HomeMy WebLinkAboutRES NO 12-66RESOLUTXON NO o :'t2-66
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF BA~EPSF~LD ADOPTING AND SUBMITTING A
BUDGET FO~ EXPEND.~TUEE OF FUNDS ALLOCATED
FEOM THE STATE HIGHWAY FUND TO CXTIESo
WHEEEAS~ a master agreement has been executed by the City
and the State of California on April 3~ 19619 for expenditure of
funds allocated from the State highway fund to cities; and
WHEF~EAS~ the City Council has prepared a budget proposal
showing eskimo-ted expendi~ures of such funds recommended to be
made during the 1965~66 fiscal year; and
WHEREASp ~he City Council has heard read said budget
proposal and is familiar with the'conten~s thereof;
THEEEFORE~ be it resolved by the City Council of the City
of Bakersfield that ~ald budget proposal~ dated March
be and it is hereby adopted as the budget of proposed expenditures
of the gas tax allocation to cities, said budget proposal be and
the same is hereby approved and the Director of Public Works is
directed to sign the same on behalf of said budget proposal to be
su~.~ymitted to the Department of Public Works, State of Califoznia,
in accordance with the provisions of Section 197 of the Streets
and Highways Code.
.......... O00 ..........
AYES: COUNCILMEN BALFA Z, DOOLIN, HOSKING, PARK, RUCKER, STIERN,
NOES: COUNCILMEN: ~b,,j ~
ABSENT COUNCILMEN:
ABSTAINING COUNCILMEN:
APPRO VED ~
· STATE HIGHWAY ENGINEER
Sacramento,,. California
But Proposal 40.
for the fiscal year ending
June 30, 19 66
Date March 14
, 19__
66
(TO BE TRANSMITTED THROUGH DISTRICT ENGINEER)
'Mr. W. L. Welch
.Disffict Er~ineer
Address Box 1352, Fresno,
BUDGET· PROPOSAL FOR STATE ALLOCATED (SECTION 2107) FUNDS
The City of Bakersfield ' . ·hereby
by this budgetShall be done under the terms of the master agree-
ment covering the budgeting and expenditure of these funds as executed on Aprfi 3, 19 6 1
(date)
SUMMARY OF FUNDS BUDGETED FOR EXPENDITURE
Seurce of Funds Maintenance Other
'Right of Way Construction *
State allocated
(Sec. 2]07)funds
State Highway Budget Funds
City Funds
Other Funas
125,000;00
395,746.52
Total
(See following pages for details)
Includes preliminary and construction engineering.
125,000.00
SUMMARY OF STATE· ALLOCATED (Sac. 2107) FUNDS' AVAILABLE**
395,746.52
0.725¢
$ 1,368.28
· Unexpended under project 68 (City)
Rental income decreased per Controller"s audit letter
dated May 12, i965 (City) -205.14
Sale of Property decreased per same letter (City) -650.00
Funds accrued during.the fiscal year ending Iune 30, 1965(City) 27,584.24
Funds accrJled during the fiscal year ending
June 30, 1965 (State) " 254,519.14
Estimated to accrue during the fiscal year ending
Iune 30, 1966 .- . . 238,130.00
.... l"otal'~adS availabl~ '55Z0,746..5.2
tl~ nat ur~
Director of Public Works
Plans, specifications and estimates of cost for each con-
strgction or improvement project will be submitted in
accordance' with Section 199 of the Streets a~l Highways
Code prim to advertising or commencing work by day labor.
* * Attach additional page if
more space is needed for
this summary.
Official Title
FORM MC-18 (3-64) Rev.
City
MAINTENANCE
(Permissive maintenance defined in Section 27 (a), (b) and (E)
of Streets arid Highways Code, os amended-1959)
General maintenance
- Project
State (per mal.tenbnce*igreement)
(Signold (Lighting) (Signs)'(Striping) (Other)
(Strike out InalFoprlote Items)
'Totel Molntenence
.; 'l)!lcm'lllfion of elk oRd locations:
Amovfit
OTHER
Amolmt
AHendenCe at i. 'T. T. E.
( eferabl budgeted with
~Z-:i.on 21/1~7:5 funds)
oo
Cancel Proiect lO0'and PrQject 101
Reduce project 103 to $55,24'6.52
-2-
DESCRIPTION'
· +' 'Home of Street '
Beginning end and.*
.:..!" of proposed work
PROJECT STATEMENT
PROPOSED IMPROVEMENT OF SELECT CiTY 'STREETS.
(Use separat.e sheet for eactq!projeCt)
~0~" e:~t- of 'River ' ~u~ev~.
~r0j'ec+;'No. 121
Bakersfi~ld
Esti~ed hourly traffic volume ap~oaching intersections wile· n~t'eXceed cjpac,y of pro,sod .trm f~ cu.ent
.aWic ..d,;~ t~ofic' ten years hence; (Re{.: Divi'S{'~ o; Hi~hway's CircUlar' L.". No. ~42) (YES) 3~:
. Jf NO, expl~ion given on Page 4. , ' ' ' * - *: *"" ' ' '-
RIGHT OF WAY
" . 'Estimated cost $
, "': :,,...,!Prosant. width. 1 lO feet. Proposed width
*' "= ';' .~Otol width provided by sot-backs ' ft. (F~esent).
CONSTRUC~TION :-
- Estim~ cost $ ~ RR, ~. ~ . (InCluding. engi~ering).
~isl~ of; const~ction and, conltru~ion engineering. (City)
S~vision of preliminary engt~e~lng.' ,(City). (~.
GE~ETRIC SECTION
(Ref. i Topic 4.01 .CIW and C~r~ive preiect. Ma.ual of
·Tobe acquired by (City) (State),
feet,
ft. (propOsed)
!966 ~ = 113, 000
1976. ~LD~.. = 15,000 ·., EXISTING PROPOSED
Number and ~width 'of traffic' .lanes
· ' WJd~.*~ e~b parking U~I* ={' : Rt. Lt.,. [ Rt.
lanes ' 2
~dlen Width~ ~* ~* '
Width of Curb off-sets ~ 2
Width of 't~ning ' ' Lt Rt.
"'lanes '
· T~ol"wid~ b~ween e~erior Curbs
Reasons for less than desirable widths explained on page 4.
STRUCTURAL SECTION*
"R-V~due = 17 to 69 EXISTING
Paverant'thickness and type
PROPOSED'
-. Oto'~" AS
AB -'aggregate base.
A5 - agg~gate sub-bose
Base thickness and type
*Types: BS - bituminous seal,
AC- aspbaltic concrete.
FORM MC-18 (3-64) Roy.
POSSIBLE FUTURE
DEVELOPMENT,
Lt, J Rt,
Lt. Rt;
'RIdAS- read-mix aspbaltic surface
PCC - Portland cement concrete ..
CTB - cement treated bqle
'1
(Sac. 2107) Funds
City Funds (i~ec~ 1{36, 5)
County Funds
State Highway Budget Funds
Offior Funds
Previously Budgefed
· Additional Funds to be ,Budgeted
SOURCE OF FUNDS
RIGHTOF WAY '-
CONSTRUCTION*
72,500.00
x5,5Oo. oo
TOTAL
· t5 ,SO0.OO'
TOTAL
Includes preliminary and construction engineering.
I
./
PROPOSED TYPICAL CROSS SECTION .(For use where applicable) '
(Show structural section and geometric details)
Additiom;I Remarks: (explain special ·financing, basis of fund proportioning, reasons for less than desirable widths
and thicknesses, special construction features, etc.)
-4-
DESCRIPTION
Name of Street
Length In Miles . 0.56
The proposed work consists of
PROJECT STATEMENT :
PROPOSED 'IMPROVEMENT OF SELECT CITY STREETS
(Use' separate sheet for each project)
M/rig' AVentt~ frnm Wlbl~- Road tO 440' east of ~s~ l.~ne ~
Wible 'Road ~m .Ming A~nue to noah CiW ~,Jmtt$ p~ar Madrid
( ra m~, payre& cone xn~ cm~, d ' e~.)
And total estimated cost is $ 67, O00. O0 , including engineering.
TRAFFIC "
· Estimated hourly traffic volume approaching intoreactions wile not exceed capacity of proposed street for current
traffic. and for traffic ten years hence. (ROf.: Division of Highways Circular Lett~ No. 58-42) (YES) ~
If HO, explanation given on Page 4.
RIGtIT OF WAY
Estimated cost $ ~"
' . To be acquired by (City)
Present width 80
feet. Proposed width' - 110 feet.
Total width provided by set-backs ' ft. (present). ' ft. (proposed)
Estimceed cost S G7, ~fl~ (l~clu~ing enginesing).
Svpervlslen of conetr,Jctlon and construeSigh engineering.. (City)
Sq~effisimt of INwllm!nary engineering. (City). (Ste~a)'
· .GEOMETRIC SECTION
(Ref.= Topic 4.01 City and' Cooper~tive Projects Manual of Instructlong)
ADT upon completion 6,000
DESIGN ADT 12,900
Number and width of traffic lanes
Width of curb parking
Median Width
Width of curb off-sets
Width of turning
lanes
Total width between eXterior curbs·
EXISTING
4' 11'
Lt. I Rt.
Reasons for less then desirable width. ;xplained on page 4.
STRKTURAL SECTION®
Traffic Index 6
R-Value 61
Pavement thickness and type
Base thickness end type
*Types: BS - bituminous seal,
AC- aspbaltic con"rate,
PROPOSED
4' 12'
Lt,
10'
18
90'
EXISTING
PROPOSED
(Tent. tlv~) .
... 3;! AG
AB -'aggregate
· ~$ -, aggregate sub-boca
Rt,
'POHIBLE FUTURE
DEVELOPMENT
Lt. I Rt.
Lt. .~ ·
RIdAS-' rood-mix .sphaitlc europe
PCC ' Portland cement concre~
CTB - cement treated bqse
'SOURCE OF FUNDS
State
(Sac. 2107) Funds
City Fund.
County Funds
'RIGHT OF WAY
. CONSTRUCTION*
63,000'.00
63,000.00
Stme Highway Budeat Funds
Other Funds
Pmvleudy BudSetnd
Additional' Funds to be Budgeted
Includes preliminary a~d'construction englnsorlng.+
,P-/w
63. 000. O0
63.000'00
I
I
.!. PROPOSED TYPICAL CROSS SECTION
(For use where applicable)
(Show structural section. and geometric de~ails)
Additk~ Remarks: (explain special financing, be.is of fund proport4oning, reasons for less then cleslr.bie widths
and thicknesses, special. construction feelures, etc.)
The above geometric sectton will be used except for the left side of
Wible Road where parking will be :-prohibited next to freeway fence and a
offset provided in tieu of'a4 [0' shoulder,
DES~:RIPTION
Name of Street '
B~ginnifig and end'
of proposed werk
PROJECT STATEMENT:
PROPOSED ·IMPROVEMENT OF SELECT CITY STREETS
(Use' separate sheet for each project)
BakersfiGlcl
Soutit "H"' Street (Ui~ 882-3)
Mine Avenue :to White i, ane
LengthlnMiles: 1.53 .' "
The proposed work consists of Grade ,- Pave, Install drainaSs ~.ilitie~, fraffi~ '
(Grading, pay/hE, conaffecting cur~a sad gutlee~
, Signals. and safety lighting
And t{~| estimated cost is $ 520 # 0O0,00 '. , including enSineerine. '
TRAFFIC
· Estimated hourly traffic volume approaching intersections will not exceed capacity of proposed street for currefit
traffic and for traffic ten years hence. (Ref.: Division of Highways Circular Letter No. 58-42) (YES)
· I~ NO, ~xplanatien given eft' Page '4.
RIGtIT OF WAy · ,
Estimated cost $
Present width 60 feet. Proposed width' 85 feet.
Total width provided by set-backs ,ft. (present).
CONSTRUCTION ,, ,.
Estimated cost $. 520.. 000.00 . (Including engineering).
Supervlslefi of construction and construesiGn engineerinS.. (City)
Supervision of'preliminary engineering.' (City).
GEOMETRIC SECTION
....
(RaI. s Topic 4.01 City and' Cooperative Pro{Sets Manual of Instructions)
ADT upon' comple~ion
DESIGN ADT EXiSTinG
Number and width of traffic, lanes 2
Width of curb parking Lt. Rt.
lanes 6' 6'
Median Width
Width of curb off-sets
Width of turning
lefi~s '
Total width between exterior curbs 36'
Reasons for loss than desirable widths explained'on page 4.
STRKTURAL SECTION*
Trc~c{ic Index
R-Va I ue EXISTING
Present thickness end type 3"
· To be acquired by (City) (State).'
ft. (propoSed) '.
PROPOSED
4' 12'
Lt. '[ Rt.
2° ·
14 - 18'
Rt.
76 -80°
PROPOSED
(Tam,afire)
3" AC .
POSSIBLE FUTURE
Lt. J Rt.
Lt.
Bose thickness and type ....
*Types: BS - bituminous seal,
AC- alpbaltic concrete,
< ,,o.
~,t"r'_ I/I f I _~,r_, ~,
AB -'aggregate bose~
· A$ "aggregate sub-bose'
RMAS-road-mix aspbaltic .udac~
PCC ' Portland c~men~ cen~r~
CTB - cement treated bqse
SOURCE OF FUNDS
\
Stete A|locetnd'
(Sec. 2107) Funds
City Funds
County Funds
Stete Highwgy Budget Funds .'
RIGHT OF WAY'; *' ' CONSTRUCTION*
55,246.52
TOTAL
55,246.52
260,000.. O0
Other Funds
Pm,deg$1y Budie~nd
AdditloNI~ Fuels to be Budgeted
204,753.48
204,753.48
'rOYAl,.
* Includes preliminary and construction engineering.
520,000.00
5 2,.0,000. O0
,I
p, ROPOSED TYPICAL C~O~ SECTSOH
(For use where applicablo) .
-- (Show structural section and geometric details)
Additk~ Risels: (explain special financing, basis of fund proportioninS, reasons for less than desirable widths
and thicknesses, special construction features, etc.)
PROJECT STATEMENT: Project No.
PROPOSED 'IMPROVEMENT OF SELECT CITY STREETS BO~JDi'8~G~J~J
(Use separate sheet for each project) (Ci~)
DESCRIPTION
Name of Street '
Beginning and end'
of proposed work
Length In Miles
The proposed work consists of
(Gradin~l, pavinll, eonetmetir~ curbs end l~e~ e~.)
~d t~l esttm~ed cost is $ ~m~,~ , including engi~i~.
T~FFIG
EIti~ hourly ~affic volume ap~oachlng int~se~ions will not exceed coppery of ~N~d
~lc and ~ traffic t~ y~s ~nce. (ROt.: Divl,i~ of Highways Circular L~ No. ~42) (YES)
If ~, e~l~ion given ~ Page 4.
RIGHT OF WAY
Estimated cost $ j~SmOOOeGO .' To be acquired by (City) (State).
Present width GO feet. Proposed width .~w,j}~. feet.
'Total width irov!ded by set-backs e ft. (present). ft. (proposed)
Estimated cost $ aSO,O0~.~ '(:Including en~ineoring).
Suporvlehm of construction and conetruetlop e~i ineerl.q3~. L(City)
Supervision of preliminary engineering. (City) ~
· GEOMETRIC SECTION
(ROf.: Topic 4.01 CIty and' Cc~ppor~tlve ProjeCts Manual .of Instructions)
ADT upon completion
DESIGN ADT' ~0,~ EXISTING
Number and width of tra~ic4~anes
Width of curb parking Lt. J Rt..
Idadim Width
WIdth of curb off-sets
Width of tw~ing
Tetal width between eXterior curbs
Reaso~s for Ion than desirable widths explained on page
STRUCTURAL SECTION*
Traffic Index ·
R-Value
Pavement thickness and type
· Bale thickness end type
*Types: BS - bituminous seal,
AC- aspbaltic concrete,
EXISTING
PROPOSED
L~t. ~ RI.
PROPOSED
AB -'aggregate bose,
' A,G -. aggregate sub-bose
'POSSIBLE PUTUI~EZ
DEVELOPMENT
Lt. Rt.
Lt. - J lie.
SOURCE OF FUNDS
State Allocated'
(Sec. 2107) Funds
City Funds
Co.my Fund, '-
Stete Highway Budget Funds
RIGHT OF WAY
CQHSTRUCTION* "
C)thee Funds
previously Budpted '
Additional' Fuels to be Budgeted
* Includes preliminary and construction engineering.
t
I
PROPOSED TYPICAL CRO~S SECT60~
(For use where applicable)
TOTAL
(Show structural section and geometric details)
(explain special financing, basis of fund proportioning, reasons for less than desirable widths
end thicknesses, special construction features, etc.)
-4-