HomeMy WebLinkAboutROI NO 1635RESOLUTION OF INTENTION NO. 1635
A RESOLUTION DECLARING INTENTION TO
ESTABLISH THE MORNING DRIVE-COLLEGE AVENUE
PLANNED BRIDGE AND MAJOR THOROUGHFARE
AREA AND PRELIMINARILY APPROVING THE
BOUNDARIES OF THE AREA AND THE COST AND FEE
SCHEDULE.
WHEREAS, Chapter 16.32.060.F of Title 16 of the Bakersfield Municipal
Code and Section 66484 of the California Government Code, provides for a procedure by
which the City Council may assess and collect fees for the purpose of defraying the cost of
constructing bridge crossings or major thoroughfares identified in the transportation
circulation element of the Metropolitan Bakersfield 2010 General Plan, and;
WHEREAS, Morning Drive is designated as a major arterial for the northeast
area, and;
WHEREAS, as a part of the Metropolitan Bakersfield Circulation Element,
Morning Drive provides the much needed connection between SR 178 and College
Avenue for northeast Bakersfield, and;
WHEREAS, the City has adopted a Specific Plan Line for Morning Drive,
and;
WHEREAS, the owner of the property on the west side of Morning Drive
north of College Avenue is required to construct 2 lanes of Morning Drive from south of
their property to the intersection of College Avenue, and;
WHEREAS, the City has met with all affected property owners and is
proposing the formation of the Morning Drive-College Avenue Planned Bridge and Major
Thoroughfare Area to reimburse the cost of the improvements upon subdivision or
development of property within the Area.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby preliminarily approves the estimate, attached
hereto as "Exhibit A," the fee schedule attached hereto as "Exhibit B," and the limits of
improvements and benefitted area attached hereto as "Exhibit C" for the Morning Drive
Planned Bridge and Major Thoroughfare Area. Subdivision or development of property
within such Area will require payment of fees per the attached schedule.
3. The City Council hereby fixes Wednesday, May 6, 2009 at 6:30 PM,
or as soon as thereafter as may be heard, at the Council Chambers of the City Council,
1501 Truxtun Avenue, Bakersfield, California, as the time and place for hearing protests on
the following matters: o~c~AKF9
1
U
ORIGINAL
COST ESTIMATE
FEE SCHEDULE
THE LIMITS OF IMPROVEMENTS
BENEFITTED AREA
00000----------
o``gaKF ~
s
~ m
r
v a
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting thereof held on APR 2 2 W ,
by the following vote:
BYES;,,
NOES:
ABSTAIN:
ABSENT:
COUNCILMEMBER CARSON, BENHAM, WEIR, COUCH, HANSON, SULLI AV N, SCR VI ER
COUNCILMEMBER PtPV e._
COUNCILMEMBER fWK-V-
COUNCILMEMBER
PAMELA A. McCAR Y, CMC
CITY CLERK and EX Officio of the
Council of the City of Bakersfield
APPROVED:
By:
A" 9 o--M
CITY OF BAKERSFIELD
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By:
h-L-- 1U
R BERT SHERFY
eputy City Attorney
Exhibit "A" Cost Estimate Exhibit "C" Limits of Improvements & Benefitted Area
Exhibit "B" Fee Schedule
s
o``~AKF
m
3 r
CJ ~
ORIGINAL
Exhibit "A"
Morning Drive -College Avenue Cost Estimate
Roadway Excavation
Asphalt
Aggregate Base
Grading Site Work
Intersection Total
Morning Drive
Grading
Import
Subgrade Prep
7" Pavement
6" Aggregate Base
Finish shoulders
Striping
B1/C1 Culverts
Riprap
Gunite Swales
Relocate power poles
Erosion Control
Morning Drive Total
Storm Drain
Secondary Subdrains
Rip rap Areas
Storm drain line
Catch basins
Bqunite & rip rap swales
Manholes
Storm Drain Total
College Avenue
Grading
Import
Subgrade Prep
7" Pavement
6" Aggregate Base
Finish shoulders
Striping
B1/C1 Culverts
Riprap
Gunite Swales
Relocate power poles
Erosion Control
College Avenue Total
Less Impact Fee Credit
Design
CM/Testinq
Other Costs/Fees
1 Impact Fee Credit is based upon Res. No. 218-08: Project No. 177:Morning, SRI 78 to College
and Morning
icy
I $13.231
23,9671
$317,083
ITN
I $93.711
1,3581
$127,258
icy
I $49.611
1,0671
$52,934
ILS
1 $551,250.001
11
$551,250
I
I I
1
$1,048,525
ILS
1 $284,093.001
11
$284,093
ILS
1 $272,076.001
11
$272,076
ILS
1 $92,148.001
11
$92,148
ITN
1 $118.701
6,3921
$758,730
ITN
I $43.381
5,3581
$232,430
ILS
1 $63,042.001
11
$63,042
ILS
1 $65,467.001
11
$65,467
1 EA
1 $35,338.001
21
$70,676
ISF
1 $16.791
4,2001
$70,518
ILF
1 $50.311
3,6051
$181,368
1 EA
1 $32,386.671
91
$291,480
ILS
1 $61,059.001
11
$61,059
1
1 1
1
$2,443,087
ILF
1 $83.131
4,4001
$365,772
ISF
1 $16.801
4,7001
$78,960
ILF
1 $143.491
2,9551
$424,013
IEA
1 $8,230.891
181
$148,156
ILF
1 $25.121
3,6051
$90,558
IEA
1 $13,748.401
51
$68,742
1
1 1
1
$1,176,201
ILS
1 $82,386.971
11
$82,387
ILS
1 $78,902.041
11
$78,902
ILS
1 $26,722.921
11
$26,723
ITN
1 $118.701
1,8541
$220,032
ITN
1 $43.381
1,5541
$67,405
ILS
1 $18,282.18
11
$18,282
ILS
1 $18,985.43
11
$18,985
IEA
I $35,338.001
21
$70,676
ISF
I $16.791
1,2181
$20,450
ILF
I $50.311
1,0451
$52,597
IEA
I $32,386.671
01
$0
ILS
$17,707.111
11
$17,707
1
I 1
1
$674,146
$534,196
$427,357
$961,553
AKeg,
~ r
U O
ORIGINAL
Exhibit "B"
Morning-College Bridge and Major
Thoroughfare Fee Schedule
Total Cost= $7,167,437
Total Acreage = 643.1
Cost Per ADT = $173
Fee Per Acre
Year
GC 1
OC
HMR 1
LR
20091
$115,1421
$64,1771
$12,1331
$6,933
20101
$123,2021
$68,6701
$12,9821
$7,419
20111
$131,8261
$73,4771
$13,8911
$7,938
20121
$141,0541
$78,6201
$14,8641
$8,494
20131
$150,9281
$84,1241
$15,9041
$9,088
20141
$161,4921
$90,0121
$17,0171
$9,724
20151
$172,7971
$96,3131
$18,2091
$10,405
20161
$184,8931
$103,0551
$19,4831
$11,133
20171
$197,8351
$110,2691
$20,8471
$11,913
20181
$211,6841
$117,9881
$22,3061
$12,746
20191
$226,5021
$126,2471
$23,8681
$13,639
20201
$242,3571
$135,0841
$25,5381
$14,593
20211
$259,3221
$144,5401
$27,3261
$15,615
20221
$277,4741
$154,6581
$29,2391
$16,708
20231
$296,8971
$165,4841
$31,2861
$17,878
20241
$317,6801
$177,0681
$33,4761
$19,129
Notes:
1. This fee schedule is based upon an inflation factor of 7% annually.
2. This fee is to be paid at the time of the recording of the map. If no map is recorded,
then the fee is to be paid at the issuance of building permit.
3. This fee is to be based upon the net area of the individual parcel for which the
building permit is to be issued
s
m
U O
ORIGINAL
Exhibit "B"
Morning - College Bridge and Major
Thoroughfare Area
Total Cost= $7,167,437
Total Acreage = 643.1 acres
Fee per Acre = $11,146
Year I
Per Aare
20091
$11,146
20101
$11,926
20111
$12,761
20121
$13,654
20131
$14,610
20141
$15,633
20151
$16,727
20161
$17,898
20171
$19,151
20181
$20,491
20191
$21,926
20201
$23,461
20211
$25,103
20221
$26,860
20231
$28,740
20241
$30,752
Notes:
1. This fee schedule is based upon an inflation factor of 7% annually.
2. This fee is to be paid at the time of the recording of the map. If no map is recorded,
then the fee is to be paid at the issuance of building permit.
3. This fee is to be based upon the net area of the individual parcel for which the
building permit is to be issued
o``gAKF9~
M
v r
O
ORIGINAL
G
Exhibit "C"
18 fi
I
o~`~AKF9s
~ m
r
U O
ORIGINAL
AFFIDAVIT OF POSTING DOCUMENTS
STATE OF CALIFORNIA)
) ss.
County of Kern )
PAMELA A. McCARTHY, being duly sworn, deposes and says:
That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield;
and that on the 4th day of Mav. 2009 she posted on the Bulletin Board at City Hall,
a full, true and correct copy of the following: Resolution of Intention No. 1635, passed
by the Bakersfield City Council at a meeting held on the 22nd day of April, 2009 and
entitled:
RESOLUTION DECLARING ITS INTENTION TO ESTABLISH THE
MORNING DRIVE-COLLEGE AVENUE PLANNED BRIDGE AND MAJOR
THOROUGHFARE AREA AND PRELIMINARILY APPROVING THE
BOUNDARIES OF THE AREA AND THE COST AND FEE SCHEDULE.
PAMELA A. McCARTHY
City Clerk and Ex Officio of the
Council of the City of Bakersfield
By: °
DEPUTY City Clerk
SADOCUMENT\FORMSWOP. R01.wpd
C,
ORIGINAL