WHEREAS, by Resolution of Intention No. 1635, adopted April 22, 2009,
a public hearing was called for May 6, 2009, at 6:30 PM in the Council chambers in the
City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of
the Morning Drive-College Avenue Planned Major Thoroughfare Area; and
WHEREAS, notice of such hearing has been given to all affected property
owners as such are shown on the latest equalized assessment roll; and,
WHEREAS, such hearing has been duly and regularly held, and all
persons interested have been given an opportunity to appear and be heard.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1. The foregoing recitals are true and correct and incorporated herein
by reference.
2. The Morning Drive alignment has been identified in the circulation
element of the 2010 General Plan.
3. The Morning Drive-College Avenue Planned Bridge and Major
Thoroughfare Area is in addition to existing major thoroughfares serving the area.
4. No majority protest as to the formation of the Morning Drive-
College Avenue Planned Bridge and Major Thoroughfare Area exists.
5. The Council hereby finds that, as to the Morning Drive-College
Avenue Planned Bridge and Major Thoroughfare Area, as described in the plans and
maps attached hereto and incorporated herein by reference, subdivision and
development of property within each such area will require construction of facilities,
described in each such area either on the basis of benefits conferred on property for
subdivision or on the need for such facilities created by the proposed subdivision and
development of other property within such area, and that the fees provided within the
schedule attached, are fairly apportioned.
6. The Morning Drive-College Avenue Planned Bridge and Major
Thoroughfare Area Plan is hereby adopted.
00000----------
o~~AK~9s
i-- m
U r
O
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by
the Council of the City of Bakersfield at a regular meeting thereof held on
MAY 0 R 2009 , by the following vote:
YES' COUNCILMEMBER: CARSON, BENHAM, WEIR, COUCH, HANSON, SULLIVAN, SCRIVNER
NOES: COUNCILMEMBER: 1'1,0 ro_
ABSTAIN: COUNCILMEMBER: YW /UL
ABSENT: COUNCILMEMBER: No r..&-
PAMELA A. MCCARTHY, CMC
CITY CLERK and EX OFFI of the
Council of the City of Bakersfield
APPROVED: MAY 0 6 2009
By: WWI
HARVEY L. HALL, Mayor
CITY OF BAKERSFIELD
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By: &&t- A - &-,IA
ROBERM. SHER
Deputy City Attorney
Attachments:
Exhibit "A" Cost Estimate
Exhibit "B" Fee Schedule
Exhibit "C" Limits of Improvements & Benefitted Area
o~gAKF ~
s
v a
ORIGINAL
Exhibit "A"
Morning Drive -College Avenue Cost Estimate
>
Intersection of College and MornlnC
Roadway Excavation CY $13.23 23,967 $317,083
Asphalt TN $93.71 1,358 $127,258
A re ate Base CY $49.61 1,067 $52,934
Grading Site Work LS $551,250.00 1 $551,250
Intersection Total $1,048,525
Morning Drive
Grading LS $284,093.00 1 $284,093
Import LS $272,076.00 1 $272,076
Sub grade Pre LS $92,148.00 1 $92,148
7" Pavement TN $118.70 6,392 $758,730
6" Aggregate Base TN $43.38 5,358 $232,430
Finish shoulders LS $63,042.00 1 $63,042
Striping LS $65,467.00 1 $65,467
B1/C1 Culverts EA $35,338.00 2 $70,676
Ri ra SF $16.79 4,200 $70,518
Gunite Swales LF $50.31 3,605 $181,368
Relocate power poles EA $32,386.67 9 $291,480
Erosion Control LS $61,059.00 1 $61,059
Morning Drive Total $2,443,087
Storm Drain
Secondary Subdrains LF $83.13 4,400 $365,772
Rip rap Areas SF $16.80 4,700 $78,960
Storm drain line LF $143.49 2,955 $424,013
Catch basins EA $8,230.89 18 $148,156
B unite & rip rap swales LF $25.12 3,605 $90,558
Manholes EA $13,748.40 5 $68,742
Storm Drain Total $1,176,201
College Avenue
Grading LS $82,386.97 1 $82,387
Import LS $78,902.04 1 $78,902
Sub grade Pre LS $26,722.92 1 $26,723
7" Pavement TN $118.70 1,854 $220,032
6" Aggregate Base TN $43.38 1,554 $67,405
Finish shoulders LS $18,282.18 1 $18,282
Striping LS $18,985.43 1 $18,985
B1/C1 Culverts EA $35,338.00 2 $70,676
Ri ra SF $16.79 1,218 $20,450
Gunite Swales LF $50.31 1,045 $52,597
Relocate power poles EA $32,386.67 0 $0
Erosion Control LS $17,707.11 1 $17,707
College Avenue Total $674,146
Less Impact Fee Credit -$524,984
Design $427,357
CM/Testing $534,196
Other Costs/Fees $427,357
Coontin enc $961,553
T-ow t Y
Impact Fee Credit is based upon Res. No. 218-08: Project No. 177:Morning, SR178 to College
o, gAKF9
U r
ORIGINAL
Exhibit "B"
Morning-College Bridge and Major
Thoroughfare Fee Schedule
Total Cost= $7,167,437
Total Acreage = 643.1
Cost Per ADT = $173
Fee Per Acre
Year GC OC HMR LR
2009 $115,142 $64,177 $12,133 $6,933
2010 $123,202 $68,670 $12,982 $7,419
2011 $131,826 $73,477 $13,891 $7,938
2012 $141,054 $78,620 $14,864 $8,494
2013 $150,928 $84,124 $15,904 $9,088
2014 $161,492 $90,012 $17,017 $9,724
2015 $172,797 $96,313 $18,209 $10,405
2016 $184,893 $103,055 $19,483 $11,133
2017 $197,835 $110,269 $20,847 $11,913
2018 $211,684 $117,988 $22,306 $12,746
2019 $226,502 $126,247 $23,868 $13,639
2020 $242,357 $135,084 $25,538 $14,593
2021 $259,322 $144,540 $27,326 $15,615
2022 $277,474 $154,658 $29,239 $16,708
2023, $296,897 $165,484 $31,286 $17,878
2024 $317,680 $177,068 $33,476 $19,129
Notes:
1. This fee schedule is based upon an inflation factor of 7% annually.
2. This fee is to be paid at the time of the recording of the map. If no map is recorded,
then the fee is to be paid at the issuance of building permit.
3. This fee is to be based upon the net area of the individual parcel for which the
building permit is to be issued
o~gAKF9~
F- m
v o
ORIGINAL
Exhibit "C"
i
'
i
13 18
~r
i
i
30 2
Legend
Morning, College
Benefit Area Boundary
~~~AKF9sT
f- m
U
O
ORIGINAL