HomeMy WebLinkAbout1995CITY MANAGER'S OFFICE (805)326-3751 1501 TRUXTUN AVENUE SUITE 201 BAKERSFIELD CA 93301
DATE: November 17, 1995
TO: PAT DeMOND
FROM: DOLORES TEUBNER
MESSAGE: Pat, as you requested, please find attached the "draft" of the Budget
and Finance Committee agenda summary report for your approval. Please let me know
if there are changes. Thanks.~ iolores
The third item addressed structural repairs to certain floor and
wall areas. The cost is unknown at this time, but Honeywell
estimated that such repairs could reach $1 million. Additional
study and testing is needed, including core sampling, in that it
was felt the reinforcing steel may have deteriorated from chemical
erosion. It was further indicated that the HVAC retrofit could be
completed without the structural repairs being incorporated at this
time by utilizing some reinforcement work under the floor in
question, but that the issue would need to be addressed at some
time in the future. Staff indicated funds are available in the
Building Replacement Reserve. Chairman DeMond requested staff
provide an estimate of the cost of the repairs if done now, or
later, taking into consideration that the applicable HVAC equipment
would need to be removed and reinstalled should the work be
completed later.
Staff asked that the Committee recommend approval of the scope of
work outlined, including the two additional items and study of the
structural damage. The Committee voted to recommend this to the
City Council. Councilmember McDermott directed staff to develop an
estimate of what it would cost the City to build a new convention
center facility, or replace the back half of the current center.
AGENDA SUMMARY REPORT
BUDGET AND FINANCE COMMITTEE
Monday, November 13, 1995
Page -2-
report on the Convention Center HVAC retrofit project. The technical
proposal outlined the scope of work for the project including the cost of
$2,489,000. Honeywell indicated that there were three additional work
items that needed to be addressed, which had not been included in the
original cost estimate. The first was $85,000 for additional core related
structural work and the second was $80,000 for additional asbestos work.
The thir .~d~e~_was major structural repairs to certain floor and wall area,
the cost is unk-'newp~at.this time. Honeywell indicated that the repairs
could cost as much as..~t~llio_n, but additional study and testing of the
problem was needed (photos'~.~e problem areas are attached to these
minutes). They ~her indicated that~e repairs are not necessary for
Hone~he HVAC retrofit"but..that they would have to be
addressed at some time in the future. Staff"as~d that the Committee
recommend approval of the scope of work includi'ng.~he two additional
work items and st~ajor structural damage.'"-Tb.~ Committee
voted t~~~o direbte.d., staff to
devel~s the City to bu'dd~a...~ew
convention center facility.
.-~
6. NEW BUSINESS
The Committee, for the public's convenience, voted to take New Business
issues in the following order: C., A., D., and B.
A, SIDEWALK PUSHCART VENDORS
The City Attorney presented an amendment to Chapter 5.45 of the
Municipal Code which provided for other merchandise to be sold through
sidewalk vendors. Currently only food and drink is allowed to be sold
through sidewalk pushcart vendors. A member of the public spoke in favor
of the amendment, indicated that sales of all merchandise by sidewalk
vendors should be allowed as long as the City regulates it. The Committee
cited concerns from business owners over the unfair competition from
sidewalk vendors. The Committee voted to make no change to the current
ordinance and continue to allow only food and drinks to be sold.
AGENDA SUMMARY REPORT
BUDGET AND FINANCE COMMITTEE
Monday, November 13, 1995
Page -3-
B. FALSE ALARMS
A representative of the Police Department presented a request from the
local school districts in Bakersfield to get a waiver or reduction of the City's
charges for false alarms. Staff indicated that the false alarms are quite
costly to the Police Department because they require 3 to 4 patrol units to
respond. It was further stated that without a penalty for frequent false
alarms, the school district's would have less incentive to fix malfunctions
in the alarm systems. The Committee indicated that the school districts are
not charged for the first four false alarms at each site, per year. The
Committee voted to deny the request for a waiver or reduction in charges
for school districts.
C. THE BAKERSFIELD SIGN
Staff presented the Committee with the current options for addressing the
Bakersfield Sign issue. Based on recent discussions with Frank Collins of
Mesa Marin Raceway, it was determined that if Mesa Marin took the
structure that they would remove the sign portion of the bridge and replace
it with advertising. The Save Our Sign Committee indicated that this was
not acceptable. The other alternative was to move ahead with a Caltrans
study of the structure to determine what improvements would be required
to refurbish the sign.
The City Manager indicated that the Private Committee should provide the
$5,000 match to the $5,000 in Caltrans funds for the study. He stated that
if the City funded the study that it might inhibit private donations for the
refurbishing and maintenance of the structure because of the perception
that the City was taking care of it. Dr. Patel, the current owner of the sign,
asked for City involvement in the funding. The Committee discussed the
various options available for funding the Caltrans study and voted to
recommend that the total cost of the study be paid 50% by Caltrans, 25%
by the City and 25% by the private group not to exceed a total of $10,000.
D. AMENDMENT OF CDBG CONSOLIDATED PLAN
Staff summarized the proposed amendment Which included funding for the
Alliance Against Family Violence and the Boys and Girls Club. Staff
indicated that Councilmember Carson had objected to the funding for the
AGENDA SUMMARY REPORT
BUDGET AND FINANCE COMMITTEE
Monday, November 13, 1995
Page -4-
Boys and Girls Club because their request had been considered outside
of the City's annual competitive process for receiving CDBG grants. Staff
stated that the funding was to match State funding that the organization
had received for facility rehabilitation and did not fit into the budget cycle.
Funds for the Boys and Girls Club grant would come from the multi-family
rehabilitation program, but would still leave approximately $80,000 for the
multi-family program. The Committee discussed the possibility of
redirecting all of the funds from this program. The Committee agreed to
recommend approval of the amendment as presented, to the City Council.
7. ADJOURNMENT'
The meeting was adjourned at 1:50 p.m.
cc: Honorable Mayor and City Council
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: June 5, 1995
Question Response Councilmember
No. 1: What is the additional cost for The cost of converting the part-time temporary Salvaggio
funding a permanent full time position for position to a permanent full-time position would
the Graffiti program as an alternative to be an additional $8,103. The salary for a full
the current temporary personnel? time position is $37,980.
No. 2: Describe the process for ED/CD is proposing to present a detailed report Carson/
establishing a new Redevelopment Project on this subject at a workshop in mid-September. McDermott
Area. Propose a time for a workshop with
the Council on this subject.
No. 3: What percentage of CDBG funds A spreadsheet detailing the funding for these McDermott
have been historically budgeted for single- programs since FY 92-93 is attached.
family housing and the percentage
budgeted for multi-family (apartment)
housing?
No. 4: Investigate successful graffiti Staff has replicated successful programs Carson
programs in other cities that may be from the City of Southgate and the
useful to Bakersfield. Bakersfield City School District.
Additional research regarding other
successful programs is being conducted.
No. 5: .What property does the City A list of properties acquired with CDBG funds Carson
currently own that was purchased with since 1980 is attached. Most of the properties
CDBG funds? What is the proposed use were purchased in order to reduce blighted
for the property? conditions and not for a specific purpose.
No. 6: What studies have been done on Three studies have been conducted. The Carson
redevelopment and blight eradication? Lakeview Avenue Neighborhood Redevelopment
How were they funded? What Feasibility Study, the Feasibility Analysis
recommendations and actions were taken? for the Establishment of a Redevelopment
Project Area for Southeast Bakersfield and
the Union Avenue Improvement Plan. A summary
of the recommendations and actions resulting
from these studies is attached.
No. 7: How marketable will the incentive ED/CD and KEDC both report that several recent Mayor Price
zone be if rail service were in place, and prospective industrial users have passed up
how much would it cost? sites in the incentive area because direct rail
service was not available. The estimated cost
for providing service is approximately $1.9
million. Additional information is attached.
No. 8: Provide a 10-year projection for See attached. McDermott
the CDDA budget.
2
No. 9: What is the number of lane miles A total of 80 lane miles are scheduled to be McDermott
that would be resurfaced during FY 95-96? resurfaced by contract or by City forces in
How can we increase the amount of Gas FY 95-96. Staff suggests reducing the Gas
Tax funding for street resurfacing and Tax fund balance from $490,000 to $200,000.
maintenance? This will still provide sufficient reserve
in the event the City loses additional State
funding. See attached memo.
No. 10: Staff should confirm that enough The projected 50 cent per month, per resident McDermott
funding is available to handle landfill increase beginning in FY 96-97 will be sufficient
issues and investigate the need to establish to cover the costs of the mandated closure and
a reserve fund. post closure maintenance. See attached memo.
No. 11: Can the user fees at the Airport be Airport fees were increased 44% in FY 91-92 and DeMond
increased beginning in FY 95-96 to support FY 92-93. The present fees are comparable with
its activities? other local airports offering similiar services.
Staff will continue to evaluate the fees as
appropriate.
No. 12: What is the value of the City's The City has approximately 740 miles of paved DeMond
streets and alleys and the cost of streets and 150 miles of paved alleys. The
replacement/maintenance? Propose a date approximate value of the street inventory is
for a workshop on the proposed pavement $297,650,000. A workshop on pavement management
management system systems will be scheduled for August. A memo
with additional information is attached.
No. 13: Is it warranted to move the This signal is scheduled to be constructed in McDermott
Jewetta/Brimhall signal ClP project up 1998 when the anticipated traffic volume would
to FY 95-96? warrant it. Additional information is attached.
3
No. 14: What positions were deleted from In FY 93-94, Street Maintenance lost a Street Salvaggio
the Street Maintenance Division during Maintainer and Street Supervisor position. The
budget cuts? What was the impact of current ratio is 39 miles per Streets employee.
those cuts? Document the need for Additional information is attached.
reinstating those positions.
No. 15: Provide a status report on signal Project design was completed on April 28, 1995. Salvaggio
project at Akers and Panama Lane. Contract award is scheduled for June 14, 1995
Council Meeting.
No. 16: What options are available for Staff will research this issue and provide a Carson
privatizing the Airport operations? preliminary report by January of 1996.
No. 17: Why do we conduct road The current policy prohibits lane closures during Rowles
maintenance and construction work during the morning commute before 8:30 a.m. When traffic
peak hours? Can we find alternatives to volume is constant throughout the day, other options
complete the projects during off-peak are explored such as evening and night time work.
hours? A memo with additional information is attached.
No. 18: Council would like to receive The latest report on Asset Forfeiture funds is McDermott
the annual report on asset forfeiture attached.
funds and major expenditures purchased.
No. 19: Why. is there no appropriation of Assessment Districts are generally capital projects, McDermott
assessment district funds in the Public and therefore operating costs are charged directly
Works operating budget? to the capital project. The amount shown in the
FY 93-94 actuals was for a feasibility study for
an assessment district being considered in that
fiscal year.
4
No. 20: Why is there a difference between The expenditure detail on page 94 is operations only McDermott
the detail of refuse expenditures on page and does not include either capital or debt service
94 and revenues listed on page 1807 expenditures. A memo is attached.
No. 21: Does the City Council have a This item will be discussed at the upcoming department
policy on funding Outside agencies? head meeting.
No. 22: The Council would like to receive See attached. McDermott
a quarterly report on merit step increases.
BAKERSFIELD
Economic and Community Development Department
MEMORANDUM
June 8, 1995
TO: Alan Tandy, City Manager ~
FROM: Jake Wager, Economic Development Direct
SUBJECT: Responses to City Council questions on FY 95-96 proposed budget.
On Monday, June 5, 1995 following this department's budget presentation, various members of the
City Council posed a total of eight questions which required additional follow-up. I am responding
to those questions in the same order as listed in your June 6, 1995 memorandum.
Councilmember Salvaggio asked what wouM be the additional cost of funding a permanent full-time
position whose primary tasks wouM be the implementation of the Graffiti Program and overseeing
the VISTA Program. The total cost of converting a part time temporary Development Technician
to full-time permanent would be $8,103.
Councilmember McDermott asked for a description of the process necessary for establishing
additional redevelopment project areas focusing especially on what level of additional
administrative cost might be incurred. As indicated at the budget hearing, you have asked me to
look at the property tax trends for the two areas generally being considered. In addition we had
spoken of presenting, through a workshop format, the process involved in project area formation as
well as discussing the impact this could have on the other affected taxing agencies and what forms
of governance exist or are allowed under California Redevelopment Law. I would propose
addressing all of the above at a mid-September workshop. This would give us an opportunity to put
together a solid workshop which could prove helpful to the Council in considering whether to move
forward. In the meantime the only expenses incurred would be staff research time.
Councilmember McDermott asked for a comparison of CDBG and HOME Funds available for
single family housing programs versus those available for multi-family housing programs. Attached
is a comparison of these programs since FY 92-93.
Councilmember Carson asked if we cold investigate successful graffiti programs in other cities. I
would like to assure the Council and you that we are not at all adverse to looking for new ideas and
new approaches to combatting graffiti. By way of illustration, the Golden Brush Award that we
have instituted is one example of just such an approach. The award is modeled after a similar
program offered by the City of Southgate. In Southgate's case the Police Chief created the award
as a way of recognizing the significant contributions that were being made by individual citizens in
helping to reduce or eliminate graffiti. Another example of our willingness to look at other
successful programs is the pilot educational program just recently implemented in partnership with
Bakersfield City School District. Our investigation of fresh ideas for new ways to combat graffiti
is on-going.
Councilmember Carson asked for a list of properties purchased with CDBG and what the proposed
use of the property is. In many instances, properties were not purchased because of an envisioned
land use. Instead, the properties were acquired in order to alleviate a negative situation. An example
of this is the current site of Clinica Sierra Vista project which is the former location of the Lakeview
Inn. Attached is a list of properties acquired with CDBG funds since 1980.
Councilmember Carson asked what studies had been completed in past years which explored the
possibility or feasibility of establishing additional redevelopment project areas. We were also
requested to determine how these studies had been funded as well as what recommendations and
actions were taken following the completion of any such studies. Three studies have been conducted:
® Lakeview Avenue Neighborhood Redevelopment Feasibility Study (Census Tract
22), prepared by Katz, Hollis, Coren & Associates, Inc. in 1982;
®Feasibility Analysis for the Establishment of a Redevelopment Project Area for
Southeast Bakersfield, prepared by Urban Futures, Inc. in 1988; and
· Union Avenue Improvement Plan, prepared as a senior project by City and Regional
Planning students at Cal Poly San Luis Obispo, 1990. This project was funded by the Kem
Council of Governments.
The 1982 study focused solely on Census Tract 22 and concluded that, although the proposed project
area contained significant blighting conditions, economic conditions within and outside the area
needed to be considered to determine an overall strategy for upgrading the residential neighborhood.
The study suggested linking an impoverished residential neighborhood to adjoining industrial and
commercial areas to achieve overall economic development objectives within the neighborhood
itself. The report also concluded that the extreme physical deterioration and the absence of private
investment is symptomatic of the underlying economic problem of the area: limited household
income aggravated by lack of employment and job training opportunities.
The 1988 report focused on a study area much larger than the earlier study, encompassing over 3,600
acres of land zoned for residential, commercial and industrial uses. This area was generally bounded
by Freeway 178 on the north, Mt. Vernon Avenue on the east, East Pacheco Road on the south, and
Union Avenue on the west. The study concluded it would be feasible to establish a viable
redevelopment project area due to the inclusion of commercial and industrial zoning. The
2
consultants determined that there were potential sections within the larger area which exhibited
characteristics which could, with redevelopment agency help, attract development, thus increasing
the assessed valuation of the area to establish future revenues for a project.
The 1990 study explored development strategies for Union Avenue, including improving the
appearance of the street and the safety of drivers and pedestrians. Among the recommendations
offered by the students were a comprehensive landscaping program along Union Avenue, a
neighborhood beautification program, and creating an assessment district for utility undergrounding
and landscaping.
No actions were taken on the recommendations of the first two studies. As for the third study, a
comprehensive landscaping plan has been developed and implemented, and an assessment district
has been formed to maintain the new landscaping as suggested by the 1990 report.
The 1990 Cal Poly study was funded by the Kern Council of Governments. We are unsure about
the funding sources of the 1982 and 1988 studies, except that neither were funded by Community
Development Block Grant monies. We will continue our efforts to identify the exact source of
funding for the 1982 and 1988 studies.
The Mayor asked if the incentive area's marketability would be increased if additional properties
were rail-served. The Mayor also inquired if we knew the cost of providing additional rail lines.
The Incentive Area lacks available industrial sites served by rail. Over the years, both this
department and Kern Economic Development Corporation have found that many companies
specifically need rail-served sites. Due to the lack of such sites in the Incentive Area, potential
employers look elsewhere to locate, and the High Density Unemployment Area continues to lose out
on potential jobs. This liability has long been recognized as an obstacle in marketing the area. In
1990, this department submitted an application for funding a feasibility study to examine bringing
rail service to the industrial areas near South Mt. Vernon Avenue and Freeway 58. Unfortunately,
higher priority was given to projects ready to be implemented, rather than those requesting feasibility
studies. Nevertheless, the initial cost estimates in 1991 to bring a rail spur to this area were
approximately $1.9 million.
Rail companies have been very creative in offering service to customers without a rail line on site.
One such concept is Santa Fe's Quantity Distribution Centers, or QDCs. Under this arrangement,
a company in Bakersfield can make one call for delivery of a product from anywhere in the
continental United States. The railroad arranges truck transportation to pick up the product and
deliver it to the railroad for shipment to the Bakersfield QDC. The product is stored at the QDC and
delivered to the company by truck when the company wants and in the amounts needed, The rest
is stored at the QDC. This "one call does it all" concept costs less than having a rail spur on site and
it provides more flexibility to many businesses.
Some companies, however, must have direct rail service. For example, the day following our budget
presentation, a very serious industrial client was in town. This client must have direct rail service.
The only site in southeast Bakersfield which meets the company's criteria lies in the unincorporated
3
area and is outside the Incentive Area. While both this department and KEDC promoted Gateway,
Enterprise, and other Incentive Area industrial locations to this client, none of these sites offered the
direct rail service the client must have on site.
Councilmember McDermott asked to be provided with the customary ten year cash flow for the
CDDA. Attached is a 10 year projection for the CDDA's cash flow. It reflects the FY 1995-96
Proposed Budget and the most recent data available at this writing as provided by the Finance
Department. Though the Agency's fiscal health has improved since their debt was consolidated in
1993, their budget continues to reflect fiscal conservatism.
Included in the cash flow is the first of a five year commitment to John Q, Hammons for costs
associated with the start up of the Hotel. In past years, a portion of the Agency's property tax
increment was shifted to the State for funding K-12 schools and community colleges. As the State's
proposed budget does not continue with the shifting of these funds, resources were not allocated for
that purpose.
As noted some of the questions particularly those focusing on redevelopment are by their nature
complex and do require additional time to adequately research and respond to the question posed.
This memorandum is intended to respond rapidly to those questions for which the answers are
immediately at hand.
4
FEDERALLY FUNDED HOUSING ASSISTANCE 06/08/95
i!:-!i!iii!:?i!i!~!!!:!!!:!:!:~:!iii!ii:i:~:i:i:i:~:!:i:~:i:!:i:i:iii:!i!i!ii[!i![iiii'''''''''''~'''''''' :* :' :' :' :* :* :* :' :* :' :* :* :* :* :* :' :* :* :' :* :' :' :' :' :* :* :' :* :* :' :* :' :* :* :* :* :' :* :* :' :' :* :' :' :* :* :' :* :' :* :* :* :' :* :* :* :* :* :' :* :* :' :* :* :' :*:* :' :* :* :* ::¥:¥:¥: :' :' :~ :':: i:~:i: !:i :i:i:!:i:i:!:!:i:i:i:i:i:i:i:i:i:i:i:?i:i:i:i:i:!:i:!:! :~:i:i:i:!:::!:!:i :::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::: :i :i:i:i:i:i:i:! :i:i:iiii i:!ii: i:i:i:!:ii!:!ii:i: !~!:i:!:i:i:!:i:!:~:~:~: i:i:!:i:!: i:!: i:i:i:i:i:i: i:!iiiiii: i iii!:iiiii:!iiii: i:!i!ii :~i!:!:i i il i:!iiii :iii: !:~:! :!:i:~:i:i:i: i:i:~:i:i:i: !:i:i: i:i :!:i:i:i: i:i:i:i:i:i:i:i:i:i:i:i:i:i :i:i :i:i: i: i:!:i: !:i: !:!:i:i:i:!:i:!:i:i:!.
SUMMARY OF BOTH ENTITLEMENTS
Total Entitlement/Program Income $2,472,300 $3,059,000 $3,891,0OO $4,339,500
Single Family Rehabilitation $597,817 24.2% $158,000 5.2% $435,000 11.2% $304,525 7.0%
Multi-Family Rehabilitation $145,750 5.9% $399,022 13.0% '$285,000 7.3% $185,000 4.3%
First Time Homebuyer$ $100,000 4.0% $97,968 3.20/0 $135,000 3.5% $250,625 5.8%
CDBG
Total Entitlement/Program Income $1,662,300 $2,525,000 $3,000,000 $3,253,000
Single Family Rehabilitation $221,567 13.3% $7,500 0.3% $135,000 4.5% $0 0.0%
Multi-Family Rehabilitation $0 0.0% $279,022 11.1% $135,000 4.5% $80,000 2.5%
First Time Homebuyera $100,000 6.0% $97,968 3.9% $75,000 2.5% $0 0.0%
HOME
Total Entitlement/Program Income $810,000 $534,000 $891,000 $1,086,500
Single Family Rehabilitation $376,250 46.5% $150,500 28.2% $300,000 33.7% $304,525
28.0%
Multi-Family Rehabilitation $145,750 1.8% $120,000 22.5% $150,000 16.8% $105,000
9.7%
First Time Homebuyers $0 0.0% $0 0.0% $60,000 6.7% $250,625
23.1%
Property Log of Real Estate Purchased with CDBG Funds
and Owned by City of Bakersfield
June 8, 1995
I. City Owned Property Purchased with CDBG Funds
1. 407 Lakeview Avenue
APN :019-071-14
Lot No.: Sunset Tract Lots 23, 24, 25, and 26
Purchase Price: $90,000
Status: Substandard structures demolished, cleared lot
East side of Lakeview, north of Virginia Avenue
2. 417 and 425 Lakeview Avenue
APN:019-071-11 and 16
Lot No.: Sunset Tract Lots 19, 20, 21, and 22
Purchase Price: $52,500
Status: Substandard structures demolished, cleared lot
East side of Lakeview, north of Virginia Avenue
3. 508 Lakeview Avenue
APN: 018-122-15
Lot No.: Tract 1171 Lot 36 except for the southern 30 feet
Purchase Price: $37,000
Status: Substandard structures demolished, cleared lot
Portion used for cul-de-sac
S.W. corner of Ralston and Lakeview
4.700 and 702 Lakeview Avenue
APN: 018-091-20 and 21
Lot No.: Tract 1232 Lot 58 except for the northern 35 feet
Purchase Price: $17,200
Status: Substandard structures demolished, cleared lot
Portion used for cul-de-sac
N.W. corner of Gorrill and Lakeview
5. 720 Lakeview Avenue
APN: 018-091-45
Lot No.: Tract 1232 Lot 1 except for the southern 60 feet
Purchase Price: $28,000
Status: Commercial building scheduled to be sold July 19, 1995
Im:DB9/CDBG.LOG
6. 530 Fourth Street
APN: 009-401-06 Lot No.: Lowell Park Tract Lot No. 13
009-403-11 BI. 3 Union Add. Lot No. 1 (Pt.)
009-403-12 BI. 3 Union Add. Lot No. 1 (PT.)
009-403-21 Lowell Park Tract Lots 15 - 22
Purchase Price: $200,000
Status: Part of Bakersfield Senior Citizens Center Complex
7. 530 Fourth Street
APN: 009-403-22
Lot No.: Block 3 Union Addition Lot No. 1 (Pt) and 2 (Pt)
Purchase Price: $36,700
Status: Part of Bakersfield Senior Citizens Center Complex
8. 530 Fourth Street
APN: 009-403-10
Lot No.: Block 3 Union Addition Lot No. 1 (Pt)
Purchase Price: Unknown
Status: Part of Bakersfield Senior Citizens Center Complex
9. 1530 and 1600 East Truxtun Avenue
APN: 017-072-14
Lot No.: Kern Block 177 (Pt) and 178 (Pt)
Purchase Price: $137,000
Status: Bakersfield Homeless Center Complex
Im:DBg/CDBG.LOG
Central District Development Agency 03:30 PM
10 Year Cash Flow with 000's Omitted os-Jun-e5
Resources
Beginning Balance ~ 1,185 1,222 1,572 1,486 1,208 1,263 1,274 1,301 1,360 1,456
Tax Increment Gross 2 1,351 1,297 1,311 1,295 1,445 1,474 1,503 1,533 1,564 1,595
Interest Revenue:
Investments 3 78 68 53 57 81 99 103 123 138 149
Parking Lot Note 4 30 30 30 30 45 60 60 60 60 60
Loan from COB General Fund $ 208
Lease Revenue:
Eye Street Garage 6 131 136 139 463
Convention Center 7 401 400 404 402 399 402 403 404 404 403
Other Financing Sources 8 8,545 25 50 50 50 50 25
Sale of Agency Parcels 9 203
Other Revenues to 68 1 I 1 I I 1 I 1 1
Total Resources 3,447 11,907 3,510 3,734 3,204 3,349 3,400 3,473 3,578 3,689
Less Expenditures
Cost Allocations ~ ~ 219 259 243 212 227 231 236 240 245 250
Other ~2 57 89 36 1 04 85 87 89 90 92 94
County of Kern - Tax Collections ~3 29 27 22 23 30 32 34 36 38 40
Eye Street Parking - Reimbursment ~4 164 140 144
Parking Lots ~5 30 30 30 30 45 60 60 60 60 60
Housing Sat-aside lo 265 260 290 300 310 315 320 335
ERAF 17 208 75 75
Debt Service:
Sewer Fund - Loan ~8 169 810
General Fund - Loan 49 208
Eye Street Parking 20 133 124 134 657
Tax Allocation Bonds - 1983 ~ 614 5,938
Tax Allocation Bonds - 1993 2~ 172 548 760 761 760 763 765 760 764
Convention Center COP's - 1987 23 401 400 404 402 399 402 403 404 404 403
Convention Center - Hotel 24 409 1,264 121 100 200 200 200 200 100
Reimbursements - Porter Roberson 25 2 3 3 3 3 3 3 3
City Center Parking Lot =s 648
Total Expenditures 2,225 10,335 2,024 2,526 1,941 2,075 2,098 2,113 2,122 2,049
Ending Balance 1,222 1,572 1,486 1,208 1,263 1,274 1,301 1,360 1,456 1,640
Ending Balance Reserve:
Debt Service 27 1,071 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163 1,163
Insurance ~8 100 100 100
Debt Due - Parking 20 77 89 93
Total Reserves Required 1,248 1,352 1,356 1,163 1,163 1,163 1,163 1,163 1,163 1,163
Available Balance (26) 220 130 45 100 111 1 38 197 293 477
c:\1 mad\ed\ceshflw5,wkl
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR ~~~
DATE: JUNE 9, 1995
REF: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
Currently, proposed resurfacing for fiscal year 1995/96 amounts to 50 lane miles (13 street
miles) to be resurfaced by contract projects and 30 lane miles (15 street miles) to be
resurfaced by City forces. The attached chart shows those figures compared to the City's
total street mileage. As shown we are well below the optimum 15 year resurfacing cycle
with our current program.
With respect to how we can increase Gas Tax funding for street resurfacing, we have the
following response. Currently, the vast majority of available Gas Tax dollars goes towards
resurfacing projects. In addition, we aggressively apply for other Gas Tax dollars through
programs such as the State Local Transportation Partnership Program (SLTPP).
There is also available approximately $490,000 in Gas Tax fund balance. We could utilize
some of these funds for additional resurfacing projects and leave a fund balance of
approximately $200,000. There should however be some caution taken if we further reduce
the fund balance since the State if proposing to reduce funding for the SLTPP program.
P:\MEMOS\RAUL19
B A K E R.S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR~/~7~
DATE: JUNE 9, 1995
SUBJECT: RESPONSE TO FY 95/96 BUDGET WORKSHOP QUESTION
Question from Councilmember McDermott
"Staff should confirm that enough funding is available to handle landfill issues
and investigate the need to establish a reserve fund."
Response
Funding for final closure of the old landfill can be anticipated in three
segments: landfill gas control, mandated environmental closure with post
closure maintenance, and possible remediation work. While costs for the first
two can be estimated, the third will remain unknown until the State approves
the draft closure plan and Environmental Impact Report (EIR). According
to the consultant's studies, remediation will be accomplished through
implementation of the closure plan. Thus, no remediation costs are currently
anticipated.
Cost estimates and funding plans are as follows:
1. Landfill gas control
The approximate $950,000 cost for a gas control
system to achieve final closure is divided into a
$200,000 project currently underway, a $150,000
amount budgeted for design work in FY 95-96,
and the remaining $600,000 spread over five year
financing at $150,000 per year beginning in
FY 95-96. Staff has included FY 95-96 costs in
the proposed balanced budget.
Page 1 of 2
MEMORANDUM
ALAN TANDY, CITY MANAGER
DATE: JUNE 9, 1995
SUBJECT: RESPONSE TO FY 95/96 BUDGET WORKSHOP QUESTION
2. Mandated closure and post-closure maintenance
The consultant's draft closure plan is estimated to
cost $2.3 million. Closure costs are shared
equally by the City and Kern County, except for
the burn dump and gas control work which are
the City's responsibility. The City's share of the
estimated $2.3 million closure work is $1.3
million. By spreading this cost over 5 year
financing beginning mid-year in FY 96-97 and
budgeting $120,000 annually for estimated post-
closure maintenance, staff estimates that a 50¢
per month per residence (or 4.8%) rate increase
would be required in FY 96-97.
Using the above projection, it does not appear necessary to build a reserve.
However, the possibility of high costs for remediation work still exists,
pending EIR approval. If these occur and are not covered by the City's
insurance, they would typically be funded with 20 year financing to minimize
impact on refuse rates.
KPB:smp:mro
c: Kevin P. Barnes, Solid Waste Director
Page 2 of 2
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
June 9, 1995
TO: ALAN TANDY, CITY MANAGER //~
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
SUBJECT: PUBLIC WORKS BUDOET WORKSHOP QUESTIONS / RESPONSES
Can the user fees at the Airport be increase beginning in
fiscal year 1995-96 to support its activities?
During the fiscal year 1991-92 and 1992-93 the fees were
raised 44%. Our present fees are comparable with other local
airports and at this time we do not have any more to offer
than similar facilities. We will analyze our fee structure at
the airport beginning September 1995. We will be able to make
recommendations to the Council regarding any increases by
January 1996.
What options are available for privatizing the Airport
operations? (Provide at least a preliminary report by January
of 1996)
Staff will begin gathering information on privatizing the
operations of the Airport an provide a preliminary report by
January 1996.
B A K E R.S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works Director
DATE: June 7, 1995
SUBJECT: Value of City Streets
Currently, there are approximately 740 miles of paved streets and 150 miles of paved alleys within
the City of Bakersfield. This places our city in the top ten urbanized areas statewide with regard
to street mileage. The approximate value of our street "inventory" is as follows:
Arterial Streets 100 miles $102,200,000.00
Collector Streets 65 miles $ 31,506,000.00
Local Streets 575 miles $163,944,000.00
Alleys 150 miles $ 21,384,000.00
Total Street "Value" $297,650,000.00
The City has far outgrown our current system of pavement management and should consider some
of the more comprehensive programs available. Staff has done some research on these programs
and would like to propose a workshop in August for the City Council on pavement management
systems.
CI094:\STREET$.MEM
RMR.'mps
xc: Reading File
Project File
Jac~lues R. La Rochelle
Marian P. Shaw
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
Traffic Engineering Memorandum
DATE: June7, 1995
TO: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
FROM: STEPHEN L. WALKER, TRAFFIC ENGINEER/~'~
SUBJECT: RESPONSE TO FISCAL YEAR 1995/96 BUDGET WORKSHOP, PUBLIC
WORKS QUESTION NUMBER (TRAFFIC ENGINEERING RELATED)
Following is the Traffic Engineer's response to questions regarding traffic signals:
Can we move the Jewetta/Brimhall Signal CIP project up to FY 95-967
(McDermott)
Response:
The intersection is anticipated to meet warrants for a traffic signal in 1998. This
is based on available development information and projections of traffic volume
based on buildout in the area. Since the intersection does not now meet any
warrants and there are currently 25 other locations that now meet one, or more,
warrants, I do not recommend a change in the project year. If the intersection
should meet warrants sooner than anticipated, the proposed project year will be
changed accordingly.
Currently, the intersection is a simple "TEE" intersection with no road to the south
and the streets are only two lane roads. Installation of a traffic signal will require
additional right of way acquisition plus construction of the intersection to the
expanded intersection width standard. With respect to the future high school site
on Jewetta, about 1/4 mile south of Brimhall, the Kern High School District had
informed Traffic Engineering that the new school would not open until the fall of
1998 and this was taken into consideration in our scheduling. We have again
checked with Mr. Jack Colvard, KHSD, who verified that the fall 1998 date is the
earliest the school may open. If the intersection is funded for the 1997-98 year,
a signal should be operational by the time the school opens in the fall of 1998.
cc: PW Memo Files
Traffic Engineering File - Budget Workshop Questions 95-96 budget
slw:\DATA\WP\I g95\BudQuest.Mem
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
June 9, 1995
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works Director (~L
SUBJECT: Public Works Department Fiscal Year 1995-96 Budget Workshop
Questions/Responses - June 5, 1995
What positions were deleted from the Street Maintenance Division during budget
cuts? What was the impact of those cuts? Document the need for reinstating those
positions.
During the 1992-93 fiscal year in the Street Maintenance section there were twenty
employees and two supervisors that were responsible for maintaining 661 miles of
streets. This ratio of employees to streets is roughly 33 miles per employee.
During the budget process for fiscal year 1993-94 the Street Maintenance section lost
a Street Maintainer and Street Supervisor position. As a result, this section had
nineteen blue collar employees and a ratio of over 35 miles of streets per employee.
In the current fiscal year the City has roughly 739 miles of streets and still only
nineteen employees. This gives us a ratio of almost 39 miles of streets per employee.
As a matter of historical comparison, our ratio in the mid 1980's was 22 miles per
employee.
While much of the street maintenance equipment has improved, pothole
repairs, crack sealing, section repairs, concrete repairs and penetration sand
sealing are performed much as they were years ago. Consequently, the street
ratio increase from 33 miles to 39 per employee is an 18% increase. This
factor coupled with an extremely wet year has resulted in a significant
increase in the work load. Obviously, we have not been able to keep up with
this increase and the condition of our streets reflect this. As the street
mileage continues to increase the ability to perform standard maintenance
programs such as pot hole and section repairs, penetration sand sealing, crack
sealing, patching, etc. decreases significantly due to lack of available
personnel. The personnel that typically perform the standard maintenance
programs are street maintainers.
cc: Joe Lozano
STREET MAINTENANCE SECTION
STREET MILES PER EMPLOYEE
STREET MILES
$0
............................................................................... ............................... ...............
~o ~ ~ ~
o ~ ~ ~
~2/~ ~/~4 ~4/~$ ~$/~ ~$/~ REG,
NUMBER OF EMPLOYEES ~ MILES PER EMPLOYEE
NOTE: The 95/96 REQ. is based on the
request for two additional Street
Maintainers.
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
Traffic Engineering Memorandum
DATE: June 7, 1995
TO: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
FROM: STEPHEN L. WALKER, TRAFFIC ENGINEER/~'~)
SUBJECT: RESPONSE TO FISCAL YEAR 1995/96 BUDGET WORKSHOP, PUBLIC
WORKS QUESTION NUMBER (TRAFFIC ENGINEERING RELATED)
Following is the Traffic Engineer's response to questions regarding traffic signals:
Provide status report on signal project at Akers and Panama Lane.
(Salvaggio)
Response:
The project is on schedule. The design phase of the traffic signal project was
completed on April 28, 1995 with approval of the plans and specifications for
bidding. Bids from contractors were received and opened on May 24, 1995. The
Iow bid was received from Taft Electric of Ventura, California in the amount of
$95,143 which does not include the City furnished controller cabinet and traffic
controller unit. The award of contract is on the agenda for the upcoming June 14,
1995 Council meeting.
Construction will be scheduled by the Construction Inspection section of Public
Works after award of contract and receipt of signed contract documents. The
contractor has 35 working days to complete the project after receiving the notice
to proceed from Construction Inspection.
cc: Bruce Deeter, CE III, Traffic Engineering
Brad Underwood, CE 111, Traffic Engineering
PW Memo Files
Traffic Engineering File - Budget Workshop Questions 95-96 budget
slw:\DATA\WP\1995\BudQuest.Mem
MEMORANDUM
TO: ALAN TANDY, CITY MANAGER R ~ //
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTO
DATE: JUNE 7, 1995
REF: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
STATUS OF PANAMA LANE OVERCROSSING WIDENING PROJECT.. '~ ·
On January 11, 1995, the City Council approved the agreement for the consultant
to provide Caltrans with a Project Study Report (PSR) and Project Report (PR) to be
approved by Caltrans prior to the completion of the Plans, Specifications and Estimates
(PS&E). Based upon the original schedule, the combination PSR/PR was to be completed
and sent to Caltrans by June 1, 1995 with plans completed by January 1996. This project
is scheduled to be budgeted for in the fiscal year 1996/97. This allows ample time for the
completion of the project prior to advertisement in July, 1996.
At this time, I am happy to report that the PSR/PR has already been sent to Caltrans for
theft review and approval. This project is fight on schedule and design should be completed
on schedule baring any delays imposed upon us by Caltrans.
P:\MEMOS~RAUL18
MEMORANDUM
DATE: JUNE 8, 1995
TO: ALAN TAN-DY, CITY MANAGER
FROM: RAUL ROJAS, PUBLIC WORKS DIRECTOR/v/~
SUBJECT: RESPONSE TO QUESTION ~ ASKED DURING PUBLIC WORKS'
BUDGET PRESENTATION
The question is:
"Why do we conduct road maintenance and construction work during peak hours?
Can we find alternatives to complete the projects during off-peak hours?"
The answer is:
Our current policy is as follows:
On all construction projects involving major collectors and/or arterials and which
require lane closures, staff evaluates the volume of traffic anticipated in the
construction area during the morning and afternoon peak commute times. The
primary concern is for the morning commute since all of our projects are limited to
normal working hours of 7:30 am to 4:30 pm.
If construction of the project will require lane closures in the principal direction of
morning commute traffic on a given high volume street, the specifications include a
statement that the contractor may not close lanes in that direction of traffic prior to
8:30 am. If the morning commute traffic is uni-directional on the street, he may
close lanes in the non-principal direction prior to 8:30 am.
On some street segments in the City, traffic volume remains relatively high throughout the
day. Traffic will experience delays at those locations during a construction project. To
require the contractor to arrange his work in those situations to avoid creating traffic delays
would greatly increase the construction cost of the project.
Where the traffic volume is constantly high throughout the day, staff investigates other
possible options for minimizing the project's impact on vehicular circulation. One possibility
\ARNOLD\GENERALUACK.608
that is considered is evening and night time construction. This option works extremely well
in industrial areas since the vehicular traffic is very minimal at those times of day. In
commercial areas this option is less effective since there is vehicular traffic in the evening
hours due to customer arrivals and departures from the commercial area. Staff very seldom
will allow this option on projects that are adjacent to residential areas due to the impact of
construction noise on those citizens.
In the circumstances where the contractor requests extra working hours beyond the normal
7:00 am to 4:30 pm, he must pay for the City Inspector's overtime. In addition, the
specifications issued for the project, never allow lane closures in either direction during the
afternoon commute time.
\ ARNOLD\GENERAL~J ACK.608
MEMORANDUM
JUNE 7, 1995
TO: ALAN TANDY, CITY MANAGER
FROM: GREGORY J. KLIMKO, FINANCE DIRECTOR/~
SUBJECT: FISCAL YEAR 1995/95 BUDGET WORKSHOP QUESTION/RESPONSES
Below is the response to Councilmember McDermott request regarding:
Why is there a difference between the detail of Refuse Fund Expenditures on page
94 and revenues listed on page 1807
The $16,379,275 Refuse Fund Expenditures on page 94 reflects the Public
Works Department Operating Budget so funded. The Revenues on Page 180
includes funding for Debt Service, Capital Improvements and transfers for
additional refuse equipment in addition to the Public Works Department
Operating Budget.
krc
MGJK.20
BAKERSFIELD
MEMORANDUM
June 5, 1995
TO: GAIL WAITERS, ASSISTANT CITY MANAGER
FROM: JOHN W. STINSO~,bJA~SISTANT CITY MANAGER
SUBJECT: MERIT STEP INCREASE REPORTS
Attached is the most recent report on Merit Step Increases as requested by
Councilmember McDermott at the June 5th budget meeting. It includes information
for the first quarter of 1995 and a summary of activity to date for this fiscal
year. These are distributed to the Council quarterly as part of the weekly
General Information memo.
MEMORANDUM
TO: JOHN W. STINSON, ASSISTANT CITY MANAGER DATE: 4/18/95
FROM: ANTHONY GONZALES, HUMAN RESOURCES SUPERVISOR ~
SUBJECT: REPORT ON MERIT STEP INCREASES
QUARTER PERIOD JANUARY - MARCH 1995
Per the City Council's request, attached is a listing by department of the number of eligible
employees who received Step 4 or 5 "medt" increases for the quarter January - March 1995.
Thirty (30) of thirty-two (32) eligible employees received Step 4 or 5 "merit" increases during the
pedod.
STEP INCREASE REPORT
JANUARY-MARCH 1995
18-Apr-95
tEXECUTIVE 3 2 I 1 2 1
FINANCE 1 I 1 1 0 0
!ATTORNEY 2 1 0 0 2 1
POLICE 6 6 1 1 5 5
[FIRE 2 2 0 0 2 2
i PUBLIC WORKS * 9 9 5 5 4 4
I WATER RESOURCES I 1 0 0 1 1
~ COMMUNITY SVCS 5 5 2 2 3 3
I DEVELOPMENT SVCS 3 3 0 0 3 3
liED/CD 0 0 0 0 0 0
· Solid Waste totals are mcludecl in Public Works and not Water Resources.
STEP INCREASE REPORT 1994-1995
Steps 4 and 5
18-Apr-95
IEXECUTIVE 1 0 1 1 3 2 2 0
0
0
0
I: POLICE 6 6' 17 15 6 6 10 0
FIRE 5 5 14 14 2 2 2 0
PUBLIC WORKS 8 7 8 71 9 9 15
!WATER/SOLID WASTE 2' 2 2 2I 1 1 I 0
',couMtmrr¥ svcs 4 4 3
i DEVELOPMENT SVCS 2 1 I II 3 3 1 0i
~.D,CD , o, o ut o o o o
* Beginning January-March 1995, Solid Waste totals are included in Public Works and not Water Resources.
**increases April-June not reported yet.
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: May 31, 1995
Question Response Councilmember
No. 1: What other items did the Police A Senior Records Clerk and Sergeant position. The Chow/McDermott
Department request that are not included impact of additional workload is not known at this
in the proposed budget? time. $25,000 in temporary personnel was allocated
until such time that sufficient documentation is
available to justify a permanent clerk position.
The amount of temporary pay allocated is 75% of
the amount needed to fund a permanent full-time
clerk. Regarding the other position, it was felt
that the seven positions recommended were a higher
priority than the traffic sergeant/supervisor.
No. 2: Staff should research the feasibility According to Chief Brummer, they are researching Carson/
of the City of Bakersfield taking over the the cost and feasibility of internalizing this McDermott
responsibilities of booking arrestees within function. A report for the Council to consider
the city limits, will be available within the next few months.
No. 3: Why doesn't the City use Gas Tax The primary reason is that Gas Tax funds are a Salvaggio
to pay for median island maintenance and limited resource and specific street improvement
what is the functional purpose and reason have been determined to be a higher priority purpose.
the City constructs these islands? The median islands are constructed for traffic control
and as a safety barrier. The General Plan, approved
by the City Council, calls for these medians to be
landscaped.
No. 4: Staff should research why the Public Works estimates that the park will be McDermott
residents of Tevis Ranch will be completed in early 1996. In light of this
charged a full year's assessment when the fact, the assessment will be prorated for
park is not completed, six months.
2
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: May 31, 1995
Question Response Councilmember
No. 1: What other items did the Police A Senior Records Clerk and Sergeant position. The Chow/McDermott
Department request that are not included impact of additional workload is not known at this
in the proposed budget? time. $25,000 in temporary personnel was allocated
until such time that sufficient documentation is
available to justify a permanent clerk position.
The amount of temporary pay allocated is 75% of
the amount needed to fund a permanent full-time
clerk. Regarding the other position, it was felt
that the seven positions recommended were a higher
priority than the traffic sergeant/supervisor.
No. 2: Staff should research the feasibility According to Chief Brummer, they are researching Carson/
of the City of Bakersfield taking over the the cost and feasibility of internalizing this McDermott
responsibilities of booking arrestees within function. A report for the Council to consider
the city limits, will be available within the next few months.
No. 3: Why doesn't the City use Gas Tax The primary reason is that Gas Tax funds are a Salvaggio
to pay for median island maintenance and limited resource and specific street improvement
what is the functional purpose and reason have been determined to be a higher priority purpose.
the City constructs these islands? The median islands are constructed for traffic control
and as a safety barrier. The General Plan, approved
by the City Council, calls for these medians to be
landscaped.
No. 4: Staff should research why the Public Works estimates that the park will be McDermott
residents of Tevis Ranch will be completed in early 1996. In light of this
charged a full year's assessment when the fact, the assessment will be prorated for
park is not completed, six months.
2
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: May 24, 1995
Question Response Councilmember
No. 1: Are there other drainage basins Two others are being used besides Patriots. Park -- Mayor Price
that the City uses for recreation? Wilson Park and Centennial Park. Over time, these
basins just don't drain well because of bad soil,
so they are taken out of circulation.
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: May 22, 1995
Question . Response Councilmember
No. 1: What entitlement revenues does the A listing of these revenues and their sources are Carson
City receive, and how are they budgeted? highlighted in the attached memo from the Finance
Director.
No. 2: What are the issues regarding the A memo on this issue is attached. Staff will have DeMond
emergency fuel needs of the Fire a proposed fuel program for Council to review by
Department? mid-July 1995.
No. 3: How does the Fire Department's A memo comparing budgeted overtime versus actual McDermott
overtime budget for fy 94-95 compare expenditures for fy 94-95, and the proposed for
with its proposed budget for fy 95-96? FY 95-96 is attached.
Salvaggio
No. 4: What will Assistant City Manager Assistant City Manager Stinson will continue to
Stinson's duties be once the Human serve as the Department Head responsible for the
Resources Manager is hired? Human Resource and Risk Management divisions, in
addition to working on special projects assigned
by the City Manager. A memo highlighting some of
these assignments is attached.
No. 5: Please provide more detail A detailed accounting of the personnel changes is · Salvaggio
regarding the personnel changes attached, along with the listing of personnel by
that have occurred within the Executive division for the total organization. The total
Department in the past five years, number of personnel is below that of the 1991/92 fy.
No. 6: There are no CIP projects The City currently has one vacant site for a new Public Comments
approved for the Fire Department for fire station -- Buena Vista. However, there is no
fy 1995/96. funding available for staffing and equipment. Once
the results of the joint City/County study are in,
staff will begin analysis of the recommendations to
determine the feasibility of additional resources.
Funds have been earmarked in Council Contingency for
upgrades to the joint communications center in the
amount of $163,000.
Because capital outlay funding was appropriated to
construct a wall at Fire Station #2, this item was
not funded as a CIP project.
During the fy 1994/95, CIP funding was approved to
retrofit Fire Station #2 and to construct a permanent
Fire Station #13; as well as approval to purchase four
engine trucks.
2
MEMORANDUM
MAY 25, 1995
TO: ALAN TANDY, CITY MANAGER
i_x l/
FROM: GREGORY J. KLIMKO, FINANCE DIRECTOR//~/''''
SUBJECT: FISCAL YEAR 1995/95 BUDGET WORKSHOP QUESTION/RESPONSES
Below is the detail of the Federal, State and County Entitlement Revenues requested by
Councilmember Carson.
General Fund
State Motor Vehicle In-Lieu Tax $7,200,000
State Homeowner Subventions 350,000
State Reimbursements
Police Officers Standards Training (POST) 75,000
S.B. 90 - Mandated Reimbursements 50,000 125,000
Other Grants:
Federal C.O.P.S. AHEAD 252,180
State Vehicle Anti-theft Program(SB2139) 75,000
County Miscellaneous Payments 5,000 332,180
Total General Fund $8,007,180
Community Development Block Grant Fund
Community Development Block Grant:
Current Year Entitlement $2,953,000
Prior Year Entitlement 118,475 $ 3,071,475
HUD Emergency Services Grant (ESG) 91,000
County Share - Employers Training Resources 9,000
HUD Home Program 974,000
Total CDBG Fund $4~145~475
ALAN TANDY
MAY 25, 1995
PAGE TWO
Intermodal Surface Transportation Efficiency Act Fund (ISTEA)
Surface Transportation Program (STP) $1,019,200
Transportation Enhancement Activity (TEA) 272,000
Congestion Mitigation & Air Quality (CMAQ) 728,300
Highway Bridge Replacement & Rehabilitation (HBRR) 30,800
Total ISTEA Fund ~
Street and Road Transportation Fund (TDA)
Bikeway/Pedestrian Pathway $ 90,000
Gas Tax Fund
State Gas Tax $3,300,000
State and Local Transportation
Partnership Program (SLTPP) 828,000
Total Gas Tax Fund $4,128,000
Refuse Fund
County Grant - Drop Off Program $ 40,000
Airpark Fund
Federal Aviation Administration (FAA) -
Clear Zone Acquisition $1~ 151~200
krc
MGJK. 17
BAKERSFIELD
MEMORANDUM
May 23, 1995
TO: HONORABLE MAYOR AND CITY COUNCIL
FROM: GA ITERS, ASSISTANT CITY MANAGER
SUBJECT: MAY 22, 1995 BUDGET WORKSHOP RESPONSE
· Question: What are the issues regarding the emergency fuel needs of the Fire
Department? (DeMond)
Response: During the 1994/95 budget year the Public Works Operations Manager was
given responsibility of coordinating all fuel-related issues for the City. He
is currently working with the Fire Department in addressing these issues
and coming up with a reasonable strategy that will accommodate the Fire
Department's needs.
A number of issues need to be addressed prior to a decision being made
regarding placement and construction of fuel tanks, such as:
· The cost/benefit of having additional city-owned fuel tanks, rather
than accessing local gas stations or fuel distributors.
· Determining whether above-ground or underground fuel tanks are
the most acceptable and/or environmentally safe.
· Identifying the potential liability factors.
· Assessing whether to maintain the current locations or reassess
their placement. Currently there are five located at fire stations #1,
#3, #6, #9, #10, and one at the Corporation Yard.
· In addition to the above-mentioned locations, the Fire Department
has a 110 gallon fuel truck and the Equipment Division has one 500
gallon and one 200 gallon fuel trucks. Fuel trucks are also available
from fuel distributors for emergency situations.
MEMORANDUM
"WE CARE"
DATE: MAY 24, 1995
TO: ALAN TANDY, CITY MANAGER
FROM: MICHAEL R. KELLY, FIRE CHIEF~
SUBJECT: 1995-96 BUDGET WORKSHOP RESPONSE
Below is a comparison of the 1994-95 budgeted and actual personnel
overtime and the 1995-96 proposed budget for same:
Budget Expended* Proposed
1994-95 1994-95 1995-96
3011-521 $1,495 $2,510 $1,500
Administration
3021-523 $21,706 $18,852 $24,218
Prevention
3021-524 $1,506 $308 $1,300
Environmental
3021-525 $15,574 $41,027 $16,442
Communications
3021-526 $1,221 $28 $1,289
Maintenance
3031-527 $360,008 $384,032 $425,000
Suppression
3031-528 $3,114 $10,761 $3,614
Training
* Actual expenditures as of April 30, 1995
4.5 remaining pay periods in 1994-95.
The Administration overtime exceeded the Budget due to personnel
shortages and the learning curve associated with the HTE computer
conversion for the budgeting module. Communications exceeded its
budgeted overtime due to vacant positions.
Suppression and Training exceeded their overtime because of
employee shortages due mainly to extended sickleave, industrial
injuries and vacant permanent positions.
Page -2-
May 24, 1995
Our academy is graduating May 26; this will add a total of fourteen
(14) Firefighters to our Suppression force which should decrease
our overtime in June. We estimate our total overtime to be
$410,000 for the 1994-95 fiscal year in the Suppression Division.
We experienced an unusual year in the number and longevity of
injuries'. As a note, we have not had 'any significant overtime
expenses for a large emergency this fiscal year.
The 1994-95 Suppression overtime was for eleven fire stations. We
will have twelve stations in 1995-96.
MRK/kec
MBMO\K~LLY\WORKSHOP.RES
BAKERSFIELD
MEMORANDUM
/.M~ 24, 1995
TO: ALAN TANDY, CI~AGER ~./ /
FROM' ,JOHN W. STI'NSON, ASSISTANT ClTY MANAGER
SUB,JECT: RESPONSE TO BUDGET WORKSHOP QUESTION
This memo is in response to the question regarding my responsibilities once the
Human Resources Manager position is filled. The primary responsibility of the
Human Resources Manager would be the day-to-day management and direction of the
Human Resources Division. I would still oversee the general activities of the
division and would continue to be involved directly in appeals of disciplinary
matters, labor negotiations (we will have Management, General Supervisory, Fire
and Miscellaneous negotiations within the next six months), overseeing the work
of the health care consultant with the Joint City/Employee Insurance Committee
(provider renewals and retiree medical insurance which will involve meetings with
retirees and union representatives), overseeing selection of outside consultants
(City Physician and Police Psychologist are up for renewal - Request for
Proposals, the selection process, interviews and contracts must be prepared).
I will be involved in any serious personnel matters which may occur, particularly
those which may involve potential litigation. I will perform other duties
typical of a department head overseeing a division such as personnel matters,
budgeting and long-range planning.
I would also continue my management and oversight of the Risk Management Division
in a similar manner. This would include overseeing the transition to an outside
claims administrator for worker's compensation. I also review claims settlement
documents and will continue our efforts to provide better claims information to
City management and the City Council. I am working with the City Attorney to
improve communication and tracking of liability claims, particularly those which
become litigated. This is to assess potential costs to the City and monitor our
claims history for signnificant trends.
In addition to these duties, I would continue to perform the following tasks
within the City Manager's Office:
· Council Committee Staffing
I currently staff the Intergovernmental, Personnel, and Community
Services Council Committees. This involves preparing agendas,
coordination of department staffs on agenda items, and preparing
minutes and reports resulting from committee meetings.
· Permit Streamlining
I continue to make sure the recommendations from the report ~re
tracked regarding staff follow-up and implementation. This involves
meeting with departments to make sure implementation and processing
required Ordinance changes is occuring. Progress reports to Council
are also my responsibility.
ALAN TANDY, CITY MANAGER
May 24, 1995
Page -2-
· City Council Agenda Preparation
I currently share this assignment with you and Gail. This involves
the complete review of each agenda and working with the City Clerk,
City departments and the City Attorney's Office to make required
changes prior to the submittal of the agenda to the City Council. It
also requires the preparation of the "Agenda Highlights" memorandum.
· Booking Fee Agreement
I am working closely with the Police Department, and the County, to
resolve this issue. It will involve meeting with the County and the
preparation of the proposed agreement for a flat fee amount.
· Property Tax Split
I am working with other cities, and the County, reviewing the tax
split figures and assisting you with negotiations. I am also
negotiating tax splits for annexations in process with the County
Administrative Office. This involves significant analysis and
communication of budgetary and cost figures for all Kern County cities
and the County.
· Park Development Fees
I am working with North Bakersfield Recreation and Park District
regarding the issue of park development fees in newly developing
areas. This will involve analysis and research with the Development
Services and Community Services departments and discussions with the
Recreation and Park District and Kern County to accomplish equity in
the fee.
· Human Resources Streamlining
I am beginning this project to streamline the Human Resources Division
to make it more responsive to City departments. This will require
liason with department heads, unions, Civil Service Commissions, and
a special committee. Recommended implementation will involve
significant work with the City Attorney's Office to prepare
appropriate revisions to memorandums of understanding, administrative
rules and ordinance preparation. There will also be ongoing committee
and Council communication.
· Emergency Medical Care Advisory Board
I am the appointed representative of the Kern County City Manager's
Association on this County-wide board dealing with ambulance
regulation and emergency response. This includes the involvement of
Police and Fire personnel in emergency medical responses.
· Intergovernmental Relations
I continue to spend time working with other Kern County cities to
develop good working relationships and to discuss common issues. This
includes attending Ci~ty Manager and Kern County Association of Cities
meetings and performing analysis of current issues. Recently, I
assisted the City of Delano in communicating the impacts of the tax
split issue to their City Council.
ALAN TANDY, CITY MANAGER
May 24, 1995
Page -3-
In addition to these specific tasks, I respond to numerous Councilmember requests
for information or assistance such as student tours, attending public meetings,
speaking engagements on behalf of the City (I will be presenting the State of the
City Address with the Mayor), and other typical support functions.
These are current and projected assignments. As you are aware, new issues and
priorities develop and different or additional projects are anticipated based on
the needs of the office.
.jws
BAKERSFIELD
MEMORANDUM
May 25, 1995
TO: ALAN TANDY, CITY MANAGER
FROM'.~.B. TEUBNER, ASSISTANT TO THE CITY MANAGER
SUBJECT: HISTORY OF EXECUTIVE PERSONNEL COMPLEMENT
Attached is a brief history of the Executive Department's personnel complement
from FY 91-92 to FY 95-96, in response to Councilmember Salvaggio's questions.
The attached list provides narrative detail for all increases and decreases in
personnel in each division of the Executive Department.
if you need any additional information, please let me know.
HISTORY OF COMPLIMENT CHANGES FOR THE EXECUTIVE DEPARTMENT
FY 91-92 ADOPTED THROUGH FY 95-96 PROPOSED
DIVISION # OF EMPLOYEES
City Manager
FY 91-92 7.95
FY 92-93 7.95
FY 93-94 6.28 In this fiscal year, J. Stinson was reclassed to Asst. City Manager and reallocated 1/3 of his time to each of 3 divisions. An Internal Auditor positi n was deleted
and an Acct. I position was transferred to Finance. Also, a second Asst. City Manager position was added.
FY 94-95 6.28 In this fiscal year, a vacant Budget Analyst position was deleted and the Asst. to the City Manager position was reinstated.
FY 95-96 6.28
Human Resources
FY 91-92 7.00
FY 92-93 8.00 In this fiscal year, the Benefits Coordinator position was transferred to H.R. from the Risk Management Division.
FY 93-94 7.33 In this fiscal year, the H.R. Manager position was deleted and 1/3 of J. Stinson was allocated to H.R.
FY 94-95 8.33 In this fiscal year an additional secretary position was added to assist with increased workload.
FY 95-96 9.33 In this fiscal year, it is proposed that the H.R. Manager position be reinstated to deal with increased workload.
Risk Management
FY 91-92 6.00
FY 92-93 5.00 In this fiscal year, the Benefits Coordinator ~position was transferred out of Risk Management to the Human Resources Division.
FY 93-94 4.34 In this fiscal year, a Clerk-Typist position was deleted and 1/3 of J. Stinson was allocated to this Division.
FY 94-95 4.34
FY 95-96 3.34 In this fiscal year, it is proposed that the Worker's Comp. Coordinator position be deleted due to contracting out for Worker's Comp administration.
City Clerk
FY 91-92 7.00
FY 92-93 7.00
FY 93-94 7.00
FY 94-95 7.00
FY 95-96 7.00
Data Processing
FY 91-92 7.00 In this fiscal year, a Technician position was added.
FY 92-93 7.00
FY 93-94 7.00
FY 94-95 8.00 In this fiscal year, the MIS Manager position was added as part of the reorganization of this Division.
FY 95-96 8.00
9:1 7 AM5125195EXC3.XLS
CITY OF BAKERSFIELD
Personnel by Division
': ::i:.::::;::.::? . ':' ':. '::':::i: : :::::i!:.:ii:!iiii!;:.:..i~:.::.~Abth°rized AUthb?'iz~idi:':A~th:~rized
.ii ::;...: :.: ?'i:::::: ::
Administrative Services 10.05 10.05 10.05 8.00 8.00 8.00
Suppression Services 169.00 170.00 170.00 166.00 165.00 171.00
Safety Services 13.95 13.95 13.95 13.00 13.00 12.00
Support Services 10.00 10.00 10.00 9.00 9.00 9,00
Fire Services 203.00 204,00 204,00 196.00 195.00 200,00
Engineering Services 49.60 50.60 51.60 50.52 52.52 52.52
General Services 52,39 53.39 53.39 48.96 50.25 50.25
Streets 57.25 57,25 57.25 55.33 52.44 53.44
Equipment 49,25 49.25 49.25 46.30 46.25 46.25
Wa stewate r 27.51 27.51 27.51 27.56 27,54 27.54
Solid Waste 59.34 59,34 59.34 58.33 53.10 53.10
Public Works 295,34 297.34 298.34 287.00 282.10 283.10
Ag ric u Itu ral Water 18.13 18.13 18.13 16.44 16.45 16.45
Domestic Water 2,53 2.53 2.53 2.23 2.45 2.45
Water Resources 20.66 20.66 20.66 18.67 18,90 18.90
Parks 62.66 62.66 62.66 58.67 59.67 61.67
Recreation 8.67 9.67 9.67 9.67 9.67 9.67
Convention Center 18.67 19.67 19.67 17.67 17.67 17.66
Community Services 90.00 92.00 92.00 86.01 87.00 89.00
Planning 21.00 21.00 21.00 19.50 19.50 19.00
Building 30.00 32.00 32.00 30,50 31.50 34.00
Planning/Building 51,00 53.00 53.00 50.00 51.00 53,00
CITY OF BAKERSFIELD
Personnel by Division
· i';¥':':::.ii:;i:-i'':~: :?:!!:. !;::.: 'ii.i: ?:/::;:'i ';"i ~::!::':' ': ii~Adthbriz~d;!:: :Auth:brized~:.i:~::AdthOri2ed;:.::: AUth0riZ~d ~ AUth~:ti2~d pr~p~'~d :
Community Development 9.60 9.60 9.60 8.60 9.60 9.60
Eoonomic Development 7.45 7.45 7.45 6.45 6.45 6.45
Community/Econornic Dev. 17.05 17.05 17.05 15.05 16.05 16.05
Total Employees 1,077.00 1,096.00 1,099.00 1,060.73 1,073.00 1,092.00
FY 1995/96 DEPARTMENT BUDGET PRESENTATIONS
QUESTIONS/RESPONSES
Date: May 22, 1995
Question Response Councilmember
No. 3: What State and Federal entitlement Carson
revenues does the City receive; how much
from each source; and how is it allocated in
each department's budget?
No. 4: What is the status on progress of DeMond
City fuel needs assessment?
No. 5: What was budgeted for Fire McDermott
Department personnel overtime in FY 94-95
versus the actual year-to-date expenditures
for FY 94-95 and the proposed budget
amount for overtime for FY 95-967
No. 6: What will be Assistant City Manager Salvaggio
Stinson's duties and responsibilities once
the Human Resources Manager is hired?
No. 7: What are the changes in the Salvaggio
Executive Department's complement list
over the past five years?
BAKERSFIELD
MEMORANDUM
May 22, 1995
TO: . DEPARTMENT HEADS
FROM: ALAN TANDY, CITY MANAGER ~ '~ '~'-~
SUBJECT: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
The following questions posed by the City Council during budget workshop sessions
requires a response from your department. Responses are to be in memo form and
forwarded to my office not later than the Thursday proceeding the workshop in question.
All responses will be forwarded to the Council in their Friday packet.
If you have any questions or need clarification, do not hesitate to ask. Responses to
budget inquiries must be immediate!
Wednesday, May 22, 1995
Finance: Provide detail of what State and Federal entitlement revenues does the City
receives, how much from each source and how it is allocated in each
department's budget. (Carson)
cc: Gail Waiters
Dolores Teubner
BAKERSFIELD
MEMORANDUM
TO: DEPARTMENT HEADS 'r'''. ''' : ' '
FROM: ALAN TANDY, CITY MANAGER ~ .
SUBJECT: FISCAL YEa, R 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
The f°llowing questions posed by the City Council during budgot'workshopse~qions
requires a response from your department. Responses are to bo in memo form and
forwarded to my office not later than the Thursday proceeding the workshop'in quo~on.
All responses will be forwarded to the Council in their Friday packet.
If you have any questions or need clarification, do not hesitate to ask. Responds to
budget inquiries must be immediate!
Wednesday, May 22, 1995
Executive: Provide a status report on progress of City fuel needs.assessment
requested from the Equipment Division with the assistance-of the Fire
Department. (DeMond)
cc: Gail Waiters
Dolores Teubner
BAKERSFIELD
MEMORANDUM
May22,1995
TO: DEPARTMENT HEADS
FROM: ALAN TANDY, CITY MANAGER~'~/
SUBJECT: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
The following questions posed by the City Council during budget workshop, sessions
requires a response from your department. Responses are to be in memo form and
forwarded to my office not later than the Thursday proceeding the workshop in question.
All responses will be forwarded to the Council in their Friday packet.
If you have any questions or need clarification, do not hesitate to ask. Responses to
budget inquiries must be immediate!
Wednesday, May 22, 1995
Fire Department: Provide a comparison of what was budgeted for Fire Department
personnel overtime in FY 94-95 versus the actual year-to-date
expenditures for FY 94-95 and the proposed budget amount for
overtime for FY 95-96. Provide narrative detail of any increases or
decreases. (McDermott)
cc: Gail Waiters
Dolores Teubner
BAKERSFIELD
MEMORANDUM
.. May 22,.;1995
TO: DEPARTMENT HEADS ..........:....: .,'..~. ~ .-
FROM: ' ALAN TANDY, CITY MANAGER~ ~ ~"T' ."" ' .
SUBJECT: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESP~)NSES-
The following questions posed by the City Council during budget workshop Sessions
requires a response from your department. Responses are to be in memo form and
forwarded to my office not later than the Thursday proceeding the workshop in question.
All responses will be forwarded to the Council in their Friday packet.
If you have any questions or need clarification, do not hesitate to ask.- Responses to
budget inquiries must be immediate!
Wednesday, May 22, 1995
Executive: Provide detail of what Assistant City Manager Stinson's duties and
responsibilities will be once the Human Resources Manager, is hired.
(Salvaggio)
cc: Gail Waiters
Dolores Teubner
BAKERSFIELD
MEMORANDUM
May 22, 1995
TO: DEPARTMENT HEADS
FROM: ALAN TANDY, CITY MANAGER'~/~ ~'¢ 74T
SUBJECT: FISCAL YEAR 1995/96 BUDGET WORKSHOP QUESTIONS/RESPONSES
The following questions posed by the City Council during budget workshop sessions
requires a response from your department. Responses are to be in memo form and
forwarded to my office not later than the Thursday proceeding the workshop in question.
All responses will be forwarded to the Council in their Friday packet.
If you have any questions or need clarification, do not hesitate to ask. Responses to
budget inquiries must be immediate!
Wednesday, May 22, 1995
Executive: Provide a narrative explanation for the changes in the Executive
Department's compliment list over the past five years. (Salvaggio)
cc: Gail Waiters
Dolores Teubner
FY 1995/96 BUDGET WORKSHOP
QUESTIONS/RESPONSES
Date: May 17, 1995
Question Response Councilmember
No. 1: What is being done with the fencing Staff will have to investigate the options further. A DeMond
around the City's Corporation Yard? preliminary review of the project suggested that trees,
shrubs, fencing and irrigation would be needed.
However, there may be a need to make improvements to
the canal bank to accommodate the fencing, as well as
an assessment of additional sidewalk.
No. 2: What was the personnel Some fluctuations resulted from streamlining efforts, as Salvaggio
complement for each department prior to well as general reorganizations. Several departments are
the budget cuts of 1993/947 currently below the 92/93 level, due to budget cuts
(instead of streamlining efforts). However, because of
gains and losses citywide, the proposed total
complement for 1995/96 is only seven below that of
1992/93.
CITY OF BAKERSFIELD
Personnel by Division
· i :::.: : :.i ~i::i : :.i: ."" ': i:i' ::Adthorized .iAUth°ri~ed: 'Authbi~i~d
Mayo r 1.00 1.00 1.00 1.00 1.00 1.00
General Government 1.00 1.00 1.00 1.00 1.00 1.00
City Manager 7.95 7.95 7.95 6.33 6.28 6.28
City Clerk 7.00 7.00 7.00 7.00 7.00 7.00
Human Resources 7.00 7.00 8.00 7.33 8.33 9,33
Risk Management 5.00 6.00 5.00 4.34 4.34 3.34
Data Processing 6.00 7.00 7.00 7.00 8.00 8.00
Executive 32,95 34.95 34.95 32.00 33.95 33.95
Finance 28.00 28.00 28.00 0.00 0,00 0,00
Administration 3.00 3,00 4,00
Accounting and Reporting 13,00 14.00 14.00
Treasury 7.00 7,00 8.00
Purchasing 3.00 3.00 3,00
Financial Services 28.00 28.00 28.00 26.00 27.00 29.00
Legal Counsel 14.00 15.00 16.00 16.00 16.00 16.00
City Attorney 14.00 15.00 16,00 16.00 16.00 16.00
Administrative Services 52.00 55.00 55.00 58.00 15.00 15.00
Operations 216.00 221.00 222.00 215.00 223.00 229.00
Investigations 56.00 57,00 57.00 60.00 61,00 62.00
Support Services 0.00 0.00 0.00 0.00 46.00 46,00
Police Services 324.00 333.00 334.00 333.00 345.00 352.00
CITY OF BAKERSFIELD
Personnel by Division
....
'::: :::i: : Pr°qr~:ms :';: :: i: :::: ~ ~ii ~: ~: ': i:~9'0:~91 :'::.
Administrative Services 10.05 10.05 10.05 8.00 8,00 8.00
Suppression Services 169.00 170.00 170.00 166.00 165.00 171.00
Safety Services 13.95 13,95 13.95 13.00 13.00 12.00
Support Services 10,00 10.00 10.00 9.00 9.00 9.00
Fire Services 203.00 204.00 204.00 196.00 195.00 200.00
Engineering Services 49.60 50.60 51.60 50.52 52.52 52.52
General Services 52.39 53.39 53.39 48.96 50.25 50,25
Streets 57.25 57.25 57,25 55.33 52.44 53.44
Equipment 49.25 49.25 49.25 46.30 46.25 46.25
Wastewater 27.51 27.51 27.51 27.56 27.54 27.54
Solid Waste 59,34 59.34 59.34 58,33 53.10 53,10
Public Works 295,34 297.34 298.34 287.00 282,10 283,10
Ag ric u Itu ral Ware r 18.13 18.13 18.13 16.44 16,45 16.45
Domestic Water 2.53 2.53 2.53 2.23 2.45 2.45
Water Resources 20.66 20.66 20.66 18.67 18.90 18.90
Parks 62.66 62.66 62.66 58.67 59.67 61.67
Recreation 8.67 9.67 9.67 9.67 9.67 9.67
Convention Center 18.67 19.67 19.67 17.67 17.67 17.66
Community Services 90.00 92.00 92.00 86.01 87.00 89.00
Planning 21.00 21.00 21.00 19.50 19.50 19.00
Building 30.00 32.00 32.00 30.50 31.50 34.00
Planning/Building 51.00 53.00 53.00 50.00 51.00 53.00
CITY OF BAKERSFIELD
Personnel by Division
"::.i:..: '!'"'::";: ?. i :: '::i~.:i::?:.:.:.: ::' i. ::::i:i ..: : '.:':i'~:.i ~'A~th~'rized''.. :AUth'~:riz~:d ~!:AUth°tiZed i: :i!i:::i:Auth0~i~d
· :.i: :;:::: :::::i ~:':..: ;:.': P ~C~ q fa m s: :;::. :: i;:; .'. :;;!::::.;i::; :::: ::::~i:~:~:~:§:~i:!ii;: .':..:: :1 :'91~ i:: ~gi~ ~::~: :::~:i ~::~9~:~::9:~: ::: ~::99:3:~ 19~; ~: ~: i i ::i:: ~ ?: ~: ~ii:~:§:~:.!!i !i:.~:i i~.
Community Development 9.60 9.60 9.60 8.60 9.60 9.60
Economic Development 7.45 7.45 7.45 6.45 6.45 6.45
Community/Economio Dev. 17.05 17.05 17.05 15.05 16.05 16.05
Total Employees 1,077.00 1,096.00 1,099.00 1,060.73 1,073.00 1,092.00
MEMORANDUM
April 14, 199§
TO: JOHN STINSON, ASSISTANT CITY MANAGER
FROM; PAMELA McCARTHY, ASSISTANT CITY CLE~. ~~
This is in response to your question regarding the impact of the postage rate
increase on the fee charged for the Agenda/Minute Mailing Service.
Currently the postage rate for 2 ounces (average mailing) of First Class ma~ is 50.4
cents (pre-sort rate). This increased from the former postage rate of 47.8 cents
(2.6 cents). As you can see postage is a relatively small portiofl of the cost of
mailing and the postage increase was not significant enough to warrant an increase
in the $3.00 charge.
If you need any additional information regarding this matter, please contact me.
:pm
cc: Gall Waiters, Assistant City Manager
MANAG ER~STINSON . MEM
· · · · ee · e~l-e el . · · ee eee · · e!
DRAFF
March 3, 1995
ORDINANCE NO.
AN ORDINANCE AMENDING CHAPTER 8.44
OF THE BAKERSFIELD. MUNICIPAL CODE
RELATING TO FIREWORKS.
BE IT ORDAINED by the Council of the City of Bakersfield
as follows:
SECTION 1.
Chapter 8.44 of the Bakersfield Municipal Code is hereby
amended to read as follows:
Chapter 8.44
FIREWORKS
Sections:
8.44.010 Definitions.
8.44.020 permit required.
8.44.030 Application - Issuance - Fee.
8.44.040 Regulations.
8.44.050 Revocation.
8.44.060 Appeal.
8.44.010 Definitions.
Whenever used in this chapter, unless a different meaning
clearly appears from the context, the words set out in this section
shall have the following meanings:
A. "Person" means any individual, partnership,
corporation or association of any nature whatsoever.
8.44.020 Permit required.
It is unlawful for any person to sell or offer for sale
or expose for sale within the city any fireworks in violation of
this chapter or without having a valid permit therefor in
accordance with the provisions of this chapter.
8.44.030 Application - Issuance - Fee.
A. A permit for the sale of safe and sane fireworks may
not be issued applicants unless they meet the following
qualifications:
March 3, 1995
1. A nonprofit organization or corporation
organized and existing primarily for veteran, patriotic, religious,
welfare, charitable or civic-betterment purposes, organized and
established in the City at least one year prior to the filing of
application for permit under this chapter and having a bona fide
membership of at least thirty-five members; provided:
2. Retail (for profit) business establishments
which have, for a period of at least one year prior to the filing
of an application for permit under this chapter, held a valid
business tax certificate issued by the city under Chapter 5.02 of
this code; provided, no such permit shall be issued to any such
retail business establishment unless such establishment was issued
a permit the previous year.
3. Any entity which held a permit issued by Kern
County for a particular location the previous year, which location
was subsequently annexed to the City within the past year, shall be
treated as if it had held a permit from the City for purposes of
this section.
4. A permit shall not be issued unless the person,
applying for the permit has first obtained a permit or license from
the State Fire Marshall under Part 2, Division 11 of the Health and
Safety Code of the state.
B. All recipients of Fireworks permits except those
specifically exempted in paragraph C herein, shall be selected by
a drawing (by lot) conducted by the City Manager or his/her
designee.
C. The total number of fireworks permits to be issued
shall not exceed one permit per 4,000 population, or portion
thereof, in the City of Bakersfield, as set forth in the annual
report of the State Department of Finance; but not less than fifty.
Provided, however, any person applying for a fireworks permit who
had such a permit in 1994 and also in the previous year shall be
issued a permit if otherwise qualified without being included in
the drawing, notwithstanding the fact that such issuance may
increase the number of permits to more than that allowed herein.
D. Applications for Fireworks Permits shall be
submitted after March 15th and before May 15th of each year. No
applicatiOns shall be accepted nor processed by the City after May
15th of each year.
E. Applications for Fireworks permits shall be made on
forms to be furnished by the city manager or his designee, shall'be
signed under penalty of perjury by the applicant and shall require
· ' March 3, 1995
the following information and documents:
1. The name, address and telephone number of the
nonprofit organization or retail business establishment for which
application is made;
2. The applicant's business tax certificate number
if it is a retail business establishment, and the name and address
of all owners of such business;
3. The location of the proposed fireworks sales;
and
4. The purpose of the nonprofit organization or
corporation, its principal and permanent meeting place; the
approximate date of its establishment in the city; the total number
of its local membership; the names and addresses of its
officers.
5. A plot plan drawn to scale, showing the
location of the temporary fireworks stand, utilities, location of
permanent and temporary structures, curb cuts and/or driveways and
identifying the nearest available sanitary facilities, and fire
hydrants;
6. A written authorization from the owner of the
location or person in lawful possession thereof, if other than the
applicant, for the locating of the business upon his or her
property.
7. Evidence, satisfactory to the city manager or
his designee, of (1) general liability insurance providing coverage
on an occurrence basis for bodily injury, including death of one or
more persOns, property damage and personal injury, with limits as
required by the city; and (2) workers' compensation, with statutory
limits and employers liability insurance with limits as required by
the city. All policies required of the'applicant hereunder shall
be primary insurance as to the city, its mayor, council, officers,
agents, employees and volunteers and any insurance or self-
insurance maintained by the city, its mayor, council, officers,
agents, employees and volunteers shall be considered excess
insurance, over and above the applicant's insurance and shall not
contribute with it. The applicants shall save, ~hold harmless and
indemnify the city, its officer, agents, employees and volunteers
from all claims, demands, damages, judgments, costs or expenses in
law or equity that may at any time arise from or is anY way related
to any work performed by applicant, his agents or employees under
the terms of any permit issued under this chapter.
March 3, 1995
8. Cash bond in the sum of one hundred dollars, to
be forfeited to the city in the event the permittee fails to remove
said stand, equipment and rubbish from the premises upon which the
stand is located before twelve noon on July 15 of the year for
which said permit is granted. The cash bond shall be returned to
the applicant upon full performance of the requirements of this
chapter.
9. Approval from the Public Works Department of the
City that operation of the Fireworks stand at the proposed location
will not present any substantial hazard to vehicular or pedestrian-
traffic.
F. Location of temporary stands may.not be changed
after an application is filed except as required by the city, or
where there is evidence of change in property ownership or
management and prior approval or consent has been revoked by the
new owners or managers.
G. No one organization or business may receive more
than one permit for fireworks sales during any one calendar year.
I. All permits issued under this chapter shall remain
in effect from noon on July 1 to noon on July 5 unless earlier
suspended or revoked.
J. The applicant shall pay a fee not to exceed the cost
of processing any such application and inspecting such business as
set forth in Section 3.40.070.
K. 'Permits may be issued with conditions to ensure that
the business will be operated in a safe and legal manner, will not
disturb the peace and quiet of the neighborhood and will not
constitute an undue burden on city resources.
8.44.040 Requlations.
A. Those fireworks which are'classified as "dangerous
fireworks" under Section 12505 of the California Health & Safety
Code are prohibited, except that such fireworks as are defined and
classified as "safe and sane fireworks" in Section 12529 of the
California Health and Safety Code may be displayed, sold and used
pursuant to the provisions of this chapter and not otherwise.
B. No permit holder shall shout, make any outcry, blow
a horn, ring a bell or use any other sound device including any
loudspeaker, radio or amplifying system where sound of sufficient
volume is emitted or produced therefrom capable of being plainly
- 4 -
March 3, 1995
heard upon the streets, alleys, parks or other public places.
C. Any permit issued pursuant to this chapter shall be
non-transferrable, and shall be valid only as to the applicant and
location provided on the application for such permit.
D. E~cept as expressly permitted by and in accordance
with the provisions of Chapter 12.44 of this code, the sale, ~offer
to sell, advertising or display of merchandise on any street or
sidewalk in the city is prohibited.
E. All retail sales of safe and sane fireworks shall be
permitted only from a temporary fireworks stand and the sale from
any other building or structure is prohibited.
F. No fireworks stand shall be located within one
hundred feet of any gasoline storage or gasoline pump or any garage
or within thirtY feet of any other building, or within six hundred
feet of any other fireworks stand.
G. Fireworks stands need not comply with the provisions
of the building code of the city except that the building official
shall have authority to require that stands be constructed in a
manner~which will reasonably insure the safety of attendants and
patrons.
H. Fireworks stands shall be located only in a C-1
zoning district or a zoning district less restrictive than C-l,
unless located upon property owned and occupied by a church and/or
school, which church or school is either a legal or legal
nonconforming use of such property, and the fireworks stand is
located no less than three hundred feet (300') from the property
line of any residence.
I. All temporary stands for the display and sale of
fireworks'shall obtain an electrical permit from the city building
department.
J. If a toilet is not immediately available during all
open or sale hours of the fireworks stand, then an approved
chemical one must be provided.
K. Each'stand in excess of twenty-four feet in length
must have at least two exits. Each stand in excess of forty feet
in length must have at least three exits.
L. Each stand shall'be provided with not less than two
2A 10 BC-type fire extinguishers, underwriter approved, in good
working order and easily accessible for use in case of fire.
-- 5 --
March 3, 1995
M. No person shall light, or cause or permit to be
lighted, any 'fireworks or any other article or material within any
such stand, or within fifty feet thereof.
N. No smoking Shall be allowed in any stand, nor within
fifty feet thereof. "No Smoking" signs shall be prominently
displayed.
O. All weeds and combustible material shall be cleared
from the location of the stand, including a distance of at least
twenty feet surrounding the stand.
P. There shall be at least one adult in attendance
during the open or sale hours of the fireworks stand. No minor
under the age of eighteen shall be permitted in a stand.
Q. All permits must be posted in a conspicuous place.
~R. Fireworks shall be sold only between the hours of
twelve noon, July 1st, to twelve noon on July 5th.
S. Permittee shall strictly comply with all provisions
of the State Fireworks Law (Sections 12500 et seq. of the Health
and Safety Code).
T. The fireworks stand shall be removed from the
temporary location by twelve noon on July 15th, and all
accompanying litter shall be cleared from said location on or
before said time.
U. Night watchman accommodations shall not be closer
than twenty-five .feet from the fireworks stand.
V. No fireworks_shall be placed in any fireworks stand
until a permit for such stand has been issued by the citY.
W. Any person who receives a notice to correct any
violation of these regulations or any other condition~ of the
permit, and who fails to correct such violation within the time
prescribed in the notice, may be assessed a fee not exceeding the
city's cost of reinspection in accordance with Section 3.70.040 of
this Code.
8.44.050 Revocation.
Any permit 'issued pursuant to this chapter shall be
immediately revoked by the city manager or his designee whenever he
finds:
/
- 6 -
DRAFT
March 3, 1995
A. That misrepresentations were made on the
application; or
B. That any of the terms or conditions of said permit
have been violated, or that the business has been operated in
violation of local, state or federal law.
8.44.060 Appeal.
A. Should any applicant be dissatisfied with the
decision of the city manager or his designee not to grant a permit
or to revoke a permit, then said applicant may, no 'later than ten
days after notice of such'decision is deposited in the United
States mail, addressed to the applicant or permittee at the address
provided on the application, make written objection to the city
council setting forth the grounds for dissatisfaction, whereupon
the council shall hear said objections at a regular meeting no
later than three weeks following the filing of the objection with
the city clerk. The applicant shall be given written notice no
less than three days prior to said hearing. The council may, upon
said hearing, sustain, suspend or overrule the decision of the city
manager or his designee, which decision shall be final and
conclusive.
B. Pending the hearing before the council, the decision
of the city manager or his designee shall remain in full force and
effect and any reversal thereof by the city council shall not be
retroactive but shall take effect as of the date of the council's
decision.
SECTION 2.
This Ordinance shall be posted in accordance with
provisions of the Bakersfield Municipal Code and shall become
effective thirty (30) days from and after the date of its passage.
o0o
- 7 -
I HEREBY CERTIFY that the foregoing Ordinance was passed
and adopted by the Council of the City of Bakersfield at'a regular
meeting thereof held on , by the following
vote:
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED
BOB PRICE
MAYOR of the City of Bakersfield
APPROVED as to form:
JUDY K. SKOUSEN
CITY ATTORNEY
By:
LAURA C. MARINO
Assistant City Attorney
JKS/meg
ORD 95-1 \FIRkAVRK4 .ALT
March 3, 1~5
- 8 -
Debra L~. Johnston, RN, MSN
Family Nurse Practitioner
S. A. R. T. Coordinator
Bakersfield Memorial Hospital
420 34th Street
P.O. Box 1888 /Bakerstield, CA 93303-1888
Telephone: (805) 327-4847, Ext. 3140
Voice Mail: (805) 6Sl-7818
Community Need Community Support
Prior to 1994, Bakersfield did not have a coordinated ~ ~ Our trained staff are now providing this service to
program to meet the unique needs of sexual assault If you are sexually assaulted, the women and men who fall victim to sexual
and rape victims -- local hospitals were simply not we want to help you. assault. However, there are still many opportunities
prepared to diagnose and treat victims of sexual for community support of the SART program.
assault in their emergency rooms. Call the police and ask them to take you
to Bakersfield Memorial Hospital. Funding is needed for those nurses who are willing
As a result, 30 percent of reported rape cases in Kern ~ J/ to be trained as Sexual Assault Nurse Examiners.
County did not proceed to trial due to inadequate Those already trained need ongoing education to
evidence collection, keep up with advances in medical treatment and
evidence collection.
To address this problem, agencies around the county
developed the Sexual Assault Response Team If you or your organization would like to support
(SART) at Bakersfield Memorial Hospita!. Trained Staff the SART program, please contact Debbie Johnston,
The SART program employs certified Sexual Assault SART Program Coordinator, at 3274647, extension
Nurse Examiners who are on call 24 hours a day. 3140 or Debbie Touchstone, Nurse Manager, at 327-
What Is SART? c~ These nurses are specially trained to provide proper 4647, extension 3173.
SART (Sexual Assault Response Team) is designed medical treatment, perform forensic examinations,
to help victims of sexual assault and to collect the and give courtroom testimony. Follow up exams are
also conducted by the nurses provide comparison Commitment ,~
proper information and evidence needed to pros-
ecute individuals who commit rape and sexual evidence and treatment. Since opening in 1956, Bakersfield Memorial Hospi-
assault, tal has had an ongoing commitment to the health of
women and children. We continually look for new
SART is a coordinated effort involving: Privacy ways to improve and expand our services in this area
.The Medical Community ' In addition to special staff, this unique program uses and to address the needs of our community.
Law Enforcement a dedicated medical treatment room with a separate
The District Attorney entrance for the victims. In this private area, coun- We are pleased to provide the needed facilities for
Alliance Against Family Violence seling and medical treatment are the top priority, the city's Sexual Assauk Response Program.
Rape in America
· Every single minute in America, there are 1.3
forcible rapes of adult women; 78 women are
forcibly raped each hour.
One out of every eight adult women, or at least
12.1 million American women, has been the
victim of forcible rape.
· Women under the age of 18 account for more
than six out of 10 rape cases (61%).
·police.Only 16 percent of rapes are ever reported to the
One in three women and one in 10 men will be
sexually assaulted at some point in their lives.
Rape in Bakersfield
~ Approximately 200 forcible rapes of adult
women and 600 child molestations are reported
in Bakersfield annually.
The Alliance Against Family viOlence reports
that 1,354 persons contacted their agency regard-
ing sexual assault assistance in 1993.
A coordinated program to help
victims of sexual assault and rape
Bakersfield MemOrial Health Foundation
420 34th Street
Bakersfield, California 93301
805/395-1259 ~
BAKERSFIELD MEMORIAL HOSPITAL
Emergency Department
MEMORANDUM
TO: Bakersfield. City Council Members
FROM: Debra Johnston, SART Coordinator
DATE: February 17, 1995
SUBJECT: Bakersfield Memorial Hospital
Sexual Assault Response Team Informational Report
The following information is attached for your review:
SART PROGRAM OVERVIEW
COST SAVINGS ASSOCIATED WITH SART PROGRAM
1994 STATISTICAL SUMMARY
SEXUAL ASSAULT RESPONSE TEAM BROCHURE
LETTERS OF SUPPORT (to be distributed at meeting)
Bakersfield Police Department
Kern County District Attorney's Office
BAKERSFIELD MEMORIAL HOSPITAL FEBRUARY 1995
SART PROGRAM
What is an organized SART and how does it work?
Traditionally, when victims of sexual assault call 911, police officers take them to hospital ERs,
where they might wait up to 12 hours for necessary, 2-3 hour interview and physical exams.
Survivors can lose heart during a process that feels like a continuation of the assault, police
officers lose valuable time, and ER staff have to juggle victims' needs with those of more critical
medical cases. With every hour that passes between the assault and the eXam, the body is
absorbing bodily fluids and semen that could be evidence. A timely exam is critical, not only
for evidence gathering, but also for the psychological well-being of the victim.
There is just no place for a sexual assault victim in an emergency room and ER physicians do
not have the time needed for the evidentiary examination. Since evidence collection is forensic -
belonging to, used in, or suitable for use in courts - and not medical, there are few health care
practitioners who have received special education in this field. ER Physicians receive little or
no training on how to do this precise and time-consuming, meticulous examination. Most of the
victims have just been assaulted by a male and for them the sight of another male can trigger
a negative response.
"Some victims wouldn't consent to the exam until they knew that no male doctor
would be around. It's important that we can be sensitive to the trauma these
patients have experienced."
- Carolyn Fisher
Santa Cruz SART SANE
A Sexual Assault Response Team (SART) is made up of a Sexual Assault Nurse Examiner
(SANE), District Attorney representative, Law Enforcement representatives, and a Victim
Advocate can solve this situation.
When a 911 sexual assault call comes in, the police officer escorts the survivor to a SART
interview in a special exam room at a hospital or separate site. Patients do not enter the ER
unless they need medical services. Within 30 minutes, the SART team arrives, a 24° on-call
SANE along with a victim advocate. The police officer remains to record the victim's remarks
for the purposes of a criminal investigation. The SANE conducts the interview, using a detailed
form that is standardized state-wide. The SANE lets the patient's account of the assault guide
the search for evidence during the physical exam. The SANE locates and collects hair, tissue,
and fluid samples that could identify an assailant; pulls victim hairs for comparison; takes
numerous swabs that must be specially air-dried without heat and carefully tagged for
preservation as evidence; and she identifies, documents and photographs wound patterns. The
advocate stays throughout the exam, helping to set the pace of the procedure.
"Law enforcement officers (involved with the Santa Cruz SART) feel they are able
to establish a rapport with survivors. This often results in them receiving more
complete information about the assault improving the odds of apprehending the
suspect. The district attorney believes that more thorough investigations and
improved evidence collection has brought about more guilty pleas rendered earlier ~
in the criminal proceedings."
- Sherry Arndt, RN
Santa Cruz SART
The interview and examination are based on guidelines established by the California Office of
Criminal Justice Planning (COCJP) as well as any requirements of local police and crime labs.
If the chain of evidence is broken at any point, its credibility could be jeopardized. Maintaining
a chain of evidence means that the SANE cannot leave the victim alone with evidence and cannot
let evidence go unattended or unsecured until it is turned over to law enforcement officials.
A major, recent advance in sexual assault evidence-gathering involves the use of a colposcope,
a microscope mounted with a camera to photograph minute damage to genital tissue. The
pattern of such damage enables the SANE to determine whether sexual intercourse was
consensual. In many cases, colposcopic evidence convinces suspects and their attorneys to plea-
bargain rather than take a case to trial.
The SANE also gives the assault survivor after-care instructions, prophylactic antibiotics,
information about AIDS testing, and, if appropriate, discusses the availability of morning-after
pills. She decides whether to refer the patient to the ER. The victim advocate works with the
survivor to plan follow-up counseling and other resources once the exam is over.
In California, SANEs function as objective observers and documenters of evidence that they can
then impartially discuss in court, so they are less involved with the patient's ongoing care than
nurses normally would be.
Under a 1986 state mandate, any county with a population of more than 100,000 must have a
program to meet the needs of sexual assault survivors, and the cost of sexual assault exams is
paid by the relevant law enforcement agency.
2
Why SANEs are better sexual assault examiners:
A Sexual Assault Nurse Examiner (SANE) is an integral part of the Sexual Assault Response
Team (SART). Currently, statistics show that 30 % of rape cases do not proceed to trail due to
inadequate evidence collection. In counties where trained SANEs are consistently available to
perform evidential examinations and give courtroom testimony, conviction rates have increased
from 4 % to 85-90 %.
"The SANE nurses routinely produce better evidence than that obtained during
exams not conducted by personnel with SANE training. Because of superior
training, SANE nurses obtain better forensic evidence, do a more thorough
examination, and effectively utilize colposcopic photography. The difference in
the quality of the evidence is remarkable." - Edward Jagels
District Attorney
"Ix has been my experience as a prosecutor that the SANE Program routinely
produces better cases for obtaining convictions of sexual assault perpetrators.
The SANE nurses, because of their training, obtain better forensic evidence, do
a more thorough job of examination, and rely on the use of colposcopic
photography." - Kyle J. Humphrey
Former Deputy District Attorney (1992)
SANEs are certified through an 80-hour curriculum. Physicians, law enforcement officials, and
advocates from rape crisis centers prepare the nurses to conduct exams, provide emotional
support to patients, and differentiate signs of trauma associated with rape and other non-
consensual sexual contact. A criminalist from the crime las discusses forensic evidence;
prosecutors, judges, and defense attorneys explain the criminal justice proceedings and what
constitutes effective testimony. The classroom presentations are followed by preceptorships in
vaginal examination, "ride-alongs" with law enforcement officers, moot court, interviewing
skills, and other activities designed to familiarize the nurses with their teammates' roles and
responsibilities.
A SANE can identify the cause of an injury based on its location and characteristics, knows
where to look for tissue damage is a victim says they were on their back or stomach when raped,
and can photograph injuries that show if the victim tried to withdraw or fight as evidence.
SANEs can also determine from an injury pattern whether a weapon was sharp or blunt, and can
deduce what happened such as whether a rapist used his penis or an object.
Statistics documenting conviction rates with organized SARTs and SANEs.
According to a 1986 research project assessing the services provided to rape survivors,
prosecutors tended to be more pleased with evidence collected by nurse examiners, crediting the
training of the nurses in the technology of rape kit exams. According to the San Luis Obispo
SART, conviction rates have increased from 4 % prior to the formation of the SART to 85-90 %.
"In addition to their value at the examination state, the SANE nurses' testimony
is invaluable. Deputies inform me that in cases in which a SANE nurse has
testified the jury has been much more willing to return a guilty verdict."
- Edward Jagels
District Attorney
"In addition to their value at the examination stage, the testimony of a trained
expert is invaluable in explaining to a jury how rape, sodomy, or sexual assault
may or may not leave any physical evidence, of how invasive the examination
itself is, and how vulnerable a victim is. In the cases I have tried where a SANE
nurse has testified, the jury has been much more willing to return a guilty
verdict." - Kyle J. Humphrey
Former Deputy District Attorney (1992)
"If it were up to me, I would require a SANE examination of every sexual assault
victim. It would insure better treatment of victims and more successful
prosecutions." - Kyle J. Humphrey
Former Deputy District Attorney (1992)
COST SAVINGS ASSOCIATED WITH SART PROGRAM
The following information was obtained from Dr. Laura Slaughter, Medical Director, of the
Suspected Abuse Response Team Program, San Luis Obispo County. Data obtained from SLO
County Auditor's Office, and excludes pre-trial preparation.
1992 Statistics:
Cases with positive physical findings and thorough case documentation often don't go to trial.
There were 23 sexual assaults during the period reported which were seen and examined at the
San Luis Obispo SART. Of these 23 assaults, the following outcomes occurred:
1992 Subpoena Information
23 Cases 34 Subpoenas = 1.5/Case
11 SLO County 12 Out of County
31 Prosecutor 3 Defense
Outcome
1 Dismissed
10 Jury Trial
9 Guilty
1 Not Guilty
12 Plead Guilty due to evidence obtained from SART exam
Financial Savings:
In San Luis Obispo, the average rape trial lasts 5 days and costs $40,000. Each perpetrator who
plead guilty due to the weight of evidence and did not require a trial equaled a cost savings of
$40,000 minus the $700 that the San Luis Obispo SART charges for the exam.
12 X 40,000 = 480,000
12 X 700 = 8,400
Cost Savings $ 471,600
The Personal Factor:
While the County of San Luis Obispo saves $39,300 each time the SART Program does an
evidence examination which leads to a guilty plea, the citizens and victim/survivors are saved
from the danger of continued assaults when a perpetrator is convicted.
BAKERSFIELD MEMORIAL HOSPITAL
SART PROGRAM
1994 STATISTICAL SUMMARY
From: 5-1-94
To: 12-31-94
Total Number of Cases: 48
Female: 47
Male: 1
Age Information:
Minimum Age: 4
# < = 14 yrs: 9
# > 14 yrs: 39
Maximum Age: 55
Average Age: 24
Agency Breakdown:
BPD: 40
KCSO: 8
Race Breakdown:
Black: 19 %
Caucasian: 44 %
Hispanic: 35 %
Other: 2 %
Outcome Breakdown:
Cases Still Open: 23
Cases To Trial: 3
Trial Conviction Rate: 100 %
Cases Pending Trial: 2
Cases Plead: 7
Cases Closed: 13
~ 02x16x95 17:49 DA KERN COUNTY 002
OFFICE OF ~ DISTRIC~ ATTORNBY
COUNTY OF KERN
CIVIC CENTER JUeTICIE BUILDIN(]
1 ~ 1 E TRUXTUN AVENUE STEPHEN M. TAUZER
BAKERgFIELD, OALIFORNIA 95301 A9919TANT DISTRIOT A1TORNEY
($05) 881.:2421, FAX: (605) 861-2797
I~WARD IL JAOgL~ TIIOMA$ D, SPARKS
DISTRICT ATTORNEY CHIEF DEPUTY DI$mlCT AYTONfF. Y
February 16, 1995 ,
Debts L. Johnston
Chairperson
8exual Assault Response Team
Bakersfield Memorial Hospital
4~0 34th arrest
Bakerefiela~ CA 93301
Dear Debts:
Zt is my great pleasure to write on behalf of the Kern County
District Attorney's office, and tllanK you and all personnel
involved in the $.A.R.T. program for your assistance in the
Compassionate and effective handling of sexual assault cases.
As a sexual assault prosecutor for more than seven years, I
have witnessed firsthand many times the devastating emotional
impact that sexual aseault inflicts on its survivors. At the same
timew the crime is one of the most difficult to successfully
prosecute because it so frequently occurs in private, without
corroborating witnesses.
The Sexual Assault Response Team, providing a thorough and
compassionate approach to investigating these cases, has been of
great value to our office and to victims of sexual assault. From
a legal standpoint, it is much easier to successfully prosecute
when trained medical personnel have examined the ViCtim and
obtained medical and scientific evidence which corroborates the
fact of sexual assault. As you ~now, our record of convictions
(either at trial or by guilty plea) in cases involving trained
nurse examiners has been extremely high.
From a human standpoint, I know from the statements of rape
victims that the treatment they receive from your personnel is very
satisfactory, and helps minimize the needless emotional trauma that
the criminal Justice system has sometimes inflicted on vi=tims in
the past..
02/16/95 17:50 DA KERN COUNTY I 003
February 16, 1995 Page 2
I sincerely hope that the S.A.~.T. pro.am at Memorial Will
continue its valuable aeeietanoe to the vio~ime of this tragic
crime.
Sincerely,
~DWARD R. JAGEL$
DI'TRICTA~RN~
Jo~n S, Somers
DePuty Distriat Attorney
~ss/l~
BAKERSFIELD
MEMORANDUM
January25, 1995
FROM: GAIL/E?'v~AITERS,)L~'"~; ASSISTANT CITY MANAGER
TROUGH: ALAN TANDY, CITY MANAGER
SUBJECT: FISCAL YEAR 1995-96 BUDGET INSTRUCTIONS
The budget for fiscal year 1995-96 will essentially be a "low to moderate growth" budget
from fiscal year 1994-95. The City has experienced a five percent growth in sales tax
revenues over last year, however, the Finance Director is projecting a modest two to
three percent growth for the 1995/96 fiscal year. Property tax revenues are also
estimated to grow approximately four to five percent over 1994/95 (this excludes
revenues from the Union #10 annexation).
The Iow to moderate growth budget position is in response to this preliminary
information. It allows us to achieve service continuity and perhaps some,incremental/
enhancements to improve service delivery. We will not be able to "catch up" to previous'
years budget constraints.
Again in 1995/96 because of one-time savings, we expect room for a reasonable capital
improvement program. Additional revenues resulting from a rebate of our PERS rates
and a greater fund balance than anticipated (carried over from last fiscal year) have
contributed to the opportunity to use one-time, non-recurring savings for one-time non-
recurring expenses.
While we do not want to paint a picture like prior years "gloom and doom," we surely do
not want to give an impression that things are back on track. We anticipate that some
departments will submit proposed budgets that will require additional personnel becaused
of identified growth in specific service delivery areas or because hardships fr0hi:previous~
cuts have proven to be intolerable. These two situations are distinct and must be viewed
as such. First priority will be given to requests that focus on maintaining current service
levels. Secondary to that will be requests for expanded service levels. However, you
should be cognizant of the reality that requests for new positions end up in a competitive
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 2
arena and organizationally, will be extremely limited in number. Detailed and well
thought out substantiation of your position will be essential for serious consideration of
long term added operational costs.
STATE BUDGET
We have received information on the Governor's proposed budget and those areas
affecting municipalities. Overall, the Governor has indicated California's economy is in
the midst of "sustained recovery" because of growth in employment, new housing
construction, retail sales and a number of other indicators. His budget priorities include
continued expansion of the state's economy, promotion of self-sufficiency and protection
from crime and violence. For the first time in several years, the state budget boasts a
revenue and expenditure situation that is no longer deteriorating, but is continuing at a
moderate growth level. Even so, the Governor has presented a "hold the line" spending
budget, while the state moves cautiously through the remains of the recession. A
moderate position is appropriate for the City of Bakersfield in that we can never really
let our guard down until the state legislature passes its final budget on June 15, 1995.
Specific to municipal government, the state budget is not proposing a raid on city
revenues as in prior years. No further reductions in property tax or vehicle license fees
are proposed, nor does it include any plans to reallocate the local sales tax. However,
the Governor does propose requiring 50 percent of the cities' fines and penalties
currently going to the state to be sent to counties instead, to realign trial court funding.
This will result in over $900 million in new resources for counties. In addition, the state
budget shifts $100 million in transportation funds away from the State and Local
Partnership Program to other transportation programs. This change could have an
impact on our city's ability to complete street resurfacing projects because the matching
funds we currently enjoy will be reduced.
The state legislature's approach to this budget is more uncertain than usual given the
lack of a clear majority in the state assembly. We have been cautioned by the League
of California Cities to consider ourselves still "very much at risk" for budget reductions
in 1995-96, especially when the state continues to count on an approximate $800 million
reimbursement from the federal government for the cost of federally-mandated programs
provided to illegal immigrants.
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 3
BUDGET PROCESS
New Software
Perhaps the biggest challenge ahead for us is the successful cOnverao~!!~,~;:~#~.
computer hardware and software system. I want to extend my thanks in advance to
every employee for their hard work, patience and contributions to moving this process
along so that we could be on line for this budget cycle. We all know that this is not an
ideal time to be making the conversion, however, the longer we walt, the further behind
we get. I have no doubt that once installed, each of you will be excited about the
opportunities you will have to make your operations more productive, informative, and
effective.
In the meantime, the transition must be a coordinated and cooperative effort. Youd
immediate input, suggestions and response to procedures is essential to holding-d°wn
the frustration level as well as unnecessary delays. You may find it a little uncomfortable
because there is not a procedural manual currently available to support the new HTE
software. Those employees who received the initial training should be'willing,:.to~
develop it as we go along, and be available to others in the organization whO'~'~e~
questions or get stuck and cannot seem to move forward.
Bud,qet Submittal
Because this will be a Iow to moderate growth budget year, departments should develop
a conservative budget that allows for a reasonable inflation factor and minimal additions
or increases for major service priorities. Anticipated increases for medical insurance,
longevity pay, step increases, safety certificate pay and any negotiated salary settlements
that are currently in effect, will be calculated by the Manager's Office and forwarded to
you for inclusion into your budget submission.
Again this year we will be negotiating salary settlements for all bargaining units -- April
1995 for Police, and January 1996 for all others. Because salary settlements typically
do not occur until after budgets are submitted to the Manager's Office, those costs will
be factored into departmental budgets by the Manager's Office as they become
available.
Several procedural changes will take place this budget cycle that will hopefully, ease the
burden of putting your proposed budgets together.
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 4
1. G Forms. The G Form as you know it will no longer exist. HTE software
has a feature called "Miscellaneous Information" that should, be. used to
wdte justifications.. Justifications at the City Manager level are no longer
necessary for general office supplies; but are required for:reimbursable?
expenses, professional and consulting services, other~'oatside.:s~rVices,
computer supplies and peripherals, and contrlb'btions.
2. Fee Projections. As you know, the fee projection process started
November 29. The plan is that Council will approve proposed fees in
March, which gives us a little more time to work the fees' into our
calculations for developing our operating budget.
3. Project Tracking. A separate meeting will be held to go over the transition
and specifics of the new project tracking system. At this meeting, you will
be informed of the process for using project numbers for the CIP as well
as for a limited number of operating projects. Prior to this meeting, all
departments must have their current project listing cleaned up and devoid
of anything that does not meet the criteria which constitutes a valid project.
That criteria is being supplied to you under separate cover.
4. Capital Improvement Program. Through discussions with the appropriate
departments, a decision has been made to accelerate the CIP process so
that it has less of an opportunity to compete with developing the operating
side of the budget. CIP requests are due to the City Manager's Office not
later than February 27, 1995, in anticipation for Council review in March
and Council adoption in Apdl. As mentioned above, specific details about
the CIP process and project tracking will come shortly.
Enterprise and Interdepartmental Services
Departments with enterprise services should seek out ways to increase their
contributions to the General Fund for those services that are directly related to or have
some administrative/maintenance costs that are specific to the enterprise service. My
staff is available to discuss alternatives to achieve that objective. It is important for
departments to seek early assistance as it relates to Interdepartmental Services. This is
an area where the one-time monies will make the availability of needed remodels and
upgrades in computer hardware a possibility.
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 5
Personnel-Related Issues
Training and installation of the HTE payroll application is not'sci3edule~t~ls~i~.unfil.
Apdl and, therefore, all data related to existing personnel costs will have to be manually
entered into your proposed budget by Data Processing. We are currently in the process
of building the salary project~on file. Departments can use the "BUD.USER" applications
on the PRIME to generate the costs and appropriate detail for temporary and seasonal
employees and overtime. Once the costs have been calculated, departments must then
enter the costs into the proper accounts on the HTE software.
Under the PRIME system, special pay costs were reflected in one account -- 70100 -- as
part of regular salaries and wages. With the HTE software, them are separate accounts
for each type of special pay. For this budget year only, departments will have to
calculate and manually enter these costs, including sick leave conversion pay, into the
appropriate accounts within the HTE software.
Personnel additions will be considered for critical needs and where unusually difficult
situations exist. Several departments have indicated some concern about waiting until
after the budget cycle begins to propose and receive a decision on new positions,
reclassifications or organizational changes. This process also presents somewhat of a
timing problem for the City Manager's Office. Consequently, those departments who
have already thought through their personnel needs and have completed the necessary
work to justify their request, may submit them immediately. Requests for organizational
changes and new position requests should be submitted directly to the Manager's Office.
Reclassification requests are due to Personnel by February 1. Effective with this year's
budget process, reclassification requests will automatically bedenied..,:if,,-~are,not~.
accompanied by a solid justification which details significant'changes in-j°13"duttes:and
a carefully thought through narrative. Written justifications are required for
reclassifications even if there is no net change in salary. A copy of your submissions to
Personnel should also be included in your budget binder.
Beginning with the 1996-97 budget year, we will be encouraging departments to do
more advanced planning as it relates to personnel requests. Specific guidelines will be
distributed that will allow departments to submit any requests they are. aware'of by
November 1 so that prior to the budget kickoff, departments will, in many case~i, have
a decision on whether to include personnel requests in their proposed,budgets. We
believe by making this change, departments will be afforded more flexibility in their
workload; a better chance of getting their requests approved because they would be
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 6
submitted early; and it will allow my office an opportunity to analyze all the factors that
must be considered when approving personnel changes.
Capital Outlay Requests
In the past, capital outlay requests were handled outside of requests for operating items.
With the HTE software, departments will be required to provide the appropriate level of
detail for capital outlay requests in the "Miscellaneous Information" screen. All
requisitions over $600 must have a description and note the quantity and amount:
(Departments will be notified once a final decision has been made regarding an increase
to the capital outlay threshold.) The Purchasing Division will provide departments with
a listing of capital outlay items and their costs. Capital outlay requests should be
considered in context of the current budget situation. Priority will be given to one-time
expenses which tend to reduce recurring annual costs.
Reimbursable Expenses
As in previous years, this account is subject to review. Due to the sensitivity of recurring
expenses in this area, historic expenditures should be thoroughly examined and
considered carefully. Requests for out-of-state training and travel will be made on a
case-by-case basis, requiring City Manager approval. Requests should be done in the
Miscellaneous Information screen, and must include individual name, position, type of
training, location, dates, and how the training will benefit the city.
Interdepartmental Services
Requests for new vehicles and communications equipment also should be given careful
consideration before being included in your budget. These requests are due to the
Equipment Division not later than February 16, 1995. New vehicle requests that are to
support new positions or are replacement vehicles have a better chance at getting
approved. Fleet Management is working to reduce the total fleet, which may include
implementing a car pool process for departments.
In general, requests submitted to General Services are budgeted by General Services,
however, last year there were a number of items that were transferred into the Capital
Improvement Program. This is a good reason for special project requests such as
Fiscal Year 1995-96
Budget Instructions
January 25, 1995
Page 7
modifications of existing facilities and/or equipment to be worked out with the
appropriate internal service department prior to presenting it in your proposed budget.
These requests are also due to General Services not later than February 16, 1995,
Wrap Up
This year the budget team will be made up of the following individuals:
Assistant City Manager for budget; Finance Director; Assistant~tc~,,the,City._.M~a.ger;
Administrative Analyst II; and Public Works Operations Manager antiGens
Superintendent. Ail of these individuals will be able to respond to questions specific to
their areas of responsibility and are available to go over your budgets with you. Any
general questions, comments or suggestions you may have about the budget process
should be directed to Gall Waiters or Dolores BuddeI-Tuebner.
Thank you again, in advance, for your patience, cooperation and hard work with the
upcoming budget process. There will be many trying times, but if we all remember we
are working toward the same goal -- to provide quality, effective and efficient services
to our community -- the transition will be highly successful. Suggestions for ways we
can implement cost-savings, and any creative ideas you may have to help us get
through the next six months will be greatly appreciated. Your assistance along these
lines during the 1993/94 budget year helped us recover in fiscal year 1994/95 from some
very strenuous constraints. The outlook for 1995/96 as it relates to our financial position
is positive; and an exciting challenge awaits us with our new computer system and the
opportunities that will come with it. Let's make the best of it.
ADMINISTRATIVE RULES
AND REGULATIONS
SUBJECT: AUTOMOBILE AND MILEAGE ALLOWANCE
I. STATEMENT
Due to the nature of the position held, it is more economical
for the City in some instances to provide certain employees
with either reimbursement for car miles traveled or car
allowances. The following procedure clarifies the City's
automobile and mileage allowance policy.
II. PROCEDURE
1. When officers or employees of the City are authorized to
use their own automobiles in the cause of City business,
they shall be reimbursed for costs at a rate up to the
rate currently used by the IRS for tax purposes.
Driving to and from work is not considered City business
unless such driving is in conjunction with meetings of
the Council, boards, commissions, other special meetings
or functions relative to City business.
2. Whenever feasible for out-of-town trips on City business,
a pool car should be utilized if available. Whenever
long trips are taken on City business, due regard should
be considered on the basis of airfare. If it is less
costly to fly to a destination, employees are encouraged
to fly or be reimbursed for automobile expense in an
amount equal to the price of a round trip plane ticket.
3. Department heads who are not furnished an official City
car, shall be reimbursed for automobile use at the rate
of three hundred, twenty-four dollars ($324) per month.
i 2
Page., of
ADMINISTRATIVE RULES
AND REGULATIONS
, ./,~' APP~OVer0
SUBJECT: '~
AUTOMOBILE AND MILEAGE ALLOWANCE
II. PROCEDURE (cont'd)
Reimbursement rates will be based on the following formula:
Internal rental rate, including depreciation, fuel,
oil, parts, accident ~amage repair, labor, etc.,
based on a mid-size, four-door sedan, with air
conditioning, power steering, power brakes, and AM
radio, depreciated five years with an annual mileage
of 14,500 miles per year.
Purchase Cost $12,000
Salvage Value 2,000
Amount Depreciated $10,000
$10,000 - 60 months : $167 depreciation per month.
12,240 miles @ 21~ per mile = $215 for maintenance,
fuel, oil and tires monthly.
$167 Depreciation
215 Maintenance, fuel, oil, tires, etc.
50 Liability insurance
$432 x .75 : $324 Monthly total
4. Additional personnel, as delineated in City Council
Salary Resolution, shall be paid $50 per month for
furnishing their own personal automobiles.
5. Authorization for reimbursement for automobile expense
must be given by the appropriate department head and an
expense voucher submitted upon conclusion of the mileage
transaction.
6. Monthly automobile allowance authorized by salary
resolution shall be paid by payroll check on the first
paydate following the month being compensated.
III. CITATION
City Coucil Resolution - Personnel Compensation.
Revised 8/01/88 2 2
Page_ of ~
ADMINISTRATIVE RULES _
'i'.: ~ ' .?, Oa~e 2/12/81
AND REGULATIONS
SUBJECT: BU$'(NE$$ LEAVE '"'
I. STATEMENT
All probationary and permanent employees shall be eligible for
authorized business leave with pay. Such eligibility is based
upon a positive determination by the department head that a
business leave with pay is beneficial to the City.
II. PROCEDURE
Business leave with pay may be granted subject to advance
authorization by the supervisor, department head, and the City
Manager.
1. The cost of lodging shall be reimbursed or paid directly
by the City. This policy requires that minimum cost
accommodations in keeping with availability, convenience
and propriety shall be obtained by the attending officer
or employee. If a spouse accompanies the employee, the
City will reimburse at the singles lodging rate only.
2. Transportation to and from a conference or meeting shall
be reimDursed or paid directly by the City based on the
following considerations.
a. The officer or employee making travel arrangements
shall secure the most economical mode of
transportation in keeping with the considerations of
availability, convenience and propriety; City owned
vehicles shall be used, if available and
appropriate, when traveling to conferences or
meetings within California.
b. When air travel is appropriate, coach class shall be
utilized whenever possible. City employees, who are
certified airplane pilots and are listed as
individual insured on the City's insurance policy,
are occasionally available to use in the case of
tight time constraints or long distances which must
be traveled. The use of this type of air travel is
acceptable when the total amount charged is less
than the amount required for commercial round trip
airfare.
I 2
Page. , ~ f -----...-----
ADMINISTRATIVE RULES
:~' =" '~ Oate 2/12/81
, AND REGULATIONS '"
SUBJECT: -" ~'~°~"~
BUSINESS LEAVE
II. PROCEDURE (cont'd)
c. When a private automobile is used, reimbursement for
such use shall either be paid at the per mile rate
currently allowed by the Internal Revenue Service or
at the rate of air travel costs to and from the
employee's destination, whichever is lowest.
d. Taxi or bus fare as required for transportation to
and from meeting site or airport.
e.. Car rental is permitted only when absolutely
necessary and prior permission is granted by the
department head and City Manager.
3. All registration fees shall be reimbursed or paid
directly by the City.
4. A per diem allowance of forty-five ($45.00) dollars to
cover all meetings or conference costs in addition to
those enumerated above shall be provided for only those
days attending or in transit to and from an approved
conference. The allowance which covers the cost of meals
of employees on business leave within a 24-hour period is
allowed, based on the following policy: breakfast $8;
lunch $12; dinner $25. No additional reimbursement for
meals will be allowed within one 24-hour period.
If meals are included in the conference registration'fee,
then a proportionate amount should be deducted from the
$45.00 per diem.
If reasonable expenses at the conclusion of the
conference are more than the $45.00 per diem then the
employee may submit an expense voucher with supporting
documents to their department head for reimbursement.
(As outlined in Section VI-3.1 of the Administrative
Rules and Regulations).
5. Charges such as room :~ervice, personal telephone calls,
or any costs incurred for anyone other than the officer
or employee shall not be reimbursed.
[[[. C~TAT[ON
Bakersfield Municipal Code, Chapter 2.84.620
Revised 9/24/87
Revised 8/01/88 2 2
Page of
3akersfie[d, California, :,lax- '2 1984 - Page
following
call vote:
Aye: Councilmen Childs, Christensen, ~Ic , Ratty,
Rockoff, Barton
Noes:
Absent: No
In ans' a Councilman Childs, Fire and
Development Services indicated the letter from Doris C.
Williams. 1030 Chester P April 17, 1984, regarding rezoning
the Lowell Addition, of California Avenue between
Chester Avenue an, ,n Avenue, erred to Staf~ at the meeting
of April 25, 1 was inadvertent] iotten. He will check
into the le ~nd contact Councilman Chil~ ~oon as possible.
answer to a question by ~[ayor Shell 'ding gap in
comm~ ions between The Emergency Operation Center ergency
asting System, Police Chief Price stated he would ha i-
into that
REPORTS
Councilman Rockoff. Chairman of the Budget and Finance
Committee. read Report No. 13-84. regarding Policy on Reimbursable
Expenses for City Council ~lembers, as follows:
Pursuant to reviewing of expense vouchers, the
Budget and Finance Committee noted a need for
clarification and the establishment of a policy
on reimbursable expenses for City Council Members.
On ~Iarch 23, 1984, the Budget and Finance Commit-
~ee submitted a memorandum to the City Council
regarding suggested policy on reimbursable expenses
for City Council ~lembers. After discussion at the
City Council ~leeting of 5~arch 28, 1984, the matter
was referred back to the Budget and Finance
Committee for study and recommendation.
We have me~ ~o review the guidelines suggested in
~he ~Iarch 23rd correspondence, recommendations from
~he discussion which ensued at the Council ~Ieeting
of ~Iarch 2Sth. and subsequent recommendations made
by other Council !.Iembers. As a result of our dis-
cussions and review we recommend the following
~u~delines:
I. ~IILEAGE - "Reimbursable ~[ileage" means
miles traveled by Council
Hembers by private conveyance.
2akers.~'ie[d. (?ali fornla. !!ay '2. i984 - Page ?
A. No mileage reimbursement will be
allowed for travel to and from City
Council ~leetings.
B. Local mileage reimbursement will be
allowed for travel [o and from com-
mittee meetings, commission meetings,
board meetings, and other directly-
related City Council activities.
C. All Council authorized trips outside
of the City Limits will be allowed
reimburseable mileage: however, Council
~Iembers should use City vehicles where-
ever possible. Trips to meetings
associated with the League of California
Cities and the Kern County Association
of Cities are to be considered author-
ized in general and will not need
specific City Council authorization.
II. EXPENSES
A. Expenses incurred by a Council Member
in fulfilling the specific direction of
the City Council shall be authorized for
reimbursement.
B. Where possible, City Council Members
should obtain authorization from the
City Council prior to incurring expenses.
[f prior approval by the City Council is
no~ possible, any requests for the reim-
bursement of expenses incurred must receive
City Council approval prior to actual pay-
ment ~o ~he requesting City Council Member.
III. FORM FOR CITY COL~CIL REIMBURSABLE ~[ILEAGE AND
EXPENSES
A. All expenses must be documented as to time,
place, persons, and purpose prior to author-
ization for payment by the City Council.
Such documentation must be furnished on
Form CCI, "City Council Member Expense
Voucher" (the form is currently being
designed and will be finished prior to the
May 2, 1984 City Council Meeting).
B. Each Council Member is to submit the Expense
Voucher monthly, whether or not he is
requesting reimbursement for expenses incurred.
The form is to be si~ned and all appropriate
receipts and supporting documents are to be
a~ached ~o the Expense Voucher.
C. Copies of each Expense Voucher are to be
tncluded with the voucher register in the
Council Packets.
This Committee recommends the City Council approve the
above-stated ~uidelines as policy and place into affect
immediately.
Bakersfield. Cali£ornia. ~.!a~' 2, [984 - Page 8
Uaon a motion by Councilman Rockoff, Budget and Finance
Committee Reoort No. 13-84 regarding Policy on Reimbursable Expenses
for City Council ~.{embers. was received.
Councilman Childs stated he will be traveling to Santa
Clara and would feel more comfortable driving his own vehicle rather
than a City vehicle.
Councilman Rockoff made a motion to accept Budget and
Finance Committee Report No. 13-84 regarding Policy on Reimbursable
Expenses for City Council Members, -and recommendations as outlined
in the reOort.
After a lengthly discussion, Councilman Rockoff stated he
would amend the Budget and Finance Committee Report No. 13-84, Page
3, III. B. to read as follows:
B. "Each Council Member is to submit the Expense
Voucher monthly, if he is requesting reimburse-
ment for expenses incurred. The form is to be
signed and all appropriate receipts and support-
ing documents are to be attached to the Expense
Voucher, if there are any."
Upon a motion by Councilman Rockoff, Amended Budget and
Finance Committee Report No. 13-84 regarding Policy on Reimbursable
Expenses for City Council ~Iembers. was accepted, with deletion of
Item Ill. A.
CONSENT CALENDAR
(a) Allowance of Claims Nos. $433 to 550~,
inclusive, in the amount of $3~8,544.98.
(b) Claim for Damages from Harlan O. Voigts,
108 Atherton Court, Bakersfield. (Refer
to City Attorney)
(c) Improvement Agreement for Parcel Map Nos.
7059 and 7256 with Tenneco Realty Develop-
ment Corporation. for construction of
t:::nrovements therein. Parcel Map No. 7059
is located at the northwest corner of Gos-
ford Road and X~ing Avenue and Parcel ~iap
No. 7256 is located southerly of Ming
Avenue, easterly of Old River Road.
(d) Notice of Completion and Acceptance of
Work on "Groundwater Recharge Area -
Ph~ [". Contract No. 83-212, with
Cone,jo Contractors,
MEMORANDUM
TO: LEE ANDERSEN, COMMUNITY SERVICES MANAGER July 8, 1995
FROM: FRANK FABBRI, PARKS SUPERINTENDENT -~.
SUBJECT: COUNCIL REFERRAL--CITY SWIMMING POOLS
At the City Council meeting of June 28, 1995 Councilmember .Carson
requested information on the City's policy regarding location and
construction of municipal swimming pools.
I am not aware of any written policy on this issue prior to the
adoption of the Park Element of the 2010 General Plan in 1990. In
the early 1960's it was the City's intent to include swimming pools
in most all neighborhood and community parks. As the City grew,
additional infrastructure, in addition to neighborhood parks, were
required. Funds for these new improvements were very competitive
and therefore new park construction and improvements were often
deferred. Lack of funding changed the. City's plans on future park
development, including swimming pools. The passage of Proposition
13 placed additional restraints on funding for parks and
recreational improvements.
In 1990 the Park Acquisition and Development Ordinance was passed
which provides funding to purchase and construct future
neighborhood parks with basic improvements. Funding for swimming
pools in neighborhood parks is not included within the ordinance.
The Park Element of the 2010 General Plan mentions swimming pools
should be considered in the design of community parks and they
should be situated near high schools. Minimum standards for a
community park is 20 acres with a service area of 3 to 5 miles
walking distance. The last community park constructed which meets
the criteria for a swimming pool as outlined in the 2010 Plan is
Patriots Park, constructed in 1975 and located at Ming Avenue and
Stine Road. The continuing lack of available construction funds has
made this project unrealistic.
The City currently has ten (10) swimming pools. Three pools,
Jefferson, Central and Beale are the oldest dating back to pre
1940. In 1957 the pool at Martin King Jr. Park was constructed.
Four additional pools, Saunders, Wayside, Planz and Jastro were
added in 1958 and 1959. In 1964 the installation of the Siemon Park
pool was completed. The most recent municipal pool was built in
1994, thirty years after the Siemon Park pool, when a developer in
southwest Bakersfield donated a swimming pool at the newly
constructed Silvercreek Park.
COUNCIL REFERRAL (CITY SWIMMING POOLS) JULY 8, 1995
Construction costs for a swimming pool, similar to the one built in
Silvercreek Park, is estimated at over $500,000. Annual maintenance
costs for a municipal pool is approximately $30,000. The existing
city swimming pools are open for swim lessons and recreational
swimming for several months during the summer and is one of the
more costly recreation programs.
If discretionary funds for recreational facilities become
available, one might consider additional swimming pools; but there
are several neighborhoods within the City which are park deficient
which should also be considered for funding of basic improvements.
cc: Alan Tandy, City Manager
Allen Abe, Assistnt Parks Superintendent
Georgina Lorenzi, Business Manager
File: pool
OI~IN~CE NO.
AN ORDINANCE AMENDING CHAPTER 8.44
OF ~HE B~ERSF~E~D ~C~P~ CODE
~TINO TO FIbrOUS.
BE IT ORDAINED by the Council of the City of Bakersfield
as follows:
SECTION 1.
Chapter 8.44 of the Bakersfield Municipal Code is hereby
amended to read as follows:
Chapter 8.44
FIREWORKS
Sections:
8.44.010 Definitions.
8.44.020 Permit required.
8.44.030 Application - Issuance - Fee.
8.44.040 Regulations.
8.44.050 Revocation.
8.44.060 Appeal.
8.44.010 Definitions.
Whenever used in this chapter, unless a different meaning
clearly appears from the context, the words set out in this section
shall have the following meanings:
A. "Person" means any individual, partnership,
corporation or association of any nature whatsoever.
8.44.020 Permit required.
It is unlawful for any person to sell or offer for sale
or expose for sale within the city any fireworks in violation of
this chapter or without having a valid permit therefor in
accordance with the provisions of this chapter.
8.44.030 Application - Issuance - Fee.
A. A permit for the sale of safe and sane fireworks
shall be issued only to applicants who meet the following
qualifications:
1. A nonprofit organization or corporation
organized and existing primarily for veteran, patriotic, religious,
welfare, charitable or civic-betterment purposes, organized and
established in the City at least one year prior to the filing of
application for permit under this chapter and having a bona fide
membership of at least thirty-five members; provided:
a. No permit shall be issued to any such
organization or corporation unless it was issued a permit the
previous year unless the total number of permits issued to such
organizations and corporations is less than one permit per 4,000
population in the City of Bakersfield, as set forth in the annual
report of the State Department of Finance, but not less than fifty,
in which event permits may be issued to organizations and
corporations unlicensed the previous year in the order in which
their applications are made from May 16th through May 31st.
Priority as between applications made the same day shall be
determined by a drawing conducted by the finance director.
Priority as between applications made for the same location shall
be given to the applicant who held a permit for that location the
prior year. Not more than fifty permits shall be issued except as
it may be necessary to issue a greater number so that each such
organization or corporation to whom a permit was issued the
previous year, and who made application for a permit during the
period commencing March 15th and extending through May 15th and
otherwise qualified hereunder, is issued a permit.
b. Should any such organization or corpor-
ation issued a permit'the previous year fail to apply for a permit
before May 16th, such organization or corporation shall be treated
as if it had not been issued a permit the previous year and its
application for a permit, if made prior to June 1st, shall be
subject to the process and limitation set forth in subdivision l(a)
of this subsection.
2. Retail business establishments which have, for
a period of at least one year prior to the filing of application
for permit under this chapter, held a valid business tax
certificate issued by the city under Chapter~5.02 of this code;
provided, no such permit shall be issued to any such retail
business establishment unless such establishment was issued a
permit the previous year.
3. Any entity which held a permit issued by Kern
County for a particular location the previous year, which location
was subsequently annexed to the City within the past year, shall be
treated as if it had held a permit from the City for purposes of
this section.
- 2 -
B. A permit shall not be issued unless the person,
organization, establishment, corporation, or firm applying for the
permit has first obtained a permit or license 'from the State Fire
Marshall under Part 2, Division 11 of the Health and Safety Code of
the state.
C. Applications for permits under this section shall be
made on forms to be furnished by the city manager or his designee,
shall be submitted between March 15 and May 15 of the year for
which the permit is requested, shall be signed under penalty of
perjury by the applicant and shall require the following
information:
1. The name, address and telephone number of the
nonprofit organization or retail business establishment for which
application is made;
2. The name, mailing address, title, telephone
number, previously used names~ date of birth, sex, height, weight,
eye color, hair color, driver's license number, social security
number and arrest record, if any, of the persons who will manage
the business during the time that it is proposed to be carried on
in the city;
3. Prior permits issued to the applicant pursuant
to this chapter and whether such permits were ever revoked or
suspended and the reasons therefor;
4. The location of the proposed fireworks sales;
and
5. The purpose of the nonprofit organization or
corporation, its principal and permanent meeting place; the
approximate date of its establishment in the city; the total number
of its local membership; the names and addresses of its officers;
and its tax-exempt number.
B. The application shall be accompanied by the
following documents:
'1. A plot plan drawn to scale, showing the
location of utilities, improved parking areas, location of
permanent and temporary structures, curb cuts and/or driveways and
identifying the nearest available source of potable water, sanitary
facilities, and fire hydrants;
2. A written authorization from the owner of the
location or person in lawful possession thereof, if other than the
applicant, for the locating of the business upon his or her
property.
- 3 -
3. Evidence, satisfactory to the city manager or
his designee, of (1) general liability insurance providing coverage
on an occurrence basis for bodily injury, including death of one or
more persons, property damage and personal'injury, with limits as
required by the city; and (2) workers' compensation, with statutory
limits and employers liability insurance with limits as required by
the city. All policies required of the applicant hereunder shall
be primary insurance as to the city, its mayor, council, officers,
agents, employees and volunteers and any insurance or self-
insurance maintained by the city, its mayor, council, officers,
agents, employees and volunteers shall be considered excess
insurance, over and above the applicant's insurance and shall not
contribute with it. The applicants shall save, hold harmless and
indemnify the city, its officer, agents, employees and volunteers
from all claims, demands, damages, judgments, costs or expenses in
law or equity that may at any time arise from or is any way related
to any work performed by applicant, his agents or employees under
the terms of any permit issued under this chapter.
4. Cash bond in the sum of one hundred dollars, to
be forfeited to the city in the event the permittee fails to remove
said stand, equipment and rubbish from the premises upon which the
stand is located before twelve noon on July 15 of the year for
which said permit is granted. The cash bond shall be returned to
the applicant upon full performance of the requirements of this
chapter.
C. The city manager or his designee shall, in his
discretion, issue a permit if he finds:
1. That the application is complete and truthful;
2. That neither the applicant nor any manager of
the business has been convicted of a crime substantially related to
the qualifications, functions or duties of the business for which
application is made, unless he has obtained a certificate of
rehabilitation.
3. That neither the applicant nor any manager of
the business has done any act involving dishonesty, fraud or deceit
with the intent to substantially benefit himself or another, or
substantially injure another.
4. The business for which the application is made
will be maintained and conducted in accordance with all laws of the
city and the state.
5. That operation of such business at such
location will not present any substantial hazard to vehicular or
pedestrian traffic.
- 4 -
6. That paved parking adequate for the purposes of
the business exists at the proposed location. The adequacy of such
parking shall be determined in accordance with the provisions of
Chapter 17.58 of this Code.
7. That a valid business tax certificate or tax-
exempt number has been issued for this business.
8. That the applicant is sufficiently insured.
9. That no permit issued to the applicant pursuant
to this section has been revoked, unless the city manager or his
designee finds that the reasons for such revocation are unrelated
to this application.
D. All permits issued under this chapter shall remain
in effect from noon on July 1 to noon on July 5 unless earlier ·
suspended or revoked.
E. The applicant shall pay a fee of one hundred
($100.00) at time of application.
F. Permits may be issued with conditions to ensure that
the business will be operated in a safe and legal manner, will not
disturb the peace and quiet of the neighborhood and will not
constitute an undue burden on city resources.
~.44.040 Requlations.
A. 'Those fireworks which are classified as "dangerous
fireworks" under Section 12505 of the California Health & Safety
Code are prohibited, except that such fireworks as are defined and
classified as "safe and sane fireworks" in Section 12529 of the
California Health and Safety Code may be displayed, sold and used
pursuant to the provisions of this chapter and not otherwise.
B. No permit holder shall shout, make any outcry, blow
a horn, ring a bell or use any other sound device including any
loudspeaker, radio or amplifying system where.sound of sufficient
volume is emitted or produced therefrom capable of being plainly
heard upon the Streets, alleys, parks or other public places.
C. Any permit issued pursuant to this chapter shall be
non-transferrable, and shall be valid only as to the applicant and
location provided on the application for such permit.
D. Except as expressly permitted by and in accordance
with the provisions of Chapter 12.44 of this code, the sale, offer
to sell, advertising or display of merchandise on any street or
sidewalk in the city is prohibited.
- 5 -
E. Ail retail sales of safe and sane fireworks shall be
permitted only from a temporary fireworks stand and the sale from
.any other building or structure is prohibited.
F. No fireworks stand shall be located within one
hundred feet of any gasoline storage or gasoline pump or any garage
or within thirty feet of any other building, or within six hundred
feet of any other fireworks stand.
G. Fireworks stands need not comply with the provisions
of the building code of the city except that the building official
shall have authority to require that stands be constructed in a
manner which will reasonably insure the safety of attendants and
patrons.
H. Fireworks stands shall be located only in a C-1
zoning district or a zoning district less restrictive than C-l,
unless located upon property owned and occupied by a church and/or
school, which church or school is either a legal or legal
nonconforming use of such property, and the fireworks stand is
located no less than three hundred feet (300') from the property
line of any residence.
I. All temporary stands for the display and sale of
fireworks shall obtain an electrical permit from the city building
department prior to any electrical work.
J. Ifa toilet is not immediately available during all
open or sale hours Of the fireworks stand, then an approved
chemical one must be provided.
K. Each stand in excess of twenty-four feet in length
must have at least two exits. Each stand in excess of forty feet
in length must have at least three exits.
L. Each stand shall be provided with not less than two
2A 10 BC-type fire extinguishers, underwriter approved, in good
working order and easily accessible for use in case of fire.
M. No person shall light, or cause or permit to be
lighted, any fireworks or any other article or material within any
such stand, or within fifty feet thereof.
N. No smoking shall be allowed in any stand, nor within
fifty feet thereof. "No Smoking" signs shall be prominently
displayed.
O. All weeds and combustible material shall be cleared
from the location of the stand, including a distance of at least
twenty feet surrounding the stand.
- 6-
P. There shall be at least one adult in attendance
during the open or sale hours of the fireworks stand. No minor,
age sixteen or younger shall be permitted in a stand.
Q. All permits must be posted in a conspicuous place.
R. Fireworks shall be sold only between the hours of
twelve noon, July 1st, to twelve noon on July 5th.
S. Permittee shall strictly comply with all provisions
of the State Fireworks Law (Sections 12500 et seq. of the Health
and Safety Code).
T. The fireworks stand shall be removed from the
temporary location by twelve noon on the fifteenth day of July, and
all accompanying litter shall be cleared from said location on or
before said time.
U. Night watchman accommodations shall not be closer
than twenty-five feet from the fireworks stand.
V. No fireworks shall be placed in any fireworks stand
until a building permit for such stand has been issued by the city
building department.
W. Any person who receives a notice to correct any
violation of these regulations or any other condition of the
permit, and who fails to correct such violation within the time
prescribed in the notice, may be assessed a fee not exceeding the
city's cost of reinspection in accordance with Section 3.70.040 of
this Code.
8.44.0~0 Revocation.
Any permit issued pursuant to this chapter shall be
immediately revoked by the city manager or his designee whenever he
finds:
A. That misrepresentations were made on the
application; or
B. That the applicant or any manager of the business
has been convicted of a crime substantially related to the
qualifications, functions or duties of the business for which
application is made, unless he has obtained a certificate of
rehabilitation; or
C. That the applicant or any manager of the business
has done any act involving dishonesty, fraud or deceit with the
intent to substantially benefit himself or another, or
substantially injure another; or
- 7 -
D. That any of the terms or conditions of said permit
have been violated, or that the business has been operated in
violation of local, state or federal law.
8.44.060 Appeal.
A. Should any applicant be dissatisfied with the
decision of the city manager or his designee not to grant a permit
or for the revocation of a permit, then· said applicant may, no
later than ten days after notice of such decision is deposited in
the United States mail, addressed to the applicant or permittee at
the address provided on the application, make written objection to
the city council setting forth the grounds for dissatisfaction,
whereupon the council shall hear said objections at a regular
meeting no later than three weeks following the filing of the'
objection with the city clerk. The applicant shall be given
written notice no less than three days prior to said hearing. The
council may, upon said hearing, sustain, suspend or overrule the
decision of the city manager or his designee, which decision shall
be final and conclusive.
B. Pending the hearing before the council, the decision
of the city manager or his designee shall remain in full force and
effect and any reversal thereof by the city council shall not be
retroactive but shall take effect as of the date of the council's
decision.
SECTION 2.
This Ordinance shall be posted in accordance ~ith
provisions of the Bakersfield Municipal Code and shall become
effective thirty (30) days from and after the date of its passage.
o0o
- 8-
I HEREBY CERTIFY that the foregoing Ordinance was passed
and adopted by the Council of the City of Bakersfield at a regular
meeting thereof held on
vote: , by the following
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED
BOB PRICE
MAYOR of the City of Bakersfield
APPROVED as to form:
JUDY K. SKOUSEN
CITY ATTORNEY
By:
L~URA C. I~.RINO
Assistant City Attorney
LCM/meg
ORD~\F~%AqU(2.0~
J~muary 30, 1995
- 9-
ADM NISTRATIVE REPORT
TO: Honorable Mayor and City Council APPROVED
FROM: Judy K. Skousen, City Attorney DEPARTMENT HEAD ~
DATE: January 4, 1995 CITY ATTORNEY ~
CITY MANAGER ~-~
SUBJECT: An Ordinance Repealing Chapter 5.52 of the Bakersfield Municipal Code Relating to Tow
Trucks.
RECOMMENDATION:
Staff recommends adoption of ordinance.
~l~ACKGROUND:
At its meeting of December 14, 1994, Council adopted the resolution setting rates and equipment
specifications for tow trucks and held first reading of this ordinance.
On October 27, 1993, representatives-of the Police Department, City Manager's Office and City
Attorney's Office met with current tow truck permitholders to discuss these proposed amendments. Suggestions
from the permitholders were incorporated into the resolution. The permitholders agreed, with the proposed
resolution and contracts, and the repeal of the ordinance.
Approximately one year ago, Staff provided a draft of the changes to various community groups
and tow truck industxy associations for their review and comment. None were received. The Budget and
Finance Committee met on this issue several times and expressed concerns regarding a sunset clause for rate
review and a local, preference for tow truck businesses. Letters will be sent to operators on the waiting list that
will put them on notice that preference will be given to businesses located within the City limits. Staff has also
added a clause to the contracts providing for bi-annual rate review. The Budget and Finance Committee
recommends approval of the resolution and ordinance.
Currently, the City refers towing services to incidents pursuant to an ordinance requiring a
permit for those who wish to provide such services to the City. This is more appropriately done by contract
with these businesses.
LCM/meg/K- 12\TowTruckXAdmin-db. Rpt
January 4, 1995, 10:15am
ADMINISTRATIVE REPORT Page 2
Council meeting of 1/11/95
Re: Tow Truck Services
Under the current tow ordinance, only six towing services are available to tow for the Bakersfield
City Police Department. Under this ordinance, there are no provisions for medium- or heavy-duty towing.
The current tow list does not specify equipment specifications and tool lists that the operators should comply
with on their tow vehicles~ Under the proposed contract system, it would specify light-duty, medium-duty or
heavy-duty towing and their individual specifications. The new resolution contract system would bring
uniformity to all agencies throughout our area.
Under the proposed resolution, the equipment specifications, tool lists, etc., will be in
compliance with the specifications and standards adopted by the California Highway Patrol.
Under the current tow ordinance, it lists a permit application procedure in order to be placed on
the Bakersfield Police Department Tow Rotation List. This application procedure is outdated and is not useful
in selecting tow services to be considered for use on the tow list. The new contract system will allow the City
to have better control over the actions and services of the tow companies, i.e., response time, accident scene
responsibility, equipment requirements and equipment maintenance.
Under the current ordinance, tow companies are allowed to tow unsafely by towing larger
vehicles with smaller, inadequate tow trucks. The new contract system would specify what the tow truck is
capable of towing safely and legally. Under the new contract system, a medium-duty and heavy-duty tow list
will be established outlining specifications and requirements. This will enable the City to have access to six
~,~nedium tow companies and three heavy-duty tow companies and meet the new specifications and safety
{~andards set forth in the new contract. The limitation on the number of contracts the City may enter into is
contained in the resolution. '
In the proposed resolution, rate increases requested are in regard to the heavy-duty storage rates
and the heavy-duty uprighting overturned vehicles rate. Indoor storage for heavy-duty vehicles is proposed to
increase from $11.00 to $16.00 per day, a $5.00 increase. Outdoor storage for heavy-duty vehicles is proposed
to increase from $8.00 to $11.00 per day, a $3.00 increase. Setting overturned vehicles on wheels is proposed
to increase from $25.00 to $50.00, a $25.00 increase. The increases in storage rates for heavy-duty vehicles
is due to the additional, space required for storage, compared to smaller vehicles. The increase in setting
overturned vehicles is due to the extraordinary equipment required to perform this service for heavy-duty
vehicles. These fees were adapted from the current rate schedule from the local California Highway Patrol
Rate Schedule.
This ordinance repeals the ordinance mandating a permit in order to Provide tow services at the
request of the City. The Police Department is in the process of obtaining signatures on contracts from the tow
services currently holding permits. The rates set out in these contracts are those adopted by resolution of the
Council. Similarly, equipment specifications set forth in the contracts are those set by Council resolution.
LCM/meg/K- 12\TowTruckLa, dmin-db. Rpt.
January 4, 1995, 10:15*un
ORDINANCE NO.
AN ORDINANCE REPEALING CHAPTER 5.52
OF THE BAKERSFIELD MUNICIPAL CODE
RELATING TO TOW TRUCKS.
BE IT ORDAINED by the Council of the City of Bakersfield
as follows:
SECTION 1.
Chapter 5.52 of the Bakersfield Municipal Code is hereby
repealed.
SECTION 2.
This Ordinance shall be pOsted in accordance with
provisions of the Bakersfield Municipal Code and shall become
effective thirty (30) days from and after the date of its passage.
o0o
MECHANICAL ROOM SLAB DAMAGE
#3
SPAULING AND HEAVING OF THE REINFORCED CONCRETE
SLAB AT THE MECHANICAL ROOM.
#5 UNDERSIDE OF CONCRETE SLAB SHOWING RUST SEEPAGE.
#6 STEEL SUPPORT BEAM AT UNDERSIDE OF SLAB.
DAMAGE AT EXTERIOR CONCRETE WALL.
NOTE DETERIORATION OF REINFORCEMENT.