HomeMy WebLinkAboutRES NO 90-82ESOLUTION NO. 90-8P,
RESOLUTION OF THE CITY COUNCIL ORDERING
CERTAIN CHANGES AND MODIFICATIONS TO
THE ENGINEER'S "REPORT" IN A SPECIAL
ASSESSMENT DISTRICT
WHEREAS, the CITY COUNCIL of CITY OF BAKERSFIELD, CALIFORNIA, has' previously
adopted its Resolution of Intention pursuant to the provisions of the
"Municipal Improvement Act of 1913", being Division 12 of the Streets and
Highways Code of the State of California, for the construction of certain works
of improvement in a special assessment district known and designated as
ASSESSMENT DISTRICT NO. 81-1
(hereinafter referred to as the "Assessment District"); and
WHEREAS, subsequent thereto, the City Council did, by 'Resolution, approve the
"Report" and call for sealed bids on the construction of the works of improve-
ment as contemplated in said AsSessment District; and,
WHEREAS, prior to said Public Hearing, sealed bids were received and consi-
dered for the construction of the works of improvement in the Assessment
District, and at this time an amended assessment roll has been presented show-
ing modifications and reductions in all assessments because of the favorable
construction bid so received; and,
WHEREAS, at this time bids have also been received for the sale of bonds; and,
WHEREAS, it now appears that the changes and modifications as set forth in the
amended assessment roll as presented herein should be approved and ordered to
be done.
NOW, THEREFORE, IT IS HEREBY RESOLVED AS FOLLOWS:
SECTION 1. That the above recitals are all true and correct.
SECTION 2.
That it is hereby ordered that the changes and modifications as
set forth in the amended assessment. roll- as-presented herein,
based on the bids received, are hereby approved and ordered to be
done.
SECTION 3.
That said changes and modifications above mentioned are hereby
ordered pursuant to the authority as set forth in Section 10352 of
the Streets and Highways Code of the State of California (the
"Municipal Improvement Act of 1913").
SECTION 4.
That the Englneer's "Report", the Assessment l, and all related
documentation, as so modified, are all for the best interests of
the property owners within the Assessment District, and said
assessment, as modified and apportioned, is in accordance with the
benefits received, and the "Report", as herein modified and
amended, shall stand as the "Report" for all subsequent proceed-
ings relating to this Assessment District.
I hereby certify that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting held on the 18th day
of August , 1982, by the following vote:
AYES: COUNCILMEN: BARTON, CHRISTENSEN, MEANS, PAYNE, RAI'Pf, ROCKOFF, STRONG
NO S: COUNC,LME Z .............
ABSENT: COUNCILMEN: _
ABSTAINING: COUNCILMEN:
:-,~ ~-L~ ,--,
APP ED ~:~ 20th day~o~,
LDF~- ' -' ' E
'~F ' '~H
CITY CL F E
COUNCIL OF THE CITY OF BAKERSFIELD
APPROVED AS TO FORM:
KERSFT R IELD
AMENDED
ENGINEER'S REPORT
MUNICIPAL IMPROVEMENT ACT OF 1913
CITY OF BAKERSFIELD
for
ASSESSMENT
DISTRICT NO.
81-1
[FAIRVIEW)
1982
WILLDAN ASSOCIATES
ENGINEERS PLANNERS
290 South Anaheim Blvd.
Anaheim0 Calif. 92805
The following changes have been made to the Engineer's Report as
originally submitted:
1) The construction costs have been reduced from $566,085 to
$501,535.37 to reflect the actual bids received.
2) The costs of printing, posting, publishing has been increased
from $5,000 to $10,000 on advise of the financial underwriters.
3)
The project contingency fund has been reduced from $52,727 to
$50,464.63 due in part to the reduced construction costs; also
the State tax will not be required.
4)
The financing costs have been reduced from $237,221 to $159,875.78
as the result of receiving the actual purchase price commitment from
the bond underwriter. This reflects the general lowering of the
interest rates.
5)
These changes were distributed proportionally to the various parcels
based upon the assessments set forth in the preliminary report. The
assessments for assessment parcels 6 and 7 were reduced an addi-
tional 10% as the result of the greater difficulty in developing these
parcels as reflected in subsequently received appraisal reports.
Assessment District No,
Fairview
City of Bakersfield
81-1
COST ESTIMATES
Prel i m i na ry
Assessment
Confirmed
Assessment
Cost of Construction:
Sanitary Sewer
Storm Drain
Water Company Construction
TOTAL CONSTRUCTION
Design Engineering
City Preliminary Engineering
Construction Staking & Inspection etc
Assessment Engineering
Bond Counsel
Printing· Posting· Publishing & Bonds
Right-of-Way Engineering
Interest on Money Advanced
Bond Servicing
TOTAL INCIDENTALS
TOTAL CONSTRUCTION & INCIDENTALS
$178,258
347,494
40,000
$566,
$ 20,
20,
25,
$103,
$659,
085
000
000
000
000
000
000
500
500
000
000
085
$501,535.37
20, 000.00
5, 000.00
20,000.00
25, 000.00
14, 000.00
10, 000.00
2, 500.00
1,500.00
10,000.00
08,000.00
$609,535.37
Project Contingency C~8%
(--i,,..; od=~ -'l-7'-~;t0-of-l%-SL,,i.,=
Project Cost for Bond Computation
Financing
Bond Discount ..~t5% @9, 5%
Reserve Fund @ 10%)
TOTAL INCIDENTAL COST
52,727
$711,812
237,271
$382,998
50,464.63
$660, 000.00
159,875.78
$31 8,340.41
BALANCE TO ASSESSMENT
$949,083
$819,875.78
Estimated Cost of Construction
Estimated Incidental Costs F, Expenses
Total Estimated Cost
Less Contributions
Balance to Assessment
Preliminary Final
Approval Approval
5 566,085 5501,535.37
382,998 318, 340.41
5 949,083 581 9,875.78
5 949,083 5819, 875.78
For particulars as to the individual assessments and their descriptions,
reference is made to the Assessment Roll attached hereto.
6)
All costs and expenses of the works of improvement have been asses-
sed to all parcels of land within the assessment district in a manner
which is more clearly defined in the Method of Assessment, a copy
of which is contained herein.
DATED:
1982 BY:
J. Dale Hawley
Superintendent of Streets
City of Bakersfield
~ssessment District
Fairview
City of Bakersfield
No.
ASSESSMENT ROLL
Asmt 'Assessor' s Owners
# Number Name/Address
175-020-05-00-6C
2 175-020-07-01-1C
3 175-020-08-00-5C
4 175-020-10-00-0C
5 175-030-05-00-9C
6 175-030-07-00-5C
7 175-030-08-00-8C
8 175-030-15-00-8C
9 175-030-16-00-6C
Genevieve Myers
% Hilltop Developers Inc
1830 Brundage Lane
Bakersfield 93304
Covington Brothers Tech
2451 East Orangethorpe
Fullerton 92631
Greenfield Unified School
District
MTL Development Co &
4226 Limited
2823 Miles Street
Bakersfield 93306
Giorgia Grassotti
899 West Fairview Road
Bakersfield 93307
H-Bar Development Co Inc
917 19th Street
Bakersfield 93301
MTL Development Co
% Eugene F. Cassady & Co
307 Vista Verde Way
Bakersfield 93309
Per ry M. Jones, j r
927 Fairview Road
Bakersfield 93304
Challenge Builders Inc
% Department of State
1206 California Avenue
Bakersfield 93303
Preliminary
Assessment
$195~ 210. 71
128,149.11
158,999.17
115,517.19
116,861.75
103, 1 82.09
3,256.79
63,374.86
Confirmed
Assessment
$171,827.97
112,474.59
-0-
138,555.17
101,387.74
95,684.31
85,288.12
2,813.41
55,459.45
Asmt
10A
10B
11
12
13
Assessor' s
Number
175-030-17-00-4C
175-030-18-00-8C
175-030-19-00-0C
175-030-20-00-2C
175-030-23-00-1C
Owners
Name/Address
James M. Johnson
1031 West Fairview
Bakersfield 93307
Road
James M. Johnson
DBA J F, C Accountants
1031 West Fairview Road
Bakersfield 93307
Ramen V. Solano &
Mary L. Solano
1101 West Fairview Road
Bakersfield 93307
Challenge Builders Inc
% Mrs G. B. Obela
1206 California Avenue
Bakersfield 93303
City of Bakersfield
1501 Truxtun Avenue
Bakersfield 93301
Preliminary
Assessment
$ 1,441.10
228.90
4,798.99
58,062.34
-0-
$949,083.00
Confirmed
Assessment
$ 1,244.91
197.74
4,145.66
50,796.71
-0-
$819, 875.78