Loading...
HomeMy WebLinkAbout6/15/2007 B A K E R S F I E L D CITY MANAGER'S OFFICE MEMORANDUM June 15, 2007 TO: Honorable Mayor and City Council { FROM: Alan Tandy, City Manager SUBJECT: General Information 1. The City of Shafter is suing us again. This time over the Adavco Development on 7th Standard Road. The action only serves to potentially delay the widening of the south side of 7th Standard — most illogical! 2. A progress report on the TRIP projects prepared for Congressman McCarthy is enclosed. We are doing well! The Fairfax/SR 178 interchange, SR 99/7th Standard Road interchange, Mohawk extension, and Phase I of the Westside Parkway are all on the near-term list for construction. 3. Enclosed is a copy of a letter from Senator Ashburn to the California Transportation Commission urging it reconsider the widening of Route 58 (Rosedale Highway) from four to six lanes between Allen Road and Route 99. We appreciate Senator's Ashburn support of our transportation projects. 4. Two hearings took place this week with neighbors surrounding Aera Park. While comments were far reaching including some who completely oppose it, we will take into account design issues voiced. We will also be "signing" all of our future park project sites as we have found out that new people in town are completely unfamiliar with long- term City projects. 5. Taft City Council unanimously rejected a recommendation to begin the process of establishing impact fees imposed on developers to pay for the infrastructure ranging from streets to parks to wastewater treatment needed to support new developments. 6. Kern County landfill fees will increase about 6% on July 1St. For residences, the fee is a line item on the County's property tax bill. For businesses, the fee is a line item on the City's commercial refuse service bill. This County fee increase is separate from the 3.2% increase for City refuse rates in FY 2007-08. 7. The date for National Incident Management System (NIMS) training is set for Wednesday, July 11th from 5:15 to 9:15 pm at the Convention Center. Councilmembers, Department heads and their designees are invited to attend. 8. Jastro Pool has had major leaks. We have conducted exhaustive testing, the results of which are in the enclosed report. We are attempting short-term repairs to get it open for the season. We will keep you advised on how it goes. Honorable Mayor and City Council June 15, 2007 Page 2 9. Recreation and Parks' activity report for the month of May is enclosed. 10. The Streets Division work schedule for the week of June 18th is enclosed. 11. The Special Enforcement Unit's monthly report for May 2007 is enclosed. 12. Responses to questions from the June 4th budget presentations are enclosed. City Council will be adopting the budget on Wednesday, June 20tH 13. Council requests are enclosed, as follows: Councilmember Benham • Code Enforcement's investigation at 1400, 1500 and 1600 blocks of Kentucky St.; • California Water Services practices of marking streets and clean-up; and, Councilmember Couch • Establishing Development Standards for Taft Highway. AT:rs:rk cc: Department Heads Pamela McCarthy, City Clerk Roberta Gafford, Assistant City Clerk ZO B A K E R S F I E L D June 11, 2007 Alan Tandy • City Manager Honorable Kevin McCarthy United States Congress, 22nd District 1523 Longworth House Office Building Washington DC 20515 Re: Thomas Roads Improvement Program Dear Congressman McCarthy: We are pleased to forward to you a May 2007, Progress Report on the Thomas Road Improvement Program (TRIP) in Bakersfield. The project is moving ahead at a very favorable pace. Within the next few months, we will be inviting you to groundbreaking ceremonies for both the Fairfax / State Route 178 Interchange and the State Route 99 / 7 th Standard Road Interchange projects. Design is underway on the Westside Parkway, with the first groundbreaking scheduled to occur in 2008. $29 million in environmental and design contracts for five other major TRIP projects will be awarded this summer. Our interagency team of Caltrans, Kern County, the City of Bakersfield, and management consultant, Parsons, are working to deliver all of the TRIP projects in record time through project team reviews and creative programs, such as AB 1858, which you sponsored on our behalf when you were in the State Assembly. We encourage you to contact Caltrans District 6 Director Malcolm Dougherty at 559-488-4082 for confirmation and update of the status of our progress to date. Please feel free to have your staff contact me with any questions you may have. We look forward to seeing you at the groundbreakings. Rej ,, tfully, Tandy City Manager CC.' Honorable Mayor and City Council Vincent Fong, Field Representative for Congressman McCarthy Raul Rojas, Public Works Director Chris Clark, Parsons Pro ram Mana er Ted Wright, TRIP Manager g g Todd Wood, Kern County Engineer Manager Malcolm Dougherty, Director—Caltrans District 6 Ron Brummett, Executive Director—Kern Council of Governments City of Bakersfield • City Manager's Office • 1501 Truxtun Avenue _ Bakersfield, California • 93301 (661) 326-3751 • Fax (661) 324-1850 Progress/Status Report Page 1 rkum l' . c�Mnea Thomas Roads Imnrovement Program —Bakersfield California Progress/Status Report May 2007 When signed into law in August 2005, the Safe, Accountable, Flexible, Efficient Transportation Equity Act, a Legacy for Users (SAFETEA-LU) provided $244 billion for highways, highway safety, and public transportation projects. Through the efforts of former Congressman William M. Thomas, SAFETEA-LU included $630 million in earmarks for highway improvements in four primary corridors in metropolitan Bakersfield. To administer these funds and manage project development, the City of Bakersfield has executed a Memorandum of Understanding and a Cooperative Agreement with Caltrans and has established a collaborative team of affected partners in a centralized office in Bakersfield. This team consists of representatives from the City of Bakersfield, the County of Kern, Caltrans and a management consultant, Parsons Corporation. Known as the Thomas Roads Improvement Program (TRIP) in honor of Congressman Thomas, the program consists of several individual projects in four primary corridors in Bakersfield: 1) Beltways, 2) the Centennial Corridor Loop, 3) State Route 178 and 4) Rosedale Highway (currently State Route 58). Although it is not part of the SAFETEA-LU earmark, the 8.2-mile Westside Parkway is also being administered under TRIP, because it connects to and is part of the larger transportation system and is part of the backbone of the TRIP program. Summary of Progress to Date Westside Parkway • $168 million in funds are on hand, including $45.2 million augmentation from the CTC • Right-of-way acquisition is 90% complete • Design contracts are underway • First contract moving to construction beginning in late 2008 • Second contract moving to construction in late 2008 or early 2009 Related Construction Project Schedule • STATE ROUTE 178/Farifax Avenue interchange ($45 million) is out to bid — in construction this summer • STATE ROUTE 99/7" Standard Road interchange ($25 million) will be out to bid this fall. The above referenced bids total $238 million in construction that will be issued in the near term. Progress/Status Report Page 2 Environmental and Design Contracts • With federal approval, ready to award contracts for environmental planning and design for Rosedale Highway, State Route 178/ Morning Drive interchange, State Route 178/Oak Street interchange, Centennial Corridor South and Westside Parkway • $29 million in environmental and design contracts The TRIP team established a centralized office that includes engineering staff from the City's Public Works Department, the County's Road Department, Caltrans District 6 and Parsons, the management consultant. Now located at 900 Truxtun Avenue, the office has a combined staff of 25 engineers and planners working together in a collaborative effort to expedite project delivery. The use of "over — the-shoulder" reviews and the anticipated delegation this summer of environmental authority from FHWA to Caltrans will allow projects to move quickly into construction. Overview of Activities The Westside Parkway Although it is not funded under the SAFETEA-LU earmark, the Westside Parkway is being administered and managed under TRIP. The Parkway, when completed, will be an 8.2 mile, east- west freeway from Allen Road to Truxtun Avenue. The City of Bakersfield is the lead agency for the Westside Parkway and for its environmental document under the National Environmental Protection Act (NEPA). A major milestone occurred in January of this year when the No Significant FA issued a Finding of reimbursement) to proceed. With the ficant Impact (FONSI) for the Westside Parkway. Issuance of the F HW is critical because it allows final design and right-of-way acquisition (with federal FONSI in hand, the City immediately initiated design of the Westside Parkway, awarding design contracts to Dokken Engineering and DMJM-Harris for Mohawk Street and the Westside Parkway. The Westside Parkway is being funded primarily under the State Transportation Improvement Program (STIP), which is administered by the California Transportation Commission (CTC). The TRIP staff, with the assistance of local legislators, has been aggressively pursuing STIP "Augmentation" funds, and as a result, CTC has approved additional $45.2 million in SUP funds for the Westside Parkway. It is estimated that this will allow construction of the Parkway from Truxtun Avenue to Coffee Road. The TRIP team is continuing to develop staging and funding plans to allow continued construction of the Westside Parkway from east to west, first from Truxtun Avenue to Calloway Drive and then on to Allen Road. • Mohawk Street — Rosedale Highway to Truxtun Avenue. This project will extend Mohawk Street over the Kern River between Truxtun Avenue and Rosedale Highway and will include an interchange with the future Westside Parkway. Construction will begin in the fall of 2008. • Westside Parkway — The first portion of the new Westside Parkway will include the portion from Truxtun Avenue to Coffee Road or perhaps Calloway Drive, with the above-mentioned interchange with Mohawk Street. Construction will begin in early 2009. Unc�omin4 Construction Projects Construction will begin this summer on the first of the TRIP projects, the STATE ROUTE 178/Fairfax Road interchange. This project will construct a grade-separated interchange between Fairfax Road and STATE ROUTE 178 and will include a 1-mile easterly extension of the STATE ROUTE 178 freeway in northeast Bakersfield. Final design of this project has been approved by Caltrans, right-of-way Progress/Status Report Page 3 acquisition has been completed, and utilities have been relocated. The City is the lead agency during construction and has advertised the project for construction, with bid opening set for late June 2007. Groundbreaking ceremonies are expected to occur in late summer. Construction is scheduled to be completed in 2 years. Following this, construction bids are expected to be opened later this summer for the State Route 99/7th Standard Road interchange and grade separation project, where the County of Kern is the lead agency. This project includes widening and improving the existing 7th Standard Road/State Route 99 interchange and the construction of a grade separation over the adjacent BNSF railroad tracks. Groundbreaking ceremonies are expected in the fall of this year and construction is expected to be completed in 2 years. The remaining TRIP projects will go into construction as soon as possible after approval of the environmental document and completion of final plans. Environmental Documents and Desi n Projects in TRIP are in one of three stages of project development: preliminary engineering/ environmental approval, final design, or construction. The City and the County, with approval of the FHWA, will be entering into remaining federally-reimbursable contracts with planning and engineering consultants for each project. In anticipation of FHWA approval this summer, the TRIP team is currently negotiating engineering contracts that will total approximately$29 million for: Rosedale Highway Environmental Document(ED)/Final Design — HNTB Associates State Route 178 Morning Drive Interchange ED/Final Design — Psomas Associates State Route 178/Oak Street— ED/Final Design - RBF Consulting Centennial Corridor South — Environmental Document— HNTB Associates West Beltway— ED/Final Design — Parsons Brinkerhoff Program Management Following mobilization and the selection of initial engineering consultants, the TRIP team undertook a comprehensive review of the proposed projects and their probable costs. Recently experienced highway construction cost increases, coupled with the need to consider inflation in futur e construction year contracts, indicated that full construction of the proposed projects will require funds from supplemental sources. The City Council of Bakersfield, on May 23, 2007, adopted a nine-point program to generate those supplemental revenue sources. They include an increased transportation development fee locally which can be bonded if necessary, supplemental developer mitigation, future State Transportation Improvement funds and advocacy of a local transportation tax measure, among other sources. The Financial Plan has been submitted to FHWA for review and approval. The FHWA had five initial questions, which we are now responding to. As part of the ongoing Program Management effort, the TRIP team has undertaken numerous studies and developed the overall management program. Among the project management activites completed: • Prepared concept cost estimates for each of the TRIP projects, for use in conjunction with the Financial Plan. These concept level estimates will be refined during planning and design as plans are developed. Progress/Status Report Page 4 • Reviewed and updated the Kern COG 2030 traffic model for use in the design of TRIP projects • Prepared a Procedural Manual for Environmental Document Preparation, which will be a guideline for environmental consultants preparing documents for TRIP. • Prepared Technical Procedures for the preparation of plans, specifications and estimates. These policies will serve as guidelines for design consultants. • Prepared preliminary geometric layouts for the Centennial South Project. Several alternative alignments are under consideration. • Developed the Right of Entry environmental work for projects where itowi will be necessary cto enter privateepropert for biological and wetland-related studies. property • Prepared a drainage study for the South Beltway for use in preparing specific plan lines for the new highway. This will facilitate the establishment of a General Plan line for the South Beltway. • Pursued additional funding sources for several projects in Metropolitan Bakersfield, including State Route178, Rosedale Highway and the Westside Parkway. • Prepared the Monthly Status Report that provides a detailed report on project progress and project cost. With the passage of Assembly Bill 1858, portions of State Route 58 (Rosedale Highway), State Route 178 and State Route 204 can be relinquished by Caltrans to the City of Bakersfield or the County of Kern. In removing a State Route designation, it is expected that the roadway can be constructed to City or County standards, which would require less right-of-way and would involve an expedited review and approval process during both the environmental and design phases. Negotiations are ongoing between Caltrans District 6 and the City of Bakersfield and the County of Kern regarding relinquishment of the three routes. Next Steps The TRIP team is committed to expediting project delivery in every way Possible. environmental phases of projects, the team will work closely with agency and consultant staff to minimize review cycles and review time. In the design phase, over-the-shoulder reviews will eliminate the need to pass comments back and forth and will expedite the approval process. The next steps include: • Moving forward with consultant contracts for preliminary engineering, environmental documents, final plans and construction management. Total contacts to be awarded: $50 million. • Implementing the City's positive action plan to address funding and planning issues. Specifically, this will include working closely with the CTC staff and commissions to secure all Possible STIP funding, as well as pursuing additional state and federal funding sources. Such programs include the State-Local Partnership Program, the Trade Corridor Improvement Program and the Public Lands Highway Discretionary Program. FAMENTC) CA �18 34 ��` !'ti,6 5! AC,a Al �;�2 A,304 PUBLIC E"LOYMENT 11-,1 VIC C ANO RETIREMENT 105 VICE CHAR .,ALASf--r--D CA 933C,9 RULES C,44--, ARPROPRIA-,IONS GOVERNMEN'r MOE)ERNIZATION ACCOUNTABILITY TRANSPORTATION&HOUSING SENATE SFI-t(-T 1rnMM,T-TEE,,,,, DEFENSE AEROISPACE NOUSTRY CHAIr, F,L+ruary 26, .2007 SENATOR ROY ASHBURN kls- Marian Bergeson EIGHTEENTH. SENATE DISTRic r C I(" 11 201N Street Sacramento, CA 95814 Dcar Chairperson Bergeson, am writing to express my concerns regarding the California Transportation Commission's recent staff recommendations for the first Y of program funding relating to the Corridor Mobility Improvement Account(C"MIA), Prop.I B. y ()I*tilt thirty-three recommendations tentatively selected tinder the Congestion Relief Cate or}, ,-III projects emanate from either Southern or N' Saari J()atluill Valley has been selected orther'California. Currently, no project from the tinder the Congestion Relief Category. Improving,cant traffic lon It' one of the fastest growing areas of the state and nation complies with the provisions set forth in the Highway Safety, Traffic Reduction, Air Quality,and Port Security Bond Act of 2006, %vIloleheartedly agree with Cjoverno prtject�,, that 11, r SchIw3rzCnc99Cr that the CTC consider other high priority y meet the objectives Of the CIMA program I,c t i ccxlly, I urge yo fir re-consideration 'be 14"idefli'19 ql'Roule 58(Roseej,,41e 11i4,h1 i"ay)ftOmfOu"to six lanes between Allen ROW and R""I" 9f)i)l the Cilv oJ'Bahrsfieid. The om ission of this critical Route 58 project has been exacerbated by the fact that a recent Kern,County Hwy. 99 improvement project did not make the list of projects eligible for the S I billion dollars available in SR 99 Bond Program Funding, despite having higher priority rating over other projects on the Caltrans project list. The Route 58 Rosedale l4wv. project clearly,meets the bond criteria of performance il"'PI'Ove'llents to the stale highway system that relieve Congestion by expanding capacity, while enhancing Operations and improving travel times within high congestion corridors. Additionally, substantial supplemental federal funding is already secured for the pircJect. Prop.I R calls upon the CTC. to ensure that the program is geographically balanced and I ask that YOU consider the transportation needs of the San Joaquin Valley in an equitable manner. Thank Y01-1 lbr.your attcntlon to bond oversight as %ve address the state's future transportation challenges. tiei regards, 'I- Ro-v Ashburn � Vy r. 4 p +, cd bA Q dpi' Qi RS m m O (1) >, � b — o A V= D o3 � � � � boo &OW c m tZ O tx Cd 40. C m > c O 4 Cd pV U P. M � 9 M ED bbL-0 o Cd ct O cc f. 4-4 RS VV+ •'. p �° 0 �+ F. bA C JO w J C Ct C's t 0 Z cz uz >d o d c� cc O � � �� --.-4. p � oo �, > Rs O $::.Lccd RI V y V R< 7:1 o � W a> m .. '�' Q "� c� •��." „v' N y�" Cd� V o 4ce1 t�• 'O A � > E- Uo� � 0 4 U ° r. F-{ 0 M cc O z Q Z O U KERN COUNTY WASTE MANAGEMENT DEPARTMENT • Daphne B.Harley, Director 2700"M"Street,Suite 500 Bakersfield,CA 93301-2372 (661)862-8900 (800)552-KERN(option 6) Fax:(661)862-8905 June 12, 2007 http://www.co.kern.ca.us/wmd/ Alan Tandy, City Manager City of Bakersfield 1501 Truxtun Avenue Bakersfield, CA 93301 Dear Mr. Tandy: SUBJECT: Adjustment to Land Use Fees, Gate Fees and Bin Fees This letter is just a reminder of the notice sent to you in September 2006 regarding the increase in the County's main revenue sources for the solid waste system. These revenue sources are the Land Use Fee, Gate Fee and Bin Fee. The Land Use Fee is charged on the tax roll for residential properties in the County. As a result of this fee, there is no additional charge at a landfill or transfer station for disposal or recycling of normal household trash. The Gate Fee is charged on a per ton of waste basis at landfills or transfer stations for all non-residential waste and other chargeable items, such as tires, dead animals, camper shells or construction and demolition material from any source. The Bin Fee is charged for non-residential waste on a per container volume basis. As mentioned in the September letter, the public hearing before the Kern County Board of Supervisors on the increases was scheduled for December 12, 2006. On that date, the Board of Supervisors approved an increase in the Land Use Fee from $66.00 to $70.00 per unit per year for one to four unit parcels and from $53.00 to $56.00 per unit per year for a five or more unit parcel. The Board also approved increasing the Gate Fee from $36.00 per ton to $38.25, and increasing the Bin Fee from $1.90/yard to $2.00/yard. All of the approved fee changes are effective July 1, 2007. Please remind your accounting staff of these changes. If you have questions concerning these changes, please feel free to contact me at (661) 862-8998. Sincerely, DAPHNE B. HARLEY, Director �By: Thomas F. McCutcheon Special Projects Manager I:\CLERICAL\LETTERS\2007\07-33 TFM_rsl.doc cc: Raul Rojas, Public Works Director Kevin Barnes,Solid Waste Director ADM-City-BAK Winner of local, state and national awards for innovation and efficiency. B A K E R S F I E L D Department of Recreation and Parks Date: May 30, 2007 To: Alan Tandy, City Manager From: Dian66400ver, Director of Recreation & Parks Subject: Jastro Pool Report The Jastro Pool report is attached. It includes a summary of everything staff has done to address the leak problems at the pool. The report also provides options to what staff can do to remedy the situation, at least temporarily. More costly, but permanent solutions are also provided. Also included are: Pictures of the leaks found to date The full report from Aquatic Design Attendance figures from the past two years "We create a quality community through people, parks and programs" JASTRO POOL MAY 29, 2007 Jastro Pool, located on Truxtun Avenue in Jastro Park, is currently being assessed for the source of major leaks. Toward the end of 2006 pool season, Jastro Pool was losing about 32,000 gallons of water a day. In 2005, the pool closed for two weeks to repair leakage due to water loss of 20,000 gallons per day. That repair was more temporary than we had originally hoped for, and the search for the main cause of the leak began in January of 2007. The following is a summary of the various actions staff has taken to get to the source of leakage: 1. Standard Leak Test. A standard leak test was the first test conducted and consists of shutting off all pumps and placing a cylinder into the pool. The water in the cylinder accounts for evaporation loss. In a 24-hour period, the water level dropped over 20 inches below the water level in the cylinder indicating a water loss greater than 32,800 gallons per day. The pumps were not operating during this leak test. The test was done on two separate occasions, and after each test, the Pool would have only 2inches remaining in the bottom after 72 hours. 2. Video Camera Test: The second test was using a video camera from the sewer department to visually assess the lines into the pool. The return lines were not able to be videoed due their size and significant corrosion. The video did show cracking and deterioration in the gutter system, corrosion in the main drain lines, and severe deterioration in the sumps for each main drain. 3. Dye Tests• Dye tests were then conducted with a scuba diver to confirm the main water loss points. This test consists of a scuba diver spraying dye near the identified leak points to determine the flow of water. Once the dye was released, it was pulled into 4 return lines and both drain sumps. This showed that the majority of water loss was through the return lines. 4. Drillin- Next, staff excavated next to the pool deck in selected locations to find the main source of the leak. The drilling tool used would drop 2-3 feet into caverns in some locations indicating that there were large empty spaces in different areas around the pool. 5. Aquatic Design Assessment• Staff then contracted with Aquatic Design, recognized experts in pool structures, to provide an assessment of the pool leakage problem. The report summarizes the leak problem in the following paragraph from page 4 of the Aquatic Design Report: "The water leaks noted above appear to be coming from various sources in the pool system. It may be prudent to have additional destructive testing conducted to take core samples of the pool shell at the pool cracks to determine the exact extent of the pool shell failure if the existing pool shell is to be reused in a pool renovation. At a minimum all of the pool piping should be replaced. The pool inlets should be replaced at the same time. This will require that pool deck be removed and replaced to provide access to these pipes." He estimates the pool renovation costs, in its existing shell and condition, to be about$650,000, but that estimate does not include extra soft costs such as contractual agreements. To fully repair Jastro pool, according to Aquatic Design would be about one million dollars. (Full report from Aquatic Design is attached). 6. Air Pressure Test: Staff then tested the return lines by forcing air pressure into them. The lines would not hold pressure, indicating damage somewhere in the lines. 7. Excavation: Even after all these tests, we still did not have a clear picture of where all that water was going, and what was the major source of the leaks. Public Works staff then began major excavation work around the perimeter of the pool, first exposing the entire west wall (the deep end). Not finding major water damage or extremely wet soil, water was then put into the pool to see if there were air bubbles. Water seemed to be traveling out of the expansion joints, and a few other pool cracks, so the excavation targeted the center of the pool deck areas, digging the full depth of the pool. Finally, water was gushing out of the pipes in these locations at high rates. (Pictures attached). NEXT STEPS: If the pool is to be operational in 2007, the following steps would need to be taken: a. Excavate the entire deck. b. Replace all the piping around the pool and the main line into the pool from the pump house. c. Determine if the pool shell will be able to hold the water for the summer by boring into the sides. d. Replace all decking and fencing prior to opening. e. Estimated costs with staff doing the majority of the work,plus using existing concrete contractor: $50,000. f. Estimated time frame,pending no other major structural findings: 30 days. This would put us in the middle of the swim season, with only four or five weeks remaining for pool use in 2007. g. These repairs listed are only temporary fixes; more permanent ones are outlined in the report from Aquatic Design. JASTRO POOL ATTENDANCE: Jastro pool has experienced major attendance decreases since McMurtrey Aquatic Center opened in 2004. Jastro Pool was closed during the 2004 pool season, and reopened for about eight weeks in 2005 to a total attendance of 1,002. In 2006, it opened as an instructional pool only, increasing attendance to 2,152. Its close proximity to McMurtrey hinders attendance as a general swimming pool, but does provide space for an instructional pool, especially for private and semi-private lessons. (Attendance charts attached). ALTERNATE USE: City staff from both Recreation and Parks and Public Works Departments are doing everything they can to make Jastro Pool a functional, workable pool. It was built in the early 1960's with metal pipes which do not mix with chemically treated water over time. It no longer meets the current Health codes for public pool operation; however, the Kern County Health Department is willing to work with us to grandfather in existing conditions if we choose to open again. Jastro Park pool is an excellent location for a Wet Playground, otherwise known as a Spray parks. The basic water supply is there, with restrooms available. The five existing wet playgrounds at Beale, Planz, MLK, Wayside and Jefferson are very well attended each day. At any given time at these various sites, there are usually 25-40 kids, depending on the time of day. The Spray parks operate from early April to late October, providing seven months of free, daily water play for area children and families. Hours of daily operation are from l O:OOAM to 8:OOPM. Lifeguards are not needed due to no standing water in the wet play areas. Vandalism at these Spray parks has been minimal due to their high use and popularity. Staff has been able to install these wet playgrounds for about $225,000, including costs of the structures. If a contractor is hired to install them, the cost would be about $350,000. CONCLUSION: Jastro Pool could be made into a working pool with staff doing most of the remedial repairs. These repairs would be temporary fixes by replacing the pipes going into and around the pool. In doing these remedial repairs, further pool damage may be discovered, thus making the repairs more costly and time consuming. Staff will also seal the existing cracks in the floor and walls of the pool, but again, this is only a temporary fix. The repairs do not address making the pool and bathhouse accessible or meeting current standards for water turnover rates, as referred to in the Aquatic Design report. Attendance at Jastro pool has declined in the two years it's been open since McMurtrey Aquatic center opened to the public. A long term solution that is cost effective is converting it into a spray park which operates seven months each year, not fenced in, and is ADA accessible. Staff is ready to proceed with either option: temporarily repair Jastro Pool as it is, or convert into a Spray park. Attachments: Pictures of water leaks, Aquatic Design Report and Attendance reports JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT I.I AQUATIC DESIGN GROUP ASSESSMENT 1.2 Introduction This report summarizes the architectural assessment of the Jastro Park swimming pool and its related equipment. This assessment is based upon the conditions that we were able to observe, and staff information provided. As-built plans of the pool were not available for this review. No destructive testing has been conducted to determine the as-built conditions of the pool complex. Destructive testing and evaluation are outside of the scope of this report. Without destructive testing the structural viability of these components cannot be ascertained. 1.3 Scope I visited the Jastro Park swimming pool in Bakersfield, California to perform an assessment of the existing swimming pool. The swimming pool was drained and not open for use during my visit. The Jastro Park pool is a rectilinear outdoor pool. The Pool is classified as a public swimming pool as defined by California State Administrative Code Title 24, Chapter 31 B. The California Health and Safety Code Title 22, Uniform Fire Code Article 80, California Building Code Chapter 31 B also apply to this pool. The code required bathrooms are provided in an adjacent building and are excluded from the scope of this report. This building also houses the swimming pool mechanical and chemical equipment. This report is commissioned by the City of Bakersfield. During my site visit I met with City staff. The following report is a summary of the existing conditions, code violations, deficiencies and proposed improvements for rehabilitation of the Jastro swimming pool. The scope of this report includes the swimming pool, pool deck area, and pool mechanical equipment, but excludes the structural integrity of the pool shell and mechanical spaces. It also excludes handicap accessibility in path of travel to the pool and within the bathhouse. The architecture of the pool area buildings and locker rooms are not included in the scope of this report. This report identifies any conditions that do not comply with current codes that were found. Some of these conditions may currently be operating on a grandfathered exemption. It is important to note that though some grandfatherable exemptions by the County Environmental Health Services department may allow the pool to legally operate in non-compliance of current Title 24 and other standards, but that the liability of any health and safety risks to the public may still remain. We therefore recommend that these issues should be reviewed on an individual basis for determination of disposition and possible remedy for each violation. Certain violations of the State Administrative Code may be due to deterioration and material failures in which the code requires that these violations be rectified immediately or the facility is to be shut down. Other violations may be due to modifications to the code over the years. Providing that the violation is not deemed an immediate health or safety risk the Environmental Health Department may allow the violation to exist as a "grandfatherable condition". These grandfathered conditions are normally allowed to exist until such time as when the facility is having work done in which the scope of the work will allow for the violation to be remedied. If such work were going to take place then the Environmental Health Department would demand that the violation be brought into compliance. AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 1 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT In addition to the code violations being of concern to the Environmental Health Department they can also be of concern to the City's Risk Manager as well. If a facility is in violation of the current State Code the liability exposure alone may warrant the remedy of the violation. Given the subjective nature of the interpretation of the code, violations that may be deemed a grandfatherable violation at one point may not be allowed at another time or by a different inspector. 1.4 Facility Data The Jastro pool is reported by staff to have been constructed in the early 1960's. The swimming pool is 75-feet long and 35-feet wide. The pool has water depths ranging from 3-feet to 5-feet. The pool is a poured in place concrete construction. The pool has a painted finish. It has a perimeter scum gutter and two floor drains for water recirculation. The pool floor has expansion joints that run the entire perimeter of the Pool floor separating the floor from the pool wall. An additional expansion joint divides the pool floor in half. Wall inlets near the bottom of the pool walls are utilized to introduce the filtered pool water back into the pool. The pool lacks ADA accessibility. The pool has two sets of walk-out stairs and both sides of the shallow end and two sets of recessed steps and grabrails at the deep end as means of egress from the pool. The pool does not have any underwater lights for night use of the pool. The pool is in relative close proximity to the City's newest aquatic facility, the McMurtrey Swim Center. 1.5 Programming The staff reports that the Jastro swimming pool was operating as a seasonal pool. The pool is reported to be used primarily for swim lessons and introduction to water classes. Staff also reports that there have been some discussions of some joint use of the swimming pool with the school district. Unfortunately the Jastro swimming pool lacks adequate depth to support typical high school swimming programs and uses. With a shallow end depth of 3-feet the pool is not deep enough for competitive swim flip turns. The deep end depth of 5-feet is not deep enough for racing platform dives into the pool. The National Federation of State High Schools requires a minimum of six lanes for a high school swim meet. These lanes must be a minimum width of seven feet. The Jastro pool at 35-feet wide is not wide enough to support a high school swim meet. The pool is also too small and too shallow to support high school water polo. The only high school programs the Jastro pool can support is physical education classes for shallow water and some lap swimming. From a high school stand point the problem with having swimmers train in a pool such as the Jastro pool is that the swimmers will not be conditioned to then compete in a regulation size pool and therefore will not be able to compete. For the City's swim lesson plan the existing Jastro pool can be used. The pool doesn't have as much walk-in stair area as is generally preferred for this type of programming. The pool also does not have any amenities to support much in recreation swimming, though this may be able to be supported by the McMurtrey pools. 1.6 Operational Issues The staff reports that they have conducted a cylinder test of the pool and determined that the pool is leaking twenty inches of water in a 24-hour period. With a surface area of 2,625 square feet every inch of water in this pool represents 1,636 gallons of water. AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 2 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT A 20-inch daily water loss then equates to 32,725 gallons of water. With a total volume of 75,750 gallons the pool is loosing about half of its water daily due to water leaks. The City has conducted several other tests to try to determine the source or sources of the water leaks. These tests have included video camera inspections of the pool piping, dye tests of visible pool structure cracks and expansion joints, and excavation around the outside of the pool at certain locations. Based upon these tests the conclusion is that the pool has numerous sources of pool water leaks. The problem areas leading to some of the identified leaks include the following: • Expansion joint leaks in the pool shell • Pool shell crack leaks • Gutter systems crack leaks • Gutter piping leaks • Pool return piping leaks The pool gutter is also reported to be out of level, which would indicate some settling of the pool structure or surrounding soils. Some of the excavations around the pool have also found areas void of soils under the pool deck and around the pool shell. 1.7 Pool Deck and Appurtenances The pool is surrounded by a natural concrete decking. Portions of the pool deck have been removed to provide access for the water leaks tests. After viewing the exposed concrete sections the pool decking does not appear to have substantial reinforcement to prevent differential movement or failures. If the pool piping is to be replaced to solve some of the pool leaks the entire pool deck will have to be removed and replaced. 1.8 Pool Mechanical The pool mechanical equipment is located in a small bathhouse adjacent to the swimming pool. The original pool mechanical equipment has been replaced. A gas fired heater was also added to the pool mechanical system. The pool water is filtered by a Pentair brand two tank Triton TR-140 high rate sand filter system with a total media surface area of 14.12 square feet. There pool water is pumped via a centrifugal pump. The pool heater appears to be worn and in need of replacement. The city staff reports that the pool recirculation flow rate is between 150 to 180 gallons per minute. To meet the current code requirement of a six hour turnover rate the pool water flow rate needs to be 211 gallons per minute. The pool water chemicals are stored in the same area as the pool mechanical equipment. 1.9 Non- Code Compliant Conditions The following are conditions found that do not comply with current code standards. If the pool were to be renovated or repaired there is a chance that the local environmental health authority will require that all non-compliant conditions be brought into compliance. I. Pool water leaks. 2. Pool gutter out of level. 3. The perimeter fence is a 2" chain link fabric. 4. Pool turnover rate. 5. Swimming Pool walk-out stairs lack contrasting color per code. 6. Pool perimeter fence. AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 3 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT The water leaks noted above appear to be coming from various sources in the pool system. It may be prudent to have additional destructive testing conducted to take core samples of the pool shell at the pool cracks to determine the exact extent of the pool shell failure if the existing pool shell is to be reused in a pool renovation. At a minimum all of the pool piping should be replaced. The pool inlets should be replaced at the same time. This will require that the pool deck be removed and replaced to provide access to these pipes. In addition the pool gutters should be removed and replaced. The pool expansion joints should be removed and replaced to eliminate them as a potential water leak. Underwater lights could be added at this time if desired to support night use of the pool. The pool will also have to be refinished as part of this type of project. The Pool pump will need to be replaced if the pool is to provide the code required 6-hour turnover rate. 1.10 Maintenance I. The pool heater needs to be replaced. 2. The pool chemicals should be stored in an isolated area. 1.11 Existing Pool Renovation Opinion of Probable Costs LINE ITEMS ITEM DES- IPTION SZTY ESTIMATE 1.9.0 CODE COMPLIANCE 1.9.1 Replace pool expansion joints Lump Sum $ 70,000.00 1.9.2 Repair pool shell cracks Lump Sum $ 45,000.00 1.9.3 Replace pool gutter Lump Sum $ 1 10,000.00 1.9.4 Replace underground pool piping Lump Sum $ 65,000.00 1.9.5 New mechanical room piping Lump Sum $ 8,400.00 1.8.6 New pool circulation pump Lump Sum $ 2,500.00 1.9.7 New pool finish Lump Sum $ 75,000.00 1.9.8 New perimeter fence mesh Lump Sum $ 15,000.00 1.9.9 New pool inlets Lump Sum $ 18,000.00 1.9.10 New pool deck Lump Sum $ 156,420.00 1.9.1 1 New pool grabrails and handrails Lump Sum $ 12,000.00 1.9.12 TOTAL CODE COMPLIANCE $ 655,900.00 1.10.0 MAINTENANCE&OPERATIONS 1.10.1 New pool heater Lump Sum $ 26,000.00 1.10.2 New chemical storage area Lump Sum $ 50,000.00 1.10.3 TOTAL MAINTENANCE AND OPERATIONS $ 76,000.00 AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 4 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT PROFORMA EXISTING POOL RENOVATION PROJECT OPINION OF PROBABLE COST ITEM DESCRIPTION TY ESTIMATE 1.9.0 CODE COMPLIANCE 1.9.1 Replace/repair pool expansion joints Lump um 1.9.2 Repair pool shell cracks p $ 70,000.00 Lump Sum $ 45,000.00 1.9.3 Replace pool gutter Lump um 1.9.4 Replace underground piping p $ 1 10,000.00 Lump Sum $ 65,000.00 1.9.5 New mechanical room piping Lum Sum P $ 8,400.00 1.9.6 New pool recirculation pump Lump Sum $ 2,500.00 1.9.7 New pool finish Lump Sum $ 75,000.00 1.9.8 New perimeter fence fabric Lump Sum $ 15,000.00 19.9 New pool return inlets Lump Sum $ 18,000.00 1.9.10 New pool deck Lump Sum $ 156,420.00 1.9-11 New deck grabrails and handrails Lump Sum $ 12,000.00 1.9.12 TOTAL CODE COMPLIANCE $ 577,320.00 1.10.0 MAINTENANCE&OPERATIONS 1.10.1 New pool heater Lump Sum $ 26,000.00 1.10.2 New chemical storage area Lump Sum $ 50,000.00 1.10.3 TOTAL MAINTENANCE AND OPERATIONS $ 76,000.00 1.1 1.0 SOFT COSTS 1.1 1.1 General Contractor Mark-up 15% $ 97,998.00 1.11.2 Contingency 15% $ 97,998.00 1.1 1.3 Architectural&Engineering 12% $ 78,398.40 1.1 1.4 Tests& Inspections 1.1 1.5 Acceleration (Annual Rate) 1 8% $ 6,533.20 1.1 1.6 TOTAL SOFT COSTS $ 52, 0 $ 333,193 1 93..20 2.1 1.0 TOTAL PROJECT COST $ 986,513.20 AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 5 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT 1.12 Replacement Pool Opinion of Probable Costs The following is an estimate to replace the existing pool with a new pool of the exact same size and configuration as the present one. This option assumes that the pool is a skimmer surface water collection system in lieu of a perimeter gutter. ITEM DESCRIPTION QTY ESTIMATE 1.12.0 CONSTRUCTION COSTS 1.12.1 Demolition&Disposal Lump Sum $ 70,000.00 1.12.2 New pool&mechanical equipment Lump Sum $ 393,750.00 1.12.3 New pool decks Lump Sum $ 156,420.00 1.12.4 New perimeter fence fabric Lump Sum $ 15,000.00 1.12.5 Chemical storage area Lump Sum $ 50,000.00 1.12.6 TOTAL CODE COMPLIANCE $ 685,1 70.00 2.12.0 FF& E COSTS 2.12.1 Deck Equipment Lump Sum $ 26,000.00 2.12.2 TOTAL MAINTENANCE AND OPERATIONS $ 26,000.00 3.12.0 SOFT COSTS 3.12.1 General Contractor Mark-up 15% $ 106,675.50 3.12.2 Contingency 15% $ 106,675.50 3.12.3 Architectural&Engineering 12% $ 85,340.40 3.12.4 Tests& Inspections 1% $ 7,I 1 1.70 3.12.5 Acceleration (Annual Rate) 8% $ 56,893.60 3.12.6 TOTAL SOFT COSTS $ 362,696.70 4.12.0 TOTAL PROJECT COST $ 1,073,866.70 AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 6 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT 1.13 Expanded Replacement Pool Opinion of Probable Costs The following is an estimate to replace the existing pool with a new pool that has six lanes to meet the minimum needs of the City and High School programs. This assumes a six lane pool that is 45-feet wide by 75-feet long with a set of walk-out stairs. This estimate assumes a continuous gutter pool configuration. ITEM DESCRIPTION OTY ESTIMATE 1.12.0 CONSTRUCTION COSTS 1.12.1 Demolition& Disposal Lump Sum $ 70,000.00 1.12.2 New 6-lane gutter pool&mechanical equipment Lump Sum $ 603,750.00 1.1 2.3 New pool decks Lump Sum $ 156,420.00 1.12.4 New perimeter fence fabric Lump um P $ 15,000.00 1.12.5 Chemical storage area Lump 1.12.6 TOTAL CODE COMPLIANCE p um $ 50, 0 $ 895,170.00 1 70..0 00 2.12.0 FF& E COSTS 2.12.1 Deck Equipment Lump 2.12.2 TOTAL MAINTENANCE AND OPERATIONS p um $ 26,000 $ 26,000..0 00 3.12.0 SOFT COSTS 3.12.1 General Contractor Mark-up 15% $ 1 38,175.50 3.12.2 Contingency 15% $ 1 38,175.50 3.12.3 Architectural& Engineering 12% $ 110,540.40 3.12.4 Tests&Inspections 1% $ 9,2 1 1.70 3.12.5 Acceleration (Annual Rate) 8% $ 73,693.60 3.12.6 TOTAL SOFT COSTS $ 469,796.70 4.12.0 TOTAL PROJECT COST $ 1,390,966.70 AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 7 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT 1.15 EXHIBITS The following are pictures to document the conditions noted above. Figure I Figure 2 Jastro Park Existing Pool Jastro Park Pool Site -A'g' v r , r }d , Figure 3 Figure 4 Pool Wall Inlets and Cracks Pool Expansion Joint and Crack f r a� Figure 7 _ Figure 8 Existing Disabled Lift and Deck Pool Gutter Cracks AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 8 of 9 JASTRO PARK EXISTING SWIMMING POOL ASSESSMENT r 1 Figure 9 Figure 10 Excavation and Outer Pool Shell Excavation and Outer Pool Shell Figure I I Figure 12 Pool Deck Removal Pool Deck Removal AQUATIC DESIGN GROUP MAY 2007 JASTRO PARK BAKERSFIELD,CALIFORNIA Page 9 of 9 JASTRO ' • • ATTENDANCE • - - 11 11 11 11 11 . Re c. Swim 2,713 3,200 - 463 Swim Lessons 1,160 1,912 250 1,340 Program Swim 564 1,714 - 289 812 Total 4,437 6,826 1,002 2,152 * School pool parties increased Program Swim attendance in 2003 * Jastro was closed in 2004 for the opening of McMurtrey * Jastro was closed 24 days during the summer for maintenance in 2005 Number of Patrons y yC / CP o cn CD n - - 9 7 o 0 E S / ? ? 0 0 « — y 2 a \ 0 0 0 0 0 0 0 0 0 0 C = T * 0 0) o y o ^ C- / \\ D o \ \. / / CD � � 0 @ cr $ ® (D a COD + 2 = 0 7 / % \ o / o = 2 0 yN 0 § e / E / y o ' 0 \ . ? ` ƒ C)q -0,1 \ - ƒ % _ / O ® � o ?k k m & o - a aT \ m u : ƒ / # CD k a N CL / CD / q � ) 0 2 ' E ƒ o k 0 2 o 0) 0) mi ® k 2 / 7 C CD � 4 - " o ' t c y IN O , � x o � a d x N b � , � C ro � x �n x b 0 a x ro z 0 ors vr' t co c c y x r trJ C �1 cn cn Co kkv x h7 H :U Z O G� d [rJ y c x ro o ro c� r� x U. • rrj x ro 0 h w dr ' oe g M� t �� a� 4 t b t y t�7 ' ro n ro n n a x, C r 0 0 t � uV x: B A K E R S F I E L D Department of Recreation and Parks Date: June 13, 2007 To: Alan Tandy, City Manager From: Dianne Hoover, Director of Recreation & Parks Subject: May Monthly Report ADMINISTRATION • Dianne and Allen Abe met with representatives from Kern High School District and Greenfield Schools to discuss possible field usage. • Continued to monitor soccer playing in small, neighborhood parks • Park reservations and attendance continues to be higher than last year by about 30% • Grand Opening of Solera Gardens Park occurred on Thursday, May 22"d with Mayor Hall and Councilmember Weir in attendance. • The City accepted 3.4 acres into maintenance, and entered 2.9 acres into a one year maintenance period. PARKS MAINTENANCE • Completed repairs to playgrounds at Jefferson Park and Castle Park. • Replaced twelve toilets at Silver Creek with stainless steel ones. • A total of 114 trees were planted throughout the city in May. • Over 183 shrubs and 945 groundcover plants were installed at various locations. • New Park Supervisor Il, Mike Kelly, started in late May. Mike was previously the Director of Parks and Recreation in Tehachapi. • Filling of fulltime vacancies became a priority, and several promotions of existing employees occurred as well. • Tree crews continue to trim, raise and remove trees as needed. "We create a quality community through people, parks and programs" • Eighty graffiti requests were made, and 174 requests to repair vandalism were turned in. The majority of the vandalism is irrigation related. AQUATICS: • Attendance at McMurtrey continues to increase over the same time last year by 91%. Totals this May were 7,854; in 2006 it was 4,106. • Special events in May included the Spring Splash Carnival with over 800 in attendance. The event offered free swimming, demonstrations of various classes being offered, aquatic family games, and sign ups for summer lessons and programs. • Many guests at the Spring Carnival said it was their first visit to the complex and that they would return. • School pool parties also increased by over 100%. All pool party times are booked for the rest of the summer. • The 100 mile club has 283 members now, with two of them reaching the 500 mile mark. • McMurtrey opened on Memorial Day weekend with a record attendance of 1,141 guests. In 2006 the weekend had a total of 651. • All 5 spray parks are now open from 9:OOAM to 8:OOPM due to popular demand; previous hours opened at 10:OOAM, but kids would be lined up ready to play before ten, so we now open at 9:00. • Recruitment and training of over 120 lifeguards, pool managers, coaches and coordinators was completed in May. ATHLETICS: • Kern Trophy continues to provide trophies for 1St and 2"d places in our softball program at no cost to the City. Over 30 trophies are donated in the spring league. • There are over 2,000 players and spectators each week in the program. • Summer softball has an increase of ten teams over the same time last year for a total of 110 teams. Games are played each night at Planz, Wayside, Patriots, MLK and Beach parks. • T-ball was held at Silver Creek for ages 5 to 7. • Pee Wee sports introduce kids 3 to 5 to several sports such as soccer, basketball, and t-ball. Each child receives a multi-sport certificate. • Partnering with the Ice Center, we are now offering Adaptive ice skating for those with disabilities. The program received lots of publicity and is beginning to fill up. • "League of Dreams" T-ball is for those with disabilities and was a very successful partnership with Terrio Kids and Therapy Fitness. • June programs will include Beale Band concerts, Softball Tournaments, Adaptive Tennis and skating, and more sports clinics for kids of all ages. "We create a quality community through people, parks and programs" SILVER CREEK CENTER: • The After School program ended in late May with participants creating a health and fitness video. • Rentals were high in May due to school parties, with over 2200 in attendance. • Sign ups for summer programs kept everyone busy with over 1,500 served in the office. Total attendance was 5,686. Dr. MARTIN LUTHER KING JR. CENTER: • Total attendance was 4,010 which include all programs and rentals. • Two Movies in the Park were held in May: one at Wayside Park and one at Jastro Park. Wayside had about 60 in attendance due to the cold, windy weather that night. Jastro had over 500 participants. Several articles in the paper, including a front page spread highlighted our Movies in the Park series. • A dance recital was held for the dance program at MLK and was very well received. The program will return in the fall. "We create a quality community through people, parks and programs" i weal wims 1004:)s LAH cc co r� en Jolem do enb kill g O O N CD LO OO W N V/Nco Lo T N � c) (0 LO U') M LO N cn rn Ln v to c, � M co M N N N n T cn 4 N wdoc:g r r N '� O O O tp tt> O O T uadOE:g N co ° cY) �t N M �t � rte„ r t a` wdzt ^ t\ O r T (h tfy r-- t0 • . . N CO CO cn LO CO (O h r-, V M ! wdOE: NNNpN � NNNNCO NOTr00 Nr— ,— tp c) N () (7 c`') N (� C le wdOE:S O wdOE:9° Lo co r- ao rl - p r- co r� (D r, _ It T N N N ,-- N N N CO N N � co 00 O CO • ' Ct O T N O N C\' N in N ('') O CY) n cn .-- r� N N N *- N M O WOOD:�i N N N * N co f') N N N ch N c) N N N N N V . lllBOE:rS T A N N 0 cO r 4? M O 04 Page 1 of 2 STREETS DIVISION — WORK SCHEDULE WEEK OF JUNE 18 — JUNE 22, 2007 Resurfacing/Reconstructing streets in the following areas Reconstructing streets in the area between Panama Lane and Pine Castle Avenue, Stine Road and Summerfield Drive Resurfacing streets in the area between Planz Road and Wilson Road, east of Stine Road. Miscellaneous Streets Division projects: Continue working on the storm line installation project on Benton Street, between Wilson Road and Belvedere Avenue. Continue working on the curb and gutter installation project (CDBG funded) in the area between Flower Street and 178 Highway, Alta Vista Drive to Kern Street. Continue working on the curb and gutter installation project in the area between California Avenue and 4th Street, Union Avenue and "P" Street. Installing curb, gutter and sidewalk on the south side of Casa Loma Drive, west of Lotus Lane. '\DO'UME-1\RKIRKW-1\LOCALS-1\Temp\XPgrpwise\Week of June 18,2007.Work Schedule.doc Page 2 of 2 STREET SWEEPING SCHEDULE Mondav, June 18, 2007 Between Panama Lane and Panama Road, Stine Road to 99 Highway. Tuesday, June 19, 200_7 Between Wilson Road and Stine Road, Ming Avenue to White Lane. Between District Boulevard and Panama Lane, Gosford Road to Ashe Road. Ashe Road and Stine Road, Panama Lane, north to the railroad tracks. Cul-de-sac between Manley Court and Chris Court, north of Angela Way. _Wednesday, June 20 2007 Between White Lane and Panama Lane, Buena Vista Road to Old River Rd. Between Old River Road and Gosford Road, White Lane to Pacheco Road. Between College Avenue and Willis Avenue, Morning Drive to Park Drive. Thursday, June 21, 2007 Between Stockdale Highway and White Lane, Gosford Road to Ashe Road. Between Ming Avenue and White Lane, Ashe Road to Wilson Road. Friday, June 22, 2007 Between Stockdale Highway and Ming Avenue, Allen Road to Old River Road. Between Old River Road and Gosford Road, Ming Avenue and White Lane. Between Brundage Lane and E. Belle Terrace, Union Avenue to Cottonwood Road. Between Union Avenue and Cottonwood Road, Casa Loma Drive to Watts Drive, Between Oswell Park Drive and Brundage Lane, Oswell Street to Leeta Street. Between Brundage Lane and Zephyr lane, Oswell Street to Calle Del Sol. CADOCUME-1\RKIRKW-1\LOCALS-1\Temp\XPgrpwise\Week of June 18,2007.Work Schedule.doc O� ,C�A , BAKERSFIELD POLICE MEMORANDUM ✓'�ARY it • c�L,F 0 Date: June 11 , 2007 To: Alan Tandy, City Manager JUN 7 From: W. R. Rector, Chief of Police Subject: Special Enforcement Gang Violence Report I have enclosed the Special Enforcement Unit's monthly report for May, 2007. Please call if you have any questions. W R R/vrf Bakersfield Police Department Special Enforcement Unit Monthly Report — May 2007 The following is a compilation of the performance of the Special Enforcement Unit and significant incidents / investigations for May 2007. 105 Felony Arrests 14 Guns Seized 66 Supplemental Reports 33 Misdemeanor Arrests 519 FI's 94 General Offense Felony Warrant Reports 16 Arrests 30 Citations 15 Vehicle Reports 25 Misdemeanor Warrant 507 Probation and Parole Arrests Searches 4 Search Warrants Hrs. Assisting Other 3 2007 Shootings 33 Hours In Training 700 Department 9 2006 Shootings Sections 12 2005 Shootings 10 2004 Shootings Year to Date Statistics January — May 2007 495 Felony Arrests 76 Guns Seized 312 Supplemental Reports 294 Misdemeanor Arrests 2272 FI's 575 General Offense Felony Warrant Reports 93 Arrests 271 Citations 145 Vehicle Reports 171 Misdemeanor Warrant Probation and Parole Arrests 2218 Searches 36 Search Warrants Hrs. Assisting Other 24 2007 Shootings 204 Hours In Training 2751 Department 20 2006 Shootings Sections 37 2005 Shootings 30 2004 Shootings SEU DAILY ACTIVITY 5/1/07 — Tuesday— 1700-0300 SEU Officers arrested the following suspects: Larry Witzig, 60, 2/4/46, from 2400 White Ln, arrested for possession of meth for sales, transportation of meth, conspiracy, and destruction of evidence. Kevin Reed, 35, 3/1/71, from 2400 White Ln, arrested for possession of meth for sales, transportation of meth and conspiracy. Diana Witzig, 29, 6/25/77, from White Ln / Hughes, arrested for a felony warrant. 5/2/07 — Wednesday — 1200-0300 SEU Officers arrested the following suspects: David Razo, 49, 2/5/57, from 1216 Monterey St, for possession of meth for sale and maintain a residence for narcotics. Lorena Gonzalez, 33, 7/3/73, from 1216 Monterey St, for loitering for purpose of narcotic activity. Anthony Rodriguez, 43, 5/11/63, from 1216 Monterey St, for possession of paraphernalia and loiter for narcotic activity. Desiree Cantu, 20, 12/26/86, from 1216 Monterey St, for possession of a controlled substance for sale and loiter for narcotic activity. 07-91832, Serial: NL220622, New England Firearms, shotgun, 12 gauge, 3949 Soranno #D 5/3/07 — Thursday — 1200-0300 SEU Officers arrested the following suspects: 5/4/07 — Friday— 0800-0300 SEU Officers arrested the following suspects: Guillermo Martinez, 25, 7/6/81, from Bernard at Alta Vista, for being an unlicensed driver and passing over yellow line (cited) 5/5/07 — Saturday — 0800-0300 SEU Officers arrested the following suspects: Donald Maynor, 18, 6/22/88, from the 700 block of V St, for possession of paraphernalia and false ID or a real person. Elias Castaneda, 26, 3/6/81, from 1415 Truxtun Ave, for robbery, participation in a criminal street gang and conspiracy. Aaron Ford, 32, 6/9/74, from 205 Clyde, for a felony warrant. Timothy Humphrey, 23, 6/8/83, from E. California/Beale Ave, for a misdemeanor warrant (cited). 5/6/07 - Sunday- 0800-2400 SEU Officers arrested the following suspects: Samuel Turner, 33, 3/29/73, from the 800 block of S. Union, for possession of cocaine. Paul Montes, 21, 1/7/85, from the 200 block of Pacheco, for a misdemeanor warrant. Albert Lashaul, 20, 8/3/86, from Monterey/ Inyo, for violation of parole. Robert Emile, 35, 2/14/72, from 714 S. Haley St, for discharge of a firearm. Robert Ray, 56, 6/8/50, from 901 E. California Ave, for possession of paraphernalia and heroin. Jessie Wallace, 48, 4/10/58, from the 900 block of Cannon, for a misdemeanor warrant (cited) from the 1000 block of Monterey St, for ADW- pipes, bats and conspiracy. from the 1000 block of Monterey St, for ADW - pipes, bats and conspiracy. 15, 6/20/91, from the 1000 block of Monterey St, for ADW- pipes, bats and conspiracy. 15, 6/2/91, from the 1000 block of Monterey St, for ADW - pipes, bats and conspiracy. 14, 9/10/92, from from the 1000 block of Monterey St, for ADW- pipes, bats and conspiracy. Jorge Grajeda, 18, 2/19/89, from the 1000 block of Monterey St, for ADW- pipes, bats and conspiracy. Dionisio Martinez, 19, 8/14/87, from the 1000 block of Monterey St, for ADW - pipes, bats and conspiracy. Joe Lopez, 18, 5/4/89, from the 1000 block of Monterey St, for ADW- pipes, bats and conspiracy. Edgar Mendoza, 18, 11/25/88, from the 1000 block of Monterey St, for ADW - pipes, bats and conspiracy. 5/7/07 - Monday- 0800-0300 SEU Officers arrested the following suspects: Adam Flores, 21, 6/5/85, from the 1000 block of Miller St, for resisting arrest. Robert Porter, 28, 4/14/79, from 2342 S. M St, for resist/obstruct/delay an officer. Gabriel Vasquez, 19, 9/22/87, from Kentucky St/ Haley St, for driving on a suspended license, possess a blank check, possess stolen property and possess counterfeit money. Kevin Vaughn, 25, 2/14/81, from 2342 S. K St, for violation of parole. Dawayne King, 21, 11/14/85, from Haley/ Kentucky, for violation of parole. 12, 5/8/94, from 1201 40th St#106, for robbery and participation in a criminal street gang. Jose Lopez, 27, 10/6/79, from the 1200 block of E. 18th St, for conspiracy, participation in a criminal street gang, gang member possess a loaded firearm, serial number obliterated and driving on a suspended license. Alejandro Gutierrez, 21, 9/21/85, from the 1200 block of E. 18th St, for conspiracy, participation in a criminal street gang, gang member possess a loaded firearm, serial number obliterated. George Lopez, 23, 7/11/83, from the 1200 block of E. 18th St, for conspiracy, participation in a criminal street gang, gang member possess a loaded firearm, serial number obliterated. Michael Pasillas, 26, 5/2/80, from the 1200 block of E. 18th St, for conspiracy, participation in a criminal street gang, gang member possess a loaded firearm, serial number obliterated and CCW. Jorge Romero, 22, 6/23/84, from the 1200 block of E. 18th St, for conspiracy, participation in a criminal street gang, gang member possess a loaded firearm, serial number obliterated, felon possess ammo, felon possess firearm. 07-96262, No serial, Charter Arms, revolver, .38, from 1208 E. 18th St 5/8/07 — Tuesday— 1700-0300 SEU Officers arrested the following suspects: Francisco Ramirez, 29, 3/16/78, from Old Pine/Virginia, for probationer in possession of a firearm and participation in a criminal street gang. Gun Seized: 07-96888, Serial: 864720, Charco, 5 shot revolver, .38, from Old Pine / Virginia 5/9/07 — Wednesday — 1200-0300 SEU Officers arrested the following suspects: 5/10/07 — Thursday — 1200-0300 SEU Officers arrested the following suspects: 5/11/07 — Friday SEU Officers arrested the following suspects: Neal Scheidemantel, 20, 10/5/86, from 2701 Ming Ave, for robbery and parole violation. burglary. 17, 1/14/90, from 922 S. Williams, for possession of stolen property and vehicle burglary. 16, 4/11/91, from 922 S. Williams, for possession of stolen property and vehicle Jeremy Parks, 24, 3/10/82, from 1100 Union Ave, for a felony warrant. Kenneth Chatman, 28, 9/17/78, from the 2200 block of Chester Ave, for public intoxication. Terry Brown, 20, 3/20/86, from 300 Bill Ave, for a misdemeanor warrant. Michael West, 22, 9/4/84, from 300 Bill Ave, for driving on a suspended license, no registration, and no insurance. Debra Barrios, 51, 12/15/55, from the 600 block of 28th St, for unlicensed driver, false tab, no proof of insurance and unregistered vehicle (Cited) 5/12/07 — Saturday — 0800-0300 SEU Officers arrested the following suspects: 14, 2/9/92, from 1100 Niles St, for resist/ delay officers. license. 17, 8/20/89, from E. 10th / S. Robinson, for Assault with a deadly weapon and no Darrell Williams, 23, 11/18/83, from 901 E. California, for spousal abuse, criminal threats, burglary and participation in a criminal street gang. Tony Sickler, 18, 9/12/88, from the 4900 block of Oswell Park, for possession of a deadly weapon, burglary tools, vandalism tools and participation in a criminal street gang. _ and conspiracy. 17, 5/24/89, from the 4900 block of Oswell Park, for robbery, burglary, 17, 1/16/84, from Oswell / E. Brundage, for a misdemeanor warrant. 5/13/07 - Sunday - 0800-0300 SEU Officers arrested the following suspects: Ryan Graham, 19, 3/25/88, from Oleander Ave / California Ave, for criminal threats and participation in a criminal street gang. Anthony Garcia, 23, 11/20/83, from Lawson St, for a misdemeanor warrants and VC charges. (Cited) Miguel Rodriguez, 19, 6/15/87, from the 1300 block of Virginia Ave, for suspended license and expired registration. 5/14/07 - Monday - 0800-0300 SEU Officers arrested the following suspects: Gustavo Trujillo, 20, 11/20/86, from Kentucky St/ Webster, for a felony warrant. Andre Page, 31, 7/7/75, from Murdock / MLK, for committing a felony while on bail, possession of marijuana for sale and participation in a criminal street gang. Kevin Smith, 29, 2/27/78, from Murdock/ MLK, for public intoxication. 17, 10/1/89, from 3100 Pioneer, for being an unlicensed driver, stop sign violation, no insurance and false id. Christopher Luque, 34, 10/2/72, from the 400 block of Easter, for a misdemeanor warrant. Jose Espinoza, 21, 10/8/85, from N Baker/ Goodman, for misdemeanor warrants. Luis Flores, 27, 1/10/80, from the 2500 block of Lake St, for possession of a controlled substance and obstruct/ resist officers. 16, 7/16/90, from the 1800 block of Madison, for strong arm robbery and active participation in a criminal street gang. Thomas Christopher, 44, 8/28/62, from 619 31st St, for a felony warrant. Wesley Griffin, 24, 8/14/82, from the 1100 block of MLK Blvd, for petty theft with priors. Robert Ruano, 34, 9/29/72, from Mt. Vernon / Oregon, for excessive music and stop light violation. (Cited) Obie Chris, 28, 8/3/78, from Murdock / MLK, for a misdemeanor warrant. (Cited) Odell Smith, 37, 11/17/69, from Murdock/ MLK, for a misdemeanor warrant. (Cited) Eric Wright, 42, 10/18/64, from Murdock/ MLK, for a misdemeanor warrant. (Cited) 2/21/89, from the 900 block of Mt. Vernon, for excessive music. (Cited) Lyndia Herring, 51, 1/6/56, from the 200 block of MLK, for a misdemeanor warrant. (Cited) 5/15/07 - Tuesday - 0800-0300 SEU Officers arrested the following suspects: Reynaldo Santana, 21, 7/26/85, from 815 Martin Luther King Jr Blvd, for GTA, possess a stolen vehicle and conspiracy. Benjamin Bravo, 24, 10/3/82, from 815 Martin Luther King Jr Blvd, for auto theft, possess a stolen vehicle, participation in a criminal street gang, suspended license and conspiracy. Bobby Moore, 20, 11/19/86, from the 1500 block of Orange St, for possession of cocaine base for sales and participation in a criminal street gang. Jaime Wandick, 19, 11/1/87, from 1415 Truxtun Ave, for false info to an officer of a real person and a misdemeanor warrant. Michael Mannings, 22, 6/25/84, from MLK/ E. 10th, for parole hold. Latorrance Hodges, 30, 11/4/76, from 100 Flower, for a misdemeanor warrant. Joel Brandon, 19, 10/20/87, from the 200 block of Texas St, for suspended license and brake light out. (Cited) 5/16/07 - Wednesday - 1200-0300 SEU Officers arrested the following suspects: Derrick Williams, 37, 10/20/69, from the 1500 block of E. 10th for criminal threats. Quentin McBride, 24, 10/2/82,from the 500 block of Taylor for a misdemeanor warrant. Alton Henry, 23, 2/9/83, from the 500 block of Taylor St, for a misdemeanor warrant. 5/17/07 - Thursday - 1200-0300 SEU Officers arrested the following suspects: 5/18/07 - Friday - 0800-0300 SEU Officers arrested the following suspects: Robert Collard, 23, 8/31/83, from Pacheco / S. Union Ave, for possession of a dangerous weapon. Joey Barnes, 28, 8/18/78, from 533 Price St, for possession of a stolen vehicle, GTA, conspiracy, commits an offence while on bail and gang participation. 16, 12/29/90, from the 2300 block of Gage St, for curfew violation. 17, 3/24/90, from the 2300 block of Gage St, for curfew, resist/ delay officers and minor possess tobacco products. Thomas Flemmons, 18, 6/9/88, from 200 Rexland Dr, for possession of burglary tools, possess a stolen vehicle, GTA, possess a shaved key, conspiracy and gang participation. Rosanna Balderas, 22, 9/9/84, from Hayes / Wilkins, for GTA, possess a stolen vehicle, gang participation and unlicensed driver. Tony Hartsell, 42, 10/13/64, from the 3000 block of Union Ave, for a suspended license, false tabs, unregistered vehicle and no insurance. Erik Franco, 27, 5/25/79, from the 10 block of Clyde St, for a misdemeanor warrant. (Cited) Kimberley Thomas, 41, 12/20/65, from the 3300 block of Shellmacher, for possession of marijuana. (Cited) Clifton Thomas, 45, 4/15/61, from the 3300 block of Shellmacher, for possession of narcotic paraphernalia. (Cited) 5/19/07 - Saturday - 1200-0300 SEU Officers arrested the following suspects: Whitney Wandick, 19, 5/1/88, from 1017 6th St, for possession of cocaine base for sale, conspiracy and gang participation. Latwanna Hardie, 36, 7/15/70, from 1017 6th St, for possession of cocaine base for sale, conspiracy, gang participation and maintain a residence for narcotics. Ira Jones, 21, 4/13/85, from 1017 6th St, for possession of cocaine base for sale, conspiracy, and gang participation. Gary Clayton, 28, 9/21/78, from 1017 6th St, for possession of cocaine base for sale, conspiracy, and gang participation. Stephen Fonseca, 29, 3/21/77, from the 900 block of Valhalla, for possession of narcotic paraphernalia. Dorian Deleon, 28, 9/22/78, from 1300 New Stine, for resist/ delay officers, gang participation, felon possess a firearm, gang member CCW, gang member possess a loaded firearm, possess a non-registered firearm, felon possess ammo, possess a stolen firearm, and possess a firearm on school campus. Pedro Rivera, 23, 11/29/83, from Lake St/ Miller St, for possession of burglary tools, unlicensed driver and no front plate. Rodrigo Cruz, 22, 7/4/84, from Lake St/ Miller St, for possession of meth, transportation of meth, and possession of paraphernalia. Brian Perez, 18, 6/23/88, from 610 McCord, for possession of paraphernalia. (Cited) Gun Seized: 07-105744, Serial: BRS372US, Glock, .40 caliber pistol, from 1300 New Stine. 5/20/07 - Sunday - 0800-0300 SEU Officers arrested the following suspects: Patrick Aguilar, 37, 7/27/69, from Flower St/ Virginia, for possession of heroin and paraphernalia. Dennis Holder, 24, 3/27/83, from the 1500 block of West Dr, for felon possess a firearm, CCW, gang member carry a loaded firearm, loaded non-registered firearm, felon possess ammo, conspiracy, participation in a criminal street gang, received stolen property and violation of parole. Charles Wells, 25, 11/19/81, from the 1500 block of West Dr, for CCW, gang member carry a loaded firearm, loaded non-registered firearm, conspiracy, participation in a criminal street gang and receive stolen property. 15, 8/9/91, from the 1500 block of West Dr, for gang member carry a loaded firearm in public, conspiracy, participation in a criminal street gang, CCW by a gang member, CCW, receive stolen property, minor possess a concealed weapon and ammo. Jerry Gray, 28, 10/30/78, from the 1500 block of West Dr, for CCW, gang member carry a loaded firearm, loaded non-registered firearm, conspiracy, participation in a criminal street gang and receive stolen property. Derrick Mackey, 28, 7/21/78, from the 1500 block of West Dr, for felon possess a firearm, CCW, gang member carry a loaded firearm, loaded non-registered firearm, conspiracy, participation in a criminal street gang, and receive stolen property. Tommy Moten, 19, 9/28/87, from the 1500 block of West Dr, for felon possess a firearm, CCW, gang member carry a loaded firearm, loaded non-registered firearm, felon possess ammo, conspiracy, participation in a criminal street gang and receive stolen property. Edgar Rodriguez, 19, 1/6/88, from the 1400 block of Quincy, for possession of meth, no front plate, unlicensed driver and possession of paraphernalia. Felipe Hernandez, 24, 8/13/82, from the 100 block of E. Terrace Wy, for possession of marijuana for sale, unlicensed driver, unsafe movement, stop sign violation, seatbelt violation and no front plate. Evangelina Garcia, 40, 11/29/66, from 1300 1/2 Quincy St, for a felony warrant. Inoscencio Delgado, 20, 3/14/87, from the 2100 block of Kentucky St, for possession of meth and paraphernalia. Gun Seized: 07-106680, Serial: HH009990, Gardner, revolver, .22, from 1518 West Dr. 5/21/07 - Monday - 0600-0300 SEU Officers arrested the following suspects: Noe Mora, 19, 12/26/87, from the 1200 block of Haley St, for resisting officers and no light on bike. 14, 2/8/93, from 1215 Feliz for CCW and gang participation. Gustavo Vasquez, 18, 12/8/88, from the 1200 block of Feliz, for public intoxication. 15, 2/10/92, from the 1200 block of Feliz, for obstructing / resisting officers. Pablo Gonzalez, 26, 8/9/80, from the 3000 block of Kentucky St, for possession of meth, possession of paraphernalia and no bike light. Paul Wright, 38, 7/6/68, from Sumner / Baker, for misdemeanor warrants. (Cited) 5/22/07 — Tuesday — 1700-0300 SEU Officers arrested the following suspects: Gilbert Robles, 30, 8/10/76, from 2206 Gage St, for possession of meth for sales, maintain a residence for narcotics and participation in a criminal street gang. Christobal Juarez, 53, 2/25/83, from 2206 Gage St, for violation of parole. Steven Barron, 18, 10/16/88, from the 2600 block of S. Union Ave, for a misdemeanor warrant. (Cited) 5/23/07 — Wednesday— 1200-2200 SEU Officers arrested the following suspects: Zeno Vigneault, 29, 7/6/77, from 3205 Leonard St, for a felony warrant. Daniel Loveless, 21, 4/1/85, from Palm / H St, for reckless discharge of a firearm, CCW - firearm, carry loaded firearmin public, carry a non-registered firearm and possess metal knuckles. Victor Tores, 18, 1/26/88, from Palm / H St, for CCW - firearm, carry a loaded firearm in public, carry a non-registered firearm, conspiracy and obstruct/ resist officers. Gun Seized: 07-109040, Serial: T568257, RL, .22 caliber revovler, from Palm and H St 5/24/07 — Thursday— 0700-0300 SEU Officers arrested the following suspects: James Flowers, 53, 11/19/53, from the 900 block of Pacheco, for possession of cocaine and paraphernalia. Gun Seized: 07-109699, Serial: 86663, High Standard, .22, semi-auto, from 4309 Lantados 5/25/07 — Friday — 0800-0300 SEU Officers arrested the following suspects: Derrick Milton, 19, 4/16/87, from the 500 block of MLK Blvd, for no plates, no CDL and no insurance. Angel Larios, 27, 10/11/79, from 1700 Lincoln St#8, for possession of paraphernalia and a parole hold. 5/26/07 — Saturday — 0800-0300 SEU Officers arrested the following suspects: Ernesto Gutierrez, 24, 3/21/83, from 701 Knotts St #C, for possession of methamphetamine and possession of paraphernalia. Eric Madrigal, 27, 9/25/79, from 701 Knotts St #C, for possession of PCP. Jeremy Lewis, 25, 7/1/81, from the 1500 block of California Ave, for resisting and fighting in public. Cecil Blont, 23, 5/24/83, from 709 Kentucky St, for having a suspended license, no insurance and window obstruction. 5/27/07 - Sunday - 0800-0300 SEU Officers arrested the following suspects: Antonio Valdez, 26, 8/5/80, from 720 Terrace Way #11, for UTI and parole violation. Leopoldo Barrios, 24, 1/30/83, from 4th St/ L St, for a felony warrant. Omar Mora, 20, 7/25/86, from E. Truxtun / Kern, for possession of meth. Charles Hopkins, 33, 11/29/73, from 120 L St, for false ID to an officer. Victor Rosales, 23, 8/26/87, from E. Truxtun / Kern, for being an unlicensed driver, no insurance and inoperable brake light. Anthony Hamen, 24, 6/9/82, from 134 S. Owens, for a felony warrant. Ruben Cervantes, 24, 7/31/82, from 134 S. Owens, for possession of methamphetamine. Jose Calistro, 28, 8/23/78, from 4259 Columbus, for carjacking, ADW - firearm, felon possess firearm and obstruct/ resist officers. Arnold Pineda, 21, 2/11/86, from 4259 Columbus, for carjacking, ADW - firearm and obstruct/ resist officers. Guns Seized: 07-112038, Serial: D572406, Rossi, pistol, .38, from 3719 K St 07-112560, Serial: N416285, Titan Tiger, pistol, .38, from 4259 Columbus 5/28/07 - Monday - 0800-0300 SEU Officers arrested the following suspects: Johnny Ward, 19, 4/3/88, from 617 Watts, for probationer possess a firearm, felon possess firearm, possess loaded firearm, felon possess ammo and gang participation. Ricky Johnson, 18, 8/31/88, from 1024 Washington, for assault with a deadly weapon, terrorist threats and commit a crime while out on bail. Adam Barrios, 21, 3/10/86, from the 1300 block of Cheatham, for auto theft and possess a stolen vehicle. Rayshawn Stubbs, 24, 7/6/82, from the 600 block of Eye St, for a misdemeanor warrant. Jose Marroquin, 21, 5/14/86, from 1101 Union Ave, for a misdemeanor warrant. Manuel Camacho, 22, 7/26/84, from 1101 Union Ave, for unlicensed driver, false info, expired registration, false tabs, parole violation and no insurance. Manuel Camacho, 25, 6/24/81, from the 1100 block of Pershing, for resist/ obstruct officers and parole hold. Billy Collins, 25, 5/4/81, for misdemeanor warrants. (Cited) Gun Seized: 07-112592, Serial: 691599, Charter Arms, .38 Special, from 617 Watts Dr. 5/29/07 — Tuesday — 0900-0300 SEU Officers arrested the following suspects: Jesse Taylor, 31, 6/30/75, Niles / Miller, for misdemeanor warrants. Pedro Arambulo, 27, 9/10/79, from 1107 Lincoln St, for felony evading, violent resist an officer, drive on a suspended license and unsafe vehicle movement. Vincent Rodriguez, 40, 3/18/66, from MLK / E. 9th, for a felony warrant. Guns Seized: 07-113768, Serial: KD428139, Taurus, revolver, .357, from 1112 Dobrusky Dr. 07-113768, Serial: 70BS14745, Colt, semi-auto, .45, from 1112 Dobrusky Dr. 07-113985, Serial: K119209, Kimber, semi-auto, .45, from the 3800 block of Soranno Ave. 5/30/07 — Wednesday— 1200-0300 SEU Officers arrested the following suspects: Cory Collins, 29, 7/21/77, from 1110 4th St, for violation of parole. 5/31/07 — Thursday — 1200-0300 SEU Officers arrested the following suspects: Marquise Carr, 18, 6/16/88, from 20 Williamson Way, for a felony 187 warrant. officers. 16, 3/22/91, from 5201 Monitor, for curfew violation, park curfew and resist/ delay officers. 14, 8/14/92, from 5201 Monitor, for curfew violation, park curfew and resist/ delay B A K E R S F I E L D 41 00 J MEMORANDUM TO: Alan Tandy, City Manager FROM: Stanley Grady, Development Servicgs Director DATE: June 13, 2007 SUBJECT: Re: Kentucky Street Cleanup Referral# 1767 F ouncilmember Benham requested staff to investigate conditions on the 1400, 1500 and 1600 locks of Kentucky St. which need cleanup due to tumbleweeds, trash and grocery carts. Code Enforcement went out to Kentucky St. and found in the 1500 and 1600 blocks there was tumbleweeds and multiple shopping carts all over the neighborhood. Code Enforcement notified the CART Retrieval Service, and they will have the carts removed this week. We have contacted Luis Peralez in Public Works Dept. and we will have a crew go out on Saturday to abate the tumbleweeds. 1 f B A K E R S F I E L D Z��J MEMORANDUM June 11, 2007 TO: Alan Tandy, City anager �4i__�- FROM: Maurice Randall, Business Manager THROUGH. Florn Core, Water Resources Manager SUBJECT: CALIFORNIA WATER SERVICE Council Referral No. 001753 (Ward No. 2) During the City Council meeting of May 9, 2007, Council Member Benham requested assistance by staff regarding an e-mail from Stephen Montgomery concerning California Water Service's poor practice of leaving excessive locator marks for their meter boxes and not cleaning up after repairs and maintenance on city streets. Staff contacted California Water's district manager Timothy Treloar regarding Stephen Montgomery's e-mail concerning their poor practices related to marking streets and clean- up while making service related repairs. Cal Water contacted Mr. Montgomery and provided the following information: They explained to the customer that they typically use a chalk type paint that only last a few months. The reason that they use that type of paint to mark their facilities is because it's required by law. They further explained that what may seem as excessive marking is an effort to prevent damage to water pipes and to minimize disruption in service to customers. They apologized to Mr. Montgomery for leaving a bit of a mess at the site and thanked him for bringing the meter box lid to their attention. Cal Water met with their crews and reminded them that it isn't company practice to leave a mess at street repair sites or old lids lying around. Finally, they explained to the customer that streets in Bakersfield may seem to get marked on a lot but that is strictly because there is a lot of construction work occurring here in town. B A K E R S F i E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: June 11, 2007 SUBJECT: DEVELOPMENT STANDARDS ON TAFT HIGHWAY Referral No. 1766 COUNCILMEMBER COUCH REQUESTED THAT STAFF EXPLORE THE CONCEPT OF ESTABLISHING DEVELOPMENT STANDARDS ON TAFT HIGHWAY WHICH ARE SIMILAR TO THOSE DEVELOPMENT STANDARDS APPROVED FOR SEVENTH STANDARD ROAD. Staff could develop a similar standard for Taft Highway as was developed for Seventh Standard Road. It should be noted that there are many new developments already approved along the Taft Highway alignment between Gosford Road and Wible Road. Those already approved developments did not require additional landscape improvements to be provided. Therefore, retrofitting additional landscape would be problematic. Given the above, an enhanced standard can still be developed for the remainder of those areas not yet developed. Staff will prepare a map of the area that indicates which developments have already been approved to determine the possibility of applying this new standard. z z z z z z v 0 0 CD CA UI W _ O O O n Q = O (D 0 p (�D (D 0 CAD O 0 o Q (�D 0 CL n 77 O X '� CD ( Q n (D Q O � W o � �, 0 � 0 00 0 " 0 0 G) , 3 00 (° go o O CD CD0- cD (D 0 ((D ° cJ � CD om � � (D N 0 0 �' CD O CD < :3 5• T � O (D Cc 71, CD 0 � � Q (n (D(D CD 3 -n n O (D _0 O (D 3 _. A� Cn -< CD Sy — O n (0 0 w (n CD 19 wu Cs CD CD :D m - cn y <c CD O 0 J CD O G O O S (OD O T ro O (D C) ° 0 w O O -0 0' -n Q o °o n. — - o 0 C CD - 0 (D 'O -. 0 Sll w � v O � moo o N0 Q° (D � (D C 'mv (D -t (nc� <CD � � m 0 < 5• 0 mD O (D -t , n C7 CD c :7 (n O CD (D _ O Ni (D 00 :' a CD Z m Q (n 7 = me CD CD �, v (1) cn O O _0 _0 _0_0 o o Z M O O o o N 3 3 3 3 3 3 m 3 3 3 3 3 3 'a m O O 0 0 0 0 0 Q CD Z U) n 0 =7 CD CD (D CD CD CD CD Q 0- sz Q n 0 n 0 C/) o 0 w CD cn O O O 0 3 0 3 z z z z z z z D v O O O O O o 1 co J N W N _` p .� 0' v � 0 � 0 (D � � m p � o icon � � M `< (D = 70 0 U) s �* o O J o � c c s � (n O O 3 ( Q C- CD� < cD � � � o � � � � � c �' p n O cc (D w T 0 -T. CD —77 CD CD W N O W = � (D a J = (n `< (D (D O= O CD � o � c moo o � cc mm o � o -.� m Z' = (D (D 0- _, -0 _ 0 0 o o o 0 a, < o � 0 o — _' � 0 o 0 0 ° 0o(D Z3 70-. Q w 0 c (0 w W < 0 -u 0 cn cQ a o zT o o CD zT O c 0- c U) ° c cn r � ono �, � oD (Q (D � Q w o m n o w :u -,I -� o x ccn O ((D n u0i (n 0 2 p .� — 0 J0 -' 0 Z3 (D (D a 3 O n (D Qo ZY 00 _ (D CD O w 0 -0 a JJ O 7. CD CD (D U) ((n (D (D cn (A (D 70 0 lD a 0 O O O � O O 0 (n (n cn N cn o (D 0 O (D (D cD N 3 CD CD (D cD cD (D 3 3 0 0 0 A� 0 a a Q Q Q Q c ¢' sv sv sv n n 0 � n w n n n 2 00 pp 0 m 0 O O w CD (D O N o c c = c r_ 0 o � n 3 ' �D C' A z z z z z z z D v O o 0 0 o O o a) N CD �D O Cc) OD Ul U)« .. o' v 0- 00 (-"D' o oho _0 Q � � o aoo � o 7p CD C7 0 0 C C M -� n C f� C n cz C- 3- < �` - Q W 0 Q �7 W CS CD 1 Q O Q. c u> 0' w — � — o — Cn � CP CD o o < � c� � C,J — 0 � — = CD Q Q CD ((D c (D (D :3� cQ O 3 CD — o o w" 3. CD w O Z3 CD rt P CD CD CD � o � mQ� � oo � Q � a - � - = Cl) 0 n Q p O W 0 Q Q N CD ° -0 C/) r. m w o w CD W W 0 o c ° �CD O O cQ CD � :3 CD CD o 0 cncn2) - o ° o — o C Z3 cn w CD cnQ � O � ° ,, (O — (a 0— (a oQ : o CD � cn �' c � � -,1 2) 0Q0 ;7CD0 CD 0 � o 0 CD _ CD cn O m Sv �' < O D cQ o ° ° s O 3. CQ O CD c°n O (D C cQ 0 n. w n sv CD m D ° CD o CD(D 0- CD -D 0 � w CD . 0 CD CD CD '" U) o r cn a) 7 Q 0 CT — po CD CD 0 N O O CD O CD � (n cn U) cn (D Q CAD N "O _0 -a "O -a 3 "" 3 O O O O O U Q CZ U) UUi Uri UUi f(n 0 o 0 o CD CD CD (D CD r Q c 3 3 3 3 o O o O o cQ < S0 Q Q Q Q Q t= c c c c 90 p 3 3 3 � cD CD 0 0 o 3 (D CD CD rn m CD Q Q. Q Q Q n n n n n 0 cD O 0 sv CD CD ¢� 0 0 O 0 n _ _ Q 3 m cD z W 3 s 3 1 Ct) 2 2 0 D \P P \ _ �• � ° 5.� ■ / k_0 - = \ \ 2 C \ / � = Q 2 0- § \ \ \ / � } @ m / oz3 $ \ m/ O o = --I m % 5 = _ \ § ZT 0 k = . m C = a / \ = q 2 — m $ 2 ƒ k ® D o 0 \ (a ° o _0 @ \ s / � 3 ® m _ \ -T (D \ :3 I o zr _ ~ _ / o o § 7 \. g / a / I ƒ $ § 2 7 � J ƒ \ ? o \ / (D k 7 7 \ ƒ ¥ ). o 0 \ 2 = (D a m CD J 2 ) $0- / / \ % % 7 / f f \ \ 3 g w m � 0 O � m � m m o (D I a / = c _ = n g 7 m § a @ � 0 ........ "0000000010..x........................B A K E R S F I E L D JUN 13' 2007 Department of Recreation and Parks Date: June 13, 2007 To: Alan Tandy, City Manager From: Dian"rveQr—, Di rector Subject: RESPONSES TO QUESTIONS/REQUESTS FROM CITY COUNCIL FOR FY 07-08 BUDGET PRESENTATION The following are the responses to the City Council questions raised during the department budget presentation. Attached are additional materials and reports for further clarification and/or information. Questions/Requests Attachments (if applicable) No. 1 Would like to know who should be contacted in the Recreation & Parks Department about areas with landsca ng that needs to be improved. Response Please contact: to No. 1 Dianne Hoover, Director, 326-3014, or Allen Abe, Assistant Director, 326-3138 Northwest Corner of Calloway& Olive: Please refer to Public Works response. River Run Blvd: A large portion of the ground cover and shrubs were damaged by the big freeze. Much of the dead material has been removed and staff continues the removal to this date. Staff waited to give some of the freeze-damaged plant material a chance to re-grow. Unfortunately, a large portion of it has not come back to life. A dead Alder tree has already been removed and is scheduled for replanting in Fall '07. The replanting of ground cover in the area should be completed by July 20, 2007. No. 2 Would like more information on the cooperative efforts regarding tree planting and maintenance between PG&E and the City as a development builds out. Response The City of Bakersfield, Recreation & Parks Department P, G & E to No. 2 collaborates with P G & E on their "Plant the Right Tree in the program Right Place" program. This encourages customers and information businesses to plant "power line-friendly" trees under high-voltage attached. power lines. Through the plan check and field inspection process, City staff review plans and visually inspect areas of new development which include landscaped areas. Tree placement is surveyed to ensure there will be no conflict with power lines. Budget Responses June 13, 2007 Page 2 In established developments, City staff visually surveys areas that may have problems or potential problems with trees and power- lines. City staff has prioritized these areas and consults with P, G & E who also pays for the replacement of the trees to mitigate future problems. To date, 160 trees have been replaced as part of this program. No. 3 Would like to know more information (detailed breakdown) of the change in Recreation & Parks personnel costs from FY 2006-07 to FY 2007-08. Response Changes from 00 08. to FY 07-08 include ten (10) new Worksheet to No. 3 positions, five (5) retirement vacation/sick leave payouts, and detailing costs recommended annual step and fringe benefit increases totaling attached. $1,118,000. No. 4 Would like to receive a schedule of the "Movies in the Parks." Response "Movies in the Park" is back again for the spring and summer Flyer attached. to No. 4 season. The Friday night event began on May 4t" and continues through August 24th. Each movie is averaging approximately 200 — 600 people. This popular event was advertised in the local newspaper on several occasions through articles and Public Service Announcements. The Department is utilizing Teleminder/AEN to let area residents know when a movie is showing in a nearby park. The intent of this popular program is to provide a famil y event in each Ward. No.—5 -Would like more information on how the roller hockey rink at Saunders Park will have multi-purpose uses and information on the management of the roller hockey rink. Response Two reports on this project are attached. to No. 5 Reports submitted 05/30/07 and 01/02/07 No. 6 Would like a report on efforts between the City and the attached. Count to bring Casa Loma Park into the City. Response The City is not able to take possession of the County-owned Report to No. 6 Casa Loma Park without compensation. submitted 03/19/07 No. 7 Would like a report on the proposed expansion of the skate attached. park located at Beach Park and a cost estimate for the expansion. Response In coordination with Public Works, a proposed agreement with the to No. 7 original contractor of the Skate Park at Beach to perform additional work is being processed. Once all approvals are done, the contractor and staff will conduct a public input meeting to seek design ideas, especially from users of the Skate Park. Construction is estimated to begin Fall '07 with a project budget of $155,000. "We create a quality community through people, parks and programs" Budget Responses June 13, 2007 Page 3 No. 8 Would like more information on the status of the pool at Jastro Park. Response Two detailed status reports attached. Reports to No. 8 submitted 06/13/07 and 05/29/07 No. 9 Would like more information about the results of the attached. community-wide survey as part of the Recreation & Parks Master Plan. Response A community-wide survey was an essential part of the Recreation Master Plan to No. 9 and Parks Master Plan development process. The phone survey, Executive to be statistically correct, needed at least seven-hundred Summary completed responses. Surveyors had the ability to ask questions (provided in in both English and Spanish. Over 1,200 calls were made city- Council wide and the results were favorable. Committee) and Telephone The highlights of the survey are attached. To summarize the Survey highlights, over 80% surveyed indicated that they are "somewhat' Highlights from to "very satisfied" with parkways, medians and parks the Plan are maintenance. According to the consultants who have surveyed attached. over 100 California communities, this is well above the average satisfaction rate which is normally in the 65%range. The attachment is taken directly from the Recreation and Parks Master Plan 2007 document. If you have any questions, please let me know. Attachments cc: John Stinson, Assistant City Manager Senior Staff "We create a quality community through people,parks and programs" C' {r' �O� '�' The Buena Vista Group David R.Couch SMITHBARNEY First Vice President-Wealth Management Portfolio Manager Tel 661-663-4620 david.r.couch@smithbarney.com tl Citigroup Global Markets Inc. 0 9100 Ming Avenue,Ste.205 P.O.Box 25001 Bakersfield,CA 93390-5001 Fax 661-663-4650 Toll Free 800-421-2171 Response No. 2 Attachment M M = P, G & E "Plant the Right Tree in the Right Place" Program Information Tree Trimming Page 1 of 1 Plant the Right Tree in the Right Place The utility sponsors programs to encourage customers to plant the"right tree in the rioht�iace."This means planting"power line-friendly trees"near high-voltage power lines."Right"trees do not grow taller than 25 feet,and should pose no threat to high-voltage power lines. Transmission Line Clearance The majority of Pacific Gas and Electric Company's power lines belong to an electric distribution system.This system carries power ranging from 4,000 volts to 21,000 volts. The lines that carry electricity from power plants to where it is needed 8c�atier Wire Border power the state belong to the company's transmission system.This system carries power between 60,000 volts to 500,000 volts. Because of the higher voltages,greater clearance distance is needed between vegetation and transmission poles and towers. In many cases, no trees or tall shrubs can grow under or alongside transmission lines. An ideal integrated vegetation management scenario is depicted above with only shorter, native plants growing under the lines—to protect them from wildfires. http://www.pgc.com/field_work projects/vegetation_mgmt/tree trimming/ 6/7/2007 Education Page 1 of 3 Education Plant the Right Tree in the Right Place Deciduous Trees&Shrubs Evergreen Trees&Shru....bs.. SafeTree Hidng.._E...I.ectrica.)._Li nes_and._Poles Plant the Right Tree in the Right Place Tall treas SuCh 08: Plant tailor trees away Trees and shrubs are an important part of the Made oifetIBi environment and the communities that we live in. prt�GB lnes Please plant the right tree in the right place. Here are Oak some tips to think about when making your plant Pine TIC@ iflrUlhi selections: If you plan to plant under power lines, tOtE It I ZOn@ consider these trees and shrubs. car lees f I , I I Deciduous Trees&Shrubs a ;+FIO Ili.; Medium bus Sm811 such U: such as: Redbird Washington hat Mome Dogwood Camden raintme Crabapple Deciduous Trees&Shrubs Tree Name I Mature Mature Description Height Spread Eastern Redbud { Spring blooming with striking 35 feet 35 feet (Cercis pink flowers, canadensis) heart-shaped leaves. _..._._ _ .____. .. ......W.�_.._ _ Washington Summer blooming,white 35 feet 20 feet Hawthorn flowers;fall color;winter (Crataegus spp.) fruiting, attracts birds. i Crape Myrtle Summer blooming with 20 feet 15 feet (Lagerstroemia impressive red and spp,) white flowers. I Robinson Spring blooming,pink feet 20 feet E Crabappple le 25 flowers;fall fruiting, (Malus X red berries attract birds. Robinson') L._..__..__...._....._............. .._...__....._ Chinese Great Fall color;winter _ 35 feet 35 feet Pistache fruiting. (Pistacia chinensis) Flowering Plum d Spring flowering with white 35 feet 20 feet http://w-ww.pge.com/riield_work projects/vegetation_mgmt/education/index.html 6/7/2007 Education Page 2 of 3 3 (Prunus spp.) flowers, 3 purple foliage. Flowering Spring flowering with white 35 feet 20 feet [Cherry flowers,shiny bark.runus spp.) Ornamental Spring flowering with white 30 feet 20 feet Pear flowers. (Pyrus calleryana) Evergreen Trees & Shrubs Evergreen Trees&Shrubs Tree Name i Description Mature Mature i 4-e pread , .e_...._....._ ..__...__.� _ Strawberry 9 Spring flowering with white 5 feet Madrone flowers;summer fruiting, (Arbutus orange gumball-sized fruit, unedo) attracts birds. Bottlebrush Spring flowering,with red 0 feet (Callistemon j bottiebrush-like flowers. spp•) Citrus Fruit Summer fruiting(lemon,lime, 30 feet 15 feet Trees grapefruit,orange,tangerine). q (Citrus) p Hopseed Bush i Mix of purple and green 20 feet 10 feet (dodonaea 1 foliage,good for screening. viscosa) Bronze Loquat Spring flowering with white 25 feet 25 feet (Eriobotrya flowers,great leaves. deflexia) Australian Weeping foliage. 25 feet 20 feet Willow j (Geijera i parviflora) s Toyon Summer flowering with white 20 feet 15 feet (Heteromeles flowers;winter fruiting;native arbutifolia) multi-trunked tree,drought tolerant. Oleander Spring and summer flowering 20 feet 15 feet (Nerium with white/pink/red flowers; oleander � ) good for screening. E Pittosporum Vertical in growth,dense green 30 feet 15 feet (Pittosporum 1 foliage. f tenuifolium) Evergreen Spring flowering with white 35 feet 20 feet Pear flowers;semi-deciduous if cold (Pyrus or stressed. [kawakamii) African Sumac Tri-foliate leaf. (Rhus iancea) 25 feet 25 feet http-//www.pge.com/field_Work projects/vegetation_mgmt/education/index.html 6/7/2007 Education Page 3 of 3 SafeTree For more information about proper tree and vegetation placement near electric power lines,contact your local nursery or visit SafeTree.The SafeTree_Program is a five-year public awareness program funded by Pacific Gas and Electric Company, providing information about,and funding for,the planting of trees safely away from electric power lines. Hiding Electrical Lines and Poles Many customers find the look of utility poles that carry power lines unappealing. Poles cannot totally be hidden,but here are some tips: • Use vegetation to draw your eyes away from poles. • Plant trees that have a spreading crown to diffuse the vertical view. • Strategically plant trees in your yard to block the view of poles. Keep in mind that you have to look up to see the lines. For example, trees that have a spreading crown can be 20 feet from lines, blocking a view of poles and lines.And they'll never need to be trimmed because they are not a hazard to the lines. • Plant lower-growing trees or shrubs near the base of poles,but no closer than five feet. There is an exception: If you reside in an area where the state is responsible for fire protection,you cannot plant anything closer than 10 feet from poles.See pole.clearing. • Plant trees at least six feet to the side of underground facilities,such as electric,gas and telephone lines,and television cables. To find out where these facilities are located, call Underground._Service Alert at 1 (800)227-2600 at least three days before you plant. Also remember: • Do not plant trees that grow tall near poles.Tall trees grow into lines and may present other safety risks.When trimmed or removed, poles will be exposed again. • Do not plant vines that will grow up poles.Vines on poles may pose a threat to utility workers,when climbing poles. In addition, care should be taken that trees are planted at least six feet to the side of underground facilities, such as electric,gas and telephone lines,and television cables. To find out where these facilities are,call Underground Service Alert at 1(800)227-2600 at least three days before you plant. http:"www.pge.com/fi eld_work_proj ects/vegetation_mgmt/education/index.html 6/7/2007 Response No. 3 Attachment Salary & Benefits Cost Comparison Worksheet Response No. 4 Attachment "Movies in the Park" Flyer MOVES IN. Tfl� E ?Akk Friday night movies in the park are back! Come watch your favorite movies at a different park each week. Pack up your picnic gear, blankets, lawn chairs and leave the entertainment to us. Popcorn and sodas will be available for a small fee. All movies are rated G or PG and will begin at dusk. Wayside Park Cat in the Hat (PG) May 4 Jastro Park Happy Feet (PG) May 18 Siemon Park Charlotte's Web (G) June 8 Patriots Park Spirit (G) June 22 Pin Oak Park Over the Hedge (PG) July 13 Planz Park The Wild (PG) July 27 Park at River Walk Ice Age: The Meltdown (PG) August 10 Dr. Martin Luther King Jr. Park Akeelah and the Bee (PG) August 24 I _ w m CITY OFBAKERSFIELD For more information please contact us at Recreation 326-FUNN &Parks Or visit us at www.bakersfieldcity.us Response No. 5 Attachment Roller Hockey Rink Project Reports B A K E R S F I E L D Department of Recreation and Parks Date: May 30, 2007 To: Alan Tandy, City Manager From: Dianne Hoover, Director of Recreation & Parks Subject: Roller Hockey Rink/Multiple Sports Court The donated Roller Hockey Rink to the City of Bakersfield was manufactured by a company known as Sport Court. Since 1974, Sport Court has developed over 50,000 projects world wide. They manufacture various types of sports floors, and the City of Bakersfield inherited the surface known as Defense. Defense is the best floor for sports such as Roller Hockey because it is so durable. In talking with the Sport Court representative, it is also an ideal court for indoor soccer, basketball, volleyball and a new, fast growing sport called "futsal." Futsal is a combination of soccer and football and is primarily played on roller hockey courts. The City of Bakersfield is in need of more gym floors that can handle basketball and indoor soccer. There is a huge need for more basketball courts, especially ones that are supervised and programmable. The soccer community is looking for more spaces to play, and adding indoor soccer to the city's facilities would be a big asset. Roller hockey is also a sport that has outgrown current local facilities, and participants are anxious to have another court to use. The court, when fully built, would have enough room for one full-sized roller hockey court. On the same floor, indoor soccer could be played. The floor could also be painted with basketball lines; with enough room under the roof for three basketball courts since the length of a basketball court is "We create a quality community through people, parks and programs" the same as the width of the roller hockey court. With these dimensions in mind, three volleyball games could also be played on the court if needed. The management of this facility is proposed to be contracted or leased out. The management company would pay the City for the opportunity to manage the courts, and the contract could include some revenue sharing. When in use, no matter what activity is being played, it will be supervised. Much like the ice arena, revenue would be derived from team fees, admission fees, and sponsorships. Advertising on the dasher boards can be sold for even more revenue generating possibilities. Other uses for this large facility may be corporate outings or similar type functions by laying down a tarp or simple floor covering. The floor is also suitable for dance lessons, recitals and competitions. Since it will be a multi-use court, the manufacturer recommends adding a rubber layer between the concrete base and the polypropylene tile surface that came with the rink. The estimated purchase cost of this layer is $15,000.00. Purchasing portable basketball hoops, soccer nets and volleyball nets would add an estimated $75,000 to the initial installation costs. Appropriate fowl lines and other boundary lines would need to be painted on the surface with Sport Court's recommended paint; costs will be determined by how many lines are actually needed. These proposed additional costs could easily be absorbed by the specific user groups and by user fees. By having a multiple-sport facility that has a roof, is supervised and controlled, this facility will be in constant use. Focusing on the three sports with highest current demand for space in Bakersfield: soccer, basketball and roller hockey; this facility would be heavily programmed with games, tournaments, practice times and league play. The potential revenue would support the facility, and the City has a win-win situation with local sports enthusiasts. Attachment: Sport Court folder "We create a quality community through people,parks and programs" B A K E R S F I E L D Department of Recreation and Parks Date: January 2, 2007 To: Alan Tandy, City Manager From: Dianne Hoover, Director of Recreation and Parks Subject: Roller Hockey at Saunders Park The proposed Olympic-size Roller Hockey Rink at Saunders Park will benefit the citizens of Bakersfield in several ways by offering a recreation opportunity that is not currently available within the city. There are many kids and adults looking for alternative activities that provide team camaraderie, coaching, mentoring, fitness and fun. I. Will the Roller Hockey Rink cost us from the General Fund? The Roller Hockey Rink is a full Olympic size rink and was donated to the City of Bakersfield, free of charge. Council approved the Capitol Improvement Projects (CIP) for the '06- '07. The Roller Hockey rink was allocated $530,000 for the concrete base, aluminum roof, and basic amenities such as lights, fences and fans. Further improvements such as lockers and additional restrooms can be budgeted from future revenues. 2. What are other cities' economic experience? The cities that have a Roller Hockey rink usually contract out the management of the rink. The management organization usually pays the city an up front rental fee or lease for the opportunity to operate the facility. There could be other revenue factors built into the contract such as concessions and tournament incentives. The City of Irvine built their facility on vacant land next to a park, actually as a request from Wayne Gretsky, National Hockey League star. Irvine receives rent from the management company in addition to revenues from out of town guests during tournaments who stay at the local hotels, eat at local restaurants and shop locally. The City of Irvine has entered into a contract with a new management company which just started on January 2"d, 2007. Irvine sees the Roller Hockey facility as a way to promote the city and its many assets. Roller Hockey enthusiasts from Bakersfield travel to Irvine to participate in their chosen sport due to the lack of a full size rink locally. Currently, there are about 200 adult players in Bakersfield and they believe if we had a regulation court, participation would also increase. They currently rent time at Rollerama, they buy equipment, and they purchase concession items. Roller Hockey is often a lead-in to Ice Hockey sports. Our Ice Hockey center is very popular, and growing with skaters each day. The Bakersfield Condors attract people from all over the community and other communities to attend events and games. By building a bigger base of potential players through roller hockey, the economy grows with the number of amateur players, fans and out of town guests. The Condors players have given back to the community as well by going to schools and various groups to encourage kids to get involved in positive activities. By providing another level of coaching, encouragement, and active recreation, the community reaps benefits on many levels, including economic, social and civic pride. 3. How will we operate it? It is our intention to bid out the operation of the Roller Hockey Rink. All interested parties, including the existing operator of Rollerama will have the opportunity to submit proposals to operate a full size roller hockey rink for the public. The awarded contract can specify incentives such as introducing as many people as possible to the sport of Roller Hockey, offering low-cost sessions for those who want to just try it and family nights where all ages are invited to attend as an introduction to roller hockey. It will benefit both the operator and the city to make this a very successful venture. The city will also receive revenues from concessions, tournaments and sponsorships in creating events that will attract new players. 4. Why do we need it? Currently, some roller hockey enthusiasts are using our public tennis courts or streets as their playing surface. Tennis players call us to put up signs to discourage roller hockey players because they want to play tennis and not wait for an empty court due to roller hockey. There appears to be a big demand in the city for roller hockey, and providing a safe, appropriate place to participate in the sport is positive for the city. With current limited facilities to play, current players are finding alternative locations not suitable for roller hockey, traveling out of town, or leaving the sport temporarily until another facility opens nearby. The city provides other popular sports for all ages: soccer, softball, baseball, swimming and bicycle paths. Roller Hockey is another recreation opportunity that the city can provide to encourage kids to get involved in productive activities. The city operates a successful ice rink, and hosts a professional team — the Bakersfield Condors. Many ice hockey players started as roller hockey players in their local communities. Currently, the Ice Sports Center has about 200 adults that play on a regular basis, in addition to over 150 kids who play in-house or on travel teams. There are more potential skaters out there, and roller hockey is less expensive to play than ice hockey, which will open more doors for more kids. While roller hockey can be a lead in to ice hockey, many players choose to stay with roller hockey throughout their life. On a typical weekend night at the Ice Sports Center, 300 to 400 people of all ages, abilities and interests come out to enjoy the activity. During the recent holidays, they had over 500 families participate on various nights when it was open to the public. 5. Who will use it? All ages, demographics and abilities will be able to use the Roller Hockey rink. There are even wheelchair roller hockey teams that could be started. While the hours of operation may vary, it will be used heavily after school and weekends. When it is in use, players and participants will be supervised by the operating company. We plan to honor the park hours, which currently is from 5:OOAM to 10:OOPM. The potential to introduce more people to the sport of roller hockey is great, and providing a safe, supervised means to do so benefit all current and future players. While there is an estimated population of 200-250 current roller hockey enthusiasts, that number could grow significantly with a full size rink available at affordable rates. Prior to closing in 2002, the Indoor Hockey and Soccer Center had 189 adults and 288 youth ranging in ages from 8-18 as players. They are still out there, and the potential for growth with the appropriate facility will be great. 6. Why Saunders Park? Saunders Park is centrally located and easily accessible from major streets, Interstate 99 and Highway 58. It is well-buffered from adjacent properties, with 1-99 being on the west side of the park. Saunders Park has necessary support amenities such as restrooms, parking and open space. The Fire Station next to the park is also a desirable amenity to have. The proposed location of the roller hockey rink will fill an under-utilized part of the park that is not currently programmed. Since the facility will be supervised when in use, it will provide added staffing to the park. The security lighting planned for the facility will add lighting to an area of the park that is currently dark. We will also have this park on our night patrol list which means it will be patrolled by a security firm randomly each night. 7. Additional information Attached is a letter from Kevin Kerwin, owner of Rollerama and a response from me, the Director of the Recreation and Parks Department. Also attached are letters of support from potential users of the Roller Hockey facility. Response No. 6 Attachment Casa Loma Park Report /101�4401;� B A K E R S F I E L D OFFICE OF THE CITY MANAGER MEMORANDUM March 19, 2007 TO: Irma Carson, Council member- Ward 1 FROM: Alan Tandy, City Manager 1"L SUBJECT: Casa Loma Park In response to your request, attached is a memo showing repair, conditions, costs and related regarding Casa Loma Park. Please call if you have questions. Attachment cc: Dianne Hoover, Recreation and Parks Director P to ............:..._:........,:._:.: 6 if MAR 16 Z807 Department of Recreation and Parks Date: March 14, 2007 To: Alan Tandy, City Manager From: Diann "over, Recreation and Parks Director Subject: Casa Loma Park Assessment Radius — Park Assessment Potential As requested, the following information is provided in response to the question regarding potential revenue from active city projects within the park assessment radius of Casa Loma Park. The request also inquired whether the County has made any improvement to the park this past year. The attached chart identifies the originally proposed costs of improvements to Casa Loma compared to what has already been accomplished by County staff. According to our estimates, they have completed approximately $100,000 of items that City staff had originally identified as needed work. Of the remaining items that need to be done, restroom replacement is the most expensive. The current restrooms are usable, and most likely will be functional for quite some time. It is difficult to put a time on necessary replacement due to the extent of unknown vandalism that may happen, which would require replacement beyond repair. The annual maintenance costs to Casa Loma Park remains at $60,000. Potential revenue from nearby new construction for park maintenance is limited. The attached maps include all active Tentative Tract Maps and Site Plan Review projects as of this date in the area of Casa Loma Park and show a 3/ mile assessment radius boundary. The assessment radius is generally used as the boundary but is modified slightly at major streets or other physical constraints such as canals. The radius touches two Tentative Tracts, the first being 6521 located south of Casa Loma Drive and east of Dr. Martin Luther King Jr. Boulevard, the second being 6917 located south of Wilson Road and west of South Union Avenue. Additionally, the Casa Loma Apartments project located at the southeast corner of Casa Loma Drive and Louts Lane is within the park assessment radius. "We create a quality community through people,parks and programs" Since the assessment radius of the park only partially covers a few lots in the far northwest portion of Tentative Tract 6521 current policy would not allow for assessment of any lots in the tract and would utilize Dr. Martin Luther King Jr. Boulevard as the easterly assessment boundary for the park. Additionally, the assessment radius of the park covers over half of the lots in Tentative Tract 6917 with no physical constraints to the remaining lots; therefore, all 23 lots of the subdivision could be assessed for park maintenance when they are improved with mobile homes. Casa Loma Apartments, at build out, will provide 113 units. Section D. Public Works — Engineering of the Site Plan Compliance List for the project includes the following condition of approval: The developer shall form a maintenance district for maintaining the future landscaped median island within Casa Loma Drive along the entire frontage of the development. The developer must contact the Public Works Department for requirements to form the maintenance district prior to issuance of a Building Permit. Although park maintenance is not specifically addressed in the condition, it could be inferred that this project be assessed if and when a park were provided; therefore, the project could add an additional 113 units. The attached Consolidated Maintenance District Cost per Tier document indicates a Park Tier Level 1 assessment of$18.52 per EDU (equivalent dwelling unit). The potential revenue from future development of active Tentative Tracts within the assessment radius of Casa Loma Park is: 23 EDU's x $18.52 for annual revenue of$425.96. (Tract 6917) The potential revenue from future development of active Site Plan Review projects within the assessment radius of Casa Loma Park is; 113 EDU's x $18.52 for annual revenue of$2,092.76 (Casa Loma Apartments) The Casa Loma Apartments are also located within the park assessment radius of a future city park in Tentative Tract 6521. Therefore, if it is decided that an actual park assessment fee can be charged, the annual maintenance dollars could be designated for the new city park or Casa Loma Park if the city maintains it. The apartment complex happens to be located between the two parks. Please see attached. "We create a quality community through people, parks and programs" CASA LOMA PARK - Repairs Needed Original Repairs Proposed Cost New Cost Baseball diamond lights(includes changing lamps to more efficient lights and repairs to electrical __panels) $ 30,000.00 Yet to be completed $30,000.00 Irrigation standardized $ 20,000.00 Yet to be completed $20,000.00 Replace security lighting $ 52,000.00 Completed Shelter house reconstruction 2 $ 27,000.00 Completed Replace picnic tables and BBQ slabs: $ 24,000.00 Yet to be completed $24,000.00 Create a sidewalk on three sides of the park $ 28,500.00 Yet to be completed $28,500.00 Replace restroom building $ 150,000.00 Yet to be completed $150,000.00 Park tree trimming, removals and new plantings: $ 20,000.00 Completed Turf renovation $ 4,500.00 Yet to be completed $ 4,500.00 Trees pruned thinned and canopy raised Completed Additional picnic tables and barbecues added Completed Repair fence at softball/baseball field Completed Restroom graffiti removed Completed Replace rims and nets on basketball court Completed F_ TOTAL �_$ 356,000.00 1 $257,000.00 "We create a quality community through people,parks and programs" 11 TP ILLTA IV sat I 6ry QI'�, # I — j r ii 1 I Z Ir 41 s rx 0, J F-1 _ II .f X { 1 1 1L {L t - par ' N � �_I �+ 1 rtci sb„�� S.3 41 tit riL 1 I "1M y r i4 ,a•1 r� r � t�d,;. t� �•', lr,�_ ma ��� � �' r.3.r..-�.,,,•.1 r.3 i � '�� k� l 3�` k u 3' - �� t�'<*1 �.:>r ri'by r4'ti v„''e .�. '� � .' -� ��€��� ,��� x• 1 xr ' "s�vl� ��. x � �s � #� '^yr �s- ,�� ti� J •t k r �• '� t."�-{Y Mt ,M1 wip M, hr n E '�'r.m�' l 1Y i.,.Y3�# :- .3 w 4 ! � .. `W,."... ! �y�Y � � t -E•. � - ��� i •; -.4�'t`'J. as .. '� n t Tr �'' ;^9rC`4'fi �cs�r•'"t�* r,8 �'d ""3 1' 1 ssw•,�,w r �'t y u. .k £ ra :.'c 79 0 q INC. * w a �aa S " I 1 1 , cx CNI W I �— r i � I � E S IT At L ` { `j y-•- } 11 1 ITT ` {—z�* _d._. ti �__ 1 k.! �✓ — L tip _ _L_ ° p_- 7. � — f IL L �_ � '�--"F - k 4 IF- Will LA ®r • t , J= }r ;_ h (i•,�—"S' T�7�'(—F7�� i i 1, }S, k " r= ���r�.;�{ '��� MIT r }k ! 4 ' i r�r" f i j " ! ] S 31 t 1, i r � ��^i—,—•i�'� s J_s`__�I���'ui � '.1Y� I M 'i — �` � k�— f l J' '`(l z i 1� Exhibit "A" Consolidated Maintenance District Cost per Tier Street Tier Park Tier Existing Tier New Tier Rates New Tier Rates New Tier Rates' Rates 04-05 Budget 05-06 Budget 06-07 Budget 0.00 0.50 $8.56 $8.58 $8.97 $9.26 0.00 1.00 $17.12 $17.16 $17.93 $18.52 0.00 1.50 $25.68 $25.74 $26.90 $27.79 0.50 0.00 $11.40 $15.12 $15.80 $16.32 0.50 0.50 $19.96 $23.70 $24.77 $25.58 0.50 1.00 $28.52 $32.28 $33.73 $34.85 0.50 1.50 $37.08 $40.86 $42.70 $44.11 1.00 0.00 $22.80 $30.24 $31.60 $32.64 1.00 0.50 $31.36 $38.82 $40.57 $41.91 1.00 1.00 $39.92 $47.40 $49.53 $51.17 1.00 1.50 $48.48 $55.98 $58.50 $60.43 1.50 0.00 $34.20 $45.36 $47.40 $48.97 1.50 0.50 $42.76 $53.94 $56.37 $58.23 1.50 1.00 $51.32 $62.52 $65.33 $67.49 1.50 1.50 $59.88 $71.10 $74.30 $76.75 2.00 0.00 $45.60 $60.48 $63.20 $65.29 2.00 0.50 $54.16 $69.06 $72.17 $74.55 2.00 1.00 $62.72 $77.64 $81.13 $83.81 2.00 1.50 $71.28 $86.22 $90.10 $93.07 2.50 0.00 $57.00 $75.60 $79.00 $81.61 2.50 0.50 $65.56 $84.18 $87.97 $90.87 2.50 1.00 $74.12 $92.76 $96.93 $100.13 2.50 1.50 $82.68 $101.34 $105.90 $109.40 3.00 0.00 $68.40 $90.72 $94.80 $97.93 3.00 0.50 $76.96 $99.30 $103.77 $107.19 3.00 1.00 $85.52 $107.88 $112.73 $116.45 3.00 1.50 $94.08 $116.46 $121.70 $125.72 4.00 0.00 $91.20 $120.96 $126.40 $130.57 4.00 0.50 $99.76 $129.54 $135.37 $139.84 4.00 1.00 $108.32 $138.12 $144.34 $149.10 4.00 1.50 $116.88 r $146.70 $153.30 $158.36 'These rates are to be adjusted annually by the CPI S:\PROJECTS\MAINDIST\ADMINRPT\CMD Exh A Annual Rates Cost per Tier 05-06 Budget.xls Z 0 /110 B A K E R S F I E L D Development Services Department Jack Hardisty, Director Dennis C. Fidler Building Director Stanley C.Grady (661)326-3720 Fax(661)325-0266 July 2, 2002 Planning Director (661)326-3733 Fax(661)327-0646 EGIS Group Inc. 33 Sylvan Way Woodacre, CA 94973 RE: Notice of Decision - Site Plan Review (Project No. 02-0551) Dear Sirs: The Development Services Director, upon recommendation of the Site Plan Review Committee, has approved your plans for the construction of 113 two-story apartment units ( with a request for a 36%density bonus) in a R-2 (Limited Multiple Family Dwelling) zone district at 1525 Lotus Lane. Your proposal meets the minimum required codes, policies and standards for development as adopted by the Bakersfield City Council. Specific items have been noted (see attached Site Plan Compliance List) that you need to resolve before you can obtain a building permit or be allowed occupancy. These items may include changes or additions that need to be shown on the final building plans, alert you to specific fees, and/or are comments that will help you in complying with the city's development standards. Each item will note when it is to be completed and they have been grouped by department so that you know who to contact if you have questions. Your next step is to either apply for necessary building permits to construct your project, or begin your business activities depending on the request submitted. You must submit final building plans to the Building Division. The Site Plan Review Committee will review these finaLplans while building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List. Please react them carefully. Failure to satisfy an item may delay your obtaining a building permit or commencing your project. After construction of your project but before the City can allow occupancy,the Building Division must inspect the development to find if it complies with the approved plans, and any other relevant permits and codes. If you have satisfied all of the requirements, the Building Director will issue a certificate of occupancy; if not, the area inspector will give you a correction notice. Once you have made all of the corrections, the Building Director can issue a certificate of occupancy. You may not occupy a development until the Building Director has issued a certificate of occupancy. REVISIONS TO THE APPROVED PLAN Any time after site plan approval but before the approval expires, you may submit revisions to the plan. We will treat these revisions as a new site plan application subject to a new review and required fees. The Planning Director can only approve minor changes to the original plan without a new application if they are necessary to meet a condition, mitigation, or result from physical obstacles or other comparable constraints. City of Bakersfield • 1715 Chester Avenue • Bakersfield, California • 93301 sPR #02-0551 Page 2 EXPIRATION OF PLAN APPROVAL Approval of this site plan expires on July 2, 2004, (2 years from the decision date) unless building permits have been issued, or on projects not requiring a building permit, the use has commenced. The project must be completed within 5 years from the decision date. If the property is rezoned, site plan approval will expire upon the effective date of the rezoning unless the use is permitted in the new zone. . The Planning Director may extend the expiration date up to one(I) year if you resubmit new plans for check against the code requirements in effect at that time and include a written request for the extension. We must receive this request before expiration of the project approval. We will not require a fee for this extension request; however, changes to the plans originally approved for purposes other than code requirements shall be subject to a new site plan review, including payment of all required fees. ENVIRONMENTAL DETERMINATION In accordance with the provisions of CEQA, an initial study was conducted for this project and it was found that it would not have a significant effect on the environment. A public hearing was held on July 2, 2002, accepting public testimony on the project and its environmental effects, and a Negative Declaration was approved by the Development Services Director at the conclusion of the hearing. Public hearing notices were posted, mailed to all property owners within 300 feet of the project area, and published in a local newspaper of general circulation at least 20 days before the hearing. APPEAL Any person may appeal this decision. An appeal is limited to whether or not an adopted development standard, zoning regulation, mitigation, or policy applied or not applied to the project, was done consistent with the authority granted by city ordinances or the California Environmental Quality Act (CEQA). The appeal must be in writing stating the precise basis or issue as noted, include a $334 filing fee, and must be filed within 10 days of the decision date to the City of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue, Bakersfield, CA 93301). The Planning Commission will hold a public hearing on the appeal and their decision will be final unless their decision is appealed to the City Council. Site plan approval is based on the statements made in the application and the plans you submitted. Any errors or omissions on these plans could alter the compliance list and/or void this decision. If you have questions about any of the items noted in the Site Plan Compliance List, you must speak to the contact person representing the department requiring that item. If you have other questions regarding general information about the site plan review process, please contact Wayne Lawson in the Planning Division at (661) 326-3145. DECISION DATE: July 2, 2002 Sincerely, AC ISTY, Development Services Director DR/pas S:\BLA_SPR\FORMS�spr_4ata\02-055 I\sprjtr wpd SPR #02-0551 Page 3 SITE PLAN COMPLIANCE LIST The following are specific items that the Site Plan Review Committee has noted that you need to resolve before you can obtain a building permit or be allowed occupancy. These items may include changes or additions that need to be shown on the final building plans, alert you to specific fees, and/or are comments that will help you in complying with the City's development standards. The item will note when it is to be completed and each has been grouped by department so that you know who to contact if you have questions. A. DEVELOPMENT SERVICES - BUILDING (staff contact- Phil Burns 661/326-3718) 1. The applicant shall submit 4 copies of grading plans and 2 copies of the preliminary soils report to the Building Division. You must submit a final soils report to the Building Division before they can issue a building permit. 2. The applicant shall include fire resistive wall construction details with the final building plans for all exterior walls of any building that are within 20' of property lines if it is commercial, or 5' of property lines if it is residential. 3. Include with or show on the final building plans information necessary to verify that the project complies with all disability requirements of Title 24 of the State Building Code. 4. The applicant shall obtain all required approvals from the Kern County Environmental Health Services Department (2700 "M" Street, Bakersfield, CA; Ph. 661/862-8700) for any public pool or related facility before building permits can be issued. Disabled access to any public pool and related facility shall comply with Title 24 of the State Building Code. 5. Structures exceeding 10,000 square feet in area shall require installation of an automatic fire sprinkler system. 6. Before the Building Division can allow occupancy of this multiple-family residential complex, they must inspect and approve the placement and colors of the address numbers identifying each unit and/or building, and building/unit location maps so that emergency personnel can easily find a specific unit when responding to the site during an emergency. 7. Business identification signs are not considered nor approved under this review. A separate review and sign permit from the Building Division is required for all new signs, including future use and construction signs. Signs must comply with the Sign Ordinance(Chapter 17.60). 8. The Building Division will calculate and collect the appropriate school district impact fee at the time they issue a building permit. SPR#02-0551 Page 4 B. DEVELOPMENT SERVICES.--PLANNING (staff contact - Dave Reizer 661/326-3673) 1. The minimum parking required for this project has been computed based on use and shall be as follows: Number of Parking Required Use Dwelling Units Ratio Parking Apartment Complex 113 D U's 2 spaces/DU 226 spaces (2,3,&4 Bedroom Units) (Plus an additional 10%for guest parking) 23 spaces Total Required 249 Spaces (Note: 253 parking spaces are shown on the proposed site plan.) 2. The applicant shall include a copy of a final landscape plan with each set of the final building plans submitted to the Building Division. In addition, one (1) copy of the landscape plan shall also be submitted to the Planning Division. Building permits will not be issued until the Planning Division has approved the final landscape plan for consistency with approved site plans and minimum ordinance standards (please refer to the attached standards - Chapter 17.61). Please be advised that these landscaping standards create four(4) categories of trees and each category has its own separate set of spacing, evergreen-to-deciduous ratios, location, and performance standards. These categories are: • Street frontage trees • Parking lot (shade trees) • Shade/accent trees at building entrances • Trees that buffer adjacent residential areas 3. Approved landscaping, parking, lighting, and other related site improvements shall be installed and inspected by the Planning Division before final occupancy of any building or site. Please schedule final inspections with the staff contact noted above. (NOTE: Plants must match the species identified and be installed in the locations consistent with the approved landscape plan. Otherwise, changes made without prior approval of the Planning staff may result in the removal and/or relocation of installed plant materials and delays in obtaining building occupancy.) 4. Overlooks from windows, balconies, and decks of the 2"d or higher floor into rear yards of property containing single family homes must be architecturally screened (see attached Section 17.08.090). This condition affects any office, commercial, and industrial building, and any apartment or condominium structure containing 3 or more units that are within 150 feet of properties zoned R-1, R-S, R-S-I A, MH, or PUD, or from condominium projects of a single family character. Screening proposals must be approved by the Planning Division before building permits will be issued. Suggested methods for accomplishing screening are included in the attached ordinance section. SPR #02-0551 Page 5 5. Parking lot lighting is required by the Bakersfield Municipal Code (Section 17.58.060A). Illumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent residential properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light. All light poles, standards and fixtures, including bases or pedestals, shall not exceed a height of 40' above grade. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. 6. Habitat Conservation fees shall be required for this project and will be calculated based on the fee in effect at the time we issue an urban development permit (includes grading plan approvals) as defined in the Implementation/Management Agreement (Section 2.21) for the Metropolitan Bakersfield Habitat Conservation Plan. Upon payment of the fee, the applicant will receive acknowledgment of compliance with Metropolitan Bakersfield Habitat Conservation Plan (Implementation/Management Agreement Section 3.1.4). This fee is currently$1,240 per gross acre, payable to the City of Bakersfield (submit to the Planning Division). This fee must be paid before any grading or other site disturbance occurs. 7. A Park Development and Improvement Fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time the permit is issued. The current fee is $635 for each independent residential unit. 8. Prior to building permits being issued, the developer shall record a covenant ensuring that the development contains housing that meets one of the criteria of"qualified housing" as defined in Section 15.79.010 D. The developer shall submit this covenant to the Planning Director for review and approved (by the Director and City Attorney) prior to recordation. C. FIRE DEPARTMENT (staff contact- Dave Weirather 661/326-3706) 1. Show on the final building plans the following items: a. Both offsite (nearest to site) and on-site fire hydrants with required fire flows. New fire hydrants shall be sited and installed in accordance with the latest adopted version of the California Fire Code. Hydrants must be in working order to assure that adequate fire protection is available during construction unless other arrangements for such protection are approved by the Fire Department. Please provide 2 sets of the engineered water plans to Dave Weirather. (Note: All new fire hydrants must be purchased,from the Fire Department.) b. Project address, including suite number if applicable. If the project is within a shopping or business center, note the name and address of the center. C. Name and phone number of the appropriate contact person. SPR #02-0551 Page 6 2. All access (permanent and temporary) to and around any building under construction must be at least 20 feet wide, contain no vehicle obstructions, and be graded to prevent water ponding. Barricades must be in place where ditches and barriers exist in or cross roadways. Emergency vehicle access must always be reliable. D. PUBLIC WORKS - ENGINEERING (staff contact-Janice Horcasitas 661/326-3576) The applicant shall construct curbs, gutters, cross gutters, sidewalks, and street paving along Casa Loma Drive and Lotus Lane according to adopted city standards. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. __..._ 2. The applicant shall install 4(four) street lights along Lotus Lane and Casa Loma Drive as shown by staff on the returned site plan. The applicant shall be responsible for providing the labor and materials necessary to energize all newly installed street lights before occupancy of the building or site. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. -/3. The applicant shall construct standard handicap ramps at the southeast corner of Casa Loma Drive and Lotus Lane and at each entrance to the project according to adopted city standards. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. 4. The applicant shall install new connection(s) to the public sewer system. This connection shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. -,5. All driveways, vehicular access and parking areas shall be paved with a minimum of 2" Type B, A.C. over 3" Class II A.B. according to the Bakersfield Municipal Code (Sections 15.76.020 & 17.58.050 N.) and the adopted standards of the City Engineer. This paving standard shall be noted on the final building plans submitted to the Building Division before any building permits will be issued. 6. If a grading plan is required by the Building Division,building permits will not be issued until the grading plan is approved by both the Public Works Department and Building Division. 7. Before you can occupy any building or site, you must reconstruct or repair substandard off- site improvements to adopted city standards as directed by the City Engineer. Please call the construction superintendent at 661/326-3049 to schedule a site inspection to find out what improvements may be required. 8. You must obtain a street permit from the Public Works Department before any work can be done within the public right-of-way(streets, alleys, easements). Please include a copy of this site plan review decision to the department at the time you apply for this permit. SPR #02-0551 Page 7 9. A sewer connection fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time a building permit is issued. 10. If the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a "Notice of Intent" (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity(WQ Order No. 92-08- DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. Compliance with the general permit requires that a Storm Water Pollution Prevention Plan (SWPPP)be prepared, continuously carried out, and always be available for public inspection during normal construction hours. 11. A transportation impact fee for regional facilities shall be paid at the time a building permit is issued. This fee will be based at the rate in effect at the time the permit is issued. The Public Works Department will calculate an estimate of the total fee when you submit construction plans for the project. 12. The developer shall, along the entire frontage of the development within Casa Loma Drive, pay$40 per linear foot to the city for construction the future median island (`/2-width). Building permits will not be issued until this fee is paid. 13. The developer shall form a maintenance district for maintaining the future landscaped median island within Casa Loma Drive along the entire frontage of the development. The developer must contact the Public Works Department for requirements to form the maintenance district prior to issuance of a Building Permit. E. PUBLIC WORKS -TRAFFIC (staff contact-George Gillburg 661/326-3997) 1. Street return type approach(es), if used, shall have 20' minimum radius returns with a 28' throat width. All dimensions shall be shown on the final building plans. - `-°-2. Show the typical parking stall dimensions on the final building plans. Minimum parking stall dimensions shall be 9'wide x 18' long. Vehicles may hang over landscape areas no more than 2`/z feet provided required setbacks along street frontages are maintained, and trees and shrubs are protected from vehicles as required by the Planning Division. SPR #02-0551 Page 8 F. PUBLIC WORKS - SOLID WASTE (staff contact-John Wilburn 661/326-3114) 1. You must contact the staff person noted above before building permits can be issued or work begins on the property to establish the level and type of service necessary for the collection of refuse and/or recycled materials. These levels of service are based on how often collection occurs as follows: • Can or cart service -- 1 cubic yard/week or less • Front loader bin service -- 1 cubic yard/week - 12 cubic yards/day • Roll-off compactor service -- More than 12 cubic yards/day 2. Show on the final building plans 5 (five), 8' x 10' inside dimension refuse bin enclosures designed according to adopted city standards (Detail #S-43). Before occupancy of the building or site is allowed, 10 (ten), 3 cubic yard front loading type refuse bins shall be placed within the required enclosures. 3. Facilities that participate in recycling operations must provide a location that is separate from the refuse containment area. This shall be shown on the final building plans. o 0 0 w Y Z o 09 Are X 0; 6' !6&AZ F00 099 9 I yj o N I w cn'orz os OS 6' 6'aid ti 9r.6a Ilk yy z*061 0 i bY�a q "6r/ 9r'6a 9f'6B Q7'6Cl lZYrl r1'Or9 m I _c; b 00 Y 00 n m f�'099 N I I r�on ce'arr a roll) orr o � I I I I C/i II O I 0 00 !} b (3 /W c J I O V C_ O W Z LL- 0 V W Z z a� - W y O Response No. 8 Attachment m m m Jastro Pool Reports /� 4 0 B A K E R S F I E L D DATE: June 13, 2007 TO: Alan Tandy, City Manager ,, FROM: Dianne dove Recreation & Parks Director RE: Jastro Pool Repair Update Working with the Department of Public Works, we have developed a plan to repair the pool to open to the public this summer season. This repair will be temporary versus a more permanent repair allowing us to avoid the pool being closed to the public this summer. The repairs began this week on the leak sources at Jastro Pool. This project will consist of repairs of the leaks, replacing concrete deck areas, pool painting, fence repair, and mechanical equipment maintenance. The pool is tentatively scheduled to reopen to the public in early July. 1 JASTRO POOL MAY 29, 2007 Jastro Pool, located on Truxtun Avenue in Jastro Park, is currently being assessed for the source of major leaks. Toward the end of 2006 pool season, Jastro Pool was losing about 32,000 gallons of water a day. In 2005,the pool closed for two weeks to repair leakage due to water loss of 20,000 gallons per day. That repair was more temporary than we had originally hoped for, and the search for the main cause of the leak began in January of 2007. The following is a summary of the various actions staff has taken to get to the source of leakage: 1. Standard Leak Test: A standard leak test was the first test conducted and consists of shutting off all pumps and placing a cylinder into the pool. The water in the cylinder accounts for evaporation loss. In a 24-hour period,the water level dropped over 20 inches below the water level in the cylinder indicating a water loss greater than 32,800 gallons per day. The pumps were not operating during this leak test. The test was done on two separate occasions, and after each test,the pool would have only 2inches remaining in the bottom after 72 hours. 2. Video Camera Test: The second test was using a video camera from the sewer department to visually assess the lines into the pool. The return lines were not able to be videoed due their size and significant corrosion. The video did show cracking and deterioration in the gutter system, corrosion in the main drain lines, and severe deterioration in the sumps for each main drain. 3. Dye Tests: Dye tests were then conducted with a scuba diver to confirm the main water loss points. This test consists of a scuba diver spraying dye near the identified leak points to determine the flow of water. Once the dye was released, it was pulled into 4 return lines and both drain sumps. This showed that the majority of water loss was through the return lines. 4. Drilling: Next, staff excavated next to the pool deck in selected locations to find the main source of the leak. The drilling tool used would drop 2-3 feet into caverns in some locations indicating that there were large empty spaces in different areas around the pool. 5. Aquatic Design Assessment: Staff then contracted with Aquatic Design, recognized experts in pool structures, to provide an assessment of the pool leakage problem. The report summarizes the leak problem in the following paragraph from page 4 of the Aquatic Design Report: "The water leaks noted above appear to be coming from various sources in the pool system. It may be prudent to have additional destructive testing conducted to take core samples of the pool shell at the pool cracks to determine the exact extent of the pool shell failure if the existing pool shell is to be reused in a pool renovation. At a minimum all of the pool piping should be replaced. The pool inlets should be replaced at the same time. This will require that pool deck be removed and replaced to provide access to these pipes." He estimates the pool renovation costs, in its existing shell and condition,to be about $650,000, but that estimate does not include extra soft costs such as contractual agreements. To fully repair Jastro pool, according to Aquatic Design would be about one million dollars. (Full report from Aquatic Design is attached). 6. Air Pressure Test: Staff then tested the return lines by forcing air pressure into them. The lines would not hold pressure, indicating damage somewhere in the lines. 7. Excavation: Even after all these tests, we still did not have a clear picture of where all that water was going, and what was the major source of the leaks. Public Works staff then began major excavation work around the perimeter of the pool, first exposing the entire west wall (the deep end). Not finding major water damage or extremely wet soil, water was then put into the pool to see if there were air bubbles. Water seemed to be traveling out of the expansion joints, and a few other pool cracks, so the excavation targeted the center of the pool deck areas, digging the full depth of the pool. Finally, water was gushing out of the pipes in these locations at high rates. (Pictures attached). NEXT STEPS: If the pool is to be operational in 2007,the following steps would need to be taken: a. Excavate the entire deck. b. Replace all the piping around the pool and the main line into the pool from the pump house. c. Determine if the pool shell will be able to hold the water for the summer by boring into the sides. d. Replace all decking and fencing prior to opening. e. Estimated costs with staff doing the majority of the work, plus using existing concrete contractor: $50,000. f. Estimated time frame, pending no other major structural findings: 30 days. This would put us in the middle of the swim season, with only four or five weeks remaining for pool use in 2007. g. These repairs listed are only temporary fixes; more permanent ones are outlined in the report from Aquatic Design. JASTRO POOL ATTENDANCE: Jastro pool has experienced major attendance decreases since McMurtrey Aquatic Center opened in 2004. Jastro Pool was closed during the 2004 pool season, and reopened for about eight weeks in 2005 to a total attendance of 1,002. In 2006, it opened as an instructional pool only, increasing attendance to 2,152. Its close proximity to McMurtrey hinders attendance as a general swimming pool, but does provide space for an instructional pool, especially for private and semi-private lessons. (Attendance charts attached). ALTERNATE USE: City staff from both Recreation and Parks and Public Works Departments are doing everything they can to make Jastro Pool a functional, workable pool. It was built in the early 1960's with metal pipes which do not mix with chemically treated water over time. It no longer meets the current Health codes for public pool operation; however, the Kern County Health Department is willing to work with us to grandfather in existing conditions if we choose to open again. Jastro Park pool is an excellent location for a Wet Playground, otherwise known as a Spray parks. The basic water supply is there, with restrooms available. The five existing wet playgrounds at Beale, Planz, MLK, Wayside and Jefferson are very well attended each day. At any given time at these various sites,there are usually 25-40 kids, depending on the time of day. The Spray parks operate from early April to late October,providing seven months of free, daily water play for area children and families. Hours of daily operation are from 10:00AM to 8:OOPM. Lifeguards are not needed due to no standing water in the wet play areas. Vandalism at these Spray parks has been minimal due to their high use and popularity. Staff has been able to install these wet playgrounds for about$225,000, including costs of the structures. If a contractor is hired to install them,the cost would be about $350,000. CONCLUSION: Jastro Pool could be made into a working pool with staff doing most of the remedial repairs. These repairs would be temporary fixes by replacing the pipes going into and around the pool. In doing these remedial repairs, further pool damage may be discovered,thus making the repairs more costly and time consuming. Staff will also seal the existing cracks in the floor and walls of the pool, but again,this is only a temporary fix. The repairs do not address making the pool and bathhouse accessible or meeting current standards for water turnover rates, as referred to in the Aquatic Design report. Attendance at Jastro pool has declined in the two years it's been open since McMurtrey Aquatic center opened to the public. A long term solution that is cost effective is converting it into a spray park which operates seven months each year, not fenced in, and is ADA accessible. Staff is ready to proceed with either option: temporarily repair Jastro Pool as it is, or convert into a Spray park. Attachments: Pictures of water leaks, Aquatic Design Report and Attendance reports Response No. 9 Attachment Recreation and Parks Master Plan Telephone Survey Highlights CHAPTER 3 Demand and Needs Analysis TELEPHONE SURVEY HIGHLIGHTS After careful review of the responses to the Bakersfield Recreation and Parks Needs Survey,Research Network Ltd. has gleaned the following highlights: Maintenance Satisfaction More than eight of every 10 households polled stated that they are somewhat or very satisfied with maintenance of trees in City parkways and street medians (82 0/6),with maintenance of landscaping other than trees in City parkways and street medians (83 0/6),and with maintenance of recreation and parks facilities in the City (85%). Parks Safety Satisfaction More than eight of every 10 households polled (83%) stated that they are somewhat or very satisfied with the safety of recreation and parks facilities in the City.An additional 17% of respondents replied that they are somewhat or very dissatisfied with such safety. Recreation Benefits Approximately equal shares of respondents stated that they seek physical fitness,health and well-being benefits or opportunities to gather and socialize with others from their recreation choices (each garnering a 36%response).Together, these two benefits were identified by 72% of those polled. The benefit of learning opportunities for hobby, self-improvement or career development was a priority for 20% of the responding residents while 9% cited benefiting from recreational opportunities to give back to the community through volunteer work. The Park at River Walk Nearly two of every three respondents (64%) stated that they recognize the name "the Park at River Walk" and they know what it refers to.An additional 28% of those polled agreed with the statement"I have heard that name but I know nothing else about it." Nearly one in 10 (9 0/6) residents agreed with the statement"I have never heard that name." One in seven households polled (14%) expected they would be a "Frequent User" of the Park at River Walk during the next year. Nearly half of residents polled by telephone (47%) forecast they would be "Moderate Users"while the remainder (39%) was labeled "Light/Non Users." Nearly one in four respondents Page 3-6 Bakersfield Recreation and Parks Master Plan CHAPTER 3 Demand and Needs Analysis (23%) stated they had no plans to use the Park at River Walk in the next year. Recreation Facility Usage Nearly one of every three (32%) of the sample of telephone respondents described themselves as a "Frequent User" of parks and recreation facilities. Four or every 10 residents polled by telephone (45%) were "Moderate Users"while the remainder (23%) was labeled "Light/Non Users." Greater than one in 10 respondents (12 9/6) reported no recreation facility usage during the past year. Frequent recreation facility users were most often found among those polled reporting a head of household less than 40 years (45% frequent users vs. 25% frequent users among those 40 years or over), among respondents who are residents of Bakersfield for five years or less (41% frequent users vs. 30% among remaining residents), among residents of Northwest and Southeast Bakersfield (39% and 37%,respectively vs. 25%in the Southwest and 28%in the South Central subarea), and among respondents who stated they are seeking health/fitness or social interaction benefits from their recreation choices (36%) vs. 24%among those looking to learn/improve themselves. Selected Facility Usage More than four in 10 respondents (42%) reported having at least one member who used the Kern River Parkway in the past year. This compares with a 34% usage incidence charted during an April 2000 survey conducted on behalf of the City.Thus, usage of this important local recreation resource has increased.The Ice Sports Center was reportedly used by members of 20% of households in the last year while the McMurtrey Aquatic Center was used by 17% of households. Indoor Facility Usage One in seven respondents (14%) described themselves as a "Frequent User" of indoor recreation facilities,while one of every five residents polled by telephone (22%) were "Moderate Users" of indoor recreation facilities during the past year. The remainder (64%) was labeled "Light/Non Users." More than half of the respondents (57 9/6) reported no indoor recreation facility usage during the past year. i Bakersfield Recreation and Parks Master Plan Page 3-7 CHAPTER 3 Demand and Needs Analysis Selected Indoor Facility Use One in seven residents questioned (15 1/6) reported having at least one member who used the Silver Creek Community Center in the past year. The Dr. Martin Luther King,Jr. Community Center was reportedly used by members of 7%of households in the last year. Most Used Recreation Facility The recreation facilities reportedly most often used included: Hart Memorial 8% Library 3% Yokuts 5% Jefferson 3% Silver Creek 5% Buena Vista 3% Park at River Walk 4% Jastro 3% Beach 4% Kern River Parkway 3% Beale 3% Planz 3% Recreation Activities Usage Of activities tested in the survey,the 10 tested activities cited as being under taken by the largest share of the Bakersfield households currently polled were Walking/jogging/running 70% Recreational basketball 30% Picnicking 62% Trail hiking 25% Bicycling 47% Swimming for recreation 24% or lessons Use of play equipment, tot ° Organized league ° lots 38/° basketball and 19/0 Use of wet playgrounds 32% Softball 16% Recreation Programs Use "Frequent Users" comprised 21% of the entire sample of households polled. Frequent users were most often found among respondents who reported having children under the age of 18 years (32% frequent users vs. 11% among households without children). "Moderate Users" constituted an additional 25% of the households interviewed and the remainder (54%) was labeled "Light/Non Users." More than four in 10 Bakersfield residents polled (45%) reported not using the programs at all in the last year. Such non-users were more often found among residents of Southwest and Southeast Bakersfield (51% "Non Users" vs. 35% among remaining respondents); among households with a head 60 years or older(65%vs. 40% among remaining respondents); and in households without children less than 18 years (58%vs. 30%among households with children). Page 3-8 Bakersfield Recreation and Parks Master Plan ;; CHAPTER 3 Demand and Needs Analysis Selected Program Use Four out of 10 residents questioned reported having at least one member who used fitness or gymnastic lessons or classes in the past year. Music,drama,dance or performing arts lessons or classes were reportedly used by members of 26% of households in the last year while arts, crafts, or cooking lessons or classes were used by 23% of households. Parenting and early childhood development lessons or classes were used by 15% of those polled. One Desired New Facility In aggregate, 75%of the responses received identified specific facility types.The remaining 25% of respondents indicated that they had no new recreation facility desired. Response results garnering at least a 2% response that were facilities other than those previously analyzed in the survey included Bandshell, East parks,volleyball, fishing, fitness center,dog park, and teen/youth services. One Desired New Program In aggregate,69%of the responses received identified specific program types. The remaining 31%of respondents indicated that they no new recreation program needs. Program types garnering the greatest number of responses included Arts or Crafts Instruction or 6% Personal Development or 2% Classes Business Instruction Swimming Lessons 5% Outdoor Concerts 2% Aerobics, Spinning, or Fitness ° Before or After School Day Classes 5�O Care 2° �0 Dance Instruction or Classes 3% Baseball or Softball 2% Martial Arts Classes 2% Yoga, Meditation, or Stress 2% Relief Instruction or Classes Basketball 2% Youth Programs 2% Adult Day Care 2% Development Fee Increase Residents polled most often stated they are somewhat or definitely against the development fee increase proposal (55 1/o). The greatest levels of support for the proposal were noted among respondents reporting a household head less than 40 years (53% somewhat/definitely support vs. 40% among remaining respondents);among respondents describing themselves as Hispanic (53%vs. 42% among those described as White); and among households with children less than 18 years (49%vs. 40% among those with none). © I Bakersfield Recreation and Parks Master Plan Page 3-9 B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM JUN 12 2007 TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director f DATE: June 12, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 10 What is the status of installing a signal at River Run Councilmember and Ming? (Raul Rojas) Couch At the present time, the intersection of Ming Avenue at River Run is not warranted for a traffic signal. It is expected to be warranted when the adjacent Castle and Cooke development of commercial property is built. Castle and Cooke is the developer of the area and have designed the plans for the traffic signal to go in with the development in anticipation of the location meeting warrants in the future. Timing of the commercial development is not known. Traffic Engineering will schedule a traffic signal warrant study to determine if the location is close to meeting, or meets, required minimum warrants. GAGROUPDAT\Budget\07-08 Budget\Council Updates\Signal at River Run and Ming.doc B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: June 7, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 11 What is the status of right hand turn pockets from Councilmember westbound Stockdale onto northbound Coffee? Couch (Raul Rojas) When the project was in design phase, staff asked the owner of the property to dedicate the right of way necessary for the west-bound-to-north-bound right turn lane at this intersection. The offer was if the owner would dedicate it, the City would construct the improvements. (The norm is that the property owner will be responsible for both the dedication and construction costs when he develops the property.) The property owner declined this offer, so staff was not able to include construction of this right turn lane in the current project. After the budget presentation on June 4, 2007, staff again contacted the property owner and asked him if he would dedicate the necessary right of way. He is now considering it. In the event that he does dedicate that right of way, staff will bring forth a project to construct this right turn lane. GAGROUPDA-RBudget\07-08 Budget\Council Updates\Stockdale-Coffee Turn Pockets.doc i JUN 1 1 2007 B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: May 17, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 12 Would like more information about where the grade Councilmember separation at Rosedale Hwy and Landco is on the Couch County's list of projects. (Raul Rojas) Public Works staff has talked with Kern County Roads Department staff regarding the separation of grade for Rosedale Highway at Landco. Kern County does not have a formal priority list for the construction of grade separations, but informally they said they would think that both the Allen Road/Hageman Road and Kratzmeyer Road grade separations would be above the grade separation at Rosedale Highway, primarily due to past accident history. GAGR0UPDA-RBudget107-08 BudgetlCouncil Updates\Rosedale-Landco.doc B A k E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director ! � DATE: June 7, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 13 Will the City assume responsibility for the '/ of the I Councilmember intersection at Brimhall & Verdugo that is in the Couch County since the other 3/ are in the City? Raul Rojas As currently programmed, the budgeted funds for this project is based on the City covering 100% of the project costs. Staff will approach the County of Kern to find out if they are willing to contribute to this project. GAGROUPDAT\Budget\07-08 Budget\Council U pdates\Brim hall-Verdugo.doc S A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: May 17, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 14 Would like more information about median areas that Councilmember are not landscaped (Staff to contact Councilmember Couch Couch for a list). (Raul Rojas) Following is the status of each of the landscape/median projects that you inquired about: 1. Stockdale west of Allen Road: Currently we have no budget to construct this missing portion of the median. We will continue to keep this section of median on our "radar screen" and construct it when money becomes available. 2. Hageman west of Coffee Road: This portion of median simply needs to have a minor amount of landscaping installed. We will work with the Parks Department to complete this work. 3. Olive Drive at Calloway Drive: We recently completed all of the necessary construction for this road widening project. The remaining landscaping portion will be designed and completed within the next six months to one year. This project was part of a larger intersection project that involved moving the Friant Kern Canal and as such is funded through the Transportation Development Fund. GAGROUPDAT\Budget\07-08 Budget\Council Updates\Medians.doc E A K E R S F 1 E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: May 17, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 15 Would like more information on funding sources for Councilmember the $1.3 million CIP project at the Municipal Airpark. Carson (Raul Rojas) Funds for the project at the Municipal Airport are 95% federal (FAA) and 5% local match. The City General Fund will not be used as the 5% local match will be covered by the General Aviation Fund. GAGROUPDAT\Budget\07-08 Budget\Council Updates\Airpark.doc i B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: May 17, 2007 SUBJECT: Budget Workshop on June 4, 2007: Response to Council Questions No. 16 With regards to the road resurfacing on Coffee Rd Councilmember adjacent to the Stockdale Village shopping center: Benham a. Would like the City to look into signage that will help travelers navigate the various exits of the shopping center, and do we have someone communicating our timeline with the stores? (Raul Rojas) Staff will investigate the type and feasibility of informational signs for traffic leaving the Town & Country shopping center. The traffic signal at the shopping center entrance and Coffee Road should be open by the end of the day Friday, June 8. Currently the schedule to complete the pavement reconstruction portion of the work requiring one lane in each direction is Tuesday, June 12. Traffic will still be reduced by one and sometimes two lanes in each direction during the remaining phases of work; however, these periods will be when construction is actively in progress and should be open by afternoon rush hour. GAGROUPDAT\Budget\07-08 Budget\Council Updates\Coffee Road-Stockdale Highway Resurfacing.doc BAKE of a oa U"aRs' U �� d cgL`F,°BylP MEMORANDUM CITY ATTORNEY JUN 1 ' 2007 June 11, 2007 TO: HONORABLE MAYOR AND CITY COUNCIL FROM: VIRGINIA GENNARO, CITY ATTORNEY I �1 SUBJECT: COUNCIL QUESTION NO. 17 FROM 06/0044//07 BUDGET PRESENTATION COUNCILMEMBER BENHAM REQUESTED THE CITY ATTORNEYS OFFICE INVESTIGATE WHETHER THE CITY WILL FACE ANY LIABILITY ISSUES, LIKE THE ONES BEING DISCUSSED REGARDING QUIET ZONES, BY RELOCATING THE RAILROAD CROSSING ARMS AT PANAMA LANE & UPRR SUNSET BRANCH CROSSING? Question: Whether the City will face potential liability due to the reconstruction of the railroad crossing at Panama Lane on the UPRR Sunset Branch crossing? Answer: No. The City will not face liability issues similar to the issued that could arise from the creation of a Quiet zone. The City is not creating a Quiet Zone. Rather, it is merely doing road improvements and paying UPRR to construct improvements on the crossing. UPRR is responsible for all signal construction and any work within two feet of the tracks. VG/dll cc: Alan Tandy, City Manager S:\COUNCIL\Referrals\06-07 Referrals\Benham-17BdgtPres.PanamaLnRRXing.doc JUN 7 7 ?007 B A K E R S F I E L D MEMORANDUM June 7, 2007 TO: ALAN TANDY,�C�TY MANAGER FROM: MAURICE RANDALL, BUSINESS MANAGER THROUGH: FLORN CORE, WATER RESOURCES MANAGER SUBJECT: FY 2007-08 DEPARTMENT BUDGET PRESENTATIONS RESPONSE FROM THE CITY COUNCIL ON JUNE 4, 2007 Question/ June 4th 2007 Dept. Budget Presentations Response No. 18 Would like more information about the differences in Councilmember rates collected by the various water service Carson companies. (Florn Core) The rates California Water Service Co. charges are regulated by the California Public Utilities Commission. Unlike the City of Bakersfield, Cal Water is allowed to recover a reasonable rate of return on its operations and they are required to pay income taxes on the profits. Cal Water has operated and maintained its water system in central, northeast and southeast Bakersfield since 1927. Due to the age of many of their facilities the system continues to require large capital replacement costs as well as higher ongoing maintenance and operational costs on an annual basis. In an effort to meet increased water quality standards and reduce annual capital and operational costs Cal Water recently took advantage of the newest technology in water treatment by investing in a new $50 million water filtration plant in Bakersfield which should help stabilize rates in the future. S:\BUDGET\2007RESPONSETOBUDGETQUESTIONS.doc B A K E/Xmows� 0 R S F 1 E L D Development Services Department Stanley C. Grady, Director M E M O R A N D U M TO: ALAN TANDY, CITY MANAGER FROM: STANLEY C. GRADY, DEVELOPMENT SERVICES DIRECTOR DATE: June 8, 2007 SUBJECT: BUDGET WORKSHOP ON JUNE 4, 2007: RESPONSE TO COUNCIL QUESTIONS No. 21 Describe General Plan policies on agricultural land preservation and infill development being considered in the General Plan Update. (Councilmember Benham The attachments are in response to the question raised by Councilmember Benham during department budget presentations. Planning staff has been reviewing ways that the City could promote infill development and new urbanism concepts without a major overhaul of existing processes. The attached memorandum contains their initial report. Agricultural policies of the general plan and their relationship to CEQA, are contained in the attached outline. At this time, we do not have a uniform strategy to mitigate the loss of agricultural land. The issue is being addressed on a project by project basis. A different approach may emerge through the general plan update process. SG\dlc attachments B A K E R S F I E L D Development Services Department - Planning Division M EMORANDUM June 7, 2007 TO: STANLEY C. GRADY, DEVELOPMENT SERVICES DIRECTOR FROM: HAYWARD J. COX, ASSOCIATE PLANNER,-C , ` SUBJECT: SHORT-TERM SMART GROWTH IMPLEMENTATION Jim M., Jim E., Paul, and I have followed up on our discussion regarding potential Smart Growth implementation opportunities. The following outline describes the short-term implementation measures, including anticipated processing timeframes, we propose to undertake subject to your approval: 1. Establish a new overlay zone which can be applied to older residential and commercial infill development areas to invigorate growth through modified development standards, including but not limited to: a. Reduced parking requirements; b. Mixed-use development, including live/work lofts; and C. Waiving owner-occupancy requirements for second dwelling units. This measure will allow for greater density in older areas of the City. It will also eliminate the need for special hearings to attain needed flexibility in zoning standards for these areas. The Baker Street area is a candidate for implementation of this overlay zone following its adoption. Planning Commission Hearing: Approx. 3- 4 months 2. Require parkway landscape strips along public streets to improve walkability. Coordinate with Public Works based upon the design work formerly presented at the Council Committee level. No Planning Commission action necessary. This measure will improve the aesthetics of public streets, improve walkability, and enhance pedestrian safety by providing a buffer between pedestrians and vehicular traffic. -1- City Council Hearing: Approx. 2-3 months 3. Modify the design standards of the multi-family zones to improve the architectural design quality of such development, particularly smaller infill developments in the R-3 and R-4 zones. This measure will improve and preserve the architectural quality of residential neighborhoods. Planning Commission Hearing: Approx. 2-3 months 4. Comprehensively review the Parking Ordinance and modify where appropriate, possibly including: a. Allow tandem parking spaces in certain residential infill developments, provided they are not located within the required front yard setback. b. Reduce the guest parking requirements for residential developments of 2 to 4 units on lots of 10,000 square feet or more. C. To avoid excessive mandatory parking development, require parking studies in larger developments to determine minimum acceptable parking levels, or use staff-run model for parking. d. Relax parking requirements in certain residential and commercial mixed- use zones where adequate on-street parking exists. e. Allow on-street parking to be applied towards parking requirements in existing infill circumstances/developments. f. Determine minimum/maximum parking requirements for mixed-use zones. This measure will eliminate over-development of parking lots, reduce the heat- island effects of new development, and improve the aesthetics of the community. Planning Commission Hearing: Approx. 4-6 months 5. Incorporate policies into the General Plan and adopt zoning standards to promote greater connectivity between residential and neighboring commercial uses including: a. Require commercial developments in newly developing areas to be bounded by public streets. b. Greater use of the grid street pattern and shortened block lengths. C. Require direct pedestrian connections, with enhanced design standards to ensure public safety, from residential subdivisions to adjacent commercial development areas. d. Apply the pedestrian walkway and public space provisions of the Large Retail Centers Ordinance to certain smaller commercial and mixed-use developments, where such developments are adjacent to residential areas. -2- This measure will relieve traffic congestion on arterials by providing alternate routes, reducing the distance of pedestrian and vehicular trips to neighborhood destinations, encouraging walkability and generally improving circulation and accessibility between neighborhoods and commercial developments. Planning Commission Hearing: September, 2007 Long-Term Implementation Measures Other potential implementation measures discussed, but deemed to be long-term measures to be addressed through the General Plan Update process and beyond include: 1. Further develop the General Plan concept of mixed-use centers, surrounded by medium density residential uses. Enhance the current C-B and C-C Zones, or develop a new zone for this undertaking. 2. Consider the requirement to incorporate a mixture of uses within the C-B and C- C zones, or create a new zone, possibly including a required minimum intensity of development (e.g. minimum floor area ratio and/or lot coverage). 3. Revise the minimum and maximum density levels in all "R" zones and General Plan land use designations to maximize the efficient use of remaining developable land (revisit minimum setbacks and lot sizes). 4. Consider requiring the preparation of Master Plans when the first development proposal is submitted within an area designated for a mixed-use center under the General Plan, regardless of the size of the proposal; 5. Consider form based zoning in the downtown area to achieve flexibility and a pedestrian friendly environment or a hybrid that addresses setback issues. 6. Expand downtown provisions and coordinate various downtown plans and areas (e.g. Downtown RDA, Central Parking District, Central City Master Street Tree Plan, etc). cc: Jim Movius Jim Eggert Paul Hellman SAHayward\Smart Growth Short-Term.doc -3- RELATIONSHIP TO COUNCIL GOALS Goal No. 4 Plan for growth and development No. 15 Develop strategies to reduce consumption of prime agricultural land for urban development RELATIONSHIP TO GENERAL PLAN GOALS 1. Provide for the planned management, conservation, and wise utilization of agricultural land in the planning area. 2. Promote soil conservation and minimize development of prime agriculture land as defined by the following criteria: • Capability Class I and/or II irrigated soils • 80 — 100 Storie Index rating • Gross crop return of$200 or more per acre per year • Annual carrying capacity of 1 animal unit per acre per year 3. Establish urban development patterns and practices that promote soil conservation and that protect areas of agricultural production of food and fiber crops, and nursery products. POLICIES 2. Review projects that propose subdividing or urbanizing prime agricultural land to ascertain how continued commercial agricultural production in the project vicinity will be affected (1-2). 3. Protect areas designated for agricultural use, which include Class and II agricultural soils having surface delivery water systems, from the encroachment of residential and commercial subdivision development activities (1-2). 4. Monitor the amount of prime agricultural land taken out of production for urban uses or added within the plan area (1-3). 5. Encourage coordination between the Soil Conservation Service and local planning agencies (1-7). 9. Protect prime agricultural lands against unplanned urban development by adopting agriculture zoning, agricultural land use designations, and by encouraging use of the Williamson Act and the Farmland Security Zone Program and policies that provide tax and economic incentives to ensure the long-term retention of agricultural lands (1-5). 10. Encourage landowners to retain their lands in agricultural production (I- 6). 11. Encourage property owners to improve or preserve soil conditions (I- 7). 14. When considering proposals to convert designated agricultural lands to non-agricultural use, the decision making body of the City and County shall evaluate the following factors to determine the appropriateness of the proposal: • Soil quality • Availability of irrigation water • Proximity to non-agricultural uses • Proximity to intensive parcelization • Effect on properties subject to "Williamson Act' land use contract. • Ability to be provided with urban services (sewer, water, roads, etc.) • Ability to affect the application of agricultural chemicals on nearby agricultural properties. • Ability to create a precedent-setting situation that leads to the premature conversion of prime agricultural lands • Demonstrated project need • Necessity of buffers such as lower densities, setbacks, etc. (1-8) IMPLEMENTATION 2. Evaluate discretionary projects for their impact on agricultural resources. 3. Document urban expansion and changes in the amount of agricultural land for purposes of determining cumulative impacts to prime agriculture land. 5. Encourage the use of Land Conservation Act contracts in areas designated for agricultural land use. 6. Provide public information on economic incentives available to aid in the preservation of prime agricultural land. 7. Coordinate with the Soil Conservation Service to provide technical assistance on improving or preserving soil conditions. 8. Review General Plan Amendment proposals to urban uses in accordance with factors specified in Agricultural conservation Policy No. 14. RELATIONSHIP TO CEQA Would the Project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agriculture use, or a Williamson Act contract? C) Involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non- agricultural use? • Project Specific Impacts • Cumulative Impacts B A K E/: r 0 R S F 1 E L D Development Services Department Stanley C. Grady, Director M E M O R A N D U M TO: ALAN TANDY, CITY MANAGER FROM: STANLEY C. GRADY, DEVELOPMENT SERVICES DIRECTOR DATE: June 8, 2007 SUBJECT: BUDGET WORKSHOP ON JUNE 4, 2007: RESPONSE TO COUNCIL QUESTIONS No. 22 Would like more information on the categories of group homes and the City's options to restrict the locations and/or proximity of group homes. (Councilmember Carson The attached material is in response to the question raised by Councilmember Carson during department budget presentations. SG\dlc attachment RESIDENTIAL CARE FACILITIES State law preempts local zoning controls over licensed residential care facilities. If a licensed facility serves six or fewer persons (this does not count the caregivers), the law states this is a residential use and therefore, cannot be treated any differently than a typical family living situation. This means that the city cannot require any special permits, business license, home occupation permit, fire code restrictions, building codes, etc. unless such is required of any other family dwelling. Occupancy (number of people) is limited by the Uniform Housing Code, which applies to all residences, and is based on the size of each bedroom. The areas under state law cover a number of different types of residential care homes. These preemptions are found as follows: Health facilities (care for developmentally disabled and skilled nursing care) California Health and Safety Code Sections 1267.8, 1267.9 Community care facilities (covers all other types of care not already noted for adults and children) California Health and Safety Code Sections 1566.3, 1567.1 Residential care facilities for the elderly California Health and Safety Code Sections 1568.083, 1568.0831, 1569.85 Alcoholism recovery and drug abuse facilities California Health and Safety Code Sections 11834.02- 11834.30 Family day care homes (day care for children) California Health and Safety Code Sections 1596.70- 1596.795; 1597.40- 1597.47,1597.65 Homes or facilities for mentally disordered, handicapped, or dependent and neglected children California Welfare and Institutions Code Sections 5115- 5120 State law requires that a residential facility have a valid license to operate (Section 1568.5 of the Health and Safety Code). Therefore, if a facility is licensed by the state, the city must recognize the zoning preemption. Without a state license, the zoning preemption is not effective. Two agencies license these facilities. The State Department of Social Services licenses all day care, mental care, group, and elderly care homes. The State Department of Alcohol and Drugs licenses only alcohol and drug rehabilitation homes. Both agencies conduct annual inspections of these homes and will respond to complaints regarding their operation. There is no distinction made for secular verses non-secular providers. Over concentration of certain care homes in a neighborhood is also regulated by the state for licensed facilities. Licenses issued by the Department of Social Services (except for foster homes and elderly care) must be a minimum of 300 feet away from any other licensed home (as measured from the outside walls of the house - Section 1520.5 of the CA Health and Safety Code). If a home is less than the 300 feet, an exemption must be granted by the city, otherwise the license is denied. (To date, the City of Bakersfield has not granted any exemptions, nor would they be supported). This 300-foot separation restriction does not apply to licenses issued by the State Department of Alcohol and Drugs for rehabilitation homes. Listings of licensed facilities may be obtained from both agencies either through the internet at www.calcarenet.ca.gov or by phone. State Department of Social Services: Monterey Park - (323) 981- 3300 (group homes only; operational complaints) State Department of Social Services: Fresno - (559) 243-8080 (elderly, disabled and day care homes, operational complaints) State Department of Alcohol and Drugs: Sacramento - (916) 445-0834 (alcohol and drug rehabilitation only; operational complaints)