HomeMy WebLinkAboutRES NO 053-09 RESOLUTION NO. 0 5 3 n 9 RESOLUTION OF THE CITY OF BAKERSFIELD ADOPTING THE MORNING DRIVE-COLLEGE AVENUE PLANNED MAJOR THOROUGHFARE AREA AND MAKING FINDINGS RELATIVE THERETO. WHEREAS, by Resolution of Intention No. 1635, adopted April 22, 2009, a public hearing was called for May 6, 2009, at 6:30 PM in the Council chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of the Morning Drive-College Avenue Planned Major Thoroughfare Area; and WHEREAS, notice of such hearing has been given to all affected property owners as such are shown on the latest equalized assessment roll; and, WHEREAS, such hearing has been duly and regularly held, and all persons interested have been given an opportunity to appear and be heard. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The foregoing recitals are true and correct and incorporated herein by reference. 2. The Morning Drive alignment has been identified in the circulation element of the 2010 General Plan. 3. The Morning Drive-College Avenue Planned Bridge and Major Thoroughfare Area is in addition to existing major thoroughfares serving the area. 4. No majority protest as to the formation of the Morning Drive- College Avenue Planned Bridge and Major Thoroughfare Area exists. 5. The Council hereby finds that, as to the Morning Drive-College Avenue Planned Bridge and Major Thoroughfare Area, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 6. The Morning Drive-College Avenue Planned Bridge and Major Thoroughfare Area Plan is hereby adopted. 00000---------- o~~AK~9s i-- m U r O ORIGINAL I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on MAY 0 R 2009 , by the following vote: YES' COUNCILMEMBER: CARSON, BENHAM, WEIR, COUCH, HANSON, SULLIVAN, SCRIVNER NOES: COUNCILMEMBER: 1'1,0 ro_ ABSTAIN: COUNCILMEMBER: YW /UL ABSENT: COUNCILMEMBER: No r..&- PAMELA A. MCCARTHY, CMC CITY CLERK and EX OFFI of the Council of the City of Bakersfield APPROVED: MAY 0 6 2009 By: WWI HARVEY L. HALL, Mayor CITY OF BAKERSFIELD APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By: &&t- A - &-,IA ROBERM. SHER Deputy City Attorney Attachments: Exhibit "A" Cost Estimate Exhibit "B" Fee Schedule Exhibit "C" Limits of Improvements & Benefitted Area o~gAKF ~ s v a ORIGINAL Exhibit "A" Morning Drive -College Avenue Cost Estimate > Intersection of College and MornlnC Roadway Excavation CY $13.23 23,967 $317,083 Asphalt TN $93.71 1,358 $127,258 A re ate Base CY $49.61 1,067 $52,934 Grading Site Work LS $551,250.00 1 $551,250 Intersection Total $1,048,525 Morning Drive Grading LS $284,093.00 1 $284,093 Import LS $272,076.00 1 $272,076 Sub grade Pre LS $92,148.00 1 $92,148 7" Pavement TN $118.70 6,392 $758,730 6" Aggregate Base TN $43.38 5,358 $232,430 Finish shoulders LS $63,042.00 1 $63,042 Striping LS $65,467.00 1 $65,467 B1/C1 Culverts EA $35,338.00 2 $70,676 Ri ra SF $16.79 4,200 $70,518 Gunite Swales LF $50.31 3,605 $181,368 Relocate power poles EA $32,386.67 9 $291,480 Erosion Control LS $61,059.00 1 $61,059 Morning Drive Total $2,443,087 Storm Drain Secondary Subdrains LF $83.13 4,400 $365,772 Rip rap Areas SF $16.80 4,700 $78,960 Storm drain line LF $143.49 2,955 $424,013 Catch basins EA $8,230.89 18 $148,156 B unite & rip rap swales LF $25.12 3,605 $90,558 Manholes EA $13,748.40 5 $68,742 Storm Drain Total $1,176,201 College Avenue Grading LS $82,386.97 1 $82,387 Import LS $78,902.04 1 $78,902 Sub grade Pre LS $26,722.92 1 $26,723 7" Pavement TN $118.70 1,854 $220,032 6" Aggregate Base TN $43.38 1,554 $67,405 Finish shoulders LS $18,282.18 1 $18,282 Striping LS $18,985.43 1 $18,985 B1/C1 Culverts EA $35,338.00 2 $70,676 Ri ra SF $16.79 1,218 $20,450 Gunite Swales LF $50.31 1,045 $52,597 Relocate power poles EA $32,386.67 0 $0 Erosion Control LS $17,707.11 1 $17,707 College Avenue Total $674,146 Less Impact Fee Credit -$524,984 Design $427,357 CM/Testing $534,196 Other Costs/Fees $427,357 Coontin enc $961,553 T-ow t Y Impact Fee Credit is based upon Res. No. 218-08: Project No. 177:Morning, SR178 to College o, gAKF9 U r ORIGINAL Exhibit "B" Morning-College Bridge and Major Thoroughfare Fee Schedule Total Cost= $7,167,437 Total Acreage = 643.1 Cost Per ADT = $173 Fee Per Acre Year GC OC HMR LR 2009 $115,142 $64,177 $12,133 $6,933 2010 $123,202 $68,670 $12,982 $7,419 2011 $131,826 $73,477 $13,891 $7,938 2012 $141,054 $78,620 $14,864 $8,494 2013 $150,928 $84,124 $15,904 $9,088 2014 $161,492 $90,012 $17,017 $9,724 2015 $172,797 $96,313 $18,209 $10,405 2016 $184,893 $103,055 $19,483 $11,133 2017 $197,835 $110,269 $20,847 $11,913 2018 $211,684 $117,988 $22,306 $12,746 2019 $226,502 $126,247 $23,868 $13,639 2020 $242,357 $135,084 $25,538 $14,593 2021 $259,322 $144,540 $27,326 $15,615 2022 $277,474 $154,658 $29,239 $16,708 2023, $296,897 $165,484 $31,286 $17,878 2024 $317,680 $177,068 $33,476 $19,129 Notes: 1. This fee schedule is based upon an inflation factor of 7% annually. 2. This fee is to be paid at the time of the recording of the map. If no map is recorded, then the fee is to be paid at the issuance of building permit. 3. This fee is to be based upon the net area of the individual parcel for which the building permit is to be issued o~gAKF9~ F- m v o ORIGINAL Exhibit "C" i ' i 13 18 ~r i i 30 2 Legend Morning, College Benefit Area Boundary ~~~AKF9sT f- m U O ORIGINAL