Loading...
HomeMy WebLinkAboutROI NO 1635RESOLUTION OF INTENTION NO. 1635 A RESOLUTION DECLARING INTENTION TO ESTABLISH THE MORNING DRIVE-COLLEGE AVENUE PLANNED BRIDGE AND MAJOR THOROUGHFARE AREA AND PRELIMINARILY APPROVING THE BOUNDARIES OF THE AREA AND THE COST AND FEE SCHEDULE. WHEREAS, Chapter 16.32.060.F of Title 16 of the Bakersfield Municipal Code and Section 66484 of the California Government Code, provides for a procedure by which the City Council may assess and collect fees for the purpose of defraying the cost of constructing bridge crossings or major thoroughfares identified in the transportation circulation element of the Metropolitan Bakersfield 2010 General Plan, and; WHEREAS, Morning Drive is designated as a major arterial for the northeast area, and; WHEREAS, as a part of the Metropolitan Bakersfield Circulation Element, Morning Drive provides the much needed connection between SR 178 and College Avenue for northeast Bakersfield, and; WHEREAS, the City has adopted a Specific Plan Line for Morning Drive, and; WHEREAS, the owner of the property on the west side of Morning Drive north of College Avenue is required to construct 2 lanes of Morning Drive from south of their property to the intersection of College Avenue, and; WHEREAS, the City has met with all affected property owners and is proposing the formation of the Morning Drive-College Avenue Planned Bridge and Major Thoroughfare Area to reimburse the cost of the improvements upon subdivision or development of property within the Area. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: The foregoing recitals are true and correct and are incorporated herein. 2. The Council hereby preliminarily approves the estimate, attached hereto as "Exhibit A," the fee schedule attached hereto as "Exhibit B," and the limits of improvements and benefitted area attached hereto as "Exhibit C" for the Morning Drive Planned Bridge and Major Thoroughfare Area. Subdivision or development of property within such Area will require payment of fees per the attached schedule. 3. The City Council hereby fixes Wednesday, May 6, 2009 at 6:30 PM, or as soon as thereafter as may be heard, at the Council Chambers of the City Council, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for hearing protests on the following matters: o~c~AKF9 1 U ORIGINAL COST ESTIMATE FEE SCHEDULE THE LIMITS OF IMPROVEMENTS BENEFITTED AREA 00000---------- o``gaKF ~ s ~ m r v a ORIGINAL I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on APR 2 2 W , by the following vote: BYES;,, NOES: ABSTAIN: ABSENT: COUNCILMEMBER CARSON, BENHAM, WEIR, COUCH, HANSON, SULLI AV N, SCR VI ER COUNCILMEMBER PtPV e._ COUNCILMEMBER fWK-V- COUNCILMEMBER PAMELA A. McCAR Y, CMC CITY CLERK and EX Officio of the Council of the City of Bakersfield APPROVED: By: A" 9 o--M CITY OF BAKERSFIELD APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By: h-L-- 1U R BERT SHERFY eputy City Attorney Exhibit "A" Cost Estimate Exhibit "C" Limits of Improvements & Benefitted Area Exhibit "B" Fee Schedule s o``~AKF m 3 r CJ ~ ORIGINAL Exhibit "A" Morning Drive -College Avenue Cost Estimate Roadway Excavation Asphalt Aggregate Base Grading Site Work Intersection Total Morning Drive Grading Import Subgrade Prep 7" Pavement 6" Aggregate Base Finish shoulders Striping B1/C1 Culverts Riprap Gunite Swales Relocate power poles Erosion Control Morning Drive Total Storm Drain Secondary Subdrains Rip rap Areas Storm drain line Catch basins Bqunite & rip rap swales Manholes Storm Drain Total College Avenue Grading Import Subgrade Prep 7" Pavement 6" Aggregate Base Finish shoulders Striping B1/C1 Culverts Riprap Gunite Swales Relocate power poles Erosion Control College Avenue Total Less Impact Fee Credit Design CM/Testinq Other Costs/Fees 1 Impact Fee Credit is based upon Res. No. 218-08: Project No. 177:Morning, SRI 78 to College and Morning icy I $13.231 23,9671 $317,083 ITN I $93.711 1,3581 $127,258 icy I $49.611 1,0671 $52,934 ILS 1 $551,250.001 11 $551,250 I I I 1 $1,048,525 ILS 1 $284,093.001 11 $284,093 ILS 1 $272,076.001 11 $272,076 ILS 1 $92,148.001 11 $92,148 ITN 1 $118.701 6,3921 $758,730 ITN I $43.381 5,3581 $232,430 ILS 1 $63,042.001 11 $63,042 ILS 1 $65,467.001 11 $65,467 1 EA 1 $35,338.001 21 $70,676 ISF 1 $16.791 4,2001 $70,518 ILF 1 $50.311 3,6051 $181,368 1 EA 1 $32,386.671 91 $291,480 ILS 1 $61,059.001 11 $61,059 1 1 1 1 $2,443,087 ILF 1 $83.131 4,4001 $365,772 ISF 1 $16.801 4,7001 $78,960 ILF 1 $143.491 2,9551 $424,013 IEA 1 $8,230.891 181 $148,156 ILF 1 $25.121 3,6051 $90,558 IEA 1 $13,748.401 51 $68,742 1 1 1 1 $1,176,201 ILS 1 $82,386.971 11 $82,387 ILS 1 $78,902.041 11 $78,902 ILS 1 $26,722.921 11 $26,723 ITN 1 $118.701 1,8541 $220,032 ITN 1 $43.381 1,5541 $67,405 ILS 1 $18,282.18 11 $18,282 ILS 1 $18,985.43 11 $18,985 IEA I $35,338.001 21 $70,676 ISF I $16.791 1,2181 $20,450 ILF I $50.311 1,0451 $52,597 IEA I $32,386.671 01 $0 ILS $17,707.111 11 $17,707 1 I 1 1 $674,146 $534,196 $427,357 $961,553 AKeg, ~ r U O ORIGINAL Exhibit "B" Morning-College Bridge and Major Thoroughfare Fee Schedule Total Cost= $7,167,437 Total Acreage = 643.1 Cost Per ADT = $173 Fee Per Acre Year GC 1 OC HMR 1 LR 20091 $115,1421 $64,1771 $12,1331 $6,933 20101 $123,2021 $68,6701 $12,9821 $7,419 20111 $131,8261 $73,4771 $13,8911 $7,938 20121 $141,0541 $78,6201 $14,8641 $8,494 20131 $150,9281 $84,1241 $15,9041 $9,088 20141 $161,4921 $90,0121 $17,0171 $9,724 20151 $172,7971 $96,3131 $18,2091 $10,405 20161 $184,8931 $103,0551 $19,4831 $11,133 20171 $197,8351 $110,2691 $20,8471 $11,913 20181 $211,6841 $117,9881 $22,3061 $12,746 20191 $226,5021 $126,2471 $23,8681 $13,639 20201 $242,3571 $135,0841 $25,5381 $14,593 20211 $259,3221 $144,5401 $27,3261 $15,615 20221 $277,4741 $154,6581 $29,2391 $16,708 20231 $296,8971 $165,4841 $31,2861 $17,878 20241 $317,6801 $177,0681 $33,4761 $19,129 Notes: 1. This fee schedule is based upon an inflation factor of 7% annually. 2. This fee is to be paid at the time of the recording of the map. If no map is recorded, then the fee is to be paid at the issuance of building permit. 3. This fee is to be based upon the net area of the individual parcel for which the building permit is to be issued s m U O ORIGINAL Exhibit "B" Morning - College Bridge and Major Thoroughfare Area Total Cost= $7,167,437 Total Acreage = 643.1 acres Fee per Acre = $11,146 Year I Per Aare 20091 $11,146 20101 $11,926 20111 $12,761 20121 $13,654 20131 $14,610 20141 $15,633 20151 $16,727 20161 $17,898 20171 $19,151 20181 $20,491 20191 $21,926 20201 $23,461 20211 $25,103 20221 $26,860 20231 $28,740 20241 $30,752 Notes: 1. This fee schedule is based upon an inflation factor of 7% annually. 2. This fee is to be paid at the time of the recording of the map. If no map is recorded, then the fee is to be paid at the issuance of building permit. 3. This fee is to be based upon the net area of the individual parcel for which the building permit is to be issued o``gAKF9~ M v r O ORIGINAL G Exhibit "C" 18 fi I o~`~AKF9s ~ m r U O ORIGINAL AFFIDAVIT OF POSTING DOCUMENTS STATE OF CALIFORNIA) ) ss. County of Kern ) PAMELA A. McCARTHY, being duly sworn, deposes and says: That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield; and that on the 4th day of Mav. 2009 she posted on the Bulletin Board at City Hall, a full, true and correct copy of the following: Resolution of Intention No. 1635, passed by the Bakersfield City Council at a meeting held on the 22nd day of April, 2009 and entitled: RESOLUTION DECLARING ITS INTENTION TO ESTABLISH THE MORNING DRIVE-COLLEGE AVENUE PLANNED BRIDGE AND MAJOR THOROUGHFARE AREA AND PRELIMINARILY APPROVING THE BOUNDARIES OF THE AREA AND THE COST AND FEE SCHEDULE. PAMELA A. McCARTHY City Clerk and Ex Officio of the Council of the City of Bakersfield By: ° DEPUTY City Clerk SADOCUMENT\FORMSWOP. R01.wpd C, ORIGINAL