 STOCKDALE @ MCDONALD 2,5 ~eslgn co~p~ete; KernCOG is reprogfaf-~-~ming for funding Mar-02 Feb-03 Not Yet Not Yel T4K112 SR 178 ADVANCED PLANNING 3 This is project is for a study only. Oct-03 Jun-04 Scheduled scheduled ,STORM DRAIN IMPROVEMENTS Nov-03 Mar-04 Jun-04 Jul-U4 E4K108 CHE,5~F-R @ 32ND 2 STORM DRAIN IMPROVEMENTS Jul-03 Sep-03 Feb-04 M.ar-04 E4K103 TR 5130 4 in ~e~gn STREET IMPROVEMENTS T4K123 COFFEE @ DOWNING 4 in ~e~,~. Started right-of-way co~demnation proceedings against PG&E Jun-03 Apr-04 Jun-U4 Aug-05 STREET IMPROVEMENTS Castle & Cooke de~gn~ and is now constructing these i~p~-ove,~e,~;.$ which T4K140 JEWEI~A AVENUE 4 will facii;[ate future construction of Westside Parkway done done Jul-03 Dec-03 STREET IMPROVEMENTS Castle & Cooke desigr~e~ and is now constructing these improvemenls which T4K119 JEWEl'FA AVENUE 4 are adjacent to the City's future ,~ccer park. done done Jul-03 Dec-03 STREET IMPROVEMENTS Jul-03 Nov-03 Feb-04 Apr-04 T4K108 MING AVE - EDNA TO ANITA 7 in 3of4 G.~GROt ipDAT~I3ani\C, IF~FY 03-04\C, tP FY 0,3-04 AtfG.xls Updated Au.qust 29, 2003 ~-- PROJ PROJECT TITLE WARD COMMENTS DESIGN PHASE CONSTRUCTION PHASE NUM NUM BEGIN (esl.~ END {esl.~) BEGIN ~est.I END lest.) STREET IMPROVEMENTS design is complete. Waiting for Southern Cai Gas lo relocate Iheir main line in Not Yet Not Yei TOK013' OLIVE DRIVE W OF CALLOWAY 4 )rder to schedule slreet improvemenl conslruclion, done done Scheduled Scheduled STREET IMPROVEMENTS Not Yet Not Yet Not Yet T1 K027 RR CROSSINGS 3 in design, awaiting Public Utilities Commission approval Jan-02 Scheduled Scheduled Scheduled STREET RESURFACING CALLOWAY T3K017 DRIVE, ROSEDALE TO MEACHAM 4 in preliminary design. Project includes construction of curbed median islands. Jan-04 Mar-04 May-04 Jul-04 STREET WIDENING CALLOWAY DRIVE, . T3K017 ROSEDALE TO MEACHAM 4 Co~slruction will be by Cily forces and annual contractors. May-03 Aug-03 Oct-03 Nov-03 STREET WIDENING ROSEDALE HIGHWAY T4K106 - CALLOWAY TO THE EAST 4 This is a. multi-year project- design FY03-04; conslruct FY 04-05 & 05-06. Nov-03 Oct-04 Sep-05 Nov-05 STREET WIDENING ROSEDALE HIGHWAY - GIBSON TO SR99 2 in design Aug-01 Nov-03 Jan-04 Apr-04 TOK006 STREET WIDENING T3K057 BRIMHALL - CALLOWAY TO JEWI= I I A 4 in design Feb-03 Aug-03 Oct-03 Dec-03 STREET WIDENING Final design of retaining wall pending. T1K028 COLLEGE @ FAIRFAX 3 Design for street widening is 80% complete. May-Of Oct-03 Jan-04 Apr-04 STREET WIDENING T3K053 ! STOCKDALE HWY-MEDIAN RECONST 2, 5 This is a multi-year project - design FY03-04; conslruct FY 04-05. in design Jun-03 Mar-04 Jun-04 Aug-04 LBS301 STREETSCAPE BAKER $iF~EET - PHASE 2 under construction Sep-02 Mar-03 Jun-03 Sep-03 T4K104 S¥~EETSCAPE BAKER STREET - PHASE ,c 2 Dec-03 May-04 Jul-04 Oc!-04 STREETSCAPE FY 03-04 construction funds were pulled from Ibis projecl and will be T4K105 19TH @ EYE 2 reinstated for FY 04-05. Jan-04 Apr-04 Jul-04 Aug-04 STREETSCAPE T3K049 NORTH CHESTER 2 June 5 bids exceeded funds available. In redesign 1o reduce costs. Mar-03 Sep-03 Nov-03 Jan-04 Not Yet Not Yet Not Yet Not Yet Union Avenue Slreellighfs 1 Scheduled Scheduled Scheduled Scheduled Not Yet Not Yet WEST BELTWAY T4K114 ADVANCED PLANNING 4, 5 iThis is project is for a sludy only. Sep-03 Jun-04 Scheduled Scheduled T2K046 WESTSIDE PARKWAY 2, 4 ~n-going Jun-02 Jun-05 Jun-05 Jun-09 E3K004 i WWTP 1t2 EFFLUENT STORAGE 1 Droject currently out Io bid. done done Oct-03 Mar-04 E7K012 WWTP#3 HEADWORKS 4 iunder construction done done Dec-03 r, ~,l'ln! iPnAT~nnni~r, lP~F'Y 03 n4\~lP FY ti'a 04 Al I~ ',d~ 4 of 4 !' SEP ,2003 B A K E R S F I E L D PUBLIC WORKS DEPARTMENT CITY OF BAKERSFIELD MEMORANDUM September 3, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~ SUBJECT: UPDATE: STOP SIGNS AND CROSSWALK AT HOMELESS CENTER Council Referral #533 COUNCILMEMBER BENHAM MADE AN EMPHATIC REQUEST THAT THE PUBLIC WORKS DEPARTMENT FIND A WAY TO FACILITATE GOLDEN EMPIRE TRANSIT DISTRICT'S REQUEST FOR A CROSSWALK AND TWO STOP SIGNS AT THE BAKERSFIELD HOMELESS CENTER. The Public Works Director and the Traffic Engineer met with Mr. Chester Moland of Golden Empire Transit to discuss bus routing and proposed improvements on East Truxtun Avenue, near the Bakersfield Homeless Shelter. Mr. Moland agreed in principal to the implementing of left turn lane improvements on East Truxtun to facilitate the bus turn off of Washington Street and the installation of a crosswalk, signs, markings and future lighted crosswalk experimental devices. He will take the proposal to his Board of Directors for formal approval in the next few weeks and advise the City staff of the outcome. Background: The City of Bakersfield had requested Golden Empire Transit (GET) to consider modifying their bus route to include a stop at the Bakersfield Homeless Shelter on East Truxtun Avenue at Williams Street. GET responded by requesting additional stop sign controls and a crosswalk in order to operate their buses on the new route. As noted in the July 18, 2003 memo, the Traffic Engineer determined that the GET buses could safely and efficiently use the intersections without unwarranted traffic controls. The Traffic Engineer proposed turn lane improvements, in lieu of additional stop signs on East Truxtun, which would benefit the bus operation. A crosswalk with warning signs at Williams Street was also proposed along with future installation of experimental lighted crosswalk lighting devices. G:\GROUPDAT~Referrals~003\CC Mtg 07-09\533 Update.doc BAKERSFIELD CENTENNIAL GARDEN ;&'CONVENTION CENTER MEMORANDUM TO: ALAN TANDY, CITY MANAGER FROM: ~JIM FOSS, GENERAL MANAGER DATE: SEPTEMBER 4, 2003 SUBJECT: UPDATE ON COUNCIL REFERRAL #000589 BIKE AREA AT CENTENNIAL GARDEN Councilmember Benham requested staff look into the feasibility of encouraging bike transportation to daytime events at Centennial Garden and possibly provide an area for bikes. With the help of Steve Hollingsworth, General Services Superintendent, we have found a bike rack that can be installed in the large parking lot south of Centennial Garden Arena. In addition, SMG (Shawn Brandon, Marketing Manager), will advertise, via its website www.centennial.qarden.com, about this new feature. ~ £ ~ $ F 'i' ~ 'I.., D PUBLIC WORKS DEPARTMENT CITY OF BAKERSFIELD MEMORANDUM September 3, 2003 TO: ALAN TANDY, CITY MANAGER FROM' RAUL M. ROJAS, PUBLIC WORKS DIRECTOR SUBJECT: GREEN WASTE AND DRAINAGE ISSUES Council Referral #566 Councilmember Benham referred a letter to staff from Jonathan Payne, Boy Scout, regarding problems with green waste and drainage issues. Staff to prepare response. Staff provided the attached response to Jonathan Payne regarding problems with greenwaste and drainage issues. G:\GROUPDAT~Referrals~003\CC Mtg 08-27~566 - SW.doc B A K E R S F I E L D PUBLIC WORKS DEPARTMENT 1501 TRUXTUN AVENUE BAKERSFIELD. CALIFORNIA 93301 (661) 326-3114 RAUL M. RO.IAS KEVIN BARNES DIRECTOR. CITY ENGINEER SOLID WASTE MANAGER September 3, 2003 Jonathan Payne 617 Winchester Bakersfield, CA 93309 Dear Jonathan, Thank you for your letter concerning greenwaste collection and street drainage. It is good to know that you are a community-minded Boy Scout. Your observation about spilled mosquito prevention is noteworthy. In general, greenwaste collection crews do not leave material on the street. However, due to wind, overloading by the resident, or sticky wet grass that doesn't clear out of the container, there is occasional spillage. Of course, there is also a great deal of yard.debris regularly blown into the street by gardeners with leaf blowers. And, depending on the season, fallen leafs blow into the street as well. The result of all this is, as you observed, is potential blockage of water drainage along the curbs and storm drains. The City of Bakersfield therefore operates two cleaning programs. These are regular street cleaning (good for neighborhood cleanliness as well as good drainage) and fall leaf pickup. In case it is helpful for your merit badge project, the cost of these programs is about $2 million per year. The City operates a fleet of 12 street sweepers on a regular basis. The fall leaf collection program includes about four trucks and a large skip loader, running from October through December each year. If a problem occurs in a particular location and does not seem to be resolved by these services, please let me know. I can be reached at (661) 236-3114. It is always good to have input to help improve our services. Sincerely, / / Solid Waste Manager G:\GROUPDA'I%Referrals~2003\CC Mtg 08-27~etter to Boy Scout Jonathan Payne (566).doc Septem~r 4, 2003 SOLID WASTE DIVISION 4101 TRUXTUN AVENUE (661) 326-3114 BAKERSFIELD. CA 93309 Fax (661) 852-2114 B A K E R S F I E L D CITY OF BAKERSFIELD MEMORANDUM August 29, 2003 TO: ALAN TANDY, CITY MANAGER FROM: ~['~RA/IJL M. ROJAS, PUBLIC WORKS DIRECTOR SUBJECt[ I ~e'~P STREET SEWERS INFORMAL REFERRAL FROM COUNCILMEMBER CARSON Staff has completed the surveying necessary to complete plans for sewer improvements on P Street north of Brundage Lane. It appears the homes that do not currently have sewer service can receive this service through a relatively short gravity line. Staff will complete the necessary work for this design in the next two weeks at which time we can determine the best course of action to construct the facilities. G:\GROUPDATWlemo~003\P Street Sewers.doc ~ SEP B A K E R S F I E L D PUBLIC WORKS DEPARTMENT CITY OF BAKERSFIELD MEMORANDUM September 3, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR.,2~ SUBJECT: MING & ASHE CURB REPAIRS Council Referral #571 Councilmember Hanson requested staff check on the completion of repairs to the curb and sidewalk at the southwest corner of Ming and Ashe. The CIP includes a project for widening the intersection of Ming Avenue and Ashe Road. To facilitate that project and as part of their franchise obligations, Pacific Gas & Electric (PG&E) relocated their facilities at the southwest corner of the intersection. PG&E replaced the sidewalk, curb and gutter at that corner with temporary asphalt concrete with the plan that it would be replaced with new Portland cement concrete by the City's construction of the intersection widening. After the construction documents are complete and an estimate for the City's work is prepared, staff will request that City Council appropriate Transportation Development Funds for the construction of this project. City Street Division staff will clean up this temporary sidewalk and place a leveling course on it to provide a smoother surface. G:\GROUPDAT~Referrals\2003\CC Mtg 08-27~571 - Streets.doc BAKERSFIELD CITY OF BAKERSFIELD MEMORANDUM September 4, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR.~'~-L_.~ SUBJECT: TIF PROGRAM ALLOCATIONS Council Referral #559 Councilmember Maggard requested staff prepare a memo before September 10th addressing the allocations of the TIF Program and outline how we can receive input from Community Developers. Staff has held several meetings with the representatives of the Building Industry Association (BIA) and has done considerable evaluation of their proposals. At the Council Meeting of July 30, 2003, a presentation of project allocations was made. The BIA was represented at that Council Meeting as well as the County Board of Supervisors Meeting of August 26, 2003. On Monday, September 8, 2003, at the Urban Development Committee public input will be taken on this matter and another hearing will be held on Wednesday, September 10, 2003, at the City Council Meeting. At each of these hearings, more Developer input and evaluation will be possible. Finally, at the Joint City/County Session on Monday, September 15, 2003, there will be further opportunity for input. G:\GROUPDAT\Referrals~003\CC Mtg 07-30\559 - TIF.doc DEPARTMENT OF RECREATION AND PARKS DATE: August 29, 2003 TO: Alan Tandy, City Manager FROM: Alan Christensen, Interim Director Recreation & Parks~ SUBJECT: ALLEY CLEARANCE PROJECT UPDATE Ref000565 (WARD 7) Councilmember Salvaggio requested staff provide an update to Paul Graham's previous memo regarding the alley clearance project. In a May memo Mr. Graham described the alley clearance project in cooperation with Solid Waste Division for clearance pruning of alleys. The purpose of the pruning is to address citizen needs but also make these alleys clearly accessible for our city Solid Waste and Fire Department trucks. Due to budget restraints, the project is being conducted only on Wednesdays rather than the original plan of three (3) days a week. The priority areas was based on the number of alleys in that area and the volume of service requests for that area so we could service large sections at once. The central part of the city was the beginning point which covered Oak and Chester Avenues from 17th street to 24th street. We are now working northward in the area of Westchester and then Alta Vista/Panarama. The crews will then head to the southern portion of the city. S:\Council Referrals\Ref000565.doc August 29, 2003 (1:23PM) iSEP ~ ~' B A K E R $ F I E L D PUBLIC WORKS DEPARTMENT CITY OF BAKErSfieLD MEMORANDUM September 4, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~~ SUBJECT: TRAFFIC SIGNAL AT BERKSHIRE AND MONITOR Council Referral ~560 ICouncilmember Salvaggio referred a letter from Gary Rice, Greenfield Union School District, requesting staff look at the traffic signal budget, as they feel there is a greater need for a signal at Berkshire and Monitor as opposed to one at Monitor and Panama Lane. In August 2001 the intersection of Berkshire and Monitor, adjacent to Ollivier Middle School, was made a 4-way stop intersection. Two years have passed since the installation of the stop sign control; and two new schools have now opened. With the associated increase in development and traffic volumes, a new traffic study of the intersection is justified. Traffic Engineering staff will perform an updated signal warrant study at Berkshire and Monitor for comparative ranking with the intersection of Panama Lane and Monitor. In May of 1999, the intersection of Panama Lane and Monitor met warrants for a traffic signal. The analysis, and the Traffic Engineer's recommendation, should be available in three weeks. G:\GROUPDAI'~Referrals~003\CC Mtg 08-27~560 - Traffic.doc B A K E R S F I E L D PUBLIC WORKS DEPARTMENT CITY OF BAKERSFIELD MEMORANDUM September 3, 2003 TO: ALAN TANDY, CITY MANAGER FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR SUBJECT: POSSIBLE STOP SIGNS AT BERKSHIRE Council Referral #562 Councilmember Salvaggio requested staff address the feasibility of placing stop signs at South H and Berkshire and another at Union and Berkshire. Traffic Engineering staff will perform standard stop sign warrant traffic studies for the intersection of South H and Berkshire and the intersection of Union and Berkshire. Results of the traffic studies, and the recommendations of the Traffic Engineer, are expected in about three weeks. G:\GROUPDA~Referrals~2003\CC Mtg 08-2'A562 - Traffic.doc