HomeMy WebLinkAboutBUSINESS PLAN~ RIO BRAVO HYDROELECTRIC PROJ.'
1 MI E RANCHERIA ROAD
.a :S
RIO BRAVO HYDROELECTRIC PROJECT
Manager BOB TEAGARDEN
Location: 1 MILE EAST RANCHERIA RD
City BAKERSFIELD
SiteID: 015-021-000118
BusPhone: (661) 872-4487
Map 104 CommHaz Low
Grid: 12A FacUnits: 1 AOV:
CommCode: KCFD STA 44
EPA Numb:
SIC Code:4911
DunnBrad:
Emergency Contact / Title Emergency Contact / Title
JIMMY DAVIS / PLANT OPERATOR STEVE WILSON / PLANT OPERATOR
Business Phone: (661) 872-4487x Business Phone: (661) 872-4487x
24-Hour Phone (661) 343-2704x 24-Hour Phone (760) 549-3280x
Pager Phone (661) 335-3044x Pager Phone (661) 852-9209x
Hazmat Hazards: Fire Press ImmHlth DelHlth
Contact JIMMY DAVIS Phone: (661) 872-4487x
MailAddr: 16500 HWY 178 State: CA
City BAKERSFIELD Zip 93306
Owner KERN HYDRO PARTNERS Phone:- (480) 595-7147x
Address PO BOX 2244 1 State: AZ
City CAREFREE Zip 85377
Period to TotalASTs: _
Preparers TotalUSTs: _
Certif'd: RSs: No
ParcelNo:
Emergency Directives:
PROG A - HAZMAT
ENT'D J UL 2 6 2007
-,~'Y-,ri an my inruiry of those individuals
'~'~--,~,=~~+r.;,~r orJra, ir;in(~ the irifarmation, I certify
`d°7s~e~~ %',~nalty ci i<~L°~ that I have personally
~t~~rndr`E~ anr.{ a~~n f~rniiiar with the information
'"~`~°~"i~"•eo ~~nd `~=~'+r=~?° the information is true,
clL"a^:1rc's.te, and ~Gm~?iete.
Sign~tura- - ~°°~' ~--~~~
Date
Gall
Gal
-1- 07/13/2007
~~ _
F RIO BRAVO HYDROELECTRIC PROJECT
~ Hazmat Inventory
~ MCP+DailyMax Order
= SiteID: 015-021-000118 ~
By Facility Unit ~
Fixed Containers on Site ~
Hazmat Common Name... SpecHaz EPA Hazards Frm DailyMax Unit MCP
NITROGEN F P IH G 4740.00 FT3 Min
00600 TRANSFORMER OIL DH L 2216.00 GAL Min
MOTOR OIL DH L 1272.00 GAL Min
CARBON DIOXIDE F P IH G 1136.00 FT3 Min
-2- 07/13/2007
~~' -
-3-
07/13/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
~ Inventory Item 0005 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
NITROGEN Days On Site
' 365
Location within this Facility Unit Map: Grid:
1ST LEVEL IN INTAKE STRUCTURE AND 1ST LEVEL POWERHOUSE CAS#
7727-37-9
STATE TYPE PRESSURE TEMPERATURE CONTAINER TYPE
Gas Pure Above Ambient Ambient PORT. PRESS. CYLINDER
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
4740.00 FT3 4740.00 FT3 4740.00 FT3
TTT ATT1T\l1TTA /Yl1T RT\/~T.TTLTT l1
ruaatu~LVUa ~.vi~lruivaly t a
$Wt. RS CAS#
100.00 Nitrogen No 7727379
ril-~G1jtCLJ 1jJJtSJJ1~l~1V1w7
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies F P IH / / / Min
~ Inventory Item 0003 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
00600 TRANSFORMER OIL Days On Site
365
Location within this Facility Unit Map: Grid:
SWITCHYARD TRANSFORMER SURFACE LEVEL AT POWERHOUSE CAS#
64742536
STATE TYPE PRESSURE TEMPERATURE CONTAINER TYPE
Liquid TMixture ~ Ambient ~ Ambient IN MACHINE/EQUIP
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
2216.00 GAL 2216.00 GAL I 2216.00 GAL
rtt~utu~LVUO t.Vi•lrV1VG1V1J
%Wt. RS CAS#
100.00 Mineral Oil No 8020835
nric~ru~L r~a ~r~~Jl•1G1V 1J
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies DH / / / Min
-4- 07/13/2007
•~ -
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
~ Inventory Item 0002 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
MOTOR OIL Days On Site
MOBIL AW 46 ISO VG 46 365
Location within this Facility Unit Map: Grid:
1ST TWO LEVEL IN POWERHOUSE OIL STORAGE CONTAINMENT PAD CAS#
AND 1ST LEVEL OF INTAKE STRUCTURE 8020835
STATE TYPE PRESSURE TEMPERATURE CONTAINER TYPE
Liquid Mixture Ambient Ambient IN MACHINE/EQUIP
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
1272.00 GAL 1272.00 GAL 1272.00 GAL
nt~~tircLVUa ~vl~ir~lvl;ivl~
~Wt. RS CAS#
100.00 Motor Oil, Petroleum Based No 8020835
t11~GKKL E~5 JJ; 7.71~1~1V l J
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies DH / / / Min
~ Inventory Item 0004 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
CARBON DIOXIDE Days On Site
365
Location within this Facility Unit Map: Grid:
2ND LEVEL IN POWERHOUSE CAS#
124-38-9
~GasATE TpureE -~AboveSAmbEent AmbientT~E PORTCOPRESSERCYLINDER
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
1136.00 FT3 1136.00 FT3 1136.00 FT3
I1HGH[CLVU2~ 1.V1~lYV1V~1V 1.7
oWt. RS CAS#
100.00 Carbon Dioxide No 124389
17tiGlilCL HJ .7L~.7.71°1P~1V 1 ~J
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies F P IH / / / Min
-5- 07/13/2007
:~ >
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Notif./Evacuation/Medical Overall Site
~ Agency Notification 07/19/2006
THE PLANT OPERATOR WILL VERIFY THAT THE PENSTOCK GATES AND BYPASS VALVES ARE
OPEN AND THEN WILL DIAL 911 AND ADVISE THE CITY OF BAKERSFIELD POLICE
DEPARTMENT OF THE EMERGENCY. THE POLICE DEPARTMENT WILL NOTIFY THE
CALIFORNIA HIGHWAY PATROL AND BAKERSFIELD FIRE DEPARTMENT.
THE PLANT OPERATOR WILL NOTIFY: 1) THE DISTRICT MANAGER, BOB TEAGARDEN,
OLCESE WATER DISTRICT AND 2) NICKEL ENTERPRISES, OF THE EMERGENCY SITUATION.
THE PLANT OPERATOR AND/OR THE.DISTRICT MANAGER WILL NOTIFY THE CITY OF
BAKERSFIELD, CITY WATER DISPATCHER (STEVE LAFOND), THE KERN RIVER
WATERMASTER (CHUCK WILLIAMS), KERN HYDRO PARTNERS (EDWIN E HUDSON), AND THE
FEDERAL ENERGY REGULATORY COMMISSION (JOHN SCOTT) OF THE EMERGENCY
SITUATION.
9
9
Employee Notif./Evacuation 07/19/2006
OPERATION INSTRUCTIONS FOR A POTENTIALLY HAZARDOUS SITUATION (RAPIDLY
DEVELOPING FAILURE AND SLOWLY DEVELOPING FAILURE).
IN THE EVENT CRACKS OF LEAKAGE APPEAR, OPERATOR ACTIONS AND NOTIFICATION
PRIORITIES ARE AS FOLLOWS:
A. THE PLANT OPERATOR WILL NOFITY THE CANAL OPERATOR OR THE CANAL OPERATOR
WILL NOFITY THE PLANT OPERATOR ABOUT THE SITUATION OBSERVED.
B. OPERATOR(S) WILL NOTIFY THE DISTRICT MANAGER, OLCESE WATER DISTRICT, AND
KERN HYDRO PARTNERS.
Public Notif./Evacuation 09/02/1999
VISITS TO THE FACILITY BY THE PUBLIC ARE CONTROLLED BY ESCORTS. SHOULD AN
EVACUATION BECOME NECESSARY DURING A VISIT, EMPLOYEE/VISITORS WILL EXIT THE
PLANT BY EITHER THE NORMAL OR EMERGENCY EXITS OR BOTH AND ASSEMBLE OUTSIDE
THE FENCED AREA FOR AN ACCOUNTING OF PERSONNEL.
-6- 07/13/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Notif./Evacuation/Medical Overall Site
~ Emergency Medical Plan 09/02/1999
THE EMERGENCY MEDICAL PLAN IS CONTAINED IN THE PROJECT SAFETY AND HEALTH
ACTION PLAN. FIRST AID TREATMENT IS ADMINISTERED AT THE PLANT AND LOCAL
AMBULANCE SERVICES ARE EMPLOYED, IF NECESSARY, TO TRANSPORT INJURED
PERSONNEL TO THE NEAREST MEDICAL CENTER OR HOSPITAL.
-7- 07/13/2007
~.
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ Mitigation/Prevent/Abatemt Overall Site ~
~ Release Prevention 07/30/1991 ~
RELEASE PREVENTION STEPS ARE CONTAINED IN THE SPILL PREVENTION AND
COUNTERMEASURE PLAN.
Release Containment
07/30/1991
RELEASE CONTAINMENT AND/OR MINIMIZATION INSTRUCTIONS ARE CONTAINED IN THE
SPILL PREVENTION AND COUNTERMEASURE PLAN.
Clean Up 07/19/2006
CLEAN-UP PROCEDURES ARE CONTAINED IN THE SPILL PREVENTION AND COUNTERMEASURE
PLAN.
V1.11C1 rc~sc~urc:e r-ictivaLion
-8- 07/13/2007
;~
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ Site Emergency Factors Overall Site ~
apeciai nazara~
Utility Shut-Offs 02/06/2007
A) GAS - NONE
B) ELECTRICAL - GEN/CONTROL RM LEVEL
C) WATER - AT THREE LEVELS
D) SPECIAL - NONE
E) LOCK BOX - NO
Fire Protec./Avail. Water
01/11/2007
PRIVATE FIRE PROTECTION - WATER HOSES AT 3 LEVELS; PORTABLE FIRE
EXTINGUISHERS AT 3 LEVELS; HEAT AND SMOKE DETECTION AT ALL LEVELS IN PLANT.
FIRE HYDRANT - 2 10-FT PENSTOCKS. STANDARD FIRE HOSE CONNECTION LOCATED ON
TOP OF PLANT TO CHARGE FIRE PROTECTION SYSTEM BY FIRE DEPT. RIVER WATER IN
VICINITY OF PLANT.
Building Occupancy Level 03/27/2006
2 EMPLOYEES
-9- 07/13/2007
;_ z
~ RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Training Overall Site
~ Employee Training 07/19/2006
MATERIAL SAFETY DATA SHEETS ON FILE.
BRIEF SUMMARY OF TRAINING PROGRAM: TRAINING PROGRAM FOR PERSONNEL INVOLVED
OR SUBJECT TO EXPOSURE TO HAZARDOUS SUBSTANCES IS CONTAINED IN THE PROJECT
SAFETY AND HEALTH ACTION PLAN. ALL EMPLOYEES WHOSE WORK INVOLVES THE USE OF
HAZARDOUS SUBSTANCES RECEIVE SPECIFIC ORIENTATION TRAINING AND PERIODIC
REFRESHER TRAINING.. TRAINING INVOLVES THE DEGREE OF HAZARD WITH EACH
SUBSTANCE, PRECAUTION TO BE TAKEN AND PERSONAL PROTECTIVE EQUIPMENT
REQUIRED. MATERIAL SAFETY DATA SHEETS ARE USED IN THE TRAINING SESSIONS.
THE PROJECT EMERGENCY ACTION PLAN, SPILL PREVENTION CONTROL AND
COUNTERMEASURES PLAN, CODE OF FEDERAL REGULATIONS, TITLE 40, PART 112 - OIL.
POLLUTION PREVENTION AND CHAPTER 6.95 OF THE CALIFORNIA HEALTH AND SAFETY
CODE ARE ALSO USED AS REFERENCE MATERIAL IN THE HAZARDOUS TRAINING PROGRAM.
9
9
r ay.c ~
_~ ~ r_
•aciu Lvi r u~.u.LC vac
-10- 07/13/2007
n ~ ~-
1 t.
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ Training Overall Site ~
ncl.u i.vt ru~,utc vac
-11- 07/13/2007
,,
RIO BRAVO HYDROELECTRIC PROJECT
Manager BOB TEAGARDEN
Location: 1 MILE EAST RANCHERIA RD
City BAKERSFIELD
CommCode: KCFD STA 44
EPA Numb:
SiteID: 015-021-000118
BusPhone: (661) 872-4487
Map 104 CommHaz Low
Grid: 12A FacUnits: 1 AOV:
SIC Code:4911
DunnBrad:
Emergency Contact / Title Emergency Contact / Title
JIMMY DAVIS / PLANT OPERATOR STEVE WILSON / PLANT OPERATOR
Business Phone: (661) 872-4487x Business Phone: (661) 872-4487x
24-Hour Phone (661) 343-2704x 24-Hour Phone (760) 549-3280x
Pager Phone (661) 335-3044x Pager Phone (661) 852-9209x
Hazmat Hazards:
Fire Press ImmHlth DelHlth
Contact JIMMY DAVIS Phone: (661) 872-4487x
MailAddr: 16500 HWY .178 State: CA
City BAKERSFIELD Zip 93306
Owner KERN HYDRO PARTNERS
Address PO BOX 2244 1
City CAREFREE
Period to
Preparers
Certif ' d:
ParcelNo:
Phone: (480) 595-7147x
State: AZ
Zip 85377
TotalASTs: _
TotalUSTs: _
RSs: No
Emergency Directives:
PROG A - HAZMAT
Based on my inquiry of those individuals
responsib{e for obtaining the information, I Certify
under penalty of law that I have personally
examined and am farniliar with the information
submitted and believe the information is true,
accurate, and complete.
Signat bate
Gall
Gal
ENTD FEB 2 6 2007
-1- 02/06/2007
~z s
F RIO BRAVO HYDROELECTRIC PROJECT
~ Hazmat Inventory
~ MCP+DailyMax Order
= SiteID: 015-021-000118 ~
By Facility Unit ~
Fixed Containers on Site ~
Hazmat Common Name... SpecHaz EPA Hazards Frm DailyMax Unit MCP
NITROGEN F P IH G 4740.00 FT3 Min
00600 TRANSFORMER OIL DH L 2216.00 GAL Min
MOTOR OIL DH L 1272.00 GAL Min
CARBON DIOXIDE F P IH G 1136.00 FT3 Min
-2- 02/06/2007
-3- 02/06/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
~ Inventory Item 0005 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
NITROGEN Days On Site
365
Location within this Facility Unit Map: Grid:
1ST LEVEL IN INTAKE STRUCTURE AND 1ST LEVEL POWERHOUSE CAS#
7727-37-9
~GasATE T TYPE PRESSURE TEMPERATURE CONTAINER TYPE
I Pure Above Ambient Ambient PORT. PRESS. CYLINDER
AMOUNTS AT THIS LOCATION
Largest C4740100rFT3 Daily4M740100m FT3 I- Daily4740r00e FT3
- - r~~x~cLUUa ~.OMPONENTS
%Wt. RS CAS#
100.00 Nitrogen No 7727379
titiGfiKL t~~a.Gaa1~1~1v1a
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies F P IH / / / Min
~ Inventory Item 0003 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
00600 TRANSFORMER OIL Days On Site
365
Location within this Facility Unit Map: Grid:
SWITCHYARD TRANSFORMER SURFACE LEVEL AT POWERHOUSE CAS#
64742536
STATE TYPE ~~ PRESSURE TEMPERATURE CONTAINER TYPE
Liquid TMixture I Ambient ~ Ambient IN MACHINE/EQUIP
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum I Daily Average
2216.00 GAL 2216.00 GAL 2216.00 GAL
ntic~tiRl~vuo l.Vl"!t'V1VP~1V 1.7
oWt. RS CAS#
100.00 Mineral Oil No 8020835
211iGtitCL Li. 7 Jr,.7 w71"1L~1V 1 ~7
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies DH / / / Min
-4- 02/06/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
~ Inventory Item 0002 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
MOTOR OIL Days On Site
MOBIL AW 46 ISO VG 46 365
Location within this Facility Unit Map: Grid:
1ST TWO LEVEL IN POWERHOUSE OIL STORAGE CONTAINMENT PAD CAS#
AND 1ST~LEVEL OF INTAKE STRUCTURE 8020835
Liquid TMixture ~mbRent~E ~ AmbientT~E IN MAOCHINE/EQUIPPE
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
1272.00 GAL 1272.00 GAL 1272.00 GAL
7
- riL~GAtClJVlJ7 l.Vl~lrV1VL"1V1~
%Wt. RS CAS#
100.00 Motor Oil, Petroleum Based No 8020835
t1HGHKIJ a'~~ ~ L' .7.71~1L' 1V 1.7
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies DH / / / Min
~ Inventory Item 0004 Facility Unit: Fixed Containers on Site ~
COMMON NAME / CHEMICAL NAME
CARBON DIOXIDE Days On Site
365
Location within this Facility Unit Map: Grid:
2ND LEVEL IN POWERHOUSE CAS#
124-38-9
STATE TYPE PRESSURE TEMPERATURE CONTAINER TYPE
Gas TPure ~-Above Ambient_ Ambient PORT. PRESS. CYLINDER
AMOUNTS AT THIS LOCATION
Largest Container Daily Maximum Daily Average
1136.00 FT3 1136.00 FT3 1136.00 FT3
nc-ic~r~cuvv~ ~.Vi~irVivnly i ~
oWt. RS CAS#
100.00 Carbon Dioxide No 124389
i1FiGHiCL 1-~A .7l~JJ1~1r.,1V 1.7
TSecret RS BioHaz Radioactive/Amount EPA Hazards NFPA USDOT# MCP
No No No No/ Curies F P IH / / / Min
-5-
02/06/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Notif./Evacuation/Medical Overall Site
~ Agency Notification 07/19/2006
THE PLANT OPERATOR WILL VERIFY THAT THE PENSTOCK GATES AND BYPASS VALVES ARE
OPEN AND THEN WILL DIAL 911 AND ADVISE THE CITY OF BAKERSFIELD POLICE
DEPARTMENT OF THE EMERGENCY. THE POLICE DEPARTMENT WILL NOTIFY THE
CALIFORNIA HIGHWAY PATROL AND BAKERSFIELD FIRE DEPARTMENT.
THE PLANT OPERATOR WILL NOTIFY: 1) THE DISTRICT MANAGER, BOB TEAGARDEN,
OLCESE WATER DISTRICT AND 2) NICKEL ENTERPRISES, OF THE EMERGENCY SITUATION.
THE PLANT OPERATOR AND/OR THE DISTRICT MANAGER WILL NOTIFY THE CITY OF
BAKERSFIELD, CITY WATER DISPATCHER (STEVE LAFOND), THE KERN RIVER
WATERMASTER (CHUCK WILLIAMS), KERN HYDRO PARTNERS (EDWIN E HUDSON), AND THE
FEDERAL ENERGY REGULATORY COMMISSION (JOHN SCOTT) OF THE EMERGENCY
SITUATION.
9
9
Employee Notif./Evacuation 07/19/2006
OPERATION INSTRUCTIONS FOR A POTENTIALLY HAZARDOUS SITUATION (RAPIDLY
DEVELOPING FAILURE AND SLOWLY DEVELOPING FAILURE).
IN THE EVENT CRACKS OF LEAKAGE APPEAR, OPERATOR ACTIONS AND NOTIFICATION
PRIORITIES ARE AS FOLLOWS:
A. THE PLANT OPERATOR WILL NOFITY THE CANAL OPERATOR OR THE CANAL OPERATOR
WILL NOFITY THE PLANT OPERATOR ABOUT THE SITUATION OBSERVED.
B. OPERATOR(S) WILL NOTIFY THE DISTRICT MANAGER, OLCESE WATER DISTRICT, AND
KERN HYDRO PARTNERS.
Public Notif./Evacuation 09/02/1999
VISITS TO THE FACILITY BY THE PUBLIC ARE CONTROLLED BY ESCORTS. SHOULD AN
EVACUATION BECOME NECESSARY DURING A VISIT, EMPLOYEE/VISITORS WILL EXIT THE
PLANT BY EITHER THE NORMAL OR EMERGENCY EXITS OR BOTH AND ASSEMBLE OUTSIDE
THE FENCED AREA FOR AN ACCOUNTING OF PERSONNEL.
-6- 02/06/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Notif./Evacuation/Medical Overall Site
~ Emergency Medical Plan 09/02/1999
THE EMERGENCY MEDICAL PLAN IS CONTAINED IN THE PROJECT SAFETY AND HEALTH
ACTION PLAN. FIRST AID TREATMENT IS ADMINISTERED AT THE PLANT AND LOCAL
AMBULANCE SERVICES ARE EMPLOYED, IF NECESSARY, TO TRANSPORT INJURED
PERSONNEL TO THE NEAREST MEDICAL CENTER OR HOSPITAL.
9
-~- 02/06/200
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ MitigationjPrevent/Abatemt Overall Site ~
~ Release Prevention 07/30/1991 ~
RELEASE PREVENTION STEPS ARE CONTAINED IN THE SPILL PREVENTION AND
COUNTERMEASURE PLAN.
Release Containment 07/30/1991
RELEASE CONTAINMENT AND/OR MINIMIZATION INSTRUCTIONS ARE CONTAINED IN THE
SPILL PREVENTION AND COUNTERMEASURE PLAN.
Clean Up 07/19/2006
CLEAN-UP PROCEDURES ARE CONTAINED IN THE SPILL PREVENTION AND COUNTERMEASURE
PLAN.
Vt.i1C 1. 1CC~V UI. C:C HLl.1Vdl.1 V11
-8- 02/06/2007
:,
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ Site Emergency Factors Overall Site ~
.7~JCG1d1 ridGdiU~
Utility Shut-Offs 02/06/2007
A) GAS - NONE
B) ELECTRICAL - GEN/CONTROL RM LEVEL
C) WATER - AT THREE LEVELS
D) SPECIAL - NONE
E) LOCK BOX - NO
Fire Protec./Avai1. Water 01/11/2007
PRIVATE FIRE PROTECTION - WATER HOSES AT 3 LEVELS; PORTABLE FIRE
EXTINGUISHERS AT 3 LEVELS; HEAT AND SMOKE DETECTION AT ALL LEVELS IN PLANT.
FIRE HYDRANT - 2 10-FT PENSTOCKS. STANDARD FIRE HOSE CONNECTION LOCATED ON
TOP OF PLANT TO CHARGE FIRE PROTECTION SYSTEM BY FIRE DEPT. RIVER WATER IN
VICINITY OF PLANT.
Building Occupancy Level 03/27/2006
2 EMPLOYEES
-9- 02/06/2007
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118
Fast Format
~ Training Overall Site
~ Employee Training 07/19/2006
MATERIAL SAFETY DATA SHEETS ON FILE.
BRIEF SUMMARY OF TRAINING PROGRAM: TRAINING PROGRAM FOR PERSONNEL INVOLVED
OR SUBJECT TO EXPOSURE TO HAZARDOUS SUBSTANCES IS CONTAINED IN THE PROJECT
SAFETY AND HEALTH ACTION PLAN. ALL EMPLOYEES WHOSE WORK INVOLVES THE USE OF
HAZARDOUS SUBSTANCES RECEIVE SPECIFIC ORIENTATION TRAINING AND PERIODIC
REFRESHER TRAINING. TRAINING INVOLVES THE DEGREE OF HAZARD WITH EACH
SUBSTANCE,. PRECAUTION TO BE TAKEN AND PERSONAL PROTECTIVE EQUIPMENT
REQUIRED. MATERIAL SAFETY DATA SHEETS-ARE USED IN THE TRAINING SESSIONS.
THE PROJECT EMERGENCY ACTION PLAN, SPILL PREVENTION CONTROL AND
COUNTERMEASURES PLAN, CODE OF FEDERAL REGULATIONS, TITLE 40, PART 112 - OIL
POLLUTION PREVENTION AND CHAPTER 6.95 OF THE CALIFORNIA HEALTH AND SAFETY
CODE ARE ALSO USED AS REFERENCE MATERIAL IN THE HAZARDOUS TRAINING PROGRAM.
rayc a
nciu ivL rut.u.~c v5C
-10-
02/06/2007
/ ,~
i, -r
F RIO BRAVO HYDROELECTRIC PROJECT SiteID: 015-021-000118 ~
Fast Format ~
~ Training Overall Site ~
n~iu Lvi L'UI.UIC U5C
~/
i
/ ,
-11-
r~
l~
~ _ ~~
/02/06/20„0-~~
~~
1
7 _~
. ~
+ RIO BRAVO HYDROELECTRIC PROJECT _____________________ SiteID: 015-021-000118 +
Manager BOB TEAGARDEN BusPhone: (661) 872-4487
Location: Map 104 CommHaz Minimal
City BAKERSFIELD ~ ~` /, ~~~~~~~~ ~ Grid: 12A FacUnits: 1 AOV:
CommCode: KCFD STA 44
EPA Numb:
SIC Code:4911
DunnBrad:
Emergency Contact / Title Emergency Contact / Title
JIMMY DAVIS f PLANT OPERATOR STEVE WILSON / PLANT OPERATOR
Business Phone: (661.) 872-4487x Business Phone: (661) 872-4487x
24-Hour Phone (661) ~~'~4x 24-Hour Phone (760)
Pager Phone (661) c Pager Phone (~-)'fix
Hazmat Hazards: Fire Press ImmHlth DelHlth
Contact J
MailAddr: P~-1 ~ ~~ ~ ~~~
~ Phone:
State: (661) 872-4487x
CA
City BAKERSFIELD Zip 93306
-Owner KERN HYDRO PARTNERS Phone: (480) 595-7147x
Address PO BOX 2244 1 State: AZ
City CAREFREE Zip 85377
Period to TotalASTs: = Gal
Preparers TotalUSTs: = Gal
Certif'd: RSs: No
ParcelNo:
Emergency Directives:
I `~
PROG A - HAZMAT
~~~.~.y
~~~
iP~~~ r~
~v~ s
~ ~,,~~'- 3 y3
i
f
f~
~~.
~. ~ Y
lol~f- 33~' 3b`~Y
Based on my inquiry of those individuals
responsible for obtaining the information, 1 certify
under penalty of law that I have personally
examined and am familiar with the information
submitted and believe the information is true,
accurat nd complete.
~- z v-d.~
Si n ture Da e
z
~1
ENT'D J U L 19 2006
~-f~ve (,liclso~-
GEC( ~~ ~ Sy f -3a8a
-1- 03/27/2006