HomeMy WebLinkAbout02/22/02 BAKERSFIELD CITY MANAGER'S OFFICE MEMORANDUM February 22, 2002 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager /~7-'~/, SUBJECT: General Information 1. There is a significant memo enclosed from Public Works detailing a two phase plan to enhance our internal street repair plan. We will do a report on this at the next Council meeting. 2. Councilmember Benham and staff had a positive meeting with the group of Veterans who are looking at a Veterans' memorial for Central Park or to have Central Park expanded for that, per the charrette concept. 3. Work is continuing on the future 40-acre park site, located immediately north of the Kern River and Stockdale Highway bridge. The excavation of the 10-acre recharge lake is approximately 90% complete and earthwork will begin next week on the westerly playing field and recharge pond areas. This excess dirt (approximately 100,000 cubic yards) is being relocated to the new 32-acre Rio Vista park site, located just south of the Kern River channel, to shape and contour the park and future "aqua-theatre" area. Using our current estimates, rough grading for this earthwork should be completed by mid-March. 4. EDCD has good news to report - a developer has purchased the property at 710 Brundage Lane for use as a 78-unit affordable multi-family housing project. Per the enclosed memo, the project will include an activity room to provide educational classes and after-school programs for the tenants. It will be a very positive addition to the area. 5. The Solid Waste Division mailed the attached flyer with their commercial refuse billings this month. It provides information about the County's program to assist businesses recycle of economically dispose of small amounts of hazardous waste. 6. The latest CIP status report from Public Works is enclosed for your information. 7. A response to a Council request is enclosed: Councilmember Couch · Additional information regarding award of contracts for the design of the Fire and Police Substation. AT:rs cc: Department Heads Pam McCarthy, City Clerk Trudy Slater, Administrative Analyst BAKERSFIELD .... TO: ALAN TANDY, CITY MANAGER /~ /~ FROM: RAUL ROJAS, PUBLIC WORKS DIRECTOR y~.....~ DATE: February 21,2002 SUBJECT: STREET MAINTENANCE This memo describes increased maintenance efforts proposed by the Street Division. A second memo is forthcoming, which will describe a plan to increase our street maintenance effort and funding improvements to major arterial streets for the very near future. The Public Works Department, Street Division is composed of four maintenance sections and they all provide a valuable service. However, the following topic concentrates on the Street Maintenance section which is responsible for maintenance on all City streets and alleys. Due to the City's growth through new development and annexations, the street mileage that this section is responsible for maintaining has increased from 657 miles in 1992 (25 employees and two supervisors) to approximately 900 miles of streets and 200 miles of alleys as of December 31,2001 (26 employees and one supervisor). Work on an annual basis involves resurfacing, reconstruction, penetration sealing, section repairs, pothole patching, crack sealing, median island modification, concrete work, alley clearing, assisting with leaf collection, and flood control during major storms. In addition, this section responds to calls from the Police and' Fire Departments for barricades, delineators and equipment as needed for emergencies and special events. While this section's primary focus is on residential streets, general street surface maintenance such as penetration sealing, section repairs, pothole patching and crack sealing are done on major streets. The main objective is to perform preventive maintenance that will result in a 20-year life span on all streets. A detailed summary of employees, equipment and work performed is attached hereto. The Streets Division gas tax funding for maintenance has increased dramatically from $400,000 in FY 95/96 to over $1.2 million in the current fiscal year. Even with this increase, the resurfacing backlog exceeds ten years. With our current efforts, the number of streets needing these repairs is growing faster than our crews can resurface or reconstruct them. In other words, we may resurface twelve street miles per year only to have an additional eighteen miles requiring resurfacing the following year. G:\GROUPDAT~M2002_CityManager~StreetsMaintenance.wpd February 21,2002, 1:50 pm Page 1 of 8 '"-- -~ages Additionally, more streets must be reconstructed rather than resurfaced due to extreme deterioration. Of the 900 miles of streets, nearly 350 miles are in need of reconstruction. Street reconstruction is more expensive than resurfacing because more material and labor are required. The Streets Division is continually seeking out and experimenting with new street maintenance technology to provide more efficient and cost effective street maintenance. Examples are: · Reconstruction by pavement reclamation and soil stabilization. This involves pulverizing the existing asphalt and base to a depth of ten inches, grading, compacting and removing any excess material prior to placing new asphalt concrete. This process has reduced the time required to reconstruct a residential street by two to three days: · Penetration sealing is an important street maintenance process which helps prevent further deterioration of the pavement. Using a new product, TOPEIN-C, allows this to be done in weather conditions above 70 degrees rather than the 90 degrees required for the former product. This has extended the period when this maintenance work can be done. The new product also does not require sanding of the streets, thereby reducing staff time, cost and citizen concerns. Use of this product for the past two years has increased the amount of streets receiving sealing from 50 miles per year to 180 miles per year. · Crack filling with hot-pour mix rather than the former cold-pour dries much quicker; consequently no sanding and no bumps are created. This product has been used for the past three years and has reduced the number of staff required to perform this maintenance. These new street maintenance technologies assist in prolonging pavement life and reducing manpower, allowing more time for other street maintenance activities. However, the efficiencies gained from the new methods, required more funds for maintenance materials. The following information summarizes our current major maintenance methods, personnel and equipment. Street Resurfacinq This process involves grinding headers along the edge of the street next to the gutter and at the ends of the street segment to be paved. This is done in conjunction with our annual contractor and City forces working together. The contractor is responsible for the machine and the grinding of the asphalt, with the City responsible for trucks to haul off the material, traffic control, sweeping, notifying residents, moving vehicles and ramping the end cuts with cold mix. City crews prepare 30 to 45 streets in this manner each time. It takes two to three days of grinding to complete this work. The City crew that works on this job is the same crew that paves the streets. The resurfacing of these streets takes approximately six weeks to complete, barring equipment failure or other difficulties. Employees used for this is as follows: One H.E.O., six L.E.O., six S.M.W. Equipment used is as follows: Full Size Pick-up, Paving Box, Oil Truck, Motor Sweeper, Large Steel Roller, Rubber Tire Roller, two Super Dump Trucks, six 10-Yard Dump Trucks. To perform this operation a total of 13 people are needed. G:\GROUPDA'r~12002_CityManager~StreetsMaintenance,wpd February21,2002, 1:50 pm Page 2 of 8 Pages Street Reconstruction (Di_a_ain_a Out} This process consists of digging up and hauling off the old asphalt to an asphalt recycling site, reworking and compacting the old aggregate base. As is often the case, if there is no aggregate base the grade is cut down and excess soil hauled off. The street is then reshaped and compacted with native soil, aggregate base is hauled in and compacted followed by paving of the street. This takes about five to seven days to complete barring equipment failure or other difficulties. Employees needed to complete this are as follows: One H.E.O, six L.E.O. and six S.M.W. The equipment used is as follows: Large Motor Grader, two Skip Loaders, Water Truck, Rubber Tire Roller, two Super Dump Trucks, six 1 O-Yard Dump Trucks, and associated paving equipment. To perform this operation a total of 13 people are needed. Our current effort of resurfacing and reconstruction during the year includes working long hours during the week (6 A.M. to 6 P.M.) and at times on Saturdays. We are limited to the hours worked in a day by the operation hours of the asphalt batch plant where the material is purchased. In working extended hours and thus increasing the use of the paving machine, we have experienced more equipment failure. During this past paving season, we did not pave approximately 45 days due to breakdown of the existing paving machine. The current paving machine was purchased in 1997 and is now having some major work done on it by the Equipment Division. Having this key piece of equipment unavailable for an extended time frame substantially reduces the amount of work that can be done by the Street Division. The need exists to purchase a backup paving machine that will allow continual work throughout the paving season. Phase 1 This initial phase provides an additional paving machine and an alternative to the current method of street reconstruction. The current paving machine, being five years old, would become a backup to the new paving machine, thereby increasing the number of productive paving days. An alternative street reconstruction process consists of grinding up (pulverizing) the existing pavement and mixing it with the old aggregate base and/or soil in one operation. The street is then shaped, the materials compacted, and any excess is hauled off. This is followed by paving the street. The entire process takes 'two to three days, barring equipment failure or other difficulties. This new method is being done as time permits on a trial basis using a private contractor to do the pulverizing. Using a private contractor for this service has limited the use of this process as we are controlled by their schedule and other commitments. We have found this process to be successful, as mixing of the pavement with the base material gives the street a thicker and stronger base. The pulverizing machine would also be used to do section repairs on major streets, giving us the ability to do them quicker and more efficiently, eliminating 32 man hours that are used under the current method. This phase recommends the City purchase the paving machine, pulverizing machine and dump trucks and increase personnel to perform the additional work. In doing so, street resurfacing would be increased from 12 miles annually to approximately 18 miles annually, and street reconstruction would be increased from two miles annually to approximately 10 miles annually. G:\GROUPDAT~M2002_CityManager~StreetsMaintenance.wpd February21,2002, 1:50 pm Page 3 of 8 Pages The following additional equipment, personnel, and associated costs would be required: One-time Cost Annual Cost EQUIPMENT i ~ _ ~ Paving Machine $ 285,000.00 $ 42,020.00 Pulverizing Machine $ 250,000.00 $ 45,000.00 (2) lO-Yard Dump Trucks $184,000.00 $ 37,456.00 Subtotal $ 719,000.00 $124,476.00 PERSONNEL (1) H.E.O. $ 60,438.00 (2) L.E.O. $103,322.00 (6) S.M.W. (Time Six Months) $ 90,000.00 Subtotal $253,760.00 Subtotal - Equipment & Personnel $378,236.00 MATERIALS Asphalt Concrete $300,000.00 TOTAL $ 719,000.00 $678,236.00 Phase 2 This phase recommends the City purchase the equipment and manpower to have an additional paving crew. Adding the paving crew would allow one crew to be dedicated to paving on a daily basis during our resurfacing season. The plan would be to prepare by grinding 40 to 50 street at one time, then have both paving crews begin resurfacing immediately. When there are about six streets remaining from the first phase, one paving crew would work with the annual contractor to start grinding the second phase; when complete the crew would go back to resurfacing. In addition, one crew would be used to pave streets that have been pulverized and prepared for paving. This would increase our resurfacing program from 12 miles to approximately 30 miles of streets resurfaced annually and reconstruction could increase another three to four miles annually. All these figures are contingent on weather, difficulties or priorities that may arise. G:\GROUPDAT~STREETS\StreetsMaintenance.wpd February 21,2002, 2:8 pm -- Page 4 of 9 Pages The following personnel and equipment would be required: One Time Cost Annual Cost i Paving Machine $ 285,000.00 $ 42,020.00 I Paving Machine Trailer $ 17,500.00 $ 3,973.00 i(7) l-Yard Dump Trucks $ 644,000.00 $131,096.00 (2) 21-Yard Dump Trucks $ 340,000.00 $ 45,586.00 Large Steel Roller $ 82,000.00 $ 8,372.00 Roller Trailer $ 17,000.00 $ 3,973.00 Rubber Tire Roller $ 58,000.00 $ 7,362.00 Oil Distributor Truck $ 150,000.00 $ 19,485.00 (2) Full size Pick-ups $ 44,000.00 $ 7,307.00 WaterTruck $ 15,000.00 $ 13,000.00 Subtotal $1,752,500.00 $282,174.00 (1) H.E.O. $ 60,438.00 (6) L.E.O. $309,966.00 (6) S.M.W. $271,200.00 Subtotal $641,604.00 Subtotal - Equipment & Personnel $923,778.00 Asphalt Concrete $700,000.00 TOTAL $1,752,500.00 $1,623,778.00 While the additional staff in either phase will be used to increase efforts during paving season, at other times they will perform other important functions. During the non-paving season these additional employees will clean alleys, perform leaf collection, street section repairs, concrete repairs, crack sealing, pothole repairs and median island modifications. Council has allotted additional funding and while the City Streets Division functions as efficiently and productively as possible, City streets continue to degrade faster than completed maintenance efforts. One of the City Council goals has been to improve street conditions throughout the city. Streets Division staff is fully supportive of this goal and continues to review new technologies and products that can aid in the achievement of this goal. We believe that either of these options will further the effort made to improve the G:\GROUPDAT~M2002_CityManager~StreetsMaintenance.wpd February21, 2002, 1:50 pm -~'age 5 of 8 Pages condition of City streets. Phase 1 focuses on the reconstruction efforts, while Phase 2 deals with both reconstruction and resurfacing efforts. I recommend we pursue the implementation of Phase 1. This option allows for full utilization of the paving season by having a backup paving machine increasing the number of miles paved each year. The pulverizing machine will allow for increased productivity in the areas of street reconstruction and section repairs. It is our intent to dedicate much of this recaptured paving time to the maintenance of arterial and collector streets such as: Gosford Road, Ming Avenue, White Lane, Mt. Vernon Avenue, Columbus Street, etc. Should it be decided to implement Phase 1, the paving machine and pulverizing machine should be purchased immediately to take advantage of the upcoming paving season. To expedite the process, this equipment should be purchased through sole sourcing. G:\GROUPDAT~M2002_CityManager~StreetsMaintenance.wpd February21,2002, 1:50 pm Page 6 of 8 Pages The following table compares the amount of work for the various street maintenance operations currently being done with the estimated amounts from the two phases. Street Maintenance Programs Process Current Phase 1 Phase 2 Street Resurfacing 12 miles 18 miles 30 miles Street Reconstruction 2 miles 10 miles 14 miles Street Penetration Sealing 180 miles 180 miles 180 miles Section Repairs 1/2 mile 3 miles 4 miles Alley Resurfacing 1/8 mile 1/4 mile 6 miles NON-PAVING SEASON ~ ~:,~ ......... ®~ ~ ~: ~:~'~;~,~ Crack Sealing 8 miles 8 miles 8 miles Pothole Repairs 30,000 each 30,000 each 30,000 each Concrete Repairs: Curb & Gutter 10,000 In ft. 10,000 In. ft. 15,000 In. ft. Sidewalk 25,000 sq. ft. 25,000 sq. ft. 40,000 sq. fi. Handicap ramps 36 each 36 each 45 each Median Islands Modification Exposed 70,000 sq ft. 70,000 sq. ft. 70,000 sq. ft. Aggregate Median curb 5,700 In. ft. 5,700 In. ft. 5,700 In. ft. River Rock 660 tons 660 tons 660 tons Additional work: Alley Cleaning 40 miles G:\GROUP DAT~M2002_CityManager~StreetsMaintenance.wpd February21, 2002, 1:50 pm Page 7 of 8 Pages Street Division ! Street Maintenance Field Employees: 5 Heavy Equipment Operators (H.E.O.) 10 Light Equipment Operators (L.E.O.) 11 Service Maintenance Workers (S.M.W.) Dedicated Equipment: (6) Full Size Pickups (4) Patch Trucks (4) Skip Loaders (2) Lg Motor Graders (2) Sm Motor Graders (1) Paving Machine (1) Lg Steel Roller (2) Rubber Tire Rollers (4) Sm Steel Rollers (2) Super Dump Trucks (7) 10-Yard Dump Trucks (3) 5-Yard Dump Trucks (1) Motor Sweeper (1) Water Truck (1) Backhoe (2) Bobcats (1) Crack Sealing Machine (4) Air Compressors (1) Concrete Saw Rec~ular Work Performed: Street Resurfacing 13 employees March to November Grinding Headers 12 employees March to November Street Reconstruction 12 employees March to November Street Penetration sealing 6 employees March to October Section Repairs 8 employees February to December A.C. Patch Crew 3 employees All Year Long Cold Mix Patch Crew 2 employees All Year Long Median Island Modification 3 employees All Year Long Crack Sealing 6 employees October to March Leaf Crew 4 employees October to February Concrete 3 employees All Year Long Sidewalk Crew 3 employees All Year Long Alley Cleaning 8 employees November to March Alley Resurfacing 10 employees March to November c: Brad B. Underwood, Public Works Operations Manager Luis A. Peralez, Streets Maintenance Superintendent G:\GROUPDAT~M2002_CityManager~StreetsMaintenance.wpd February21, 2002, 1:50 pm -~'age 8 of 8 Pages BAKERSFIELD MEMORANDUM February 20, 2002 TO: Alan Tandy, City Manager FROM: Donna Kunz, Economic Development Director SUBJECT: Proposed Multi-family Affordable Housing Project at 710 Brundage A priVate developer has recently purchased the property at 710 Brundage Lane for the purpose of developing a seventy-eight unit affordable multi-family housing project. The projects non profit developer is Corporation for Better Housing and has been in existence since 1995. Corporation for Better Housing has eight completed projects in California, a ninth project recent is under construction in Arvin. The project planned for Brundage Lane will include a 1,500 square foot activity room where various educational classes and after school programs will be provided. The classes will include computer training classes and English as a second language and will be available to the tenants at no charge. In addition, other amenities include on-site laundry area, tot lot playground and an outdoor activity area with barbeques and picnic tables. The two bedroom units are anticipated to be 750 square feet and three bedroom units are planned at 1,025 square feet. The projects design includes stucco buildings with stone accents. Rents for the two bedroom units in the project are expected to range from $275 to $502 and will be from $318 to $580 per month for the three bedroom units. The project's anticipated funding includes nine percent tax credits and private investment. To qualify for the tax credit program, tenants must meet various criteria, including income limitations. The maximum allowable yearly income for a two bedroom unit is $22,165 and for a three bedroom is $25,685. Occupancy for the two bedroom units will be limited to four persons and the three bedroom units will allow up to six people. The developer intends to submit a tax credit application in the Spring 2002 funding round to the California Tax Credit Allocation Committee. This Brundage Lane site was identified in the Southeast Economic Development Strategy as a potential development site for commercial uses. Last fall, the Department provided the developer a copy of the strategy to assist him in identifying potential sites in the Southeast. REC a~:'~?'~:~. BAKERSFIELD I FEB 2 2 PUBLIC WORKS DEPARTMENT M E M O R A N D U M ICITV,., ,~ANAGE~~ TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: February 15, 2002 SUBJECT: Small Business HazmatAssistance To help businesses economically recycle or dispose of small amounts of hazardous waste, the Solid Waste Division has inserted the attached flyer in this month's commercial refuse billing. The flyer describes a program which is part of the County's local Special Waste Facility on the corner of Standard and Foster Streets. The program is funded by a combination of landfill fees and state grants. attachment KB G:\GROUPDAT~SOLIDWASTE\Smalt Business Help.wpd February 15, 2002 BUSINESS HAZARDOUS WASTE DISPOSAL XEMPT MALL UANTITY KERN COUNTY · SPECIAL WASTE FACILITY BUSINESS HAZARDOUS WASTE PROGRAM The Kern County Special Waste Facility serves the hazardous waste disposal needs of Kern County residents and businessesl The Conditionally Exempt Small Quantity Generator (CESQG) Program allows eligible businesses to bring hazardous waste to the County's Special Waste Facility. This program is sponsored by tile Kern County Waste Management Department and grants received from the California Integrated Waste Management Board. BUSINESS ELIGIBILITY State and Federal hazardous waste laws limit the use of this collection program to businesses that qualify as Conditionally Exempt Small Quantity Generators (CESQGs). To qualify as a CESQG, a ,business must generate less than 27 gallons or 220 pounds of hazardous waste per month. This includes a maximum of 1 quart or 2.2 pounds of acutely hazardous waste. Businesses that generate more than these amounts are required to use a licensed hazardous waste hauler to manifest and transport their waste. Businesses are required to sign a waiver declaring that they are a CESQG. BUSINESS APPOINTMENTS All businesses must register and set an. appointment to use the Facility. To register for an appointment please call Waste Management at (661) 862-8922. Waste will not be accepted without an appointment! GATE FEES Gate fees for disposal are based upon the weight and category of waste the business generates. The method for calculating the mount to be charged to a CESQG shall be based on the actual weight of the hazardous waste (including container) as measured by a scale at the time of disposal. Businesses will be billed within 30 days. QUANTITY LIMITATIONS The Facility will accept a monthly maximum of 220 pounds of hazardous or 2.2 pounds of extremely hazardous waste from each participating CESQG. Note** Historical accumulations may require the use of a private hazardous waste disposal tm. TRANSPORTATION & LABELING State laws limit the amount 'of hazardous waste that may be transported by a CESQG. Prior to the appointment, the business will be issued packaging and labeling information and a variance allowing transport of the waste to the Facility. Please use caution when transporting hazardous waste to the Facility. Bring the products in original containers when available. If contents are different than listed, please label container clearly. Containers should have a secure fitting lid and be packed upright, in a leak-proof box. Regulations for packaging and labeling can be found in the' Department of Transportation Code of Federal Regulations, Title 49, Transportation, Parts 100-199. Sponsored by: Kern County Waste Management Department California Integrated Waste Management Board Printed on Recycled Paper ~' '~'~-'~ EXCLUDED WASTE The Special Waste Facility is not permitted to accept the following waste: ~ Asbestos )~ Explosives ~ Radioactive waste ~' Biohazardous waste }, Unknown chemicals ~' Containers larger than 5 gallons REMINDERS To Qualify: ~' Generate less than 220 pounds of hazardous waste or 2.2 pounds of extremely hazardous waste. ~ Business must be located in Kern County. To Transport: Properly label and seal each container. Pack in an upright position. Protect from breaking, leaking, and mixing with other waste. > Variance must accompany waste being delivered the day of appointment. To Dispose: } .Call the Kern County Waste Management Department at (661) 862-8922. } .Contact private waste disposal fu-m if business doesn't qualify for the CESQG program. REDUCE DISPOSAL COSTS Buy only what you need Use all of the product Use non-toxic alternatives Give lett over products away for reuse BRING TO APPOINTMENT: Complete appointment packet · Letter · Cost Estimate Worksheet · Transportation Variance · Packaging & transportation info · Program Rules FACILITY LOCATION The Kern County Special Waste Facility is located in Bakersfield at 4951 Standard Street. Southwest comer of Standard and Foster Street. .... HAZARDOUS- BUSINESS KERN COUNTY SPECIAL WASTE FACILITY 4951 STANDARD ST., BAKERSFIELD, CA BUSINESS 0 N LY BUSINESS Foster St. ~ 1 CALL (661) 862-8922 X -~ N 0 BUSINESS WASTE DISPOSAL BUSINESS WASTE ACCEPTED: Gilmore St. Pesticides & Weed Killers t ~ !11 BY APPOINTMENT ONLY Automotive Products / / ~ CALL (661) 862-8922 Industrial Cleaners ~ Paint & Paint Products ',,[ Batteries i Rosedale Hwy. TRANSPORTATION AND DISPOSAL RULES: //HAZARDOUS· RESlDENTIA · A maximum of 5 gallons, or 50 pounds of waste may be r transported, per vehicle, per visit. KERN COUNTY SPECIAL WASTE FACILITY · The contents of any single container of waste may not 49,51 STANDARD ST,, BAKI:RSFIELD, exceed five gallons. · Containers must be closed, labeled and not leaking. (661) 862-8922 I OPERATING HOURS: Do not mix waste. FosterSt. ~l, RESIDENTIAL Thursday & Friday: 10 am to 4 pm RESIDENTIAL Saturday: 8 am to 4 pm Gilmore St. RESIDENTIAL WASTE ACCEPTED: ~ Pesticides & Weed Killers Automotive Products Household Cleaners Paint & Paint Products Batteries Rosedale Hwy Pu/ / c wor ,s Cal ita[ Imt roveme t Prooram Sc e [e Fiscal Year zoo -zooz 02_~/.7/02 NUM NUM BEGIN test.) END (est.) BEGIN (est.) END (est.) T1 K031 KROLL WY BRIDGE - W OF GOSFORD RI 5 in design Jul-2001 Mar-2002 Apr-2002 Jun-2002 T2K033 STREET IMPROVEMENTS; WHITE/ 6 survey-data collection phase Jan-2002 Apr-2002 May-2002 Jul-2002 DOVEWOOD T2K020 STREET IMPROVEMENTS; COFFEE RD/ 4 street right-of-way from PG&E required for project Mar-2002 May-2002 Sep-2002 DOWNING E9K011 MOHAWK SEWER CONSTRUCTION 4, 5 in design Feb-2000 Oct-2001 Feb-2002 Jun-2002 PHASE II TOK144 SOUTHWEST BIKE PATH 4 bids to be opened, awarded 3110102 Feb-2001 Dec-2001 Apr-2002 Jul-2002 T9K015 SIGNAL NEW, COMANCHE/SR 178 3 being reviewed by CalTrans (2nd review) Mar-2000 Jan-2002 Jul-2002 Sep-2002 T1K028 STREET IMPROVEMENTS; COLLEGE/ 3 in design May-2001 May-2002 Jun-2002 Aug-2002 FAIRFAX TOK013 BRIDGE CONSTRUCTION - OLIVE/ 4 in design Jun-1999 Jun-2002 Jul~2002 Feb-2003 CALLOWAY T1K007 RESURFACING VARIOUS STREETS VAR in design, plans and finance documents submitted to Caltrans Jan-2001 Nov-2001 Jul-2002 Sep-2002 00-01 for approval T1K032 WIDEN TRUXTUN AVENUE 2 in design Sep-2001 Mar-2002 Jul-2002 Sep-2002 E9K014 MT VERNON TRUNK SEWER IMPROV · 1 in design Mar-2000 Jan-2002 Apr-2002 May-2002 T1K011 SIC NEW AUBURN AT EISSLER 3 bid awarded, construction to begin??? May-2001 Oct-2001 Mar-2002 Apr-2002 T1K009 SIG NEW MT VERNON AT PANORAMA 3 in design NOV-2001 Jan-2002 Apr-2002 May-2002 T1K024 SIG NEW VERDUGO AT HAGEMAN 4 in design Oct-2001 Mar-2002 May-2002 Jun-2002 T2K036 FS #11 MEDIAN & SIC MOD 5 in design Dec-2001 Mar-2002 Apr-2002 Jun-2002 T2K028 SIC NEW BRUNDAGE AT WASH 1 in design Feb-2002 Apr-2002 May-2002 May-2002 T2K023 SIG PLANZAT REAL 6 in design Jan-2002 May-2002 Jun-2002 Jul-2002 T2K027 SIC PLANZ AT WILSON 5, 6 tied up for conformity determination at State level. Feb-2002 May-2002 Jul-2002 Aug-2002 ELK002 SEWER IMPROVGWENDOLYN 7 under construction Ap.r-2001 Jul-2001 Sep-2001 E2K004 SEWER MAIN BRIMHALL RD 4 under construction Jul-2001 Nov-2001 Mar-2002 Jun-2002 Page 1 of 3 G:\GROUPDAT~Dani\CIP\ClP PW 2000-01_RevFeb19_2002.wb3 W°ri s Capita[ Improvement Prooram Sc e /e Fiscal Year zoo -zooz 02/?2/02 . . · , PROJ IPROJECT TITLE WARD COMMENTS I DESIGN PHASE I CONSTRUCT'ON PHASE NUM NUM BEGIN (est.) END {est.) BEGIN (est.) END (est.) E7K005 SEWER REHAB MAIN/SO CHESTER 1 study by Ruettgers & Schuler in progress Sep-2001 Mar-2002 Mar-2002 Jun-2002 P1K003 HVAC UPGRADE, CITY HALL 2 project advertised late November; no bids received, project May-2002 Feb-2002 May-2002 Feb-2003 re-advertised late December ELK003 SEWER IMPROV PACHECO #10 7 in design Mar-2002 May-2002 ^ug-2002 Jan-2003 P1H004 FS ~ ELEC UPGRADE 2 in design Nov-2001 Jan-2002 Feb-2002 Apr-2002 T1K034 MING INTERSECTION EXPANSION 3 in design Dec-2000 Feb-2002 Jul-2002 AT ASHE AND NEW STINE T2K022 MING INTERSECTION EXPANSION 4 in design, applying for encroachment permit for CalTrans; Property Nov-2001 Feb-2002 May-2002 Jul-2002 AT SR99 Management acquiring ROW. TOK009 STORM IMPROVEMENTWHITE/HUGHES 5 in design NOV-2001 May-2002 Jun-2002 ^ug-2002 T1K027 ST IMPROV RR CROSSINGS 3' in design Jan-2002 Mar-2002 May-2002 Jun-2002 T8K002 BRDG WIDENING WHITE LANE AT SR99 7 project report currently being prepared, soq to be reviewed, Mar-2002 Nov-2002 Feb-2003 Dec-2003 interview & select design firm TOK007 STREET IMPROVEMENTS; BRIMHALL RD 4 project awarded, design complete Ju1-~1999 Nov-2001 Mar-2002 Jun-2002 T2K031 TRAFFIC SIG OLD RIVER RD AT 4 in design Feb-2002 Mar-2002 May-2002 Jul-2002 RIDGE OAK DRIVE T7K021 INTERCHANGE ON SR178 3 project report currently being prepared, rfq for consultant Jul-1999 Jan-2003 ^pr-2003 Nov-2004 AT F^IRFAX to prepare construction plans to have been released 12/01. TOK006 STWIDENING ROSEDALE HIGHWAY 2 in design ^ug-2001 May-2002 Aug-2002 Nov-2002 P1C020 RIOVISTA PARK 4 in design Mar-2001 Jun-2002 ^ug-2002 TOK012 BRIDGE CONST, HAGEMAN AT SR99 2 in design Jul-2001 Jun-2002 Sep-2002 May-2003 P5C002 LANDSCAPE MEDIANS 6 under construction Jan-2002 Feb-2002 Feb-2002 ^pr-2002 COLUMBUS/PANORAMA T1K022 LANDSCAPE MEDIANS 2 in design Feb-2002 ^pr-2002 May-2002 Jun-2002 STOCKDALE HWY/ASHE T1K022 LANDSCAPE MEDIANS 3 in design NOV-2001 Feb-2002 Mar-2002 May-2002 UNION/PANORAMA E7K002 SEWER CONST MAIN - 4 under construction Mar-2000 Sep-2000 Mar-2001 ^pr-2002 BUENA VISTA II T1K033 ENTRY MONUMENTS VAR under construction Dec-2000 Sep-2001 Oct-2001 Mar-2002 Page 2 of 3 G:\GROUPDAT~Dani\CIP\CIP PW 2000-01_RevFeb19_2002.wb3 ? worlds Capita[ Improvemem rooram Sc e /e Fiscal Year _oo -zooz 02/~2/02 _ NUM NUM BEGIN (est.) END (est.) BEGIN (est.) END (est.) T9K012 NORTHEAST BIKE PATH 3 under construction, grading complete, project suspended for Ju1-1998 Apr-2000 Mar-2002 Apr-2002 CalWater work. Paving to begin mid-March. P8H001 FS #15 4 in design, soqs from architechts received and reviewed. Aug-2001 Jul-2002 Oct-2002 J'ul-2003 interviews in early January. POC009 CENTENNIAL GARDEN SMOKE 2 design completed, waiting for transfer of funds Nov-2001 Feb-2002 Apr-2002 May-2002 HATCH MODIFICATION T1K023 STREET IMPROVEMENTS; HAGEMAN 4 addition of landscaped medians from Calloway tO Verdugo Sep-2001 Feb-2002 Mar-2002 May-2002 T4K055 STREET IMPROVEMENTS; LAKE STREE'I' 2 under construction TOK138 CASA LOMA #6 STREET IMPROV'S I under construction Jan-2002 Feb-2002 Apr-2002 Jun-2002 T9K012 NORTHEAST BIKE PATH 3 Q9K003 NATURAL GAS FUELING STATION 2 )re-qual of contractors and vendors 2/19/02 May-2002 Sep-2002 TOK011 STREET RECONSTRUCTION-WHITE LAN 6 )reconstruction meeting to be held in February Apr-2002 Jun-2002 T2K026 TRAFFIC SIG-STINE @ BEECHWOOD 6 in design Feb-2002 Apr-2002 May-2002 Jul-2002 T2K043 TRAFFIC SIG-STOCKDALE @ McDONALr 2,5 re-program CMAQ funds for project Mar-2002 May-2002 TRAFFIC SIG-MT VERNON @ CHURCH 3 in design Feb-2002 Apr-2002 May-2002 Jul-2002 E7K012 WWTP#3 HEADWORKS ~n design by Carrollo Engineers POC009 CENTENNAIL GARDEN BULLET 2 work started on teller windows, control room glass to be Sep-2001 Oct-2001 Feb-2002 Apr-2002 RESISTANT GLASS ~dded to contract Page 3 of 3 G:\GROUPDAT\Dani\CIP\CIP PW 2000-01_RevFeb19_2002.wb3 B A K E R S F I E L PUBLIC WORKS DEPARTMENT MEMORANDUM TO: ALAN TANDY, CITY MANAGER FROM: RAUL ROJAS, PUBLIC WORKS DIRECTOR DATE: February 19, 2002 SUBJECT: AWARD OF CONTRACTS: FOLLOWUP Council Referral #WF0019106 (Ward 4) Councilmember Couch requested that staff meet with the two citizens who sent letters regarding the award of contract for the design of the Fire and Police Substation. Give specifics as to why one firm is chosen over the other and possibly revisit the manner in which the City awards contracts and give more to local contractors. The response to this Council Referral #WF0019106, dated January 29, 2002, stated that City Attorney's Office staff and Public Works Department staff would be continuing to review the issue of incorporating a "local preference" element in the selection of the consultants. This memo is a followup response to that Council Referral. City Attorney's Office staff has informed Public Works Department staff that the only available legal basis to support a "local preference" element is the one percent tax benefit given to local vendors when the City purchases supplies. In place since the mid-1990's, this local vendor preference is founded on the sales tax directly related to that purchase. However, due to concerns expressed by both the local professional community and various council members, Public Works staff proposes to continue its current policy of utilizing a 5% local incentive for professional consultant work. Staff is working on a report regarding the total dollars of agreements awarded to consultants over the last five years and tracking that by local versus out-of-town firms. c: Bart Thiltgen, City Attorney Jacques R. LaRochelle, Assistant Public Works Director G:VSROUPDA'I~RcfcrralsX2002~CC Mtg 1-23\WF0019106-FoHowup Ted.wpd