HomeMy WebLinkAboutRES NO 146-01RESOLUTION NO. ] ~ 6 ' 0 ~.
A RESOLUTION DISPENSING WITH BIDDING
UNDER SECTION 3.20.060 OF THE
BAKERSFIELD MUNICIPAL CODE RELATING
TO DESIGN/BUILD.
RECITALS
WHEREAS, the use of design/build methodologies has been shown to be an
effective method of reducing construction costs; and
WHEREAS, the use of design/build joins the construction and design of a project
under one single legal entity thereby reducing conflicts; and
WHEREAS, the City Council believes the use of design/build is appropriate for
certain unique projects where specialized design or construction methods are necessary
or special design expertise must be employed; and
WHEREAS, the City Council believes the public and the procurement process can
be adequately protected through the use of a fair competitive process for choosing a
design/build entity which best serves the interests of the City.
NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield
as follows:
The above recitals are true and correct and are incorporated herein by
reference.
The following named project is appropriate for design/build because of the
specialized nature of the design or construction or because specialized
design expertise must be employed.
The following named project justifies an exception to the bidding process and
the City Council hereby determines that the work, supplies, equipment and
material can best be obtained through the design/build construction
procurement process.
Upon adoption of this Resolution, the Public Works Director is authorized to
proceed with the design/build procurement process, as set forth in the
Bakersfield Municipal Code § 3.20.060D, et al, for the following project:
Heating, Ventilating and Air Conditioning System Upgrade at City Hall
-- Page 1 of 3 Pages --
O~G HAL
The Public Works Director shall recommend a design/build entity that
combines appropriately licensed contracting, architectural and engineering
services, as needed, into one legal entity.
The Public Works Director shall invite no less than three (3) appropriate
design/build entities to participate in the selection process.
The Public Works Director shall, in a timely manner, bring the contract for
award of the project to the City Council for approval with a report setting forth
the reasons the award is recommended to the chosen design/build entity.
.......... 000 ..........
-- Page 2 of 3 Pages --
O~IGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting thereof held on
SEP ! 9 2001~ , by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
COUNCIL MEMBER BENHAM, CARSON, COUCH, HANSON, MAGGARD, SALVAGGIO, SULLIVAN
COUNCIL MEMBER ~l 0 ~J .~.
COUNCIL MEMBER
COUNCIL MEMBER
APPROVED
SEP 1 9 2001
By HJ[RVE~; L. HALL
Mayor
CITY CLERK and Ex OfficiO)Clerk of the
Council of the City of Bakersfield
APPROVED AS TO FORM:
BART J. THILTGEN
City Attorney
Deputy City Attorney
G:\eng\SHARED\PROJECTS\CMW\HVAC City Hall\resoldispnsbid.wpd
--September 6, 2001
-- Page 3 of 3 Pages --