Dan Anson -Re: Tr. 6362 Phase 1 -NOC Dan, We need an additional deposit in the amount of $35,000. Moreland Corporation had paid $5000 deposit so far. The total deposit is for 4 temporary
sumps. I have not verified the sump if it is draining or not since there is no access to the sump. I can verify if the sump is draining properly once Phase 2 improvements are completed.
Thanks Manny Behl Engineer II Public Works Division Ph: (661) 326-3576 Fax:(661) 852-2011 mbehl@bakersfieldcity.us >>> Steve Lesh 8/19/2009 11:42 AM >>> The improvements for this subdivision
have been completed. A Notice of Completion can now be filed. Steven Lesh Construction Supervisor City of Bakersfield Public Works 1501 Truxtun Ave. Bakersfield, CA 93301 (661) 326-3106
Office (661) 852-2116 Fax slesh@bakersfieldcity.us From: Manpreet Behl To: Anson, Dan Date: 9/4/2009 2:29 PM Subject: Re: Tr. 6362 Phase 1 - NOC CC: Holladay, Jim; Lesh, Steve Page 1