HomeMy WebLinkAbout02/01/1995, B A K E R S F I E L D
Kevin McDermott, Chair
Randy Rowles
Patricia M. Smith
Staff: Gail E. Waiters
...AGENDA
URBAN DEVELOPMENT. COMMITTEE
Wednesday, February 1, 1995
12:15 p.m.
City Manager's Conference Room
Second Floor - City Hall
1501 Truxtun Avenue
Bakersfield, CA
1. ROLL CALL
2. APPROVAL OF OCTOBER 31, 1994 MINUTES
3. PRESENTATIONS
4. PUBLIC STATEMENTS
5. DEFERRED BUSINESS
6. NEW BUSINESS
A. SIDEWALK REPAIR PROGRAM - R. Rojas
B. HOME OCCUPANCY'PERMITS - Hardisty
C. STATUS REPORT ON WASTEWATER TREATMENT PLANT - Tandy/R. Rojas
D. 1995 PROPOSED MEETING SCHEDULE - Waiters
7. ADJOURNMENT
GEW.~p
FILE COPY
NOTICE OF SPECIAL MEETING
OF THE
URBAN DEVELOPMENT COMMITTEE
OF THE COUNCIL
OF THE-CITY OF BAKERSFIELD
NOTICE IS HEREBY GIVEN that the Urban Development Committee of the
City Council will hold a Special Meeting for the purpose of a Committee Meetin.q on
Wednesday, February 1, 1995, at 12:15 p.m., at City Hall, City Manager's Conference
Room, Suite 201, 1501 Truxtun Avenue, Bakersfield, California, to consider:
1. ROLL CALL
2. APPROVAL OF OCTOBER 31, 1994 MINUTES
3. PRESENTATIONS
,
4. PUBLIC STATEMENTS
5. DEFERRED BUSINESS
6. NEW BUSINESS
A, . SIDEWALK REPAIR PROGRAM - R, Rojas
B. HOME OCCUPANCY PERMITS - Hardisty
C. STATUS REPORT ON WASTEWATER TREATMENT PLANT- Tandy/R. Rojas
D. 1995 PROPOSED MEETING SCHEDULE - Waiters
7. ADJOURNMENT
G~il/E. Waiters,/~ssistant City Manager
GEW:jp
URBAN DEVELOPMENT COMMI'I'I'EE - 1995 PROPOSED MEETING SCHEDULE
WEDNESDAYS @ 12:15 PM
COMMITTEE MEETING COUNCIL MEETING
February 1 February 8
None February 22
March 1 March 8
None* March 22
None* April 5
None April 19
April 26 May 3
None* May 17
None* June 14
None* June 28
July 12 July 19
None August 9
August 16 'August 23
September 6 September 13
None September 27
October 4 October 11
None October 25
November 1 November 8
None November 29
December 6 December 13
*No meeting scheduled because of budget hearings/holidays.
MEMORANDUM
FROM: JACK HARDISTY, Development Services
SUBJECT: LCie~soCnOsUnCil Referral 14097 - Home Occupatio/~rflits and Piano
Piano lessons given to students who come to the teacher's home would not be
permitted as a home occupation because the ordinance criteria for home
occupation permits prohibits the rendering of services to persons who go to
the home for those services and it prohibits activities which produce noise,
pedestrian or vehicular traffic or other activity which constitute a
nuisance.
This home Occupation permit process is a way the ordinance permits some use of
a home for commercial or professional use incidental and secondary to a
dwelling. We have issued well over 13,000 permits using criteria adopted by
the City Council and have experienced relatively few problems. Commercial
encroachment into a neighborhood in excess of a home occupation could be
permitted by conditional use permit. For instance, we have approved teaChing
swimming by conditional use permit.
This is how we maintain the integrity of residential zones but recognize a
degree of overlap in our lives which may be permitted without imposing on our
neighbors.
JH/Id
s:MPL
EXECUTIVE SUMMARY
This executive summary presents the recommended improvement program and financial
planAevenue program for the City of Bakersfield, .through the Year 2040. Details of this
summary are presented in this milestone report.
Background
Brown and Caldwell was retained 'by the City of Bakersfield in August of 1993 to develop
a wastewater master plan and supporting financial plan to guide the wastewater collection,
treatment, and disposal improvements well beyond the turn of the century, and to prepm'e the
. requh'ed environmental impact report (EIR) in accordance with California Environmental Quality
Act (CEQA) guidelines.
This project has been conducted in phases, and periodic milestone reports have been
submitted to the City. Initially, a progress report, submitted in November of 1993, set forth the
fundamental elements needed to develop the master plan, such as population projections, waste
discharge requirements, projected wastewater characteristics, study area boundaries, and an
evaluation of the existing City Plants 2 and 3.' Milestone Report No. I summarized the various
alternatives considered and evaluated for the City on a cursory level, and recommended three
regional wastewater alternatives for detailed evaluation. Milestone 2 presented the detailed
evaluation of three regional alternatives, and the recommended of the proposed regional
wastewater alternative for detailed planning. Milestone Report Nos. 3 and 4, combined into this
single report, summarize .the detailed plan and the supporting financial plan/revenue program.
Recommended Improvement Program
By evaluating various economic and non-economic criteria, eight regional wastewater
alternatives were evaluated: three of which were evaluated in further detail. From this detailed
evaluation, Brown and Caldwell has recommended a regional wastewater alternative to best serve
the cormnunity through the Year 2040. This overall plan proposes to:
· Keep and upgrade ·existing Plant 2, which serves the east portion of the City;
· Maintain operations at Plant. 3 through the Year 2021, and subsequently
decommission the plant to allow further development in this fast growing area of
the City;
· Develop and implement a new Plant 4 in the southwest Bakersfield area, to serve
the growing Western Rosedale area, west Bakersfield and southwest areas of the
community. Plant 4 is proposed to be constructed by the turn of the century;
· Construct new trunk sewers which will support the projected wastewater flows,
and convey the wastewater to the new Plant 4 in the most economic manner
(maximize gravity flows).
· Develop a long-term effluent disposal/reuse plan, with built-in flexibility to
-accommodate future changes.
Plant 2. Plant 2 will be upgraded in Year 1997, to accommodate future growth in the
eastern Bakersfield area, particularly from the northeast area of the City. Additional flows' are
anticipated from the Northeast Trunk Sewer construction project. The prior design for the Plant
2 upgrade should be implemented, with modifications, as follows: construct new headworks,
modify the grit removal system, upgrade.the septage station, add one primary clarifier, two new
trickling filters, one new sludge digester, and upgrade the sludge drying beds. The constrUction
cost for these improvements is estimated .at approximately $17 million. This recommended
upgrade will be flexible enough to accommodate future flows up to 28.5 mgd, the rated capacity
of the original Plant 2 upgrade Package.
Plant 3. Plant 3, due to the continued development of the City in the southwest, will
continue operation at present capacity until the Year 2021. In the meantime, the City should
consider purchase of development fights along the north and east plant site boundaries, to restrict
residential development immediately adjacent to the plant site. No expansion of Plant 3 is
recommended due to the rapid City growth surrounding the plant site. The Gist-brocades .yeast
plant waste should be re-considered for treatment at Plant 3, if feasible. When the new Plant 4
opens by the turn of the century, this yeast waste should be treated at Plant 4.
Plant 4. A new Plant 4. is recommended to serve the west and southwest area of
Bakersfield. With the anticipated growth in Western Rosedale, hook-up to the sewer system and
abandonment of septic systems, and rapid development in the southwest area of the City, Plant 3
will reach its present capacity by Year 1999. In addition, the rural southwest is expected to grow
substantially during the planning period. With this in mind, a new Plant 4 is recommended in
the extreme southwest area of Bakersfield, west of I-5 on Bear Mountain Boulevard. This
location allows the best use of gravity flow to the plant, is in close proximity to potential
reclaimed water users, and is remotely located away from present or future urban development.'
Approximately 45 miles of new trunk sewers, phased in as needed, will be required to convey
sewage to the new plant.
Effluent Disposal/Reclamation Plan
We recommend that the City continue to reuse secondary effluent to the extent feasible
through the planning period. The City should also pursue a long-range plan for groundwater
recharge in the southwest Bakersfield area. Details of the plan, including phasing in storage
ponds, identified reclamation sites, and discussion of future groundwater recharge are included
in this report..
Projected Connection and User Fees'
It is essential to' formulate a viable financial plan to ensure implementability in the future.
We prepared a detailed financial plan as part of the detailed analysis of this recommended
improvement program.
Information in .this report is a forecast of user charges and connection fees, at current
dollar levels, over the next 46 ,years, until the year 2040. The summary table below lists the
estimated user charge and connection fee levels over this period, as a percent of the current fee
level (for service charges), and in dollars at current 1994 cost levels for connection fees.' The
forecast set forth below is sensitive to assumptions, and the recommendation concerning how
connection fees are established is important. It is estimated that the probable sewer service fees
and the new connection fees through the year 2040 at 1994 cost levels:.
Percent of current
.Year Sewer Service Fee Connection Fee
1995 100 $ 900
1996 I00 1,200
2000 100 1,800
2010. 70 3~000'
2020 60 2,000
203O 40 1,300
2040 35 1,000
Over the next five years, it is forecast the weighted average construction and operational
inflation rate which will apply to the economic' forecasts set forth in the tables in Appendix C
will be 4.5 percent annually. Therefore the estimated fees are expected to be as follows, in
current dollars:
'Percent of current
Year Sewer Service Fee Connection Fee
i 996 104.5' $1,254
1997 109.2 1,420
1998' 114.1 1,600
1999 119.3 1,900
2000 124.6 2,250
Connection fee levels are recommended to increase in 1994 dollars from the current level
per equivalent service unit of $900 to -in FY 1995-96; to $1,800 in FY 1999-2000; to $3,000 in
FY 2009-10, decrease to $2,000 in FY 2019-20; and then decrease to St,000 in 2037.
vii
BAKERSFIELD
'Alan~d~,~~ity'~ger'~~---~/ Randy Rowles, Chair
Staff: Gail E. Waiters Kevin McDermott
Patricia M. Smith
AGENDA SUMMARY REPORT
URBAN DEVELOPMENT
Monday, October 31, 1994
12:15 p.m.
City Manager's Conference Room
1. ROLL CALL
Call to Order 12:40 p.m.
Present: Councilmember Randy Rowles, Chair; Vice Mayor Kevin McDermott,
and Councilmember Patricia Smith
2. APPROVAL OF OCTOBER 5, 1994 MINUTES
Approved as submitted.
3.PRESENTATIONS
None
4. PUBLIC STATEMENTS
Robert Clerico spoke to the committee regarding encroachment permits and signs. He
asked that the City Council reconsider the ordinance as it relates to the downtown area.
He pointed out that some store owners are not following the ordinance and if the City was
more flexible with the ordinance, it could renew downtown by attracting more business.
Staff will report back to the Committee regarding any modifications they would
recommend. That information will also be forwarded to Mr. Clerico.
Urban Development Committee
Agenda Summary Report
October 31, 1994
Page 2
5. DEFERRED BUSINESS
A. TRAILS PLAN
Staff provided an update to the Committee on the Trails Plan. Good progress has been
made by staff with special interest groups and property owners. An administrative review
by the department heads will be completed within two weeks and then the proposed plan
will go to the Planning Commission and finally, the Council. Staff will bring a draft back
to the Committee at its next meeting. "
B. TRANSPORTATION IMPACT FEES UPDATE
There was no new information to report. Staff is waiting for a TEC meeting to be
scheduled to address the specific issues. A memo highlighting current status of revenues
collected was distributed to the Committee.
C. STATUS REPORT ON FREEWAYS
Staff distributed a status report on the freeway and state highway projects. GET said they
will support the decision to-drop both the Westpark and Rosedale alignments. Staff gave
credit to CaiTrans for being so cooperative. The Committee thanked staff for thgir efforts.
Construction on the Calloway Bridge will begin the first part of 1995. The Coffee Road'
project has been on hold. There will be a meeting of the State Water Quality Board on
December 9, wherein this project will be on their agenda. State Route 178 is in a
"transitional mode." Staff will check with E. Del Smith on other funding opportunities for
expansion prior to 178 coming Up on the state appropriation list.
D. WASTEWATER TREATMENT PLANT
Brown and Caidwell's recommended location suggests site #21 and 28 as the preferred
site. It is $2-3 million more in total costs. The land is vacant and available for sale now.
A lift station at the freeway would need to be installed. Since 67 percent of the population
will be county residents, the county should support annexation, and be required to connect
to the proposed plant expansion. Staff recommends not going forward with any plans
now. Staff will summarize the Brown and Caidwell report in a memo to the full Council.
In the meantime, Brown and Caldwell will continue with their study and steps pursuant to
site #21 and 28. A report will come back to the Council in January 1995.
6. NEW BUSINESS
A. ACCESSORY BUILDINGS
A metal 30 x 50 accessory building behind a residence is not in compliance with the City's
ordinance. The site depicted in staff's visual presentation to the Committee was in an
Urban Development Committee
Agenda Summary Report
October 31, 1994
Page 3
unincorporated area of the County and recently annexed into the City. Staff recommended
amending the City's ordinance to make the height restriction more definitive for "number
of feet height" as well as the current "height based on one story buildings."
B. EAST HILLS THEATRE
Staff brought to the Committee a proposal to approve a Planninq Commission
development amendment for the property at East Hills for a free standing ~'heater. Staff is
concerned about the potential for increased traffic and how a second theater might impact
the mall theater. Randy Bohls, architect representing East Bakersfield Associates, spoke
regarding the specifics for expanding to a total of 16 or 17 screens with the free standing
theater. The Committee asked that staff investigate this proposed project further, clarify
the issues with United Artists and bring the item back to the Committee.
C. STREAMLINING PROCESS
Five very productive meetings have been conducted with the Streamlining Task Force.
Items discussed include credit card payment for permit fees and deleting landscape plan
check reviews that are unnecessary. Staff will continue to update the Committee on the
developments of the streamlining process.
D. DRAFT EIR FOR 1994 REGIONAL TRANSPORTATION PLAN
The Regional Transportation Plan is a two-year planning document that projects
transportation issues 20 years out for the entire county. Staff is currently reviewing the
document and will be coordinating comments before the November 10 review due date.
Staff will develop questions to provide input into the document for Council consideration
on November 2, 1994.
7. ADJOURNMENT
Adjourned 2:25 p.m.
cc: Honorable Mayor and City Council
GEW:jp
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
October 31, 1994
TO: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
FROM: DARNELL HAYNES, BUSINESS MANAGER ~
SUBJECT: CUMULATIVE STATUS REPORT - TRANSPORTATION IMPACT FEES
This memorandum is to report the current status of the revenues
collected and expenditures incurred from transportation impact fees.
Listed below is a summary of the fund activity since July 1, 1992.
July 1, 1992 - June 30, 1993
Interest on Investments $ 42,390.00
Traffic Impact Fees $ 3,477,320.00
Contributions & Donations (Riverlakes) $ 200,000.00
Total Revenue Collected $ 3,719,710.00
Less: Transfer to Gas Tax Fund $ (885,400.00)
Less: Transfer to Gas Tax.(Riverlakes) $ (400,000.00)
Less: 1992-93 C.I.P. Expenditures $ (211,934.00)
Revenue Remaining at June 30, 1993 $2,222,376.00
July 1, 1993 - June 30, 1994
Interest on Investments $ 51,390.00
Traffic Impact Fees $ 1,657,736.00
Contribution &-Donations (Riverlakes) $ 200,000.00
Total Revenue Collected $ 1,909,126.00
Less: 1993-94 C.I.P. Expenditures $ (971,768.00)
Revenue Remaining at June 30, '1994 $ 937,358.00
July 1, 1994 - October 30 1994
Traffic Impact Fees $ 649,350.00
Less: 1994-95 C.I.P. Expenditures $ (206,036.00)
Total Revenue Collected $ 443,314.00
Total Revenue Remaining For Fiscal Year 1994-95 $3,603,048.00
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandv. Citv Manager
FROM: Raul M. Rojas. Director of Public Works
DATE: October 31. 1994
SUBJECT: STATUS OF FREEWAY AND STATE HIGHWAY PROJECTS
METROPOLITAN BAKERSFIELD AREA
For your information and Council distribution, attached is the October report prepared bv
this department regarding the status of the various freewav and State highway projects ih
the metropolitan area. The previous reports also provide additional background on the
various projects.
October 31, 1994
STATUS OF FREEWAY
AND STATE HIGHWAY PROJECTS
METROPOLITAN BAKERSFIELD AREA
Public Works Department
Marian P. Shaw, CE III
This report is intended to update the members of the City Council on the progress of various freeway and
State Highway projects in the metropolitan area since the September status report.
Kern River COrridor (Kern River Freeway)
On October 20, 1994, CalTrans held a Project Development Team meeting at GETs offices. The meeting
was well attended by the public opposing both the Kern River South Option and the Rosedale Alignment.
CalTrans staff and their consultants presented updates on the third public meeting. Comments were made
by the public and PDT members. Two significant actions were taken: the PDT voted to support CalTrans'
decision to drop the Westpark alignment from further study; and the PDT also voted to drop the Rosedale
alignment from further study. This last action is conditioned on CalTrans staff consulting with PDT members
who were not present including the Corps of Engineers, EPA and U.S. Fish and Wildlife Service. The
Rosedale alignment will not proceed unless these agencies object to the dropping of it or identify some
unforseen fatal flaw with the Kern River alignment.
The public hearing on the project will be held sometime in 1995, and a preferred alignment will be 'selected
after the hearing. The Environmental Impact Report will be completed in 1995. CalTrans hopes to have the
specific plan line process completed by the time the right-of-way money becomes available in July of 1996.
State Route 178 (Crosstown Freeway)
There has been no change in the status of the Crosstown Freeway from that last reported. The House has
authorized $4.5 million for this project. The project was not included in the recent appropriations bill and
may be considered for funding next year.
State Route 99
There are currently three major projects programmed for State Route 99: the Rosedale interchange
landscaping, the Golden State/Airport Drive interchange modification, and .the widening of S.R. 99 to eight
lanes between Wilson Road and Golden State/Airport Drive.
Construction started Monday, September 19, 1994, on the landscaping of the Rosedale interchange. The labor
for this project is being performed by the California Conservation Corps. Construction will be complete in
late November, 1994.
Construction on the Golden State/Airport Drive interchange modification is ahead of schedule. The route
was opened for traffic mid-October.
Freeway Status Report
October 31, 1994
The widening of S.R. 99 between Wilson Road and Airport Drive was advertised on September 19, 1994. The
bids will be opened on November 2, 1994; the bid will be awarded on November 14, 1994 and construction
will start November 15, 1994. The railroad agreement is complete and construction will start on the bridge
widening at the Bakersfield Yard on the first week of January, 1995. The widening project will take
approximately 2 years to construct. Work on this project will be closely coordinated with the City's California
Avenue Widening project, which will include redesign of both the eastbound California/northbound 99 ramp
and the westbound California/northbound 99 ramp.
South Beltway
Public Works and. Planning staff are pursuing the Specific Plan Line adoption for the South Beitway. The
Environmental Impact Report approved by Kern COG added three alternatives to the ones already proposed.
The City is completing an engineering evaluation of the additional routes.
West Beltway
The County has adopted the specific plan line for the West Beltway from Seventh Standard road to I-5.
Coffee Road Grade Separation
The Separation of Grade District has selected an environmental consultant, a geotechnical consultant, and two
appraisers, but has not yet issued the Notice to Proceed.
FS:\FREEWYI&.STS