HomeMy WebLinkAbout04/10/1996 13 A K E R S F I E L D
Kevin McDermott, Chair
Randy Rowles
Patricia M. Smith
Staff: Gall E. Waiters
AGENDA
URBAN DEVELOPMENT COMMITTEE
Wednesday, April 10, 1996
12:15 p.m.
City Manager's Conference-Room
Second Floor - City Hall, Suite 201
1501 Truxtun Avenue
Bakersfield, CA
1. ROLL CALL
2. APPROVAL OF FEBRUARY 15, 1996 MINUTES
3. PRESENTATIONS
4. PUBLIC STATEMENTS
5. DEFERRED BUSINESS
A. ICE RINK PROPOSAL - Klimko
B. STATUS ON FREEWAYS - Rojas
6. NEW BUSINESS
A. TRANSPORTATION ALTERNATIVES FOR METRO BAKERSFIELD - Rojas
B. STATUS OF FIRE SERVICES - Kelly
C. TRAFFIC IMPACT FEES UPDATE - Rojas
7. ADJOURNMENT
GEW:jp
FILE COPY
.,- B A K E R S F I E L D
' Kevin McDermott, Chair
Alan Tandy, City Manager Randy Rowles
Staff: Gail E. Waiters Patdcia M. Smith
AGENDA SUMMARY REPORT
URBAN DEVELOPMENT COMMI'R'EE
Thursday, February 15, 1996
12:15 p.m.
City Manager's Conference Room
1. ROLL CALL
Call to Order at 12:33 p.m.
Present: Councilmembers Kevin McDermott, Chair; Randy Rowles and
Patricia M. Smith
2. APPROVAL OF JANUARY 29, 1996 SPECIAL MEETING MINUTES
Approved as submitted
3. PRESENTATIONS
None
4. PUBLIC STATEMENTS
None
5. DEFERRED BUSINESS
A. DESTEC FUNDING
Staff revised their recommendation for the potential uses for the DESTEC funding
to include $210,000 for improvements to Siemon and University Parks; no
allocation for the $299,000 in park development fees already collected in Park
Zone 6; and for Council to determine the allocation of the remaining funds of
$290,000 between Highland High School, Kern County Soccer Foundation and
American Youth Soccer Organization (AYSO). The Committee recommended that
AGENDA SUMMARY REPORT
Thursday, February 15, 1996
Page -2-
$60,000 be allocated to the Soccer Foundation as "seed money." Staff and the
Foundation indicated that the County would consider a contribution during their
budget hearings in August 1996; $230,000 be allocated to Hiqhland High School
for lighting during the first phase of their project. A provision'is to be added into
the agreement with the City that assures the DESTEC money will be expended
by 1999, and that the high school will not receive any money until they show
some ability to complete their project.
B. SPEED UNDULATION PROGRAM PROPOSAL
At the last Committee meeting, staff was asked to develop a policy that put in
place a speed undulation program. The Committee reviewed the policy and
asked that some minor changes and/or clarifications be made: 1) Money would
be contributed up front and placed in a trust fund prior to construction; 2) In order
for construction, 75 percent of the residents affected would need to sign the
petition; 3) The City Engineer is responsible for defining the minimum
circumference for the area affected; 4) The policy will state "sponsor group"
instead of resident so as not to imply that the burden would lie with one resident;
5) Placement of the undulation(s) would be pictured or sketched and would
accompany the petition so that residents can see the placement prior to signing
the petition; 6) Staff will monitor the issue and determine at a later date how to
proceed with a request to remove an undulation once it has been installed. Staff
will recirculate the final policy and if there are no additional comments or changes
by the Committee, will schedule it for Council action.
6. NEW BUSINESS
A. DESIGNATION OF SCENIC CORRIDORS
Staff provided the Committee with a concept plan to address certain roadways as
"scenic corridors" of the City. A map was distributed which identified what areas
are currently landscaped, the funding mechanism, and the volume of traffic on the
streets charted. The Committee concurred with the preliminary concept and
asked staff to do more work along those same lines. The Planning Director
recommended that the project not be called "scenic corridors" because that is a
designation that is used by the state for specific corridors. He instead suggested
using the term "entry ways" into the City. Staff also noted that this concept can
be tied to the base benefit study being conducted for maintenance districts,
because this project also has budget and long-term maintenance issues.
7. ADJOURNMENT
Adjourned 1:40 p.m.
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Urban Development Committee
FROM: Raul M. Rojas, Director of Public Works
/
/
DATE: April 9, 1996
SUBJECT: STATUS OF FREEWAY AND STATE HIGHWAY PROJECTS
METROPOLITAN BAKERSFIELD AREA
Attached for your information is the April report prepared by this department regarding the status
of the various freeway and State highway projects in the metropolitan area. The previous reports
also provide additional background on the various projects.
April 9, 1996
STATUS OF FREEWAY
AND STATE HIGHWAY PROJECTS
METROPOLITAN BAKERSFIELD AREA
Public Works Department
Marian P. Shaw, CE m
This report is intended to utxlate the members of the City Council on the progress of various freeway and State Highway
projects m the metropolitan area since the January 29, 1996 status report.
Kern River Corridor (Kern River Freeway)
On January 23, 1996, Kern COG presented to the CTC a Resolution from the City Council supporting CalTran's plan
to consider a "useable segment" of the ultimate freeway for future funding. The CTC staff will make their
recoi ..... endatlom on the TIP to the CTC on Wednesday, April 10, 1996. Kern COG will not find out the results of this
until next week, but they believe that the $45 million funding for right-of-way will remain available to us, although
possibly in a later year than the 1996 STIP.
CalTrans continues to work on the environmental documents and engineers report for the route adoption. A public
hearing for the enviroaaiental document may be scheduled for late 1996, with a Plan Line adoption taking place mid-1997.
State Route 178 (Crosstowfi Freeway)
There has been no change in the status of the Crosstown Freeway from that last reported.
Work on the widening project is progressing according to schedule. Paving will start April 20 for the new lanes on the
north end of the project. There remains about 6 months of work on the river bridge; all other bridges except tho
Bakersfield Yard Overhead are now complete. CalTraus hopes to be able to open the bike path (on a temporary ali~t, nment
under the bridge falsework) in about 3 weeks.
Graffiti has been a continuing problem for the project, with about $100 a week being spent in graffiti removal. However,
the Resident Engineer has recently had mo~ion-seusitive lights set up in some of tho more highly targeted areas and reports
a marked decrease in graffiti in those areas.
City staff met with County and Kern COG staff on January 17th relative to funding the environmental impact report. Kern
COG will fund $40,000 and ~he City and County will fuml $30,000 each. Ron Brummett is preparing a three party MOU
to set out the funding details. He expects to have this ready and reviewed by all the parties and counsels for the first
Council meeting in May. Once funding is established the EIR will take about 8-12 months to complete.
There has been no change in the status of the West Beltway sinc.~ the last report.
Freeway Stares Report
April 9~ 1996
Coffee Road Grade Se_narafion ~
City Project: Tbe City's project is the widening to six lams (although initially the street will be striped for four lanes only)
of Coffee Road from Brimhall Road north 700 feet and from Rosedale Highway south 700 feet. The gap in the project
will, for the time being, transition to the existing two lane road crossing the railroad lines. When the grade separation
project is constructed, all of Coffee Road between Brimhall Road and Rosedale Highway will be six lanes. This project
is currently under construction and should be completed in approximately 8 weeks.
Grade Separation Project: The Separation of Grade District has hit a snag in their negotiations with PG&E regarding
acquisition of their property. Although the District is still pursuing negotiations, they have filed for condemnation to
guarantee possession of the property. There are still a great number of issues outstanding regarding relocation of both
PG&E's and Sunland facilities and construction easements.
TheState Regional Water Quality Control Board ha~ not finished their review of the report filed with them regarding "near
surface" contamination, Their review may result in other remediation work being necessary.
Final plans and specifications have been submitted and reviewed by staff. Project bidding should begin shortly.
F$:kF~I.ST~
B,A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works Director ;/~'--~7//'~'
DATE: April 10, 1996
SUBJECT: Traffic Impact Fees Update
Urban Development Committee - April 10, 1996
On April 4, 1996, a public hearing was held before the Planning Commission of the City of Bakersfield.
Three people spoke in opposition to the amended ordinance; Lee Jamison (Jato), Barbara Martin (BIA) and
Roger McIntosh (Martin McIntosh). The Planning Commission, after much debate, voted (5 to 2) to
recommend that the City Council have a first reading of the amended Transportation Impact Fee Ordinance.
No changes were made to the ordinance by the Commission, but Commissioner Brady did point out that Ashe
Road from Harris to District was left out of the Facilities List.
Some of the concerns expressed by the public were as follows: 1. The burden on commercial and industrial should be reduced (Jamison, BIA).
2. The growth factor used seems high (BIA).
3. Do not include the supplemental list of collector streets (BIA).
4. Lock in the fee for 8 years (BIA).
5. Some of the facilities on the list should be removed (BIA).
Some of the concerns of the commissioners were as follows: 1. The residential fee should not be raised.
2. New development cannot pay more than its fair share.
3. If the State funds for the freeways do not materialize, we must come up with an alternative
funding source that ensures that all residents pay, not just new development.
A meeting is scheduled with City and County staff and the BIA on Monday, April 15, 1996, to discuss their
concerns and txy to build their support for the new program. Their concern about the growth factor cannot be
addressed until the traffic model is rerun, which will be in about 12 to 18 months to keep on the three year
schedule recommended by this committee at the January 17, 1996 meeting.
The major concern with the program at this point seems to be the effect on industrial and commercial
development. Although the same basic fee structure must be maintained in order to preserve the nexus, staff
proposes that the fee structure be expanded again to the sixteen land use types that the current fee program
uses. Several of the land use types were "collapsed" into one or two categories in an attempt to simplify the
administration of the fee. This expansion will give a broader range of fees for both commercial and industrial
and should help somewhat in the fee calculations for smaller projects.
P:\TII~PHASE2\ URB DEVRP.MEM
xc: R~ading File
Pr~jeot File
.hcqu~ R. 1~ Rochelle
Marian P. Shaw
Proposed Phase II Impact Fee - expanded
i.,.~..¥.~,~,,~ ...... ~ ............
..........
SINGLE FAMILY, DETACHED 1 $2,197
MULTI-FAMILY 2 $1,471
H~ISER~CE INDUSTRIAL 3 $87
LIGHT INDUSTR~L 4 $38
OFFICE COMMERC~L
Under 100,000 sq. fi. 5 $33
100,000-199,999 sq. ff. 6 $39
200,000 sq. ff. & over 7 $41
RETAIL COMMERC~L
Under 10,000 sq. ff. 8 $50
10,000~9,999 sq. ff. 9 $50
50,000-99,999 sq. ff. 10 $62
100,000-199,999 sq. ff. 11 $71
200,000-299,999 sq. ff. 12 $91
300,000-399,999 sq. ff. 13 $100
400,000499,999 sq. ff. 14 $121
500,000-999,999 sq. ff. 15~ $145
1,000,000 sq. ff. & over 16 $160
p:~phase2~llfee.~2
P:\TIF'~HA~LLFEEWB2 I 04/10
MEMORANDUM
· /
TO: URBAN DEVELOPMENT COUNCIL COMMITTEE
FROM: LEE ANDERSEN, COMMUNITY SERVICES MANAGER
SUBJECT: DESTEC FUNDS ~-/~r~-
DATE: FEBRUARY 15, 1996
Attached for your information is a memo to Alan Tandy, City Manager
that responds to concerns raised during the January 17, 1996
meeting. Also attached is support information from groups
interested in utilizing the Destec Funds.
M E M O R A N D U M
TO: ALAN TANDY, CITY MANAGER
FROM: LEE ANDERSEN, COMMUNITY SERVICES MANAGER ~,//
SUBJECT: DESTEC FUNDS
DATE: FEBRUARY 14, 1996
At the Urban Development Committee Meeting of January 17, 1996 the
issue of the Destec donation was discussed. Staff provided an
update along with-written alternatives for potential projects. They
included: 1) improvements to Siemon and University Parks for
$210,000, 2) improvements to open space in the northeast (east of
Thorner School) at $385,000, 3),improvements on existing school
property (Thorner and Nichols) at $195,000, 4) improvements at Kern
County Soccer Park at $125,000 and 5) improvements at Highland High
School for $20,000. In addition; the Highland High School Stadium
Committee made a presentation and requested $300,000 for their
project. The Council Committee requested staff clarify concerns
raised during the meeting and provide an update at the next
available Committee meeting.
Staff has met with City School Board and staff to determine their
level of commitment. We were advised in' writing from Dr. Kenneth
Garland, Assistant Superintendent (see attached), that the District
can only commit to mowing twice weekly and coordinate lighting
reservations. He also indicated the School Board was in support of
a donation to the High School Stadium project.
We also communicated with the. Soccer Foundation who agreed to
maintain lighting improvements through user fees (see attached
letters). Their facility would be available to the General Public
on a reserved basis. Charges would include parking, ($2.00 per car)
and staff and utilities charges at $30.00 per hour'.
heHigh School District has indicated the fields can be reserved~_l~
y certain organizations but does not include~the general public.-~
T~e~r basic rental fee is approximately ~ for a three hour
minimum. (See attached rate sheet and rental policy).
Both the City School District and the High School District have
indicated liability insurance will be required. Insurance costs are
not available at this time.
Destec Funds February 14, 1996
With the above information in mind, staff is revising it's previous
recommendations to include the following:
· Because maintenance and liability issues could
not be resolved for planned improvements adjacent
to Thorner School or on City School property,
it is recommended City School projects be
eliminated from consideration. $ 0
· Fund improvements at Siemon and University Parks - $210,000
· Fund open field sports lighting - $290,000
Organizations and groups interested in
utilizing Destec funds for lighting projects
may include:
1) Highland High School Stadium Co~Littee
2) Kern County Soccer Foundation
3) AYSO
TOTAL $500,000
If the Co~Littee allocates funds to the above group(s), staff
recommends their governing bodies enter into a signed agreement
with the City certifying that maintenance, public access for the
improvements, and construction on the projects start within two
years or the funds are to be returned to the City. We further
recommend if funding is allocated to the School that the project be
initiated as soon as possible which will assist in developing
community support for their fund raising efforts.
An alternate to any of the above projects would be to retain a
portion of the Destec funds to be used on an undetermined project
at a later date. (Agreement with Destec expires December 1, 1999).
Finally, it is recommended the $299,000 in park development fees
collected within Park Zone 6 be retained for future park
development at the Panorama Hills site or at a park site south of
Highway 178, east of Fairfax. The latter undeveloped site is city
owned and currently within the Consolidated Park Maintenance
District.
cc: Patricia Smith, Councilmember
Frank Fabbri, Parks Superintendent
File:des21496
BAKERSFIELD CITY SCHOOL DISTRICT
EDUCATION CENTER, 1300 BAKER STREET
~ E. GARLAND. Ph.D. BAKERSFIELD, CALIFORNIA 93.305-4399
Assistant Supt.-Administrative Services (805) 631-4600
(8o5)
(805) 326-1485 FAX
February 5, 1996
Mr. Frank Fabbri, Parks Superintendent
Community Services Dept. - Parks Division
4101 Truxtun Avenue
Bakersfield, CA 93309
Dear Mr. Fabbri:
The Bakersfield City School District Board of Education met on February 3, 1996, to again
review your requests concerning utilization of DESTEC funds for parks and the district's
participation in ongoing maintenance costs for these developments. You have previously
indicated the possibility of a swap of the existing city park owned property near Thorner School
for property to the East of the Thorner School site. When it has been decided that a swap will
take place, the Board is interested in discussing the maintenance on fields developed on such a
site. The district's participation will be limited to providing mowing every two weeks. The
district will not be able to support other maintenance and utility costs such as water charges,
sprinkler repairs or other field and equipment upkeep.
The Board has a real interest in the allocation of available park and recreation funds, because it
relates to providing a wholesome community for young people. The same children the district has
responsibility for proceed on to the Highland High School program; therefore, the Board
encourages you to give a high priority to the requests for stadium development at Highland High
School.
We have been very appreciative of your willingness to cooperate with the school district on
improvements for our children and the community where they live and play. The Board and
administration remains open to farther dialogue with you and other ci,'y officials as you proceed
with establishment of priorities for utilizing available funds.
Sincerely,
Assistant Superintendent-Administrative Services
Id
c: Mr.' Leland Anderson, Community Services Manager
~ FEB-05-1996 13:37 FROM TO 8610864 P.O1
To: Allen Abe, Biakersfield Parks & Rec.
From: Bob Mille~, Kern County Soccer Park
Re: Funding for L~ghts
The teleph6ne system at your office would nut r~ng to the
operator, ~0 her~'s the fax.
Ih ave received a call today regarding county participation in
the funding of o~r lighting project. Maybe just exploratory.
You may wish to call Me1 G~bbons, Kern County AdminisTrative
Off~ce, 861-257~i, ext. '~f~?." M~."'Gibbons ualled today ~o inquire
after'receiving a referral of my letter to Supe~visor Patrick.
He is interested! in what ~he total, then the possible sharin~ of
costs. This call was quite a nice surprise to me, as my 9revlous'
inquiries were n~t met with positive responses.
Thanks,
Bob Mil/er
861-2861
TOTPI_ P. 01
' ~EB--8~-1996 11:5~ FROM TO 8~10864 P.O1
Robert C. Miller
Pres., KC Soccer
Park Board
12340 BacKdrop.
Bak., CA 93~06
Mr. Allen Abe
Bakersfield City Park~ & Rec.
re: Soccer Park L~ghting
Use fees &.Public availability
Dear Mr~ Abe:
This letter will supplement the information included in my
previous letter concerning the availability of fields at the Soccer
Park, including ligh~ing. Any organized play or use during normal
play hours would be subject to parking fees and field fees. Ca~ual
play would be subjec~ ~o parking fee~. The use of 1X~h%$ would be
subject to a fee e~tima~ed ~o be $20.O0, per hour, per field, based
on u~i~ity costs.
The arrangement of play under the l~ghts on a da~e when there
are no other event~ p~anned would have to be ~ade in advance. IT
is estimated an hourly rate of $20.00, per hour, woul~ t~e care of
u~il~tie~, with an additional hourly rate for a Park represenTaTive
to be present. This ~i~ure would be the wage, ese., ¢ost~, the
total utility and wage cost~ estimated to be at or below $$0.00.
The Soccer Park is perennially v~lnerable to theft and
destruction, and has often been victimized. We can't just leave
the gate open. A couple of days notice would be all tha~
would be necesse~y.
These operational costs, that must be p&seed alon~, w~l~
surely be lower than other facilities, due ~o the number of
volunteers who assist the Soccer Park and 2he efficiency ~f the
system that we plan to install.
As stated before, our ~urvival 2s use based. The added play
that we can generate with lights will help the Park. There will be
a surge in avai2able recreation, which w211 grow hand-in-hand w2th
our progress. If the lighting program goes forward, we wi12 be
trying to greatly increase the soccer and pursue all other
compatible uses of the facl2ity.
Thank you very much for ¥ou~ consideraxion.
JP~-L~9-1996 14:5~ FRO~ TO 8610864 P. O1
K~/~(~ Robert C. Hiller
Pres., KC Soccer
Park Board
12340 Backdrop
Ba.k., CA 93306
Mr. Allen Abe
Bakersfield City Parks & Rec.
Soccer Park
Financial &Public availability
Dear- Mr .,---Abe: ......... "': ........... '" ' "~" ......
'"' The Kern Cowry Soccer Park was bui~ fo= the k~ of the ~ea
~d, dGe ~o its usage, benefits the ~dnlts, m~y b~ineesee, most
greatly those associated w~th tourism ~ recreation, an~ local
~over~ent due to increased t~ revenues.
The Soccer Park is supported en~rely ~hrough user ~ees and a
few donations, as ~ receive abs~.lut=ly no ~ng from
gover~enta~ sou=re, includ~ng the Co~ o~ Kern. We a~e aleo
entirely self ma~nta~ne~, as the Cowry governs ~mprovemente
~axes our concession receipts, ~t does not participate o~ a~d
th~ maintenance or ope=at,on. Volunteers ~d 2 ~~r~=s ~o
that needs to be.done. Th~s includes wa~er~ng, mowing, p~ng,
~d any repairs that ne~ to be ma~e.
The fees ~nclude a $2, per car, ~rk~ng fee ~hat ~s
during re~larly sch=dul~d ~vents such as lea~es, ~o~n~n~s,
c~s. The lea~es pay an ~ual fee of $15, ~r player, and
tourn~en~ org~izers pay S25. Der ~e~, for the ~en~s tha~ ~h~
ho=~ a~ ~he Soccer Park. ~e concessionaire pays a X-age of gro~e
sales. Tb2s ~s ~he firs~ year of ~ outsider r~ing the studs,
a change ~ha~ has been ~de ~o res~e vol~teers and
turn a vir~ua~ ~sh ~n~o a f~n~c~al benefit.
A~ you can ~ee, ~he s~val of the Soccer Park ~s d~rec~ly
dependen~ on the n~be= ~d s~ze o~ ~he activities =hat oecd.
The Soccer Park ~s ~rg~nally s~d Z~n~clally for ~he f~rs~
~his year. ~r construction deb~ has been reduced from $280,000,
or more, ~o les~ ~h~ SSO,000, as the yearly operation has been
limited To donat~on~ for any ~mprovemen~s. All available
have been neces~arily spen~ on deb% re~remen~ and day-to-day
~inten~ce ~d opera~ion. Th~s process has been so burde~ome
tha~ ~ ~ ~yond our reach ~o proceed w~h a l~ght~ng project
without outside f~d~ng.
Our f~eld~ are available ~or c~ual ac~v~%~es as long as
the~'~s someone there ~o open ~he gate ~d watch ou~ for our"
interes~. Since our location m~e~ much of our e~ipmen% ~d
supp~ee ~o ~lnerable to ~heft, the ga~e ~s locke~ when no
vol~teer$ o= employee~ are present. Ai~s% any day w~l~ see the
Pa~k open from 8~ -2pm. The~e are oTten c~ual play or
a~ work is occurring. These are no~ objectionable, ~less
beoome =e~lar, a~ which time we are forced ~o see~ something
for the Park. We ca~o~ forfeit aseiet~ce ~=om ~hoee who are
ueing ~he Pa~k ~e~la=ly, when t~ P~k continues to be ~n such
~RN-29-1996 14:32 FROM TO 86101364 P.02
tenuous shape f~nan¢ially.
We are non-profit, which has also been no profit. We are used
by more kids than any other facility in the area, and our events
bring more people into the area than any other known facili~y. Ali
the bene~Ats that have been derived for individ~al~, businesses, or
lo¢al government, will increase if we are allowed to e~pand the
available recreation ag ~he Soccer Park through the installation of
lighting. NatXonal ch~p~onships for f~eld hockey ~d ~U cro~s
count~ are scheduled ~d are Just a hint of the
If you have ~U ques~on~, p3e~e don't hesitate to call, ~d
th~ you for %he ~nforma~lon ~d attention ~n ~h~ matter to date.
Fred L. Starrh, President
~' J. Bryan Batey. Vice President Connie Wattenbarger, Clerk
~' ~ -'7 Bob J. Hampton Sandra V. Se,~xo
~ THOMAS N. JONES, Ed.D., SUPERINTENDENT
2000 TWENTY-FOURTH STREET * BAKERSFIELD * CALIFORNIA * 93301-3899 * (805)631-3100 * FAX: (805)631-2133
DR. NEAL W. OLSEN
~ Supednten¢Jenk Business
February 13, 1996
Pat Smith
City Council Member, Ward 3
1'501 Truxtun Ave.
Bakersfield, CA 93301
Dear Ms. Smith,
This letter is written to indicate the Kern High School District's support of the
Highland High School Stadium Committee's efforts to raise funds for a multi-use
stadium on the Highland High School Campus. It is the District's understanding that as
Bakersfield City Council member representing Ward 3, you are involved in the decision
of how to allocate $ 500,000 of DESTEC money. The District supports the position that
a substantial portion of this money be allocated to the Highland stadium project.
I am enclosing a copy of the current Reoulations and Charges for Community_
Use of School Facilities which outlines the p~licies and charges which apply when
community groups desire to use the District's facilities. Consistent with this document,
stadium usage by the Bakersfield Parks and Recreation Department, Bakersfield City
School District, and non-profit youth sports organizations would be charged at the direct
cost rates listed on page 7. Please note that while the rates for lighting are based upon
the use of all lighting standards, charges can be pro-rated per standard where
applicable. Waivers to the policies outlined in this document may be considered by the
Associate Superintendent of Business.
On a separate but important item, I would like to call your attention to the
commitment of the KHSD to this stadium project. While the district is unable to
contribute to the actual construction costs, it is willing to commit resources to the project
management and on-going maintenance of the facility. Outlined below is an summary
of estimated commitments by the KHSD to the Highland High School Stadium Project
over a period of 20 years.
Environmental Impact Report $ 26,000
Project Management
based on Centennial High School. Stadium Project $ 50,000
Maintenance
materials and labor - $ 20,000 annually for 20 years $ 400,000
Utilities
electricity and water - $4,600 annually for 20 years $ 92,000
School site administration
facility management - $2,000 annually for 20 years $ 40,000
TOTAL: $ 608,000
These are conservative estimates and include only expenses above and beyond
the current level of service required to manage and maintain the existing football field.
Please do not hesitate to call me if you have any questions regarding this
information or the Kern High School District's commitment to operating and maintaining
its facilities.
Sincerely,
~nald E. Carter
Director, Business Administration
cc: Anne Scott - Principal, Highland High School
Sue Kinney - Athletic Director, Highland High School
Frank Fabbri - Park Superintendent
Highland High School Stadium Committee
REGULATIONS,AND GHARGEs~
FOR GO~MU'NITY U
KERN HIGH SCHOOL DISTRICT
GENERAL REGULATIONS
1. Board policy prohibits the use of facilities by non-school groups on Sundays.
2. No facilities will be available Thanksgiving, Christmas, New Years or any other holiday
when the administration of the school has determined that they are unable to find staff who
will be available for supervision.
3. A deposit of 20% or $250 (whichever is less) of an agreed upon estimate of charges shall
be paid at the school site at least five working days prior to the event and forwarded to the
· District Fiscal Services Office prior to the date of the activity. Payment should be made
payable to the Kern High School District and should be in the form of a cashier's check or
money order. Failure to comply will be cause for revocation of the rental agreement.
Waiver of policy may be granted by the school site administrator to certain predetermined
groups and organizations.
4. Cancellation shall be made 72 hours prior to the first day of use and shall be made with
the facility administrator at the respective school site. A fee equal to 25% of the deposit
shall be retained by the fiscal services office for costs incurred in processing the rental
agreement.
5. Basic rental fees include .costs of normal staffing, utilities, maintenance, supplies and
custodial labor. Rental agreements are considered an estimate of costs. If the plant
supervisor and/or site administrator have detei'mined additional personnel are needed to
operate or clean after an event, the renter is responsible for these additional costs.
6. Any group or individual requesting the use of an auditorium, lecture center, cafeteria,
gymnasium, athletic stadium or athletic field, must have general liability insurance in the
amount of $1,000,000 for each occurrence. A Certificate of Insurance must be attached
to each request to use a facility. The site administrator must check the Certificate of
Insurance for effective dates of coverage.
The policy endorsement and Certificate of Insurance shall name the District, its officers,
employees and agents as additional insureds with respect to liability arising from use of
district facilities and shall contain a provision that the insurance may not be canceled nor
the limits reduced during the scheduled use. A sample copy of a Certificate of Insurance
is attached.
For individuals or unorganized groups (non-legal entities) incapable of being sued as a
group (entity), a hold-harmless agreement should be signed by each facility user
indemnifying the district from liability for such use. ^ sample hold-harmless agreement is
attached.
General Requlations (continued)
7. The school sites will retain the Facility Use Application until after the last day of the
scheduled event in order to adjust it for the actual charges incurred. The form is then
initialed by the appropriate supervisor and forwarded to the District Fiscal Services Office
for billing.
8. Renters are billed the first day of the month following the last day of the scheduled event.
Non-governmental entities are required to pay in full within ten (10) working days after
receiving billing information. Failure to do so will result in 'the renter losing the privilege to
rent Kern High School District facilities or equipment.
9. Kern High School District reserves the right to require renters to provide professional
security agents as deemed necessary.
10. All requests for the use of the school site's cafeteria facilities, regardless if the kitchen is
to be used, must be approved and signed by that school site's Food Service Supervisor.
If food and/or food service personnel are requested or required, billing for these services
will be handled through the Food Services Department.
11. All requests for facility use must be approved and signed by the Plant Supervisor at the
respective site whether or not, labor is charged or waived.
12. The fiscal services office reserves the right to audit each Facility Use Application for
compliance to the Kern High School District's regulations and charges schedule.
13. Non-profit organizations that are requesting reduced rates must provide their tax-exempt
number. A space is provided on the request form for this number.
14. When one district school uses the facilities of another, the user school may be respon-
sible for labor costs.
15. When reciprocal arrangements for facility use have been worked out with other agencies
and no facility fees will be charged, the details of such arrangements must be
communicated to and approved by the Associate Superintendent of Business.
16. When requests are received for use of the entire campus or major portion thereof, the fees
to be charged shall be determined following consultation between school and district
officials.
17. No athletic facilities, fields or equipment may be rented by the community on weekdays
during the school year until after 6:00 p.m.
2
ADMINISTRATIVE PROCEDURES
COMMUNIT~ FACILITY USE FEES
CATEGORIES FOR FEES
There are two categories for purposes of charging fees.
A. Fair Rental
B. Direct Cost
A short description of each category is as follows:
'A. FAIR RENTAL RATES - DEPOSIT REQUIRED
This category is designed to accomodate commercial organizations who wish to use the
facilities of the Kern High School District.
1. Rate Structure:
a. Mandatory charges on facilities and labor.
b. Fair rental rates on facilities and full labor rates.
2. Suggested eligibility:
a. Commercial enterprises
b. Profit-making organizations
B. DIRECT COST RATES - NO DEPOSIT REQUIRED
This category is designed to accomodate non.profit organizations which are scheduling
activities, fund-raisers, etc., which have no direct connection or bearing to the Kern
High School District.
1. Rate Structure:
a. Mandatory charges on facilities and labor.
b. Direct Cost rates on facilities and discounted labor rates.
2. Suggested eligibility:
a. Feeder schools sponsoring fund raising activities, concerts, programs,
ceremonies, etc.
b. Non-profit organizations which are sponsoring fund-raisers and/or activities
c. Government agencies
d. Colleges
e. Churches
f. Recreation Department sponsored activities
g. Non-school sponsored athletic activities for students
h. Non-profit organizations providing direct financial assistance to the schools
i. Non-profit activity/athletic support groups not involving high school age students
(ie. junior high wrestling clubs)
j. Civic organizations or service clubs - activities that provide direct community
service
k. Quasi-school groups involving students in grades K-8 (ie. Kern County Honor
Band, Choir)
I. School commercial jointly sponsored profit sharing activity (commercially
initiated)
m. Feeder school P.T.^. programs
n. Professional inservice activities with categorical funding
o. High school booster bingo
(Waivers for all or part of the rental fees may be granted by the Associate Superintendent, Business for school
organizations or groups when the activities are directly associated with the approved instructional or extra-curricular
programs.)
CHARGES FOR COMMUNITY USE OF SCHOOL FACILITIES
GENERAL CHARGES
Classrooms: $15.00 $ 7.50
Art, Home Economics, Band and Choral Rooms,
Libraries, and Industrial Shops: 22.50 11.25
Cafeterias (without kitchen facilities): 35.00 17.50
Cafeterias (with kitchen facilities): 45.00 22.50
Gymnasiums (without locker rooms): 35.00 17.50
Gymnasiums (including locker rooms): 45.00 22.50
Newer Gymnasiums at Centennial, East, Ridgeview,
Shafter, and Stockdale (without locker rooms): 50.00 25.00
Newer Gymnasiums at Centennial, East, Ridgeview,
Shafter, and Stockdale (including locker rooms): 60.00 30.00
*All use of building facilities on Saturdays will be charged on a 2 hour minimum. BOARD
POLICY PROHIBITS THE USE OF FACILITIES BY NON-SCHOOL GROUPS ON SUNDAYS.
Computers: (per hour per computer) $ 4.25
Instructor/Supervisor must be approved by the site.
Software and supplies to be arranged.
Film Projectors 5.00
Per day 25.00
Tape Recorders, P.A. System, Slide Projectors, Record Players and 2.50
Film Strips: Per day 8.50
Overhead Projectors: (4-hour minimum) 17.50
Screens: (If rented with projectors) 4.25
Cassette Players: (Batteries not provided) 4.25
Typewriters: (1 hour minimum) 4.25
Per day 25.00
Pianos: (On-Site Use Only) Upright 10.00
Grand 25.00
Loaning of 7'. V. or Video Equipment is NOT PERMISSIBLE.
Harvey Auditorium (labor costs below are mandatory)
*Performance (Main Floor 1,120) $ 590.00 $ 295.00
*Performance (w/Balcony 1,750) 660.00 330.00
Auditorium with Green Room 60.00 30.00
Rehearsal (Up to 4 hours) 385.00 192.50
Rehearsal (Each additional hour) 85.00 42.50
Little Theater (224)
*Performance 140.00 70.00
Rehearsal (per hour) 35.00 17.50
AN Theater (215)
*Performance 90.00 45.00
Rehearsal (per. hour) 25.00 12.50
Lecture Centers - (labor costs below are applied as appropriate)
Arvin (956) Ridgeview (650)
Centennial (635) Shafter (950)
East (970) Stockdale (650)
*Performance 175.00 87.50
Rehearsal (Up to 4 hours) 120.00 60.00
Rehearsal (Each additional hour) 40.00 20.00
North High Amphitheater
Minimum Labor Costs
Auditorium Manager 4 hrs @ $45.50/hr 182.00 136.50
House Manager 4 hrs @ $22.50/hr 90.00 67.50
Stage Hands (2) 8 hrs @ $ 8.50 /hr 136.00 102.00
Custodian 4 hrs @ $29.50/hr 118.00 88.50
Custodian (clean-up) 6 hrs @ $29.50/hr 177.00 132.75
Custodian (balcony) 2 hrs @ $29.50/hr 59.00 44.25
Custodian (greenroom) 2 hrs @ $29.50/hr 59.00 44.25
Normal performance time is four (4) hours.
Football, baseball, softball, soccer fields $12.00 $ 6.00
(lights charges are extra)
Lights, football fields
(minimum 3 hours on Saturdays and holidays)
Arvin ,Six standards 15.00 7.50
Bakersfiled Four standards 15.00 7.50
Centennial
East Bakersfield Four standards 8.00 4.00
Foothill ~ Four standards 15.00 7.50
Kern Valley Eight standards 15.00 7.50
North Six standards 16.00 8.00
Shafter Six standards 15.00 7.50
South Eight standards 16.00 8.00
West Four standards 16.00 8.00
Lights, baseball field 6.00 3.00
Kern Valley
Regular Time Rate $19.75 $14.80
Overtime Rate (2-hr. minimum) 29.50 22.10
AOOIII). CERTIFICATE OF INSURANCE 89,
THIS CERTIFICATE IS lUUED A~ A MAT't~R OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEN
14alter Hortensen ;Issoczates insurance EXTEND OR A'-TER THE COVERAQE AFFORDED BY THE FOLICiES BELOW
47~1 St ockd&le
B4kersfieid, C~ 933~9 COMPANIES AFFORDING COVERAGE
coo~ s~ c,~ A S]SK-SeJf Insured Schools of
COMFANy
SELF [NSURED SCHOOLS OF KERN9 ET ~ couP,NY
P.0. 8ox 9939 L_n'mq C
581BI Suna&le I:lvenue
Bakersfield ~TTEn D
C~ 93389-9939
COMPANY
(POLICY HOLDER) , -~i~. E
COVEF..An__~
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIO0
INDICATED. NOTWITHSTANDING ANY REOUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THiS
CERTIFICATE MAY SE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POUCIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS.
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. UMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
co
LTR T?~E OF INSU~UIC~ FOUnt NUMIIN IKXJGY ~Cl~fl ~ IxlqNATIQN
DATE IMM/OD/YY) ~ATE (MM~ ALL UMIT$ ~# THOUSANDS
Q~NIRAL LIAIIUTY
X COMMEAC;AL GENERAl. LIABILITY
CLAluS uAOE X OCCUR. IqK)OUCTS. COMINOPS AGGREGATE S
iI~R~ONAL & AOYi~¥1EING INJURY S
AI~TOMOML~ LIABlUT~ MEDICAL EXP~NSE I~ny ~ne
ANY AUTO ~J~ $
AU. OWNE0 AUTOS UMIT
~O0~.Y
SCHEDULED AUTOS INJUNY S
.reED AUTOS (iliev W
NON-OWNED AUTOS INJUNY
OARAGE LIABILITY (Ill/
E~CE~ UA~IUT¥
EACH AGGREGATE
OCCURRENCE
OTHER ;NAN UMBRELCA FORM $ $
WORKER'~ COMPENSATION STATUTORY
AND I lEACH ACCIDENT)
EMPLOYERI' I $ (01~EA~E--FOLICY LIMIT~
OTHER $ (DISF..A~E --EACH EMPLO'~
~n~lll DESCRIPTION OF USE
CERTIFICATE HOLDER CANCF. LLATION
N~E: ~ND ~DD~ESS OF C£RT;F;C~TE HOL. D£R S.OULD ANY OF THE ABOVE DESCRIBED POUCIES BE CANCELLED BEFORE THE
EXPI~ON DATE THEREOF. THE 18~U~NQ COMPANY Wit/. ENDEAVOR TO
MAIL DAYS WR~'/~"N NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
LEFT. BUT FAILURE TO MAIL SUCH NOTK~ SHALL IMPO~ NO OBLIGATION OR
UABILrTY OF ANY KIND UPON THE CI~4PANY. IT~ A(]F. NI~ OR REPRESENTAtiVES.
AU'T:--::.-- - ~-- ___ ~ £ _ ~-,A.~--
ACORD 2S-S
~ HIGH SCHOOL DISTRIC~
2000 Twenty-Fourth Street
~eld, C. alifomia 93301
SAVE HARMLESS AGI~I=:-MENT AND COVENANT NOT TO SUE
The , in consideration of being
(Name of Individual)
permitted to use facilities of the located at
and in connection with
between the dates of , 19 , and ,
19 , do hereby covenant and agree that the ,
their officers, employees, agents, members or representatives shall not be linhle for any loss,
damage, injury or liability of any kind toany person or property caused by or arising from any
use of the premises of the , or any part therein, arising
from any act or omission of the undersigned or its agents, employees, nor shall the above
enumerated entities be liable for any loss, damage or injury from any cause whatsoever to the
property or person of the undersigned or any of its employees, agents or other persons entering
upon or using said premises or any part thereof, or to any properW stored or placed thereon.
Notwithstanding anything to the contrary herein contained and irrespective of any insurance
carried by the undersigned for the benefit of the above enumerated entities, the undersigned
agrees to protect, indemnify, covenant not to sue and hold the above enumerated entities
harmless from any and all damages or liabilities of whatsoever natu_~ arising out of or in
connection with the or in the use of occupancy of the
premises or any part thereof. _
Dated:
Address:
(Sis~laulre)
POLICY OF TIlE CITY OF BAKERSFIELD
RELATIVE TO THE USE OF ROAD UNDULATIONS FOR
TRAFFIC SPEED CONTROL ON PUBLIC STREETS
PURPOSE
The purpose of this policy is to set forth the process and criteria by which the installation
of road undulations may be recommended to the City Council and to identify the conditions
which they may be installed.
BACKGROUND
The use of road undulations is not intended as a solution for all traffic and speed control
problems. It will be the City's policy to carefully review each request for the installation of
a road undulation to ensure that the proposed location and attending circumstances meet
all the criteria outlined in this policy.
POLICY
1. The initiation of requests for Speed Hump installations shall be in accordance with
the following:
a. All requests shall originate from the residents of the street.
b. All requests shall be in the form of a formal petition (forms will be supplied
by the Public Works Department).
c. All petitions shall be circulated by the residents themselves. The sponsor of
the petition shall contact and obtain the signature of one resident residing at
each residence that accesses the street segment on which undulations are
being requested to be installed. If the sponsor is unable to contact a resident,
"NO CONTACT," will be noted on the petition signature space with the days
and times that contact was attempted. The sponsor must make at least two
attempts to contact a resident.
d. A separate petition shall be used for each street.
e. Each petition supporting the installation of undulations shall contain the
signatures of residents representing at leF, st 7.5% of the residences that face
directly on the street segment where undulations are to be placed and are
located within 75 feet of the curb on the street and will include all residences
that access the street se~oment.
f. Completed petitions shall be returned to: City Engineer, City of Bakersfield,
1501 Truxtun Avenue, Bakersfield, Ca. 93301
g. A petition supporting the installation of undulations must be submitted
containing signatures of residents desiring the installation of road undulations
on the subject street.
2. Road Undulations shall only be installed in conformance with design guidelines that
have been established by the City Engineer.
3. Since road undulations are still experimental roadway features, additions, alterations,
or removals of any or all road undulations by the City may occur at any time.
4. Prior to the installation of road undulations, the City Engineer will notify the Fire
Department, the Police Department and ambulance services of each installation.
5. If, after undulations are installed, residents wish to have the undulations removed,
each petition requesting removal of the undulations shall contain the signature of
residents representing at least 51% of the residences that face directly on the street
segment where undulations have been placed and located within 75 feet of the curb
on the street and will include all residences that access the street segment. A
separate petition shall be provided for each segment. The petition for removal will
be presented to the City Engineer for his consideration.
WARIL~NTS
The installation of road undulations on public streets will be considered only if all of the
following conditions are met over the entire proposed street segment as determined by the
City Engineer:
1. The average daily traffic volume shall be more than 500 but less than 2500 through
vehicles per day.
2. The street shall have a posted speed limit of 25 mph or be unposted with a prima
facia limit of 25 mph.
3. More than twO-thirds (66.7%) of the surveved motorists must exceed the posted or
prima facia speed limit, or the $5th percentile must exceed the posted or prima facia
speed limit bv l0 mph.
4. -I-he street shall not be over 44 feet wide.
5. The street shall have no more than 2 through traffic lanes. The curb adjacent to the
road undulation locations must be of the raised six or eight inch standard barrier
curb type and not roll-over curb.
6. The street shall have good vertical sight distance, pavement surface quality.,
horizontal sight distance, drainage and street lighting. It must be free of unusual
features which might affect the operation of road undulations.
7. The street shall be residential or local street meeting the following definitions as
stated in the California Vehicle Code:
"A residential street is defined as a road having 13 or more
buildings on one side of the road or 16 or more buildings on
both sides of the road, within a distance of 1/4 mile. Buildings
must be located within 75 feet of the roadway curb face and
they must face and access the street. The street must be at
least 300 feet in length and not exceed a total of one mile."
S. To avoid approach speeds of greater than 40 mph, the location of the first proposed
road undulation shall be such that the approach speed in advance of the first
undulation can be effectively controlled via a physical design feature such as a curve
or controlled intersection.
9. Installation of a road undulation will not be permitted where substantial diversion
of traffic to other local streets will occur as determined by the City Engineer.
10. Road Undulations shall not be considered for streets that serve as bus routes or are
commonly used bv emergency vehicles as an access corridor.
11. Road Undulations shall not be installed on a street where they would cause, an
aggregate 30 seconds delay in Fire Department response time or if they cause the
response to exceed slx minutes.
12. Street Lighting must exist on the street blocks where undulations are proposed to be
installed.
PROCEDURES
1. ,After a petition is received, the City Engineer xvill:
a. Verig, that each petition contains the requisite number 'of signatures by
calculating the total number of residents that are entitled to sign the petition
and ensure that the 75% criterion has been met.
3
b. Obtain necessary traffic data.
c. Verify compliance with all warrants.
2. All requests for road undulations that meet all policies and warrants will be given to
the City Engineer. The City Engineer will review all relevant issues and then make
recommendations as to which streets should receive road undulations.
3. The City Engineer will make recommendations to the City Council for approval of
installing road undulations on a particular street.
4. Staff will field locate the approved road undulations for the installation.
INSTALLATION
Construction
1. The City shall procure an annual contract for speed undulation installation.
2. All undulations should be constructed in accordance with Figure
3. The undulations shall be installed across the entire roadway to the lip of the gutter
with the last one foot tapered flush with the pavement to minimize gutter running
and to preserve gutter flows (see Figures __).
4. The residents shall pay the City the dollar amount required per the annual contract
or. obtain a private Contractor to install all required speed undulations.
5. A private contractor shall obtain an "Open Street" permit prior to beginning
construction.
Warning Devices
1. A standard Caltrans W37 30" warning sign stating "Bumps" with 5 inch series E
letters should be installed at least 100 feet from the undulation.
2. Speed advisory signs stating 10 mph should be installed below the "Bumps" warning
signs.
3. Signs and markings shall be installed with undulation construction.
4. S-foot high "Bump" legends should be painted in white at appro,,cimately 50 to 100
feet in advance of road each undulation. These legends should remain for up to one
;'ear after installation of the undulation after which time the legend may be removed.
4
5. One foot wide longitudinal ladder markings should be painted on each undulation
at 6 feet on center.
6. Double yellow centerline may be provided in the vicinity of the undulation where
determined by the City Engineer.
Placement of Undulations
Road Undulations should be placed according to the following guidelines:
1. Undulations should be placed from 200 to 300 feet away from intersections, stop
signs or sharp curves so that drivers are unlikely to approach them at high speed.
This ensures that sufficient driver reaction time is provided.
2. Undulations should be spaced from 200 to 400 feet apart.
3. The final positioning of the undulations should take into consideration the following
which should be field verified prior to installation:
a. All undulations shall not be located over manholes or within 30 feet of
hydrants.
b. Undulations should be located downstream of storm drains.
c. Undulations should be located on property lines when possible.
d. Undulations should be I0 feet awav from driveways.
e. Vertical curves and grades should be evaluated with respect to advance
visibility, of undulations. Typically, all undulations should be placed at least
200 feet away from sharp horizontal curves and be readily visible from at least
200 feet if placed near vehicle curves.
f. Undulations should not be placed on horizontal curves of less than 300 feet
radius.
4. Undulations should not be placed on streets with grades greater than 10% or in a
location that is not clearlv visible for at least 200 feet.
Removal of Undulations
1. The City shall procure an annual contract for speed undulation removal.
2. The residents shall pay the City the dollar amount required per the annual contract
or, procure a private Contractor to remove all speed undulations per City approved
methodology.
3. A private contractor shall obtain an "Open Street" permit prior to beginning removal
operations.
4. Removal shall be as follows:
a) All signs must be removed.
b) All markings must be obliterated in a rectangular pattern, so that the
markings cannot be distinguished.
c) The speed undulation must be removed to 1 1/2" below the finish pavement
and the area repaved.
Funding
1. All costs associated with removal of speed undulations shall be borne by the
residents, whether done bv the Citv annual contract or private contractor.
6