Loading...
HomeMy WebLinkAbout3/03/2006 B A K E R S F I E L D CITY MANAGER'S OFFICE MEMORANDUM March 3, 2006 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager �T SUBJECT: General Information 1. Jim Foss has accepted a position to manage the Glendale Arena in Phoenix. He came to town well before construction on our arena was complete. He has had responsibility for every lease, concert, and touring show we have had in the building. In addition, Jim has been responsible for the positive financials and great customer service. He has always been one of the best examples of those who serve our citizens with loyalty, dedication, and hard work. We extend congratulations to Jim on his promotion to a "big league" arena in Phoenix. We extend our thanks to him for doing so much for Bakersfield, and we extend our best wishes for his future! Separately, you will receive an invitation to attend the farewell luncheon to honor Jim on Thursday, March 9t" from 11:30 a.m. to 1:00 p.m. Fittingly, it will be held at the arena in the main entrance/concourse area. 2. When you have an opportunity to visit the newly opened William M. Thomas Terminal, you will see the City Council's dedication plaque just to the left of the main entrance. The new airport facility fulfills a long needed improvement for our growing area and will provide a greatly improved first impression for visitors flying into Bakersfield. 3. Final pricing has been completed on the refinancing of the arena debt. While there are still a few papers to sign, the interest rates are set and actual savings came out a little better than estimates. First year savings (2005-06) are approximately $2,029,000 and savings in 2006-07 are approximately $237,000, so combined savings in the first 18 months will be $2,266,000. As soon as the transaction is officially completed, we will bring a request back to the Council to transfer current year debt service savings to fund the various capital improvements for the convention center and arena facilities. 4. An updated version of the City Council goals document is enclosed as a mid-year progress report. 5. A memo is attached from Recreation and Parks listing the various locations where tree trimming will take place during the next four weeks. Honorable Mayor and City Council March 3, 2006 Page 2 6. Per the enclosed memo from Chief Rector, the television program, "America's Most Wanted", on Saturday, March 11th, will feature a segment on the recent armed robbery that occurred at the Chester Lane Market. The suspect involved in that crime is still at large. 7. The Police Department is applying for a justice assistance grant for equipment, with the intention of purchasing a color copier for the crime lab. No City match of funding is required. The attached memo is to fulfill the requirement that the City Manager and the City Council to be notified about the grant application. 8. The ribbon cutting event for the new playground equipment at Quailwood Park was postponed until Tuesday, March 7th at 3:30, because of the uncertainty of weather conditions this week. With rain again in the forecast for next week, Tuesday remains tentative. 9. Responses to Council referrals are enclosed, as follows: Councilmember Benham • Public service announcements pertaining to the new fireworks restrictions; Vice-Mayor Maggard • Report on Valley Plaza security and actions to increase security standards; Councilmember Couch • Actions to ease traffic flow, including possible alternate routes during the Chester Avenue bridge renovation project; • Status report on various traffic problems — Rosedale and Landco; Allen and Hageman; Olive Drive/Highway 99; • Status report on staff review of drawings related to widening of an area of frontage road on Brimhall; Councilmember Sullivan • Actions to alleviate flooding issues at Oakdale and Western; • Time frame for completion of resurfacing at Hempstead at Edgemont and Eastbourne Way; • Status report on evaluation of a four-way stop at St. Francis School; Councilmember Scrivner • Report on various issues related to the disposal of locally generated biosolids; • Status report on requests pertaining to prosecution for graffiti offenses and the feasibility of prohibiting the sale of spray paint to those under 21; • Citizen concerns regarding poor traffic flow at White Lane and Wible, Ming Avenue and Real (further information to be provided regarding street racing concern). AT:rs cc: Department Heads Pamela McCarthy, City Clerk CITY OF BAKERSFIELD 2005 City Council Goals Status Report - February 2006 GOAL #1 : PROVIDE QUALITY PUBLIC SAFETY SERVICES Police Services: 1. PROVIDE CONSISTENT SAFETY AND LAW ENFORCEMENT THROUGHOUT GREATER BAKERSFIELD. 2. Support and enhance proactive, city-wide efforts to reduce gang violence, illegal drug use, domestic violence and child abuse. Through a variety of Crime Prevention efforts, the department educates adults and children on the dangers of gang violence, illegal drug use, domestic violence, and child abuse. The Police Activities League provides services to over 800 at risk youth per year, regularly organizing interaction between these children and sworn police officers. In 35 grammar and junior high schools, thirteen police officers teach a DARE curriculum over a 9 week period to over 6,500 children. 3. Increase the number of actual participants and neighborhoods participating in the Neighborhood Watch program. Between 7/1/05 and 12/31/05, Crime Prevention presented 46 neighborhood watch programs to various groups. We now have 626 active NW programs in the city. 4. Support implementation of the strategic plan developed by the Police Department to address delivery of Police services. Plan for and develop funding mechanisms for proposed substations and associated staffing when possible. Continue efforts to increase Police patrol and progress towards a goal of 1.3 officers per 1,000 population. In August 2005, 27 Police Trainees began our Academy. 22 are expected to graduate on 2/1/06. In October 2005, 8 Academy Lateral/Academy Graduate Police Officers were hired. Our sworn compliment is 345. 5. Continue the implementation of the red light camera enforcement program and support increased traffic safety efforts through targeted red light violation enforcement and public education regarding the hazards of excessive speed and distracted driving. In July 2005, the 8th intersection (White Lane and Wible) was added to the department's Redflex Red Light Violation program. There are a total of 12 intersections / approaches outfitted with the Red Light cameras. In 2005, the monthly average number of citations issued for all approaches was 700. 6. Encourage community efforts to identify and address the root causes of crime in Greater Bakersfield." The department continues to have a representative on the Chamber's Vision 2020 Task Force. 7. Pursue and coordinate Homeland Security programs and facilitate information sharing with state and federal agencies regarding regional security concerns. Since just after September 2001, the department has participated in a Homeland Security Task Force with the FBI and the Kern County Sheriff's Office. We have a detective assigned full-time to this position. 8. Pursue additional grant funding for Police Service Programs. In 2005, the department received new grant funding from the Office of Traffic Safety, The Alcohol Beverage Control, and we are pursuing a grant from the US Dept of Justice for Gang Resistance Education and Training. 2005 City Council Goals-Status Report 2/06 Page 1 (Vision 2020 related items are shown with a') 9. Explore new or alternative funding mechanisms for constructing and staffing new police facilities. The Police Department has been working with the City Manager's Office and other City staff in the adoption of development agreements for large areas being planned for development which provide for Community Facilities Districts to fund additional officers to serve those areas. 10. Enhance the City's graffiti enforcement efforts using community education, information on the City's graffiti Web site, City crews and volunteer clean-up efforts, and Police enforcement. Work with the City Attorney's office to develop a plan to prosecute "quality of life" misdemeanors in conjunction with the District Attorney's Office. In July 2005, the department dedicated an officer full-time to investigate graffiti cases and to conduct prevention efforts specifically aimed at this scourge. Frequently this officer is assisted by officers who are working in a light duty capacity. The GHOST (Graffiti Habitual Offender Suppression Team) program began in February 2005 and since it's inception, 77 graffiti arrests have been made, and a total of 262 cases have been cleared by these arrests. An e-mail address was created for graffiti tips and through the 32- ERASE program, over 6,000 removal requests have been logged. An additional Police Officer and Maintenance Craftworker with associated equipment were added in February 2006 to increase the City's graffiti enforcement and eradication efforts. 3 surveillance camera systems were also added for graffiti enforcement. Fire Services: 1. PROVIDE CONSISTENT FIRE AND RELATED EMERGENCY SERVICES THROUGHOUT BAKERSFIELD. The Joint Powers Agreement with Kern County has been updated and modified to address the transition of fire services from the County to the City when the land area or population of incorporated areas become the majority protected within a County fire station service area, which should provide a more consistent level of service to City residents. 2. Perform a comprehensive study for fire service needs and future station locations based on planned growth within the Metropolitan General Plan. Implement new station development plans (Pursuant to Joint Powers Agreement with County, including funding the construction and staffing of Station #12 and Station #14). Fire Department staff is currently working with the City Manager's Office on a Request for Proposal (RFP) to hire a consultant to identify future station locations due to the anticipated growth. Annually, more funds are set aside for the future construction of Fire Stations 12 and 14. Progress is being made for the funding of staff for fire stations through Community Facilities Districts (CFDs) in several of the recent master planned communities. 3. Use technology to develop faster, safer, and more efficient responses to emergencies. To help improve response times, we have preempted most signals in metropolitan Bakersfield, and are working towards the complete utilization of automatic vehicle locators and routing software to "call" the closest fire company, which may not be the assigned first-in company. With grant funding, we are moving forward with automatic vehicle locators and detailed map routing. 4. Continue Weapons of Mass Destruction training and preparation. During the past year Fire Department staff has conducted drills on mass casualty, decontamination and point of distribution sites for mass vaccination/treatment. We are continuing to update the disaster plan and become National Incident Management System (NIMS) compliant. We have an administrative Captain, through grant funding, providing Metropolitan Medical Response System (MMRS) training to hospitals, County Health, high schools and others. 5. Pursue additional grant funding for fire service programs. The Fire Department has received grant funds for the following: diesel exhaust systems for 10 fire stations, OSHA compliant medical aid jackets to protect our firefighters from biological contamination, a Fire Captain to help prepare our city for disasters and terrorist events, improvements to the Emergency 2005 City Council Goals-Status Report 2/06 Page 2 (Vision 2020 related items are shown with a') Communications Center's CAD system and the use of mobile computers, and a new fire records management system. 6. Maintain as much as possible, fire safety and public safety programs through grants and program sponsorship efforts. The Fire Department received $5,000 from Shell Oil Company and $1,750 from Walmart for the public education program. School tours have continued and staff works with the media to promote fire safety. 7. Explore new or alternative funding mechanisms for constructing and staffing new fire facilities. Fire Department staff has worked with the City Manager's Office on Community Facility Districts for master-planned communities. 8. Complete relocation of Fire Station #5. The City has purchased the land, hired the architect, and has started the planning process. Project completion should be July, 2007. GOAL #2: ENHANCE THE CITY'S TRANSPORTATION NETWORK 1. MAINTAIN AND IMPROVE THE QUALITY OF EXISTING SURFACE STREETS AND ARTERIALS BY CONTINUING TO ENHANCE THE ROAD RESURFACING PROGRAM, INCLUDING A SIGNIFICANT REDUCTION OF THE MAINTENANCE BACKLOG AND INCREASING FUNDING FOR STREET MAINTENANCE. A. Evaluate the condition of city streets and develop a measurable plan to achieve street resurfacing improvements. Develop strategies for reconstruction of segments of selected arterial streets, based on priority, using state and federal road funds or other available funding sources. All residential streets have been inspected by City staff. Streets will either be placed on the resurfacing or reconstruction list, based upon the street condition. Cost for street materials, per street, will be estimated. This will assist staff in preparing the Fiscal Year 2006/2007budget request. The Streets Division estimates resurfacing/reconstructing approximately 70 Lane Miles during the 2006/2007 budget year. B. Implement a long term program for reconstruction of arterial streets using recurring state road funds and pursue a plan through KernCOG using 10% of state road funds allocated for Bakersfield for rehabilitation of local streets and roads. Through KernCOG, the City has developed a plan to utilize 10% of its Regional Transportation Improvement Program dollars for major roadway reconstruction/rehabilitation. Although the plan is in place, the State fiscal crisis has delayed State Transportation Improvement Plan (STIP) funding. The City has budgeted one-time funds (such as the $4.2 million Vehicle License Fee receivable) that become available for roadway rehabilitation. C. Identify and create additional revenue sources to obtain all available state and federal transportation funding." Staff will apply for Federal Funds to resurface/reconstruct major streets. D. Set aside one-time eligible monies as a priority for street maintenance projects as they become available. Vehicle License Fee receivable one time revenues in the amount of $4.2 million were allocated to various street resurfacing projects. E. Support passage of the "Safe Roads Measure" for transportation funding. Staff continues to work with other agencies on developing a Y2 cent transportation sales tax measure. 2. PURSUE THE DEVELOPMENT OF FREEWAYS AND MAJOR TRANSPORTATION CORRIDORS CONSISTENT WITH THE PREFERRED ALTERNATE FROM THE URS GRIENER REPORT. A. Secure necessary rights-of-way and adequate funding. State and Federal funding is being used to acquire rights of way for the Westside Parkway. Congressman Thomas 2005 City Council Goals-Status Report 2/06 Page 3 (Vision 2020 related items are shown with a') obtained $630 million in federal dollars for various road projects in the metropolitan area this past summer. There is also proposed for the November ballot a local measure that would be dedicated to road maintenance and various road projects. Right of way has continued to be acquired for the Westside Parkway, and 65% to 70% of the right of way for the project has already been acquired. B. Meet with Kern County and encourage Caltrans to amend preferred alternate 15 and change the designation of Highway 58 from the vicinity of 7 t Standard Road to the South Beltway. Caltrans will be starting studies this coming summer to adopt a new route for SR58, and they have indicated a strong interest in designating the South Beltway as the future SR58. A clause pertaining to this new route was included in the recently approved Master Cooperative Agreement between the City and Caltrans. The County also approved the specific plan line for the South Beltway in August of 2005. C. Provide periodic workshops to update the Council on status of the freeway and beltway projects. Staff has continued to provide updates and workshops of the freeway projects. D. Encourage completion of the Westside Parkway. Staff has been working diligently with both Caltrans and the Federal Highway Administration to obtain environmental clearance for the Westside Parkway. Once this clearance is obtained, final design and construction can take place. E. Increase education efforts with the community and the opportunity for public input. Staff has continued to update the City's web site regarding the various freeway projects, as well as provide the media with information and maps of projects when requested and as they become available. F. Pursue the prudent acquisition of needed properties on designated transportation corridors from willing sellers with available funds designated for transportation purposes. The City has been using Transportation Development Fees to acquire land for various transportation projects including the southeast corner of the intersection at Oak Street and 24`h Street, and areas around the future interchange of the Westside Parkway and the West Beltway. 3. High Speed Rail A. Actively pursue high speed rail system. Staff continues to monitor and participate in meetings regarding high speed rail. 4. Promote and encourage public transportation.* Staff continues to work with the Golden Empire Transit District on locating bus stops and facilitating transit access points in conjunction with development activity. In addition, GET and the City are implementing a signalized bus priority system. 5. Support efforts for adequate air transportation. A. Work with Kern County to insure good quality air service and increase local usage. (Fly Bakersfield first). The City continues to support air service at Meadows Field, including providing financial support for the construction of the new air terminal. 6. Maintain/construct trails for cycling, walking, jogging and equestrian uses.* The new Park at River Walk has several walking paths throughout the park, and it is located adjacent to the Kern River Parkway with paved openings into the park. A walking bridge over the Kern River connects this park with the new 40 acre park site. The 40-acre park on the north side of the river is planned to have an equestrian staging area, in addition to walking paths throughout the new baseball fields. Other new developments, such as the Old River Ranch, will have several walking paths, as well as a bike path, to connect to the future regional park. In addition, standards for creating new developments are being updated to include a buffer area 2005 City Council Goals-Status Report 2/06 Page 4 (Vision 2020 related items are shown with a*) between the road and the pedestrian areas. The northeast trails plan is being implemented as development occurs in that area. Several City departments are working together to make recommendations for development of a trails plan for newly developing areas. 7. Recognize the link between land use and transportation through adoption and implementation of General Plan policies including development and transportation standards which promote a balanced transportation system of pedestrian, bicycle, transit, and motor vehicles. Explore alternative development concepts which promote pedestrian and transit oriented communities. City staff works with local developers to assist with planning and design of livable communities that provide for balanced transportation systems. Staff has conducted workshops for the public, City Council and Planning Commission on this issue. Livable community concepts and policies have been incorporated into the recently updated General Plan. 8. Work with the County and other governmental entities to cooperatively plan for and fund multi-jurisdictional transportation facilities in the metropolitan area. Staff has cooperative agreements and will be working directly with the County and Caltrans on the Thomas Roads projects, including sharing office space. Staff continues to work with other local, state and federal agencies to secure funding and plan for transportation facilities for metropolitan Bakersfield. GOAL #3: CONTINUE POSITIVE DOWNTOWN DEVELOPMENT 1. Support the implementation of the Downtown Charrette Plan.* Include in that process consideration of: A. 19th Street streetscape extension. Design work has been completed and construction is scheduled to start by May 2006. B. Chester Avenue Streetscape extension from 24th Street to Garces Circle. Funding is in place, design work is completed, the project is currently out to bid, and construction is scheduled to begin in April 2006, C. Encourage commercial development that includes plazas and pocket parks. Staff continues to work on ways to implement concepts developed as part of the Charette. D. Creation of districts-arts, education, theater, government, finance, etc. Staff continues to work on ways to implement concepts developed as part of the Charette. E. Central Park expansion. This is related to the Mill Creek project. Funding for the design has been identified and a design consultant is expected to be selected by March 2006. The consultant will complete construction drawings by October of 2006. F. Mill Creek project. Funding for the design has been identified and a Design Consultant is expected to be selected by March 2006. The consultant will complete construction drawings by October of 2006. G. Selection of downtown site for Federal Courthouse. The GSA has awarded the new Federal courthouse project to Castle and Cooke to be located at Stockdale and Buena Vista Road. 2. Continue to build on the success of the Convention Center Hotel, Centennial Plaza, Rabobank Arena and Amtrak Station. A special HUD Economic Development Grant in the amount of $750,000 and a Federal low interest loan in the amount of $3,750,000 have been awarded to the City for the development of 65,000 sq. ft of commercial and 100 units of affordable housing on property located near Q Street, California Avenue and the Kern Island Canal. 2005 City Council Goals-Status Report 2/06 Page 5 (Vision 2020 related items are shown with a') A. Develop concepts for projects which contain the following elements: entertainment, trees, landscaping, family activities, pedestrian-friendly design, safety, attractiveness. Minimize the negative aspects of railroad. Recreation and Parks Staff continues to work with the War Veterans group to build a memorial next to the Visitor's Bureau, in front of the Amtrak Station. The proposed memorial includes a water element, more trees, and will be ADA accessible. Recreation and Parks staff also is planning more community, family friendly activities at the McMurtrey Aquatics Center. A Polar Bear Plunge was held New Year's Day, attracting over 250 people downtown. More family nights will be planned this spring and summer; some in cooperation with the Ice Center. Several City departments collaborated on a Prop 50 project which, if funded, will transform a riparian area between the Kern River and the bikeway into an interpretive area for outdoor learning. The proposal calls for boardwalks and overlooks with explanatory signs indicating the various plant and animal life found in the Kern River, as well as some historical facts about the Kern River and the surrounding area. It may be a year before we are notified of the grant. B. Develop parks of various sizes to provide green space for walking, relaxing, jogging, biking, and picnicking. Provide a pedestrian friendly atmosphere by linking the parks with historic trolleys, a river walk, or water taxis on a canal system.* Recreation and Parks staff is involved in selecting the consultant for the Mill Creek Project. We have been involved and will continue to be part of the process for this important downtown project which will include Central Park and McMurtrey Aquatic Center. The Recreation and Parks Director has met with Joe Colombo a few times on suggesting that the 9/11 Memorial be a part of the Mill Creek Improvement Project. The Mill Creek project includes several water features, tying into the canal and Central Park. C. Clear blight from the redevelopment areas around the arena, Amtrak Station and Hotel. Identify underutilized and blighted properties in the downtown core area as potential sites for improvement. A former industrial Brownfield site has been acquired and 50% cleared. The property, 4.5 acres, will become a component of the South Mill Creek project. D. Promote mixed use development that supports the entertainment district along California Avenue to Union Avenue including additional entertainment venues, landscaping and innovative urban design elements, urban housing, restaurants, retail and other commercial uses. Two projects with these elements are under development, South Mill Creek and CityPlace. The projects are proposed to include restaurants, a theater, affordable housing and other commercial uses. 3. Address downtown parking needs by developing a comprehensive plan in cooperation with public and private downtown interests which addresses joint use and other creative ways to integrate parking downtown.' Initiate discussions with owners of small parking lots on ways to make them accessible for public parking. Interviews were held with owners of key parking lots located throughout downtown. All of the lots were currently utilized privately or were planned for future development opportunities. It was determined that a future east downtown garage should be explored after additional redevelopment occurs and sufficient build out has been completed. 4. Encourage quality downtown housing developments which bring families to the downtown area. Three affordable urban downtown housing projects are under development. 74 cottage town homes will be completed and occupied by November 2006. The Baker Street project is slated to provide a mix of 84 various style market rate and affordable town homes, condos and lofts. The project should begin construction by summer of 2006. A. Implement housing development in the Southeast and Old Town Kern Redevelopment areas. Several tax credit family rental projects are under construction and in development in the Southeast Redevelopment Project Area in the Cottonwood vicinity. EDCD is negotiating with the County Housing Authority on the development of a new 2005 City Council Goals-Status Report 2/06 Page 6 (Vision 2020 related items are shown with a") senior rental project to be located on R Street adjacent to the existing Park Place Project. The project will provide an additional 50 affordable residences for seniors. 5. Expand the downtown street light design and streetscape design, and incorporate benches, refuse containers, tables and chairs and explore the use of solar lighting.* General Services works with Design Engineering and ED/CD on street light issues in the downtown area. Research has shown that solar lighting is not practical in areas that have readily available power sources. Solar lights are not as efficient in areas that have trees and tall buildings. Streetscape construction is scheduled to commence by Spring 2006 on Chester Avenue from 24th to Garces Circle. The project will compliment the existing streetscape from Truxtun to 23rd and will incorporate benches, trees, specialty lights and benches. 6. Encourage mixed use development that includes a diverse mixture of housing, retail and commercial uses.* Work has begun on the conversion of the downtown landmark Padre Hotel into a maximum of 83 residential condominiums and 10 commercial retail spaces on the ground floor. The project is expected to be completed by December 2007. The City is the process of leasing up to 200 parking spaces in the City-owned parking garage to the developer to make the condominium units more attractive to prospective buyers. A. Implement a mixed use development in the Southeast and Old Town Kern (Baker and Kentucky Streets) Redevelopment areas. Property has been assembled and a development agreement negotiated for the Baker Street Mixed use project. Construction will begin in summer 2006. 7. Encourage water features in the downtown. This issue is under review by the Planning and Development Committee. A. Encourage use of canals and river elements in the downtown. Develop the Kern Island Canal to become a center for community activities and outdoor enjoyment.* A design contract will be awarded by Spring 06 for the canal improvements from California Avenue to Golden State as part of the Mill Creek project. B. Encourage the use of various water elements — fountains, pools, and ponds to enhance the parks, town squares, etc.* The War Veterans Memorial to be in front of the Amtrak Station, in the park area next to the Convention and Visitors Bureau will include a water feature. A water feature and/or public art will be incorporated into all redevelopment assisted projects. The first will be presented in the downtown cottage project in June 2006. C. Develop a plan to incentivize water features in the downtown through implementation of planning requirements for water features as a design element required of certain size or types of projects, or use alternative revenue sources to assist with funding such amenities. This issue is under review by the Planning and Development Committee. 8. Encourage private courtyards and landscaped spaces that provide opportunities for formal and informal leisure use and activities (e.g. the alley/court at the Superintendent of Schools Office).* The new "Cottages" downtown housing development near Central Park will incorporate courtyards and small park areas into its design. 9. Encourage the use of trees and flowers, lighting, street furniture, public art, signage, flags. Use surface material that enriches the paving options on our streets, sidewalks, and curbing.* Staff has been working with the Downtown Business Association for improved landscaping including tree selection, tree pruning, and tree grates. We also met with them to discuss future holiday lighting which will be sponsored and installed by private companies. Staff will put up, maintain and remove holiday lights around the Rabobank Arena between November and January in future years. 2005 City Council Goals-Status Report 2/06 Page 7 (Vision 2020 related items are shown with a') 10. Pursue property acquisition in the downtown from willing sellers for projects that fulfill stated downtown planning objectives. During the past year staff has acquired 1 parcel in the downtown and 5 in Old Town Kern for potential projects. GOAL #4: PLAN FOR GROWTH AND DEVELOPMENT 1. Facilitate annexations where staff is sensitive to the areas and where support starts with the neighbors. Provide information to explain financial incentives or other benefits of annexation which encourage urban areas in the County to be annexed into the City.' The City has completed fourteen annexations in 2002, eight in 2003, eight in 2004, and 19 completed in 2005. Staff is currently working on 82 pending and anticipates that approximately 20 annexations will be complete for 2006. The City's Sphere of Influence boundary was amended in August 2004 which expanded the area by approximately 13,000 acres and then again amended in January 2006 to increase the boundary by 91 square miles (58,240 acres) for future annexations. The municipal services study was modified and adopted by LAFCO in January 2006 to correspond with the Metropolitan Bakersfield General Plan area. 2. Proceed with Sphere of Influence change to include areas which are likely to develop within the City so adequate advanced planning for infrastructure and delivery of public services can be done. On January 24, 2006 LAFCo approved an amendment to Bakersfield's sphere of influence that included most of the territory within the metropolitan Bakersfield planning area, with the exception of Oildale and Lamont. The approval included an agreement that the City not seek to amend the SOI for a period of five years. 3. Work with major corporations/homebuilders and land owners to facilitate master planned additions to Bakersfield including the use of development agreements. Staff presented two master planned communities to the Planning Commission and City Council for review and approval. Both projects included development agreements. A third community is in the planning stages and will include a development agreement. The agreements provide the developer with assurances allowing development of their project over time, while providing the City with measures to reduce their impact on public safety services and park and recreational facilities. 4. Support affordable housing for seniors and low/moderate income residents. Staff applied for and received a $1.56 million State grant to provide first time homebuyer down payment assistance. Staff coordinated with a developer to receive a subdivision tract density bonus to construct 52 units of affordable housing within a 260 unit market rate and affordable housing development which will be located west of Ridgeview High School between Ryzona Dr. alignment and McKee Rd. Grading and infrastructure is underway. Full build-out is expected within the next three years. Staff worked with Kern Affordable Housing, Inc. (KAH) by processing their request for a HOME CHDO grant in the amount of $300,000 for the rehabilitation of a sixteen multi-unit rental development for low income families located at 414 Real Road. Construction bidding is underway and the project is expected to be completed by the end of the calendar year. 5. Encourage and support redevelopment project areas to promote development in the Old Town Kern-Pioneer and Southeast areas of Bakersfield through use of redevelopment, Enterprise Zone incentives, community planning efforts, and other available revitalization tools. Several commercial and mixed use redevelopment projects are underway or have been recently completed in both Old Town and the Southeast. These include the recently completed Little Saigon Commercial Center on Union Avenue, a planned mixed use residential, a new commercial/theater project near California Avenue and Q streets in Southeast and a planned mixed use residential and commercial project on Baker Street in Old Town Kern. 2005 City Council Goals-Status Report 2/06 Page 8 (Vision 2020 related items are shown with a`) 6. Encourage and support redevelopment and neighborhood improvements in Southeast Bakersfield area including the following improvements: a. Streetlights — General Services has added numerous street lights in the southeast area. We assist ED/CD in redevelopment areas with suggestions, ideas, and cost estimates. b. Street repairs - Staff will submit a street repair list to the Economic/Community Development Department. This list will assist them in applying for Community Block Grant Funds. As funds become available, oils and streets will be converted to asphalt streets. c. Median island landscaping and streetscapes- In 2005, median islands, with landscape and street lights, were installed on Martin Luther King Boulevard between California Avenue and Virginia Avenue. Median islands were installed on California Avenue between Union Avenue and So. Owens Street. As funds become available, the median island on Martin Luther King Boulevard will be extended to Wilkins Street and streetscape improvements will be made to the medians on California Avenue between So. Owens Street and Williams Street. Improvements have been constructed on medians, curb, missing sidewalks and gutters near key commercial corridors on Brundage, Union and California Streets. The City programs federal funds that are received annually to address these infrastructure gaps. 7. Encourage and support redevelopment and neighborhood improvements in 34th Street area between Chester Avenue and Union Avenue, including the following improvements: a. Streetlights — General Services has surveyed the 34th Street area for any needed additional street lights. This area has previously been upgraded with additional lighting in needed areas. The area has been recently resurveyed and additional lights are not recommended at this time. b. Street repairs - Curb, gutters, and sidewalks have been installed in the area between 34th Street and W. Columbus Street; Chester Avenue and Union Avenue. In this same area, the streets have been converted from oils and to asphalt. Staff will continue to evaluate and prioritize street improvements in the 34th Street area. c. Median island landscaping and streetscape on 34th Street — Public Works staff will study and evaluate the possibility of installing a median island on 34th Street between Union Avenue and Chester Avenue. If the study shows that medians do fit in on 34th Street, the project would be submitted to the Economic/Community Department for requested Community Block Grant funding. Economic Development staff is working with Memorial Hospital on a joint design plan that will evaluate the blocks that are feasible for improvements. A design budget and plan will be developed by June 2007 and additional grant funds will be sought to award the construction in possible phases. 8. Support implementation of the southeast Bakersfield Charrette Plan. Several tax credit family rental projects are under construction and in development in the Southeast Redevelopment Project Area in the Cottonwood vicinity. The Little Saigon Plaza project is complete and fully leased. Staff continues to encourage new commercial activity along the key corridors included in the Charrette. Median improvements along those corridors have been completed. 9. Work with the FAA to review the appropriateness of the zoning agreement around the Bakersfield Municipal Airport regarding potential residential and commercial development in that area. Public Works staff has submitted a request to the FAA for airport closure. Planning staff has reviewed the airport land use compatibility plan and recommended an exception for one project. A portion of the project was at the extreme end of compatibility zone B-2 but outside the boundary recommended in the compatibility plan guidelines. Future projects that conflict with the plan will have to address adjustments through amendment of the airport land use compatibility plan. 2005 City Council Goals-Status Report 2/06 Page 9 (Vision 2020 related items are shown with a') 10. Continue to provide consistent urban services within the metropolitan area defined by the City's General Plan.* City ordinances require extension of infrastructure to development within the City. 11. Meet jointly with Kern County Board of Supervisors to discuss maintenance standards and development of parks owned by the County that are within the City and explore opportunities for improvements. Staff met with Supervisor Rubio and county staff to discuss Casa Loma Park and Kern Delta Park specifically. Basically, without some maintenance dollars coming with additional park land to maintain, the city is not able to absorb those parks into our system at this time. The County will continue to maintain their parks within their budgeted dollars. 12. Plan for development of City facilities such as fire stations, police stations, parks, etc., with other governmental agencies and organizations and locate such facilities in a manner which will provide economies of scale, reduce costs and maximize the public benefit of City facilities and other related public facilities. Recreation and Parks staff has met with the Fire Chief to discuss possibilities of adding community rooms, or even gymnasiums, for public use to new fire stations. Having a place for programs to keep kids involved in positive activities in various neighborhoods will go a long way toward crime prevention. Future development may be able to use park development fees for these recreation facilities in exchange for park acreage, on a limited basis. In addition, the Recreation and Parks Director has met with the Kern County Superintendent of Schools to discuss programming for after school programs in school facilities. They discussed the possibility of adding a community gym to new school plans; again, possibly paid for by park development fees. The Director has also discussed programming and use of facilities with the Kern High School District and the Greenfield School District. 13. Provide property owners with incentives to create in-fill or redevelopment.* This has become more challenging with the passage of SB 975, however, incentives have still been creatively applied to promote the development of in-fill affordable housing projects. These affordable housing developments have often provided the redevelopment catalyst for areas. The City also obtained a special $1 million dollar grant from the EPA to establish a local revolving loan fund to provide a financing source for businesses to deal with the cleanup of former petroleum sites, allowing the property to be put into new development use. 14. Require non-contiguous development to provide all necessary infrastructure or provide economic disincentives through variable fees.* City ordinances require extension of infrastructure to development within the City. 15. Develop strategies to reduce consumption of prime agricultural land for urban development.* The City's General Plan promotes, through various policies, concentric development patterns and agricultural land preservation. We also require farm land conversion studies for a change in designation from agricultural to urban uses. 16. Develop policies for specific incentives for residential in-fill in blighted areas.* Staff has developed a special in-fill down payment program up to $35,000 for City assisted in-fill development in all three redevelopment project areas for single family housing projects assisted with city or redevelopment funds. 17. Streamline and provide incentives for first time homebuyers in blighted areas.* Staff has developed a special in-fill down payment program up to $35,000 for City assisted in-fill development in all three redevelopment project areas. In some instances land cost write downs have been applied to bring development costs down on qualified affordable housing development projects. The Redevelopment Agency developed and implemented a program for small home builders in Southeast Bakersfield that provides them construction financing for the development of affordable homes for sale on single lots. It is estimated approximately 100 new homes will be constructed over the next 10 years under this program. 2005 City Council Goals-Status Report 2/06 Page 10 (Vision 2020 related items are shown with a`) 18. Create stricter code enforcement to help maintain neighborhoods and increase visual standards.* City staff continues to work with the County to enhance the County's code enforcement efforts and make them more consistent with the City. 19. Involve youth in re-developing blighted neighborhoods through various efforts, such as tree planting, graffiti removal, trash clean-up, and other neighborhood improvement programs.* General Services works with various youth groups and supports "paint days" by providing locations for graffiti removal, paint, rollers, brushes, and other supplies. We also promote the "Adopt-A-Wall" program. Staff worked with Councilmembers and youth volunteers on several graffiti clean up days in our parks and the Kern River Parkway. A Boy Scout Eagle project was coordinated for the Park at River Walk to clean up trash. Youth and parents from Keep Bakersfield Beautiful assisted to help plant trees. The Recreation and Parks Director is in the process of contacting high schools to see if the art department would be interested in creating a mural on some of our park restroom outside walls. The youth would be involved in creating and painting the art work and the city could provide the materials. 20. Retrofit existing neighborhoods to be more pedestrian friendly and provide for pedestrian friendly thoroughfares in new developments.* The new downtown cottage development provides walkways and courtyards encouraging pedestrian activity. 21. Adopt incentives for reuse of commercial zones and improving utilization of existing problem commercial areas.* The City actively pursues grant opportunities to meet the financial economic standards required for urban development. The City has used tools, such as land contribution, purchase of land covenants for affordable housing, down payment assistance and low interest loans for Brownfield clean up as incentives. 22. Encourage pocket revitalization of commercial centers and/or individual city blocks which may benefit from a targeted approach to economic assistance and does not conflict with or duplicate existing redevelopment efforts. Staff has been preparing larger scale projects using this approach including the Little Saigion commercial project, the Baker Street village and South Mill Creek 50 acre concept. 23. Support implementation of the Baker Street Charrette Plan. Baker Street received funding to complete the streetscape and improve the railroad crossing from Truxtun to Jackson. A redevelopment project containing 49,000 square feet of retail and 84 town homes and condos is under negotiation. If approved, the project will begin construction by summer 2006. The Agency has possession of 14 properties. Demolition of the structures has occurred. 24. Continue efforts to secure a permanent position on Local Agency Formation Commission (LAFCO) board by finding a sponsor for required special legislation. A permanent position for Bakersfield on the LAFCO Board has been accomplished through special legislation carried by Senator Dean Florez which was approved in 2005. The City representative, Councilmember David Couch, attended his first meeting on January 24, 2006. GOAL #5: STRENGTHEN AND DIVERSIFY OUR ECONOMIC BASE 1. Enhance the City's economic development opportunities. A. Encourage business retention through programs which collaborate with local organizations such as trade unions, vocational training centers, schools and universities to provide technical assistance, employee training resources and other business assistance. The City is a key member of the Bakersfield College Foundation Construction Alliance for Student Achievement (CASA). This is a new construction technology program developed by the college. Three vacant lots were donated by the City to the Foundation to train students in a real environment in home building. CASA program managers canvassed the southeast neighborhoods and intend to fill three courses with a total of 72 students, many from the Southeast and East Bakersfield communities. 2005 City Council Goals-Status Report 2/06 Page 11 (Vision 2020 related items are shown with a') B. Assist in business expansion and job opportunities by encouraging development of workforce training and infrastructure development which are consistent with identified strategic business attraction goals (Vision 2020). Staff continues to work with the County, KEDC, the Employers Training Resource and others to assist and promote economic development and training efforts. C. Attract industries which are best suited to our locational advantages, which include availability of energy production, access to major transportation corridors, and geographic diversity for film locations and recreational activities.* Staff continues to work with the County, KEDC, the Employers Training Resource and others to assist and promote focused economic development efforts. D. Focus on improvements and opportunities within the Southeast and Old Town Kern Redevelopment Project areas, and the Incentive Area. Several commercial and mixed use redevelopment projects are underway or have been recently completed in both Old Town and the Southeast. These include the recently completed Little Saigon Commercial Center on Union Avenue, a planned mixed use residential, a new commercial/theater project near California Avenue and Q streets in Southeast and a planned mixed use residential and commercial project on Baker Street in Old Town Kern. 2. Continue to enhance the TEAM BAKERSFIELD concept and develop a fast-track process for establishing a business.* Team Bakersfield concept continues to be used to assist businesses and developments throughout the City. 3. Implement job creation strategies identified in the Old Town Kern and Southeast Economic development plans which address high unemployment area needs by attracting targeted industries that provide higher paying jobs which can support families. The Economic and Community Development Department's business marketing materials kit has been updated and a new business website has been completed. 4. Expand telecommunications and other infrastructures to support new and existing industries.* City staff is part of the Regional Technology Council working to identify infrastructure needed to increase business development efforts. 5. Build on existing economic base: Agriculture (for example; applied technology, value-added agriculture, Genetic technology) and Energy (for example: natural gas, micro-energy generating).* The City participates in the Bakersfield College Biotechnology Council which promotes the development of biotechnology industry and training in the Bakersfield area. 6. Encourage and provide business development and entrepreneurial opportunities.* Staff continues to utilize various economic development strategies to attract business and industries to Bakersfield. GOAL #6: PROMOTE COMMUNITY PRIDE AND IMAGE 1. Implement "Bakersfield Life as it Should Be" image toolkit. The City has incorporated the image toolkit into it's presentations and publications. There is a link on the City's web site to the "Bakersfield Life as it Should Be" web site. Staff continues to participate with the Image task force of Vision 2020. 2. Continue the campaign against littering (Keep Bakersfield Beautiful and CUB Programs) and graffiti. General Services has promoted anti-graffiti programs and is constantly reminding our citizens about our 32-ERASE hotline and the "BakersfieldGraffiti.com" website. We have full time staff dedicated to removing graffiti from public and private property in the City limits. 2005 City Council Goals-Status Report 2/06 Page 12 (Vision 2020 related items are shown with a') 3. Facilitate development and encourage corporate capital investments towards cultural and recreational facilities, including the use of grants, contributions, in-kind services and other unique or appropriate one-time funding sources which may become available, while limiting the use of General Fund revenues for such capital construction. Such facilities would include the following: A. Performing and cultural arts center. Successfully negotiated a five-year, $500,000 naming rights agreement with Bright House Networks for the new Amphitheatre at the Park at River Walk. The agreement will allow for events to be staged at low cost to the community. B. Community recreation buildings. Working with City in the Hills development to build a small recreation center within the park in their development, which is being used as a selling point for their homes. C. Aquatics Facilities. Last year, City Council approved the new rates for park development fees which included a spray park in every fourth park being developed. CDBG funds were used to construct the spray parks at MILK and Jefferson. D. Multi-purpose stadium. E. Facilitate 40 acre soccer park development. After several meetings, and requests for proposals, the Southwest Area Baseball group was approved to assist in the development of the 40-acre site off Jewetta Avenue. F. Plan and develop a 200 acre plus complex to address soccer, baseball, 3 par golf, aquatic facilities and related needs. Preliminary plans have changed to include soccer, baseball, softball, and football in addition to a sprayground, pond, and basketball courts. The golf facilities have been eliminated. We are in the process of scheduling meetings with potential donors, providing naming rights in return. G. Expansion and enhancement of City recreational facility adjacent to Mesa Marin Raceway. The Raceway has now closed, and there are several housing developments planned for the surrounding area. We have proposed using a 1.6 million dollar grant from Prop 40 money to plan and improve the existing ball fields and add the adjacent easement land to build soccer fields. Included in potential plans was a wet playground and skate park. 4. Continue the operation of existing city swimming pools in a safe and cost effective manner. The continued contract with Ellis and Associates to provide effective training of lifeguards and instructors as well as monitoring operations throughout the pool season has helped tremendously in reducing accidents and hazards. Pool attendance fluctuated last season, resulting in adjustments to programming plans for 2006. In the lower attended pools, we plan to offer more private and semi-private lessons and increase program times. We are expanding programs at McMurtrey to include more family nights and additional programs such as water walking and aerobics. 5. Create landscaped gateways, freeways and arterial roads. Increase freeway and entry point landscape standards. Support implementation of the highway landscape improvement plan by securing funding to complete improvements in cooperation with Caltrans and other local agencies, and encourage community involvement. . Staff has completed a freeway beautification master plan and has made presentations to the Council on Westside Parkway aesthetic elements. A. Median island landscaping and streetscape on 34`h Street between Chester Avenue and Union Avenue. Staff Engineers are working with Memorial Hospital to develop a streetscape plan that will incorporate medians, sidewalks and street trees on some areas of the corridor between Chester Avenue and Union Avenue. The Hospital recently 2005 City Council Goals-Status Report 2/06 Page 13 (Vision 2020 related items are shown with a') expanded and is planning a new grand entrance to their facility that will also improve the landscape element at the entryway. 6. Continue efforts to enhance the city's urban forest by promoting the planting, proper care and maintenance of trees throughout the city. The city's tree maintenance budget was increased this fiscal year, and we are in the process of trimming all the trees that present a hazard for signage and clearance issues. We were able to contract with West Coast Arborists to assist in trimming and removing hazardous trees in some of our parks that were too big for the City's equipment to manage. We continue to work with the Tree Foundation and Keep Bakersfield Beautiful in planting new trees in areas that have identified needs. The newly proposed Memorial Tree Grove at the Manor Street parking area will result in 100 new trees being planted by June. The trees are being paid for by the Bakersfield Breakfast Rotary, with additional money going toward irrigation. GOAL #7: FISCAL SOLVENCY 1. To incorporate best practices from the private sector as an element of conducting business. City adopted medical insurance plan changes to bring benefit package more in line with mainstream private sector plans. 2. To prudently govern all areas of discretionary spending, including personnel, benefit and pension costs so that funds to provide services can be balanced with the need to attract and retain quality personnel. 3. To conservatively govern the financial operations of the City so that long-term liabilities are controlled as best as practicable for the benefit of the tax payer. Staff has completed negotiations with Blue and White Collar employee units to limit the City's long term liability and costs of providing retiree health care by replacing the retiree health plan with a retiree health savings option for newly hired employees. 4. To budget conservatively by using one-time revenues for capital rather than operating costs, with streets being of particular importance. Vehicle License Fee receivable one time revenues in the amount of$4.2 million were allocated to various street resurfacing projects. 5. To preserve General Fund revenues for core services of the City, such as public safety, streets, parks, and quality of life issues. The annual budget reflects the integration of this goal. 6. To respect the history of the City by keeping tax rates, fees and assessments as low as can be while still providing quality services. Staff monitors fee programs on an annual basis to determine the appropriate level of cost recovery for the provision of city services and submits revisions to fees to the City Council for consideration. 7. To maintain reserves adequate for dealing with contingencies. Cash basis reserve was increased by$1.25 million to address cash flow issues caused by the State "triple flip" action. Facilities reserve was increased by$1.45 million to address future facility needs. 2005 City Council Goals-Status Report 2/06 Page 14 (Vision 2020 related items are shown with a`) B A K E R S F I E L D Department of Recreation and Parks Date: February 27, 2006 To: Alvan Tandy, City Manager �UI0 - , ;2_u1 tai l'/0 Ow,- From: Dianne Hoover, Director of Recreation & Parks Subject: Tree Trimming Contract Locations Beginning the week of February 27, 2006, West Coast Arborists will be trimming approximately one hundred seventy (170) trees at nine areas in the city. We expect this contract to take about six (6) weeks to complete. City Hall will have its Palms trimmed and cleaned this Thursday and Friday weather permitting. The locations are listed below: • Week of February 27th - (approx.) - Patton Way - Weldon & Hageman Dr: Trim 64 trees. • Week of February 27th - (approx.) City Hall: Trim 14 Robusta Palms: Trim 8 trees. • Week of March 6th — (approx.) Patton Way - Hageman & Maleta Ct.: Trim 10 trees. • Week of March 6th — (approx.) Ming Avenue Median — Stine & Ashe Rd.: Trim 11 trees. • Week of March 13th — (approx.) Centennial Park Sump: Trim 21 trees. • Week of March 20th — (approx.) Gosford Rd. Median - White Ln. & District Blvd: Trim 12 trees. • Week of March 20th — (approx.) California Avenue Median — Chester & Union Avenue : Trim 7 trees. • Week of March 27th — (approx.) Union Avenue Median — Bernard & Columbus: Trim 14 trees. • Week of April 3rd — (approx.) Central Area — 21 st St.: Trim 10 trees. RECEIVED MAR -2 2D06 C B A K C.ORPOR4TF�S 0& 1., BAKER,th . '`��I ` MEMORANDUM cq�IL IFO R Date: March 1, 2006 To: Alan Tandy, City Manager From: W. R. Rector, Chief of Police Subject: America's Most Wanted Staff recently learned that Bakersfield has been chosen for a segment of "America's Most Wanted" to televise a recent armed robbery that occurred at the Chester Lane Market located on the corner of Chester Lane and A Street. The program is currently scheduled for broadcast on the Fox Network, Saturday, March 11 th I have attached a copy of the wanted notice for your information. Ar Adr oom% NVANT ]ED TOBE CONSIDERED ARMED AND DANGEROUS Race: B Height: 5 ' 11 - 6' 1 Build: Slim On 2/26/2006 the above pictured subject entered the Chester Lane Market, 2328 Chester Lane in Bakersfield California. The suspect demanded "everything" and immediatly fired three times. The clerk was struck in the arm and abdomen. The suspect fled the store and may have entered the passenger side of a vehicle parked nearby. The above pictured suspect was described as being a black male, 20-25 years of age, 5'11" - 6'F", thin build. The suspect was last seen wearing a dark hooded sweatshirt and dark pants. The suspect was clenching his mouth or may have had his jaw wired. If you have any information on the location of this suspect you are urged to contact Detective Calvillo at (661) 326-3504 the Bakersfield Police Department at (661) 327-7111. Or the Secret Witness Hotline at (661) 322-4040 Refer to case # 06-34263 BA Kk t V `NCORPORATEa s✓', BAKERSFIELD POLICE MEMORANDUM 1,. c�LIF Q'R lip Date: March 1, 2006 To: Alan Tandy, City Manager From: W. R. Rector, Chief of Police :. 41 Subject: Edward Byrne Justice Assistance Grant Notification The Police Department is eligible for an Edward Byrne Justice Assistance Grant. This is an annual grant for equipment and there is no type of City match requirement. Part of the grant process requires the department to notify the City Manager and Council of our proposed application. Prior to receiving the grant award, we will be submitting a complete administrative report for Council information. The department is planning on requesting a new color copier for the crime lab. The grant amount is approximately $75,000 and the total amount will be spent to purchase the copier equipment for the crime lab. The current copier is more than six years old and is in need of replacement. The copier is used by all three divisions in the department, especially Investigations for crime scene photographs and missing/wanted persons bulletins. Crime Prevention regularly utilizes the copier to print posters for their various programs. Using grant funds to purchase a new color copier is more prudent than the expenditure of general fund dollars or the option of contracting with an outside vendor. WRR/BLL/vrf RECEIVED 0 MAR - 1 2006 CITY MANAGER'S OFFICE B A K E R S F I E L D OFFICE OF THE CITY MANAGER MEMORANDUM February 28, 2006 TO: Alan Tandy, City Manager FROM: Ron Fraze, Fire Chief SUBJECT: Fireworks Restrictions Announcement Council Referral No. Ref001418 (Ward 2) Councilmember Benham requested the Fire Department investigate the use of public service announcements to the media which will assist in enlisting public service sunaort for the new fireworks restrictions. We intend to approach all news media (radio, television, and newspaper) to see if they will participate in Public Safety Announcements for the new firework restrictions effective this Fourth of July. SApowers\memos\Council Referral 2-28-06 BAKERSFIELD POLICE ' MEMORANDUM Cl✓ ARY ll.o 9,,IF O'R TO: ALAN TANDY, CITY MANAGER FROM: W. R. RECTOR, CHIEF OF POLICE L� -- DATE: FEBRUARY 27, 2006 SUBJECT: VALLEY PLAZA SECURITY COUNCIL REFERRAL NO. 1428 (WARD 3 ) Vice—Mayor Maggard referred to staff the issue of Valley Plaza security to determine if their security is adequate. If not, determine what can be done, i.e., develop standards or policies. The Police Department met with staff members of Valley Plaza shortly after the Valley Plaza shooting in December 2005. This included local and district management, and mall security supervision and management. The discussion centered on several issues germane to mall security and crime prevention. The Police Department vowed to continue its partnership with the Valley Plaza and to increase its efforts to improve mall safety in the following ways: 1. The Police Department will continue to provide a presence at Valley Plaza through the use of its foot beat officer assigned to the Police Satellite Office at White and Hughes Lanes. Officer Stephen Ridge, the officer assigned to Valley Plaza, recently resigned to take a position in Santa Maria and was replaced with BPD veteran Randy Ferris who will continue with Officer Ridge's efforts of visible foot patrol and on-going crime prevention efforts. On weekends and after Officer Ferris is off-duty, the Valley Plaza is patrolled by the district officers across all shifts. Officers continue with interior foot patrol on Saturday and Sunday and random patrol of the interior and exterior during week nights. Reserve officers working with regular officers will augment BPD's presence at the mall from time to time. 2. The Special Enforcement Unit currently patrols the interior and exterior of the mall as a deterrent to gang members who may congregate and have no legitimate business or purpose for being at the mall other than to incite problems. Most gang members and their affiliates recognize our SEU officers and would rather not run afoul of them. Officer Ferris will be trained by SEU as well. 3. On January 19, 2006 our Crime Prevention personnel conducted a business watch meeting with Valley Plaza merchants and management to discuss a variety of issues impacting the mall. Our Crime Prevention Unit will continue to hold monthly meetings at Valley Plaza geared toward making the mall, its patrons, employees and business safe through education and awareness training. Some future meeting topics include: critical incident preparation and training; business networking for crime and violence prevention; establishment of a critical incident/crimes in-progress notification tree; and, lock-down and evacuation procedures. One of the major tenants of community policing is the training and education of citizens to make them cognizant of their surroundings and how to react affirmatively and appropriately during a time of crisis when law enforcement may not be readily available. VALLEY PLAZA SECURITY COUNCIL REFERRAL NO. 1428 4. Implementation of BPD Communication Center guidelines that would create the immediate dispatch of officers when certain information is called in by Valley Plaza merchants or patrons. This would be designed to eliminate as much delay as possible between receipt of call to dispatch of officers. 5. Our School Resource Officers assigned to the area around Valley Plaza will increase their patrols of the GET transfer terminal and west side of the Valley Plaza property. This area is frequented by students attending local continuation schools, many of which have a history of behavior problems and criminal involvement including gang.affiliations. 6. Our Traffic Section will increase its random patrol of the Valley Plaza parking lots to include enforcement of fire zone and disabled parking violations. This will add an increased presence of marked police vehicles. 7. Additional efforts will include Kern County Probation and State Parole to target prior offenders on parole or who have terms of probation and may be in violation of the conditions of those terms while visiting the Valley Plaza. Valley Plaza provided the Police Department with a list of 32 security officers. Several of these security officers have backgrounds as former police officers with law enforcement agencies. This adds a depth of experience to their security detail that is rarely found in private security circles. The decision on how to deploy their private security resources rests solely with Valley Plaza management. The Police Department will work collaboratively with mall security to insure that Valley Plaza is as safe and secure as possible. Acts of violence involving homicide rarely involve complete strangers. They typically involve, at minimum, at-odds acquaintances that happen to cross paths at random locations - the Valley Plaza homicides were two unfortunate examples of this. During the recent incident, in the parking lot, an officer was in the mall and responded immediately yet was not able to save the victim nor apprehend the suspects. According to the City Attorney's Office the Police Department must be very careful in not establishing a "special relationship" with the Valley Plaza or any other establishment that requests special services. The development of a "special relationship" stated or implied could increase the Police Department's liability stemming from its activities at Valley Plaza. The Police Department continues to be just as pro-active in its approach to crime prevention and suppression at Valley Plaza as it is at the Market Place, Downtown, East Hills Mall or any other location in the City. We will continue to look for ways to make Bakersfield a safe place to live, work and shop. W R R/TDT/vrf RECEIVED B A K E R S F I E L D CITY OF BAKERSFIELD FE-8 2 8 2006 PUBLIC WORKS DEPARTMENT MEMORANDUM CITY MANAGER'S OFFICE TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: February 28, 2006 SUBJECT: CHESTER AVENUE BRIDGE Referral No. 1425 COUNCILMEMBER COUCH REQUESTED STAFF INVESTIGATE ENCOURAGING THE USE OF ALTERNATE ROUTES FOR CITIZENS UTILIZING THE CHESTER AVENUE BRIDGE WHILE THE BRIDGE IS BEING RENOVATED. During the renovation of the Chester Avenue Bridge, traffic will be routed to the easterly bridge for the duration of the project. This will restrict both north and southbound traffic to one lane in each direction. However, Staff is looking at ways to reduce the impact to the traveling public, such as modifying the timing of traffic signals, to keep traffic flowing on Chester Avenue. Staff is also currently investigating various methods of encouraging citizens to use alternate routes during the renovation of the Chester Avenue Bridge including media notification and posting of advisory signing. G:\GROUPDAT\Referrals\2006\02-22\Ref#1425(Rick M.).doc B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: V i Raul Rojas, Public Works Director DATE: wMarch 3, 2006 SUBJECT: VARIOUS TRAFFIC PROBLEMS Referral No. 1424 COUNCILMEMBER COUCH REQUESTED STAFF PREPARE A PLAN TO ADDRESS TRAFFIC ISSUES AT THE ROSEDALE AND LANDCO GRADE SEPARATION, ALLEN AND HAGEMAN ROADS, OLIVE DRIVE AND HIGHWAY 99; AND TRUXTUN AVE. AND COFFEE ROAD. Rosedale and Landco Grade Separation This grade separation was nominated at the request of the City of Bakersfield for inclusion in the Public Utility Commission (PUC) list. Staff will continue to pursue this project to get State monies. In addition, improvement to this location will be done with the Rosedale Highway Thomas Roads project. Allen and Hageman Roads This area is comprised of two intersections, both of which are in the County. We have been working with our counterparts at Kern County to improve these intersections including the planning of a future grade separation with the BNSF railroad tracks. Ultimately, the improvement will include the grade separation project. Olive Drive and Highway 99 This interchange is in the County; however, the City has initiated a projects study report with Caltrans to improve this location. Staff recently met with Caltrans, and are continuing to work on completing currently the projects study report, and ultimately construct the needed improvements. There is a plan in place for the ultimate improvement; however, we will have to go through the normal steps since it is a Caltrans facility, including the environmental work, design and eventual construction. JRL:ngf G:\GROU PDAT\Referrals\2006\02-22\Ref#1424.doc Street improvements at Truxtun Avenue and Coffee Road In response to a Council Referral from Council Member Couch, Traffic Engineering Division developed options for street improvements to increase capacity and reduce delays for the intersection of Truxtun Avenue and Coffee Road. Due to the magnitude of the recommended street improvements, the City requested T.Y Lin International to prepare concept design and cost estimates for the proposed improvements. The improvements were separated into three phases with total project cost estimates as follows: 1. Widen the Coffee Road Bridge over the Kern River to lengthen the southbound to eastbound dual left turn lane bays for additional storage capacity. - $2,180,000. 2. Widen Coffee Road northbound adjacent to retail center to add a third lane northbound, lengthen the dual right turn lane bays, and add a deceleration lane at the entrance to the retail center. In addition, widen the south side of Truxtun Avenue adjacent to the retail center to improve circulation for southbound to eastbound turning movements. - $1,180,000. 3. Install traffic signal and lighting system at the southern entrance to the retail center on the southeast corner of Truxtun Avenue and Coffee Road. In addition, construct median modifications to accommodate left turn movements for both northbound and southbound Coffee Road. - $717,000. Option 1 essentially provides storage only for southbound traffic. Currently, through lanes are not affected by the southbound left turn movement. Therefore this option will do little to increase capacity and decrease delay for this intersection. Options 2 and 3 will increase capacity for the northbound direction and improve operations for the southbound to eastbound movement. However, the cost is high (nearly $2,000,000) and will result in eliminating most of the existing trees that line the existing shopping center. The overall solution lies in construction of the Westside Parkway. This project includes construction of Mohawk Street between Truxtun Avenue and Rosedale Highway. The construction of the Mohawk Extension and Westside Parkway will alleviate the current congested conditions for the southbound traffic at this intersection. The Mohawk Extension will provide an additional river crossing into Downtown and the California Avenue Business Districts. This will reduce the amount of southbound to eastbound left turn movements at the intersection. The Mohawk Extension is anticipated to be in construction within the next two years. The Westside Parkway will provide an additional route into the Downtown Business District which will result in a significant decrease in traffic volume on Truxtun Avenue Extension near Coffee Road. The Westside Parkway is anticipated to be in construction JRL:ngf G:\G RO U P DA-RReferrals\2006\02-22\Ref#1424.doc within the next five years. Constructing the Coffee Road Bridge widening over the Kern River (phase 1) would take a minimum of two years to complete all the necessary environmental documentation and permits. Staff recommends waiting for the Westside Parkway to be constructed. After this major facility is in place, traffic can be re-evaluated and appropriate improvements proposed. JRL:ngf G:\G RO U P DAT\Referrals\2006\02-22\Ref#1424.doc B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: March 2, 2006 SUBJECT: FRONTAGE PROPERTY ON BRIMHALL Referral No. 1426 COUNCILMEMBER COUCH REQUESTED STAFF REVIEW DRAWINGS AS PRESENTED BY DAVID GAY, AND INVESTIGATE THE FEASIBILITY OF WIDENING THE FRONTAGE PROPERTY ON BRIMHALL. PLEASE PICK UP DRAWINGS IN THE CLERK'S OFFICE. Public Works staff has received the drawing and is reviewing the feasibility of widening the frontage along Brimhall Road. Staff will report back when the review is complete. C:\DOCUME-1\jlaroche\LOCALS-1\Temp\Ref#1426(MPS).doc RECEIVED B A K E R S F I E L D FEB 2 8 2006 CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT CITY MANAGER'S OFFICE MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: r�February 28, 2006 SUBJECT: FLOODING NEAR OAKDALE AND WESTERN Referral No. 1420 COUNCILMEMBER SULLIVAN REQUESTED STAFF ADDRESS FLOODING ISSUES ON THE NORTH SIDE OF STOCKDALE HIGHWAY IN THE AREA OF OAKDALE AND WESTERN, AND DETERMINE WHAT CAN BE DONE TO ALLEVIATE THE PROBLEM. There is a catch basin at the south end of Oakdale Drive. During the winter months leaves accumulate and at times block the gutter area. Streets Division crews will make sure that during a rain storm this area is cleared of leaves and debris for proper drainage. Staff will also evaluate the area to see if it is possible to install more catch basins within the Oakdale Drive and Western Drive area. G:\GROUPDAT\Referrals\2006\02-22\Ref#1420(Luis P.).doc 0 RECEIVED B A K E R S F I E L D CITY OF BAKERSFIELD FEB 2 8 2006 PUBLIC WORKS DEPARTMENT MEMORANDUM CITY MANAGER'S OFFICE TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: i4v[February 28, 2006 SUBJECT: COMPLETION OF RESURFACING HEMPSTEAD ST. Referral No. 1422 COUNCILMEMBER SULLIVAN REQUESTED STAFF PROVIDE INFORMATION REGARDING THE COMPLETION DATE FOR THE RESURFACING OF HEMPSTEAD AT EDGEMONT. The street reconstruction project on Hempstead Lane and Edgemont Drive was completed February 10, 2006. The reconstruction of Eastbourne Way, which is approximately 200 feet long and a dead-end street, will be completed the week of March 13, 2006. G:\GROUPDAT\Referrals\2006\02-22\Ref#1422(Luis P.).doc 0 B A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director DATE: r'��March 3, 2006 6 SUBJECT: TRAFFIC AT ST. FRANCIS SCHOOL Referral No. 1421 COUNCILMEMBER SULLIVAN REQUESTED STAFF EVALUATE THE TRAFFIC SITUATION AT ST. FRANCIS SCHOOL AND THE NEED FOR A FOUR-WAY STOP TO AID IN FACILITATING STUDENT DROP OFF/PICKUP Traffic Engineering staff have added this intersection to the traffic study work list for an update. The last traffic study for this intersection was performed in September 2005. At that time, the results indicated that a four-way stop was not warranted. Results for the updated traffic study are expected to be available in four to six weeks, depending on weather conditions. G:\GROUPDAT\Referrals\2006\02-22\Ref#1421 Palm-Pine traffi study.doc RECEIVED B A K E R S F I E L D FEB 2 8 2006 CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT CITY MANAGER'S OFFICE MEMORANDUM TO: Alan Tandy, City Manager FROM: Raul Rojas, Public Works Director �r DATE: February 27, 2006 SUBJECT: DISPOSAL OF LOCALLY GENERATED BIOSOLIDS Referral No. 1396 ***REFERRAL TO PUBLIC WORKS DEPARTMENT*** COUNCILMEMBER SCRIVNER REQUESTED STAFF PREPARE A REPORT TO COUNCIL REGARDING DISPOSAL OF LOCALLY GENERATED FARM BIOSOLIDS INCLUDING INFORMATION REGARDING STATE REGULATIONS, THE ORIGIN AND BASIS OF REGULATIONS, SUGGEST ALTERNATIVE METHODS OF DISPOSAL INCLUDING COST ANALYSIS, IMPACT AND RELATED ENVIRONMENTAL ISSUES. Current Biosolids Practice Biosolids processing at Wastewater Plant 2 and 3 are similar. During the treatment process solids are settled by gravity and removed from the waste stream. These solids are then transferred to large tanks (digesters) where the solids are mixed and heated to ninety eight degrees Fahrenheit for approximately thirty eight days. This "digestion" Process serves three purposes; • reduces pathogens in the biosolids, • reduces vector attraction qualities of the biosolids, • and produces methane gas which is utilized by on-site generators to produce electricity for plant use. The biosolids are then solar dried to remove excess moisture. After drying, the biosolids are sampled for nitrogen and various metals in accordance with EPA regulation 40 CFR Part 503. The biosolids cannot be land applied if threshold limits are exceeded. Typical crops grown for animal feed and fodder are wheat and alfalfa. The application rate of biosolids is calculated to ensure the existing nitrogen levels in the biosolids, irrigation water, and soil does not exceed the nitrogen uptake ability of the crop. The City Farm consists of 78 fields with each field averaging about 70 acres. Due to the small volume of biosolids generated and the size of the farm, only 25 of the 78 fields have been utilized since the year of 2000 and only 3 of the 25 fields had a repeat application of biosolids. C:\DOCUME-1\lskinner\LOCALS-1\Temp\Council Ref#1396.doc The City of Bakersfield Pretreatment Inspection Group ensures that commercial and industrial businesses do not dispose of hazardous waste into the sewer system. For example, radiator shops are not permitted to discharge into the sewer system and metal finishing industries are not allowed to discharge metals into the sewer system. Regulation of these industries has enabled the biosolids to have low levels of metals. The cost of hauling and spreading the biosolids for this current practice is $13.25 per ton with an annul cost of $40,000-$70,000 per year. State Regulations Management of the biosolids are under permit with the State Water Resources Control Board. The State Board uses the United States Environmental Protection Agency 40 CFR Part 503 as its standard. Part 503 was promulgated by the EPA in 1992. This rule is designed to protect human health and the environment and contains a set of management practices to ensure that biosolids are beneficially used properly. Annually a biosolids report is submitted to the US EPA and a copy to the State Water Resources Board. Reported are volume of biosolids, nitrogen loading, metals loading, pathogen reduction and vector attraction reduction. Alternative Methods of Disposal United States EPA 40 CFR Part 503 provides for three methods of managing biosolids; incineration, disposal at a sanitary landfill, and land application. ■ Incineration — The byproduct of this process is fly ash. This fly ash can be recycled into concrete building products. Due to the existing non-attainment status of the San Joaquin Valley air basin for ozone and particulate matter this process appears to be impractical. In addition the costs are high. The gate fees are estimated to be $45-$50 per ton, hauling costs would increase because the biosolids would be required to have a higher moisture content (approximately 2.5 times higher), and there would be capital costs at the treatment plant to install mechanical dewatering equipment. Not including the capital costs the annual fee would be approximately $991,000 per year. • Disposal at a sanitary landfill — A gate fee and higher hauling costs would be similar to the incineration option. Disposal of biosolids at a sanitary landfill uses up volume in a landfill and due to the high moisture content may cause leachate problems. • Land Application — Currently this option is being utilized. Composting falls under the category of land application and is an additional treatment after digestion. Composting can further reduce the level of potential pathogens in the biosolids. Reuse options for composted biosolids are bagged fertilizer for home use or applied on a farm for agricultural use. The cost to haul the biosolids to a composting facility is approximately $35 per ton with an annual cost of $186,000. After composting the biosolids would be land applied and would have to meet the same regulations as non composted land applied biosolids. C:\DOCUME-1\lskinner\LOCALS-1\Temp\Council Ref#1396.doc o f `B O ICEhs� cgLIFOP, MEMORANDUM CITY A TTORNEY'S OFFICE February 24, 2006 TO: HONORABLE MAYOR AND CITY COUNCIL FROM: VIRGINIA GENNARO, CITY ATTORNE i tv � SUBJECT: COUNCIL REFERRAL NO. 001410 COUNCILMEMBER SCRIVNER REQUESTED STAFF RESEARCH INFORMATION ON LEGISLATION THAT WILL ALLOW GRAFFITI OFFENSES TO BE PROSECUTED CUMULATIVELY UP TO A FELONY CHARGE. IN ADDITION, STAFF TO LOOK AT THE FEASIBILITY OF PROHIBITING THE SALE OF SPRAY PAINT TO THOSE 21 AND YOUNGER. This office is already drafting a comprehensive memo in response to a previous request regarding graffiti issues. Therefore, these referrals shall be addressed in that comprehensive memo allowing the city council to have all issues addressed in one document. VG/js SACOUNCUReferrals\05-06 Referrals\Scrivner-Graffiti comprehensive.doc e S A K E R S F I E L D CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT MEMORANDUM TO: Alan Tandy, City Manager FROM: ?��Imarch Raul Rows, Public Works Director DATE: 3, 2006 SUBJECT: CITIZEN CONCERN RE STREET RACING, DOGS AND TRAFFIC SIGNAL Referral No. 1419 COUNCILMEMBER SCRIVNER REQUESTED STAFF CONTACT RONALD SHEPARD REGARDING STREET RACING AND REPORT BACK TO COUNCILMEMBER SCRIVNER; STAFF TO PROVIDE A STATUS REPORT ON THE PROCESS AND PRIORITY OF ADDRESSING THE LARGER ISSUE OF STREET RACING CITYWIDE; STAFF ADDRESS MR. SHEPARD'S CONCERN REGARDING RESPONSE TIME TO AN ANIMAL CONTROL COMPLAINT; AND STAFF ADDRESS CONCERNS OF POOR TRAFFIC FLOW DUE TO TRAFFIC SIGNALS AT THE INTERSECTIONS OF WHITE LANE AND WIBLE, AND MING AVENUE AND REAL ROAD. STAFF ADDRESS CONCERNS OF POOR TRAFFIC FLOW DUE TO TRAFFIC SIGNALS AT THE INTERSECTIONS OF WHITE LANE AND WIBLE, AND MING AVENUE AND REAL ROAD. The Traffic Engineer contacted Mr. Shepard regarding his concerns of traffic flow at the intersection of White at Wible, Ming at Real and Planz at South Real Road. Traffic operations of the traffic signals were explained to Mr. Shepard and he outlined the problems he had observed. Traffic Engineering staff will be investigating the signals operation, based on comments from Mr. Shepard and make improvements, if possible, to alleviate his concern. Mr. Shepard did not request any additional contact from Traffic Engineering. G:\GROUPDAT\Referrals\2006\02-22\Ref#1419(Steve W.).doc