HomeMy WebLinkAboutRES NO 167-08 RESOLUTION NO. 167 — 0 8
A RESOLUTION OF THE COUNCIL OF THE CITY OF
BAKERSFIELD ADOPTING THE 2007-2035 REGIONAL
TRANSPORTATION IMPACT FEE FACILITIES LIST AND
FEE SCHEDULE, PHASE IV AND ADOPTING THE NEXUS
REPORT.
WHEREAS, Chapter 15.84 of the Bakersfield Municipal Code implemented a
Transportation Impact Fee program for new development in order for new development
to bear a proportionate share of the cost of the new or expanded transportation facilities
required by such development; and
WHEREAS, Chapter 15.84 of the Bakersfield Municipal Code requires that the
Fee schedule be evaluated to account for changes in the Regional Transportation
Facilities List, changes in cost estimates for the various projects on the list, and any
other items which would change new developments' proportionate share of the cost of
the Regional Transportation Facilities List; and
WHEREAS, Chapter 15.84 of the Bakersfield Municipal Code further requires
that the fee schedule adopted by the City Council be adjusted annually by the
Construction Cost Index; and
WHEREAS, both the Facilities List and the Fee Schedule of the Transportation
Impact Fee Program have been re-evaluated to include a new planning horizon year of
2035; and
WHEREAS, the transportation network has been updated to include the latest
development and land use trends through December of 2007; and
WHEREAS, all developments which vest after the adoption of this Resolution will
be subject to the Phase IV Transportation Impact Fee; and
WHEREAS, this change to the Transportation Impact Fee program is not a
CEQA project per Section 15378 (b)(4) of the State CEQA Guidelines; and
WHEREAS, only activities which meet the definition of "project" are the subject of
a CEQA review process; and
WHEREAS, the fees collected do not involve the commitment to any specific
project which may result in a potentially significant physical impact on the environment;
and
WHEREAS, a public hearing before the City Council was advertised and held
September 17, 2008 and the City Council finds as follows:
o s-,
-Page 1 of 3 Pages-
U O
ORIGINAL
1 . All required public notices have been given. Hearing notice was published
per Government Code Sections 66018 and 6062 (a).
2. The provisions of CEQA and City of Bakersfield CEQA Implementation
Procedures have been followed. The change to the transportation Impact Fee
program is not a "project" under CEQA, and therefore is not required to have an
environmental document.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield
as follows:
1. The above recitals are true and correct and incorporated herein.
2. The Transportation Impact Fee Facilities List, Phase IV set forth as Exhibit
"A," is hereby approved and adopted.
3. The fee schedule for Phase IV set forth as Exhibit "B" is hereby approved
and adopted.
4. The nexus report for Phase IV set forth as Exhibit "C" is hereby approved
and adopted.
5. This Resolution shall become effective 60 days after its adoption by both
the City and the County, whichever is later.
------------000------------
t
�gAKe9
O 01,
-Page 2 of 3 Pages-
� r �
ORIGINAL
HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting thereof held on SEP 17 2008
by the following vote:
AYES: COUNCILMEMBER CARSON,-BC�,WEIR,6Q6L6H,HANSON,SULLIVAN,SCI-R/IVN ER
NOES: COUNCILMEMBER(iMie—I
ABSTAIN: COUNCILMEMBER _
ABSENT: COUNCILMEMBER e*l,�
A�" 2ffj"
{�55£ CITY CLERK and Ex O i o Clerk of the
Council of the City of B kersfield
APPROVED SEP 17 2008
By
*kR aYwL. H ALL
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By /Qjt�
ROBERT M. SHERFY
Deputy City Attorney
mps
S:\PROJECTS\TIF\Phase 4\Adoption Documents\Resolution.DOC
-Page 3 of 3 Pages-
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST- FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global Completed Number of Number of Lanes
PY0J0Ct Improvement Improvement Lanes Lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles Striped Proposed Fee Lane Miles Cat_desc Notes RfW Construct. Signal Cost Cost Total Cost Fee Funding
B303 7th Standard Road Airport Drive Traffic Signals Install Signal $0 $0 $161,400 $161,400 $161,400
8304 7th Standard Road Allen Road SR 99 3.50 2 6 2 7.0 1 Lane Additions Add 1 lanes $0 $4,374,008 $0 $4,374,008 $4,374,008
E132 7th Standard Road Allen Road I Traffic Signals Install Signal 1 $0 $190,000 $190,000 $190,000
E145 7th Standard Road BNSF RR Railroad Grade Separations Grade Separation $20,000,000 $20,000,000 $20,000,000
E322 7th Standard Road Calloway Canal Canal Bridges Construct Canal Bride 1500'e/o Jewetta Avenue $2,000,000 $2,000,000 $2,000,000
8305 7th Sta and Road Calloway Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B595 7th Standard Road Chester Avenue Modified Traffic Signals Signal Modification $0 $0 $58,400 $58,400 $58,400
E323 7th Standard Road Friant-Kern Canal Canal Bridges Construct Canal Bride 1700'e/o Quail Creek $2,000,000 $2,000,000 1 $2,000,000
E321 7th Standard Road Lerdo Canal Canal Bridges Construct Canal Bride 600'w/o Jewetta Avenue $2,000,000 $2,000,000 $2,000,000
8307 7th Standard Road McCray Street Traffic Signals Install Signal $0 $0 $148,400 $148,400 $146,400
B527 7th Standard Road Old Farm Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B528 7th Standard Road Rudd Road West Beltway) Traffic Si pals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E124 7th Standard Road Santa Fe Way Zerker Road 2.50 2 4 2 5.0 1 Lane Additions Add 1 lanes $3,124,291 $3,124,291 $3,124,291
E125 7th Standard Road SR 431Enos Lane Santa Fe Way 3.00 2 4 2 6.0 2 Lane Additions Add 2 lanes $3,749,150 $3,749,150 $3,749,150
E267 7th Standard Road SR 43/Enos Lane 1.00 2 6 4 4.0 Ex and Intersection Expand Intersection $1,267,200 $1,267,200 $1,267,200
B311 7th Standard Road SR 99 1-5 FreewaV Projects Advance Planning $0 $0 $5,469,135 $5,469,135 $5,469,135
8309 7th Standard Road SR 99 State Hwy Bridges,Interchanges Replace EB Bridge:add WB-SB ram $0 $0 $7,000,000 $7,000,000 $7,000,000
8310 7th Standard Road SR 99 N/B off Ramp Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B529 7th Standard Road Verdu o Lane Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
E159 7th Standard Road Wing Way Airport Drive 0.50 2 4 2 1.0 2 Lane Additions Add 2 Lanes $624,858 $624,858 $624,858
E123 7th Standard Road Zerker Road Allen Road 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $624,858 1 $624,858 $624,858
E129 7th Standard Road Zerker Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E160 Airport Drive Norris Road Olive Drive 2.00 4 6 2 4.0 2 Lane Additions Add 2 lanes,BORDER $2,499,433 1 $1,249,717 $1,249,717
B1 Airport Drive Norris Road Expand Intersection Expand Intersection,BORDER $687,656 $687,656 $0 $1,375,311 $1,375,311
E185 Airport Drive Olive Drive Expand Intersection BORDER $500,000 $250,000 $250,000
B2 Airport Drive Olive Drive n/o State Road 0.60 4 6 2 1.2 2 Lane Additions Add 2 lanes/Expand Intersection,BORDER $0 $5,000,000 $0 $5,000,000 $5,000,000
B3 Airport Drive UP RR Railroad Grade Separations Widen RR Bridge,BORDER $0 $0 $1,222,498 $611,249 $611,249
8450 Akers Road Pacheco Road Traffic Signals Install Signal 0 0 190,000 0 190000 190,000
9302 Alfred Harrell Highway China Grade Loop Fairfax Road 0.50 4 6 2 1 1.0 2 Lane Additions Add 2 Lanes 0 624,856 so 624,858 624,858
8577 Alfred Harrell Highway Lake Ming Road Traffic Signals Install traffic signal $0 $0 $190,000 $0 $190,000 $190,000
8540 Alfred Harrell Highway West End Hart Park SR 178 5.50 2 4 2 11.0 2 Lane Additions Add 2 lanes $0 $6,873,441 $611,249 $7,484,690 $7,484,690
B158 Allen Road Ming Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E4 Allen Road Panama Lane SR 119/faft Hi hwa 2.00 0 2 2 4.0 2 Lane Additions Construct 2 lanes $2,499,433 $2,499,433 $2,499,433
E186 Allen Road SR 58/Rosedale Highway Expand Intersection Widen to 6 lanes $500,000 $500,000 $500,000
84 lAilen Road Brimhall Road Stockdale Highway 1.00 0.75 2 1 6 2 0.5 2 Lane Additions Add 2 lanes $0 $312,429 $0 $312,429 $312,429
B5 Allen Road Campus Park Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B6 Allen Road Chamber Boulevard Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
B8 Allen Road Goose Lake Slough Canal Culverts Construct new Culvert @ Sta.236+60 Goose Lake $0 $220,050 $0 1 $220,050 $220,050
B9 Allen Road Harris Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B11 Allen Road Kern River Canal Canal Bridges Construct canal bridge at Sta.150+00 River Canal $0 $0 $611,249 $611,249 $611,249
B13 Allen Road Meacham Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B14 Allen Road Ming Avenue Stockdale Highway 1.00 0.90 0 2 2 0.2 2 Lane Additions Construct 2 lanes $0 $124,972 $0 $124,972 $124,972
B15 lAllen Road Norie a Road Ha eman Road 0.38 2 2 1 0.4 1 Lane Additions NB only $36,122 $145,943 $611,249 $793,314 $793,314
B16 Allen Road Norie a Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B18 Allen Road Panama Lane Ming Avenue 3.00 0 2 2 6.0 2 Lane Additions Construct 2 lanes $0 $3,749,150 $0 $3,749,150 $3,749,150
B19 Allen Road Reina Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B20 Allen Road Snow Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B22 Allen Road SR 58 Brimhall Road 1.00 0.75 2 6 2 0.5 2 Lane Additions Add 2 lanes $0 $312,429 $0 $312,429 $312,429
B21 Allen Road UP RR Improve Railroad Grade Crossings Improve grade crossing $0 $1,000,000 $0 $1,000,000 $1,000,000
8574 Ashe Road Harris Road Traffic Signals Install traffic signal $0 $0 $190,000 $0 $190,000 $190,000
8541 lAshe Road Panama Lane Taft Highway 2.00 2 1 6 2 4.0 2 Lane Additions Add 2 lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
E6 Ashe Road SR 119/Taft Highway Curnow Road 0.50 2 4 2 1.0 2 Lane Additions Construct 2 lanes $624,858 $624,858 $624,858
B24 Ashe Road Berkshire Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B25 Ashe Road Hosking Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B26 Ashe Road McKee Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B454 Berkshire Road Akers Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B455 Berkshire Road Buena Vista Road Traffic Signals Install Si nal $0 $0 $190,000 $0 $190,000 $190,000
B456 Berkshire Road Mountain Ridge Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8457 Berkshire Road Mountain Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B458 Berkshire Road Reliance Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B29 Berkshire Road South H Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B30 Berkshire Road South Union Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8615 Berkshire Road(Star Lake Pkwy) Sunset Spur Improve Railroad Grade Crossings New at-grade crossing $0 $800,000 $0 $800,000 $800,000
E8 Breckenridge Road Masterson Street Comanche Drive 2.30 2 4 2 4.6 2 Lane Additions Add 2 lanes $2,874,348 $2,874,348 $2,874,348
B32 Breckenridge Road SR 184/Morning Drive Vineland Road 1.00 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 1 $1,249,717 $0 $1,249,717 $1,249,717
B33 Breckenridge Road Vineland Road Edison Road 1.00 0.40 2 1 4 2 1 1.2 2 Lane Additions Add 2 lanes $0 1 $749,830 $0 $749,830 $749,830
B37 I Brimhall Road Jenkins Road I Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B41 Brimhall Road Renfro Road Allen Road 0.50 2 4 2 1 1.0 2 Lane Additions Add 2 lanes(excluding Westdale Avenue to Jenkins Road KEN6e4 $0 1 $624,858 $0 $624,858 $624,858
E172 Brimhall Road Rudd Road Renfro Road 0.50 0 4 4 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $1,249,717 $1,249,717
B43 Brimhall Road Verdu o Lane Traffic Si nals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B613 Buena Vista Road Campus Park Drive Relocate Obstruction Relocate PG&E Tower $0 $0 $273,456 $273,456 $273,456
B48 Buena Vista Road Campus Park Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B49 Buena Vista Road Harris Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B51 Buena Vista Road Pacheco Road Panama Lane 1.00 0.70 2 1 4 2 0.6 2 Lane Additions Construct 2 Lanes $0 $374,915 $0 $374,915 $374,915
B614 I Buena Vista Road Pacheco Road White Lane 1.00 1 1 1.0 1 Lane Additions Add one lane $0 $624,858 $0 $624,858 $624,858
8542 I Buena Vista Road Panama Lane SR 119/Taft High a 2.00 2 4 2 4.0 2 Lane Additions Construct 2 Lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
653 Buena Vista Road Si RR Improve Railroad Grade Crossin s Im rove rade crossing at Sta.52+80 $0 $0 $122,250 $122,250 $122,250
55 uena vista oa 1 a Highway urnow Road 5 ape flops apes 5 5 5
Clxhibit Ate
S:\PROJECTS\TIF\Phase 4\Ndoption Documents\RTIF-Final 1.2 Clean090508Rmps Page 1 of 8 rri
r
(, CD
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global Completed Numberof Numberof . Lanes
Project Improvement Improvement Lanes Lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed Fee lane-Miles Cat_desc Notes R/W Construct. Signal Cost Cost Total Cost Fee Funding
B61 Calloway Drive 7th Standard Road Ha eman Road 3.00 1.50 4 6 2 3.0 2 Lane Additions Add 2 lanes $0 $1,874,575 $0 $1,874,575 $1,874,575
E227 Calloway Drive Etchard Road 100's/o Canal Bridges Widen Canal Crossing $300,000 $300,000 $300,000
B60 Callowa Drive Norris Road Olive Drive 0.50 2 6 2 1,0 2 Lane Additions Add 2 lanes $20,000 $624,856 $0 $644,858 $644,858
B62 Callow Drive SR 581Rosedale Hi hwa Holland Street 0.25 2 6 4 1.0 2 Lane Additions Widen roadwa and intersection $0 $624,858 $6,586,000 $6,210,858 $6,210,858
B64.1 Casa Loma Drive Washin ton treet Fai ax Road 2.50 0 4 4 1 p,0 4 Lane Additions onstruct 4 lanes 0 6,248,583 0 6,248,583 6,248,583
E249 Centennial Corridor TRIP Westside Parkway Terminus SR 99/SR 58 Freewa Projects Construct Freewa -TRIP LM,REGIONAL 36,543,000 $34,715,850 $34,715,850
E250 Centennial Corridor(TRIP) Westside Parkwa Terminus SR 99/SR 58 Freewa Projects Construct Freeway-TRIP ALM,REGIONAL $207,693,000 $197,308,350 $197,308,350
7461 hamber Boulevard Windermere treet Traffic Signals Install Signal D 0 190,000 0 190,000 190,000
E170 Chase Avenue Masterson Street Comanche Drive 1.00 0 4 2 2.0 2 Lane Additions onstruct 2 lanes 768,121 766,121 768,121
B71 China Grade Loo Manor Street Round Mountain Road 2.40 2 4 2 4,8 4 Lane Additions Add 2 lanes $497,908 $2,999,320 $0 $3,497,227 $3,497,227
E307 China Grade Loop Round Mountain Road Alfred Harrell Hwy 1.10 2 4 4 4.4 2 Lane Additions Add 2 lanes $0 $0 $20,000,000 $20,000,000 $20,000,000
B72 China Grade Loop Round Mountain Road I Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
675 Coffee Road 7th Standard Road Norris Road 1.50 2 6 2 3.0 2 Lane Additions Add 2lanes $61,125 $1,874,575 0 $1,935,700 1,935,700
E209 Coffee Road 7th Standard Road 320's/o Canal Brid es from 2 to 6 lanes,Widen Canal Crossin $600,000 $600,000 $600,000
57 Coffee Road Road a ocate structton a ocate transmisston tower 7 57 7 , 57 $273,457
E16 Comanche Drive Alfred Harrell Highway SR 58 6.00 2 4 2 1 12.0 2 Lane Additions Add 2 lanes $7,498,299 7,498,299 7,498,299
E189 Comanche Drive SR 58 State Hwy Bridges,Interchanges Widen overpass $5,000,000 $5,000,000 $5,000,000
E304 Comanche Drive SR 58 Traffic Signals Install Signal,State $0 $0 $250,000 $250,000 $500,000 $500,000
E17 Comanche Drive UPRR Railroad Grade Separations Grade Separation $20,000,000 $20,000,000 $20,000,000
E217 Cott onwood Road Hosking Avenue 1700's/o Canal Bridges pictures,Widen Canal Crossing $300,000 $300,000 $300,000
E218 Cottonwood Road Hosking Avenue 3200's/o Canal Bridges Widen Canal Crossing $300,000 $300,000 1 $300,000
E216 Cottonwood Road Panama Lane 1500's/o Canal Bridges Widen Canal Crossing $300,000 $300,000 $300,000
E163.1 Cottonwood Road SR 58 Panama Road 6.00 2 4 2 12.0 2 Lane Additions Add 2lanes $6,400,546 $6,400,548 $6,400,548
B80 Day Avenue Airport Drive Traffic Signals Install Signal $0 $0 $155,100 $155,100 $155,100
B81 Day Avenue Chester Avenue Traffic Signals Install Signal $0 $0 $147,800 $147,800 $147,800
B82 Day Avenue Manor Street Traffic Signals Install Signal $0 01;$0 $190,000 $0 $190,000 $190,000
B83 Da Avenue McCra Street Traffic Signals Install Signal $0 $143,200 $143,200 $143,200
B85 Edison Road Breckenridge Road Edison Highway 1.25 0 4 2 2.5 2 Lane Additions Construct 2 lanes $0 $0 $1,562,146 $1,562,146
B86 Edison Road SR 178 Breckenridge Road 2.25 0 4 2 4.5 2 Lane Additions Construct 2 lanes $0 $0 $2,811,862 $2,811,862
8148 El Toro Viejo Road AT& F RR Railroad Grade Separations rade eparation -----70- 10,000,000 10,000,000 10,000,000
8464 Etchart Road Callowa Drive Borel Street 0.50 2 4 1 0.5 1 Lane Additions Add 1 eastbound lane&move ditch $0 $177,507 $369,537 $369,537
8465 Etchart Road Callowa Drive Traffic Si nals Install Si nal $0 $190,000 $0 $190,000 $190,000
B468 Etchart Road Jenkins Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8466 Etchart Road Old Farm Road I Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B87 Fairfax Road Alfred Harrell Highway Palladino Drive 1.00 2 6 2 2.0 1 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 1 $1,249,717 $1,249,717
E203 Fairfax Road Alfred Harrell Highway State Hwy Bridges,Interchanges Expand Underpass,Widen Intersection $5,000,000 $5,000,000 $5,000,000
B92 Fairfax Road Highland Knolls Drive s/o Niles Street 0.26 4 6 1 0.3 Construct Medians Westside and Median,BORDER $20,139 $162,463 $0 $91,301 $91,301
E167 Fairfax Road Redbank Road Panama Lane 3.00 2 4 2 6.0 2 Lane Additions Construct 2 lanes $3,749,150 $3,749,150 $3,749,150
B90 Fairfax Road Redbank Road SR 58 0.75 2 4 2 1.5 2 Lane Additions Add 2 lanes $0 $937,287 $0 $937,287 $937,287
B91 Fairfax Road Redbank Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B95 Fairfax Road SR 58 State Hwy Bridges,Interchanges Widen SR 58 bridge at Sta.45+75,REGIONAL $0 $0 $1,222,498 $1,161,373 $1,161,373
B96 Fairfax Road SR 58 Off Ramps Traffic Signals Install Si nals(2nd signal cost in Additional costs),State,REGIONAL 1 $0 $250,000 $250,000 $475,000 $475,000
797 Fairview Road Monitor Street South Union Avenue 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $13,797 $384,060 D $397,857 $397,857
B99 lFruitvale Avenue Downing Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8100 I Fruitvale Avenue Ha eman Road SR 58/Rosedale Highway 1.25 2 6 2 2.6 2 Lane Additions Add 2 lanes $1,008,561 $1,562,146 1 $0 $2,570,707 $2,570,707
E206 Fruitvale Avenue Ha eman Road Expand Intersection S.E.Corner $500,000 $500,000 $500,000
B101 Fruitvale Avenue Mean Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8102 Fruitvale Avenue Snow Road Norris Road 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $0 $624,858 $0 $624,858 $624,858
B98 Fruitvale Avenue Snow Road 600's/o Canal Culverts Widen Culvert @ Beardsley Canal $0 $0 $250,000 $250,000 $250,000
E207 Fruitvale Avenue SR 58/Rosedale Highway Canal Bridges Widen canal 20'n/o Rosedale Highway,Widen Canal Crossing $300,000 $300,000 $300,000
E300 Gilmore Avenue Callowa Canal Canal Bridges Construct Calloway Canal Bride $0 $0 $611,249 $611,249 $611,249
E164 Gilmore Avenue Fruitvale Avenue Landco Drive 0.86 0 2 2 1 1.7 2 Lane Additions Construct 2 lanes $660,584 $1,000,000 $1,660,584 $1,660,584
B489 I Gilmore Avenue Landco Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E301 I Gilmore Avenue RR Railroad Grade Separations New at grade crossing $0 $0 $500,000 $500,000 $500,000
8103 Gosford Road Berkshire Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B105 Gosford Road Hosking Avenue/McCutchen Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E210 Gosford Road McCutchen Road 1500'n/o 4.00 2 4 1 Canal Bridges Widen Canal Crossing $400,000 1 400,000 $400,000
B106 Gosford Road McKee Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B543 Gosford Road Panama Lane SR 119/Taft Highway 2.00 2 6 2 4.0 2 Lane Additions Add 2 lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
E34 Gosford Road SR 119/Taft Highway Curnow Road 0.50 2 4 2 1.0 2 Lane Additions Construct 2 lanes $624,858 $624,858 $624,858
8107 Ha eman Road Allen Road 0.25 2 6 4 1.0 Expand Intersection Install Signal,Expand Intersection $0 $624,858 $190,000 $0 $814,858 $814,658
E38 Ha eman Road Heath Road Rudd Road 0.50 2 3 2 1.0 2 Lane Additions Construct 2 additional lanes $624,858 $624,858 $624,858
E45 Ha eman Road Heath Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
B109 Ha eman Road Jenkins Road Allen Road 0.53 0.20 2 6 4 1 1.3 2 Lane Additions partial-only along non-residential frontage $16,987 $817,315 $305,625 $1,139,926 1 $1,139,926
8110 Ha eman Road Jenkins Road I Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
13111 Ha eman Road Jewetta Avenue Verdu o Lane 0.20 2 6 4 1 0.8 1 Lane Additions only additional RW and improvements $43,735 $499,887 $305,625 $849,246 1 $849,246
B112 Ha eman Road Jewetta Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
8473 Ha eman Road Landco Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
8114 Ha eman Road Mohawk Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
E40 Ha eman Road Nord Road We is Avenue 0.50 2 4 2 1.0 2 Lane Additions Construct 2 additional lanes $624,858 $624,858 $624,858
B115 Ha eman Road Old Farm Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B117 Ha eman Road Renfro Road Jenkins Road 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $0 $624,858 $0 $624,858 $624,858
8118 Ha eman Road Renfro Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
13119 Ha eman Road Santa Fe Way Old Farm Road 0.50 2 6 1 2 1 1.0 2 Lane Additions Add 2 lanes $0 $624,858 1 $0 $624,858 $624,858
8581 Ha eman Road Santa Fe Way Railroad Grade Separations Grade Separation $0 $0 $35,000,000 $20,000,000 $20,000,000
E39 Ha eman Road We is Avenue Heath Road 0.50 2 4 2 1.0 2 Lane Additions Construct 2 additional lanes $624,858 $624,858 $624,858
E46 Ha eman Road :mWegisAvenue Traffic Signals Install Signal $0 1 $190,000 1 $190,000 1 $190,000
>- Exhibit A to
S:\PROJECTS\TIF\Phase 4\Ndoption Documents\RTIF-Final 1.2 Clean090508Rmps Page 2 of 8 r-
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global
Completed Number of Number of Lanes
Project Improvement Improvement Lanes Lanes Funded by Number of Cost Cost 7Additiotnall Number Street Name From To Length Miles Length Miles Striped Proposed Fee Lane•Milss Cat_desc Notes R/W Construct. Signal Cost Total Cost Fee Funding
B113 Ha eman Road(TRIP) Knudsen Drive SR 204/Golden State Highway 0.69 0 6 4 2,g 4 Lane Additions FI over-TRIP ALM $0 $54,000,000 $0 1 $54,000,000 $54,000,000
B125 Heath Road Brimhall Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
E53 Heath Road Ha eman Road SR 58/Rosedale Hi hwa 1.00 2 4 2 2,p 2 Lane Additions Construct 2 additional lanes recontruct existing) $1,249,717 $1,249,717 $1,249,717
E57 Heath Road Johnson Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E59 Heath Road Kratzme er Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
8477 Heath Road Palm Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8126 Heath Road SR 58/Rosedale Highway Stockdale Highway 2.50 1.50 2 4 2 2,0 2 Lane Additions Construct 2 Lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B127 Heath Road Stockdale Highway Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B550 Hi hland Knolls Drive Monica Street Traffic Signals Install Si nal $0 $0 $190,000 $0 $190,000 $190,000
7 an nos nve Morning rive ra is 1 na S Install 1 na
8128 Hosking Avenue Akers Road Wible Road 0.50 0.40 2 4 2 02 2 Lane Additions Construct 4 lanes 0 $124,972 0 124,972 124, 772
B570 Hosking Avenue Hughes Lane Traffic Signals Install traffic signal $0 $0 $190,000 $0 $190,000 $190,000
B130 Hosking Avenue Monitor Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8131 Hosking Avenue South H Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B133 Hosking Avenue South Union Avenue South H Street 0.30 2 4 2 0.6 2 Lane Additions Add 2 lanes $0 $374,915 $0 $374,915 $374,915
8335 Hosking Avenue South Union Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8134 Hosking Avenue SR 99 State Hwy Bridges,Interchanges Construct Interchange $0 $9,779,984 $35,000,000 $44,779,984 $44,779,984
8135 Hosking Avenue Stine Road Akers Road 0.50 0.25 0 4 2 0.5 2 Lane Additions Construct 2 lanes $0 $312,429 $0 $312,429 $312,429
8136 Hosking Avenue Wible Road South H Street 0.80 0.10 2 6 4 2.8 1 4 Lane Additions Add 4lanes $0 $1,749,603 $0 $1,749,603 $1,749,603
8437 Hosking Avenue Wible Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B480 Hosking Avenue/McCutchen Road Akers Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E72 Hosking Avenue/McCutchen Road Allen Road Buena Vista Road 1.00 0 2 2 2.0 2 Lane Additions Construct 2 lanes $1,249,717 $1,249,717 $1,249,717
E73 Hosking Avenue/McCutchen Road Allen Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
8484 Hosking Avenue/McCutchen Road Buena Vista Road Gosford Road 2.00 2 1 4 2 4.0 2 Lane Additions Add 2 lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
8481 Hosking Avenue/McCutchen Road Buena Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B482 Hosking Avenue/McCutchen Road Gosford Road Stine Road 2.00 0 4 2 4.0 2 Lane Additions Construct 2 lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
8129 Hosking Avenue/McCutchen Road Mountain Ridge Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8483 Hosking Avenue/McCutchen Road Mountain Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B154 lHoskinq Avenue/McCutchen Road Progress Road Traffic Si It Install Si na1 $0 $0 $190,000 $0 $190,000 $190,000
os In venue c utc en Road Sunset Spur Improve at roa ra a rossin s New at- ra a crossin
E215 Jewetta Avenue Ha eman Road Expand Intersection Expand Intersection $100,000 $500,000 $600,000 $350,000
8141 Jewetta Avenue Meacham Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B142 Jewetta Avenue Norie a Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B143 Jewetta Avenue Reina Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8144 Jewetta Avenue Snow Road Meacham Road 2.50 1.50 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B145 Jewetta Avenue Snow Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E61 lKratzmeyer Road Nord Road Santa Fe Way 1.50 2 4 2 3.0 2 Lane Additions Construct 2 additional lanes recontruct existing) $1,874,575 1 $1,874,575 $1,874,575
E65 Kratzmeyer Road Nord Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
6295 Kratzme er Road Olive Drive/Santa Fe Way Railroad Grade Separations Railroad Grade Separation $0 $0 $20,000,000 $20,000,000 $20,000,000
E268 Kratzme er Road SR 43/Enos Lane 0.75 2 6 4 3.0 Expand Intersection Expand Intersection $1,874,575 $1,874,575 $1,874,575
E69 Kratzme er Road SR 43/Enos Lane I Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E64 Kratzme er Road We is Avenue Traffic Si nals Install Signal $0 $190,000 $190,000 $190,000
B488 Landco Drive Ha eman Road live Drive 0.50 0 4 2 1.0 2 Lane Additions onstruct 2 lanes 0 384,060 0 384,060 384,060
B151 Masterson Street Paladino Drive Alfred Harrell Highway 1.20 0 4 4 1 4.8 4 Lane Additions Construct 4 lanes $0 $2,999,320 $0 $2,999,320 $2,999,320
B518 Masterson Street Panorama Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B152 1 Masterson Street SR 178 Alfred Harrell Highway Canal Bridges 4 box culverts&2 bridges $0 $3,227,273 $0 $3,227,273 $3,227,273
B153 I Masterson Street SR 178 Paladino Drive 0.95 2 4 2 1.9 2 Lane Additions Add 2 lanes $328,148 $1,187,231 $0 $1,515,379 $1,515,379
E71 I Masterson StreettEdison Road UPRR Railroad Grade Separations Grade Separation $20,000,000 $20,000,000 $20,000,000
B490 McKee Road Akers Road Traffic Signals Install Signal 0 0 190,000 0 190,000 190,000
8492 McKee Road Buena Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8493 McKee Road Mountain Ridge Drive Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B494 McKee Road Mountain Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B155 McKee Road South H Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8156 McKee Road South Union Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B157 McKee Road SR 99 State H Bridges,Interchanges Construct Overpass $0 $11,000,000 $0 $11,000,000 $11,000,000
8617 McKee Road Sunset Spur Improve Railroad Grade Crossin s New at- rade crossing $0 $800,000 $0 $800,000 $800,000
8440 McKee Road Wible Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8496 Meacham Road Allen Road Jenkins Road 0.50 2 4 1 0.5 2 Lane Additions Construct 2 lanes 0 192,030 0 192,030 192,030
8140 Meacham Road Jenkins Road Traffic Si nals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B498 Meacham Road Renfro Road Jenkins Road 0.50 2 4 1 0.5 2 Lane Additions Construct 2 lanes $0 $192,030 $122,250 $314,280 $314,280
B161 Ming Avenue West Beltway Buena Vista Road 2.47 1.00 0 4 2 2.9 2 Lane Additions Construct 2 lanes $0 $1,837,083 $0 $1,837,083 $1,837,083
B161.1 Ming Avenue West Beltway Buena Vista Road 2.47 1.00 0 4 2 2.9 Construct 2 lanes-north half adjacent to Berrenda Mesa $0 $1,837,083 $652,080 $2,489,163 $2,489,163
8164 Mohawk Avenue Calloway Canal I Canal Bridges Construct Calloway Canal Bride $0 $0 $1,000,000 $1,000,000 $1,000,000
B166 Mohawk Avenue Ha eman Road SR 58/Rosedale Highway 1.25 0 6 4 5.0 4 Lane Additions Construct 4 Lanes $0 $3,124,291 $0 $3,124,291 $3,124,291
8168 Mohawk Avenue SR 58 SR 58/Rosedale Hi hway 0.5 mi s/o 0.50 2 6 4 2.0 2 Lane Additions Add-2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
8162 Mohawk Avenue SR 58/Rosedale Highway Truxtun Avenue 015 0 6 4 3.0 4 Lane Additions Construct 4 lanes-Local share-River/Canal/RR&Widening $0 $7,700,000 $0 $7,700,000 $7,700,000
8172 Morning Drive Alfred Harrell Highway Paladino Drive 1.80 0 6 2 3.6 2 Lane Additions Construct 2 lanes $0 $2,249,490 $0 $2,249,490 $2,249,490
8173 Morning Drive Alfred Harrell Highway Paladino Drive Canal Bridges Construct 3 Culverts/Bridges $0 $0 $4,034,244 $4,034,244 $4,034,244
8175 Morning Drive Auburn Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B463 Morning Drive College Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B176 Morning Drive Paladino Drive SR 178 1.00 2 1 6 2 2.0 2 Lane Additions Add 2lanes $0 1 $1,249,717 $0 $1,249,717 $1,249,717
B274 I Mornina Drive Panorama Drive Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
6177 Morning Drive SR 178 College Avenue 0.90 0 6 2 1.8 2 Lane Additions Construct 2 lanes $0 1 $1,124,745 $0 $1,124,745 $1,124,745
8501 Mornin side Drive Juniper Ride Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8502 Mornin side Drive Masterson Street I Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8503 Mornin side Drive Morning Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8504 Mornin side Drive I Panorama Drive Traffic Signals I Install Signal $0 $0 $190,000 1 $0 $190,000 $190,000
<(p)AK,c
1=athibit A %
S:\PROJECTS\TIF\Phase 4\Adoption Documents\RTIF-Final 1.2 Clean090508Rmps Page 3 of 8 rrt
r-
,U O
CQI,^1NA
REGIONAL TRANSPORTATION FACILITIES LIST- FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global
Completed Number of Number of Lanes
Project Improvement Improvement Lanes Lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed Fee Lane-Mites Cat_desc Notes R/W Construct. Signal Cost Cost Total Cost Fee Funding
B611 Mount Vernon Avenue Arvin Edison Canal Canal Bridges Construct Canal Bride $0 $0 $611,249 $611,249 $611,249
B179 Mount Vernon Avenue Casa Loma Drive Belle Terrace 0.50 2 4 2 1,0 2 Lane Additions Construct 2 lanes $0 $624,858 $0 $624,858 $624,858
8610 Mount Vernon Avenue White Lane/Muller Road Panama Lane 1.50 0 6 2 3,0 2 Lane Additions Add 2 lanes $0 $1,874,575 $0 $1,874,575 $1,874,575
E83 Nord Avenue Norie a Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E84 Nord Avenue Palm Avenue Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E82 Nord Avenue Reina Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
8185 Norris Road Calloway Drive Coffee Road 1.00 0.80 2 4 0 R/W Only Oniv additional RW and improvements $5,232 $0 $1,222,498 $1,227,730 $1,227,730
B184 Norris Road Calloway Drive Traffic Si nals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B186 Norris Road Chester Avenue Manor Street 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $100,000 $384,060 $0 $484,060 $484,060
8187 1 Norris Road Coffee Road Traffic Signals Install Signal $0 1 $0 1 $190,000 $0 $190,000 $190,000
8188 Norris Road Fruitvale Avenue Knudsen Drive 0.84 2 4 0 R/W Only only additional RW and improvements $92,054 $0 1 $305,625 1 $397,679 $397,679
8588 Norris Road Manor Street Modified Traffic Signals Signal Modification $0 $0 $95,000 $0 $95,000 $95,000
8191 Norris Road Riverlakes Drive/Quail Creek Road Traffic Signals Install Signal 50%Funded $0 $0 $190,000 $0 $190,000 $190,000
13192 Norris Road SR 99 Airport Drive 1.50 2 4 2 3.0 2 Lane Additions Add 2 lanes $337,191 $1,152,181 $0 $1,489,372 $1,489,372
E239 North Beltway TRIP Coffee Road Santa Fe Wa Freewa Projects Widen and BN F Grade Separation-TRIP LM 00,000 400,000 400,000
8193 ak Street ali ornia Avenue R 178 24th treet 1.00 4 6 2 2.0 2 Lane Additions Add 2 lanes,BORDER 1,290,958 1,249,717 0 1,270,337 1,270,337
8195 Old Farm Road Norie a Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8196 Old Farm Road Reina Road Traffic Signals Install Signal $0 $0 $190,000 $1
$0 $190,000 90,000
8197 Old River Road Berkshire Road I Traffic Signals Install Signal $0 $0 $190,000 1 0 1 $190,000 $190,000
B198 Old River Road Campus Park Drive Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B199 Old River Road Harris Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B200 Old River Road Hosking Avenue/McCutchen Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B201 Old River Road McKee Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8203 Old River Road Pacheco Road Campus Park Drive 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes $0 1 $624,858 $0 $624,858 $624,858
B204 Old River Road Panama Lane Pacheco Road 1.00 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
E85 Old River Road SR 119lfaft Highway Curnow Road 0.50 2 4 2 1.0 2 Lane Additions Construct 2 lanes $624,858 $624,858 $624,858
B206 Old River Road SR 119/Taft Highway Panama Lane 2.00 2 1 4 2 4.0 2 Lane Additions Add 2 lanes $0 $2,499,433 $0 $2,499,433 $2,499,433
E316 Old River Road SR 119/Taft Highway Canal Culverts Canal Crossing $0 $600,000 $0 $600,000 $600,000
E305 Old River Road SR 119/Taff Hi hwa 0.17 Relocate Canals Relocate Canal $0 $225,000 $0 $225,000 $225,000
'264 Old River Road SR 119/Taft Hi hwa Canal Bridges Realign Old River Road and Canal Crossing and Install Signal $500,000 $3,000,000 $190,000 $500,000 $4,190,000 $4,190,000
B510 Olive Drive Old Farm Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8511 10live Drive Renfro Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B214 Olive Drive Rudd Road West Beltway) Jewetta Avenue 1.50 2 4 2 3.0 2 Lane Additions Construct 2 Lanes $0 1 $1,874,575 $645,479 $2,520,054 $2,520,054
8221 Olive Drive SR 99 Beardslev Canal 0.80 4 6 2 1.6 State Hwy Bridges,Interchanges Widen SR 99 Interchan e;Widen Beardsley Canal Culvert $1,613,697 $999,773 $3,602,303 $6,215,773 $6,215,773
B220 Olive Drive UP RR w/o Roberts Lane Railroad Grade Separations Grade Separation $0 $0 $20,000,000 $20,000,000 $20,000,000
B512 Olive Drive Verdu o Lane Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8609 Oswell Street White Lane Panama Lane 2.00 0 6 2 4.0 2 Lane Additions Add 2 lanes 0 2,499,433 0 $2,499,433 $2,499,433
B235 Paladino Drive Fairfax Road Morning Drive 1.25 0 6 4 5.0 4 Lane Additions Construct 4 lanes $0 $3,124,291 $0 $3,124,291 $3,124,291
8578 Paladino Drive Fairfax Road Morning Drive Relocate Obstruction Relocate PG&E transmission tower $0 $0 $273,457 $273,457 $273,457
B236 Paladino Drive Fairfax Road Traffic Signals Install Signal $0 $0 1 $190,000 $0 $190,000 $190,000
8237 Paladino Drive Masterson Street Alfred Harrell Highway 1.00 0 4 2 2.0 2 Lane Additions Construct 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B238 Paladino Drive Masterson Street Traffic Signals Install Signal $0 $0 $190,000 $0 $1;90,000 $190,000
8239 Paladino Drive Morning Drive Masterson Street 1.50 0 4 2 1 3.0 2 Lane Additions Construct 2 lanes(Excluding Morning Drive to Cosmo KEN648 $0 $1,874,575 $0 $1,874,575 $1,874,575
B240 Paladino Drive Morning Drive Masterson Street Canal Culverts Construct 5 Culverts $0 $0 $124,695 $124,695 $124,695
B241 Paladino Drive Morning Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B242 Palm Avenue Heath Road Renfro Road 0.25 2 4 2 0.5 2 Lane Additions of at undeveloped R area 0 192,030 0 192,030 192,030
E165 Panama Lane Cottonwood Road SR 184/Weed atch Highway 4.00 2 4 2 8.0 2 Lane Additions Construct 2 additional lanes $4,998,866 $4,998,866 $4,998,866
E89 Panama Lane Heath Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
B516 Panama Lane Mountain Vista Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E88 Panama Lane Renfro Road I Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
E87 Panama Lane SR 43/Enos Lane Allen Road 6.00 2 4 2 12.0 1 2 Lane Additions Construct 2 additional lanes $7,498,299 $7,498,299 $7,498,299
E179 Panama Lane SR 43/Enos Lane Traffic Signals Install Si nal,State $0 $250,000 $250,000 $250,000
E271 Panama Lane SR 43/Enos Lane 0.75 2 6 4 3.0 Expand Intersection Expand Intersection $1,874,575 $1,874,575 $1,874,575
E182 Panama Lane West Beltway Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
B517 Panama Lane Windermere Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8591 I Panama Lane Oswell Street Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B245 Panama Lane Allen Road Gosford Road 3.00 0.70 2 4 2 4.6 2 Lane Additions Add 2 lanes $0 $2,874,348 $0 $2,874,348 $2,874,348
B257 Panama Lane Allen Road Windermere Street I I Relocate Canals Relocate canal parallel w/so.r/w-2165' $0 $0 $695,601 $695,601 $695,601
B246 Panama Lane Allen Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B250 Panama Lane Cottonwood Road Traffic Signals Install Signal/Expand Intersection $0 $611,249 $190,000 $0 $801,249 $801,249
B251 Panama Lane Fairfax Road Traffic Signals Install Signal/Expand Intersection $0 $611,249 $190,000 $0 $801,249 $801,249
8253 Panama Lane Gosford Road Stine Road 1.00 3 6 1 1.0 1 Lane Additions Add 1 lanes $0 $624,858 $0 $624,858 $624,858
8252 Panama Lane Mountain Ride Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8255 I Panama Lane Old River Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B256 Panama Lane Reliance Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8258 Panama Lane South Union Avenue Cottonwood Road 1.00 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B244 Panama Lane South Union Avenue 1200'w/o South Union Avenue 1.00 4 6 2 2.0 1 Lane Additions Widen deficient section only $0 $1,249,717 $0 $1,249,717 $1,249,717
8261 Panama Lane Sunset RR Improve Railroad Grade Crossings Improve grade crossing at Sta.186+70 (Sunset) $0 $0 $500,000 $500,000 $500,000
B266 Panama Road Cottonwood Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B267 Panama Road Fairfax Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B268 Panama Road South Union Avenue SP RR 4.50 2 4 2 9.0 2 Lane Additions Add 2 lanes $0 $5,623,724 $0 $5,623,724 $5,623,724
6269 Panama Road South Union Avenue Modified Traffic Signals Signal Modification $0 $0 $95,000 $0 $95,000 $95,000
B263 Panama Road South Union Avenue 0.4 mi e/o South Union Avenue 0.9 mi e/o Relocate Canals Relocate Parallel Canal,So./side rd .@ Sta.21+40-48+50 $0 $0 $248,473 $248,473 $248,473
8264 Panama Road South Union Avenue 0.95 mi e/o Canal Culverts Widen canal culvert at Sta.50+30,Imp Gr Xing @ RR $0 $0 $171,150 $171,150 $1711 150
B265 Panama Road South Union Avenue 2.0 mi e/o SR 184/Weed atch Hi hwa 0.3 mi w/o Relocate Canals Relocate parallel canal from Sta.106+66-247+10 $0 $0 $1,287,657 $1,287,657 $1,287,657
8270 Panama Road SP RR SR 184/Weed atch Highway 0.2 mi w/o 0.30 2 4 2 0.6 2 Lane Additions Add 2 lanes $0 $374,915 $0 $374,915 $374,915
8271 Panama Road SR 184/Weed atch Highway Modified Traffic Signals ISignal Modification,State $0 $0 $125,000 $0 $125,000 $125,000
Fsx i�it A-'p
S:\PROJECTS\TIF\Phase 4\Adoption Documents\RTIF-Final 1.2 Clean090508Rmps , ge 4 of 8 -0
� m
r
U U
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global Completed Numberof Numberof Lanes
Project Improvement Improvement Lanes Lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed Fee Lane-Miles Cat_desc Notes R/W Construct. Signal Cost Cost Total Cost Fee Funding
Panama Hoad SR 184/Weedpatch i Way ml W O SR 18TM-ee rp at C MgMy ane Additions Add 2 lanes $0 $249747 $249,
9554 Panorama Drive ueen Street Traffic Signals Install Signal 0 0 $190,000 0 $190,000 190,000
6277 Patton Way Downing Avenue Traffic Signals I Install Signal 0 0 $190,000 0 $190,000 $190,000
B520 Patton Wa Mean Avenue SR 58/Rosedale Highway 0.75 2 4 2 1.5 2 Lane Additions Add 2 lanes $167,552 $576,090 $764,061 $1,507,704 $1,507,704
7 atton a can venue ra IC I na S nsta I na
8476 Pensin er Road Windermere Street Tra is Signals Install i nai 0 0 190,000 0 190,000 190,000
B521 Quail reek Road Norris Road 7th Standard Road 1.50 0 4 4 6.0 2 Lane Additions Construct 2 lanes 0 2,304,362 0 2,304,362 $2,304,362
E168 Redbank Road Fai ax Avenue SIR 184 eedpatch Highway 1.00 2 4 2 1 2.0 2 Lane Additions Construct 2 additional lanes $768,121 171,150 $939,27 1 939,271
7525 Renfro Road 7th Standard Road Olive Drive 1.50 0 1 4 2 3.0 2 Lane Additions Construct 2 lanes 0 1,874,575 $122,250 $1,996,825 1,996,825
8283 Renfro Road Brimhall Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
E315 Renfro Road Goose Lake Slough Canal Culverts Widen Canal Culvert South of Brimhall Road $0 1 $400,000 $400,000 $400,000
B284 Renfro Road Johnson Road Stockdale Highway 0.50 0.30 2 4 2 0.4 2 Lane Additions Add 2 lanes $0 $249,943 $0 $249,943 $249,943
B285 Renfro Road Johnson Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8287 Renfro Road Meacham Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8524 Renfro Road Olive Drive Reina Road 0.50 0 4 2 1.0 2 Lane Additions Construct 2 lanes $0 $624,858 $0 $624,858 $624,858
B289 Renfro Road Palm Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
8290 Renfro Road Reina Road Johnson Road 3.70 1.20 2 4 2 5.0 1 2 Lane Additions Add 2 lanes $0 $3,124,291 $0 $3,124,291 $3,124,291
8560 Renfro Road Santa Fe Way Railroad Grade Separations Railroad Grade Separation $0 $0 $12,220,000 $12,220,000 $12,220,000
B544 Santa Fe Way Rudd Road West Beltway) Ha eman Road 2.00 2 4 2 4.0 2 Lane Additions Add 2 lanes $0 1 $2,499,433 $0 $2,499,433 $2,499,433
B594 Sante Fe Way Reina Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
6313 ISnow Road Allen Road Old Farm Road 0.50 3 4 1 0.5 2 Lane Additions 3 on north side,1 on south side $0 $312,429 $0 $312,429 $312,429
6316 Snow Road Calloway Drive Quail Creek Road 0.10 2 6 4 0.4 4 Lane Additions 3 on north side,1 on south side $0 1 $249,943 $426,652 $676,595 $676,595
B317 Snow Road Calloway Drive Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
B318 Snow Road Coffee Road Fruitvale Avenue 1.00 1 3 4 1 1.0 1 Lane Additions Add 1 lane $0 1 $624,858 $500,000 $1,124,858 $1,124,858
B319 Snow Road Coffee Road Traffic Signals Install Signal $0 1 $0 $190,000 $0 $190,000 $190,000
8320 Snow Road Fruitvale Avenue Golden State Highway 0.35 2 6 2 0.7 2 Lane Additions Add 2 lanes $0 $437,401 $0 $437,401 $437,401
B321 Snow Road Fruitvale Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
8323 Snow Road Jenkins Road Allen Road 0.50 0 4 4 2.0 2 Lane Additions Construct 2 lanes $0 $1,249,717 $274,382 $1,524,099 $1,524,099
B324 Snow Road Jewetta Avenue Calloway Drive 1.00 0.30 3 6 1 3 2.1 4 Lane Additions 3 on north side,1 on south side $0 $1,312,202 $305,625 $1,617,827 $1,617,827
B325 Snow Road Old Farm Road Jewetta Avenue 0.50 3 4 1 0.5 2 Lane Additions 3 on north side,1 on south side $0 $312,429 1 $0 $312,429 $312,429
B530 Snow Road Old Farm Road Traffic Signals Install Signal $0 $0 1 $190,000 $0 $190,000 $190,000
8326 Snow Road Patton Way Traffic Signals Install Signal $0 $0 1 $190,000 $0 $190,000 $190,000
B327 Snow Road Quail Creek Road Coffee Road 0.50 2 6 4 2.0 4 Lane Additions Add 4lanes $0 $1,249,717 $611,249 $1,860,966 $1,860,966
8596 Snow Road Quail Creek Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
8314 Snow Road Renfro Road/Jenkins Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B322 ISnow Road SR 204/Golden State Highway Traffic nals Install Signal l $0 $0 $190,000 $0 $190,000 $190,000
er l O ane I now Oa South e a n oO CQS n I
B333 South H Street Arvin-Edison Canal Hosking Avenue 0.75 2 4 2 1.5 2 Lane Additions Add 2 lanes 70 $937,287 0 937,287 937,287
B334 South H Street Hoskin Avenue Taft Hi hwa 1.00 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
South Street a l wa to ane a ovate Canals e ovate ana $1,500,000 7 7 7
OU Union Avenue I art Highway White Lane 3.50 2 Lane I Ions Add 2 lanes so $4,374,008 $4,374,008
8607 SR 119/Taft Highway Akers Road Traffic Signals Install signal,State $0 $0 $250,000 $0 1250,000 $250,000
E112 ISR 119/raff Highway Allen Road Traffic Si nals Install Signal,State $0 $250,000 $250,000 $250,000
B339 SR 119 aftHighway Ashe Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B340 SR 119/Taft Highway Buena Vista Road SR 99 5.90 2 4 2 11.8 2 Lane Additions R/W 8 Constr.Cost Based on Program Unit Costs $3,808,326 $4,531,911 $0 $8,340,237 $8,340,237
B341 SR 119/Taft Highway Buena Vista Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
E314 SR 119/Taft Highway Farmers Canal Canal Culverts Construct Canal Culvert west of Stine Road $0 $600,000 $600,000 $600,000
E111 SR 119/Taft Highway 1-5 Buena Vista Road 5.50 2 4 2 11.0 2 Lane Additions Construct 2 additional lanes $6,873,441 $6,873,441 $6,873,441
E330 SR 119/Taft Highway 1-5 State H Brid es,Interchanges Improve Interchange $0 $7,000,000 $0 $7,000,000 $7,000,000
B342 SR 119/Taft Highway Mountain Ridge Drive Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B532 ISR 119/Taft Highway Mountain Vista Road I Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B344 SR 119/Taft Highway Old River Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B533 SR 119/Taft Highway Reliance Drive I Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
8410 SR 119/Taft Highway SR 99 South Union Avenue 1.10 2 4 2 2.2 2 Lane Additions Add 2 lanes $0 $1,374,688 $0 $1,374,688 $1,374,688
B345 SR 119/Taft Highway SR 99 State HwV Bridges,Interchanges Imp rove Interchange $0 $0 $7,334,988 $7,334,986 1 $7,334,988
E313 SR 119/Taft Highway Stine Canal Canal Culverts Construct Canal Culvert East of Gosford Road $0 $600,000 $600,000 $600,000
8346 SR 119/Taft Highway Stine Road Modified Traffic Signals Signal Modification,State $0 $0 $125,000 $0 $125,000 $125,000
8347 SR 119/Taft Highway Wible Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B350 SR 178 Edison Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
E118 SR 178 M Street Fairfax Road 5.25 6 8 2 1 10.5 Freeway Projects Construct freewaV with interchanges,REGIONAL $42,000,000 1 $39,900,000 $39,900,000
E278 SR 178 Miramonte Drive Rancheria Drive 0.80 2 6 4 3.2 1 4 Lane Additions add 4lanes $1,999,546 $1,999,546 $1,999,546
B351 SR 178 Morning Drive 0.5 mi e/o Vineland Road 0.5 mi e/o 1.00 2 4 2 2.0 Freeway Projects Add 4 lanes $0 $8,000,000 $0 $8,000,000 $8,000,000
E261 SR 178 SR 204/Golden State Avenue State Hwy Bridges,Interchanges Improve Connection,REGIONAL $20,000,000 $19,000,000 1 $19,000,000
E233 SR 178 Various State Hwy Bridges,Interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 $19,000,000 $19,000,000
E253 SR 178 TRIP Canteria Road Miramonte Drive 2.80 2 4 2 5.6 2 Lane Additions Widening-TRIP LM $1,228,000 $1,228,000 $1,228,000
E280 SR 178 TRIP Canteria Road Miramonte Drive 2.80 4 6 2 5.6 2 Lane Additions Widening-TRIP ALM $3,499,206 $3,499,206 $3,499,206
E251 SR 178 TRIP Morning Drive State Hwv Bridges,Interchanges Construct interchanges-TRIP LM $6,692,000 $6,692,000 $6,692,000
E252 SR 178 TRIP Morning Drive State H Brid es,Interchan es Construct interchanges_T ALM $30,054,000 $30,054,000 $30,054,000
5 7 t treet a treet xpan ntersectlon intersection mprovements- $47,547,000 $45,169,650
8369 SR 184/Kern Canyon Road Chase Avenue Traffic Signals Install Signal,State 0 0 250,000 0 250,000 $250,000
8587 SR 184/Kern Canyon Road Mesa Merin Drive Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
B555 SR 184/Kern Canyon Road Monica Street Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
8370 SR 184/Kern Canyon Road Morning Drive SR 178 1 2.50 1 1 2 6 2 5.0 2 Lane Additions Add 2 lanes $0 $3,124,291 $0 $3,124,291 $3,124,291
B371 SR 184/Kern Canyon Road Vineland Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B358 SR 184/Morning Drive Breckenridge Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B359 SR 184/Morning Drive Edison Highway Niles Street 1.25 2 4 2 2.5 2 Lane Additions Add 2 lanes $0 $1,562,146 $0 $1,562,146 $1,562,146
B361 SR 184/Morning Drive Eucalyptus Drive Traffic Signals Install Si nal,State $0 $0 $250,000 $0 $250,000 $250,000
F k`,j(�
E �libitJ
S:\PROJECTS\TIF\Phase 4\Adoption Documents\RTIF-Final 1.2 Clean090508Rmps ��age 5 of 8
r
0 O
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global Completed Numberof Numberof laTNun,
Project Improvement Improvement Lanes Lanes Fund Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed F Cat_desc Notes R/W Construct. Signal Cost Cost Total Cost Fee Funding
B357 SR 184/Weed atch Hi2hway ermosa Road 0.54 mi n/o Canal Culverts Widen canal box culvert at Sta.187+00 $0 $0 $134,475 $134,475 $134,475
E308 SR 184/Weed atch Highway Panama Lane Panama Road 2.00 2 4 2 4.0 2 Lane Additions Add 2 lanes $0 $2,499,433 $2,499,433 $2,499,433
8363 SR 184/Weed atch High wa Panama Road SR 58 5.80 2 4 2 11.6 2 Lane Additions Add 2 lanes $0 $7,248,356 $0 $7,248,356 $7,248,356
B282 SR 184/Weed atch Highway Redbank Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
6366 SR 184/Weed atch Hi hwa SR 58 E/B&W/B Rams Traffic Si nals Install Si nal,State 2 Si nals $0 $0 $250,000 $250,000 $500,000 $500,000
8364 SR 184/Weed T Hi hwa UP RR Railroad Grade Separations Construct grade separation at Sta.335+40 $0 $0 $18,000,000 $18,000,000 $18,000,000
8367 SR 184'Weed atch Hi hwa White Lane/Muller Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
8368 SR 184/Weedpatch Hi hwa Wilson Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
E235 SR 204/Golden State Avenue Airport Drive SR 178 2 Lane Additions Add 2 lanes,REGIONAL $30,000,000 $28,500,000 $28,500,000
E310 SR 204/Golden State Avenue Calloway Canal Canal Bridges Widen Canal Bridge,REGIONAL $0 $600,000 1 $570,000 $570,000
E309 SR 204/Golden State Avenue Carrier Canal Canal Bridges Widen Canal Bridge,REGIONAL $0 $600,000 $570,000 1 $570,000
E312 SR 204/Golden State Avenue Chester Avenue State H Bridges,Interchanges Bride Widening,REGIONAL $0 $6,000,000 $5,700,000 $5,700,000
E311 SR 204/Golden State Avenue Kern River Kern River Bridges Widen River Bridge 2 lanes.2 Miles,REGIONAL $0 $8,000,000 $7,600,000 $7,600,000
E236 SR 204/Golden State Highway F Street State H Bridges,Interchan es Construct interchan e,REGIONAL $20,000,000 $19,000,000 $19,000,000
E266 SR 43/Enos Lane 1-5 EB Traffic Signals Install Signal,State $0 $250,000 $250,000 $250,000
E269 SR 43/Enos Lane 1.5 EB 0.25 2 6 41 1.0 Ex and Intersection Ex and Intersection $624,858 $624,856 $624,858
E265 SR 43/Enos Lane 1-5 WB Traffic Signals Install Signal,State $0 $250,000 $250,000 $250,000
E270 SR 43/Enos Lane 1-5 WB 0.25 2 6 4 1.0 1 Expand Intersection Expand Intersection $624,858 1 $624,858 $624,858
E273 SR 43/Enos Lane SR 58/Rosedale Highway 1.00 2 6 4 1 4.0 Ex and Intersection Expand Intersection $2,499,433 $2,499,433 1 $2,499,433
E272 SR 43/Enos Lane Stockdale Highway 1.00 2 1 6 4 1 4.0 Ex and Intersection Expand Intersection $2,499,433 $2,499,433 1 $2,499,433
E142 SR 43/Enos Lane Stockdale Highway Traffic Signals Install Signal,State $0 $250,000 $250,000 $250,000
E107 SR 58 Cottonwood Road Fairfax Road 2.00 6 8 2 4.0 Freeway Projects Construct freeway with interchanges,REGIONAL $16,000,000 $15,200,000 $15,200,000
B373 SR 58 Real Road Cottonwood Road 3.00 0.50 4 8 4 10.0 Freeway Projects Add 2 lanes,REGIONAL $0 $40,000,000 $40,000,000 $76,000,000 $76,000,000
E234 SR 56 Various State Hwy Bridges,Interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 $19,000,000 $19,000,000
8379 SR 5B/Rosedale Highway Calloway Drive Modified Traffic Signals Signal Modification $0 1 $0 $95,000 $124,988 $219,988 $219,988
E102 SR 58/Rosedale Highway Driver Road Traffic Signals Install Signal,State $0 1 $250,000 $250,000 $250,000
83B2 SR 5B/Rosedale Highway Enos Lane I Traffic Signals Install Signal,State $0 $0 1 $250,000 $0 1 $250,000 $250,000
8383 SR 58/Rosedale Highway Fruitvale Avenue Modified Traffic Signals Signal Modification,State $0 $0 1 $125,000 $0 $125,000 1 $125,000
8385 I SR 58/Rosedale Highway Gibson Street Modified Traffic Signals Signal Modification,State $0 $0 1 $125,000 $0 $125,000 1 $125,000
E103 SR 58/Rosedale Highway Greeley Road Traffic Signals Install Signal,State $0 1 $250,000 $250,000 $250,000
B386 SR 58/Rosedale Highway Heath Road Traffic Signals install Signal $0 $0 1 $190,000 $0 $190,000 $190,000
8389 SR 58/Rosedale Highway Landco Drive Signal Modification,State $0 $0 1 $125,000 $0 $125,000 $125,000
B390 SR 58/Rosedale Highway Mohawk Street Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
8391 SR 58/Rosedale Hi hwa Nord Road Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
B394 SR 58/Rosedale Hi hwa Renfro Road Modified Traffic Signals Signal Modification,State $0 $0 $125,000 $0 $125,000 $125,000
E105 SR 58/Rosedale Highway Superior Road Traffic Signals Install Signal,State $0 $250,000 $250,000 $250,000
B601 SR 58/Rosedale Highway Verdu o Lane Modified Traffic Signals Signal Modification,State $0 $0 $125,000 $0 $125,000 1 $125,000
E104 SR 58/Rosedale Highway We is Avenue Traffic Si nals Install Signal,State $0 $250,000 $250,000 1 $250,000
B375 SR 58/Rosedale Highway TRIP Allen Road Calloway Drive 2.00 4 6 2 4.0 2 Lane Additions R/W&Constr.-Future TRIP ALM $5,000,000 $4,000,000 $0 $9,000,000 1 $9,000,000
B378 SR 58/Rosedale Highway TRIP BNSFRR Railroad Grade Separations Widen RR Grade Sep. Jewetta Avenue),Future TRIP ALM $0 $3,000,000 1 $586,799 $3,586,799 $3,586,799
8381 SR 58/Rosedale Highway TRIP Enos Lane Renfro Road 0.5 mi w/o 4.50 2 4 2 1 9.0 2 Lane Additions RAN&Constr.Future TRIP ALM $5,000,000 $9,000,000 $0 $14,000,000 $14,000,000
E256 SR 58/Rosedale Highway TRIP Gibson Street Calloway Drive 3.26 4 1 6 2 6.5 2 Lane Additions add 2 lanes Widen Roadway-TRIP LM $3,000,000 $31000,000 $3,000,000
E279 SR 58/Rosedale Highway TRIP Gibson Street Calloway Drive 3.26 4 6 2 6.5 2 Lane Additions add 2 lanes Widen Roadway-TRIP ALM $10,000,000 $10,000,000 $10,000,000
8374 SR 58/Rosedale Highway TRIP Renfro Road 0.5 mi w/o Allen Road 1.50 2 4 2 3.0 2 Lane Additions R/W&Constr.Future TRIP ALM $4,000,000 $3,000,000 $0 $7,000,000 $7,000,000
B377 SR 58/Rosedale Highway(TRIP) SJVRR Railroad Grade Separations Grade Separation @ Landco(W/o Landco Drive)-Future TRIP ALM $0 $18,000,000 $122,250 $18,122,250 $18,122,250
8395 R 65 Porterville Highway James Road 7th Standard Road 2.25 2 4 2 4.5 2 Lane Additions Add 2 lanes 0 2,205,000 0 2,205,000 2,205,000
E110 SR 99 7th Standard Road Rosedale Highway 1.25 mi n/o 3.50 6 8 2 7.0 Freeway Projects Freewa widening $28,000,000 $14,000,000 $42,000,000 $42,000,000
8396 SR 99 Olive Drive SR 204/Golden State Highway 0.50 6 8 2 1 1.0 Freeway Projects Widen for additional ramp lanes at Olive Drive $64,548 $4,000,000 $1,445,452 $5,510,000 $5,510,000
B397 SR 99 South H Street N/B Off Ramp Traffic Signals Install Signal,State $0 $0 $250,000 $0 $250,000 $250,000
E232 SR 99 Various I State Hwy Bridges,Interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 $19,000,000 $19,000,000
8398.1 SR 99 White Lane Panama Lane' 1.50 6 8 2 3.0 Freewa Projects Add 2 lanes,REGIONAL $0 $12,000,000 $0 $11,400,000 $11,400,000
7 White Lane a wa 4.75 .5 reewa roiects Construct freeway with interchanges,REUJONA 36,100,000
B399 Stine Road Berkshire Road Traffic Signals Install Signal 0 0 190,000 0 190,000 $190,000
B400 Stine Road Hoskin Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8401 Stine Road McKee Road Traffic Signals Install Signal $0 $0 $190,000 $0 1 $190,000 $190,000
E94 Stine Road SR 119/Taft Highway Curnow Road 0.50 2 4 2 1.0 2 Lane Additions Construct 2 lanes $624,858 $624,858 $624,858
B403 Stine Road Taft Highway Panama Lane 2.00 0.75 2 4 2 2.5 2 Lane Additions Add 2 lanes $0 $1,562,146 $0 $1,562,146 $1,562,146
E181 Stockdale Highway Greeley Road Traffic Signals Install Signal $0 $190,000 $190,000 $190,000
8404 Stockdale Highway Heath Road Renfro Road 1.00 2 4 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
8405 Stockdale Highway Nord Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8406.1 Stockdale Highway Renfro Road New Stine Road 5.75 4 6 2 11.5 1 Construct Medians Re-construct Median $0 $700,000 $0 $700,000 $700,000
8408 Stockdale Highway SP RR Improve Railroad Grade Crossings Improve RRX @ Buttonwiliow $0 1 $0 $122,250 1 2,250 $122,250
8409 Stockdale Hi hwa West Metro Boundary Heath Road 4.50 2 4 2 9.0 2 Lane Additions Add 2 lanes $0 Z$5,623,724 $D $5,623,724 $5,623,724
E318 Truxtun Avenue BN F RR hester Avenue 2.00 4 6 6 12.0 2 Lane Additions add 2 lanes,RE I NAL 0 0 38,000,000 38,000000 8414 Verdu o Lane Meacham Road Rosedale Hi hwa 0.50 2 4 0 1 Lane Additions East side 0 305,625 305,625 305625
8415 Verdu o Lane Meacham Road Traffic Si nals Install Si nal $0 $190,000 $0 $190,000 $190,000
B416 Verdu o Lane Norie a Road Traffic Si nals Install Si nal $0 $190,000 $0 $190,000 $190,000
UUF_ er u o ane eina oa ra is i na s nsta i na 7419 Vineland Road Edison Hi hwa Eucal tus Drive 0.75 2 4 2 1.5 2 Lane Additions Add 2 lanes 0 $0 937,287 937,287
B420 Vineland Road Eucalyptus Drive Pioneer Drive 0.25 2 4 2 0.5 2 Lane Additions Add 2 lanes $0 $312,429 $0 $312,429 $312,429
8556 Vineland Road Highland Knolls Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8557 Vineland Road Paladino Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B580 Vineland Road SR 178 Paladino Drive 1.00 0 6 2 2.0 2 Lane Additions Arterial $0 $1,249,717 $0 $1,249,717 $1,249,717
B424 IVineland Road SR 184/Kern Canyon Road SR 178 1.00 0 4 2 2.0 2 Lane Additions Construct 2 lanes $0 1 $1,249,717 $0 $1,249,717 $1,249,717
8423 Vineland Road SR 184/Morning Drive Pioneer Drive 1.00 0 1 2 2 2.0 2 Lane Additions Construct 2 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B425 Vineland Road SR 58 Edison Hi hway 0.20 2 1 4 2 0.4 2 Lane Additions Add 2 lanes $0 $249,943 $0 $249,943 $249,943
B421 Vineland Road UP RR Railroad Grade Separations Grade Separation $0 $18,000,000 1 $18,000,000 $18,000,000
W2 Vineland Road(TRIP) SR 178 State Hwy Bridges,Interchanges Construct Interchange $0 $16,962,161 $13,037,839 $30,000,000 $30,000,000
S:\PROJECTS\TIF\Phase 4\Adoption Documents\RTIF-Final 1.2 Clean09O5O8Rmps Pa e 6t of 8�n
a 9 trf
r
U CD
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global Completed Number of Number of lanes
Project Improvement Improvement Lanes lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed Fee lane-Miles Cat_desc Notes RMf Construct. Signal Cost Cost Total Cost Fee Funding
E231 West Beltway TRIP 7th Standard Road SR 58/Rosedale Highway 4.00 0 6 6 24.0 Freeway Projects Construct expressway-Future Trip ALM $24,000,000 $10,000,000 $34,000,000 $34,000,000
E137 West Beltway TRIP 7th Standard Road State H Brid es,Interchan es Construct interchanges TRIP ALM $20,000,000 $20,000,000 $20,000,000
E146 West Beltway TRIP BNSF RR Railroad Grade Se arations RR Grade separation TRIP ALM $25,000,000 $25,000,000 1 $25,000,000
E245 West Beltway TRIP Pacheco Road Westside Parkway 4.00 0 6 6 24.0 Freeway Projects Construct Expressway-TRIP ALM $24,000,000 $45,000,000 $69,000,000 $69,000,000
E243 West Beltway RIP Panama Lane Pacheco Road 1.00 0 6 6 6.0 Freeway Projects Construct Expressway-TRIP ALM $6,000,000 $6,000,000 $6,000,000
E241 West Beltway TRIP SR 1191Taft Highway Panama Lane 2.00 0 6 6 12.0 Freeway Projects Construct Expressway-TRIP ALM $12,000,000 $12,000,000 $12,000,000
E151 West Beltway TRIP SR 58/Rosedale Highway State Hwy Bridges,Interchanges Construct local interchanges-Trip ALM $30,000,000 $30,000,000 $30,000,000
E246 West Beltway TRIP Westside Parkway SR 58/Rosedale Highway Freeway Projects Construct Expressway-TRIP LM $6,400,000 $6,400,000 $6,400,000
E260 West Beltway TRIP Westside Parkway State Hwy Bridges,Interchanges Construct local interchanges-Trip $30,000,000 $30,000,000 $30,000,000
E317 West Beltwa WSPW TRIP Heath Road Jewetta Avenue Freeway Projects Construct F Tri LM $0 $10,800,000 $0 $10,800,000 $10,800,000
E319 West Beltwa (LW IS (TRIP) Heath Road Jewetta Avenue Freewa Projects Construct F Trip ALM $0 $10,800,000 $0 $10,800,000 $10,800,000
8514 West Min ollector Windermere treet Traffic i nals Install Signal 0 0 190,000 0 190,000 190,000
E320 Westside Parkway-Truxtun Tie-in Mohawk Street Truxtun Avenue 1.33 0 8 8 10.6 Freeway Projects Construct Tie-in from WSPW to Truxtun Avenue,REGIONAL $0 $30,000,000 $0 $28,500,000 $28,500,000
8426 Westside Parkwa TRIP Jewetta Avenue Coffee Road 7.00 0 6 6 42.0 Freeway Projects Construct Freeway,REGIONAL $0 $45,000,000 $0 $42,750,000 $42,750,000
E177 Westside Parkwa Phase 4(Future TRIP) Mohawk Street SR 99/SR 58 2.00 0 2 2 4.0 Future Freeway Alignment Construct freeway with interchan es-Future Trip ALM,REGIONAL $16,000,000 $15,200,000 $15,200,000
8536 White Lane Allen Road West Beltway 1.00 0 4 2 2.0 2 Lane Additions Construct 2 lanes 0 1,249,717 0 1,249,717 1,249,717
B536.1 White Lane Buena Vista Road Windermere Street 0.50 0 4 1 0.5 1 Lane Additions Construct 1 lane $0 $312,429 $0 $312,429 $312,429
8427 White Lane Allen Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
13575 White Lane Lil y Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
8538 White Lane Windermere Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 1 $190,000
B432 White Lane/Muller Road Cottonwood Road Fairfax Road 3.20 0 4 2 6.4 2 Lane Additions Construct 2 lanes S 1/2 Cottonwood Road to Washington Street $0 $3,999,093 $0 $3,999,093 1 $3,999,093
B604 White Lane/Muller Road Cottonwood Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B435 White Lane/Muller Road Fairfax Road Traffic Signals Insta SI nal $0 $0 $190,000 $0 $190,000 $190,000
White Lane/Muller Road swe Street ra Ic tgna s install tgna
E120 Wible Road SR 119/Taft Highway Curnow Road 0.50 2 4 2 1.0 2 Lane Additions Construct lanes $624,856 $624,856 $624,858
B442 Wible Road SR 119/Taft Highway Panama Lane 2.00 0.70 2 6 2 2.6 2 Lane Additions Add 2 lanes $0 $1,624,631 $0 $1,624,631 $1,624,631
8446 Administration Com uterTrackin System Computer Trackin System(City&Coun $0 $0 $244,500 $244,500 $244,500
6444 Beltway Planning Advance Planning/Studies Advance Plannin Studies $0 $0 $2,444,996 $2,444,996 $2,444,996
B447 Freeways Freeway Projects Freeway RM/ $11,202,044 $0 $0 1
$11,202,044 $11,202,044
B445.1 Ga ro'ects $0 $20,000,000 $14,325,272 $12,023,679
8448 Transit Costs $0 $0 $0 $0
Total 732.7 $1,942,328,405
BAKERSFIELD RTIF FACILITY LIST(CORE)
E160 Airport Drive Norris Road Olive Drive 2.00 4 6 2 4.0 1 2 Lane Additions Add 2 lanes,BORDER $2,499,433 $1,249,717 $1,249,717
B1 Airport Drive Norris Road Expand Intersection Expand Intersection,BORDER $229,219 $229,219 $0 $458,437 $458,437
E185 Airport Drive Olive Drive Expand Intersection BORDER $500,000 $250,000 $250,000
B2 Airport Drive Olive Drive n/o State Road 0.60 4 6 2 1.2 2 Lane Additions Add 2 lanes/Expand Intersection,BORDER $0 $500,000 $0 $500,000 $500,000
B3 Airport Drive UP RR Railroad Grade Separations Widen RR Brid e,BORDER $0 $0 $1,222,498 $611,249 $611,249
731 Bernard Street Haley Street Tra is i nals Install Signal so 0 190,000 70-7-90.000 190,000
B44 Brundage Lane Quantico Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B45 Brundage Lane SR 58 W/B Off Ramp to Cottonwood Road Traffic Signals Install Si nai $0 1 $0 $190,000 $0 $190,000 1 $190,000
B46 Brundage Lane Sterling Road Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B54 California Avenue Edison Highway Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B55 California Avenue Oak Street A Street 0.50 2 3 1 0.5 1 Lane Additions Widening south side $64,548 $312,429 $0 $376,977 $376,977
B64.2 Casa Loma Drive Cottonwood Road Washington Street 0.50 0 4 4 2.0 4 Lane Additions Construct 4 lanes $0 $1,249,717 $0 $1,249,717 $1,249,717
B65 Casa Loma Drive Cottonwood Road Traffic Si nals Install Signal/Construct Expanded Intersection $0 $1,833,747 $190,000 $0 $2,023,747 $2,023,747
B63 Casa Loma Drive Madison Street 0.25 mi e/o Canal Culverts Widen canal culvert at Sta.38+50 $0 $0 1 $48,900 $48,900 W 6,900
B66 Casa Loma Drive South Union Avenue Cottonwood Road 1.00 2 4 2 2.0 Improve Railroad Grade Crossings Improve ad sing at Sta.1+42 $0 $1,249,717 $122,250 $1,371,966 1,966
NJE163.2 Casa Loma Drive Union Avenue Modified Traffic Signals Signal Modification $0 $0 $95,000 $0 $95,000 5,000
Centennial Corridor TRIP Westside Parkway Terminus SR 99/SR 58 Freeway Projects Construct Freeway-TRIP LM,REGIONAL $36,543,000 $1,827,150 7,150
Centennial Corridor(TRIP) Westside Parkwa Terminus SR 99/SR 58 Freewa Projects Construct Freeway-TRIP ALM,REGIONAL $207,693,000 $10,384,650 4,650
olum us treet Alta Vista Drive Tra is i nals Install i nai 0 0 190,000 0 190,000 0,000 Cottonwood Road Planz Road Traffic Si naffs Install Si nai/Ex and Intersection $0 $611,249 $190,000 $0 $801,249 1,249
Cottonwood Road SR 58 Panama Road 6.00 2 4 2 12.0 2 Lane Additions Add 2 lanes $1,097,751 $1,097,751 $1,097,751
Cottonwood Road SR 58 E/B Off Ramp Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B84 East Belle Terrace Cottonwood Road I rattic tsignals Install i nai Expand Intersection 0 305,625 190,000 _____'T0 495,625 495,625
B92 Fairfax Road Highland Knolls Drive s/o Niles Street 0.26 4 1 6 1 0.3 Construct Medians Westside and Median,BORDER $20,139 $162,463 $0 $91,301 $91,301
B95 Fairfax Road SR 5B State H Brid es,Interchanges Widen SR 58 brid a at Sta.45+75,REGIONAL $0 $0 $1,222,498 $61,125 $61,125
Fairfax Road 5 amps NET I na s nsta Signals n sl na cost In Aaamonal costs),State,REGIONAL $0 . $250,000 $250,000 5, 5,
Hughes Lane M A venue errace a Icons onsruc
Madison fee fvin- is7n intake Cana Canal BnFges Cons ruct canal bridge
8171 Monterey Street Alta Vista Drive Traffic Signals Install i nai 0 0 190,000 0 190,000 190,000
Mount ernon venue amp ra IC I na s nS I na
Niles btreet fen OC rive ra IC tignals install tiignal
7224 Oak Street 21st Street 2.50 Expand Intersection Expand Intersection 500,000 500,000 500,000
E225 Oak Street 24th Street 2.50 Expand Intersection Expand Intersection $500,000 $500,000 $500,000
8193 Oak Street California Avenue SR 178/24th Street 1.00 4 6 2 2.0 2 Lane Additions Add 2 lanes,BORDER $1,290,958 $1,249,717 $0 $1,270,337 $1,270,337
Oak tree t e Road In venue .5 xpan ntersectlon 5 $500,000 ,
6208 Old Stine Road Min Avenue Belle Terrace 0.50 2 4 2 1.0 2 Lane Additions Add 2 lanes 403,424 384,060 0 787,485 787,485
B209 Old Stine Road tine ana Canal u verts I en cana cu vert tme oa 7, 7, 7,
B222 Oswell Street SR 178 Brundage Lane 2.00 4 6 2 4.0 Construct Medians Median Reconstruction $0 1 $2,499,433 $0 $2,499,433 $2,499,433
swe Street 5 amps Traffic Signals Install State 5 5 75 75 ,
B272 Panorama Drive Alta Vista Drive Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
B593 Panorama Drive Columbus Avenue Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
6413 Panorama Drive University Avenue Traffic Si nals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
8276 Panorama Drive Wenatchee Avenue Traffic Si nals Install Si nal $0 $0 $190,000 $0 $190,000 $190,000
6337 I South Union Avenue SJ RR I Improve Railroad Grade Crossings]Improve grade crossing at Ste.265+16 SJ RR $0 $0 1 $122,250 1 $122,250 $122,250 JS:\PROJECTS\TIF\Phase 4\Hdoption Documents\RTIF-Final 1.2 Clean090508Rmps vl e!7 A9cS�
y-agof8 m
I-- r
ORIGINAL
REGIONAL TRANSPORTATION FACILITIES LIST - FY 2008-2035 Metropolitan Bakersfield Transportation Impact Fee Program DRAFT 9/11/2008
Global ComDleted Numberof Numberof Lanes
Project Improvement Improvement Lanes Lanes Funded by Number of Cost Cost Additional
Number Street Name From To Length Miles Length Miles striped Proposed Fee Lane-Miles Cat_desc Notes WW Construct. Signal Cost Cost Total Cost Fee Funding
B338.2 South Union Avenue White Lane Casa Loma Drive 1.50 4 6 2 3,0 2 Lane Additions Add 2 lanes $0 $1,874,575 $0 $1,874,575 $1,874,575
E118 SR 178 M Street Fairfax Road 5.25 6 8 2 10.5 Free ay Projects Construct freeway with interchanges,REGIONAL $42,000,000 $2,100,000 1 $2,100,000
E261 SR 178 SR 204/Golden State Avenue State Hwy Bridges,Interchanges Improve Connection,REGIONAL $20,000,000 1 $1,000,000 $1,000,000
E233 SR 178 Various State Hwy Bridges,Interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 1 $1,000,000 $1,000,000
E263 SR 178-(TRIP) SR 99 Logical Termini State H Brid es,Interchanges TRIP ALM $2,000,000 $2,000,000 $2,000,000
E259 SR 178/24th Street TRIP Buck Owens Boulevard M Street Freewa Projects Roadwa Widenin -TRIP LM $2,600,000 $2,600,000 $2,600,000
E257 SR 178/24th Street TRIP Oak Street Expand Intersection Intersection Improvements-TRIP LM $1,044,000 $1,044,000 $1,044,000
E258 SR 178/24th Street(TRIP) Oak Street Expand Intersection Intersection Improvements-TRIP ALM,REGIONAL $47,547,000 $2,377,350 $2,377,350
E235 SR 204/Golden State Avenue Airport Drive SR 178 2 Lane Additions Add 2 lanes,REGIONAL $30,000,000 $1,500,000 $1,500,000
E310 SR 204/Golden State Avenue Calloway Canal Canal Bridges Widen Canal Bridge,REGIONAL $0 $600,000 $30,000 $30,000
E309 SR 204/Golden State Avenue Carrier Canal Canal Bridges Widen Canal Bridge,REGIONAL $0 $600,000 $30,000 $30,000
E312 SR 204/Golden State Avenue Chester Avenue State Hwy Bridges,interchanges Bridge Widening,REGIONAL $0 1 $6,000,000 $300,000 $300,000
E236 SR 204/Golden State Avenue F Street State Hwy Bridges,Interchanges Construct interchange,REGIONAL $20,000,000 $1,000,000 $1,000,000
E311 SR 204/Golden State Avenue Kern River Kern River Bridges Widen River Bridge 2 lanes.2 Miles,REGIONAL $0 $8,000,000 $400,000 $400,000
B372 SR 204/Union Avenue Brundage Lane I Expand Intersection Signal Modification/Expand Intersection $0 $0 $95,000 $1,833,747 $1,928,747 $1,928,747
E107 SR 58 Cottonwood Road Fairfax Road 2.00 6 8 2 4.0 Freeway Projects Construct freeway with interchanges,REGIONAL $16,000,000 $800,000 $800,000
B373 SR 58 Real Road Cottonwood Road 3.00 0.50 4 8 4 10.0 Freeway Projects Add 2 lanes,REGIONAL $0 $40,000,000 $40,000,000 $000,000 $4,000,000
E234 _9_R58 Various State Hwy Bridges,interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 $1,000,000 $1,000,000
E232 SR 99 Various State Hwy Brid es,Interchanges Ramp Improvements-Various Locations,REGIONAL $20,000,000 $1,000,000 $1,000,000
E178 SR 99 White Lane SR 119/Taft Highway 4.75 6 8 2 1 9.5 Freeway Projects Construct freeway with interchanges,REGIONAL $38,000,000 $1,900,000 $1,900,000
B398.2 SR 99 Wilson Road White Lane 1.00 6 8 2 2.0 Freeway Projects Add 2lanes,REGIONAL $0 $10,000,000 $0 $500,000 $500,000
8406.2 Stockdale Highway New Stine Road Oak Street 1.25 4 6 2 2.5 Construct Medians Median reconstruction $0 $1,562,146 $0 $1,562,146 $1,562,146
E318 Truxtun Avenue BNSF RR Chester Avenue 2.00 4 6 6 12.0 2 Lane Additions add 2 lanes,REGIONAL $0 $40,000,000 $0 $2,000,000 $2,000,000
B412 University Avenue Haley Street Traffic Signals Install Signal $0 $0 $190,000 $0 $190,000 $190,000
E320 Westside Parkway-Truxtun Tie-in Mohawk Street Truxtun Avenue 1.33 0 8 8 10.6 Freeway Projects Construct Tie-in from WSPW to Truxtun Ave,REGIONAL $0 $30,000,000 $0 $1,500,000 $1,500,000
8426 Westside Parkway(TRIP) Jewetta Avenue Coffee rd 7.00 0 6 6 42.0 Freeway Projects Construct Freeway,REGIONAL $0 $45,000,000 $0 $2,250,000 $2,250,000
E177 Westside Parkway Phase 4(Future TRIP) Mohawk Street SR 99/SR 58 2.00 0 1 2 1 2 4.0 Future Freeway Alignment Construct freeway with interchanges-Future Trip ALM,REGIONAL $16,000,000 $800,000 $800,000
6441 Wible Road Min Avenue Brundage Lane 1.00 4 6 2 2.0 2 Lane Additions Add 2 lanes $0 $1,249,717 $1,222,498 $2,472,215 $2,472,215
B445.2 Gap projects $0 $0 $100,000 $100,000 $100,000
Total 143.7 $74,787,105
876.4
Grand Total: $2,017,115,510
�AK
Foibit A F 9PP
S:\PROJECTS\TIF\Phase 4Wdoption Documents\RTIF-Final 1.2 Clean090508Rmps Rage 8 of 8 rrI
1=- r
U O
ORIGINAL
Non-Core Area
LAND USE TYPE
Bakersfield
Bakersfield
Kern County
Metro
Metro
Phase III
Current
Phase 111
Current
w/add. mit.
Phase III
Current
Phase IV
FEE
PER UNIT
First Year
Phase IV
FEE
PER UNIT
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED
MULTI-FAMILY
$7,06611
$9,55311
$12,95811
$12,22811
$13,595
$3,391 11
11
$6,21911
$4,23611
$4,710
NON RESIDENTIAL PER ADT TRIP
HEAVY/SERVICE INDUSTRIAL 11
LIGHT INDUSTRIAL
$180
$355
$168
$189
$210
1 $180
$230
$168
$189
$210
OFFICE COMMERCIAL
Under 100,000 sq.ft.
100,000-199,999 sq.ft.
200,000 sq. ft. &over
$131
$156
$120
$145
$161
$155
$182
$171
$165
$184
$174
$203
$199
$178
$198
RETAIL COMMERCIAL
Under 10,000 sq. ft.
10,000-49,999 sq. ft.
50,000-99,999 sq. ft.
100,000-199,999 sq.ft.
200,000-299,999 sq.ft.
300,000-399,999 sq.ft.
400,000-499,999 sq. ft.
500,000-999,999 sq. ft.
1,000,000 sq.ft. & over
$67
$69
$64
$79
$88
$106
$109
$129
$111
$124
$149
$153
$136
$170
$188
by individual study
by individual study
by individual study
$180
$201
by individual study
by individual study
by individual study
$219
$243
by individual study
by individual study
by individual study
$237
$263
by individual study
by individual study
by individual study
$237
$263
by individual study
by individual study
by individual study
$239
$266
by individual study
by individual study
by individual study
$239
$266
O Tv
?J S-.\PROJECTS\TIF\Phase 4\Reference\FINAL\Non-Core Fee Calculation Worksheet
� b
Exhibit B.1
8/29/2008
0 CITY
Z
D Cl����5
Core Area
LAND USE TYPE
Bakersfield
Kern County
Metro
Metro
Phase III
Current
Phase III
Current
Phase IV
FEE
PER UNIT
First Year
Phase IV
FEE
PER UNIT
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED
MULTI-FAMILY
$37523
$47905 11
$4.772 11
$5.311
$17691 11
$2,35411
$2.48011
$2.760
NON RESIDENTIAL PER ADT TRIP
HEAVY/SERVICE INDUSTRIAL
LIGHT INDUSTRIAL 11
1 $89
$82
$110
$123
$89
$82
$11011
$123
Url-K-L 1-UIVINIL LAAL
Under 100,000 sq. ft.
100,000-199,999 sq. ft.
200,000 sq.ft. & over
$65
$59
$85
$94
$77
$78
$97
$108
$87
$88
$104
$116
RETAIL COMMERCIAL
Under 10,000 sq.ft.
10,000-49,999 sq. ft.
50,000-99,999 sq. ft.
100,000-199,999 sq. ft.
200,000-299,999 sq. ft.
300,000-399,999 sq. ft.
400,000-499,999 sq. ft.
500,000-999,999 sq. ft.
1,000,000 sq. ft. &over
$33
$30
$46
$51
$53
$49
$65
$72
$75
$67
$99
$110
by individual study
by individual study
$106
$118
by individual study
by individual study
$128
$143
by individual study
by individual study
$154
by individual study
by individual study
$154
by individual study
by individual study
EArS
$156
by individual study
by individual study
156
S:\PROJECTS\TIF\Phase 4\Reference\FINAL\Core Fee Calculation Worksheet
Exhibit B.2
8/28/2008
EXHIBIT "C"
Transportation Impact Fee — Phase IV
Fee Update Background and Nexus Report
August 28, 2008
i
AK
F- r
v °
ORIGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
BACKGROUND
The Metropolitan Bakersfield Transportation Impact Fee was adopted by both the City
Council and the County Board of Supervisors in 1992. The original impetus for this
Transportation Impact Fee Program is the Bakersfield Metropolitan 2010 General Plan
Circulation Policy Statement No. 39:
"Require new development and expansion of existing development to pay
or participate in it's pro rata share of the costs of expansions in area-wide
transportation facilities and services which it necessitates. "
This Impact Fee is a development fee and the procedures laid out by the State of
California in Government Code Section 66000 et.seq. were followed in the adoption
process. As originally developed in the City, the fee program consists of an ordinance to
implement the fee on new development, and a Resolution adopting the Regional
Transportation Facilities List and a Transportation Impact Fee Schedule. In the County,
the Regional Transportation Facilities List and a Transportation Impact Fee Schedule
were adopted by ordinance. The original Facilities List included some of the facilities
needed to maintain a Level of Service of"C" or better for new growth or to prevent the
degradation of roads which are currently below Level of Service "C". The Fee Schedule
set forth the fees to be collected from new development to mitigate the need for the
facilities. When first adopted, the facilities list included only those projects which were
considered too large for individual developers to fund and construct on their own.
However, additional mitigation was needed on a case-by-case basis to account for the
local component of the traffic needs. This local component had to be determined by
individual traffic studies for each project.
The fee program was updated in 1997 to eliminate the need for individual traffic studies
to determine the local component of the traffic needs, and the facilities list was expanded
to include many roadway segments and traffic signals. The funding of these items was
the most common requirement of the local traffic studies, and their inclusion in the
facilities list eliminated the need for these studies.
Phase W Update
In 2002-2003, both City and County staff was tasked with a comprehensive update of the
Metropolitan Bakersfield Transportation Impact Fee program to extend the program out
to a new horizon year- 2020 —the Phase III update. In doing so, the socioeconomic data
for the updated model was updated for the base year of 1998 and the horizon year of
2020 and was thoroughly reviewed by City and County staff and the Kern Council of
Governments (KCOG). The Land Use base map used was the Land Use adopted for the
2010 General Plan Update. The new facilities that were required to maintain a Level of
Service of"C" or better were determined and were added to a new Facilities List. The
`gAKC9
S:\PROJECTS\TIF\Phase 4Wdoption Documents\Exhibit C Nexus.doc s
8/28/2008 Page 2 of 15 �n
� r
U �
ORIGINAL
Transportation Impact Fee—Phase IV
Fee Update Background
various components that go into the computation of the fee schedule were reviewed and
updated.
Phase IV Update
In 2007 — 2008, after a period of unprecedented growth, City and County staff were
instructed to once again update the Metropolitan Bakersfield Transportation Impact Fee
program. The same steps were followed as in the 2002-2003 update:
• A new horizon year was determined —2035. This horizon year is consistent with
the General Plan Update process now underway. However, this fee update is on a
slightly faster schedule.
• The base year of 2006 for the traffic model was used.
• The socioeconomic data — both households and employment — was updated for
the base year of 2006 and the horizon year of 2035. This data was reviewed by
City and County Planning staff and the staff at KCOG as well as the Kern
Regional Transportation /Land Use Modeling Subcommittee (KRTMC) of the
Kern COG Transportation Technical Advisory Committee (TTAC).
o The Kern Regional Transportation/Land Use Modeling Subcommittee is
made up of representatives from Kern County, Kern COG, the City of
Bakersfield, the City of Shafter, CalTrans, McIntosh and Associates and
others.
• The KCOG model was updated and validated for the new horizon year and
growth figures.
• Using the updated model results, the transportation facilities necessary to support
the growth with a Level of Service "C" as mandated by our General Plan were
determined.
• The new network as determined above was verified through new model runs by
Kern COG
• The costs of the projects on the final Transportation Impact Fee Facilities network
were determined.
• The amount of the fee based on the above and other variables was determined.
(See the discussion in the following section, "Development of Fee")
• Throughout the process, multiple informational meetings were held with
stakeholder groups such as the HBA, the Board of Realtors, the Chamber of
Commerce, etc.
• Periodic updates were given to the City Council's Planning and Development
Committee.
This paper documents the assumptions, equations, and values necessary to update both
the facilities list and the fee schedule.
C),
SAPROJECTSUIRPhase 4Wdoption Documents\Exhibit C Nexus.doc �n
8/28/2008 Page 3 of 15 o
ORIGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
DEVELOPMENT OF FEE
The Transportation Impact Fee pays for the construction of both regional and local
facilities that are required to maintain a Level of Service "C" for the Metropolitan
Bakersfield transportation system. Only those facilities required by new development as
allowed by the Metropolitan Bakersfield General Plan in effect on December 14, 2007
are covered by this Transportation Impact Fee Program.
The fee schedule was developed based upon the fact that different types of land uses will
place different demands on the regional transportation system. Those types of uses
whose impact on the road system is greater will pay a higher fee. The relative impact of
the various land uses is determined based upon trip rate, trip length and the percentage of
new trips — a number that represents those trips that are to that land use only, and are not
shared or linked together with trips to other land uses.
These fees are imposed on new development through the application of the
Transportation Impact Fee Ordinance and are collected at the building permit stage for
any development that produces additional vehicular trips over that attributable to the land
in its pre-existing condition — before the new development is in place. The fees are
placed in a separate interest bearing account, per the requirements of GC 66000 et seq,
and are only used to construct those facilities that are listed on the Facilities List.
Traffic Model
The traffic model is a computer model using CUBE software from Citylabs of Oakland,
California. The model is operated and maintained by KCOG under the authority and
direction of a Memorandum of Understanding between KCOG, the County of Kern, the
City of Bakersfield, and CalTrans. This Memorandum of Understanding sets forth the
rules for the distribution, operation and maintenance of the model. The model is updated
every 3 to 5 years. It is based on the existing and future road network, and currently
contains approximately 1700"traffic analysis zones", or"TAZ's". The TAZ is a
geographic area usually bounded by segments of the model road network. KCOG
modelers use general plan land use information and historic trends for that geographic
area to generate the number and type of trips for each TAZ. The model then uses this
information to "load"the boundary road network segments. Run for the year 2035, the
model uses the TAZ information to determine the traffic loads on the road segments
expected to be in place in the year 2035. This information yields an approximation of the
Level of Service that we would expect to see on each of the future road segments.
Facilities List
The transportation network needed for the horizon year of 2035 was derived after several
iterations. Assumptions were made as to which of the lanes for the roadways were going
to be complete by the horizon year, and the traffic model was used to determine which of O�gAKF9�
S:\PROJECTS\TIF\Phase 4Wdoption Documents\Exhibit C Nexus.doc � m
8/28/2008 Page 4 of 15 0 p
ORIGINAL
Transportation Impact Fee —Phase IV
Fee Update Background
those additional lanes was necessary to maintain a Level of Service "C". The criteria as
to whether to add a segment to the facilities list were as follows:
1. If the LOS on any link is C or better in 2006, and is also C or better in 2035, do
not add any lanes to the Phase IV list
2. If the LOS on any link is C or better in 2006 and is worse than C in 2035 — add
the necessary lanes to bring the LOS in 2035 to C or better.
3. If the LOS is worse than C on any link in 2006, add lanes only as necessary to
keep the same LOS in 2035.
4. If no road exists on the link in 2006, and 2035 shows 2 or more lanes needed for
LOS C or better, add the appropriate lanes.
5. The dedication of rights-of-way is a requirement under the City and County
subdivision and development ordinances. Therefore, only certain rights-of-way
will be included in the facilities list. Where"gap"projects that the City or County
will be required to construct, and money needs to be available to pay for the
additional right-of-way that may be required, a line item will be added to cover
these costs.
6. If the link already has lanes on the Phase III list, keep the Phase III lanes on that
segment in the Phase IV list and update the Phase III construction cost and, where
applicable, the right-of-way and other costs (unless noted otherwise).
7. If the land is Industrial or Commercial and the full improvements are not in place,
get additional travel lanes (if necessary), but not the remaining improvements
(curb, gutter, sidewalk, parking lane) — businesses must pay for their frontage
improvements.
A copy of the Facilities List map is attached as Exhibit C.1.
Cost Assumptions
The cost assumptions are as follows:
1. Road Construction Costs:
a. Arterial $624,858 per lane mile
b. Collector $384,060 per lane mile
c. Removal of both existing arterial lanes in the wrong position (no median
allowance): $25/CY for roadway excavation to a depth of 2 feet(including
disposal) and replace with topsoil at $10/CY — 20' x 2' x 1' x $35/CY
assume$52/LF
See Exhibit C.2 for backup for the arterial and collector costs.
2. Miscellaneous Costs:
a. Railroad Grade Separation: $10 to 35 million Ea.
b. Traffic signal $ 190,000 Ea.
c. State Traffic Signal $ 250,000 Ea
d. At-grade RR Crossing $ 400,000 Ea.
e. Canal Crossing $ 500,000 Ea.
f. Kern River Bridge $ 4,000,000 Ea.
g. Widen Intersection $ 500,000 Ea.
�gAKF9
SAPROJECTSMRPhase 4\Adoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 5 of 15
v o
ORIGINAL
7
Transportation Impact Fee — Phase IV
Fee Update Background
FEE EQUATION
This is a brief outline of the modified equation used to determine the Transportation
Impact Fee Schedule and the development of the various constants and variables. For an
in-depth discussion of the unmodified equation (Gas Tax version), see " Metropolitan
Bakersfield — TRANSPORTATION DEVELOPMENT FEE — Final Report" by Omni-
Means Engineers Planners dated February, 1991. The use of this fee equation establishes
the relationship between the amount of the fee for each land use type and the cost of the
public facility attributable to the land use type.
The equation is as follows:
Attributable New Travel = [(Annual Average Daily Traffic (ADT) X Average Trip
Length)/2] X%New Trips
New Lane Miles of Roads=Attributable Travel/Capacity Per Lane
Total Cost=New Lane Miles Of Road X Total Program Costs/Number of Lane Miles
Impact Fee=Total Cost
The constants and variables for the equation are the "ADT Trip Rate", the "Average Trip
Length", the "% New Trips", the "Capacity Per Lane" and the "Cost per Lane Mile of
Road". Also needed to develop the total number of trips for each land use category is the
number of new units (or square footage) from the base year of 2006 to the design year of
2035.
SAPROJECTS\TIF\Phase 4\Adoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 6 of 15
r
091GINAL
Transportation Impact Fee — Phase IN
Fee Update Background
"ADT Trip Rate"
The constants for "ADT trip rate" are determined from the data in the Institute of
Transportation Engineers "Trip Generation", 7"' Edition for each of the land use types in
the fee schedule. These land use types are:
1. Single Family Detached Housing(Land Use 210)
2. Apartment (Land Use 220)
3. General Heavy Industrial (Land Use 120)—used for Service Industrial also
4. General Light Industrial (Land Use 110)
5. General Office Building (Land Use 710)—generalized as Office Commercial
6. Shopping Center(Land Use 820)—generalized as Retail Commercial
Attached are excerpts from the Trip Generation manual for the various land uses. The
following table summarizes the trip rates:
TYPE ADT
NO. TRIP
LAND USE TYPE RATE
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED 1 9.57
MULTI-FAMILY 2 6.72
NON RESIDENTIAL PER ADT
TRIP
HEAVY/SERVICE INDUSTRIAL 3 4.24
OFFICE COMMERCIAL
Under 100,000 sq.ft. 5 13.34
100,000-199,999 sq. ft. 6 12.15
200,000 sq. ft. &over 7 11.37
RETAIL COMMERCIAL
Under 10,000 sq.ft. 8 152.03
10,000-49,999 sq. ft. 9 103.50
50,000-99,999 sq. ft. 10 75.10
100,000-199,999 sq.ft. 11 58.93
200,000-299,999 sq.ft. 12 49.28
300,000-399,999 sq.ft. 13 43.80
400,000-499,999 sq.ft. 14 40.12
500,000-999,999 sq.ft. 15 33.55
1,000,000 sq.ft. &over 16 30.33
SAPROJECTS\TIF\Phase 4\Adoption Documents\Exhibit C Nexus.doc rn
8/28/2008 Page 7 of 15 o
ORIGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
"Average Trip Length"
The average trip length is determined from the Kern Council of Government's traffic
model. The model provides estimates of average trip length in minutes by trip purpose
and the average speed of system-wide trips. The trip rate times the trip length in minutes
divided by the average speed yields the trip length in miles.
"% New Trips"
The following is excerpted from the Omni-Means report:
Many land uses, while attracting traffic, generate little if any new traffic (other than
attracting traffic to a particular location). There are several reasons for this. First, the
multiple purpose trip will tend to attract traffic to particular locations without generating
new traffic. Second, the capturing of an existing trip, such as stopping for a quart of milk
on the way home from work, will not result in additional travel. Third, diverting a trip
which already existed (such as taking the long way home from work to shop) will place
limited new travel on the road system. Take, for example, the convenience store and the
service (gas) station. The typical visit to these establishments is not a primary trip,
especially during the peak hour, but rather are trips made by individuals who are going
elsewhere, such as home or work.
An example may help. Let's assume there is an individual driving from work to home.
Assume that this individual stops at the day care center to pick up a child, a convenience
store to get milk and a service station for gasoline. How many trips have been made?
According to the standard methodology of transportation engineering, a total of four (4)
trips have been made, with eight(8) trip ends.
• Leaving work
• Entering the day care center
• Leaving the day care center
• Entering the convenience store
• Leaving the convenience store
• Entering the service station
• Leaving the service station
• Arriving home
If we were to apply an average trip length of 7.1 miles to these trips, the result would be
28.4 miles of travel, a vast over-statement of actual travel. This over-statement is
corrected in impact fee analysis in two ways. First, a percentage reduction factor(% new
trips), for trips to particular land uses which do not place additional travel on the roads,
and second, to adjust the trip lengths for non-residential land uses which more accurately
reflect the travel patterns of trips visiting those land uses. The first, % new trips, is
included in the Table below. The second, adjusted trip lengths, are also included in the
SAPROJECTS\TIMPhase 4Wdoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 8 of 15 0 d
ORIGINAL
I
Transportation Impact Fee —Phase IV
Fee Update Background
Table below. Both of these adjustments are ultimately made on the basis of professional
judgment. Such judgments, however, are based upon information provided in Trip
Generation, several articles in the "ITE Journal", information obtained from a study
performed for Brevard County, Florida adopted by ordinance by the City of Titusville,
available at http://www.titusville.com/Files/63-132.pdf and specifically upon an article
which appears in the May, 1984, issue of"Public Works". These articles were guides to
the establishment of the % new trips.
TYPE AVG. %
NO. TRIP NEW
LAND USE TYPE LENGTH TRIPS
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED 1 10.86 100%
MULTI-FAMILY 2 10.86 100%
NON RESIDENTIAL PER ADT
TRIP
HEAVY/SERVICE INDUSTRIAL 3 9.84 89%
OFFICE COMMERCIAL
Under 100,000 sq.ft. 5 11.05 92%
100,000-199,999 sq.ft. 6 11.05 92%
200,000 sq.ft. &over 7 11.05 92%
RETAIL COMMERCIAL
Under 10,000 sq.ft. 8 0.50 48%
10,000-49,999 sq. ft. 9 2.00 48%
50,000-99,999 sq. ft. 10 4.89 64%
100,000-199,999 sq.ft. 11 7.77 64%
200,000-299,999 sq.ft. 12 9.43 64%
300,000-399,999 sq.ft. 13 11.09 72%
400,000-499,999 sq. ft. 14 11.09 72%
500,000-999,999 sq. ft. 15 11.09 75%
1,000,000 sq.ft. &over 16 11.09 75%
A review of the KCOG model has indicated that these trip figures are still reasonably
accurate.
gAKF I
SAPROJECTS\TIF\Phase 4\Adoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 9 of 15 R,
r
U O
ORIGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
"Capacity Per Lane"
This constant is derived in part from the facilities list, and can be considered iterative
until the final list is determined. The average daily per lane capacity of each of the
roadway types for a Level of Service C is weighted by the number of lane miles of each
type of facility. The capacity per lane is as follows:
1. Freeways 20,000 per lane (80% of total 25,000 capacity)
2. Expressway 9,600 per lane (80% of total 12,000 capacity)
3. Highway(State) 8,000 per lane (80% of total 10,000 capacity)
3. Arterials 8,000 per lane (80% of total 10,000 capacity)
4. Collectors 6,000 per lane (80% of total 7,500 capacity)
The number of lane miles for each of the roadway types is determined from the facilities
list. The capacity per lane is shown in the following table:
Per Lane Lane % Lane Weighted
Roadway Type Capacity Miles Miles Average
Collector 6000 28.38 3.97% 238.2
Arterial 8000 421.86 59.00% 4720.2
Highway(State) 8000 73.3 10.25% 820.2
Expressway 9600 40.8 5.71% 547.8
Freeway 20000 150.64 21.07% 4213.8
714.98 100.00% 10540.2
"Number of Units"
Residential trip generation constants are in "ADT/unit" or "Peak trip/unit" units. The
number of units for single family residential and multi family residential categories come
from the KCOG data for the socioeconomic input for the traffic model. The number of
new units in the period from 2006 to 2035 is 128,000 single family residences and 16,629
multi-family residences.
The non-residential trip generation constants are in "ADT/1000 SF" units. The number
of 1000's SF for non-residential uses are derived as follows:
Assumption#1
The increase in total employment (jobs) in Metropolitan Bakersfield between 2006 and
2035 from the Kern COG Model was used to determine the number of future jobs. This
increase is anticipated to be 176,200 total jobs.
o��AKF9s
SAPROJECTS\TIF\Phase 4\Adoption Documents\Exhibit C Nexus.doc =�
8/28/2008 Page 10 of 15 o
ORIGINAL
Transportation Impact Fee —Phase IV
Fee Update Background
Assumption#2
The number of jobs in each employment category (retail, office commercial, service
industrial, light industrial, heavy industrial) was determined from the Kern County
Forecast Targets for the Kern Regional Transportation Model adopted July 2005:
Retail =41,666 jobs
Office Commercial = 109,934 jobs
Light Industrial= 12,059 jobs
Heavy/Service Industrial = 12,541 jobs
Assumption#3
The original assumptions regarding employees per acre and percent building per acre
(from City Planning Department) were used to determine future square footage to be built
by employment type. These assumptions are as follows:
Type Employees/Acre %building
Retail 17 25
Office Commercial 34 25
Industrial (All) 10.5 20
These factors were then used as follows:
Retail:
[41,666 jobs/(17 jobs/acre)] x 43,560 sq. feet/acre x 25%bldg= 26,690,766 Sq. Feet
Office Commercial:
[109,934 jobs/(34 jobs/acre)] x 43,560 sq. feet/acre x 25%bldg= 35,211,205 Sq. Feet
Light Industrial:
[12,059 jobs/(10.5 jobs/acre)] x 43,560 sq. feet/acre x 20%bldg= 10,005,217 Sq. Feet
Heavy/Service Industrial:
[12,541 jobs/(10.5 jobs/acre)] x 43,560 sq. feet/acre x 20%bldg= 10,405,754 Sq. Feet
I
SAPROJECTS\TIF\Phase 4Wdoption Documents\Exhibit C Nexus.doc O�C�AKF9��
8/28/2008 Page 11 of 15 ; m
r
U O
ORIGINAL
Transportation Impact Fee - Phase IV
Fee Update Background
In addition, these numbers are apportioned to the Core Area and the Non-Core Area and
to the square footage sub-set.
These figures are summarized in the following table:
Per Unit or
TYPE Per Square Foot
NO. Total Core Non-Core
LAND USE TYPE Units or Units or Units or
SQFT SQFT SQFT
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED 1 128,000 5,561 122,439
MULTI-FAMILY 2 16,629 659 15,970
NON RESIDENTIAL PER
ADT TRIP
HEAVY/SERVICE INDUSTRIAL 3 10,405,754 435,600 9,970,154
LIGHT INDUSTRIAL 4 10,005,217 251,403 9,753,814
OFFICE COMMERCIAL
Under 100,000 sq.ft. 5 21,126,723 19,379,839 1,746,884
100,000-199,999 sq. ft. 6 8,802,801 8,074,933 727,869
200,000 sq.ft. &over 7 5,281,681 4,844,960 436,721
RETAIL COMMERCIAL
Under 10,000 sq. ft. 8 3,300,766 2,535,822 764,944
10,000-49,999 sq. ft. 9 6,300,000 4,839,990 1,460,010
50,000-99,999 sq. ft. 10 1,250,000 960,316 289,684
100,000-199,999 sq.ft. 11 1,750,000 1,344,442 405,558
200,000-299,999 sq.ft. 12 2,090,000 1,605,648 484,352
300,000-399,999 sq.ft. 13 2,090,000 1,605,648 484,352
400,000-499,999 sq. ft. 14 2,210,000 1,697,838 512,162
500,000-999,999 sq.ft. 15 1,700,000 1,306,029 393,971
1,000,000 sq.ft. &over 16 6,000,000 4,609,515 1,390,485
An additional complication is the impact that"vesting rights" for subdivisions will have
on this program. As of April 23, 2008, there were 229 maps with 35,716 vested lots
within the City of Bakersfield and 49 maps with 3,071 vested lots within the
unincorporated area of Metropolitan Bakersfield, for a total of 278 maps with 38,787 lots
that have vested under a previous impact fee (Of these, 1,023 lots are in the Core Area).
Until the tentative maps expire or the vesting rights of the recorded maps expire, these
lots will be paying their traffic impact fees at a lower rate when they pull their building
permits. It is difficult to predict exactly how many of these"vested" lots will pull
permits in any one year. In the City of Bakersfield portion of these 35,716 lots, 1016 lots o��AK,6
SAPROJECTS\TIF\Phase 4\Adoption Documents\Exhibit C Nexus.doc >
8/28/2008 Page 12 of 15 '� o
ORIGINAL
Transportation Impact Fee -Phase IV
Fee Update Background
in 13 subdivisions will lose their vesting rights by the end of the year. Please note that
140 lots within these 13 subdivisions have already pulled their permits and paid their fees
at their"vested" level. This number will increase as the year goes forward.
The impact of"vested rights"has not been accounted for in any of the previous
Transportation Impact Fee programs (Phases I through III). Because of the current
economic climate, an estimated of 25% of the vested lots is assumed to retain vested
rights through the building permit stage. So, the base numbers for single family
residential units for the Core and Non-Core areas would be 5561 - 256 = 5,305 and
122,439 - 9,441 = 112,998, respectively. Because of the considerable lag in time
between the recording of a final map and the development of a commercial area, vesting
rights have very little effect on the non-residential permits. Therefore, no reduction in the
projected square footages of commercial or industrial projects was assumed.
These modified figures are summarized in the following table:
Per Unit or
TYPE Per Square Foot
(With 25% vested lots)
NO. Total Core Non-Core
LAND USE TYPE Units or Units or Units or
SQFT SQFT SQFT
RESIDENTIAL PER LIVING UNIT
SINGLE FAMILY, DETACHED 1 128,000 5,305 112,998
MULTI-FAMILY 2 16,629 659 15,970
NON RESIDENTIAL PER
ADT TRIP
HEAVY/SERVICE INDUSTRIAL 3 10,405,754 435,600 9,970,154
LIGHT INDUSTRIAL F- 4 10,005,217 251,403 9,753,814
OFFICE COMMERCIAL
Under 100,000 sq.ft. 5 21,126,723 19,379,839 1,746,884
100,000-199,999 sq.ft. 6 8,802,801 8,074,933 727,869
200,000 sq.ft. &over 7 5,281,681 4,844,960 436,721
RETAIL COMMERCIAL
Under 10,000 sq.ft. 8 3,300,766 2,535,822 764,944
10,000-49,999 sq. ft. 9 6,300,000 4,839,990 1,460,010
50,000-99,999 sq. ft. 10 1,250,000 960,316 289,684
100,000-199,999 sq.ft. 11 1,750,000 1,344,442 405,558
200,000-299,999 sq.ft. 12 2,090,000 1,605,648 484,352
300,000-399,999 sq. ft. 13 2,090,000 1,605,648 484,352
400,000-499,999 sq.ft. 14 2,210,000 1,697,838 512,162
500,000-999,999 sq.ft. 15 1,700,000 1,306,029 393,971
1,000,000 sq.ft. &over 16 6,000,000 4,609,515 1,390,485 o�gAKF9�
SAPROJECTS\TIRPhase 4\Ndoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 13 of 15 3 o
ORIGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
CONFORMITY WITH GOV. CODE SECTION 66000 et sec
In consideration of future growth within the limits of the Metropolitan Bakersfield
General Plan area through the year 2035, we believe that new residential and commercial
development will generate an increase in traffic that requires corresponding capital
facilities necessary to accommodate the anticipated increase. New residential and new or
intensified commercial development will create an additional burden on the existing
capital facilities that must be mitigated proportionately. If additional capital facilities are
not added as development occurs, the existing facilities will not be adequate to serve the
community. This could result in adverse impacts, thereby creating an inadequate traffic
safety and transportation network. Consequently, we believe there to be a reasonable
relationship between the need and use of the Metropolitan Bakersfield Transportation
Impact Fee Program and new development as follows:
1. There is a reasonable relationship between the need for traffic safety/capital
upgrade projects and the type of development project on which the fee will be imposed
since new development throughout the City will increase trips on local, citywide, and
regional roads, leading to the need for more traffic signals, additional turn lane signals,
and other improvements. Further, there is a reasonable relationship between the need for
the traffic safety/capital facilities projects and the type of development project on which
the fee will be imposed since each new development project will add to the incremental
need for new safety or capital upgrade projects in order to meet public safety standards
and the General Plan-mandated Level of Service requirement.
2. There is a reasonable relationship between the need for transportation projects and
the type of development project on which the fee will be imposed since new development
will increase trips on local, citywide, and regional roads, leading to a potential
deterioration level of service thereby creating the need for additional roadway capacity.
The Metropolitan Bakersfield's General Plan establishes a service standard for traffic
congestion as LOS "C" on all street corridors. New development will lower this level of
service unless improvements are made.
3. The determination of how there is a reasonable relationship between the use of the
Metropolitan Bakersfield Transportation Impact Fee and the type of development project
on which the fee is imposed is set forth in more detail within this document(see Exhibit
B).
4. To prevent the above-referenced undesirable consequences, and to reduce the
impacts of new development upon capital facilities, the capital facilities must be
constructed, at a rate that will accommodate the expected growth within the Metropolitan
Bakersfield General Plan area.
5. The Metropolitan Bakersfield Transportation Impact Fee established by this
document will be imposed upon development projects for the purposes of mitigating the
impact of the development on the ability of the City of Bakersfield and County of Kern to G gAKF9
provide specified capital facilities as shown in Exhibits A. o,
SAPROJECTSUIRPhase 4\Adoption Documents\Exhibit C Nexus.doc
8/28/2008 Page 14 of 15
ORGINAL
Transportation Impact Fee — Phase IV
Fee Update Background
6. The City of Bakersfield and County of Kern have identified the development
potential of Metropolitan Bakersfield from the Year 2006 until Year 2035 through traffic
modeling provided by Kern Council of Governments. Traffic modeling and engineering
judgment determined the extent of capital facilities required to serve and accommodate
new development as detailed on the Metropolitan Bakersfield Transportation Impact Fee
Facilities List(see Exhibit A). The facilities list provides a summary of the portion of
each improvement category's costs that can be funded by new development.
7. The categories covered by the facilities list that will be funded by the
Metropolitan Bakersfield Transportation Impact Fee which are limited to (1) traffic
safety/capital upgrade projects; (2) expansion of existing capital facilities; and (3)
expansion of the transportation network. These facilities are needed to promote and
protect the public health, safety and general welfare within Metropolitan Bakersfield, to
facilitate orderly urban development, to maintain existing levels of service, and to
promote economic and social well being.
o``gAKF9�
SAPROJECTS\TIRPhase 4Wdoption Documents\Exhibit C Nexus.doc ~ ;"
8/2812008 Page 15 of 15 ORIGINAL
1(
m
x
n
3
c
a I �
Habecker Rd
GGG I
® • 301 •* 001
A
Z �
>
m � R $ > > > Q
g m n a a � m -
Ea:
� 4
Ion Ln.- -
I
I �
m
{ I
{
n
1-�
BeadjOmSt
Nathan St
0
a
a
Martin AV -
o _
AV
a N s
c �
,a
Ch"Av
-1
Q
d
Cost Assumptions
Transportation Impact Fee - Phase IV
Arterials Quantity Unit Cost Total Cost
Assumed Cross Section Thickness (ft)
Roadway Excavation 2.2 5163 cy $18.00 $92,928
Base 0.8 1877 cy $40.00 $75,093
AC; 0.5 2297 tons $80.00 $183,744
Remove Existing Roadway 0.5 684 c $18.00 $12,320
Expansion Thickness (ft)
Roadway Excavation 2.2 1964 cy $18.00 $35,347
Base 0.8 714 cy $40.00 $28,563
AC 0.5 874 tons $80.00 $69,890
Median-Curb 5012 If $14.00 $70,168
Subtotal $568,053
Contingency 10% $56,805
Arterial Cost per Lane/Mile $624,858
6 Lane Arterial Cost Per Mile $2,592,447
Collector Quantity Unit Cost Total Cost
Assumed Cross Section Thickness (ft)
Roadway Excavation 1.85 4341 sgft $18.00 $78,144
Base 0.7 1643 sgft $40.00 $65,707
AC 0.4 1837 tons $80.00 $146,995
Remove Existing Roadway 0.5 587 cy $18.00 $10,560
Expansion Thickness (ft)
Roadway Excavation 1.85 713 cy $18.00 $12,827
Base 0.7 270 cy $40.00 $10,785
AC 0.4 302 tons $80.00 $24,128
Subtotal $349,146
Contingency 10% $34,915
Collector Cost per Lane/Mile $384,060
4 Lane Collector Cost Per Mile $1,536,241
Exhibit C.2
S:\PROJECTS\TIF\Phase 4\Reference\8_18_08\Copy of RTIF- Final 1.2 Clean 8/20/2008 � bNKF�
>. r
U
ORIGINAL
ELD
rr
EXHIBIT NO.____]p �
Metropolitan Bakersfield
Transportation Impact Fee
Update — Phase IV
Y Z
rr
--0�11�O
Overview/ History
. Program Background
• Policy Statement in 2010 General Pan (1985)
• First adopted in 1992
• Updated in 1997 — Phase II
■ Updated again in 2003 — Phase III
• Current update began in 2007 — Phase IV
• Joint Program for the Metropolitan Bakersfield
Area
■ Adopted by both the City Council and the Board of
Supervisors
IELD 1
Z
Q u
cc
�cAilo 0
Overview/ History
■ TIF Development Process
• Base and Horizon Years
• Kern COG model update
• Project list and cost determination
• Public Outreach
• Commonly Asked Questions
• Summary & Close
1ELp Q
z
Q t�
�olllo O
Kern COG Model Update
■ Sponsors
• Kern COG
• City of Bakersfield
• Kern County
■ Oversight
Kern COG Regional Transportation/Land Use Modeling
Subcommittee
■ Uses
• Regional Transportation Plan
• Air Quality Conformity
• Development EIR's
• Highway Design, TRIP
• Traffic Impact Fee
5F1ELD
z
cc
"OAD0O
Kern COG Model Update
• Components
• Computer Model
• Landuse
• Highway and Transit Networks
■ Calibration Years
■ 2006
. 2003 Validation Check
�Q5F1EL0<I
z
� C'3
O
Facilities List
{ MetrapolPro Propose-C Pnas IV I p rover n I is Fee
- - � - Proposea Fuse 7�;'Impraverr�nts
y
j
-
1
t-_
I I.�
I.
_. u»•.,a.,. F•+.•w it-� ♦--M • •� � ., ,,,�I yy ,was I '.,.- wow+-. -s-�+-�♦R
j
;, •... E n 1 ''•r .
,
i
-+ �.•:.} • y �� t -_...! �µe— .wow +r Y
-
I
''�� j • � • - F`a'r'"'� • i • • • wrj.w.— ! � � '.
-
i f .p
wn
' 1 era.,, • <.........
. i
�FLD z
� CU
VC, rr
,xoAilo O
Public Input Process
15 Opportunities for Public Input
• Council Workshop: 1
• February 27, 2008
• Public Stakeholder Meetings: 9
• March 4th & 5th
• May 23rd & 27th
• June 13, 2008 (Commercial Developers)
• August 14, 2008
• August 22, 2008 (Chamber of Commerce)
• August 26, 2008 (Roger McIntosh)
• September 2, 2008 (HBA / Assoc. of Realtors)
• September 11,2008 (Roger McIntosh)
• September 12, 2008 (Chamber of Commerce)
Planning and Development Committee Meetings: 5
• April 3, 2008
• May 6, 2008
• July 3, 2008
• August 19, 2008
• September 4, 2008
�Qc ELO
x z
s �
Results of Public Input
• Refinements to Update
. The First Draft of the Fee
■ $ 14,940 — Non-Core Area Single Family
■ Current Fee Proposal
■ $12,228 — Economic Recovery Period (-18%)
■ $ 13,f599 — Following Years (-9%)
�SFIELO_,
yQ�110 O
Results of Public Input
• Corrections to the Nexus document
■ Commercial Fee Refinement
• Analysis of Potential Core Expansion
• Creation of an "Economic Recovery Period""
• Addition and Deletion of Projects
• Comparison of Fees between Jurisdictions
�QibFIELp
x Z
sc 0
~don cre Area
LAND USE TYPE
Bakersfield
Bakersfield
Kem County
Metro
Metre
(Phase III
Current
Phase III
Current
w? add. mit.
Phase III
Current
Phase IV
FEE
PER UNIT
First.Yearli
Phase IV
FEE
PER UNIT
RESIDENTIAL PER LIMING UNIT
SINGLE FAMILY, )ETACHED)
MULTI-FAMILY
S7.0 56
$9.55.3
S 9X16-
3 12:2.2'
1 L+ti,
4.;{, x.91
S6,2191
$4:2-35 11
a4.71 r
NON RESIDENTIAL IAL PER ADS'TRIP
HEAVY.fSERVIC.E INDUSTRIAL
LIGHT INDUSTRIAL
-155
:3'r��s
S 1--J9
�-12-C
s 1 Bc
;S,2 '7
518911
,2 C
OFFICE COMMERCIAL
Under 100,000 sq.fL
1 00,000-1 99.999 sq. ft,
20-0,0,00 sq. fL & over
S 123 1
15 63
j S,20
5145
1 1
15_
1 ?
S17'
5165
$184
.ry 1 r
�03
5176
$198
RE1A1L COMMERCIAL
Under 10,000 sq', ft.
10.000-49~999 sq. ft.
50.000-99.999 sq. fL
100,000-199,1990 sq. ft.
2O0,O00-299f999 sq. fit.
300.0,00-399.999 sq. ft.
40-0,0;00-499.999! sq• fit.
500,000-999.990 sq. f#.
1,000.100 sq. ft. & over
S67
$69
$634
$79
S 6
$15p,-
5109
5129
X111
$1=
:ry 1Cf
,1 53
S136
5170
15
')y irndlvidL131 stud y
'-)y i t¢di v id ual s:ud y
L individual stud
5180
$2011
:)y i nd Vidual study
'-)y it div*idual s ud'y
b,,.indiv-iduaI stud y
S219
$243
`)y irsd;iv idual stud'"'
!)y individual s ,,,ady
bv indiv d uai stud"
S237
$253
inrJMCLIal stud;
'.)fir i,dividuual ._udy
by individua.1 study
52"17
$263
')y i;nd iVidual stud,~
1)y i r.idi v id ua l s ad yr
by endi id ua 1 study!
5239
$-5
-')y i d Midual study
.,y i�dividual s.ud
h"y individua study
5239
525
\ELD
0
0 rr
,OAilo 0
_aro A,em
L4.NID 1,13E T*,-F=�E_
Bakersfield
Kern County
'Metro
Metro
Phase III
C u rrent
Phase III
Current
Phase [V
FEE
PERU NIT
1 First Yea rjj
Phase [V
FEE
PER. UNIT
RESIDENTIAL PER. LIVING UNIT
SINGLE FAMILY, DETACH
MULTI-FAMILY
S33,52
S-4:tDOE.
34 ?;-
;3 E. I
RETAIL COMMERCIAL
52,_0654
SO
S276C
NON RESIDENTIAL PER ADT TRIP
HEAVVYY SERVICE INDUST
LIGHT INDUSTRIAL
$p_;9
58,11
,41 '0
$123
&39
S82
1 $1 L]
$123
Under 100,000 sq. ft.
100,000: 199,99.9 sq. fL
_20 0,000 sq. ft. & over
$15-15
;,!r9 19
S8151
94
S77
578
S 9 7
i[±
0 P_
1$11
$;371
S8.1211
$1 B4
6_
RETAIL COMMERCIAL
Under 10,000 sq-. ft.
10.000-49,999 sq. ft.
50X00_99,999 sq. ft.
1100,000-199,999 sq. fL
20,0,000-299,1999 sq. fL
300,000-399,999 sq. fL
400,000-499,999 sq. ft.
500,0,00-999,999 sq. fL
11,000v0O0 sq. ft- & over III-,.y
$33
530
S46
S51
S49
S65
672
$75
S67
S99
$11c
lay ndi-vidua] study
13� individual study
$106
$11P
Ly indi'vidual study
by indi'vi-dual study
$128
$143
by in-di v-idua] study
by individual study
$138
$154
I:.-,y in-JiVicluai study
by individual study
$138
$154
Fy ndividual study
key. indi'vidual study
$140
$156
in-di v.Jcluai study
I-,,y individual study
$140
1 S1513 -
�QgFIELO Q
� Z
-C CD
c
,xQAIID Q rr
Commonly Asked Questions
• Overall Transportation Funding Picture
METROPOLITAN BAKERSFIELD TRANSPORTATION PROGRAM
REVENUE SOURCES
$3.078 Billion
TIF Program--//
65%
TRIP Federal Earmark
Other
1%
STI P
6%
my Bond
4%
fax
p 1B
1%
S�IELD
� z
yoAilo Q
�Qq\ELO
� z
Commonly Asked Questions
. RTIF Facilities List — Amount by Category
FY 2008-2035 REGIONAL TRANSPORTATION IMPACT FEE PROGRAM FACILITIES
LIST -AMOUNT BY CATEGORY
(IN MILLIONS)
Administration
Traffic Signals $2.7
$52.9 Gap Projects
I $23.2
State Highway
$349.3
PG&E Tower Relocation
$0.8
Railroad Grade
Separations/Cross ings
$232.5
Right of Way
$21.6
TOTAL AMOUNT = $2,017 M Freeway Projects
$736.2
Roadway Lane Additions
$556.1
Canal/River Bridges
$41.7
�Qc,�lElp
� z
%y0
5F1ELd Q
�Q z
a cD
�. M
Ail Do
TRIP- Related Projects
Project
Phase I
Phase II
Phase III
Phase IV
Centennial
Corridor
X
X
X
Hageman Flyover
X
X
X
24th/Oak
X
X
X
X
Rosedale Hwy
X
X
X
West Beltway
X
X
X
X
7thSta nda rd/North
Beltway
X
X
X
X
SR 178
X
X
X
X
x��SFIELD z
� C`3
CP cc
,OAilo 0
Commonly Asked Questions
• Effect of "Vested " Rights
• External Truck Traffic
• Government Trips
• Commercial Rates vs. Residential Rates
• Grade Separations
• South Beltway
• West Beltway
q\ELD Q
xQ z
(D
0 M
,OA110 O
Summary & Close
• Critical Transportation Needs
• Opportunity of TRIP funds
• State of Economy — Is It The Wrong Time?
-35,000 Vested Lots
-Economic Recovery Year Built In / Option to
Extend
• Survive CEQA Challenges