B A K E R S F I E L D
CITY MANAGER'S OFFICE
MEMORANDUM
February 24, 2006
TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager Fl� rte.
SUBJECT: General Information
1 . We received some significant news this week that will move the Westside Parkway
project forward. The Draft Environmental Impact Report has been approved for
public circulation by the Federal Highway Administration. Staff and our consultant
for this project have been working with CalTrans and the FHWA for 3+ years to
reach this major milestone. The Westside Parkway, a 4 to 8 lane freeway
extending from State Route 99 west for over 8 miles connecting into Stockdale
Highway near Heath Road (see attached map), was in the planning stages before
we received the funding for the Thomas Roads projects ("TRIP"). However, it has
been included in the scope of work that Parsons Transportation Group will be
managing for us.
We anticipate the Draft EIR will be available to the public for review and comment
shortly. The comment period will be 45 days, during which there will be a public
hearing with the Planning Commission. At the conclusion of the comment period,
comments received will be addressed and incorporated into the final environmental
document, and there will again be public hearings with the Planning Commission
and the City Council. Upon completion of those processes, the FHWA will have to
sign off before we can move forward with construction.
2. We have more good news, per the enclosed correspondence from the California
Housing Finance Authority. Our request for $1 million, the final funding piece
needed for the Baker Street mixed use redevelopment projects, has been
approved. The funds will be used to underground the utilities and help underwrite
some construction costs for the project. It was a competitive loan and we were
very fortunate to be a recipient. It is a 3% simple interest loan due in 10 years.
Thanks are, again, due to Donna Kunz and her staff for "making money' for our
redevelopment efforts.
3. The installation of the new playground equipment at Quailwood Park has been
competed. There will be a brief ribbon cutting event next Thursday, March 2nd at
3:30 p.m.
Honorable Mayor and City Council
February 24, 2006
Page 2
4. The CVB president sent the enclosed letter to the Planning Department as
notification that he is withdrawing his request to rename a portion of "S" Street as
Merle Haggard Way.
5. The City/County Emergency Communications Center has received re-accreditation
as an Emergency Medical Dispatch Center of Excellence from the National
Academies of Emergency Dispatch. There were only ten ECC's in California
recognized for comprehensive implementation and compliance with the required
standards.
6. The Streets Division work program for the week beginning February 27th is
attached.
7. Responses to Council referrals are enclosed, as follows:
Councilmember Couch
• Report on the issues surrounding the local match on the Thomas Roads (TRIP)
project;
Councilmember Sullivan
• Report on the location/length of time railroad cars are laid over and whether
there is any requirement for railroad companies to abate graffiti on railroad
cars;
• Status report on continuing Police patrol at Ming and Valhalla;
Councilmember Scrivner
• Feasibility of Police patrol within neighborhoods, not just the perimeter;
• Status report on neighborhood concerns from the meeting with Berkshire-
Hosking area residents.
AT:rs
cc: Department Heads
Pamela McCarthy, City Clerk
3
x
GO
ky_ VO
' ~{ a#.m
EA? 2y
� � A
�#
3
t 1
d� ¢
} •! ..a
k
5
r r / +I
i }{
-
h X CD
i _ ! r , s . •
I IA
,,
4
OW
i I v
r -
1�':
Route, .A .
j
State of California
Cal HFA SM California Housing Finance Agency
RECEIVED
February 16, 2006 FEB 2 2 2006
CITY MANAGER'S OFFICE
Alan Tandy, Executive Director
City of Bakersfield
Bakersfield Redevelopment Agency
900 Truxton Avenue, Suite 201
Bakersfield, CA 93301
Re: Application to HELP Program
Dear Mr. Tandy:
We are pleased to inform you that your application for round 1 of Fiscal Year 2005/2006
HELP Program funding has been approved in the amount of $1,000,000. We received
applications totaling in excess of $16 million, for which we had approximately $10 million
available. We are excited about your participation and look forward to a mutually
rewarding partnership.
This commitment of funds is conditioned upon receipt of an executed HELP Loan
Agreement no later than May 1, 2006. We will be forwarding a Commitment and Loan
Agreement under separate cover for your review and execution. In the meantime,
please feel free to call Amanda Rose, HELP Program Manager, at (916) 445-9313 if you
have any questions.
Sincerely,
Theresa A. Parker
Executive Director
cc: Donna Kunz
Sacramento Headquarters Los Angeles Office
P.O. Box 4034 100 Corporate Pointe, Ste.250
Sacramento, CA 95812 Culver City,CA 90230
(916)322-3991 (310)342-1250 www.calhfa.ca.gov
GREATER BAKERSFIELD
CONVENTION & VISITORS BUREAU
February 21, 2006
Margaret Adams
Planning Department
City of Bakersfield
1715 Chester Avenue
Bakersfield CA 93301
Dear Margaret,
Please allow this letter to serve as official notification of our request to cease our
efforts to rename a portion of"S" Street Merle Haggard Way. It is not our intent
to request any name change for the street at this time or in the immediate future.
I want to thank you and the staff in the planning department for your efforts on
this project thus far.
Sincerely
Don aega Zr
President
01/31/2006 12:55 6613246557 ECC FIRE DISPATCH PAGE 02/04
FOR DIATE RELEASE:January 6,2006
iufozmatiort about the National Academies,
f orb at°Rttt-. 236 r -359-6916.
CONTACT: Carlynn PAP,Associate Director
Kern Coon /Bake
tY rsffe
Id City Fce :y
Coiuumunications Center - Awarded -., ccredi to
as an Er»ergemcy Medical Dispatch Center of
Excellence
SALT LAY CI I Y,�--The National A
is pleased�o fCr"Y award ca a ies of Emergency Dispatch(NAED)
Y and Re-A,ccr"tation as an Emergency Medical Dispatch
Center Of Excellence,to Kern Co
Center — t3'�akersfield City Emergency Conunwnications
Kean County/Balcrsfield City Em eac
only ten dmrr � Y C-ommunicaliona Center is one of
c-' 8�y communications een ms in California,and was the 77*in the
world,to be awarded this highest diction for[heir
and�pliance with tlxe Medical Priority Dispatch System prehetuive implamentatioti
Points of Excellence," ADS)and associated"20
� The Mss world's Th is the most widely-used 9I 1-typ pre-arrival
p h-life-supper protocol systcim.With asuction and
y relief' scripted tel hone for It,
aizwa obsktuction a Iul eP instructions Cp
heruorrhag contml,and c dbirth tanc
a been credited with e.the MPDS has
w' ",' oversight,medi hclpitig save thousands of lives.In addition to requiring r
-tip cal control,and a q g P oP� system
; ;. d� � Ix h'>mprovetnentprogram,RO-Accreditatiou
`< ;xt"tsy y mescal disPabcheiS � area and oerti8eation for all emergeQCy call-takers and
t Earmng this Re`
self-study Accreditation awazd is vol t�3' iniv
.�;:.;• , and analysis.This ace un and involves completing a detailed
within orrtplishxnerit demonstrat o Iz
r..,
wo the°Quuicatioms center,but also to the administratio only esiC individual
s .L
world,that lean Counhr/Bakersfielb City E n,c-ocumumty,and the
` " x
compliant with all international Emergency Communications Centex is
:. ( MD practice standsrds for Emergency Medical,Dispatch
l"th head uart
as 4 ers based in Salt Ike City Utah,the National Academies of Eneet
ka is a 501(c)(3)non-pmfu Organlyatlon CO geftcy Dispatch
' a„d standw*for eneergancy Medical,Fmprlsz < uT `tc with related programs
and dates the Medical priority bis etch 1Ia d �hi 14J regularly reviews
Y ,5� r' protocols and c¢rt}/iCation stm�dw
'Patch ri t'wf tt is Jot " and afro ma +ns
MPDS l df}br Firt xr a F'a1gr� t
�- ^? e structure. The NetElJ is the ` ''� � crrt the timeprov ,=
x` nom; standard-salting body,with over 30,000 public-sa/ety dispatch ixdusrry's lead ark In
z> r�{ members in 20 couhries. c ff
F 1 SEI}'W(• 11ff COURSE FOR EMIEiRGE/YCYDMWaj ,
VI�RLDWIDjE ,,.,
PUBLIC WORKS
STREETS DIVISION — WORK SCHEDULE
WEEK OF FEBRUARY 27 — MARCH 3, 2006
Continue pulverizing streets in the area north of Auburn Street, east of Maywood Drive.
Continue working on the amphitheater at Riverwalk Park.
Crack sealing on Stockdale Highway, between Wible Road and North Stine Road.
AREA SWEEPING SCHEDULE
Monday, February 27, 2006
Area between Columbus Street & Wenatchee Avenue, University Avenue to Panorama Drive.
Wednesday March 1, 2006
Area between Granite Falls Drive & Hageman Road, Calloway Drive to Coffee Road.
Thursday March 2, 2006
Area between Ashe Road & New Stine Road, Stockdale Highway to Sundale Avenue.
Friday March 3, 2006
Area between Casa Loma Drive & Watts Drive, Union Avenue to Cottonwood Road
Tuesday, February 28, 2006, Sweeper Operators are on their regular sweeping routes.
B A K E R S F I E L D
OFFICE OF THE CITY MANAGER
MEMORANDUM
February 24, 2006
TO: Honorable Mayor and City Council
FROM: Alan Tandy, City Manager
SUBJECT: Impact of Thomas Roads Money and Other Changed Circumstances on
Transportation Development Fee (TDF) Project List, and Associated
Issues
Introduction
Street and highway construction planning and financing has gone through unique and major
changes recently with the accelerated growth rate of the community and, particularly, due to
the $630 million and associated local match requirements brought in by Congressman
Thomas. In this report, we attempt to identify what those conditions mean to road and
highway planning, as well as projects to be funded by the TDF monies.
Transportation Development Fees
Due to the rapid growth rate in Bakersfield, we project:
1 . That nearly $21 million in TDF revenue will be brought in this year. The doubling of
the fee that was approved by the City Council and the new vesting map policy on map
extensions should keep a very high revenue stream in place even if growth slows
considerably.
2. That we will have a projected fiscal year end balance of over $8.0 million in
unobligated TDF money on June 30, 2006. (See Exhibit A)
3. That the rate at which we are receiving TDF revenue exceeds our ability to process
projects through the planning, environmental and construction phases. Therefore,
fund balances are projected to get increasingly larger over the next several years.
(See Exhibit B) The projected fund balance goes up each year to a projected $40
million in 2011-2012.
Honorable Mayor and City Council
February 24, 2006
Page 2
4. No TDF eligible projects are being delayed due to a lack of funding. In fact, at the start
of the current fiscal year, as a result of the high revenues being received, we
accelerated, from future years into this year's program, most of the list of outstanding
TDF projects. The money for these projects is on hand, and is over and above the
projected TDF Fund balance of $8.0 million. Please note the long list of projects on
Exhibit B for the 2005-2006 budget.
5. No TDF projects are projected to be delayed due to a lack of funding through 2011 —
2012.
6. Most of the larger TDF projects on the wish list beyond those currently funded will be
delayed, not because of money, but because of the time it takes Cal Trans to process
documents and do their environmental reviews. Hoskings, Snow and Olive likely have
five to seven years each of processing time, for example.
Thomas Roads
1. Congressman Thomas delivered $630 million in new highway funds to Bakersfield.
The entire list of outstanding projects on the TDF list totals $455 million. The funds
provided by Congressman Thomas exceed that amount by $175 million. Even taking
inflation into account, to update the cost of the project list, the total dollar amount
needed for the TDF list falls far short of the level of funds the Congressman delivered.
2. The traffic carrying capacity of the roads to be built with the Thomas money will reduce
the number of projects needed in the future. As an example, the Westside Parkway
will relieve traffic on Coffee, Truxtun, Brimhall, Rosedale, etc. When capacity is added
by the freeways, it reduces the need for projects on other streets. It may be that, to
some degree, adding in the need for the local match for the Thomas Roads project will
be a cost substitution.
3. The Thomas Roads projects generate the need for a local match of $98.5 million. (See
Exhibit C) We have requested $12.3 million from the County and $2.5 million from
Shafter. That leaves a balance of $83.7 million for the City to generate. We have
been asked the hypothetical question of what if the '/2 cent sales tax does not pass. In
that case we assume TDF becomes the source for the local match, we can estimate
an ability to reserve surplus amounts such as the $8.0 million projected for July 1 st and
$7.0 million for the following year, etc. It will take several years to get through the
environment and design processes. Realistically, we believe about $27 million can be
reserved by FY 2009-2010. In addition, we have already planned for the fee to cover
$19 million in local match for the first five years (see Exhibit B). The combination of
these potential reserves and programmed match money would leave +/- $37 million to
be borrowed in an estimated 2010 time frame.
Honorable Mayor and City Council
February 24, 2006
Page 3
4. The amount to be borrowed can be included, along with interest costs, into a revised
TDF formula and fee. By building the costs into the TDF equation, the fee would be
set at a level appropriate to generate the full highway matching funds without slowing
down other needed projects. The revision of the fee and formula are very complex,
and will take about 18 months.
The Public Works Director authored a memo dated September 23, 2005 (See Exhibit D)which
responded to several different questions. One question was, "What will the ramifications be
should the 'h cent sales tax initiative not pass?"
As a part of that answer, he stated "....However, this could encumber most of the TIF
revenue to be received over the next 10 — 15 years, so other needed projects on the TIF list
not within the federal program would be delayed."
His answer was written in support of the importance of the '/2 cent tax. It did not take into
account the impact of the Thomas Roads money on the financial model. It did not take into
account the revenue trends and excess of revenues over expenditures with the TDF
program. It did not take into account an assumption of revising the TDF project list to re-
evaluate projects in light of the traffic flow capacity added by the Thomas Roads projects. It
did not take into account the potential to revise the fee and project list to incorporate what the
local match requirements, including interest into the TDF fee. At the point in time the memo
was authored, it was believed that the local match was $156 million, not the $83.7 million that
it now is.
Given all of these factors in the entire context of circumstances, the answer was incomplete
and not accurate.
Summary
There will be no delay in TDF projects, either short or long term, as a result of the entirety of
the financial circumstances within the TDF, and the net impact of Thomas Roads and the
local match requirements.
Cc: Raul Rojas, Public Works Director
Jack LaRochelle, Assistant Public Works Director
Ted Wright, Civil Engineer IV
Nelson Smith, Finance Director
Transportation Development Fund
Projection of Fund Balance as of June 30, 2006
Outstanding purchase orders
and carryovers are already
Beginnning Fund Balance, July 1, 2005 A 7,513,029 deducted from this amount.
Revenue:
Amount collected from 07-01-05 to 11-30-05:
Impact Fees 9,772,187
Other 357,092
Amount anticipated to be collected from 12-01-05 to 06-30-06:
Impact Fees 10,627,813
Other 193,710
Estimated total revenue for FY 05/06 B 20,950,802
This amount excludes purchase
orders outstanding as of June
30, 2005 and FY 04/05
Estimated FY 05/06 expenditures C -20,395,442 carryovers.
Estimated fund balance as of June 30, 2006 8,068,389
EXHIBIT A
TRANSPORTATION DEVELOPMENT FUND-LONG TERM PROJECTION OF MAJOR PROJECTS
Project Description 05!06 Bud et 06/07 07108 08/09 09110 10111 11/12 Project Totals
Projects Included In scope of work of Federal Trans ortatlon Pro cts:
241n Street/Oak Street Im 391,700 1,200.000 1.59
1 700
Bride Construction-Ha eman Road 297,000 297,000
Bride Construction-Morning SR 178 269.174 269.174
3.000,000
Bnd a Improvement-SR 99 7th Standard 3.000.000
Centennial Corndor 3,584,025 200,000 200.000 1 77,025
Ha eman Flyover 500.000 1,200,000 1,700,000
3,150.000
H 178 Wideni 150,000 100,000 2,900,000
Morning SR 178 Interchange 100.000 200.000 2'000'000 2,300.000
1,840,000
Rosedale H e/o Calloway 1,610,000 230,000
SR 178 Advanced Planning 204,478 204.470
270 000
Street Improvement-SR 178.Z Green Hills 270,000
Street Widening-Rosedale H 582,600 582.600
0
Vineland rg SR 178 interchange
39.000
West Beltway Advanced Planning 39.000 100.000
Widen Oak St-Truxtun to 24th 100,000
79.327,977
Subtotal
Projects to be funded with TDF dollars: 362,050
Akers Road At Grade Crossing 362,050
Allen Road Kern River Bride 8,403,795 8.403,795
290,382
Bridge Construction-Hosking c7 99 290,382
829,677
Bridge Improvement-White Lane 99 829,677
377,900
College Fairfax 377,900
East Beltway Advanced Planning 150.000 150,000
Harris Road at Grade Crossing 362,000 362,000
Hillcresl Postal Fac Improvement 300.000 300,000
Hosking @ SR 99 Interchange 2.150.000 3,000.000 10,000,000 15,150,000
Jewetta Avenue Improvements 199.200 199,200
300,000
Knudsen Drive Extension 300,000
3.863
Metropolitan Transportation Study 3,863
480,389
Min Ashe 480,389
524,801
Min New Stine Widening 524,801
6,000
Min Expansion 6,000
Misc.ROW Acquisitions 170,000 300.000 300,000 300,000 300,000 300.000 1,670,000
Misc.Transportation Construction 170,000 200,000 200,000 200,000 200,000 200.000 1,170,000
Miscellaneous Widening Projects 1,400,000 1,000,000 600,000 600,0001 600,000 600,0001 4,800.000
Old River Road At-Grade Xing 1,366,2701 1,366,270
alive o'�ij SR 99interchange 75,0001 1,000,000 7,000,000 8,075,000
Operating budget for Design Engineerinq staff 273,335 273,335
Panama Lane Improvement-Golden Gate 218,000 218'000
Panama Lane Widening 258.000 258'000
0
Rosedale Hwy-Gibson to SR 99
Seismic Retrofit-North Chester 1,284,211 1.284,211
28.630
Si nal-Ashe Harris 28,630
Signal-Auburn La Costa 18,350 18.350
Signal-Berkshire Monitor 115,700 115,700
0
Signal-Brimhall @ Old Farm
Signal-Columbus University 111,200 111'200
102.700
Signal-Columbus @ Wenatchee 102.700
Signal-Fairfax Highland Knolls 150,000 150,000
Si nal-Min Grand Lakes 156,700 156,700
Signal-Olive @ Rivedakes 150,000 150.000
Signal-Panama Lane A Ashe 141,900 141'900
0
Signal-Panama Lane Monitor
21,000
Signal-White Lily Dr 21,800
t9,
Snow SR 99 Interchange 200,000 400.000 1,000,000 2,500,000 15,000.000 100,000
751,300
SR 178 Shoulder Widening 751,300
Stockdale Hwy Medians 1.600,200 1,600,200
260.000
Storm Drain-Brimhall/Coffee 260,000
Street Construction-Mountain Vista/SJRR 362.050 362,050
85.000
Street improvement-Akers At Grade Crossing 85,000
30,000
Street Improvement-Calloway/Norris 30,000
Street improvement-Harris Al-Grade Crossing 40,000 40,000
Street Improvement-Railroad Crossings 85.608 85,608
Street Improvement-White,SR 99 Rams 1.684,000 1'684'000
Street Improvement 8 Si -Stine 8 Hosking 400,000 400,000
Westside Par kwa Proecl 507,379 507.379
ransmission Lines and ower al outhwesl
Corner of Coffee Road and Norris Road 200,000 2�-
Subtotal 72.957.390
Projects proposed to be funded with other sources:
251.901
Bridge Construction-Fairfax SR 178 251,981
Construction Ha eman-Mo to Land 141,268 141'200
Median Island-Allen at Brimhall 50,000 50,000
443,249
Subtotal
Annual Expenditures 34.248.6161 7.680,WOI 9,400.0ool 19,100.0001 5.600,0001 16,100.0001 600.0001 92,728,616
Beginning Fund Balance at 07-01-05 22,135,880
Projected Revenues 21,000,0001 15.000,0001 15,000,000 15-000.0001 J5.000.0001 15.0004000 15,0000001 111.0001
Fund Balance f8 887 284 16 207,264 $212807,2641 $27,107,2641 $26.007.2641 40,407,264
ggIIIBIT B
Alan Tandy- Re: '=wd: TR Page 1
From: Ted Wright
To: Alan Tandy; Raul Rojas
Date: Friday, December 16, 2005 11:38:51 AM
Subject: Re: Fwd: TR
County: $12,278,580
Shafter: $2,565,789
Bakersfield: $83.640.325 (does not include$3.241,650
$98,484,694 already appropriated for
original Cent. Cor. funding)
>>> Raul Rojas 12/16/05 10:46 AM >>>
>>>Alan Tandy Friday, December 16, 2005 10:44:59 AM >>>
I need the current exact numbers for the Thomas Roads local match and how much we hope to get from
the county and shafter- probably have it in a file but only seem to be able to locate the old one when the
state was a factor
thanks
EXHIBIT C
e1�F1054 Staffing &Timelines for Project 787.66 c "
Project 803, Referral No. 1254
Page 2 of 3
i
1. The alignment described above is a combination of the southern leg of the I
Centennial Corridor, and the Westside Parkway. The southern leg of the Centennial
Corridor will connect with SR 178, extend south and then west along the BN&SF
railroad tracks and connect to the Westside Parkway. Depending upon the alternate
chosen for the Westside Parkway, either the Centennial Corridor will connect to the
Westside Parkway east of SR99 at Oak Street in the current BN&SF railroad yard, or
they will connect west of SR99 in the current City Corporation Yard. With either
alternative, the Westside Parkway will then extend west crossing the Kern River about
where the BN&SF railroad crosses the river now, and then run parallel to and north of
the Cross Valley Canal. There will be Westside Parkway interchanges at Coffee Road
and at Calloway Drive, and these interchanges would be the closest ones to Cal State
University Bakersfield. It is planned that the north leg of the Centennial Corridor will
extend from SRI 78 northwest along Golden State Avenue and connect with SR99.
I
j
I 2. All of the projects in this federal program are also on the Capitol Improvement List
for the Traffic Impact Fee (TIF) program, and it is currently planned to use funding from
the TIF to provide the City of Bakersfield's share of the non-federal match for the
federal projects so the approval of a local transportation measure is not mandatory.
However, this could encumber much of the TIF revenue to be received over the next 10-
15 ye m t e e ogram
woul n addition, the City has a tremendous back-log o
reconstruction and rehabilitation that needs to be undertaken but for which there is not
adequate funding. Finally, while this federal program will tremendously help metro-area
traffic congestion, there are still additional problems today that need to be addressed
(such as construction of a new SR58 from east Bakersfield to Interstate 5) and this 5
does not even take into account future congestion issues resulting from our rapid pace
of development. So while the federal program will go forward with or without the local
transportation measure, there are still many issues that need to be addressed for which I
the local measure is critical.
3. The organizational structure for delivering this transportation program is currently
being developed and will be presented to the City Council shortly along with a request
for creating these new positions.
4. It is not only feasible, but staff believes critical that a Project Manager be assigned
for every project on the list. While some of the projects are small and may not require a
full-time position, most are quite large and will require a full-time project manager
Position dedicated only to that project. And, absolutely, it is the plan that all of these
projects will run concurrently/simultaneously on a parallel track.
5. A project timeline/schedule is being created for each project, and there will be I
completion dates/mile stones/etc. for staff and consultants to complete their work for
G:\GROUPDAT\Reterrals\2oo5\o9.o7\Refk1254 Stalling&Timelines for Project 787.doc
t
i
9.
EXHIBIT D
DRAFT DRAFT DRAFT
SCHEDULE G
Lake Isabella Sub-Region Expenditure Plan
Project Description Amount
Sierra Way at South Fork Bridge (replace bridge and raise road) $12.3 million
Kern County Local Road Reconstruction $12.4 million
Air Quality, Transit, Bicycle and Enhancement Program $2.9 million
Total Lake Isabella Sub-Region Measure "_" Revenue $27.6 million
SCHEDULE H
Metropolitan Bakersfield Sub-Region Expenditure Plan
Project Description Amount
Bakersfield Beltway System
North Beltway $7.5 million
West Beltway $50.0 million
Extend Route 58 to 1-5(South Beltway environmental only) $2.5 million
Centennial Corridor Loop
Crosstown Freeway Corridor $45.8 million
State Route 178 Extend West to Route 99 $34.5 million
Hageman Flyover at Route 99 $11.4 million
State Route 178 East
Morning Drive Interchange(construct interchange) $11.6 million
State Route 178 Freeway(extend freeway) $34.8 million
Existing State Route 178(widen to 6 lanes) $1.6 million
Rosedale Highway and 24`" Street
Rosedale Highway(widen to 6 lanes) $13.9 million
Oak Street and 24`"Street(construct interchange) $12.6 million
24`"Street east of Oak Street(widen to 6 lanes) $6.3 million
City of Bakersfield Local Road Reconstruction $158.9 million
County of Kern Local Road Reconstruction $28.0 million
Golden Empire Transit $35.0 million
Senior Disabled Transit $5.0 million
Air Quality, Bicycle and Enhancement Program $25.0 million
Total Metropolitan Bakersfield Sub-Region Measure "_" Revenue $484.4 million
EXHIBIT E
Revised 12/13/05 16
BA
OFs�aeo..
U y
0 MEMORANDUM
CITYATTORNEY'S OFFICE
February 22, 2006
TO: ALAN TANDY, CITY MANAGER
FROM: VIRGINIA GENNABO, CITY ATTORNE
ALLEN M. SHAVE;QEPUTY CITY ATTORNEY
SUBJECT: GRAFFITI ON RAILROAD CARS
COUNCIL REFERRAL NO. 001403
Councilmember Sullivan requested staff provide information regarding location and
length of time railroad cars are laid over and whether there is any requirement for
railroad companies to abate graffiti on railroad cars.
This is a "follow-up" response to this office's earlier memo of February 3, 2006 to
the question of graffiti removal from standing railroad cars.
Union Pacific and San Joaquin Valley Railroad personnel responded to this
question in a manner consistent with the earlier response of Burlington Northern-Santa
Fe (BNSF). There is no federal or state law that limits the time railcars may be stored
on sidings. All railroads store railcars on sidings or yard storage tracks for an unlimited
time until used.
There is no federal or state law that compels railroads to remove graffiti from
stored cars. San Joaquin Valley Railroad owns no cars — just locomotives. Union
Pacific and BNSF own relatively few cars. The large majority of cars are owned by
various independent corporations which move products by rail. However, as a matter of
public relations all railroads will investigate complaints of offensive railcars or offensive
graffiti on railcars and attempt to move stale railcars to less conspicuous places. BNSF
attempts to remove graffiti when a railcar comes into one of its shops for maintenance.
Union Pacific and San Joaquin Valley railroads will attempt, upon complaint, to move
the railcar or remove the offensive graffiti from railcars, whether or not owned by them.
San Joaquin Valley Railroad has begun using "anti-graffiti" paint on its locomotives.
The telephone complaint number for BNSF is 1-800-795-2673. The number with
which complaints may be left for the Union Pacific are the Critical Call Center at 1-888-
870-8777 or, perhaps more effectively, one may call the local special agent, Lee
Henning, at 321-4641. San Joaquin Valley Railroad callers may leave a voice mail with
the local area operations manager at 1-559-592-1857 or write to Jack Gauthier at P.O.
Box 937, Exeter, California, 93221.
VG/AMS:Isc
cc: Honorable Mayor and City Council
SICOUNCIL\Referrals\05-06 Referrals\Sullivan-RailroadLayoversGraffitiSuppi.doc
CORFORAT�"45�
BAKERSFIELD POLICE '
MEMORANDUM
cI 4I F OR��A
TO: ALAN TANDY, CITY MANAGER RECEIVED
FROM: W. R. RECTOR, CHIEF OF POLICE ��r�U FEB 2 3 2006
DATE: February 21, 2006
CITY MANAGER'S OFFICE
SUBJECT: Speed Limit Enforcement at Ming and Valhalla
Council Referral No. 1411 (Ward 6)
Council Member Sullivan requested the police department enforce the speed limit at Ming and
Valhalla.
The police department continues to provide on-going enforcement on the Ming Avenue corridor,
including the intersection of Ming and Valhalla.
TDT,'vrf
p� 13PARKp
*' f� BAKERSFIELD POLICE
p
MEMORANDUM
li
1 GARY 11.Wv
TO: ALAN TANDY, CITY MANAGER RECEIVED
FROM: W. R. RECTOR, CHIEF OF POLICE`�47"" FEB 2 3 2006
DATE: February 23, 2006
CITY MANAGER'S OFFICE
SUBJECT: Patrolling Neighborhoods
Council Referral No. 1409 (Ward 7)
Council Member Scrivner requested staff address the feasibility of patrolling within the
neighborhoods, not just the perimeter.
The police department provides neighborhood patrol in a variety of ways: marked patrol cars
with uniformed officers; unmarked police vehicles with and without uniformed officers;
motorcycle officers doing traffic enforcement, and bicycle patrol. While it may appear these
units remain outside the neighborhood, they frequently respond to calls for service in these
areas or travel through these areas en route to calls for service; this happens at all hours of the
day and night. During hours of darkness and/or when calls of service are low, officers routinely
patrol neighborhoods throughout the City often without being noticed. Additionally, our Crime
Prevention Unit encourages on-going security awareness and a continued exchange of
information through the Neighborhood Watch Program.
TDT/vrf
/0 L 0 M���
B A K E R S F I E L D
OFFICE OF THE CITY MANAGER
MEMORANDUM
February 22, 2006
TO: Alan Tandy, City Manager
FROM: Alan Christensen, Assistant City Manager
SUBJECT: Berkshire Neighborhood Problems
Council Referral #001408
Councilmember Scrivner requested staff address a list of neighborhood concerns
from his meeting with residents in the Berkshire-Hosking area.
Councilmember Scrivner asked that city staff follow up on a list of issues and
statements made at a recent neighborhood watch meeting. The following responses
are offered to Mr. Morrello, neighborhood watch captain, who will forward them to the
neighbors.
Police Department
1) There have been plants stolen out of the ground at people's houses. The police
did not show up.
2) There is a group of girls that attend 011ivier Jr. High that are tagging all over the
neighborhood. The tag says `BOM"and a list of locations will follow.
3) There is no police patrol within the neighborhood. They just drive by on
Berkshire Road.
4) Robert Morillo needs more neighborhood watch flyers. (I gave him 25 or so that 1
had in my car.
Response: The Police Department has been forwarded the above list of issues. A
Lieutentant from the department will be contacting Mr. Morrillo about them.
Public Works
1) A stop sign is needed on Berkshire Road at El Senor to slow down traffic in front
of Valle Verde Elementary.
Response: The State of California imposes strict standards upon cities regarding
when and where stops signs can be installed. The Public Works Department is
looking into whether a stop sign is warranted at that location, or determine what
other solutions are available.
2) Crosswalk lines need to be painted on Berkshire Road at El Senor.
Response: Public Works will also look into crosswalk lines at that location.
Recreation and Parks
1) When is the park going to be completed on Hosking Road between Wible Road
and South H Street?
Response: The City has entered into an agreement with a home builder to build the
Park. It will be known as Granite Pointe Park. Construction plans are completed
and have been approved by the City. We expect construction to begin by April
2006. It will be available to the public by spring or summer of 2007.
2) What are the plans for a skate park in South Bakersfield?
Response: The Community services Committee has been working on this issue for
the past few months. There are plans to expand the Beach Park skating area within
the next 2 years. We also plan to construct another City park on the east side of
Bakersfield within 3 years. Petrini Homes also plans to build a skate park as part of
their development in Southwest Bakersfield within 3 to 5 years.
Miscellaneous
1) Does the City have any kind of a program that provides minimum wage jobs for
students in the summer?
Response: The Recreation Department uses many student-age workers during
summer for lifeguards and recreation helpers. Now is the time for youth ages 16
years and older to apply. Their phone number is 326-3866.
2) Because there is no park in the area, neighborhood kids are jumping the fence at
Valle Verde School to use the basketball courts. What is Greenfield School
District policy on allowing the neighborhoods to use school outdoor facilities on
the weekends?
Response: The City does not have a cooperative agreement with Greenfield
School District for shared use of their facilities, so they are completely with the
District's control. We have forwarded your request to Greenfield School District for a
response.
G raffiti
Response: We noted seven (7) incidents of graffiti from the letter. Your letter has
resulted in a work order to the Graffiti Division of the City. We expect the graffiti will
be removed soon, if it hasn't already.
W A(A `( 5, rt-11— 5 Gtr y u) ( J (etl--f -1 v-- r
w o�aw /
From: Councilmember Scrivner
To: Alan Tandy
RE: Neighborhood problems
I met with residents in the neighborhood within the following boundaries: Berkshire Rd
to the North, Hosking Ave to the South, S. H Street to the West, S.Union Ave to the East
The neighborhood watch captain for the area is Robert Morillo. He is the contact person
for any questions: 661-827-9018
Here is a list of issues and statements at the neighborhood meeting I attended last Friday:
1) There have been plants stolen out of the ground at people's houses. The police
did not show up.
2) When is the park going to be completed on Hosking Rd. between Wible Rd. and
S.H St.? (I believe it is at the site of an old nursery)
3) There is a group of girls that attend 011ivier Jr. High that are tagging all over the
neighborhood. The tag says"BOM"and a list of locations will follow.
4) There is no police patrol within the neighborhood. They just drive by on
Berkshire Rd.
5) A stop sign is needed on Berkshire Rd. at El Senor to slow down traffic in front of
Valle Verde Elementary.
6) Robert Morillo needs more neighborhood watch flyers (I gave him 25 or so that I
had in my car).
7) Crosswalk lines need to be painted on Berkshire Rd at El Senor.
8) What are the plans for a skatepark in South Bakersfield?
9) Does the city have any kind of a program that provides minimum wage jogs for
students in the summer?
10)Because there is no park in the area,neighborhood kids are jumping the fence at
Valle Verde School to use the basketball courts. What is Greenfield School
District policy on allowing the neighborhoods to use school outdoor facilities on
the weekends?
11)There is a white pickup truck that follows the kids around in the neighborhoods
(several kids at the meeting confirmed this)
The following are locations of graffiti that I observed:
� s
1) Corner of Bronte St and Lake Valley
2 Community ailboxes at same intersection
ty o
3) Sidewalk at same intersection
4) Mailboxes and sidewalk at Moonstone and Berkshire
5) Intersection of El Senor and Lake Valley—sidewalk, community mailboxes,
wood fence
6) Power box of some sort at El Senor and Lazy River
7) Sidewalk and driveway at Lake Valley and Stargaze Dr.
Robert Morrillo called me on Monday and reported that 5 vehicles were vandalized over
the weekend.