HomeMy WebLinkAbout11/12/2003 B'A K E R S F I E L D
Jacquie Sullivan, Chair
Sue Benham
Irma Carson
Staff: Alan Christensen
COMMUNITY SERVICES COMMITTEE MEETING
of-the City Council - City of Bakersfield
Wednesday, November 12, 2003
1:30 p.m.
City Manager's Conference Room - City Hall
1501 Truxtun Avenue, Suite 201, Bakersfield, CA
AGENDA
1. ROLL CALL
2. ADOPT OCTOBER 29, 2003 AGENDA SUMMARY REPORT
3. PUBLIC STATEMENTS
4. DEFERRED BUSINESS
A. Staff report and Committee recommendation on Aquatic Renovation Plan -
Tandy/Christensen
5. NEW BUSINESS
6. COMMITTEE COMMENTS
7. ADJOURNMENT
S:~AC~003 Community Services Committee~cs03nov12agen.doc
DRAFT
B A K E R S F I E L D
Al n Tandy, Cit~l~anager Sue Benham
Staff: Alan Christensen ~ Irma Carson
AGENDA SUMMARY REPORT
COMMUNITY SERVICES COMMI'I-FEE SPECIAL MEETING
Wednesday, October 29, 2003, 1:30 p.m.
Suite 201, City Hall, 1501 Truxtun Avenue, Bakersfield, CA
1. ROLL CALL
Called to Order at 1:33 p.m.
Present: Councilmembers Sue Benham and Irma Carson
Councilmember Jacquie Sullivan, Chair, arrived at 1:45 p.m.
2. ADOPT MAY 12, 2003 AGENDA SUMMARY REPORT
Adopted as submitted.
3. PUBLIC STATEMENTS
Jerry Randall, President, Association of Old Town Kern, spoke in support of
closing International Square for use as a public park.
4. DEFERRED BUSINESS
A. Kern Veterans' Report on Veterans Memorial Park Design Concepts
Assistant City Manager Alan Christensen reported the City Manager, staff and
members of the Veterans Committee met on October 24th and reviewed
preliminary plans with the following results, agreements and comments:
· The idea t° enter the park from 20th Street (vehicle parking east of Central
Park) along with the perpendicular parking on that street will be dropped
from the plan.
· The amphitheater will be moved to Phase II and will not appear in the
Phase I proposal.
Aoend~ Summ~ry Repor~ DRAFT
¢ommuni~ Services ¢ommi~ee Meeting
Wednesday, October 29, 2003
Page - 2 -
· The perimeter fencing and gates will be removed. In an effort to encourage
walking and to keep harmony with the Mill Creek Project, the park will be
open for public entry.
· Prior to seeking approval of preliminary plans from the City Council, the
Veterans group will deliver letters from the Bakersfield Museum of Art and
Senior Center management indicating they are satisfied with the design, or
if not, meetings will be set up between these groUps, the Veterans
Committee and the City to work out design issues.
· Cantilevered view points over the water are costly and will make it difficult
for .the canal district to maintain the canal and need to be removed. Prior to
approval by the City Council, the canal district should provide approval of
their board in writing.
Committee Member Benham requested staff to meet with the canal district and
explore if the cantilevered view points could remain in the design.
Other suggestions from the October 24th meeting, which staff would like the
Veterans group to take under advisement prior to the next submittal of
preliminary plans were discussed. Highlights were:
· A playground of at least minimal size should remain in the park.
· Hardscape is costly, requires the removal of trees and is too hot for
Bakersfield's summer months. City staff believes' there should be more
grass and trees and less hardscape to maintain a good balance.
· Restrooms need to be provided by either maintaining the current ones or
building replacements. The plans show them as part of the amphitheater,
which is now in Phase II. If there is an increased need for restrooms, the
City felt it should be the responsibility of the Veterans group.
· If there is a revised canal/water design, the next submittal of concept
designs should be based on that configuration.
· City staff would like the Veterans group to work with Don Hoggatt, Ralph
Braboy and the Parks Department on design issues, plant selection, etc., as
the schematic drawings are prepared.
Committee Member Benham explained she has been involved with this project
from the beginning and it was at her request that Ralph Braboy was appointed
to be the staff liaison. She has met with Mr. Graham Kaye-Eddie and although
Agenda Summary Report
Community Se~ vices Committee Meeting D AFT
Wednesday, O :tober 29, 2003
Page - 3-
there has been significant staff involvement with 'the Veterans Committee, the
current design plans do not reflect the City's concerns and the needs of the
park. The City is poised to allow use of a very valuable community resource for
this wond~;rful project, so there needs to be more communication from both
sides on tl'{e design plans.
~°n, Veterans Memorial Park Committee, explained although the
Dale Wils~
Veterans group will be building the project, the park will remain a City park and
will be maihtained by the City, with perhaps the exception of the memorials.
Graham Kaye-Eddie gave an overview of the preliminary plans. There are.
three majdr elements in the plan' 1) The Veterans Plaza' 2 '
-n ..... ! · . . , )theamph~theatre,
a ~] ~) [nelwater ~ea[ure. The Veterans Plaza will be in the shape of a service
star with ~lags on each of the five points. The amphitheatre will be for
communi~ use and will have terraced grass seating. There are four points of
entry planned with canopies. Along the banks of the canal are stages reserved
for 13 memorials/monuments with arbors planned along the canal. There are
also plans ¥or two fountains.
Economic Development Director Donna Kunz explained the new hydraulics that
are .necessary for the water flow to work have changed the sha e of the water
an ' ~ P
d w~ll need to be incorporated into the plans as the water will cover part of
the prelimihary designed area east of the canal. The concerns expressed by
staff at the October 24th meeting were that the preliminary design is becoming
more like a plaza and not a park because the plan calls for large areas of
concrete. Also, Parks Department staff felt the maze garden on the plan
created with formal boxwood hedges would require constant trimmin and be
d~fhcult to maintain.
· !
Dale Wils .n stated that they will be changing the plan to incorporate more
grass in place of the concrete around the Veterans Plaza.
Alan Christ~ensen explained the Veterans group plans to build the memorial, but
they will be turning it over to the City. As the City' will be maintaining the park,
staff would like the design to be planned using durable materials that are long-.
lasting and easily maintained.
Committee Member Benham asked staff to explore the possibility of relocating
the Commanity House.
Dale Wilson ex I ' ' ' '
~ pained the veterans group will be looking for three phases of
approval: conceptual design approval, approval of schematic drawings, and
formal ap[,roval of the final building plan, but they need approval of the
conceptual design so they can go out into the community and raise money.
Agenda Summary Report ~' .~ ~1"
Community Services Committee Meeting
Wednesday, October 29, 2003
Page - 4 -
It was discussed the changes need to be made to the. conceptual design
drawings before the plans are presented to the community for fund-raising.
Also, approval needs to be obtained from the Bakersfield Museum of Art, the
senior center and the canal district.
Committee Member Carson made a motion for staff to work with the Veterans
group to incorporate the changes discussed and bring the plans back to the
Committee meeting on December 17th. The Committee unanimously approved
the motion.
5. NEW BUSINESS
A. Discussion and Committee recommendation on International Square
Assistant City Manager Alan, Christensen reported a worsening situation at
International Square. The City has a 30 year-old agreement with the railroad to
have International Square be a public park. The Parks Department has
experienced increased problems with garbage and health concerns.
Police Chief Eric Matlock reported International Square has become a source
of problems. On any one given weekend the Police Department arrests from
30 to 60 people. The type of crimes emanating from the Square are drug sales,
prostitution, alcohol and chemical abuse, and nuisance crimes. International
Square from a law enforcement standpoint consumes needed Police resources
without continued success. The homeless using the Square could utilize the
Rescue Mission and the Homeless Center.
Economic Development Director Donna Kunz reported she has had lengthy
discussion with the' real estate director for the railroad and the railroad wants
the Square cleared back to dirt, which is in the lease agreement should the City
terminate its lease. The railroad has indicated at some time in the future they
would like to sell the property for a redevelopment project. Alternative green
space, Pavilion Park developed by the Rescue Mission, is available within a
block and a half. The Rescue Mission also provides food and showers.
Committee Member Benham explained efforts have been made to improve
International Square Park. Fencing was installed and food deliveries moved to
another location, but the conditions did not improve. The City is spending funds
and the community is not able to enjoy the use of the park. She further
explained she had a meeting with the Police Chief and Economic Development
Director and it was agreed the best solution for the whole area would be to
-close International Square.
Committee Member Benham made a motion to support staff's recommendation
to close and dismantle International Square Park and forward the
recommendation to the City Council to end the lease agreement and return the
property to the railroad.
Agenda Summary Report F 2AFT
Community Services Committee Meeting
Wednesday, October 29, 2003
Page - 5-
Bill Underwood, Homeless Collaborative, spoke against closing International
Square unless there is other green space available in the area for the
homeless.
Marie Tapp, Buckley Smith, suggested closing International Square Park to the
public for a minimum of two years and they offered to immediately clean it up.
Mona' TWocats, Kern County Homeless Collaborative, spoke about the people
using International Square and the fact that they are not just going to disappear
because they have no where else to go and are still going to be in the area.
Police Chief 'Matlock agreed drug dealers and the crime element will move and
exist elsewhere, but there is an element of drug and alcohol users camping out
in International Square causing drug pushers and prostitution to come there.
Committee Member Carson expressed she realizes the City has tried
everything possible to keep International Square Park open and with the
problems there must close it. However, she would like staff to have a plan of
action when it is turned back to the railroad as a dirt field, to make sure it is
maintained.
The Committee unanimously approved the motion by Committee Member
Benham to close International Square.
6, COMMITTEE COMMENTS
7. ADJOURNMENT
The meeting adjourned at 3:10 p.m.
Staff attendance: Assistant City Manager Alan Christensen; Ginny Gennaro, City
Attorney's Office; Assistant City Manager John Stinson; Police Chief Eric Matlock;
Economic Development Director Donna Kunz; Assistant Public Works Director Jack
LaRochelle; Public Works Park and Landscape Designer Don Hoggatt; Assistant
Recreation and Parks Director Allen Abe; Parks Supervisor Ed Lazaroti; Park Construction
and Facility Designer Ken Trone; Economic Development Associate Donna Barnes; and
Public Works Engineer Ralph Braboy
Others: Jerry Randall, Association of Old Town Kern; Bill Underwood Homeless
Collaborative; Cherie Smith, Kern Veterans Memorial; Dale Wilson, Kern Veterans
Memorial; Trenton Spears, Kern Veterans Memorial; Mike Henderson, Rescue Mission;
Mona Twocats, Homeless Collaborative; Graham Kaye-Eddie, Cross Architects; Donna
Lorenz, Kern Veterans Memorial Foundation; Carol R. Braly, Greater Bakersfield Legal
Assistance/Community Homeless Center Project; Diana Campbell Rice, Bakersfield
Homeless Center; Louis B. Gill, Jr., Bakersfield Homeless Center; Marie Tapp, Buckley
Smith; Denise Signs, Buckley Smith; and James Burger, reporter, The Bakersfield
Californian
cc: Honorable Mayor and City Council
S:~AC~.OO3ComSer~O3oct29summary,doc
DEPARTMENT OF RECREATION AND PARKS
TO: Alan Tandy, City Manager ~ ~'- November 4, 2003
FROM: Alan Christensen, Interim Recreation & Parks Director ~
SUBJECT: Aquatic Renovation Plan
Last year the City Council directed staff to implement an Aquatic Renovation Plan
designed to upgrade existing facilities and construct new facilities to meet the growing
needs of the vadous users of our aquatics programs. Because of limited resources, the
plan is being phased-in over time. The elements of Phase I of the plan that have already
been accomplished or are in process include:
· Construct one large leisure aquatic area (McMurtrey Aquatic Center)
· Renovation of Martin Luther King Pool and'Jefferson Pool (because of funding
shortages, spray parks elements are planned in FY 04-05 using CDBG funds)
· Saunders pool was closed. A second pool closure prior to the opening of the 2004
summer swim season, with the location to be identified, was required by Council to
build the McMurtrey Aquatic Center.
To continue the Aquatic Renovation Plan, staff is proposing additional phases, which
generally includes the following:
1) Dedicate funds for a new pool facility at Planz Park and use Proposition 40 grants to
complete funding of the project
2) Perform necessary.code repairs on existing pools at Siemon, Beale, Jastro and
Planz. Repairs at Jastro and Planz would be minimal and enough to meet minimum
operational and safety standards.
3) Replace Wayside Pool with a spray park.
Today there are no General Fund moneys to provide capital funding for the proposed
phases of the plan. Fortunately, Proposition 40 grant funds from the State were awarded
to the City in the amount of $1.6 million for recreation projects, and can be used for a
variety of purposes, including pool, repairs, renovation, or new construction.
Phase II, III & IV elements are a result of reviewing current condition of remaining pools,
costs of repair, attendance, usage and availability of funding. Pool closures have been
considered because the cost of renovation is so high when compared with overall
1
attendance at specific pools~ In addition, the extreme age and deterioration of some
facilities are causing large, immediate repairs, which may require renovation or closure by
the State Health Code within the next year or b,~o. Spray parks would be recommended to
immediately replace deteriorated pool facilities that are deemed to be closed.
The following report provides an analysis of: I) attendance at existing pools, 2) physical
condition of pools, 3) rationale for pool closures, and 4) a detailed description of all phases
of the Aquatic Renovation Plan. Also, a summary of the current condition of City pools is
found in in Attachment A, and a financial overview of improvement costs in Attachment
ATTENDANCE
There are a variety of programs conducted at city pools. These programs include
recreation swim, swim lessons, lap swim, swim team and pool parties. Eighty-three
percent of programming time is during recreation swim as seen on the graph
Total Programming Distribution
Swim Team
O%
! Pool Parties
Lap Swim 12%
[essons
4%
Rec Swim
83%
Over the past five years of recreation swim at city facilities Jefferson and SilverCreek
swimming pools have had the highest attendance. Beale and MLK pools trade for the third
top position. Planz pool has ranked 5t~ highest in attendance for all five years Wayside,
Jastro and Siemon have fluctuated 6th, 7th and 8th highest over the past three years. Actual
attendance numbers for the recreation swim program are listed in the table below:
?OOL 1999 2000 2001 2002 2003 Tota~
~eale 3,820 4,743 6,243 6,630 4,235 25,671
Jastro 3;906 3,308 3,111 2,713 3,200 16,238
Jeff~r~o~ 7,805 9,906 10,572 9~830 7,895 46,008
~LK 3,465 4,406 5,269 5,610 4,912 23,662
Plar~z 3,750 4,138 4~891 4,708 3,427 20,914
Sa u riders 2,006 2,564 2,632 2,626 C los ed 9,828
S~emo~ 3,581 4,720 4,001 3,130 2,564 17,996
SilverCreek 8,711 7,221 7,511 7,698 8,207 39,348
Wayside 2,264 2,782 3,447 3,752 1,708 13,953
Overall Total 39,308 43,788 47,677 46,697 36,048 213,618
The chart shows that Wayside, Siemon and Jastro pools are not well attended when
compared to other pools. Wayside decreased by almost 2,000 swimmers in 2003. It is
unclear what effect closing Saunders pool this year had on attendance at other pools
2
OPERATIONAL COSTS
Operational costs are influenced by the annual condition of the pool, attendance and coSts
of chemicals and other consumables. By dividing the net operating loss by the number of
persons attending each pool, we can determine the cost per swimmer at each facility.
Wayside Pool had the highest cost at over $74 per swimmer last season. By comparison,
per swimmer costs at other City pool were Planz $63, Jastro $40, Siemon $51, and Beale
$28. More detailed operational costs by pool are found in Attachment A.
One technology that would reduce maintenance costs at older pools is an automated
chemical system. Staff recommends these systems be installed at Jastro, Beale, or Planz
pools to reduce chemical costs by one third and staff time manually balancing chemicals.
PHYSICAL CONDITION
There has been extensive analysis conducted on the current condition of city pool facilities.
Aquatic Design Group (ADG) reviewed all the pool facilities during June 2000 and cited
several code violations, mechanical and structural deficiencies, and improvements to
maintain current programming and keep facilities operational. In March 2003, Slater
Plumbing & Mechanical Inc. (SPM) conducted a video analysis of the piping at Wayside,
Beale, Jastro, Siemon and Planz pools.
Based upon these studies, the three pools in the poorest physical condition are Wayside,
Beale and Planz. Since these studies have been conducted, additional maintenance
issues have surfaced that will create further unbudgeted costs if they are to be opened in
June 2004. Staff has also been informed by the County Health Department that code
violations at these three pools may prevent them from being opened next year unless
problems are corrected.
State Code violations include decking replacements, accessibility to the physically
handicapped, lack of handrails on stairs, inadequate safety handhold on perimeter gutters,
non adjustable wall inlets, water turnover rate does not meet the 6-hour mandate, lack of
recirculation system and other smaller code violations.
Wayside . Beale Planz Jastro Siemon
No. of Code ViolatiOns 5 4 4 5 6
Estimated Repair Cost $106,163 $106,163 $123,563 $105,600 $133,545
Additional Improvements $10,655 $54,150 $10,655 $10,655 $12,233
Total $116,818 $160,313 $134,218 $116,255 $145,778
Not-included in' the scope of the study are the requirements for the facilities to meet
accessibility standards with associated costs as required by the Americans with Disabilities
Act. Keep in mind the estimates from ADG were put together in June of 2000 and may not
reflect current costs.
WAYSIDE POOL (Built 1962)
Slater Plumbing's study stated that the return piping was obstructed with rust and debris
and they were unable to get the camera through the pipe. They recommend replacement
of return piping, which needs to be accessed through the concrete decking. Approximately
two feet of the south and north skimmer piping is cracked. In both cases they recommend
3
a seven foot replacement of the existing cast iron piping. SPMI estimates the cost to repair
this at $13,500.
State health code turnover rate is not met at this pool because of these serious piping
restrictions. Daily backwash of the filter was necessary this past season (2003) to turnover
the water, which added additional operational costs. Regular city staff believes this is the
pool that is in the worst condition and is concerned that if not repaired, it will be inoperable
during the 2004 summer swim season.
In staff's opinion, this p°ol is in a similar condition as Saunders Pool was last year. We
anticipate Wayside pool in danger of being shut down by the Health Department next
summer if maintenance issues are not corrected. Unfortunately, Wayside is
"grandfathered" under the state code and any change in piping or decking may force us to
repair all code violations in order to open the facility. This would mean repair of piping,
decking, and any code violations estimated at $200,000 or more. If Wayside is not
selected for closure this year, these ~ items need to be repaired prior to opening in
summer 2004.
Wayside Pool has experienced high rates of vandalism during the past two years. The
fence has been cut in separate places 5 times and repaired, the drinking fountain was
ripped off the wall twice, the chain and lock of the lifeguard stand was cut and the stand
was thrown into the pool, glass bottles were thrown into the pool weekly, and other
equipment has been damaged and thrown into the pool. All damage has been repaired
and staff is working on better ways to deter vandals.
BEALE POOL (Built 1932)
For several years staff has attempted to identify the source of water loss at Beale Pool
which is estimated to be 10,000 gallons per day. In 1998, a geotechnical and materials
investigation was conducted by Kleinfelder, a local firm. Their report contained three main
points: (1) the soils supporting the shell are providing the required support in that
settlement of the pool was not observed; (2) core samples indicated that the interior
surface of the pool was undergoing a separation from the main concrete shell due to water
seepage at cracks of the interior coating; and (3) the plumbing system be tested for leaks.
Some of the leaking issue was resolved last year when city staff cemented the main drain.
However; results from tests for leaks last year found that Beale pool has a minor leak in the
scum gutter system, which is approximately only 5% of the original leak of 10,000 gallons.
Most of the water from gutters drain into the sump, but there is some water leaking under
the pool deck. A pool shell and pump room renovation is necessary to stop this leak.
SPM's video inspection of this pool reported that the return piping had some build-up and
that they were unable to get through due to the radius of the piping. The clay skimmer
piping was reported to be in adequate condition.
The City was given permission by the County Health Department to operate Beale pool in
2003 with the understanding that a plan was being developed to address identified issues
prior to 2004, which may include abandoning the pool. The wading pool is not operating
because it does not comply with the state code that required one-hour turnover rate in
wading pools. This means 100% of the pool's water should be filtered and sanitized every
4
~ hour. The cost of installing new piping, a filtration system, and safe equiPment is about the
/ same cost as a spray park, which is between $185,000 and $200,000.
t' PLANZ POOL (Built 1962)
.. SPM's report on Planz pool noted that twelve inches of cast iron piping at the east skimmer
area should be replaced because the cast iron is now very brittle. In addition twenty-four
inches of cast iron piping at the west skimmer area should be replaced as well. Like
Wayside, this pool also needs to be backwashed daily because of the clogged pipes.
However, there are two absolutely critical repairs at Planz pool that must be completed
before the can be opened in summer. First, the deteriorating pump room cement floor and
decking needs repair. The pump room floor is so cracked and the rebar was so severely
rusted that large pieces of the cement floor have begun to fall through to the bottom of the
surge pit. Cost of repairs is $17,000. Second, there is a pipe leak near the pool sheik The
return line on the south side of the pool shell has a hole in it and is shooting water out one
of the Side seams of the pool. Cost of repairs is a minimum of $16,000, but the contractor
has told us that costs may be higher if they find more damage once they dig up the pipes.
JASTRO POOL (Built 1960-62)
While health code and ADA violations exist, Jastro Pool is in the best physical shape in
comparison with Siemon, Wayside and Beale. This pool has a heater and is used annually
by the high schools beginning in January and ending at the end of May.
Jastro Pool is approximately 1.5 miles from the new McMurtrey Aquatic Center. Staff will
evaluate attendance at Jastro Pool at the end of next season to determine the impact that
new and renovated facilities such as McMurtrey and MLK will have on users living in the
-downtown.
RECOMMENDATIONS
PHASE II (1-2 years)
1. Because of declining attendance, poor physical condition, and age, close Wayside
Pool permanently in spring of 2004. If closure of Wayside is an undesirable option,
then a second choice would be Beale Pool. This action would meet the Council's
decision to close two pools (Saunders was closed in 2002-03) to offset the operating
costs of the McMurtrey Aquatic Center.
2. Replace the closed pool with a water playground for $275,000. The water
playgro, und is likely to be very popular, would have no admission fee, would have no
aquatics staffing, and would cost much less to maintain than a traditional pool. An
additional $50,000 is budgeted for demolition of the closed pool. Because of
construction timelines and funding availability, the Wayside spray park would be
completed after the summer season in late 2004.
3. Perform various pool improvements to open pools this year. Costs will be about
$100,000 and would begin almost immediately and would be completed before the
summer swim season in June 2004. Again, Prop. 40 monies and Park Impact fees
could be used. Listed below are the recommended repairs:
5
t
A. Repair decking & pump room floor at Planz $17,000
B. Repair shell leak at Planz Pool $16,000
C. Repair decking at Siemon Pool $14,000
D. Automated chemical systems at Jastro or Beale $38,000
E. Contingency' $15,000
Total $100,000 ·
4. With new park construction, every fourth park should have a wet playground feature.
Wet playgrounds that are approximately 3,500 square feet in size currently costs
· between $200,000 and $250,000. Building spray parks would reduce the need for
additional pools and provide a wet area in places where pools would not be feasible.
PHASE III (2-5 years)
1. Construct a new pool at Planz Park. This facility would have zero-depth entry,
attached 25 yard lanes, and water features. Capacity would be approximately
double that of Jastro and Siemon pools, which have a combined capacity of 300
people. The majority of funding would come from Proposition 40 grant funds. Funds
are planned to be dedicated from CDBG because it is an eligible area. Contributions
should also be pursued from the Kern High School District, which would use the
facility during winter and spring. Staff would also pursue competitive grants and
other sources to complete the funding plan. Design work would begin immediately.
2. When Planz Pool is completed, another older city facility such as Beale, Wayside or
Jastro should be closed and immediately replaced with a wet playground at a cost of
about $275,000, including demolition of the closed pool.
PHASE IV (5 years or more)
1. Construct a new pool (similar to the one proposed at Planz) in the Northeast to meet
current and future needs. The city has a 20-acre site on Paladino Drive that should
be suitable for a pool. Funding would be provided through accumulated park
improvement funds and possible state grants.
2. Construct a new pool in the Southwest (VVest of Silver Creek service radius) to meet
high current and future demand. A site will need to be identified and acquired.
Funding would be provided through accumulated park improvement funds and
possible state grants.
3. Replace Siemon and any other existing pools not yet renovated, reconstructed
or replaced with wet playgrounds. Add a wet playground to SilverCreek Park.
CONCLUSION
Analysis of pool facilities is difficult given the number of factors involved, such as location,
attendance, and varying physical condition. It will be critical for staff to evaluate pool
usage after the 2004 summer season to determine if changes in attendance patterns have
occurred as a result of the new McMurtrey Aquatic Center and the rehabilitation projects at
MLK and Jefferson pools.
Hopefully staff has provided a thorough discussion of the issues, and plans for improving
facilities city-wide over the next five to ten years.
6
Attachment A
Pool Condition Summary
Wayside Beale Jastro Planz Siemon
Average Attendance (1999-2003) 2,791 5,136 3,448 ' 4,183 3,599
Actual ~2003 1,708 4,235 3,200 3,427 2,564
Actual .2002 3,752 6,630 3,713 '4,708 3,130
Actual 2001 3,447 6,243 3,111 4,891 4,001
Actual 2000 2,782 4,743 3,308 4,138 4,720.
Actual 1999 2,264 3,830 3,906 3,750 3,581
Physical Condition
ADA Compliance Non-Compliant Non-Compliant Non-Compliant Non-Compliant 'Non-Compliant
CantileVer Decking Needs Replacement Adequate Condition Fair Condition Needs Replacement Needs Replacement
Circulation-Turnover Rate Very Poor; Direct Loss System; Moderate; ~Very poor; Very poor;
Does not meet code Does not meet code Does not meet code Does not meet code Does not meet code
. Flooring in Pump Room Fair Condition Fair Condition Fair Condition Needs Replacement Fair Condition
Other Decking Fair Condition Fair Condition Fair Condition Needs Replacement Needs Replacement
'Piping Completely blocked Fair Condition Fair Condition Poor; not immediately Fair Condition
returns needed
Sump Tank Fair Condition Fair Condition Fair Condition Fair Condition Needs Replacement
Vandalism 2 times/month 1-2 Times per year Once a year 1-2 Times per year Once a year
Code Violations
Number of Violations 5 4 5 4 6
. Necessary Repair Costs $106,163 $106,163 $105,600 $123,563 $133,545
i Other Suggested Repairs $10,655 $54,150 $10,655 $101655 $12,233
Total Costs $116,818 $160,313 $116,255 $134,218 $145,778
Operational :Costs
Revenue $4,780 $7,428 $11,683 $11,888 $14,354
.Labor $46,962 $46,962 $51,878 $57,514 $66,623
~Maintenance & Repairs $84,328 $77,684 $124,614 $90,932 $110,005
~Net Costs ($126,510) ($117,218) ($1 64,809) ($136,558) ($162,274)
Attendance 1,708 4,235 3,200 3,427 2,564
Cost Per. S.wimmer $74.07 $27.68 $39.85 $63.29 $51.50
Attachment B
Project Financial Summary
PHASE II COST FUNDING SOURCES
CDBG Prop. 40 Park Funds HS District Other
Wet Sprayground at Wayside or Beale $275,000 $275,000
City-wide Pool Improvements $150,000 $100,000
Subtotal Phase II $425,000
PHASE III
New, Aquatic Facility at Planz Park $3,000,000 $500,000 $1,550,000 $200,000 $750,000
Wet Sprayground at closed pool $275,000 $275,000
Subtotal Phase III $3,275,000
PHASE IV
New Aquatic Facility in Northeast $3,000,000 $3,000,000
New Aquatic Facility in Southwest $3,000,000 $3,000,000
Wet Sprayground at Silver Creek $275,000 $275,000
Renovate Siemon and Other Pools '$500,000 $500,000
Subtotal Phase III $6,775,000
Total All Phases $10,475,000 $1,050,000 $1,650,000 $775,000 $200,000 $6,750,000
Bakersfield City Council
1401 Truxtun Ave.
Bakersfield, Ca. 93301
Ref: Naming of parks and other elements within the Kern River Parkway
Bakersfield City Councilpersons;
The Kern River Parkway Foundation would like to submit a few names to be considered as possible
selections for naming the new park within the Kern River Parkway located at Buena Vista Road and
Stockdale Highway.
"Park Rio San Felipe" is one which we like to have considered. Rio de San Felipe is the first name given
to the Kern River in 1776 by Padre Garces. Please read hist?)r, ical references to this name in Eugene
unne~ster s book titled THE GOLDEN EMPIRE and John Maynard's book called BAKERSFIELD A
CENTENNIAL PORTRAIT.
The other suggested name is "Park Winatun". This is a Yokut name given to the person in the village
designated to greet and welcome visiting guests to the village sites, many of which lied along the Kern
River. Historical and cultural reference to this name can be found in Frank Lataa's writing, HANDBOOK
OF YOKUTS INDIANS.
Furthermore, the Kern River Parkway Foundation would like to exclude the name of Rio Vista fi.om
consideration. As you know all names within the Parkway shall have historical and cultural significance
directly related to the Kern River. Rio Vista has no historical or cultural basis and does not conform to the
Kern River parkway EIR or the Parkway naming and sign ordinance. This name was given as a tag two
years ago and considering it as an official name would not adhere to legal ordinance or the intent of the
Kern River Parkway naming theme. This tag circumvented the proper channels for naming considerations.
Thank you for consideration of these matters, r
President, Kern River Parkway Foundation
PO Box 624 Bakersfield, Ca 93302-0624
bakersfield.com - City to consider closing park pool Page 1 of 2
bakersfield., corn
http://www.bakersfield.com/local/story/43 ~ 96 3 4 p-4 3 6 9 3 8 0¢,h tml
City to consider closing park pool
Officials look to save money for aquatics center with closure of
southside facility
By AMY HII ~VERS, Californian staff writer
e-mail: ahilvers~bakersfield.com
Posted: Tuesday November 1 lth, 2003, 11:20 PM
Last Updated: Tuesday November 1 lth, 2003, 11:50 PM
A city committee will decide today whether to close the Wayside Park swimming pool on the south side
of town.
But some residents who use the neighborhood pool would rather see it remain open.
The city hopes by closing the pool, which is in South Bakersfield, it will save money for the new
McMurtrey Aquatics Center. That swimming complex is now under construction.
Closing the Wayside pool would save the city more than $100,000 in repair costs and about $60,000 in
annual operation costs, according to city records.
The City Council's community services committee will decide whether to act on a recommendation to
close the pool at a meeting at City Hall today.
Some feel closing the pool would diminish the neighborhood.
Troy Scott, 41, took his kids to play at Wayside Park on Tuesday. He swam in the pool when he was
younger, and now takes his children to swim there in the summer. He didn't like the notion of taking
money used to support the neighborhood pool and using it for a bigger water park in another part of
town.
"I think it's a bad idea," Scott said. "It would take away from the neighborhood. I don't think they should
ever take away from the neighborhood."
Christian Mazariegos, 14, was also at the park Tuesday. He said he learned to swim at the park's pool
and he still swims there sometimes.
"In the summer there's no other place to go," he said.
Jareal Egan, 17, agreed, saying children in poorer neighborhoods use the pool.
http ://www.bakersfi eld. com/local/v-print/story/4359634p-4369380c.html 11/12/03
bakersfield.com - City to consider closing park pool Page 2 of 2
/
"A lot of us don't have pools. It used to be a fun place to come out and stay out of trouble," Egan said.
"It's a nice place to come and kick it."
/ Wayside is among a few pools Bakersfield has decided to upgrade or close. The city closed Saunders
Park pool this summer.
/
Some residents said Tuesday that closing Saunders Park pool was a letdown.
"I feel disappointed because I only got to swim there for two years. I was disappointed when they closed
it down," said Eddie Trevino, 13.
Trevino and his family moved to the area five years ago for a bigger house that was near the community
pool. Sarah Van Meter, Trevino's grandmother, said she used to take her children and grandchildren for
swimming lessons at the pool, and now that's gone.
"It's just very disappointing because so many children really had a good swimming pool over here," Van
Meter said.
She said the new aquatics center will likely be crowded, and is probably too far away for some families
to travel.
Marilu Lopez, who lives across the street from the park, said she didn't miss the pool when itclosed.
"It wasn't a big deal," said Lopez, 15. "We didn't use it that much."
Though the pool at Wayside could be the second pool that closes, two other Bakersfield pools at
Jefferson and Martin Luther King Jr. parks will be renovated.
Those renovations will be paid in part by federal funding from House and Urban Development
Department and in part by the city.
http://www.bakersfield.com/local/v-pfint/story/43 59634p-4369380c.html 11/12/03