Loading...
HomeMy WebLinkAboutORD NO 4475 ORDINANCE NO. 4 4 7 5 . AN ORDINANCE AMENDING SECTION 17.06.020 (ZONING MAP NO. 142-04) OF TITLE SEVENTEEN OF THE BAKERSFIELD MUNICIPAL CODE BY CHANGING THE ZONING FROM R-1/P.U.D. (ONE-FAMILY DWELLING/PLANNED UNIT DEVELOPMENT) TO R-2 (LIMITED MULTIPLE-FAMILY DWELLING) ON TWO PARCELS TOTALING 106.08 ACRES GENERALLY LOCATED AT THE NORTHEAST CORNER OF EBERLE ROAD AND ROMERO ROAD; BEING A PORTION OF THE NORTHEAST QUARTER OF SECTION 4, T31S, R27E, MDBM (FILE # 07-1370). WHEREAS, in accordance with the procedure set forth in the provisions of Title 17 of the Municipal Code of the City of Bakersfield, the Planning Commission held a public hearing on a petition to change the land use zoning of those certain properties in the County of Kern generally located at the northeast corner of Eberle Road and Romero Road; being a portion of the northeast quarter of Section 4, T31S, R27E, MDBM as shown on Exhibit "B"; WHEREAS, by Resolution No. 172-07 on OCTOBER 4, 2007 the Planning Commission recommended approval and adoption of an ordinance amending Title 17 of the Municipal Code to approve Zone Change 07-1370 as delineated on attached Zoning Map No. 142-04 marked Exhibit "C", by this Council and this Council has fully considered the recommendations made by the Planning Commission as set forth in that Resolution; and WHEREAS, the Planning Commission, as a result of said hearing, did make several general and specific findings of fact regarding changes in zoning of the subject property from R-1/P.U.D. (One-Family Dwelling/Planned Unit Development) to R-2 (Limited Multiple- Family Dwelling) and the Council has considered said findings and all appear to be true and correct; and WHEREAS, the law and regulations relating to the preparation and adoption of Negative Declarations, as set forth in CEQA and City of Bakersfield's CEQA Implementation Procedures, have been duly followed by city staff, Planning Commission and this Council; and WHEREAS, for the above described project, an initial study was conducted and an Environmental Impact Report (Ashe #4) was certified on August 16, 2006, in conjunction with related Vesting Tentative Tract Map 6747 and 6750 in accordance with CEQA; and WHEREAS, said Environmental Impact Report (Ashe #4) is applicable to and appropriate for this project; and WHEREAS, there have been no substantial changes to the project or circumstances under which it will be undertaken; and WHEREAS, no new environmental impacts have been identified; and WHEREAS, the general plan designation for this area allows low density residential development; and WHEREAS, the City Council has considered and hereby makes the following findings: -1 - <<;,Mc0' 6- ~ >- -- I- I'll __ r- L) CJ or.!C"~IAL as follows: 1. All required public notices have been given. 2. The provisions of the California Environmental Quality Act (CEQA) have been followed. 3. An Environmental Impact Report (Ashe #4) was certified on August 16, 2006, in conjunction with related Vesting Tentative Tract Map 6747 and 6750 in accordance with CEQA. 4. In accordance with CEQA Section 15162, no further environmental documentation is necessary because no substantial changes to the original project are proposed, there are no substantial changes in circumstances under which the project will be undertaken, and no new environmental impacts have been identified. 5. The public necessity, general welfare and good zoning practice justify the requested change of zone from the existing zoning district to R-2 (Limited Multiple-Family Dwelling zone. 6. The overall design of the project, as conditioned, is consistent with the goals and policies of all elements of the General Plan. 7. That infrastructure exists or can easily be provided to accommodate the types and intensities of the proposed development. 8. The conditions of approval are necessary for orderly development or to provide for the public health, welfare and safety. 9. The requested zone change will satisfy a condition of approval for Vesting Tentative Tract Map 6747 and 6750. SECTION 1. NOW, THEREFORE, BE IT ORDAINED by the Council of the City of Bakersfield 1. All of the foregoing recitals are hereby found to be true and correct. 2. The provisions of the California Environmental Quality Act (CEQA) have been followed. 3. That this project pertains to the Environmental Impact Report (Ashe #4) was certified on August 16, 2006, in conjunction with related Vesting Tentative Tract Map 6747 and 6750. 4. The Environmental Impact Report (Ashe #4) previously approved is adequate. 5. Section 17.06.020 (Zoning Map) of the Municipal Code of the City of Bakersfield be and the same is hereby amended by changing the land use zoning of that certain property in said City, the boundaries of which property is shown on Zoning Map. No. 142-04 marked Exhibit "C" attached hereto and made a part hereof, and are more specifically described in attached Exhibit "D". - 2 - / <<;,,,1\:: c; ,. 1.; r>'-.:'''''f--' , \.,.-, 6. Such zone change is hereby made subject to the conditions of approval listed in attached Exhibit "A". SECTION 2. This ordinance shall be posted in accordance with the Bakersfield Municipal Code and shall become effective not less than thirty (30) days from and after the date of its passage. ---------()Oc>--------- I HEREBY CERTIFY that the foregoing Ordinance was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on NeV 2 8 Z007 by the following vote: ~6ESi) ES: ABSTAIN: ABSENT: CAR~N. BENH'AM. ~. COUCII, HANSON, SULtrV'"AN. SCR~ER ~ ~ C-o~ COUNCILMEMBER: COUNCILMEMBER: COUNCILMEMBER: COUNCILMEMBER: ~~~ PAMELA A. McCART MC {I CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield HARVEY L. HALL Mayor of the City of Bakersfie APPROVED as to form VIRGINIA GENNARO City Attorney BY:~1n~ EX~bitS: A. Conditions 0 Approval B. Location Map C. Zoning Map No. 142-04 D. Zone Change Legal Descriptions S :\ZoneChange\yr 2007\07 -1370\OZC-CC. DOC - 3 - ~M~-9 ~ ~ >- m l;; t- V (;:) ORIGINAL EXHIBIT "A" ZONE CHANGE 07-1370 CONDITIONS OF APPROVAL CITY ATTORNEY 1. In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City" herein) against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or jUdicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for CITY's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action or proceeding, falling under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party. PLANNING 2. Any final subdivision map and/or building permit on the project site and within the Ashe #4 annexation area are subject to the approved Ashe #4 Master Parks and Trails Plan. Road improvements and improvement plans shall include a Class II Bike Path along Engle Road, Eberle Road, and Ashe Road; and a Multipurpose Trail 24-foot easement along the north side of Romero Road and along the east side of Eberle Road. Orderly development. MITIGATION/CONDITIONS OF APPROVAL GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 05-0519 Mitigation Measures From Environmentallmoact Reoort: 3. Prior to recordation of each final map, the applicant shall inform future residents about adjacent agricultural use through a covenant filed on the Project site (disclosed to residents through the purchase process), or through disclosure forms that shall be signed by new residents. The disclosure forms shall indicate that the resident acknowledges that the surrounding land uses consist of agriculture and that agriculture use includes activities to support agriculture, including pesticide use, dust generation from plowing, and slow-moving agricultural vehicles. (Mitigation measure NO.2. from GPA/ZC 05-0519) By KShea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~M~'2 ~ ~ >- .- rn I;; t- V (;:) ORIGINAL Exhibit "A" ZC 07-1370 Page 2 of 10 Hazardous Substances 4. Prior to demolitions, grubbing, or grading, the developer shall conduct soil characterization and sampling of the stained soil within the Project site underneath the smoke pots and burners as needed to determine the presence or absence of hazardous materials. If concentrations of materials are detected above regulatory cleanup levels during demolition or construction activities, the following mitigation measure shall include: · Excavation and disposal at a permitted, off-site facility; . On-site treatment; or . Other measures as appropriate. Prior to development, the Applicant shall remediate all oil-contaminated soils to the satisfaction of the Local Unified Program Agency (the Office of Environmental Services Bakersfield City Fire Department) in conjunction with the State Regional Water Quality Control Board and/or the California Department of Toxic Substances Control. (Mitigation measure No.3. from GPA/ZC 05-0519) 5. In areas of the Project site where elevated levels of volatile fuel hydrocarbons are present, the following mitigation measure shall include: . Excavation and disposal at a permitted. off-site facility; . On-site treatment; or . Other measures as appropriate. Prior to development, the applicant shall remediate all oil-contaminated soils to the satisfaction of the Local Unified Program Agency (the Office of Environmental Services of the Bakersfield City Fire Department) in conjunction with the State Regional Water Quality Control Board and/or the California Department of Toxic Substances Control. (Mitigation measure NO.4. from GPA/ZC 05-0519) 6. Prior to demolitions, grubbing, or grading, the Applicant shall remove and properly dispose of the on-site debris, consisting of drums, containers, stained vehicle parts and equipment, and miscellaneous debris, at an approved landfill facility. The areas beneath and around the removed debris shall be visually inspected by a qualified environmental assessor or another approved individual. Any stained soils observed underneath the debris shall be sampled. If concentrations of materials are detected above regulatory cleanup levels during sampling activities, the mitigation measure shall include: . Excavation and disposal at a permitted, off-site facility; . On-site treatment; or . Other measures as appropriate. (Mitigation measure NO.5. from GPA/ZC 05-0519) 7. Due to the elevated concentrations of pesticide and fungicide residues in excess of acceptable Federal, State, and/or County levels, prior to demolitions, grubbing, or grading the Project Applicant shall identify and implement remedial action (subject to approval by the City of Bakersfield and responsible regulatory agencies), to reduce contaminants to acceptable levels. (Mitigation measure NO.6. from GPA/ZC 05-0519) By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~M~-9 ~ 0", >- r> l;; r v t;. ORIGINAl Exhibit "A" ZC 07-1370 Page 3 of 10 Other Hazards 8. Prior to demolition or the removal of debris piles, the subdivider the developer shall conduct an asbestos survey to determine the presence or absence of asbestos-containing materials and submit the results to the City of Bakersfield. If asbestos-containing materials are found, abatement of asbestos shall be required before any demolition activity that would disturb asbestos-containing materials or create an airborne asbestos hazard is permitted. Asbestos removal shall be performed by a State-certified asbestos containment contractor in accordance with San Joaquin Valley Air Pollution Control District (SJVAPCD) Rule 8021, which requires: . A survey of the facility prior to issuance of a permit by SJV APCD; . Notification of the SJV APCD prior to construction activity; . Removal of asbestos in accordance with prescribed procedures; . Placement of collected asbestos in leak-tight containers or wrapping; and . Proper disposal of the asbestos. (Mitigation measure No. 11. from GPA/Z.C 05-0519) 9. Prior to demolition or the removal of debris piles, the developer shall conduct a survey to determine the presence or absence of lead-based paint and submit the results to the City of Bakersfield. If lead-based paint is found, abatement shall be required before any demolition activities occur that would create a lead dust or fume hazard. Lead-based paint removal shall be performed in accordance with California Code of Regulation Title 8, Section 1532.1, which specifies exposure limits, exposure monitoring, and respiratory protection, and mandates good working practices by workers exposed to lead. The person performing lead- based paint removal shall provide evidence of certified training for lead-related construction work. (Mitigation measure No. 12. from GPA/Z.C 05-0519) Aesthetics. Light. and Glare 10. Prior to the recordation of any final map, the developer shall show in a Construction Plan the temporary construction equipment staging areas within the Project site through the duration of construction. Appropriate distance separation from adjacent residences shall be shown, subject to review and approval of the City Planning Department. Additionally, all construction activities would be required to be consistent with the Bakersfield Municipa/ Code requirements and conditions of approval. (Mitigation measure No. 14. from GPA/Z.C 05-0519) 11. Prior to the recordation of any final map, the subdivider shall show in a Construction Plan, the project's plan to ensure that all mechanical and electrical equipment to be installed on the structure or on the ground will be adequately screened from public view. The screening shall be considered as an element of the overall design and must blend with the architectural design of the building and/or landscaping, as appropriate. Construction plans for the buildings shall indicate any fixtures or equipment to be located on the roof of the respective structure, equipment types, and design of the screening material. The method of screening shall be reviewed and approved by the City Planning Department. By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~ ~(:>'K~'9. o U' >- ;. t:: g U b ORIGINlII Exhibit "A" ZC 07-1370 Page 4 of 10 (Mitigation measure No. 15. from GPAlZC 05-0519) 12. Prior to the issuance of building permits, the Project Applicant shall ensure that the Project's exterior lighting does not spill over onto the adjacent uses, all exterior light fixtures, including street lighting, shall be shielded or directed away from adjoining uses, pursuant to all applicable lighting standards and requirements of the City of Bakersfield Municipal Code and Zoning Code. (Mitigation measure No. 16. from GPAlZC 05-0519) Noise 13. Prior to the recordation of any final map the subdivider the subdivider shall provide a Construction Plan to the City Planning Department that ensures that (1 ) all construction equipment, fixed or mobile, operated within 1,000 feet of a dwelling unit shall be equipped with properly operating and maintained mufflers; (2) construction activities shall be limited to the designated daytime hours as specified by the City of Bakersfield (currently 6 AM to 9 PM on weekdays and 8 AM and 9 PM on weekends). No construction is allowed on Federal holidays. These restrictions apply to all trucks, vehicles, and equipment that are making or involved with material deliveries, loading or transfer of materials, equipment service, and maintenance of any devices for or within the Project construction site. (Adapted from Mitigation measure No. 22. from GPAlZC 05-0519) 14. During construction, the Project Contractor shall place stationary construction equipment such that emitted noise is directed away from noise-sensitive receptors. The placement of the equipment shall meet the satisfaction of the Building Official and is subject to site inspection. Additionally, the Project Contractor shall provide evidence of the placement of the stationary equipment to the Building Official. (Mitigation measure No. 23. from GPAlZC 05-0519) 15. Prior to the recordation of any final map the subdivider shall provide a Construction Plan to the City Planning Department that ensures that Project Contractor shall incorporate muffling features into all construction vehicles and equipment and into construction methods, and shall maintain all construction vehicles and equipment in efficient operating condition. The Project Contractor shall provide evidence to the City Planning Department that the above muffling and maintenance measures have been implemented. (Mitigation measure No. 24. from GPAlZC 05-0519) 16. Prior to the recordation of any final map the subdivider shall provide a Construction Plan to the City Planning Department that ensures that stockpiling and construction vehicle staging areas shall be located as far away as practical from noise-sensitive receptors during construction activities. (Mitigation measure No. 25. from GPAlZC 05-0519) Air Quality ~ 'OM~~ o ~ >- .- l- n. - r- o D ORIGINAl By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 Exhibit "A" ZC 07-1370 Page 5 of 10 17. Prior to issuance of a grading permit, the developer shall prepare and submit a dust control plan to the SJVAPCD. The plan shall be prepared consistent with District Regulation VIII and must be reviewed and approved by the SJV APCD prior to the commencement of grading activities. The dust control measures selected shall be incorporated as a note on each grading plan. (Mitigation measure No. 27. from GPA/ZC 05-0519) 18. Prior to issuance of any building permit, the subdivider shall submit to the Planning Department a written guarantee stating that during the construction phase all construction equipment in use on the Project site and on the way to and from the Project site shall comply with the following construction equipment exhaust mitigation measures; the following mitigation measures shall be utilized during the construction phase of the Project to reduce construction exhaust emissions. These mitigation measures are stated in the GAMAQI guidance document as approved mitigation for construction equipment: · Properly and routinely maintain all construction equipment, as recommended by manufacturer's manuals, to control exhaust emissions. · Shut down equipment when not in use for extended periods of time, to reduce exhaust emissions associated with idling engines. · Encourage ride-sharing and use of transit transportation for construction employees commuting to the Project site. · Use electric equipment for construction whenever possible in lieu of fossil fuel-fired equipment. · Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing construction activity during the peak hour of vehicular traffic on adjacent roadways. (Mitigation measure No. 28. from GPA/ZC 05-0519) 19. Construction of the Project requires the implementation of control measures set forth under Regulation VIII of the San Joaquin Valley Air Pollution Control District (SJAPCD), Fugitive PM10 Prohibition. During construction the contractor shall implement the following measures, in addition to those required under Regulation VIII of the SJVAPCD, in order to reduce fugitive dust emissions, and provide evidence to the Planning Department that the following measures are complied with: . A six-foot high dust fence shall surround the construction site during primary grading activities. · All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover, or vegetative ground cover. · All on-site paved roads with off-site unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. · All land clearing, grubbing, scraping, excavation, land leveling, grading, cut-and-fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking. . When materials are transported off-site, all material shall be covered or effectively wetted to limit visible dust emissions, and at least six inches of freeboard space from the ~ ~AI(~-9 C> <P .:... "" ';; I- rn - t- (,.) C) ORIGINAl By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 Exhibit "A" ZC 07-1370 Page 6 of 10 top of the container shall be maintained. · All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited, except where preceded or accompanied by sufficient wetting to limit the visible dust emissions. Use of blower devices is expressly forbidden). · Following the addition of materials to, or the removal of materials from, the surface of outdoor storage pile, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizer/suppressant. · Within urban areas, trackout shall be immediately removed whenever it extends 50 or more feet from the site and at the end of each workday. · Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. · Asphalt-concrete paving shall comply with SJV APCD Rule 4641 and restrict the use of cutback, slow-cure, and emulsified asphalt paving materials. · Cease grading activities during periods of high winds (greater than 20 miles per hour (mph) over a one-hour period). · Limit the speed of construction-related vehicles to 15 mph on all unpaved areas at the construction site. · Implement, carryout, and trackout mitigation measures, such as gravel pads, in accordance with the requirements of the SJVAPCD Regulation VIII. (Mitigation measure No. 29. from GPA/ZC 05-0519) 20. Transportation control measures and design features can be incorporated into the Project to reduce emissions from mobile sources. The control measures listed below provide a strategy to reduce vehicle trips, vehicle use, vehicle miles traveled, vehicle idling and traffic congestion for the purpose of reducing motor vehicle emissions. These features were incorporated into the emission estimates for the Project and are therefore required in order to achieve the emission level present above. Prior to development the Project Applicant shall incorporate the following measures into the design of the Project site: · Incorporate sidewalks throughout the Project, with adequate safety signage and appropriate lighting. Connect sidewalks to any open space or recreational areas and to nearby transit loading areas and/or shelters. · Improve streets and traffic signals for intersections and street segments, which may impact the surrounding local roadway system due to traffic, generated by the proposed developments. (Mitigation measure No. 30. from GPA/ZC 05-0519) 21. In order to reduce the Project's net emissions of 30.87 TPY of ROG and 14.42 TPY of NOx to zero, the Project Applicant shall provide emission offsets through participation in a voluntary emission reduction project (VERP) through the SJVAPCD. Available mitigation programs can consist of, but are not limited to, the following: Public Works Imorovement Proiects: Project or projects approved by the City Public Works Department that will reduce emissions as described above. The improvements for said project must be completed and accepted by the Public Works Department prior to recordation of individual development phases. The project(s) selected shall be one(s) not otherwise funded or constructed with this proposed project. The ~ ~AK~?> o tP ..,.. >- - .... n- - t- V (;:) ORIQlNAl By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 Exhibit "A" ZC 07-1370 Page 7 of 10 subdivider is responsible for all costs to determine the emission reductions associated with proposed Public Works project(s). Documentation for public works improvement project(s) demonstrating mitigation compliance shall be submitted to the Planning Director prior to recordation of individual development phases. The types of public works improvement project(s) used for the reduction in emissions may include, but are not limited to, the following types: · Construction of a new warranted signal. · Modification of an existing signalized intersection to add additional left turn storage or dedicated right turn capability. OTHER PROJECTS: These are non public works projects selected by the subdivider that shall reduce emissions as described above. The subdivider is responsible for all costs to determine the emission reductions associated with the proposed project(s). Proof of mitigation compliance shall be submitted to the Planning Director prior to recordation of individual development phases. Proof of compliance may include documentation of the number, type, and year of cars crushed; location and type of engine modified, photo documentation, and quantification of emission reduction by the San Joaquin Valley Air Pollution Control District or an air quality consultant. The types of project(s) used for the reduction in emissions may include, but are not limited to, the following types: . Car crushing of older model cars. · Modification to stationary diesel engines, such as those under agricultural use. . Modification of fleet vehicles and/or other mobile sources. SJVAPCD MITIGATION FUND: Air quality mitigation fees, of the amount to be determined by the SJVAPCD and the subdivider, are due to the SJV APCD Fund account prior to recordation of any final tract map. Proof of payment and SJVAPCD mitigation certificates shall be provided to the Planning Director prior to recordation of each phase of a final tract map. Fees paid to the SJVAPCD through an approved indirect source emissions fee program may be utilized to provide applicable offsets for the proposed Project. If, during the life of the Project, the City of Bakersfield adopts an emissions mitigation program that provides equal or more effective mitigation than the measures listed above, the developer may choose to participate in the City's program to mitigate air quality impacts. A VERP shall require the Project Applicant to enter into a binding agreement with the SJVAPCP. This agreement will require the SJVAPCD to: . Review air emission impact assessment protocol and quantification of emission estimates attributable to the Project; . Acceptance of the estimated monetary value of the emission reductions to equal the emissions from the Project; By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~~K~~ ~ 0 .., >- F l;; ,. c.J t: ORIGINAl Exhibit" A" ZC 07-1370 Page 8 of 10 . Locate and implement emission reductions; and . Certify that the emissions reductions have been made to the lead agency and the developer in a form of a certificate. (Mitigation measure No. 31. from GPA/ZC 05-0519) BIOLOGICAL RESOURCES 22. Prior to site grading, the Project Applicant shall ensure in the Construction Plan that construction vehicle speed limits shall not exceed 20 miles per hour (mph) and speed limit signs shall be posted throughout the site for the duration of construction activities. (Mitigation measure No. 32. from GPA/ZC 05-0519) 23. Prior to site grading, the Project Applicant shall take avoidance measures for San Joaquin kit fox dens, follow all agency guidelines regarding kit fox tracking and excavation to prevent entrapment of animals in potential dens, as required by the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP). (Mitigation measure No. 33. from GPA/ZC 05-0519) 24. Prior to site grading, the Project Applicant shall conduct preconstruction surveys for known dens, inspect large trees for raptor nesting, and other nest sites and implement appropriate and/or necessary take avoidance measures for the San Joaquin kit fox and protected bird species in accordance with the MBHCP and the Migratory Bird Treaty Act. (Mitigation measure No. 34. from GPA/ZC 05-0519) 25. Prior to site grading, the Project Applicant shall conduct preconstruction surveys before disking or ground disturbance to ensure that no California ground squirrel burrows are present and to prevent potential entrapment of burrowing owls. Survey the buildings to ensure that no raptors are nesting at the time of demolition. If nests are encountered, use agency-approved buffer zones and avoid nests until the young have fledged. (Mitigation measure No. 35. from GPA/ZC 05-0519) 26. Prior to site grading, if any previously unidentified protected species that is not addressed in the MBHCP is found to be present, the Project Applicant shall avoid the species and have it evaluated by a qualified biologist. Notify the U.S. Fish and Wildlife Service (USFWS) and the California Department of Fish and Game (CDFG) any previously unreported protected species. Any take of protected wildlife shall be reported immediately to the CDFG and USFWS. (Mitigation measure No. 36. from GPA/ZC 05-0519) 27. Prior to site grading, the Project Applicant shall conduct pre construction surveys prior to ground disturbance to ensure that no burrowing owls are present on-site and to ensure avoidance of direct take or accidental entrapment of burrowing owls. If nests are encountered, use agency- approved buffer zones and avoid nests until the young have fledged. Additionally, the following measures, taken from the Staff Report on Burrowing Owl Mitigation (CDFG 1995) should be followed in order to minimize impacts, preserve habitat, and reduce potential impacts to burrowing owls to a level of less than significant: By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOC\ 10/17/2007 ~ ~AK~-9 o l.P >- '., '! 1- IT, ..... t- V () ORIgINAl Exhibit "A" ZC 07-1370 Page 9 of 10 · Occupied burrows shall not be disturbed during the nesting season (February 1 through August 31) unless a qualified biologist approved by the CDFG verifies through noninvasive methods that either: (1) the birds have not begun egg-laying and incubation; or (2) that juveniles from the occupied burrows are foraging independently and are capable of independent survival. · If owls must be moved away from the disturbance area, passive relocation techniques as described in the Staff Report on Burrowing Owl Mitigation should be used rather than trapping. At least one or more weeks will be necessary to accomplish this and allow the owls to acclimate to alternative burrows. (Mitigation measure No. 37. from GPA/ZC 05-0519) 28. During construction, the Project Contractor and construction workers shall dispose of all food, garbage, and plastic in closed containers and regularly remove the containers from the site to minimize attracting ranging kit fox or other animals to the site where they may be harmed. (Mitigation measure No. 38. from GPA/ZC 05-0519) CULTURAL RESOURCES 29. If archaeological resources are discovered during excavation and grading activities on-site, the contractor shall stop all work and shall retain a qualified archaeologist to evaluate the significance of the finding and appropriate course of action. Salvage operation requirements pursuant to Section 15064.5 of the CEQA Guidelines shall be followed and the treatment of discovered Native American remains shall comply with State codes and regulations of the Native American Heritage Commission. (Mitigation measure No. 39 from GPA/ZC 05-0519) 30. If human remains are discovered as a result of the Project during development, all activity shall cease immediately, and the Contractor shall notify the Kern County Coroner's Office immediately under state law, and a qualified archaeologist and Native American monitor shall be contacted. Should the Coroner determine the human remains to be Native American, the Native American Heritage Commission shall be contacted pursuant to Public Resources Code Section 5097.98. (Mitigation measure No. 40. from GPA/ZC 05-0519) OTHER MITIGATION MEASURES 31. Prior to the final inspection of building permits, the Contractor shall separate all Project construction debris and construction-related debris into recyclable and nonrecyclable items. All recyclable debris shall be transported to appropriate recycling facilities so as to reduce waste disposed of at County landfills. Additionally, recyclable materials and materials consistent with the waste-reducing goals of the City shall be used in all aspects of construction, when possible. (Mitigation measure No. 46. from GPA/ZC 05-0519) 32. Prior to the final of building permits, the Project applicant shall submit for review a Construction and Demolition Recycling Plan to the KCWMD. The Recycling Plan shall include a plan to separate recyclable/reusable construction debris. The plan shall include the method the By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~ ~AK~-9 a ~ >- - '::: J!! <.:) (;:) ORIGINAL Exhibit "A" ZC 07-1370 Page 10 of 10 contractor will use to haul recyclable materials and shall include the method and location of material disposal. (Mitigation measure No. 47. from GPA/ZC 05-0519) 33. Prior to the recordation of any final map, the subdivider shall provide a Construction Plan to the City Planning Department that ensures that the Contractor shall provide universal waste collection to the Project site along with potential mandatory collection for curbside recycling. (Mitigation measure No. 48. from GPA/ZC 05-0519) GEOLOGIC AND SEISMIC HAZARDS 34. Prior to the recordation of any final map, the Project Applicant shall conduct a detailed liquefaction potential study in the area of the future abandonment of the existing Farmer's Canal as part of the design level geotechnical investigation. Final grading and street design shall be based on detailed geologic and geotechnical evaluations of existing site conditions around the canal after abandonment, combined with a comprehensive assessment of final engineering plans by a professional Registered Geologist. Prior to the approval of final project plans and specifications, the City Engineer, or his designee, shall confirm that recommended geotechnical recommendations have be incorporated into the Project design to adequately mitigate the effects of liquefaction. (Mitigation measure No. 49. from GPA/ZC 05-0519) By KSHea S:\ZoneChangelyr 2007\07-1370\ZCExh1.DOCI 10/17/2007 ~ ~AK~-9 o ~ >- rn t;: t- () () ORIGINAl Exhibit B Location Map ~ ~A.K~-9 o ~ >- - l- m .- t- V (;:) ORIGINAL c II l1} avo NIlS .- IS II) ~ i ::i N ~ Q; "":. ~ .- ~ Z :::::!0 A~ en ~I ..... ~ Ie ~ c CO) c ~ 0 ~ p I rI: p c rI: c (") :i ~ ~ ci ci i :::I 5 ~ Q; ~ :i ~ ~ ~ c ffi :i 0 ~ ~ I'- ~ ('I) ~ ~ ~ c I :i 3 I'- 0 Cl'VO~3HS'V CJ'VO~3HS'f W i :i (!) Z c <( CD ~ :I: ... ~ U ~ ~ W :E ... t: Z ~ 0 II! c N 5 ~ c c ~ ~ ci u ~ ~ CJ'VO~ a~o::lsoo ~ c c It') ~ fQAK~1> o OJ >- ~ l- m - t- O t> ORIGINAl. Exhibit C Zoning Map No. 142-04 ~ <of-.K~-9 o ~ >- ..- l- m __ t- o (;:) ORIGINAL "lIIl:t"; o~ . ..: ("II "lIIl:t - 00.. . ~--: ii:~" ~~ t-= . III ~ ~C) z ~Z~ >0 . UNW II 2.1 !ifll ilx' II lIB ~ III~ . + :: :! _.. .. ..p" -............--. .~ ; Ii ~ . !I '; I. I' IIII 1 I ! ,III 111 I r I I Iltll!I.I!I!iilll . I; II 11111,: Illilll;i~;i:llitl:III~1 tl!I.I!!II'll,1 i.fh:t"-I-51 I ~I ~.I ilh~2 pi!!~, r!!li!~I!I!ijii iii!!liiiillilllll:li ?, t' . II "' ..' 't 'I' .,." "...... 11.-.""""" .. I &... ... ..... ~ uuuv~..I~..&3 .t=t.... ... ~ II: ::i)' .~ . t:;) : I I , 1 . I .%a . I . I ,I -----, 1 iA, 1 ---r------ 1 - '! 1- '~-J - i I ZONE CHANGE 07-1370 , U . IF' ." HI ... ~... Q :iON 0: · _t"-a: -.-":" a: I Q '~O~ ,t"-a: 'P' .D: II i I --------- ,.I ------------------------, . . . . ~--------:, . , 1 ! .: ~ 'I I ----------, + III III ~'cf! . ... . I' III , ' "<> ct OX I I Ql I . 00(\ 1- ZONING MAP 142.0.4 ':s I g ORIGINAL c ~I 1 'I I 1 1 " . ,;, ." HI I l I .... j I . a !~ .I +- Exhibit D Zone Change Legal Descriptions ~ ~AI(~-9 o <.P .>- '.! ~ I- rn - t- o ORIGrNAI~ PROPOSED ZONE CHANGE LEGAL DESCRIPTION PROPOSED R-2 {FROM R-1/PUDl BEING A PORTION OF THE SOUTH HALF OF THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 31 SOUTH, RANGE 27 EAST, M.D.M., CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA, DESCRIBED AS FOLLOWS: COMMENCING AT THE EAST QUARTER CORNER OF SAID SECTION, MARKED BY A KERN COUNTY SURVEYOR'S CONCRETE MONUMENT IN A LAMPHOLE PER FILED MAP NO. 7-1, BOOK 6, PAGE 17 IN THE OFFICE OF THE KERN COUNTY SURVEYOR, SAID POINT ALSO BEING THE CENTERLINE INTERSECTION OF ROMERO ROAD (COUNTY ROAD NO. 0-952) AND ASHE ROAD (COUNTY ROAD NO. 199); THENCE NORTH 89018'32" WEST, ALONG THE EAST-WEST MID- SECTION LINE OF SAID SECTION AND THE CENTERLINE OF SAID ROMERO ROAD, A DISTANCE OF 1304.72 FEET TO THE POINT OF BEGINNING; THENCE ALONG THE FOLLOWING FOUR (4) COURSES: 1) CONTINUING NORTH 89018'32" WEST, ALONG SAID MID-SECTION LINE AND SAID CENTERLINE, A DISTANCE OF 1,338.17 FEET TO THE CENTER QUARTER CORNER OF SAID SECTION; THENCE 2) DEPARTING SAID CENTERLINE, NORTH 00045'14" EAST, ALONG THE NORTH-SOUTH MID-SECTION LINE OF SAID SECTION, A DISTANCE OF 1,327.38 FEET TO THE NORTH LINE OF THE SOUTH HALF OF THE NORTHEAST QUARTER OF SAID SECTION; THENCE 3) SOUTH 89018'37" EAST, ALONG SAID NORTH LINE, A DISTANCE OF 1,336.61 FEET; THENCE 4) DEPARTING SAID NORTH LINE, SOUTH Q0041'11" WEST, A DISTANCE OF 1 ,327.41 FEET TO THE POINT OF BEGINNING. CONTAINING 40.75 ACRES, MORE OR LESS. MciNTOSH & ASSOCIATES 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 P:\PROJECTS\04147\LEGALS\0414707ZC01.DOC GClBDM 6/2512007 ~Mf-9. ~ ~ >- jii '::- r- v (;:) ORIGINAL PROPOSED ZONE CHANGE LEGAL DESCRIPTION PROPOSED R-2 (FROM R-1/PUD} BEING A PORTION OF LOTS 17, 18,29,30,31, AND 32 IN SECTION 4, TOWNSHIP 31 SOUTH, RANGE 27 EAST, M.D.M., CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA, ACCORDING TO THE KERN COUNTY SALES MAP NO.2 OF LANDS OF J.B. HAGGIN, FILED MAY 24,1889 IN THE OFFICE OF THE KERN COUNTY RECORDER, DESCRIBED AS FOLLOWS: BEGINNING AT THE SOUTHEAST CORNER OF SAID SECTION, MARKED BY A KERN COUNTY SURVEYOR'S CONCRETE MONUMENT IN A LAMPHOLE PER FILED MAP NO. 7-1, BOOK 6, PAGE 17 IN THE OFFICE OF THE KERN COUNTY SURVEYOR, SAID POINT ALSO BEING THE CENTERLINE INTERSECTION OF ENGLE ROAD (COUNTY ROAD NO. 0-7 AND D-952) AND ASHE ROAD (COUNTY ROAD NO. 199); THENCE ALONG THE FOLLOWING THREE (3) COURSES: 1) NORTH 89017'30" WEST, ALONG THE SOUTH LINE OF SAID SECTION AND THE CENTERLINE OF SAID ENGLE ROAD, A DISTANCE OF 2,476.68 FEET; THENCE 2) DEPARTING SAID SOUTH LINE AND SAID CENTERLINE, NORTH 47052'34" EAST, A DISTANCE OF 3,380.25 FEET TO THE EAST LINE OF SAID SECTION AND THE CENTERLINE OF SAID ASHE ROAD; THENCE 3) SOUTH 00045'49" WEST, ALONG SAID EAST LINE AND SAID CENTERLINE, A DISTANCE OF 2,298.08 FEET TO THE POINT OF BEGINNING. CONTAINING 65.33 ACRES, MORE OR LESS. tJ.tu.01 MciNTOSH & ASSOCIATES 2001 Wheelan Court Bakersfield, CA 93309 (661) 834-4814 P:\PROJECTS\04147\LE;GALS\0414710ZC01.DOC GClBDM 6/2512007 ~ ~i\K~.-s? o ~ >- .- l;; P:! <.:> (;:) ORIGINAl AFFIDAVIT OF POSTING DOCUMENTS STATE OF CALIFORNIA) ) ss. County of Kern ) PAMELA A. McCARTHY, being duly sworn, deposes and says: That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield; and that on the 29th day of NOVEMBER, 2007 she posted on the Bulletin Board at City Hall, a full, true and correct copy of the following: Ordinance No. 4475 , passed by the Bakersfield City Council at a meeting held on the 28th day of November. 2007 and entitled: AN ORDINANCE AMENDING SECTION 17.06.020 (ZONING MAP NO. 142-04) OF TITLE 17 OF THE MUNICIPAL CODE BY CHANGING THE ZONING FROM R-1/PUD (ONE FAMILY DWELLING/PLANNED UNIT DEVELOPMENT) TO R-2 (LIMITED MULTIPLE FAMILY DWELLING) ON TWO PARCELS TOTALING 106-08 ACRES GENERALLY LOCATED AT THE NORTHEAST CORNER OF EBERLE ROAD AND ROMERO ROAD; BEING A PORTION OF THE NORTHEAST QUARTER OF SECTION 4, T31S, R27E MDBM (FILE 07-1370) PAMELA A. McCARTHY City Clerk and Ex Officio of the Council of the City of Bakersfield BY:~~\..0~ DEPUTY City Clerk S:\DOCUMENT\FORMSIAOP .ORD.wpd 11/30/2007 'Qp..K~-9 J . ~ >- - l- m __ t- o () riRIGINAL ORDINANCE NO. 4 4 7 5 AN ORDINANCE AMENDING SECTION 17.06.020 (ZONING MAP NO. 142-04) OF TITLE SEVENTEEN OF THE BAKERSFIELD MUNICIPAL CODE BY CHANGING THE ZONING FROM R-1/P.U.D. (ONE-FAMILY DWELLING/PLANNED UNIT DEVELOPMENT) TO R-2 (LIMITED MULTIPLE-FAMILY DWELLING) ON TWO PARCELS TOTALING 106.08 ACRES GENERALLY LOCATED AT THE NORTHEAST CORNER OF EBERLE ROAD AND ROMERO ROAD; BEING A PORTION OF THE NORTHEAST QUARTER OF SECTION 4, T31S, R27E, MDBM (FILE # 07-1370). r' POSTED ON ~1- by City Clerk's Office City of Bakersfield by ~ WHEREAS, in accordance with the procedure set forth in the provisi()ns ()f Title 17 of the Municipal CC>de of the City ()f Bakersfield, the Planning CC>mmission held a public hearing on a petiti()n to change the land use zoning ()f those certain properties in the County of Kern generally I()cated at the n()rtheast oomer of Eberle R()ad and Romero Road; being a portion of the northeast quarter of Section 4, T31 S, R27E, MDBM as shown on Exhibit "B"; WHEREAS, by Res()luti()n No. 172-07 on OCTOBER 4, 2007 the Planning Commission reoommended approval and adoption ()f an ()rdinance amending Title 17 ()f the Municipal Code to approve Zone Change 07-1370 as delineated on attached Zoning Map No. 142-04 marked Exhibit "C", by this Council and this CC>uncil has fully oonsidered the recommendations made by the Planning Commissi()n as set f()rth in that Res()lution; and WHEREAS, the Planning CC>mmission, as a result of said hearing, did make several general and specific findings of fact regarding changes in z()ning of the subject property from R-1/P.U.D. (One-Family Dwelling/Planned Unit Development) to R-2 (Limited Multiple- Family Dwelling) and the CC>uncil has oonsidered said findings and all appear t() be true and oorrect; and WHEREAS, the law and regulati()ns relating to the preparati()n and adoption of Negative Declarations, as set forth in CEQA and City of Bakersfield's CEQA Implementati()n Procedures, have been duly followed by city staff, Planning CC>mmission and this Council; and WHEREAS, for the ab()ve described project, an initial study was oonducted and an Environmental Impact Report (Ashe #4) was certified ()n August 16, 2006, in oonjunction with related Vesting Tentative Tract Map 6747 and 6750 in accordance with CEQA; and WHEREAS, said Environmental Impact Repc>rt (Ashe #4) is applicable t() and appropriate f()r this project; and WHEREAS, there have been no substantial changes t() the project ()r circumstances under which it will be undertaken; and WHEREAS, no new environmental impacts have been identified; and WHEREAS, the general plan designation for this area all()W5 I()w density residential devel()pment; and findings: WHEREAS, the City CC>uncil has oonsidered and hereby makes the foll()wing -1 - ,.~~K~'>' ~ ?>~, . ':'(\ ~ 1$ t;':'rL C5"{: 1'.1 "(:) ORiG1N'A[