HomeMy WebLinkAbout03/05/04 B A K E R S F I E L D
CITY MANAGER'S OFFICE
MEMORANDUM
March 5, 2004
TO: Honorable Mayor and City Council
FROM: ~Alan Tandy, City Manager
SUBJECT: General Information
1. Congratulations to Mayor Hall on his re-election!
2. The passage of the $15 billion bond measure has done nothing to cure the State
budget imbalance, and we will be subject to State captures until a budget is
adopted.
An article from the March 3rd Los Angeles Times is enclosed which affirms this
opinion. It also mentions the lawsuit to block the implementation of the proposition.
There has been concern, since the introduction of the bond measure, that the
"swap" of taking our sales tax to repay the bond and replacing it with property tax
revenue may result in insufficient repayment to cities. Time will now answer that
concern.
3. The February 27th publication from the League includes a summary of the
Legislative Analyst's perspective on the Governor's budget, including the proposal
to take local property taxes to fund schools. The LAO has suggested some
alternatives to the $1.3 billion ERAF take, which would still be very detrimental to
local government. Gregory Klimko has prepared the enclosed analysis which
explains the possible ramifications to us under the LAO's suggested scenarios.
4. There was an article in the local newspaper on March 4th regarding a proposed
bond measure in California City which did not pass. They used a referendum
based parcel tax, with automatic termination as an ongoing revenue. The voters
turned it down, causing a major financial problem.
5. Per the attached report from Public Works, the federal transportation
reauthorization bill has been delayed another two months. We hope to receive
funding for future projects when it is approved.
6. Enclosed is a memo from the Water Resources Department with information on
three capital improvement projects that are underway. The projects total over $4.7
million and will provide the City's domestic water system with more production
capacity to meet the rapidly growing demands for water service.
Honorable Mayor and City Council
March 5, 2004
Page 2
7. The more recent activity report from the Recreation and Parks Department is
enclosed.
8. An activity report for Development Services is enclosed.
9. Responses to Council requests are enclosed:
Councilmember Carson
· Status of code enforcement actions on vacant lot at Jumbuck Lane near Alice
Springs Avenue;
· Citizen concern regarding the feasibility of a stop sign at El Toro and Belle
Terrace and the status of curbs and gutters on the south side of Belle Terrace
in the same area;
Councilmember Benham
· Information on permits/licenses for transient outdoor businesses located in the
County jurisdiction;
· Exploration of grant funding for the graffiti removal program;
Councilmember Ma.q.qard
· Report on water service availability in Section 9 in northeast Bakersfield (dual
response - Public Works and Water Resources);
· Citizen request to Identify a park for a possible indoor soccer facility;
Councilmember Hanson
· Report on the issues related to rehiring retired employees;
Councilmember Sullivan
· Status of graffiti removal in the Stone Creek area, near Wible Road;
Councilmember Salva.q.qio
· Status report on the sound wall and the auxiliary lane construction schedule for
the White Lane/State Route 99 project;
· Status of graffiti removal from the canal walls on the corner of South H Street at
Wilson.
AT:rs
cc: Department Heads
Pam McCarthy, City Clerk
Trudy Slater, Administrative Analyst
Los Angeles Times: Bonds a Stopgap Measure for Overspending in Budget Page 1 of 3
http://www.latimes.com/la-me-bondpass3mar03,1,4100921.story
Bonds a Stopgap Measure for Overspending in Budget
Prop. 57's success allows California to manage past debts. But another
shortfall looms.
By Evan Halper and Jeffrey L. Rabin
Times Staff Writers
March 3, 2004
SACRAMENTO -- With the sureness of an emergency room physician, state Finance Director Donna Arduin offers this
treatment protocol for an ailing California.
"When you have a patient that is critically ill, there are three steps that need to be taken," she said. "Stop the bleeding.
Sustain their condition. And put them on the road to recovery."
The $15-billion deficit bond package approved by voters Tuesday stops the bleeding, Arduin said. But lawmakers and
Gov. Arnold Sehwarzenegger must move fast to keep California from lapsing into a coma because it faces another
projected budget shortfall -- this time, $17 billion-- by summer.
"We still need to pass a [2004-05] budget that is fiscally sound, that over the next couple of years will bring us into
structural balance," she said.
The Proposition 57 bonds, merely allow California to refinance budget deficits built up over the last three years. The
initiative provides a new line of credit to extinguish old credit card bills that had mounted so much that lenders talked of
taking control of the state government's cash if they were not repaid.
Now it's on to dealing with the shortfall that continues to accumulate.
"All this is, is a temporary fix," said John Hallacy, managing director of municipal research at Merrill Lynch. "It just
means you are fixing the last couple of years and not fixing the problem going forward. It has to be replaced with a more
permanent undergirding."
The state continues to spend beyond its means at a rapid pace, thanks to a chronic "structural" imbalance between the
cost of state programs and the revenue coming in from taxpayers. At the current rate of spending, lawmakers must
overcome the additional $17 billion by early summer, according to state Legislative Analyst Elizabeth G. Hill. They can
cut programs, raise taxes, or hope for an unlikely windfall of sales or income tax revenue equivalent to what California
received during the dot-eom boom.
The governor wants to do it without any new taxes. He and Arduin presented their plan in January, and it was not well
http://www.latimes.com/la-me-bondpass3mar03,1,4888806,print.story 3/4/2004
Los Angeles Times: Bonds a Stopgap Measure for Overspending in Budget Page 2 of 3
received by majority Democrats in the Legislature. It involved major fee hikes and curbs on enrollment at state.
universities, denying tens of thousands of low- income Califomians access to health insurance programs and delaying
billions of dollars of badly needed transportation improvements.
Even if lawmakers adopt the governor's budget as proposed -- and state finance officials have no problem selling the
bOnds approved Tuesday -- Hill says the state could still end the 2004-05 budget year with a shortfall of $4 billion.
That's largely because the governor's budget relies on some suspect assumptions. Among them is that the state can
generate $500 million in revenue by renegotiating Indian gaming compacts and $400 million from unspecified cuts to the
state prison system. Other budget solutions may be illegal after recent court decisions, such as a $930-million bond the
governor is proposing to sell to cover the state's payment to the pension system for government workers, and hundreds of
millions of dollars in cuts to the Medi-Cal program that may violate federal regulations.
As lawmakers haggle with the governor over what programs the state can and cannot afford, the Schwarzenegger
administration is also racing against the clock to come up with proposals for overhauling how the state spends its money.
Arduin and other officials have been talking with interest groups about a range of issues, from moving thousands of
university students into the community college system for their first two years to renegotiating retirement benefits for
state workers.
The state Constitution gives lawmakers and the governor until June 30 to adopt a spending plan. The governor has said
on a number of occasions that California's financial reputation cannot afford to have Sacramento blow that deadline
again, as it has eight times in the past 10 years.
Investors say getting an on-time budget that is free of spending or revenue gimmicks would help restore the state's
standing on Wall Street, where California's credit is rated the nation's worst. And if the governor can at least come close
to meeting his goal of passing a 2004-05 budget by May, it would be a major political victory, further solidifying his
standing as a consensus builder able to rein in the ideologically fractured Legislature.
As they work on assembling next year's budget, the state's top finance officials will rush to start selling the bonds
approved Tuesday. The goal is to get money flowing into state coffers in time to pay off billions of dollars in short-term
loans that come due in June.
"The concerns are kind of primal at this point -- near-term solvency," said Tim Blake, an analyst with Moody's Investors
Service. "Getting out from under the danger of a very serious liquidity problem is significant."
Even after Tuesday's vote, Blake said, securing the $15 billion in bond money is still not a sure thing. A group of eiries is
warning that the plan for paying back the bond may be illegal, and they are considering filing a lawsuit to block it. The
plan involves taking sales tax money away from cities to pay back the borrowing, and then replacing that revenue with
property tax.
Cities that generate a large portion of their revenue from big-box and other retail stores fear they would not receive the
equivalent amount in property tax. But state lawyers have expressed confidence that the courts would not block the tax
swap.
Assuming the bond money is secured in time to pay back the short-term loans due in June, Blake said, the state will have
taken a step toward fiscal recovery.
But it is still only a first step. He said he didn't anticipate that Moody's would immediately change California's credit
http://www.latimes.com/la-me-bondpass3mar03,1,4888806,print.story 3/4/2004
Los Angeles Times: Bonds a Stopgap Measure for Overspending in Budget Page 3 of 3
rating from where it hovers just above junk bond stares.
"The rating is our lowest rating of any state," he said. "We wouldn't change that just because bonds are issued .... There is
is a very large budget gap still facing the state."
If~ want other stories on this topic, search the Archives at latlmes.com/archlves.
Click here for article licensing and repflnt options
Copyright 2004 Los Angeles Times
http:ffwww.latimes.com/la-me-bondpass3mar03,1,4888806,print, story 3/4/2004
Bonds a. Stopgap MeaSure
for Overspending in Budget
Prop. 57's success allows ' ' of m ' ' - ge~solu~ions~illegalaller
8_~_ar~.h ~l-, M~rrill T.yr~h "!~?st recent court decision~ such as a
California to manage means you are fixing the last. $930-million bond the governor
couple~of 'veara.~g is proposing to sell to cover the
past debts. But another ~ · .... ,state's payment to the pension'
shol~l iooms, to be re ' system for government workers,
_oe~rmonent under~ and hundreds of millions of dol-
ByEvANHALP~.R ~ ~ Th~estatecontinuestos~end lars in cuts to the Medi-Cal pro-
AND JEFFREY L. RABIN beyond its n~ns ~t . ~d gram that may violate federal
~/mess~0i~wter~ pa'ce,~anksto ac~c- regulations.
tuTml- imbalance betm~n ~the As lawmakers haggle with
SACRAMENTO -- With the co~Q~t, tff .~t~o pr~?am~ ~ the the govemor~over what pro-
sureness of an emergency room revert ' ' tax- grams the statelean and cannot '
physician, state Finance Dlrec- payers. At ~,~atXr~_mte of afford, the Schwa~enegger ad-
tor Donna Arduin offers this spen_Odinff. ~--~xnalrers must ministration is also racing
treatment protocol for an ailing ~,e~9,~e t.~o ac~OJtional$~7 bi1- against the clock to come up
Calffornia~ . liO ._ cc_ording with proposals for overhauling
"When you have' a patient to state Legislative Analyst how the state spendsits money.
that is ~ritically ill, ~here are EliT~beth G. Hill They can' cut Arduin and other officials have
three steps that need to .be programs, raise taxes, or hope been talking with interest
taken," she said. "Stop the for an unlikely windfall of sales groups about a range of issues,
· bleeding. Sustain their condi- or iricome tax revenue equiva- from moving thousands of uni-
.tiorr And put them on the road lent to .what California received versity students into the corn-
to recovery." dttringthe dot-eom boom. munity colle~ system for their
The $15-billion deficit bond · The governor wants to do it first two years to renegotiating
package approved by voters without any new taxes. He and retirement benefits for state . WALLYS~-ALIJ
· APPLAUSE LINE: Supporters beam as Gov. Schwarzeneggerj
Tuesday stops the bleeding, Ar- Arduin presented their plan in workers. '
duin said. But lawmakers and January, and it was not well re- The state Constitution gives, addresses backers of his victorious propositions in Santa Monic
Gov. Arnold 8chwexzenegger ceived by majority Democrats in ' lawmakers and the governor un-
must move fact to keep Califor- the Legislature. It involved ma- til June 30 to adopt a spending start sellingthe bonds approved po~rt.i~n af their revo_m~e-
niaffomlapsingintoacomabe- jor fee hikes and curbs on enroll- 'plan. The governor has said on a Tuesday. The goal is to get b~?o,,re~
cause it faces another projected ment at state universities, deny- number of occasions that Call- money flowing into state coffers fe~ar~e~ve me
budget shortfall -- this time, lng tens of thousands of low- fornia's' financial reputation in time to pay off billions of dol- .e~va]~nt am.ount in .P~veUerty
$17 billion -- by summer. ' income Californians access to cannot afford to have Sacra- loxs in shod-term loans that. ta~ But state mwyers na ex-
"Westillneedtopassa[2004- health insurance programs and mento bl°W that deadline agsin, come due in June. pressed confidence that the
05] budget that is flscally soUnd, delaying, billions of dollars of as it has eight times in the past "The concerns are kind ofpri- courts would not block the tax
that over the next couple of badly needed, transportation 10years. mal at this point -- near-~rm swap.
years will .bring us into struc- improvements.. Investors say getting an on- solvency," said Tim Blake, an Assuming the bond money is
turalbalance,-Shesaid. Even iflawmakers adopt the time budget that is ~ of analyst with Moody's lnvestors secured in time to pay back the
The Proposition 57 bonds , governor's budget aa proposed spending or revenue gimmicks Sezvice. "Getting out from un- short-term loans due in June,
merely allow California to reft- -- and state finance officials would help~restore the state's der the danger of a very serious Blake said, the state will have~
nance budget deficits built up have no problem selling ,the standing on Wall Street, where liquidity problem is significant.' taken a step toward fiscal recov-
,~over the la~ three years. Theini- bonds approved Tuesday-- Hill California's credit is rated the Even after Tuesday's vote, ery.
tiative provides a new line of says the state could still end the nation's worst. And if the gover- Blake said, Securing the $15 bil- But it is still only a first step.
creci~t~ to extinguish old credit 2004-05 budget year with a nor can at least come close to lion in bond money is still not a He saidhe didn't anticipate that
bills that had moUnted so shortfall of$4 billion, meeting his goal of passing a sure.thing. ~ Moody's would' immediately
fftak- That's largely because the 2004-05 budget by May, itwould warnin thc ' change Califor0A~ 'a's credit rating
Of the state govern- governors budget relies on be a major political victory, fur- bac~bon~]_~ from where it hovers just above
ment~s cash if they were not re-. some' suspect assumptions, ther solidil~g his standing as a - ~,d they are consideringA~tug~ junk bond status.
paid. ',.. Among them is that the state consensus builder able to rein in '~wsttit to block it.~~ "The rating is our lowest rat-
Now it's on to dealing with can generate $500 millibnin rev- the ideologically fractured Leg- vove'l~taking s~,z~a~,ey Lng of any state," he said; "We
the shortfall that continues to enue by, renegotiating Indian islature. ~ from c, ities to pay back the wouldn't change that just be-
accumulate, gaming compacts and $400 mil- As they work on assembling bO~g~acing cause bonds are issued ....
_"A~I~ this is, is.. m~ lion from unspecLfied cuts to the next year's budget, the state's that revenue with property tl~x. There is a very large budget gap
fix,' seJ~ Jo--~allacy, manag- state prison system. Oth.er bud- top finance officials will rush to Cities_ that generate a large~ still facing.~the state."
empty Senate ~°-~s.-u~P~~.'rs~t~was g~-a~ ~
~Democmt. Criticized President ~, w~l, nan ~nougnt tl~ey fi.om the floor. , ~
.~_._ush on gun control and laid out - were going to see only his legisla- The senator s appearance Roxbor9, N.C., in honor of Oscar nors, who declined to be named, h
~ reasons for suPporting an the other naming a post office in One of Bush's California do~
tire staff. And then he headed to had the feel of a '~ctory lap," Scott Woody, a seagoing postal said the president could count
amendment to extend the 10- the Senate. Baker said. "People cameup and on raising whatever he needs
~,ear-old asSault-weapons ban ~n~. ~ ~,. ........... clerk from Roxboro. who died on
' · · from the state. "It's never tapped
out," the donor said. ' c~
Since his reelection commit-
a Consolation PriZe m Vermont
· · · made three .other fundralsing
trips to California..
~) Today's appearEqce will be lo,
"writer mont., ~,-his first since the Nov. 17 inaugu- p(
ration of Gov. Arnold Schwarz-
As the election returns came enegger rejuvenated the state.
Dean's home state of in, about 100~ gathered to cele~ Republican Party, giving the
delivered a consoling brate at Nectar's,. a restaurant , president a West Coast ally with
to the onetime presi~ and bar in downtown Burlington star power.
candidate ih Tuesday's that hosts' the monthly Dean "There is a large amount of pi
primal, handing Meetups. There, they drank, money out' there for Republi-
first win microbrews, munched on Nec- cans," said Carla Eudy, a OOP K
campaign, tar's famous flies with gravy and . fundralser based in Washington.
won the Vermont pti- mused about the campaign that "And havinga Republican gover-
a margin of more than could havebeen, nor, who seems to be doing a
over. Massachusetts "Part of the reasonwe pushed good job, may create even more
so hard 'for the effort tonight was enthusiasm."
digits he garnered in to say thank you to him," said Schwarzenegger said he
nine states that voted - Andrea Stander, 51, who worked planned to meet with the presi-
as a volunteer county coordina- dent tonight in Los.Angeles. The Fi
: North Carolina Sen. John Ed- 'tor. White House would not elabo- st
! ds was not on the Vermont ~I think that people Very rate. r~
ot, having decided to forgo clearly wanted to send ames- In additio~ to the thr~e fund-
i
1~ focus on other contests, and eventual nominee that we speech at t'he Los Angeles Con-
[ Dean's decisive victory in his have really strong concerns and vention Center this afternoon on
~ome state broke his streak of 29 we're very organized." his initiative to earmark federal
~ralght losses at the polls and Brattleboro resident Bill contracts for religious organiza-
ne two weeks after he ended Bandish cal~ed the win "a bitter- tions that perform social serv-
s insurgent candidacy. ' sweet celebration.- ices.
' With the. win, Dean gets a "There are a lot of ~ree think- On Thursday morning, he is tc
~are Of Vermont's 15 delegates ers here," said Bandish, 5i, Who ' '
~t the Democratic convention in works for a local Internet firm.
July. "They're not being duped by the
, When the 'news came Tues2 rest of the nation into blithely
! day night, Dean was attending a following [President] Bush or
~ banquet for his son's high school Kerry."
· hockey team. For some, Tuesday night also
" Aides said the former gover- marked a personal celebration.'
,'!" 'nor was moved and gratified. Erik Stier, 21, who worked 'as
~": ", ~TI~_ win means so much to a field organizer for Dean, said
~': me, Dear~ said in a statement..
the campalgu inspired him to go
. "Throughout this' campaign, I ' in~o politics.'After Dean dropped
~ ' .have appreciated the strong suP_ out, Stier worked as campaign
"- port fi.om the people of Vermont. manager for a City Council can-
'I will never forget the work and didate.
~ ·. ~o~tea r~e~ That candidate also lost, but
"the heart that you put into our FAN: MarY Oleson holds a cutout offormer Vermont Gov. Howard . Stier said he is undeterred. On
~ campaign.- Dean outside a Baltimore polling station.
But in case anyone was won- ' ' Friday, he's driving down to ·
Washington to pUrSue work
_ dering, Dean quashed any no- madealastpushforhimin'thefi_ nor."It'srealiyheart-warming.- there.
~'"tion that he might reenter the n~/1 days before Tuesday's pri- Many Dean backers posting "This was possibly the most
face. ~ ......... mary, holding visibility events messages on his campaign web- amazing experience of my life,"
..... No, I'm not going to get back and waving Dean signs across, site said they weie moved to Stier said. "Manyyoung people I
'-in it, but having some delegates the state overthe weekend, tears by Tuesday's results, and know are incredibly motivated IN WASHINOTON: President
' is great,' he told C1VN. ' ?They didn't give 'up," said several suggested taking up a by the work that .Dean did, and the Department of HOmeland Secu~,
. Dean's Vermont supporters longtime Dean aide Kate O'Con- .
new slogan: "Don't Blame Ver- we're not going to give up." department Secretary Tom Ridge al
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Gregory J. Klimko, Finance Director ~//~-~
DATE: March 1, 2004
SUBJECT: LAO Report (2/27/2004)
The LAO report suggests alternatives to the Governor's additional $1.3 Billion ERAF take.
$216 million reduction in "Restricted Purpose Subventions" including the COPS program.
The City has used the COPS grants in recent years for Mobile Data Computers and the
Computer Aided Dispatch system capital outlay projects. The new COPS grant is Cops in
Schools (8 new officers @ $500,000 for two years).
$400 million shift in unspecified property tax cuts to special districts. "Local Communities"
would have full flexibility to implement this cut. The Board of Supervisors of each county
would establish the special districts cut amount after public hearings to achieve the total
established by the State Legislature for each county. It is not stated if Redevelopment
agencies fall within this special district category. The City's share could be as much as
$400,000 if RDA's are included (see the next item).
$320 million focused shift in Redevelopment agency property taxes through a "sliding scale"
to reduce the incentive to form or expand redevelopment project areas. This concept is
currently in place for the Southeast and Old Town Kern project areas and would probably be
accelerated and might apply to the Downtown project area. The City's RDA ERAF shift is
currently approximately $135,000. Based on the current ERAF shift the City's portion of the
$320 million would be about $320,000. This would mean a minimum additional loss of
$185,000 assuming the current RDA ERAF shift is nullified.
$400 million shift in sales tax ($200 million Cities and $200 million Counties). Reducing the
local 1% Bradley Bums tax rate to 0.92%. This would mean a $400,000 loss to the City
(based on $50 million sales tax estimated for 2004-05). Losses exceeding our portion of the
$200 million would be backfilled by county VLF allocation. This is the worst possible
precedent.
PR I 0 .R I T Y
February 27, 2004 Issue #8-2004
LEGISLATIVE ANALYST SAYS GOVERNOR'S ERAF SHIFT
WRONG WAY TO GO
Hot Bills ~NCLUDES ALTERNATIVE PROPOSAL TO CUT LOCAL
·.. Act Now GOVERNMENT REVENUES
·
· The Legislative Analyst's office (LAO) annual Perspectives and Issues
· There are no Hot
-= Bills at this time. report on the Governor's proposed budget is now available, offering the LAO's
· perspective on the budget and issues for discussion in the upcoming budget
· debate. For more, see page 4.
·
·
·
· LAND USE LEGISLATION A HOT TOPIC FOR 2004
· As League staff wades through the stacks of new legislation, it is apparent
·
· many land use bills have been introduced. Although there are more to come,
· below are several bills that cities should begin to review and track: For more,
· see page 5.
·
·
·
; INITIATIVE UPDATE: PRESS CONFERENCES, SIGNATURE
·
· GATHERING MARCH FORWARD
·
· League members and their LOCAL initiative partners capped off another
·
· week of solid campaign work on the Local Taxpayers and Public Safety
·· Protection Act, with signature-gathering in full swing, fundraising efforts pro-
= Want more details on grassing and press conferences continuing to draw attention to the initiative.
these and other bills? (All activities were carded out by city officials on their personal time, and did
Log on to the League of not involve the use of public funds.) For more, see page 6.
California Cities Web site
at www. cacities, org/
legtracking.
Page 2 SALINAS RE-INTRODUCES LEAGUE-SPONSORED HOUSING BILL: AB 2980
IS AN ETHICS CODE RIGHT FOR YOUR CITY?
Page 3 RECENT LEGAL ADVOCACY FILINGS
Page 5 DON'T MISS THE MARCH ISSUE OF WESTERN CITY MAGAZINE!
Page 6 SAVE THE DATE: "SIGNATURE SATURDAY", MARCH 13 WE NEED YOU TO HELP
GATHER SIGNATURES
SAUNAS RE-INTRODUCES LEAGUE- IS AN ETHICS CODE RIGHT FOR
SPONSORED HOUSING ELEMENT YOUR CITY?
SELF-CERTIFICATION BILL: AB 2980 The League's board of directors believes it
could be. The League board voted to endorse the
Late last week Assembly Member Simon Sail- Institute for Local Self Government's effort to
nas, Chair of the Assembly Local Government encourage as many cities as possible to engage
CO=~4H,~, ~ .... B 2980, a League-spon- in the discussion of public service ethical values
sored bill which would grant regulatory relief from through the adoption and/or update of a city code
state Department of Housing reviews of local of ethics. The action occurred at the board's
housing elements for those communities which February meeting.
commit to hit a targeted production level of afford-
able housing. The board took this action as part of a pack-~
The measure would authorize "production- age of public confidence strategies for 2004. The
based certification" and reward communities with a board had received copies of the Institute's new
return of their local control if they commit to build at process-oriented guide on adopting codes of
least 15% of their share of Iow and very Iow income ethics. The guide was produced as one of the
housing over their five-year housing element cycle, recommendations of the League's Ethics Educa-
This measure is similar to last year's AB 980 !Sail- tion Task Force. The Task Fome was created
when the League made promoting public confi-
nas). which was delayed in the Assembly while a
task force of stakeholder groups attempted to dance in city government one of its strategic
negotiate reforms to the housing element law. priorities for 2003 and 2004.
The concept behind AB 2980 is picking up The Institute's guide focuses on process
momentum and bi-partisan support. Nine co- because it recognizes that there is no "one-size
authors have added their names to the bill: Assam- fits all" code of ethics that will serve the needs of
bly Members Dutton, Laird, Longville, Vargas, and all of California's diverse cities. The guide does,'
Wiggins; Senators Denham, Florez, McPherson, however, provide a "menu" of choices for cities
and Soto. crafting a code, as well as sample language. The
guide's core message is that codes of ethics are
Requested Action For Cities: a positive opportunity for local officials to affirm
their city's commitment to core public service
values.
1) Send Support Letters: While most land
use legislation is oriented toward removing local Electronic copies of the guide are available
authority, this is a positive bill that seeks to restore without charge from the ILSG website (hEp:l/
local authority to cities that are doing what they can www.ils.q.or.q/). Printed versions are available for.
on affordable housing. It will take a major effort by
local governments to achieve positive changes to $20 plus shipping and sales tax from the League's
housing element law. If your city supported AB 980 CityBooks service at (916) 658-8257 or
last year, please send a support letter on AB 2980. www.cacities.or,q/store. Proceeds from sales of
All other cities are encouraged to support this all Institute ethics resources support the Institute's
proposal. Sample letters are available on the work in the ethics area.
Leaoue's website at www. cacities, oro/hced.
Has your city adopted or updated its ethics
2) Thank Author's and Co-authors, Ask code in the last year?. If so, the Institute would like
your Legislator to Co-Author. If your legislator to include your city in its "Ethics Hall of Fame" on
has co-authored this measure, please take the time its website. Please contact Institute staff
to thank them. If your legislator has not co- (sDeersi~cacities.or~) with a copy of your code.'
authored this legislation, please encourage them to The Institute hopes the list will grow and under-
do so. score the breadth of cities' commitment to ethical
values in public service.
PAGE 2/PRIORITY FOCUS Visit the League's Official Web Site--www.cacities.org
RECENT LEGAL ADVOCACY FILINGS
The League would like to provide special thanks Presumption of Bias and Due Process
to the individuals listed below, who wrote friend-of-the-
court letters or briefs, for their efforts on behalf of the The League filed a friend-of-the-court letter brief
League. League action and a brief summary of the urging the California Supreme Court to hear a case
case appear below. Copies of the filings are available concluding that a deputy city attorney that appeared
at: www.cacities.orcj/recentfilinqs, before a city personnel board as an advocate on a
disciplinary matter is presumed to be biased because
the deputy had previously advised the board on
Telecommunications Filings unrelated matters.
There were two cases that the League recently
The League thanks Kevin Collins with Best,
weighed in on involving local governments and
Best and Kreiger, for writing the letter brief on
telecommunications issues. The first impacts the
ability of local governments to regulate use of the behalf of the League. The opinion presents signifi-
public rights-of-way by communication providers, and cant concern for local governments, and particularly
their ability to collect franchise fees to fund local those with small legal staffs because it concludes that
services. The second case involves municipal liability an attorney who has interacted with an administrative
for attorneys' fees relating to application denials for board on several occasions may not serve in a
wireless telephone towers, prosecutorial function due to the probability of influ-
ence on the board compromising the fair hearing
The League filed a friend-of-the-court letter brief process.
The name of the case is Quintero v. City of Santa
urging the California Supreme Court to hear a case
that concluded a city may not charge a telephone Aha, 114 Cal. App. 4~ 10 (4~ Dist. Dec. 23, 2003)
corporation a license fee to use the public rights of review filed (Jan. 28, 2004).
way to construct and maintain facilities that are not
intended for use as telephone lines. The League CEQA and Farmland Mitigation
thanks William Sanders with the City and County of
San Francisco for writing the letter brief on behalf of The court of appeal recently issued an unpub-
the League. lished opinion concluding that if the environmental
impact of a project converting farmland to urban use
The name of the case is Williams Communica- can not be mitigated below a level of significance,
tions v. City of Riverside, 114 Cal. App. 4"~ 642, 9 Cal. other mitigation measure must still be adopted if they
Rptr. 3d 96 (4~ Dist. Dec. 18, 2003). would substantially lessen the environmental impact
of the project. Adopting a statement of overriding
The League filed a friend-of-the-court brief urging consideration does not exempt the local agency from
the Ninth Circuit Court of Appeals to grant rehearing mitigating measures such as the payment of fees for
en banc in a case that would allow individuals to conservation easements to limit future loss of farm-
recover attorneys fees for violations of the Telecom- land.
munication Act of 1996. The League thanks Jennifer .
Henning with the California State Association of The League thanks Dan McHugh, City Attor-
Counties for writing the brief on behalf of the League ney, Redlands, for writing the brief on behalf of the
and the California State Association of Counties. League.
The current opinion would expose local govern- The name of the case is South County Citizens
ments to increased liability because telecommunica- for Responsible Growth v. City of Elk Grove, currently
tion companies may elect to sue cities when their unpublished (3d Dist. Feb. 5, 2004). Since the
applications to install wireless telephone towers are opinion is currently unpublished it may not be relied
denied and potentially recovery attorney's fees. upon by other local agencies. There is a request for
publication currently pending with the California
The name of the case is Abrams v. City of Rancho Supreme Court.
Pa/os Verdes, 354 F.3d 1094 (9"~ Cir. Jan 15, 2004).
Visit the League's Official Web Site--www.cacities.org PRIORITY FOCUS/PAGE 3
On the general fiscal picture, the report offers * Be Mindful of Effect on Land Use Incentives
the following observations:
· Consider the Impact of Revenue Reductions
· The fiscal problem (deficit) facing the state
in the 2004-05 budget $17 billion
Alternative Approach
· Of the $17 billion deficit, $15 billion relates To accomplish the cuts to local government
to an ongoing structural imbalance between and follow the above principles the LAO proposes
revenues and expenditures in 2004-05, while the the "alternative approach" outlined below. While the
remainder of the problem is a $2 billion current- LAO acknowledges that this alternative represents
year shortfall, an undesirable intrusion into local finance, they
state that it would have fewer negative effects on
· The budget proposed by the Governor fails local governments and their residents than the
to address the ongoing structural shortfall. The administration's approach. The proposal mirrors
LAO predicts that a $7 billion ongoing gap be- the Governor's target of $1.3 billion, but accom-
tween revenues and expenditures would occur in plishes that cut level is as follows:
FY 2005-06 and continue in subsequent years,
absent any further corrective action. · Reduce $216 million in "Restricted Purpose
Subventions." Specifically they propose to eliminate
the COPS program at $100 million; the Juvenile
Report Questions New Property Tax Shift
Justice Challenge Grants at $100 million and the '
Public Library Foundation money at $16 million.
The LAO took a very bold step in this year~s
report in commenting on the Governor's proposal · Shift $400 million in unspecified property tax
to cut local government property taxes by $1.3 cuts to special districts. Local communities would
billion. In the report it states: have full flexibility to implement this cut. The prop-
erty tax shift amount would be established by the
"This proposal raises questions concerning Legislature for every county. The Board of Supervi-
the state's role regarding the property tax. In oursors in each county would hold hearings and take
view, the Legislature should use its authority testimony and then revise the amount of property
over this tax for the overall betterment of taxes received by special districts in their county to.
local government, not as a state rainy day accomplish the target shift.
fund. We recommend the Legislature reject
this proposal." (Emphasis added.) · Implement a focused shift of $320 million in
property taxes from redevelopment agencies. This
The LAO went on to say, however, that if the would be accomplished through a "sliding scale"
Legislature does pursue cuts to local government that reduces the incentive for cities and counties to
because of its difficult financial situation that the form or expand redevelopment agencies.
following principles be applied to any such
course of action: · Shift $200 million each from cities and
counties (total of $400 million). The shift would take
· Minimize Reductions to General Purpose place through a reduction in the Bradley-Bums tax
Revenues rate from the current 1% down to .92%. This would
produce $400 million annually. In turn, the state's
· Leave Past Formulas in the Past sales tax is increased by an equivalent percentage.
City sales tax losses exceeding $200 million would
· Allow Local Control be offset through a statutory revision to the existing
Continued on Page 5
PAGE 4/PRIORITY FOCUS Visit the League's Official Web Site--www.cacities.~)rg
LAO REPORT from page 4 ........... DONT MISS THE MARCH ISSUE OF
VLF allocation formula - shifting some county VLF WESTERN CITYMAGAZlNE!
revenue to cities. This month, Western City focuses on the topics of
land use, housing and planning. Articles include:
What's Next: Budget Hearings
Getting to YIMBY: Addressing Neighborhood
The extent to which the LAO proposal will be Concerns About Affordable Housing, by Bill
used as a guide when the final budget is adopted Higgins. Fear of the unknown is often one of the
is hard to determine. It will certainly be just what it biggest obstacles to building affordable housing. This
proposes to be and that is an alternative to the article offers practical approaches for addressing
Governor's $1.3 billion property tax cut. community concerns when such housing is planned.
The budget hearings are beginning in the South San Francisco's Homegrown Housing
Legislature and will move more rapidly when the Strategy, by Joe Fernekes. A city council member
Governor releases his May Revision of the Bud- describes how the city has overcome some of the
get. This is scheduled for release on May 14 and challenges associated with getting affordable housih~l
will take into consideration the personal income built, and offers some frank observations about the
state's role.
tax receipts after the April 15 deadline. This is
shaping up to be another painful budget year.
Helen Putnam Award for Excellence Winners:
LAND USE BILLS from page I . ...... -.
· San Jose Homebuyers Program Helps
Teachers Live Where They Work
AB 2702 (Steinberg) Second Units: Con- · Santa Barbara Creates Housing for Its
tains numerous mandates on local government Workers While Stimulating Downtown Activity
second unit ordinances. · San Diego Launches "City of Villages"
Outreach Program to Accommodate Future
AB 2158 (Lowenthal), AB 2284 (Chavez), AB Growth
2348 (Mullin) AB 2515 (Runner), AB 1970 · Irvine's Universal Design Program Antici-
(Harman), SB 1702 (Battin): All of these bills pates Future Housing Needs of an Aging Popu-
lation
relate to housing elements, and reflect the many
issues and problems with the existing process. PLUS
SB 1404 (Soto) Multifamily Financing Ballot Measure Fund Raising: Some Legal
Districts: Proposes a financing mechanism Do's and Don'ts, by Steven S. Lucas and Betsy
related to multifamily housing. Strauss. Important information for elected officials .
and city employees on what is and isn't permissible '
SB 1641 (Alarcon) & AB 2494 (Lieber): Big when raising funds for ballot measures.
Box Retailers: Both of these bills seek to limit
big box development. Top 10 Techniques to Support Open Govern-
ment, by Daniel G. Hobbs. A city manager shams
SB 1818 (Ducheny) Density Bonuses: pointers on how to conduct the public's business in an
Lowers required affordability components of open, forthright manner that builds public confidence.
projects eligible to qualify for density bonuses.
The Intersection of Hope and Leadership, by
SB 1263 (Torlakson) Mandatory Approvals Chris McKenzie. Why it's critically important for our
of Development Projects: Require local govern- leaders to offer hope, and what this means for
ments to approve development projects consis- Governor $chwarzenegger.
tent with specific plans.
AND MOREl
Visit the League's Official Web Site--www.cacities.org PRIORITY FOCUS/PAGE 5
INITIATIVE from page I · -.. -.. -... -.
A Tulare County press conference attracted SAVE THE I)ATE: "SIGNATURE
numerous reporters Wednesday, despite a howling
storm. The event, featuring Tulare County, City and SATURDAY", MARCH 13
public safety officials, was covered by TV and print WE NEED YOU TO HELP
media, including the Fresno Bee and Spanish GATHER SIGNATURES
speaking network Univision.
For city offidals who haven't yet volun-
In Daly City, another initiative news conference teered to help collect signatures for the
was held Thursday despite heavy flooding in the LOCAL initiative, NOWIS THE TIME/Il
area. The office of City Manager John Martin was
instrumental in the success of the conference, held April 15 is the deadline to collect 1 million
at the Pacific Plaza Building. The event was signatures to qualify the Local Taxpayers
covered by bilingual print, radio, and TV media, and Public Safety Initiative for the November
Over 75 people attended this event, which included 2004 ballot. The League and our coalition
every member of the Daly City Council, as well as partners, the Califomia State Assodation of
representatives of a Homeowners Associations Counties and the Califomia Spedal Districts
umbrella group. Association, are pushing hard to_gather
300,000 signatures through volunteer
efforts. Every signature obtained by a
volunteer will save $1.50 - $3.00 in paid
signature gathering costs. These are funds
that will be needed for advertising as election
day draws nearer.
To prevent the initiative campaign from
getting caught short with no time or re-
sources to meet the Apd115 deadline, we
will be planning a statewide "Signature
Saturday" on March 13 that will involve as
many elected officials, labor representatives
Daly City Mayor Sal Torres speaks to reporters and volunteers as possible. This event will
and a crowd of over 100 citizens, city employees and give our volunteers a definite date, time and
public safety officials Thursday. location to focus on, so they can show their
support for the campaign's effort in a high
profile way.
Initiative Continues to Garner Signatures,
Coalition Partners The League's regional representatives
will help schedule high profile locations in
The signature gathering effort is moving briskly each region, and play a major role in sched-
towards the 1 million signature goal. Reports from uling volunteers. Our consultants will be
the professional signature gatherers indicate that working hard with the reps and our initiative
the Local Taxpayers and Public Safety Protection partners to generate press coverage of this
Act is benefiting from the strongest and most statewide effort.
enthusiastic public response from among several
competing petitions in circulation this month. Please contact your regional rep to find
League Regional Reps continue to help coordinate out how you can help. We need YOU! With
the volunteer effort. To help circulate petitions your help, we CAN DO IT!
please contact your Regional Rep or visit the
campaign website at
Continued on Page 7
PAGE 6/PRIORITY FOCUS Visit the League's Official Web Site--www.cacities.org
INITIATIVE from page 6 · '"""""
www.protectlocalservices.com.
The initiative is also continuing to receive Navigating The
endorsements from various groups across the
state. Among the groups joining this week: the Legislative Process
California Association of Professional Employees,
SEIU Local 347 (representing over 12,000 public Deadlines, Procedures and
employees working for cities and school districts Common Terms
throughout Southern Califomia) and the AFL-CIO.
NEW: An overview of the budget process
Save the Datel, and special sessions
Three initiative fundraisers are coming up:
March 11 in downtown Los Angeles, March 11 at Plus:
the California Redevelopment Agency conference · A description of the legislative process
in Monterey, and March 31 in South Bay area of LA · Tips on writing an effective letter and
county. For information on fundraising events and testifying before a legislative
activities, please contact Jean Korinke at committee
916.658.8245, email ikorinke~cacities.or,q. To · Suggestions on how to participate in
make an online contribution to the campaign, visit
www.citipac.or,q, the League legislative program
· A glossary of commonly used legislative
Remember: Use Only Non-Public Funds and budget terms
City officials are reminded that their involve- · A legislative calendar listing key state
ment with or contributions to the campaign cannot budget dates for city officials
involve the use of any public funds. For more
information about this subject, please review the This publication is available from the League for
"Legal Do's and Don'ts for City Officials" on the $5. There is a ten percent discount on orders o¢
initiative page on the League's website at five or more.
www.cacities.org/initiative.
0uestions? Contact League Publications at
916/658-8257
Or order online at: www.cacities.org/store
Visit the League's Official Web Site--www.cacities.org PRIORITY FOCUS/PAGE 7.
bakersfield.eom - Desert cities eye plan B after failure of bonds Page 1 of 2
bbake ield com
http://www.bakersfield.com/local/story/4548945p-4595834c.html
Desert cities eye plan B after failure of bonds
Officials in California City, Rosamond predict big cuts to cover loss of
measures
By MICHELLE TERWlLLEGER, Californian staff writer
e-mail: mterwilleger~bakersfield.com
Posted: Wednesday March 3rd, 2004, 10:20 PM
Last Updated: Wednesday March 3rd, 2004, 10:20 PM
Jack Stewart didn't sleep much Tuesday night.
Instead, the city manager for California City stayed up, trying to figure out how the desert town would function with a $3
million budget cut.
California City voters failed to pass Measure G, a special parcel tax that would have supported city services, particularly
the police and fire departments and the replacement of city water pipes.
Without the money, the city will lose roughly 27 percent of its tax base.
"I got to go to plan B," Stewart said, admitting he hadn't really planned for defeat of the tax.
Officials in Rosamond also have the same problem. They will have to figure out what to do after the failure of Measures
H and I, parcel taxes that would have gone to the Rosamond Community Services District to pay for public parks and
street lighting.
Bud Bumett, vice chair of California City's advisory committee that oversees special tax spending, predicted a noticeable
cut in California City services in light of Measure G's failure.
"I'm sure there's going to be layoffs in June, if not before," Bumett said.
He speculated an end to city recreation activities, including public swimming, as well as cuts to the fire and police
departments.
The special taxes, which would have made up $3 million of the city's $11 million annual budget, have been paid by
California City residents for the past five years. Measure G called for a $10 increase.
Stewart said the city will likely try to get the special parcel tax measure passed again in November. That decision will
have to be made by the City Council, he added.
But with the current parcel tax set to expire at the end of June, the city will have to make some changes to deal with the
loss of money even if they can get a measure passed in November.
http://www.bakersfield.com/local/v-print/story/4548945p-4595834c.html 3/4/2004
bakersfield.eom - Desert cities eye plan B alter failure of bonds Page 2 of 2
California City Police Chief Wayne Dickerson said his department already is streamlined with only 12 sworn officers and
a growing number of calls each year.
"We're probably going to eliminate some extra things," Dickerson said, such as a pro-character, anti-drug campaign the
department was planning to start in local schools.
The city may borrow money from the United States Department of Agriculture to replace its old, leaky water pipes,
Stewart said.
"We will continue to function one way or another," Stewart said. "We'll figure it out."
In Rosamond, community service district officials had planned to use money fi'om the failed parcel taxes to pay for street
lights and improvements to United Street Park. District officials did not return calls from The Californian.
The California City City Council will have a special meeting at 5:30 p.m. March 9 at Council Chambers, 21000 Hacienda
Blvd. The regular meeting will be at 6 p.m. March 16 at Council Chambers.
http://www.bakersfield.com/local/v-print/story/4548945p-4595834c.html 3/4/2004
From: Alan Tandy
To: Rhonda Smiley
Date: 3/3/2004 9:58:14 AM
Subject: Fwd: Transportation Bill Reauthorization
>>> Ted Wright 3/2/04 3:31:21 PM >>>
Raul/Jack, per the article .below, the 6 year transportation reauthorization bill has been delayed another 2
months, so the President signed a temporary extension of the existing bill this past Sunday. As you are
aware,, our potential project funds are a part of this .new reauthorization bill and so this funding has also
been delayed 2 ~months. However, initially, the talk was that there would be a 4 month extension, so
hopefully this 2 month extension'.is a good sign that the legislature and President are close to an
agreement on the reauthorization bill.
FHWA Shutdown .Averted - Highway ,Program Extended Two-Months
On Sunday, February 29, the President signed into law HR 3850, the Surface Transportation Extension
Act of 2004. On 'Friday afternoon, the Senate passed the -two-.month extension that will *keep federal
highway and transit programs operating at current funding levels through the end of April. The House
passed .the-bill on Thursday.
The extension bill was considered "must-pass" legislation because a lapse in the program would have
forced the Federal Highway Administration to shut down on Monday morning and the flow of Highway
Trust Funds to the States would have been immediately halted.
In order to pass the ~bill, the *Senate~needed the unanimous consent of all Senators. However, Senators
McCain (R-AZ) and .Lieberman (D-CT) would not agree to pass the highway bill, unless an unrelated issue
was resolved. Having not resolved the issue by noon on Friday, the Federal Highway Administration began
planning for the orderly shutdown of the agency. At 4:00 pm, an agreement was reached and Senators
McCain and Lieberman agreed to allow the extension to proceed.
All 'Federal Highway Administration offices opened on Monday morning .and highway construction and
safety projects are proceeding without delay.
-RECE]VED
MAR-5L; D41 (
C)TY MANAGER'S
MEMORANDUM
(White paper due to photographs)
March 4, 2004
TO: Florn Core, Water Resources Manager
FROM: Steve Choate, Water Resources Engineer,~~~~
SUBJECT: Status of Current Capital Improvement Projects - Construction Progress
The City Water Resources Department currently has three capital projects underway. All three projects are
improvements to the domestic water distribution system to meet the water needs generated by the rapid
growth within the City. The City is extending the Interface pipeline to add two domestic wells utilizing the
2800 Acre Recharge Facility. In conjunction with the pipeline project, three additional turbine pumps are
being added to the six booster pumps already in operation. Together with California Water Service a three
million gallon water storage tank and booster pump facility is being built at Coffee and Norris Road to
serve the northwest.
The well field pipeline extension project connects a third and
fourth well to the ten million gallon water storage tank Interface
facility, adding additional production to meet increasing water
demands for southwest Bakersfield. This water source presents a
savings by avoiding pump taxes and allows us to take advantage
of P. G. & E.'s discounted energy rates. The project is 20%
complete and is scheduled to be operational in June of 2004..
At the opposite end of
2800 Acre Well Field Pipeline extension the Interface project
three additional
turbine pumps and a
by
generator
~-:~": system for emergency
use are being installed.
The pumps should be
ready for pressure
testing on Monday Installation of three additional turbine
March 8, 2004. pumps to the Interface Project
In northwest Bakersfield a joint City/Califomia Water Service
3 million gallon'tank floor pad. Company project to build a 3 million gallon potable water
Forming and placing structural steel, storage tank and booster pump facility began construction early
this year. This project will serve the ever expanding water
demand for this area through a shared system. The project is
15% complete and is scheduled to be finished by December 2004.
B A I< E R $ F I E L D
Department of Recreation and Parks
Date: March 4, 2004
To: Alan Tandy, City Manager
From: Alan Christensen, Interim Director of Recreation and Parks
Subject: Monthly Report for January
Attached are the monthly activity reports for each division. If you
have any questions or require additional information, please let me
know.
B A K E R S F I E L D
Department of Recreation and Parks
Parks Division
January 2004, Report
INTERNATIONALSQUARE CLOSURE
Following numerous meetings and discussion of options, a decision was made to
close International Square through City Council direction. Parks and Public
Works crews combined to complete demolition work within a three day window of
January 5-7, 2004. Certain items, such as benches, lights, and fencing were
salvaged to be used for other projects.
NEW ACREAGE
No new acreage was accepted in January for Parks Division to begin sole
maintenance responsibilities. However, three developer maintained parcels of
streetscape totaling 2.74 acres with 219 trees and 969 shrubs were entered into
a 365 day maintenance period. These locations shall become our responsibility
to maintain following conclusion of developer's 365 day maintenance
responsibility.
VANDALISM
We believe BPD was able to identify the person responsible for a considerable
amount of previously reported young tree vandalism within the downtown
corridor. The individual was detained, interviewed and subsequently deported. It
is believed as much as $5,000 irreparable damage was done to numerous trees
by this individual or someone following his pattern of vandalism.
Surprisingly, vandalism took an upturn in January. Polo Grounds split rail
concrete fence was once again targeted by vandals who broke several sections.
Several irrigation clocks were broken citywide. Basketball hoops were stolen
from Jefferson Park. The letter "G" was stolen from the Glenwood development
entry sign. Silver Creek Park marquee was broken as were several restroom
latches and an accessible swing in the north play lot. At Wayside Park, a bench
back was stolen, restroom fixtures broken and canal fence cut.
PARK RESERVATIONS
A few rains and chilly conditions best describe the month of January. As a result,
park reservations were at typical Iow levels. A total of 21 reservations were
issued with an estimated attendance of 1,430 persons.
PLANZ PARK PICNIC SITE REPAIRS
Three mature Modesto Ashe trees were removed from a combined picnic site at
Planz Park. The trees, two of which were topped years ago to keep from
growing into overhead power lines, were uplifting and cracking the concrete
picnic pads and walkways. New concrete walkway and picnic pads were
installed to replaced the damaged facilities. Six new trees will be planted in early
February to replace the removed trees.
B A K E R S F I E L D
DATE: February 3, 2004
TO: Alan Christensen, Assistant City Manager
FROM: Holly Larson, Supervisor
RE: January Monthly Report
Mill Creek Proiect:
The committee completed the grant application and submitted it to the state in mid
January. Now we wait for a response on funding.
Aquatics:
Our first manager assessment was held on January 10. Ten applicants participated.
Decisions on pool management staff will be determined after the final round of
assessments scheduled for February 7.
Interviews have been taking place to hire lifeguards for the 2003-04 season. Fiftey-two
candidates have been selected thus far. Our last interviews are scheduled for this
week. We are now maintaining a waiting list of those interested in interviewing due to
the reduction in staff caused by pool closures.
Aquatics Club of Bakersfield is currently renting Silver Creek Pool for swim practices.
Aqua Yoga and Aqua Fitness classes are scheduled in the evenings at Silver Creek.
There were no sign ups for the January Aqua Yoga class. We had 3 participants for
Aqua Fitness.
The high schools begin using Silver Creek and Jastro pools beginning February 2,
2004.
C:\Documents and Settings\sforsyth\Local SettingsWemp\monthly report.docC:\Documents and SettingsXsforsyth\Local Settings~Temp~rnonthly
report.doc 3/4/200410:09 AM
B A K E R S F I E L D
Department of Recreation and Parks
Date: February 2, 2004
To: Alan Christensen, Interim Director
From: Terri Elison, Recreation Supervisor
Subject: January Monthly Report
Silver Creek After School Proqram ......................... 524 Attendance
......................... 28 Average Daily Attendance
Silver Creek After School Program discovered the world under the sea with crafts,
games, stories, and "Finding Nemo" trivia questions. Highlights also included a "Game
Week" complete with their own Super Bowl party, various arts and craft activities, and
playing "human pinball".
Silver Creek Rentals ................................................... $0 (F,gur, do~s no,,nc,,.do ~,o,,s>
The Silver Creek multi-purpose room and/or pavilion were not rented the month of
January due to the budget situation.
Silver Creek Center
Due to the budget crisis, Silver Creek Center had to close Monday and Wednesday
nights at 7:00 p.m. This caused four classes to be canceled that were scheduled those
nights. They were Scrapbooking, Photography, Painting with Acrylics, and Painting like
the Pro's. Refunds were given for those individuals that had signed up for these
classes. Each of the contract instructors were willing to wait and see if circumstances
improve.
Vandalism continues to be a big problem at Silver Creek. The marquee was vandalized
again so staff replaced the Plexiglas with Lexan which is a stronger glass.
Classes at Silver Creek:
# Registered Total Attendance
Ballet & Gym (6 - 11) 13 52
Ballet & Gym (3 - 5) 15 60
Calligraphy Workshop 5 5
6:35 PM 2/3,/2004 C:\Documents and Settings\s!brsyth\Loca! Settings\Temp\Te~ Jan 2004 Report.doc Created by Telison
Chess no class no class
Clogging 24 96
Dance & Gym (4-5) 4 16
Dance & Gym (2-3) 6 24
Dog Obedience no class no class
Guitar 6 24
Jewelry Making (Beading) 2 2
Journal Writing to Memoirs no class no class
Kardio Kick 14 98
Karate 20 160
Knitting & Crocheting 6 24
Pilates 3 33
Poetry no class no class
Tai Chi 12 84
Tennis (Child-Beg) 4 32
Tennis (Child-lnt) 6 48
Tennis (Adults) 1 8
Upholstery 10 40
Yoga 3 24
TOTAL 154 830
Classes at Other Facilities
# Registered Total Attendance
Siemon Park
Tennis (Child) no class no class
Tennis (Adult) no class no class
All Star Dance Studio
Dance & Gym (2 1//2 - 4) 5 20
Dance & Gym (4 - 5) 1 4
American Academy of Gymnastics
Gymnastics (4 - 5) 2 8
Gymnastics (You & Me) 1 4
Gymnastics (K - 6yrs) no class no class
TOTAL 9 42
Attendance Silver Creek Center:
Rentals ......................................... 0
Classes ........................................ 830 Registrations Taken: 188
After School Program ................ 524 # of Guests Served: 293
(The # of Guests served does not include registration)
TOTAL .................... 1,354
6:35 PM 2/3/2004 C:\Documents and Settings\sforsyth\Local Settings\Temp\Terri Jan 2004 Report,doc Created by Telison
B A K E R S F I E L D
Department of Recreation and Parks
Monthly Report January 2004
Dr Martin Luther Kin~l Jr. Community Center
Youth Activities
Sports
Basketball
We continue to meet and discuss ways that our agencies (PAL, Friendship house, Boys and Girls
club) may come together and offer grass root sports programs in the community. We are still
planning on an after school basketball program here at the center. Originally we were going to start
in January but because of some staff changes at PAL we moved the league back and are hoping
to get started as soon as possible.
Boxing
We are in the preliminary stages of discussion with PAL to offer a beginning boxing program here
at the center. It is our plan to offer non contact beginners boxing for youth ages 6 to 10 years of
age.
Game room/Gym
Due to the abnormal situation of opening and closing the game room and gym on separate days to
accommodate gym participants and the game room, we are going to move several games and
tables in the gym, thereby one staff person can supervise both activities, this will allow us to keep
both rooms open.
Dean Jones Page 1 2/4/2004 2:35 PM
B A K E R S F I E L D
Department of l~ecreation anal Parlzs
Date: February 2, 2003
To: Sally Ihmels, Recreation Superintendent
From: Linda McVicker, Recreation Supervisor
Subject: Monthly Report for January
ADULT SOFTBALL
Adult Softball has been on a break during the Winter season. We will begin getting the
fields ready in February to begin with the Spring season on March 8th. Registration for
the Spring season will end February 27, 2004.
LOWELL NEIGHBORHOOD COMMUNITY CENTER
The Lowell Neighborhood Community Center was closed during the month of January.
We will be taking the supplies and equipment from the center this month to store and
utilize at other sites.
UP COMING EVENTS
We have several sports events coming up for Spring and Summer. Frisbee Golf will
begin on Saturday, April 17th. Pee Wee Track will begin on Saturday, May 8th. T-Ball
will begin on Saturday, June 12.
B A K E R S F I E L D
Department of Recreation and Parks
Date: February 2, 2004
To: Allen Abe, Assistant Recreation and Parks Director
From: Ken Trane, Park Construction and Facilities Planner
Subject: Parks Department Planning and Construction Activity
Planning
The Park Master Plan has been completed for the City in the Hills Project in
northeast Bakersfield. The plan generally locates about 29 acres of park land at
4 locations within the project.
A consultant has been selected to develop plans and specifications for the
Wayside Park Playground Rehabilitation Project. Construction is scheduled for
completion in late summer of 2004.
Construction
The Wayside Park Wet Play Area Project is proceeding into the design phase.
City Public Works and Recreation and Park Staff will work together with vendors
to develop the design and create plans and specifications. Construction is
scheduled for completion this summer.
A 10,000 square foot vacant area to the west of the new Convention and Visitors
Bureau will be improved into a mini-park with landscape and hardscape
improvements. The Veterans Memorial Park Committee has shown an interest
in collaborating with the city to provide a memorial at the site within a 20' radius
"center piece" of the mini-park. The city's landscape and hardscape
improvements should be complete within the next few months. The Veteran's
are currently gathering support and discussing design criteria.
Fire Station 15 at Deer Peak and Buena Vista Road is complete. The landscape
improvements are all installed with the exception of hydroseed turf. City
maintenance responsibility to be parks divisions in early August.
Grants
Proposition 12 We have received the first 1 million dollars from the Per
Capita Grant Program under Proposition 12, We will
eventually receive 2,4 million dollars under Proposition
12 for funding of the Bakersfield Ice Center,
Proposition 40 Fully executed contracts for the Roberti-Z'berg-Harris
Block Grant Program under Proposition 40 have been
achieved with the California State Parks. We can now
identify projects.
Development Services Department Notes
March 4, 2004
Planninq:
1. Kern COG has selected Jim Movius, Principal Planner, as the recipient of a Regional
Award of Merit in the category of Distinguished Leadership. The awards ceremony will be held
Thursday evening, March 4, 2004.
2. LAFCO held a workshop on Tuesday, February 4, 2004 to consider LAFCO's
involvement in city planning. The panel included Lloyd Zola (consultant to Shafter), Pauline
Larwood (Smart Growth), Ted James (Kern County Planning Director), John Guinn (Shafter City
Manger) and Stanley Grady (City of Bakersfield Planning Director). The Shafter contingency
promoted sales tax sharing. Mr. James thought it was good for LAFCO to resolve conflicts
between cities. Ms. Larwood opposed sprawl but interestingly suggested that Bakersfield
should have a permanent representative on LAFCO. Mr. Grady reminded LAFCO that it had no
authority over zoning and general plans. He asked that they adopt policies for review of
annexations that were reasonable and applied fairly to all cities. He also pointed out how
LAFCO's approval of special districts just outside the city encouraged sprawl.
3. On a related matter, our consultant has delivered a first draft of a municipal services
review for editing. That study when completed will serve as a basis for expanding the city
sphere of influence for future growth of the city. LAFCO is required to review this while
considering amendments to the sphere of influence.
4. The committee for the Planning Commission conducted its first neighborhood meeting in
Rio Bravo over future buildout of that neighborhood on Wednesday, February 25, 2004. The
first meeting was to identify all the issues of concern. They met again March 3, 2004 at 5:30
p.m. in the City Council Chambers to discuss possible solutions.
5. The County Recorder has started charging $25.00 per environmental document posted.
Depending on the case, there could be up to three required. We are passing that cost on to
applicants plus a $25.00 per case handling fee because we have had to set up an account with
the county and now need to manage and keep books on dollars collected and used for that
purpose.
6. We are currently processing six EIR's and issuing requests for proposals to start three
more within the next 90 days. We anticipate five or more will need to be started this summer. I ~
have approved a recommendation by staff to streamline the environmental review process.
Over the years extra steps and work have been introduced into our local guidelines. I have also.
asked for an evaluation of possible outsouming of management of the environmental review
process, either by a separate firm or expansion of EIR contracts. To give you a sense of our
changed world, between 1990 and 1995 we only did one EIR, now we are looking at doing a
dozen this year (N.B. The planning staff is 17% fewer than it was in 1990).
Development Services Notes
Mamh 2, 2004
Page 2
7. You may have noticed that construction has continued on the Wal-Mart store at Panama
Lane and Highway 99 even though Judge Twissleman required more work on the EIR. He also
authorized completion of the walls and roof to secure the building. His decision on the case has
been appealed by the project opponents. Being embedded in litigation has interfered with our
ability to pursue "big box" policies in the Planning & Development Committee. Staff continues to
gather information in preparation for the time we can deal with "big box" issues.
8. Dave Cross received conditional site plan approval for a nine story, 132,336 sq. ft. office
building at 1300 "Q" Street.
9. There is a plan for commercial development of the northeast corner of Meany and
Coffee Road in site plan review.
10. There are eleven general plan cases in process. Of those, four will be heard by the
Planning Commission on March 18, 2004. The others will be considered upon completion of
environmental reviews. It is expected that the four cases will be heard by the City Council on
May 12, 2004.
11. Current Planning is processing 48 subdivisions, four zone changes and two appeals.
12. I met with Gordon Nipp and Arthur Unger on Thursday, February 26, 2004 to talk about
the idea of a "zero" emissions requirement on project approvals. They are okay with the
concept and anxious to proceed! We may have issues to resolve in methodology and
implementation.
Buildinq Inspection:
1. Two new Kohl's stores have been completed and their grand openings will be March 5,
2004.
2. Work has begun on the 400,000 sq. ft. expansion of Dryers Ice Cream Plant. It will take
a little over a year to complete.
'3. Two 40,600 sq. ft. medical office buildings have been permitted for 3838 San Dimas
Street.
4. The Bureau of Automotive Repairs has received a permit to build an office and shop on
Sellect Avenue.
5. Stier's RV has received a permit for construction of a 45,000 sq. ft. parts and service
building.
6. A 50,000 sq. ft. mini storage at 5500 Knudsen Avenue is in for plan check.
7. Permit activity continues to outpace previous years. Refer to the attached graph.
8. Code Enforcement is adjusting to its reduced capacity to respond to complaints by
focusing attention on higher priority health and safety threats. Two cases made notorious by TV
news coverage last month involved abatement of raw sewage flows in apartment complexes.
P:\Memos\Dev Serv Notes.doc
B A K E R S F I E L D
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Jack Hardisty, Development Services Di
DATE: March 4, 2004
SUBJECT: Removal of tumbleweeds / Referral No. 699
Councilmember Carson requested staff remove tumbleweeds on a vacant lot located on Jumbuck
Lane near Alice Springs Avenue.
A violation notice was mailed to the owner on February 20, 2004. A reinspection was conducted
and the property has been cleaned.
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
CITY OF BAKERSFIELD
MEMORANDUM
March 1, 2004
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
SUBJECT: 4-WAY STOP AT EL TORO AND BELLE TERRACE
Council Referral #701
Staff is requested to respond to Mr. Crawford regarding his petition for the
placement of a stop sign at the corner of El Toro and Belle Terrace. Additionally,
report on the status of curbs and gutters on the south side of Belle Terrace in the
same area.
The intersection of Belle Terrace and El Toro was last analyzed at the request of Mr.
Crawford in August/September of 2002, right after school started that year. The
investigation concluded that the intersection of Belle Terrace and El Toro did not meet
any warrants for 4 way stop sign control. At the time of the study, there had been no
recorded accidents for the previous 12 month period. For the volume warrant, the main
street traffic volume was only 428 vehicles per hour and the side street volume average
was only 27 vehicles per hour. This is far from meeting the minimum volume warrant
(200 vehicles per hour on the side street). A previous study done in May 2002 had the
same results. Since it has been over one year from the last study, Traffic Engineering
will re-study the intersection for stop sign controls within the next 4 to 8 weeks,
depending on staffing and weather conditions.
The curb and gutter project for the south side of Belle Terrace is part of Traffic
Engineedng's Safe Route to School project grant. This improvement project is nearing
start of construction. The Grant application was submitted in early 2003 for this area of
Belle Terrace adjacent to the school. The City received a grant and on October 15,
2003, Caltrans gave notice that the funds had been obligated the project. On November
24, 2003, the plans were completed and the project advertised for a short period (21
days) to rush the project. On December 16, 2003, the bids were opened and Bowman
Asphalt was the apparent Iow bidder. On February 11,2004, City Council approved the
award of the contract to Bowman Asphalt. The contracts have been signed and the
project will start after the required insurance documents have been submitted by the
contractor. Mr. Crawford was contacted and informed of the project status.
G:\GROUPDA~Referrals~,004\02-25\701 - Traffic_Streets.doc
~Rh°nda S~iieyI~ Fwdi:~r~nsient OutdOOr B~sines~es ..................................... ~Age !~'1
From: Alan Tandy
To: Rhonda Smiley
Date: 3/1/2004 2:22:15 PM
Subject: Fwd: Transient Outdoor Businesses
>>> Cheryl Simpson 3/1/04 9:12:00 AM >>>
FYI:
At the 'February 25th Council Meeting a council member questioned whether or not the county requires
permits or licenses for Transient Outdoor Businesses, The answer is yes. The permits are obtained-from
the Kern County Sheriff's Department Permit/Licensing Unit at 1350 Norris Road, phone number (661)
391-7690.' I spoke to sheriff's deputy Larilee Abiecunas who does the .permit and licensing enforcement
.for the entire county. She stated that she issued 13 citations a day to illegal vendors over Valentine's Day
weekend,
i~!AR - 4 2004
i\rANAGER'S' ....
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
CITY OF BAKERSFIELD
MEMORANDUM
March 2, 2004
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR~-~___-~
SUBJECT: FISCAL YEAR 2003-04 BUDGET WORKSHOP QUESTIONS
Question No. 17- Follow Up
Requested a response from staff regarding efforts to explore grant funding to assist
with funding the Graffiti Removal Program. (Councilmember Benham)
Staff contacted Teresa Grossi of the California Department of Housing and Community
Development Department, Code Enforcement Grant Program Section. We were
advised that there are no funds left in this program at this time.
G:\GROUPDAT~Georgina\Question No. 17 Follow Up 3-2-04.doc
.B A K E R S F I E L D::
PUBLIC WORKS DEPARTMENT
CITY OF BAKERSFIELD
MEMORANDUM
March 1, 2004
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~
SUBJECT: WATER AVAILABILITY IN SECTION 9 NORTHEAST
Council Referral #702
Councilmember Maggard requested staff provide information to S&S Builders
regarding the availability of water in Section 9 in the northeast and report back to
Council. Staff to explore the feasibility of forming in Assessment District to assist in
providing the necessary infrastructure.
It is possible for the City to aid in the formation of an Assessment District, however,
water is a private utility. The Assessment District would have to be formed with taxable
bonds, as tax-free bonds cannot be used to pay for private utilities.
G:\GROUPDA'P, Referrals~2004\02-25\702 - Marian.doc
B A K E R S F I E L D
MEMORANDUM
March 3, 2004
TO: ALAN TAND~~AGER
FROM: FLORN CORE-WATER RESOURCES MANAGER
SUBJECT: WATER AVAILABILITY IN SECTION 9 NORTHEAST
Council Referral ID: Ref000702
"Councilmember Maggard requested staff provide information to S & S Builders
regarding the availability of water in section 9 in the northeast and report back to
Council. Staff to explore the feasibility of forming an assessment district to assist in
providing the necessary infrastructure."
Section 9 in the northeast area of Bakersfield is referring to a site that is located between
Masterson St. and Alfred Harrell Highway, north of the future Paladino Ave. It is on high
ground that will have views overlooking the Kern River and the surrounding area. S & S
Builders is represented by Dan Pike in Bakersfield.
There is water available since the completion of the new California Water Service Co.'s
Bakersfield Water Treatment. Mr. Pike has met with Cai Water and was given the
information on water pipeline extensions needed to serve the development. The
developers will need to extend existing water transmission mains and install 2 booster
pumps in order to serve the proposed developments. From the map provided showing
future Tract No. 6137, containing 316 lots, it appears that water mains extensions of about
2000' of 30" diameter pipe, approximately 2100' of 24" pipe, 2000' of 12" diameter pipe and
2 booster pumps will need to be installed to meet the demands and fire flow requirements
of this proposed tract. The costs could range from $700,000 to $900,000 for these mains
and the pumps. The costs would be fully refundable by Cai Water to the developers. The
mains would also be able to serve other future tracts in the section 9 development of S & S
Builders' property.
The Public Works Department will review the feasibility of forming an assessment district to
address the infrastructure issues.
RECEIVED
''
MAR - 5 ~
CITY MANAGER'S OF
DEPARTMENT OF RECREATION AND PARKS
DATE: March 1, 2004
TO: Alan Tandy, City Manager
Interim Director Recreation & Parks ~j
FROM:
Alan
Christensen,
SUBJECT: LOCATION FOR AN INDOOR SOCCER FACILITY/PARK
Ref000706 (Ward City Wide)
Staff is requested to review information provided by citizen regarding a proposal for an indoor
soccer facility. Which would be located at a city park at no cost to city. Staff is to identify a
park and respond back to council.
Staff met with Mr. Victor Placencia and discussed his ideas of a Soccer facility at a city
park. He stated the cost of such a facility is estimated to be about $15,400 and he
would be responsible for obtaining the funding. Mr. Placencia is asking the City to
provide was one tennis court in a city park that could be converted to a soccer facility.
He is also interesting in organizing and conducting soccer games at the facility as a
private enterprise.
Initially, Mr. Placencia identified Grissom and Wilson as possible parks for such a
facility. But Grissom does not have any tennis courts and Wilson's tennis courts were
just recently resurfaced. Staff is very hesitant in changing the use of the tennis courts at
Wilson because of its high tennis use and interest.
After reviewing tennis court facilities around town, staff is suggesting to Mr. Placencia
that Beale Park tennis courts might be considered as a possible site. Staff will pursue
this alternative with him in the coming weeks.
W:\Council Referrals 2004\Ref000706.doc
March 5, 2004 (9:55AM)
' "RECEIVED -
MAR - 3
HUMAN RESOURCES DIVISION ,
MEMORANDUM HTY MANAGER'S OFFICE
TO: ALAN TANDY, CITY MANAGER i~ ~,~/'
FROM: CARROLL HAYDEN, HUMAN RESOURCES MANAGER
DATE: MARCH 1,2004
SUBJECT: PERS COMPLICATIONS AND RE-HIRING RETIREES
Council Referral No. Ref000704 (Ward 5)
ICouncilmember Hansen requested staff provide written information regarding the re- I
hiring of retired employees and complications, if any, with PERS.
I
Normally, a retired person receiving a monthly allowance from PERS may not be
employed in any capacity by a PERS employer unless they have first been reinstated
from retirement, thus ceasing any retirement allowance.
However, there is an exception for re-hiring retired employees, by any PERS employer,
if the retired person is hired as a temporary employee and does not exceed 960 hours
in any calendar year for all employers. The re-hiring must be either during an
emergency to prevent stoppage of public business or because the retired employee has
skills needed in performing work of limited duration.
Another avenue to use the assets of a former employee would be to hire the retiree
through a consultant. To hire a retiree as an independent contractor would most likely
not meet the criteria established by the federal government for an independent
contractor as we would often be dictating the scope of the work, providing the work
place, and necessary equipment. If the retiree were hired through a consultant, the City
would not be the employer, thus the number of hours worked would not have to be kept
below 960 as the work would not be through a PERS contracting agency.
CH/kec
S:~(aren\Council Referrals~memos\Councilmember Hanson referral 2-25-04 PERS & rehidng retirees.doc
.... RECEIVED
· , ,: ',:&~':ER's OFCzlCE
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
CITY OF BAKERSFIELD
MEMORANDUM
March 1, 2004
TO: ALAN TANDY, CITY MANAGER
FROM' RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
SUBJECT: GRAFFITI IN STONE CREEK AREA
Council Referral #705
Staff is requested to remove graffiti in the Stone Creek area, near Wible Road.
The Stone Creek area near Wible Road was extensively vandalized by graffiti. City
anti-graffiti crews worked four days to document and remove the graffiti in this area.
G:\GROUPDAT~Referrals~004\02-25\705 - GS.doc
I~ Rh0nda Smiley':"~wd: White Lane at stat~' Route 99 Page 1 1
From: Alan Tandy
TO: . Rhonda Smiley
Date: 3/4/2004 8:53:10 AM
Subject: Fwd: White ~Lane at State Route 99
>>> -Nick Fidler 3/3/04 2:11:43 .PM >>>
Jack,
In response to Councilmember Salvaggio's request for information on:
1. Height of soundwall and why wall.stopped? and .pattern of soundwall?
The soundwall is planned to be 4.37 meters (14'-4") in height. Currently, the contractor has constructed
the foundation(CIDH) and base of the soundwall. The base of the soundwall is a concrete barrier and the
remaining wall will be a splitface block with two.rows of flutted block and two rows of smooth block at the
top. The Soundwall is to match the ~wall about ~,~ mile :north of White Lane on S~R. 99. The contractor was
to begin constructing the blockwall next week, but due to a shorthfall in .production of the approved flutted
block, this may be delayed. T. he block supplier-has indicated there is a 3 month-delay in suppling the
flutted block due to production ~runs. Granite-is looking for other block suppliers which can match the
flutted block needed. If they can find a supplier that will match the block, Granite will continue with -their
schedule to begin construction next week. If they cannot, the block wall will be postponed until a new
supplier can be approved; Granite will then begin the construction of the northbound offramp insted.
2. Aux Lane schedule?
Caltrans has reccommended Griffth Construction Company as the responsible Iow bidder for the
Southbound auxilary lane at White Lane. Their.preposed schedule is as follows:
Award Contract: April 5, 2004
Begin Construction: May 10, 2004
Construction Complete: March 1,2005
Thank you
Nick Fidler
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
CITY OF BAKERSFIELD
MEMORANDUM
March 1, 2004
TO: ALAN TANDY, CITY MANAGER
FROM' RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~
SUBJECT: GRAFFITI ON SOUTH H AT WILSON
Council Referral #707
Staff is requested to remove graffiti from the canal walls on the corner of South H
Street at Wilson. Additional graffiti is on H south of Wilson.
The Anti-graffiti crews will be removing the graffiti on March 3, 2004, in the Wilson
Road South H area.
G:\GROUPDAT~Referrals~2004\02-25\707 - GS.doc