HomeMy WebLinkAbout1990 Special Provisions Project 51008I ~ cow rio..
_I;
CITY OF BAKERSFIELD
CALIFORNIA ,I
NOrTICE Z~0 CONTRAC.CpRS
i
SPECIAL PRC7VIgIpNS
BID PROPC~SAL AND CON'!'RACT
FOR
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~§~~~~~~S~S~~~~~~~~~~~~~~
TRAFFIC SIGNAL, SYSTEM ON FAIRVIEW F~QAD
C ' § § AT S~IJTH "K" STREET § §
~
§s
BID OPENIlVG; L1p,1E June 14, 1990
TIME 2:00 P.M.
P~~T 51008
~~~~~~~~~§~~~~~~~~~§~~~~~~5~~~~~~~~~~~~~~~~~~~~~~~~~~~5~~~~~~~~~~~~~~
QROFESS/pN
N L
~T ~ PUBLIC WORRS ~~'~~~Q~`~ ~V G.-
CITY OF BARERSFIELD ~ m 1501 TRU~~'tUN AVENUE 1 .32 m~
BAKERSFIEI,D, CA 93301
r~~ Telephone: (805) 326-3724 * EXP. f,~~
`Sjq~ C IV 1~
~F CALF
~ D23:51008
~ GG:lh i,
CITY OF BAKERSFIELD, CALIFORNIA
D E P A R T M E l~ T O F P U B L I C W O R K S
SPECIAL PROVISIONS
SECTION 1 - DEFINITIONS AND TEgMS
1-1.01 GENERAL. This work embraced herein shall be done in accordance
with the Standard Specifications entitled "State of California, Department of
Transportation, Standard Specifications, January 1988," as referenced herein,
insofar as the same may apply, which specifications are hereinafter referred to
as the Standard Specifications, and in accordance with the following special
provisions.
I In case of conflict between the Standard Specifications and these
' special provisions, the special provisions shall take precedence over and be used
in lieu of such conflicting portions.
1-1.02 DEFINITIONS AND TERMS, p,11 definitions and terms in Section 1, "Definitions and Terms," of the Standard Specifications shall apply, except
whenever the following terms or pronouns are used, the intent and meaning shall
be as follows:
City - City of Bakersfield, California.
Department of Transportation, GAI,TRANg - The Engineering Department of the City of Bakersfield.
Director - City Engineer.
Engineer - The City Engineer, acting either directly or through properly
authorized agents, such agents acting within the scope of the particular duties entrusted to them.
Laboratory - The designated laboratory authorized by the City to test
materials and work involved in the contract.
Star►dard Specifications - Standard Specifications of the Department of Transportation, Business and Transportation Agency, dated January, 1988.
State - The City of Bakersfield.
State Contract Act - Chapter 1, Division 2 of the Public Contract Code.
The provisions of this act do not apply to this contract.
Other terms appearing in the Standard Specifications, the general
provisions, and the special provisions, shall have the intent and meaning
specified in Section 1, Definition of Terms of the Standard Specifications.
D23:51008.3 _3_ GG:lh
SECTION 2. PI2pP06AL REQUIREMENTS
2-1.01 GENERAL INFpgMATIprJ. The Purchasing Officer of the City of
Bakersfie~.d, California, will receive at her office, City Hall, 1501 Truxtun
Avenue, in said City, until 2 o'clock P.M. on June 14, 1990 sealed
proposals for
i
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD
AT SOU'Tfi "H" STREET
2-1.02 APPROXIMATE ESTIMATE. The Engineer's estimate of the quantities of work to be done and materials to be furnished are approximate only,
being given as a basis for the comparison of bids, and the City of Bakersfield
does not expressly or by implication agree that the actual amount of work will
correspond therewith, but reserves the right to increase or decrease the ampunt
of any class or portion of the work or to omit portions of the work that may be
deemed necessary or expedient by the Engineer.
2-1.03 EXAMINATION OF PLANS, SPECIFICATIONS., SPECIAL PROVISIONS, AND
SITE OF WORK. The bidder is required to examine carefully the site of work, the
proposal, plans and specifications, and contract forms. It will be assumed that
the bidder has investigated, and is satisfied as to the conditions to be
encountered, the character, quality, and quantities of work to be performed and
materials to be furnished, and as to the requirements of the specifications, the special provisions, and the contract. It is mutually agreed that the submission
of a proposal shall be considered prima facie evidence that the bidder has made
such examination.
2-1.04 REJECTION OF PROP06ALS CONTp~INING p,I,TEgATIONS, ERASURES OR
IRREGULARITIES. Proposals may be rejected if they show any alterations of form, additions not called for, conditional or alternative bids, inccxnplete bids,
erasures or irregularities of any kind. Proposals in which the prices obviously
are unbalanced may be rejected.
The right is reserved to reject any and all proposals and waive any
irregularity.
2-1.05 PROPO~P,L FpRiy. A].1 proposals must be made upon blank forms to
be obtained from the Purchasing Officer, the form of which appears herein
in~diately following these special provisions. All proposals must give the
prices proposed, both in writing and figures, and must be signed by the bidder,
with his address. If the proposal is made by an individual, his name, telephone
number and post office address must be shown. If made by a firm or partnership, the name and post office address of each member of the firm or partnership must
be shaven. If made by a corporation, the proposal must show the names of the
state under the laws of which the corporation was chartered and the names,
titles, and business addresses of the president, secretary and treasurer.
D23:51008.4 -4- GG:lh
2-1.06 BIDDER'S GUARANTEE. All bids shall be presented under sealed
cover and, shall be accompanied by a Proposal Guaranty made payable to the City of
Bakersfield, for an amount equal to at least ten percent (10~) of the amount of
said bid, and no bid shall be considered unless such Proposal Guaranty is
enclosed therewith.
2-1.07 RF.QiJIRED LISTING OF PRUPOSED SUBCONTRACi~ORS. Each proposal
shall have listed therein the name and address of each Subcontractor to whom the
bidder proposes to subcontract portions of the work in the ampunt of 1/2 of one
percent of his total bid or $10,000, whichever is greater, in accordance with the
Subletting and Subcontracting Fair Practices Act, commencing with Section 4100 of
the Public Contract Code. The bidder's attention is invited to other provisions of said Act related to the imposition of penalties for a failure to observe its
provisions by using unauthorized subcontractors or by making unauthorized
substitutions.
A sheet for listing the Subcontractors, as required herein, is included
in the Proposal.
Bidders are cautioned that this listing requirement is in addition to
the requirement to provide a list of DBE Subcontractors after the opening of the
proposals for projects utilizing Federal funds.
2-1.08 OMISSIONS IN SPECIFICATIONS AND DRAWINGS. Any materials or
work mentioned in the specifications and not shave on the drawings or shown on the drawings and not mentioned in the specifications shall be of the same effect
as if shown or mentioned in both.
Omissions from the drawings or the specifications of the materials or
details of work which are manifestly or obviously necessary to carry out the
intent of the drawings and specifications or which are customarily furnished or
perfornled, shall not relieve the Contractor of his responsibility for furnishing such omitted materials or performing such omitted work; but shall be furnished or
performed as if fully shown or described in the drawings or specifications.
2-1.09 WITHDRAWAL OF PR(JP06AIS. Any bid may be withdrawn at any time
prior to the time fixed in the public notice for the opening of bids by request
for the withdrawal of the bid filed with the Purchasing Department. The request shall be executed by the bidder or his duly authorized representative. The
withdrawal of a bid does not prejudice the right of the bidder to file a new bid.
Whether or not bids are opened exactly at the time fixed in the public notice for
opening bids, a bid will not be received after that time, nor may any bid be
withdrawn after the time fixed in the public notice for the opening of bids.
2-1.10 PUBLIC OPENING OF PROPOSALS. Proposals will be opened and read publicly at the time and place indicated in the "Notice to Contractors."
Bidders or their authorized agents are invited to be present.
2-1.11 RELIEF OF BIDDERS. Attention is directed to the provisions of
Public Contract Code Sections 5100 to 5107, inclusive, concerning relief of
bidders and in particular to the requirement therein, that if the bidder claims a mistake was made in his bid, the bidder shall give the Department written notice
within 5 days after the opening of the bids of the alleged mistake, specifying in
the notice in detail haw the mistake occurred.
D23:51008.5 -5- GG:lh
Public Contract Code Section 10285.1 (Chapter 376, Stats, 1985)
provides as follows:
Any state agency may suspend, for a period of up to three years from
the date of conviction, any person from bidding upon, or being awarded,
a public works or services contract with the agency under this part or from being a subcontractor at any tier upon the contract, if that
.person, or any partner, member, officer, director, responsible managing
officer, or responsible managing employee thereof, has been convicted
by a court of competent jurisdiction of any charge of fraud, bribery,
collusion, conspiracy, or any other act in violation of any state or
federal antitrust law in connection with the bidding upon, award of, or
performance of, any public works contract, as defined in Section 1101, with any public entity, as defined in Section 1100, including for the
purposes of this article, the Regents of the University of California
or the Trustees of the California State University. A state agency may
determine the eligibility of any person to enter into a contract under
this article by requiring the person to submit a statement under
penalty of perjury declaring that neither the person nor any subcontractor to be engaged by the person has been convicted of any of
the offenses referred to in this section within the preceding three
years.
A £orm for the statement required by Section 10285.1 is included in the
proposal.
2-1.12 DISQUALIFICATION OF BIDDERS. More than one proposal from an
individual, firm, partnership, corporation, or combination thereof under the
same or different names will not be considered. Reasonable grounds for believing
that any individual, firm, partnership, corporation or combination thereof is
interested in more than one proposal for the work contemplated may cause the
rejection of all proposals in which such individual, firm, partnership, corporation or combination thereof is interested. If there is reason for believing that
collusion exists among the bidders any or all proposals may be rejected.
Proposals in which the prices obviously are unbalanced may be rejected.
SECTION 3. A4~RD AND EXECUTION OF CONTRACT
3-1.01 GENERAL. The award of the contract, if it be awarded, will be
to the lowest responsible bidder. The language "responsible" refers to not only
the attribute of trustworthiness, but also to the quality, fitness and capacity
of law bidder to satisfactorily perform the proposed work.
3-1.02 AWARD OF CONTRACT. The award of the contract, if it be
awarded, will be made within forty-five (45) days after the opening of the
proposals unless extension is approved by the lavest responsible bidder.
3-1.03 CONTRACT BOND6. The Contractor shall furnish two good and
sufficient bonds. One of the said bonds shall guarantee the faithful
performance of the said contract by the Contractor and shall be in an amount equal to one hundred percent (100$) of the contract price. The other of the
said bonds shall be in an amount of fifty percent (50$) of the contract price
.and shall guarantee payment to laborers, mechanics and material workers employed
on the job under the contract and shall be in the amount and satisfy the
D23:51008.6 -6- GG:lh
requirements specified in Section 3248 of 4he California Civil Code.
Whenever any surety or sureties on any such bonds, or on any bonds
required by law for the protection of the claims of laborers and material men,
. become insufficient, or .the City has cause to believe that such surety or
sureties have become insufficient, a demand in writing may be made of the Contractor for such further bond or bonds or additional surety, not exceeding
that originally required, as is considered necessary, considering the extent of
the work remaining to be done. Thereafter no payment shall be made upon such
contract to the Contractor or any assignee of the Contractor until such further
bond or bonds or additional surety has been furnished.
3-1.04 EXECUTION OF CONTRACT. The contract shall be signed by the
successful bidder and returned, together with the contract bonds within ten (10)
days, not including Sundays, after the bidder has received notice that the
contract has been awarded. No proposal shall be considered binding upon the
City until the execution of the contract. All contracts shall be considered as
being made and entered into in the City of Bakersfield, California.
Failure to execute a contract and file acceptable bonds as provided
herein within ten (10) days, not including Sundays, after the bidder has
received notice that the contract has been awarded, shall be just cause for the
cancellation of .the award and the forfeiture of the proposal guaranty.
3-1.05 RETURN OF BIDDER'S GUARANTEES. Within ten (10) days after the award of the contract, the City of Bakersfield will return any monies or form
for deposit of money that are not to be considered in making the award. All
other proposal guarantees will be held until the contract has been finally
executed, after which they will be returned to the respective bidders whose
proposals they accompany.
SECTION 4 - BEGINL~IING OF WORK, TIME OF COMPLETION AND
LIQUIII~TED I1~MAGES
4-1.01 GENERAL. Attention is directed to the provisions of Section
8, Article 8-1.03, "Beginning of Work," Article 8-1.06, "Time of Completion" and
Article 8-1.07, "Liquidated Damages," of the Standard Specifications, and is specifically hereby made a part of these special provisions.
The first paragraph of Section 8-1.03, "Beginning of Work," of the
Standard Specifications, is amended to read:
The Contractor shall begin work within fifteen (15) days
after receiving written notice the contract has been approved by the City Council if necessary and to proceed. The
Contractor shall diligently prosecute the same to completion
before the expiration of 30 working days.
Contract working days will co~mience from the date the
Contractor begins work or the 15th calendar day from the date of the written notice to proceed, whichever comes first.
The Contractor shall pay to the City of Bakersfield the sum of $ 200.00
per day for each and every calendar day's delay in finishing the work in excess
of the number of working days prescribed above.
D23:51008.7 -7- GG:lh
Full compensation for conforming to the requi2ements of above paragraph
shall be considered as included in the prices paid for the various items of work
and no additional allowance will be made therefor.
SECTION 5. GENERAL
5-1.01 STATE CONTRACT ACT NOT APPLICABLE. Sections 1-1.40, "State
Contract Act," and 9-1.10, "Arbitration," of the Standard Specifications are
deleted. This contract is not governed by the provisions of the State Contract
Act. The adoption and use of the Standard Specifications in the performance of
the work called for in this contract shall not be construed as an election by the City to proceed under Section 20396 of the Public Contract Code. In the event
that a dispute arises between the parties, they are not obligated to submit the
matter to arbitration in any form (although they may do so upon written
agreement).
5-1.02 ALTERATION IN QUANTITY OF Wt~RR. Increases in work totaling more than ten percent (10~) of the contract amount shall be processed as a change
order subject to approval by the City.
5-1.03 CONTROL OF WC~RR. Control of work shall conform to the
provisions in Section 5, "CONTROL OF WORK," of the Standard Specifications
and these special provisions.
Section 5-1.02 "Plans and Working Drawings", of the Standard
Specifications is amended by adding the following paragraph after the fourth
paragraph:
_ Working drawings Qr plans for any structure not included in the plans
furnished by the Engineer shall be approved by the Engineer before any work involving these plans shall be performed, unless approval is
waived in writing by the Engineer.
Section 5-1.07 "Lines and Grades" of the Standard Specifications
is amended by adding the following paragraph after the first paragraph:
Three consecutive points shown on the same rate of slope must be
used in cosrnnon, in order to detect any variation from a straight grade,
and in case any such discrepancy exists, it must be reported to the
Engineer. If such a discrepancy is not reported to the Engineer, the
Contractor shall be responsible for any error in the finished work.
The second paragraph in Section 5-1.07, "Lines and Grades" of the Standard Specifications is amended to read:
When the Contractor requires such stakes or marks, he shall notify
the Engineer of his requirements in writing a reasonable length of
time in advance of starting operations that require such stakes or
marks. In no event, shall a notice of less than 24 hours be considered a reasonable length of time.
Section 5-1.08, "Inspection" of the Standard Specifications is amended
by adding the following paragraph after the first paragraph:
Whenever the Contractor varies the period during which work is
D23:51008.8 -8- GG:lh
carried on each day, he shall give due notice to the Engineer, so that
proper inspection may be provided. Any work done in the absence of the
Engineer will be subject to rejection.
5-1.04 PREVAILING t~GES. Pursuant to Chapter 1 of Part 7 of Division 2 of the Labor Code (commencing with Section 1720), Contractor agrees
that in performing said work, by himself or through any subcontractor, eight
hours' labor shall be a day's work and forty hours' labor shall be a week's work,
and that Contractor shall keep an accurate record showing the name and actual
hours worked for all workers employed in said work, and that said record shall be
kept open at all reasonable hours for inspection pursuant to Section 1812 of the Labor Code. The Contractor and all Subcontractors shall pay not less than the
general prevailing rate of per diem wages and the general prevailing rate for
holiday and overtime to all workers employed in the construction of this project.
The prevailing rate for each craft, classification or type of work is determined
by the Director of the California Department of Industrial Relations, and his
schedule of prevailing rates is on file and available for inspection in the Public Works Department. The schedule is incorporated herein by this reference.
The City shall have the right to inspect payroll records during normal working
hours and shall have the right to question workers at any time concerning the
wages being paid. Contractor shall not interfere in any way with the City's
right to investigate conformance with the wage provisions of this contract.
Contractor shall forfeit to the City for each worker employed for each calendar day or portion thereof:
a. TWEN°i'Y-FIVE DOLLARS ($25) pursuant to Section 1775 of the Labor
Code, per worker paid less than the amount to which he is entitled
under said general prevailing rate of wages; and
b. TWENTY-FIVE DOLLARS ($25) pursuant to Section 1813 of the Labor
Code, per worker required to work more than eight (8) hours per
day or more than forty (40) hours per week, except as provided in
Section-1815 of the Labor Code.
5-1.05 PAYR~JLL RECORD6. The fourth paragraph in Section 7-1.OlA(3),
"Payroll Records," of the Standard Specifications is deleted and shall not apply to this contract.
5-1.06 LABOR NONDISCRIMINATION. Attention is directed to Section
7-1.OlA(4), "Labor Nondiscrimination," of the Standard Specifications and these
special provisions.
Attention is also directed to the requirements of the California Fair
Employment and Housing Act (Government Code Sections 12900 through 12996), to the
regulations promulgated by the Fair Employment and Housing Commission to
implement said Act, and to the nondiscrimination, affirmative action and equal
employment opportunity requirements in the special provisions.
5-1.07 APPRENTICES. The Contractor's attention is directed to Article 7-1.OlA(5), "Apprentices," of the Standard Specifications. All Contractors and
Subcontractors shall comply with the provisions of Labor Code Sections,.1777.5,
1777.6, and 1777.7 relating to the employment of apprentices.
If the Contractor does not have a union contract which provides for
apprentices, the Contractor and all Subcontractors shall submit one of the
D23:51008.9 -9- GG:lh
following:
1. A copy of a "Request for an Application for a Certificate of
Approval to Employ and Train Apprentices on Public Works." This
_ request shall be submitted to the local Department of Industrial
Relations, Division of Apprenticeship Standards on the
Contractor's and each Subcontractor's letterhead or Form P'W 1, enclosed with these specifications.
2. A copy of an approval to employ and train apprentices from the
local Department of Industrial Relations, Division of
Apprenticeship Standards.
3. Proof of a Collective Bargaining Agreement with the Joint Apprenticeship Co~nittee providing for apprentices.
One of the above shall be submitted by the low bidder to the City of
Bakersfield Purchasing Division, within two (2) working days following the bid
opening.
5-1.08 TRENCH SAFETY. The Contractor shall ccxnply with Section 6705
of the Labor Code which provides that the Contractor's responsibility shall be as
follows:
If the contract price for the project includes an expenditure in
excess of ZWENTY-FIVE THOUSAND DOLLARS ($25,000) for excavation of any
trench or trenches five feet or more in depth, the Contractor or his Subcontractor shall not begin any trench excavation unless a detailed
plan, showing the design of shoring, bracing, sloping or other
provisions to be made for worker protection during the excavation of the
trench, has been submitted by the Contractor to the City Engineer and
the detailed plans has been approved by the City Engineer.
If such plan varies from the shoring system standards established by the
Construction Safety Orders of the Division of Industrial Safety, the plan shall be
prepared by a Registered Civil or Structural Engineer.
Nothing in this section shall be deemed to allow the use of a shoring,
sloping, or protective system less effective than that required by the Construction Safety Orders of the Division of Industrial Safety.
Nothing in this section shall be construed to impose tort liability on
the awarding body or any of its employees.
The ternns "Public Works" and "Awarding Body," as used in this section,
shall have the same meaning as in Labor Code Sections 1720 and 1722 respectively.
5-1.09 SOUND CONTROL REQUIRE~ITS. Sound control shall conform to the
provisions in Section 7-1.OlI, "Sound Control Requirements," of the Standard
Specifications and these special provisions.
The noise level from the Contractor's operations, between the hours of
9:00 P.M. and 6:00 A.M., shall not exceed 86 dbA at a distance of 50 feet. This
requirement in no way relieves the Contractor from responsibility for ccxriplying
with local ordinances regulating noise level.
D23:51008.10 -10- GG:lh
Said noise level requirement shall apply to all equipment on the job or
related to the job, including but not limited to trucks, transit mixers or
transient equipment that may or may not be owned by the Contractor. The use of
loud sound signals shall be avoided in favor of light warnings except those
required by safety laws for the protection of personnel.
Full compensation for conforming to the requirements of this section
shall be considered as included in the prices paid for the various contract items
of work involved and no additional compensation will be allowed therefor.
5-1.10 PERMITS AND LICENSES. The Contractor shall procure all permits
and licenses, pay all charges and fees, and give all notices necessary and
incidental to the due and lawful prosecution of the work from any and all governmental organization which require such permits, licenses or fees. The
Contractor shall procure a business license in the City of Bakersfield.
5-1.11 V~URRING HOURS. Contractor shall limit his field working hours
from 7:00 A.M. to 4:30 P.M. Any deviations must be requested and in writing and
directed to the Construction Engineer at the Pre-Job Conference. Written approval from the Construction Engineer is required for work beyond these limits.
Any time work proceeds beyond the time limits or on holidays or weekends, the
Contractor will be charged for all associated overtime charges and said charges
may be withheld from contract retention.
5-1.12 LAWS TO BE OBSERVED. The Contractor shall keep himself fully informed of all existing and future State and National laws and all municipal
ordinances and regulations of the City of Bakersfield which in any manner affect
those engaged or employed in the work, or the materials used in the work, or
which in any way affect the conduct of the work, and of all such orders and
decrees of bodies or tribunals having any jurisdiction or authority over the
same.
5-1.13 CONTRACIiOR'S INSURANCE. The Contractor shall not commence work
under this contract until he has obtained all insurance required under this
section and the required certificates of insurance have been filed with and
approved by the City Risk Manager and the Public Works Department, nor shall the
Contractor allow any Subcontractor to carra~ence work on his subcontract until said
certificates of insurance have been filed and approved by the City Risk Manager and the Public Works Department. Contractor shall be responsible for any
deductibles under all required insurance policies.
5-1.13A HOLD HARMLESS. The Contractor shall save, hold harmless and
indemnify the City, its officers, agents, employees and volunteers fran
all claims, demands, damages, judgments, costs or expenses in law or
equity that may at any time arise from or related to any work perfornned by the Contractor, his agents, employees or subcontractors under the
terms of this agreement and shall execute and return with the executed
contract documents and bonds the "Hold Harmless Agreement," a copy of
which is attached hereto.
5-1.13B INSURANCE. In addition to any other form of insurance or bond required under the terms of this agreement and specifications, the
Contractor shall procure and maintain for the duration of this
agreement the following types and limits of insurance:
Autanobile liability insurance, providing coverage on an occurrence
D23:51008.11 -11- GG:lh
basis for bodily injury, including death, of one or more persons,
property damage and personal injury, with limits of not less than one
million ($1,000,000) per occurrence; and
The automobile liability policies shall provide coverage for owned,
non-owned and hired autos.
General liability insurance, providing coverage on an occurrence basis
for bodily i jury, includ ng death, of one or more persons, property
damage and personal injury, with limits of not less than one million
($1,000,000) per occurrence.
The liability policies, shall provide contractual liability coverage for
the terms of this agreement.
The liability policies shall contain an additional insured endorsement
in favor of the City, its mayor, council, officers, agents, employees
and volunteers;
Workers' nsation with statuto limits and e to er's liabilit
insurance with lino is of not less than one million ( 1,004,000) per
accident.
The workers' canpensation policy shall contain a waiver of subrogation
endorsement in favor of the City, its mayor, council, officers, agents, employees and volunteers.
All policies required of the Contractor hereunder shall be primary
insurance as respects the City, its mayor, council, officers, agents,
employees and volunteers and any insurance or self-insurance maintained
by the City, its mayor, council, officers, agents, employees and
volunteers shall be excess of the Contractor's insurance and shall not contribute with it.
All policies shall contain the following endorsements:
An endorsement providing the City with ten (10) days written
notice of cancellation or material change in policy language or terms.
If any part of the work under this agreement is sublet, similar
insurance shall be provided by or on behalf of the subcontractors
to cover their operations.
The insurance required under this agreement shall be maintained until all work required to be performed under the terms of this
agreement is satisfactorily completed as evidenced by fornial
acceptance by the City.
All costs of insurance required under this agreement shall be
included in the Contractor's bid, and no additional allavance will be made for additional costs which may be required by extension of
= the insurance policies.
5-1.14 CONTRACPOR'S AU7.HORITY. At the preconstruction meeting, the
Contractor shall provide the City with the foreman's or superintendent's name who
D23:51008.12 -12- GG:lh
will be in charge of this project.
5-1.15 LY~MAGE BY STORM, FLOOD, TIDAL V~VE OR EARZi3QUARE. Section
7-1.165, "Damage by Storm, Flood, Tidal Wave or Earthquake," of the Standard Specifications is deleted and shall not apply to this contract.
5-1.16 WORK IN CITY STREETS. All of the work shaven on the plans and
included in these specifications that is located in the public streets in the City
of Bakersfield shall be done in accordance with City Ordinance regulating the use
of public streets within the City, except as otherwise provided herein.
The Contractor shall inform himself as to all regulations and
requirements of the City Engineer and Superintendent of Streets of the City of
Bakersfield and shall conduct his operations in compliance therewith.
5-1.17 RIGHT OF Tn~Y. The right of way for the work to be constructed
will be provided by the City. The Contractor shall make his awn arrangements, and pay all expenses for additional area required by him outside of the limits of
right of way unless otherwise provided in the special provisions.
5-1.18 SUSPENSION OF CONTRACT. If at any time in the opinion of the
City Council, the Contractor has violated any terms of this contract, failed to
supply an adequate working force, or material of proper quality, or has failed in
any other respect to prosecute the work with the diligence and force specified and intended in and by the terms of the contract, notice thereof in writing will
be served upon him, and should he neglect or refuse to provide means for a
satisfactory compliance with the contract, as directed by the Engineer, within
the time specified in such notice, the City Council in any such case shall have
the power to suspend the operation of the contract. Upon receiving notice of
such suspension, the Contractor shall discontinue said work, or such parts of it as the City Council may designate. Upon such suspension, the Contractor's
control shall terminate, and thereupon the City Council, or its duly authorized
representative; may employ other parties to carry the contract to completion,
e~loy the necessary workmen, substitute other machinery or materials, and
purchase the materials contracted for, in such manner as the Engineer may deem
proper; or the City Council may annul and cancel the contract and re-let the work
or any part thereof. Any excess of cost arising therefr~n over and above the contract price will be charged against the Contractor and his sureties,- who will
be liable therefor. In the event of such suspension, all money due the
Contractor or retained under the terms of this contract shall be forfeited to the
City; but such forefeiture will not release the contractor or his sureties from
liability or failure to fulfill the contract. The Contractor and his sureties
will be credited with the amount of money so forfeited toward any excess of cost over and above the contract price, arising from the suspension of the operations
of the contract and the completion of the work by the City as above provided, and
the Contractor will be so credited with any surplus remaining after all just
claims for such completion as deternuned by the Engineer have been paid.
In the determination of the question whether there has been any such
non-compliance with the contract as to warrant the suspension or annulment thereof, the decision of the-City Council shall be binding on all parties to the
contract.
5-1.19 TEMPORARY SUSPENSION OF WORK. The Engineer shall have the
authority to suspend the work wholly or in part, for such period as he may deem
necessary, due to unsuitable weather, or to such other conditions as are
D23:51008.13 -13- GG:lh
considered unfavorable for the suitable prosecution of the work, or for such time
as he may deem necessary, due to the failure on the part of the Contractor to
carry out orders given, or to perform any provisions of the work. The Contractor
shall immediately obey such order of the Engineer and shall not resume. the work until ordered in writing by the Engineer.
5-1.20 PAYMENTS. Attention is directed to Sections 9-1.06, "Partial
Payments," and 9-1.07, "Payment After Acceptance," of the Standard Specifications
and these special provisions.
No partial payment will be made for any materials on hand which are
furnished but not incorporated in the work.
5-1.21 FINAL PAYI~NT. In addition to the conditions, provisions, and
requirements of Article 9-1.07B, "Final Payment and Claims," of the Standard
Specifications, the following shall apply:
The City may withhold funds, or because of subsequently discovered
facts, nullify the whole or any part of any certificate for payment, to
such extent as may be necessary to protect the City from loss due to
causes including but not limited to the following:
a. Defective work not remedied;
b. Claims filed or information reasonably indicating probable filing
of claims;
c. Failure of Contractor to make payment due for materials and/or
labor;
d. Information causing reasonable doubt that the contract can be
completed for any unpaid balance;
e. Damages to another Contractor; and
f. Breach of any terms of this contract.
When any and all such causes are removed, certificates shall be issued
for amount withheld.
The fifth paragraph in Section 9-1.07B, "Final Payment and Claims," of
the Standard Specifications is amended to read:
The Director will make the final determination of any claims which
remain in dispute after ccxnpletion of claim review. Aboard or person
designated by said Director will review such claims and make written
recommendation thereon.
The City Engineer shall, after the completion of the contract, make a final estimate of the amount of work done thereunder, and the value of such work,
and the City shall pay the entire stun so found to be due after deducting
therefrom all previous payments and all amounts to be kept and all amounts to be
retained under the provisions of the contract. All prior partial estimates and
payments shall be subject to correction in the final estimate and payment. The
final payment shall not be due and payable until the expiration of thirty (30)
days from the date the "NdTICE OF COMPLETION" is recorded at the County
D23:51008.14 -14- GG:lh
Recorder's Office and after execution and return by the Contractor of the
attached GUARANTEE when applicable.
It is mutually agreed between the parties to the contract that no
certificate given or payments made under the contract except the final certificate or final payment, shall be conclusive evidence of the perforntiance of
the contract, either wholly or in part, against any claim of the party of the
first part, and no payment shall be construed to be an acceptance of any
defective work or improper materials.
And the Contractor further agrees that the payment of the final amount due under the contract, and the adjustment and payment for any work done in
accordance with any alterations of the same, shall release the City, the City
Council, and the Engineer from any and all claims or liability on account of work
performed under the contract or any alteration thereof.
5-1.22 INCREASED OR DECRF,ASED QUANTITIES. The word "compensation" in the following paragraphs of the Standard Specifications is replaced with the
words "unit price":
Third paragraph of Section 18-1.05, "PAYI~NT".
Third paragraph of Section 24-1.08, "PAYMENT".
Second paragraph of Section 36-1.07, "PAYMENT". Tenth paragraph of Section 39-8.02, "PAYMENT".
5-1.23 HAZARDOUS MATERIALS. The Contractor shall be held
responsible for his workers and subcontractor's well-being and their education of
handling hazardous materials when hazardous materials are encountered during this project.
SECTION 6. CONTROL OF MATERIALS
6-1.01 GENERAL. Control of materials shall conform to the provisions
in Section 6, "Control of Materials," of the Standard Specifications and these special provisions.
At the option of the Engineer, the source of supply of each of the
materials shall be approved by the Engineer before delivery is started and
before such material is used in the work. Representative preliminary samples of
the character and quality prescribed shall be submitted by the contractor or producer o£ all materials to be used in the work, for testing or examination as
desired by the Engineer.
All tests of materials furnished by the contractor shall be made in
accordance with corrnnonly recognized standards of national organizations, and
such special methods and tests as are prescribed in the specifications.
6-1.02 BORRCJW, DISPOSAL AND MATERIAL SITES. The operation of any
borrow or disposal sites used by the Contractor to produce or dispose of
- material for this project shall comply with the requirements in the Standard
Specifications and these special provisions. All provisions for water pollution,
and sound control that apply within the limits of the contract shall apply to
all borrow or disposal sites utilized by the Contractor.
D23:51008.15 -15- GG:lh
iJpon completion of the work, all such sites and haul roads shall be graded and treated so that, at the time of final inspection of the contract,
they will drain, will blend with surrounding terrain, and will have a potential
as a source of blowing dust or other pollution which is no greater than when in
_ their original condition.
If the Contractor obtains necessary permits for borrow, disposal or material sites from the authority having jurisdiction or from the appropriate
pollution control boards and such permits contain requirements which conflict
with the requirements in the first and second paragraphs of this section, the
requirements of the permits shall govern over the conflicting requirements of
this section provided the permit requirements have been approved by the
Engineer.
Full compensation for complying with the requirements for borrow,
disposal and material sites in this section shall be considered as included in
the contract prices paid for the items of work which require the use of the
sites and no additional compensation will be allaaed therefor.
6-1.03 CERTIFICATES OF CON~LIANCE. In accordance with Section 6-1.07, "Certificates of Compliance," of the Standard Specifications, the
Engineer may permit the use of certain materials or assemblies, prior to
sampling and testing, if accompanied by a Certificate of Compliance.
SECTION 7. CONSTRUCTION DETAILS
SECTION.?-1 GENERAL
7-1.01 ORDER OF WI~RK. Order of work shall conform to the provisions
in Section 5-1.05, "Order of Work," of the Standard Specifications and these
special provisions.
All striping removal shall be ccxnpleted a minimum of 2 days prior
to signal being placed into operation. Pavement delineation shall be replaced
by temporary delineation before opening the traveled way to public traffic.
Temporary delineation shall consist of reflective traffic line tape applied in
pieces not less than 4 inches long nor less than 4 inches wide spaced no more
than 10 feet apart on curve nor more than 20 feet apart on tangents. Reflective traffic line tape shall be applied in accordance with the manufacturer's
instructions. Temporary delineation shall be the same color as the permanent
delineation. Full compensation for temporary delineation shall be considered as
included in the prices paid for the contract items of work that obliterated the
existing delineation and no separate payment will be made therefor.
When initially installed, all vehicle and pedestrian signal faces shall be aimed and covered with cardboard or other material with an observation
hole (max. 1" dia.) in front of each signal indication. The covers shall remain
in place until all signal operations have been checked and signal is placed into
operation.
Prior to ccxranencement of the traffic signal functional tests, all items of work related to the signal control shall be completed and all signs
shall be in place.
7-1.02 OBSTRUCTIONS. Attention is directed to Section 8-1.10,
D23:51008.16 -16- GG:lh
"Utility and Non-Highway Facilities," of the Standard Specifications, the plans, and the special provisions.
The Contractor will be required to work around public utility facilities
_ and other improvements that are to remain in place within the construction area
or that are to be relocated and relocation operations have not been completed.
In accordance with the provisions of Article 7-1.11, "Preservation of Property," and 7-1.12, "Responsibility for Damage," of the Standard Specifications, the
Contractor will be liable to owners of such facilities and improvements for any
damage or interference with service resulting from conducting his operations.
The exact location of underground facilities and improvements within the
construction area shall be ascertained by the Contractor before using equi~nent
that may damage such facilities or interfere with the services. Other forces
may be engaged in moving or removing utility facilities or other improvements or maintaining services or utilities. The Contractor shall cooperate with such
forces and conduct his operations in such a manner as to avoid any unnecessary
delay or hindrance to the work being performed by other such forces.
Any delay to the Contractor due to utility relocation whether or not the
utility is shown or correctly located on the plans will not be compensated for as idle time. However, additional contract time co~anensurate with such delays
may be allaaed.
At locations where irrigation systems exist, the Engineer will direct
the Contractor as to what steps will be required to protect the irrigation
system and the area it serves. The Contractor shall replace the irrigation system as directed by the Engineer.
Existing land subdivision monuments and stakes shall be fully protected
from damage or displacement and they shall not be disturbed unless directed by
the Engineer.
Attention is directed to the fact that nuisance water may be present at all times along the project. It will be the responsibility of the Contractor to
.provide for handling of said water and-any e~ense involved shall be considered
as included in the prices paid for the various items of work and no additional
allowance will be made therefor.
Except in the case of extra work, full compensation for conforming to the requirements of this article shall be considered as included in the prices
paid for the various items of work and no additional compensation will be made
therefor.
7-1.03 MAINTAINING TRAFFIC. The Contractor shall furnish, install
and maintain signs, lights, flags and other warning and safety devices when
performing work which interferes with or endangers the safe movement of traffic on any street or highway.
Signs, lights, flags and other warning and safety devices and their use
shall conform to the requirements set forth in the current "Manual of Traffic
Controls - Warning Signs, Lights, and Devices for Use in Performance of Wbrk Upon
Highways," published by the State of California, Department of Transportation. Application and use of devices shall be as specified and as directed by the
Engineer.
The Contractor shall keep the Bakersfield Fire Department informed at
D23:51008.17 -17- ~:lh
all times as to the exact location and progress of the work and shall notify
them immediately of any streets impassable for fire fighting equipment.
The sixteenth and nineteenth paragraphs of Section 7-1.08, "Public
Convenience," of the Standard Specifications, shall be amended to read as follows:
Construction operations shall be actively in progress only between the
hours of ~g;30 AM-4:30 PM], Monday through Friday. Where construction
operations are actively in progress, a mininnun of one traffic lane,
not less than twelve feet in width, shall be open for use by public
traffic. Where construction operations are not actively in progress,
not less than two such lanes shall be open for use by public traffic. Public traffic may be permitted to use the shoulders and, if
half-width construction methods are used, may also be permitted to use
the side of the roadbed opposite to the one under construction. No
additional compensation will be allowed for any shaping of shoulders
necessary for the accoi~nodation of public traffic thereon during
paving operations.
In order to expedite the passage of public traffic through or around
the work and where ordered by the Engineer, the Contractor shall, at
his awn expense, furnish, install and maintain construction area
signs, lights, flares, temporary railing ('I~ipe K), barricades, and
other facilities for the sole convenience and direction of public
traffic. Also, where directed by the Engineer, the Contractor shall furnish competent flagmen whose sole duties shall consist of directing
the movement of public traffic through or around the work. When
deemed necessary by the City, the signs "Road Construction Ahead,"
No. C-18, and "End Construction," No. C-13, shall be furnished,
installed and maintained by the Contractor at locations as directed by
the Engineer at least 48 hours in advance of any construction.
7-1.04 EXISTING HIGHG~Y FACILITIES. The work perfornted in
connection with various existing facilities shall conform to the provisions in
Section 15, "Existing Highway Facilities," of the Standard Specifications and
these special provisions.
Existing City highway signs and street markers shall remain the property of the City. Such signs and street markers shall be relocated and
maintained during construction so as to convey the same intent that existed
prior to construction.
Existing City highway signs and street markers shall be placed in
their permanent position by the Contractor's forces prior to completion of construction. Signs removed from the project area shall be delivered to the
City Corporation Yard at 4101 Truxtun Avenue.
PAYMENT. Full compensation for conforming to the requirements of the
two preceeding paragraphs shall be considered as included in the prices paid for
the various items of work and no additional allowance will be made therefor.
7-1.05 REMaVE TRAFFIC STRIPES AND PAVEMENT MARKINGS. Traffic
stripes and pavement markings to be removed will be as shown on plans and as
designated by the Engineer.
D23:51008.18 -18- GG:lh
Traffic stripes and pavement markings shall be removed to the fullest
extent possible frcan the pavement by any method that does not materially damage
the surface or texture of the pavement or surfacing. Where blast cleaning is
used for the removal of painted traffic stripes and pavement markings, the area
shall be shielded so that no material from the blasting operation is allayed to
enter the area that is open to public traffic. Sand or other material deposited
on the pavement as a result of removing traffic stripes and markings shall be removed as the work progresses. Accumulations of sand or other material which
might interfere with drainage or might constitute a hazard to traffic will not
be permitted.
Traffic stripes shall be removed before any change is made in the
traffic pattern.
Blast cleaning for removal of traffic stripes shall be feathered out
to irregular and varying widths. Pavement markings shall be removed by blast
cleaning a rectangular area, rather than just lettering or markings, so the old
message cannot be identified.
After removal of traffic stripes and pavement markings, a fog seal coat shall be applied in conformance with the provisions in Section 37,
"Bituminous Seals," of the Standard Specifications and the following:
In traffic stripe removal areas, the fog seal coat shall be applied
over the traffic stripe removal area and to irregular and varying widths with an
average width of 2 feet on each side of the blast cleaned traffic stripe removal area.
In pavement marking removal areas, the fog seal coat shall be applied
y to the blast cleaned rectangular area.
Full ccxnpensation for furnishing and applying fog seal coat as speci- fied herein shall be considered as included in the contract price paid per
square foot for removal of traffic stripe and pavement marking and no separate
payment will be made therefor.
Nothing in these special provisions shall relieve the Contractor from
his responsibilities as provided in Section 7-1.09, "Public Safety," of the
Standard Specifications.
H~ASUREMENT AND PAYMENT. Quantities of traffic stripe removed will
be determined by the width of the stripe plus 0.67-foot multiplied by the length
of the stripe. The space between double traffic stripes will be measured as
painted traffic stripe. Quantities of pavement markings removed will be
determined by the actual size of the rectangle measured in square feet.
Removing of traffic stripes will be paid for at the contract unit price
per square foot for the actual area of authorized stripe removal.
The contract unit price per square foot as remove traffic striping and
marking shall include full compensation for furnishing all labor, materials,
tools, equipment, signs and for doing all work necessary for removing existing striping as shown on plan and as directed by the Engineer.
7-1.06 RQAD6IDE SIC~~TS. Roadside signs shall conform to the
provisions in Section 56-2, "Roadside Signs," of the Standard Specifications and
D23:51008.19 -19-
these special provisions.
Miscellaneous roadside signs. shall conform to City Standard
TS-4. Where sign posts are placed within concrete sidewalk
the sidewalk shall be core drilled. Roto ha~nering or other
similar methods will be permitted provided that the perimeter of the damaged area is sawcut to the limits
required to form a neat finish as directed by the Engineer.
MEASURF,N~NT AND PAYMENT. Miscellaneous roadside signs shall be paid
for at the contract per unit for install roadside signs (GSP Post).
Installation of one or more sign panels mounted on a single post shall be
counted as one roadside sign (GSP Post).
7-1.06 WERHEAD SIC~TS. Overhead signs shall conform to the
applicable provisions in Section 56, "Signs," of the Standard Specifications
and these special provisions.
Mast-arm hangers for street name signs will be furnished
and installed by the City.
Street name~ns will be furnished and installed by City of
Bakersfield using mast-arm hanger methods such as Hawkins
M10J Series swinging sign bracket, with return spring
removed, or acceptable equal.
= Overhead signs installed on signal poles, mast-arms or on
flashing beacon mast-arm shall be furnished and installed by
the Contractor in accordance with the plans and these
special provisions. Compensation for overhead signs shall
be considered included in the respective contract lump sum
price or prices for signal, flashing beacon, or combination thereof .
7-1.07 TRAFFIC DELINEATION. Immediately after resurfacing
operations or when directed by the Engineer, replace all obliterated pavement
delineation with temporary delineation during the same work period, and in no
case later than 7:30 a.m. follaving such work period.
Temporary delineation consists of reflective traffic line tape applied
in pieces not less than 4 inches long nor less than 4 inches wide, spaced no
more than 20 feet apart on tangents and no more than 10 feet apart on curves.
Apply reflective traffic line tape in accordance with the manufacturer's
instructions. Temporary delineation must be the same color as the permanent
delineation.
Remove temporary delineation applied to asphalt concrete patches
immediately prior to applying asphaltic emulsion tackcoat for asphalt concrete
overlay.
A striping plan will be made available to the Contractor when traffic
delineation is to be modified by the City.
PAYMENT. Full ccx~nsation for traffic delineation shall be
considered as included in the. prices paid for the various items of work, and no
separate payment will be made therefor.
D23:51008.20 -20- GG:lh
SECTION 7 CONSTRUCTION DETAILS
SECTION 7-2 TRAFFIC SIGNALS, LIC~iTING, SIGNING,
AND STRIPING
SECTION 7-2 TRAFFIC SIGNALS AND LIGHTING
7-2.01 FOUNDATIONS. Foundations shall conform to the provisions in
Section 86-2.03, "Foundations," of the Standard Specifications and these special
provisions.
The Contractor shall furnish the anchor bolts, nuts and washers to be used for new foundations and shall furnish the appropriate nuts and washers for
existing foundations to be reused.
Portland cement concrete shall conform to Section 90-10, "Minor
Concrete," of the Standard Specifications and shall contain not less than 470
pounds of cement per cubic yard, except for pile foundations shall contain not less than 564 pounds of cement per cubic yard.
7-2.02 CONDUIT. Conduit shall conform to the provisions in Section
86-2.05, "Conduit," of the Standard Specifications and these special provisions.
Insulated bonding bushings will be required on metal conduit. Conduit
shall be installed by cutting road with rocksaw unless otherwise directed by the - Engineer. Width of trench is not to exceed 5 inches.
7-2.03 PULL BOXES. Pull boxes shall conform to the provisions in
Section 86-2.06, "Pull Boxes," of the Standard Specifications and these special
provisions.
Recesses for suspension of ballasts will not be required.
7-2.04 CONI7UCI~ORS AND WIRING. Conductors and wiring shall conform to
the provisions in Section 86-2.08, "Conductors," and Section 86-2.09, "Wiring,"
o£ the Standard Specifications and these special provisions.
CONDUCTORS - The Contractor shall use multi-conductor electrical cables for all circuits except between the service switch and
controller cabinet.
Only multi-conductor cable conforming to the following shall be used:
5 Conductor cable consisting of 5 No. 14 conductors colored 1 each
red, yellow, brown, white and black.
9 Conductor cable consisting of 1 No. 12 conductor colored white and
8 No. 14 conductors colored 1 each red, yellow, brown, black,
red black stripe yellow black stripe, brown black stripe and
white/black stripe.
28 Conductor cable consisting of 1 No. 10 conductor colored white and
27 No. 14 conductors colored as indicated in the following conductor
table for a single ring operation.
D23:51008.21 -21- GG:lh
i
CONDUCTOR TABLE
Insulation Colors
Signal Phase
Circuit or Function Base Stri
2 & 6 Red, Yellow, Brown Black Vehicle 4 & 8 Rid, Yellow, Brown Orange
Signals 1 & 5 Red, Yellow, Brown Silver
3 & 7 Red, Yellow, Brown P le
2p & 6p Red, Brown 2 Black
Pedestrian 2 Oran e 4p & 8P Red, Brown g
Signals lp & 5p Red, Brawn 2 Silver
3 & 7p Red, Brown 2 le
2p & 6p Blue Black Pedestrian 4p & 8p Blue Orange
Push Buttons lp & 5p Blue Silver
3P & 7P Blue PL? le
Pedestrian
Push Buttons White Black
Cam~non Signal White None
Railroad
Pre-emption Black g~a
Spare Black None
The cable sheath shall be' polyethylene and the conductor insulation shall be 'TYPe THWN polyvinyl chloride.
Subparagraphs 1, 2, 4 and 5 of the first paragraph of Section 86-2.09D,
"Splicing," of the Standard Specifications are deleted.
Conductors shall be spliced by the use of "C" shaped ccxnpression connectors as shown on Standard Plan ES 13.
Splices shall be insulated by "Method B."
7-2.05 SERVICE. Service shall conform to the provisions in Section
86-2.11, "service," of the Standard Specifications and these special provisions.
Unless othenaise noted, service shall be as shown on the plans and
shall be furnished with 100 amp, 240 volt, 3 pole main breaker and the following
branch circuit breakers:
No. Amps Phase Volts Branch Metered
1 60 1 110 Traffic Signal Yes
2 30 1 110 Lighting. No
*3 30 1 110 Flashing Beacons yeS
* Provided where flashing beacon is included with the traffic signal.
The Engineer will arrange with the serving utility to ccxnplete service
D23:51008.22 _22_
connections to service points shown on the plans and will pay all required costs
and fees required by the utility.
7-2.06 TESTING. Testing shall conform to the provisions in Section
86-2.14, "Testing," of the Standard Specifications and these special provisions.
The signal shall not be placed in flashing mode, with signal faces
uncovered, prior to Functional Testing.
F'gNCTIONAL TESTING. All functional testing shall conform to the
provisions is Section 86-2.14C "Functional Testing," of the Standard
Specifications and the follaaing paragraph:
Functional test period is included in the number of working days to
complete the project" as described in SECTION 4, "BEGTNNING OF WORK,
TINS OF CQMPLETION AND LIQUIDATED DAMAGES" of these special provisions.
7-2.07 SIC~IAL FACES AND SIGNAL HEAD6. Signal faces, signal heads and auxiliary equipment, as shown on the plans, and the installation thereof, shall
conform to the provisions in Section 86-4.01, "Vehicle Signal Faces," 86-4.02,
"Directional Louvers," 86-4.03, "Backplates" and 86-4.06, "Signal Mounting
Assemblies," of the Standard Specifications and these special provisions.
Housing, visors, directional louvers and backplates shall not be
structural plastic.
2 All lamps for traffic signal units shall be furnished by the
Contractor.
All signal faces shall be provided with 12-inch sections.
The third sentence of the first paragraph of Section 86-4.06, "Signal
Mounting Assemblies," of the Standard Specifications, shall be amended to read as
follows:
Slip-fitters and terminal compartments shall be cast
bronze or hot-dip galvanized ductile iron.
7-2.08 PEDESTRIAN SIG~TAI~S. Pedestrian signals shall conform to the
provisions in Section 86-4.05, "Pedestrian Signal Faces," of the Standard
Specifications and these special provisions.
Pedestrian signals shall be T~ip~ C, and shall have energy efficient heads
equivalent to Indicator Controls Corporation Model 4094B.
7-2.09 LUMINAIRES. Luminaires shall conform to the provisions in
Section 86-6.01, "High Intensity-Discharge Liuninaires," of the Standard
Specifications and these special provisions.
Liuninaires shall be furnished with 200-watt high pressure sodium lamps
and integral ballasts.
An in-line fuse shall be located in the pull box.
7-2.10 PHOrPOELECTRIC CONTI~JLS. Photoelectric controls shall conform
to the provisions in Section 86-6.07, "Photoelectric Controls", of the Standard
D23:51008.23 -23- GG:lh
Specifications and these special provisions.
Each luminaire shall be provided with a Type IV photoelectrical
control.
7-2.11 CONTROLLERS, CABINETS AND AUXILIARY EQUIPMENT. The City will
furnish the controller and cabinet assembly for each location.
7-1.12 DETEC`i~ORS. Detectors shall confornn to the provisions in
Section 86-5, "Detectors," of the Standard Specifications and these special
provisions. Location and layout of detector loops shall be as directed by the
Engineer.
INSTALLATION DETAILS: Installation and tests shall conform
to the details and notes shown on the plans.
Slots cut in the pavement shall be blown out and dried before installing
inductive loop detectors.
After conductors are installed in slots cut in the pavement, the slots shall be filled with epoxy sealant conforming to the requirements in Section
95-2.09, "Epoxy Sealant for Inductive Loops," to within 1/8 inch of the pavement
surface. The sealant shall be at least 1/2 inch thick above the top conductor in the
saw cut. Before setting, surplus sealant shall be removed from the adjacent road
surfaces without the use of solvents.
In lieu of the epoxy sealant specified above, slots may be filled with
either of the followilg materials:
1. An elastomeric sealant conforming to the following:
The sealant shall be a polyurethane material of a composition that will, within its stated shelf life, cure only in the presence of moisture. Sealant
shall be suitable for use in both asphalt concrete and Portland cement concrete.
The cured sealant shall have the following performance
characteristics:
Measuring Standard Property and Results And Conditions
Hardness (indentation) - 65-85 ASTM D 2240 Res. 'I~pe A, Model 1700
77° F. (25° C.) 50~ relative humidity.
Tensile strength - 500 psi, min. ASTM D 412 Die C, pulled at 20 IPM.
Elongation - 400, minimum ASTM D 412 Die C, pulled at 20 IPM.
Flex at - 40° F. - no cracks 25 mil Free Film Bend (180°) over 1/2"
Mandrel.
Weathering Resistance - Slight ASTM D 822 Weatherameter 350 Hrs. Chalking Cured 7 days at 77° F. (25° C.) 50~
relative humidity.
Salt Spray Resistance - 500 psi, AS'IM B 117 28 days at 100° F. (38° C.)
minimum Tensile; 400, minimum 5$ NaCl, Die C, pulled at 20 IPM.
elongation
D23:51008.24 -24- GG:lh
Dielectric Constant - Less than AS'IM D 150.
25~ change over a temperature
range of -30° C. to 50° C.
2. Asphaltic Emulsion Inductive Loop Sealant shall conform to State of
California Specification 8040-41A-15.
Loop conductors shall be installed without splices and shall terminate in
the nearest pull box. The loops shall be joined in the pull box in combination of
series and parallel so that optimum sensitivity is obtained at the sensor unit.
Final splices between loops and lead-in cable shall not be made until the operation
of the loops under actual traffic conditions is approved by the Engineer.
.All loop conductors for each direction of travel for the same phase of a
traffic signal system, in the same pull box, shall be spliced to a cable which shall
be run from the pull box adjacent to the loop detector to a sensor unit mounted in
the controller cabinet. Splices to the cable shall be made in pull boxes only.
All loop conductors for traffic counters shall terminate in a pull box or
terminal strip in the traffic count station cabinet when such a cabinet is
installed.
Conductors for inductive loop traffic signal and traffic counting
installations shall be identified and banded, in pairs, by lane, in the pull box adjacent to the loops and near the termination of the conductors in the controller
or traffic count station cabinet. Bands shall conform to the provisions in Section
t 86-2.09, "Wiring."
Identification of each conductor pair shall consist of labeling the
z phase-and detector slot nwnl~er (e.g. - 6J2L, 8J8U, 3I5U, etc.) in permanent ink
on a tag suitable for such purposes (Stuart Electric Ty Rap, Catalog No. TY5532 or approved equal).
If asphalt concrete surfacing is to be placed, the loop detector
conductors shall be installed prior to placing the uppermost layer of asphalt
concrete. The conductors shall be installed, as shown on the plans, in the compacted
layer of asphalt concrete immediately below the upperimost layer. Installation details shall be as shown on the plans, except the epos sealant shall fill the slot
flush to the surface. Detector loops in concrete pads shall be sealed with epoxy
sealant.
Loop detector lead-in cables shall conform to the provisions in Section
86-S.OlA (4), "Construction Materials," of the Standard Specifications and these
special provisions.
Loop detector lead-in cables shall be Type B, and shall conform
to the following:
1. All spade connectors used to attach to terminals inside
the controller cabinet shall be crimped and soldered to the conductor.
2. Loop wires in the pull box shall be twisted at a minimum
rate of 5 turns per foot, and the splice must be soldered
and cc~nnpletely waterproof. Connect owe end. of the shield
to earth ground (at cabinet) and insulate the other end
with no p~sible path to earth ground.
D23:51008.25 -25- GG:lh
7-2.13 GUARANTEE. The Contractor shall furnish a written guarantee to
the City on the form attached, guaranteeing all systems, except traffic signal
lamps, installed under this contract for a period of one (1) year from the date of
acceptance of the work. The guarantee, properly executed, shall be filed with the
City before notice of ccxnpletion and final acceptance is made by the City of the
work described on the plans and these special provisions.
7-2.14 PAYMENT. Payment for signals and lighting shall conform to
the provisions in Section 86-8, "Payment", of the Standard Specifications and
these special provisions.
Full compensation for cast-in-drilled hole concrete pile foundations shall be considered as included in the contract lump sum price paid for the item
requiring foundations and no separate payment will be made therefor.
D23:51008.26 -26- GG:lh
8040-41A-15
STATE OF CALIFORNIA
_ Specification
Asphaltic Emulsion Inductive Loop Sealant
1.0 SCOPE
This specification covers a one component, pourable sand filled,
asphaltic emulsion for use in sealing inductive wire loops and leads imbedded in asphalt and Portland cement concrete. This sealant is
suitable for use in freeze-thaw environments.
2.0 APPLICABLE SPECIFICATIONS
The following specifications, test methods and standards in effect on
the opening date of the Invitation to Bid form a part of this specification where referenced:
American Society for Testing and Materials D2939, D2523
California Test Method No. 434
California Department of Transportation Standard Specifications 1981
State of California Specification 8010-XXX-99 Inspection, Testing and
Other Requirements for Protective Coatings
Code of Federal Regulations, Hazardous Materials and Regulations Board, Ref. 49CFR.
3.0 REQi1IREMENTS
3.1 Composition
The composition of the loop sealant shall be a sand filled, pourable, water emulsified bitumen. It will be the manufacturers responsibility
to produce a one-component product to meet the properties specified
herein.
3.2 Characteristics of the Sealant
3.2.1 Residue by evaporation, weight percent 70 Minimum
Use ASTM D2939
3.2.2 Ash content, weight percent 50 to 65
Use ASTM D2939
D23:51008.27 _1_
Asphaltic ~nulsion Inductive Loop Sealant 8040-41A-15
3.2.3 Firm set time, hours, 4 maximum
test at one hour intervals, use ASTM D2939
3.2.4 Brookfield viscosity, Poise 50 to 125
RVT Spindle #3, 10 RPM at 75 + 2°F.
3.3 Properties of the Dried Film
3.3.1 Flexibility, No full depth Use ASTM D2939, except air dry specimens to cracks
constant weight at 75 + 5°F. and 50 + 10~ relative
humidity. Condition mandrel and specimens 2 hours at
75 + 2°F before test. Use aluminum panels, 0.03 inches
thick (Q panel or equal).
3.3.2 Tensile Strength, psi, 20 minimtnn
cast sheets 0.25 inches thick and air dry at
75 + 5°F, 50 + 10~ relative humidity for minimum of
16 hours. Load rate 0.05 inches/minute, use ASTM D2523.
3.3.3 Elongation, $ 2.0 miniimmt Same conditions as 3.3.2 use ASTM D2523
3.3.4 Slant-shear strength to concrete, psi, 150 minimum,
Use California Test Method No. 434, Part VIII. Space with no loss
damp blocks with 0.25 inches between slant faces, seal of adhesion to
sides and bottom with tape and fill with the well stirred concrete
sample, strike off the excess. Dry in 140°F oven to constant weight and condition 1 day at 75 + 2°F before
testing. Load rate to be 5000 lbs/minute .
3.3.5 Resistance to water No blistering,
Use ASTM D2939, Alternative B re-emulsification
or loss of
adhesion
3.4 Workmanship
3.4.1 The sealant shall be properly dispersed and any settling shall be
easily redispersed with minimum resistance to the sideways manual
motion of a paddle across the bottom of the container. It shall form a smooth uniform product of the proper consistency. If the material
cannot be easily redispersed due to excessive settlement as described
above or due to any other cause, the sealant shall be considered unfit
for use.
D23:51008.28 -28-
i
~ Asphaltic E~iulsion Inductive Loop Sealant 8040-41A-15
i
3.4.2 The sealant shall retain all specified properties under normal storage
conditions for 12 months after acceptance and delivery. The vendor shall be responsible for all costs and transportation charges incurred
in replacing material that is unfit for use. The properties of any
replacement material, as specified in Paragraph 3.0, shall remain
satisfactory for 12 months from date of acceptance and delivery.
3.4.3 The sealant sha11 comply with all air pollution control rules and
regulations within the State of California in effect at the time the sealant is manufactured.
4.0 QUALITY ASSURANCE PRpVISIONS
4.1 Inspection
This material shall be inspected and tested in accordance with State of
California Specification 8010-XXX-99, or as otherwise deemed necessary.
4.2 Sampling and Testing
Unless othenaise permitted by the Engineer, the material shall be
sampled at the-place of manufacture and application will not be permitted until the material has been approved by the Engineer.
5.0 PREPARATION FOR DELIVERY
5.1 Packaging
The sealant shall be prepared in a one package system ready for
application. The material shall be furnished in container size as
specified in the purchase order or contract. If ordered in 5 gallon
size the containers shall be new, round standard full open head with
bails, shall be nonreactive with the contents, and shall have
compatible gaskets. The containers shall comply with the U.S. Department of Transportation or the Interstate Ca~¢nerce Commission
regulations, as applicable.
5.2 Marking
All containers of material shall be labeled showing State
specification number manufacturers name, date of manufacture and manufacturers batch number.
The manufacturer sha~.l be responsible for proper shipping labels as
outlined in Code of Federal Regulations, Hazardous Materials and
Regulations Board, Reference 49 CFR.
D23:51008.29 -29- GG:lh
Asphaltic F~rnulsion Inductive Loop Sealant 8040-41A-15
6.0 NE7TES
6.1 Directions for Use
Saw cuts shall be blown clean with compressed air to remove excess water and debris. The sealant must be thoroughly stirred before use and
hand poured into the slots. Due to the sand content of this material,
pumping is not recorm~ended. Any clean up of road surface or tools can
be done with water, before the sealant sets.
6.2 Patents
The Contractor shall assume all costs arising from the use of patented
materials, equipment, devices, or processes used on or incorporated in
the work, and agrees to indemnify and save harmless the State of
California, and its duly authorized representatives, from all suits at
law or action of every nature for, or on account of, the use of any patented materials, equipment, devices or processes.
6.3 Certificate of Ccxnpliance
The manufacturer shall furnish a Certificate of Canpliance with each
` batch of sealant, in accordance with the provision of Section 6-1.07 of
California Department of Transportation Standard Specifications, January 1981.
D23:51008.30 -30- ~;7.h
I~
i
i
ALTERNATE LOCATION TO BE
USED WHEN THE SIDEWALK TYPE B.S.S. EXTENDS FROM THE CURB J 2~~ GALVANIZED PIPE
TO THE PROPERTY LINE, a AS PER AMERICAN FENCE CO.
PARTICULARLY IN COMMERCIAL W
AREAS. o
i► ~ (I p ~
it _ O
1 ti Y U
II Q 2~0~~~~ m
'~t:
~ Iii "~Z M~
Li J : 8~~MIN.
CLASS' ~~8~~ PC.C.
aPPROVEo
MISCELLANEOUS SIGN
DETAIL T-19 C77Y ENGINEER
R6COR0[~ CITY .OF BAKERSFiELD own /2/os/B.s
~N SOOK AT rAG~ CALIFORNIA OFrtCfAL RECORDf OF onnwN G.E. G.
KERN cou~v. CALIFORNIA ENGINEERING DEPARTMENT
~H«x:o s L. w.
P R O P O S A L
FOR
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD
AT SOUTH "H" STREET
To the City Clerk of the City of Bakersfield:
The undersigned, as bidder, declares that the only persons or parties
interested in this proposal as principals are those named herein; that this pro-
posal is made without collusion with any other person, firm or corporation; that he has carefully examined the location of the proposed work, the annexed pro-
posed form of contract and the plans therein referred to; and he proposes and
agrees if this proposal is accepted, that he will contract with the City of
Bakersfield, in the prescribed form of contract hereto annexed, to provide all
necessary machinery, tools, apparatus and other means of construction and to do
all the work and furnish all the materials in accordance with the plans and spe-
cifications for the above, filed in the office of the Finance Director of the City of Bakersfield and as specified in the contract, in the manner and time
therein prescribed, and according to the requirements of the Engineer as therein
set forth, and that he will take in full payment therefor the unit prices or
lump sums set forth in the following schedule:
The undersigned further agrees that in case of default in executing the required contract, with necessary bonds, within ten (10) days, not including
v Sunday, after having received notice that the contract is ready for signature,
the proceeds of the check or bid bond accompanying his bid shall become the pro-
perty of the City of Bakersfield.
Bidder acknowledges receipt of the following addendum:
ITEM ESTIMATED UNIT OF ITQK UNIT PRICE EXTENSION
N0. QTJANTITY MEASURE (in figures) PRICE
(in fi es)
1 1 LS Install Traffic Signa
and lighting system
SIGNED
Bidder
D23 :51008.31 Page 1 of 2 ~
ITEM ESTIMATED t1NIT OF ITF~I UNIT PRICE EXTE[JSI~1
NO. QUAEV'TITY MEASURE ( in figures) pgI~
(in fi res)
2 6 EA Install signs, road-
side (GSP Post)
3 196 SF Remove traffic
stripes and pavemen
markin s
Total $
SIQVED
Bidder Company
Address
City State Zip Code
f ) Area Code Telephone Number
License No. and Expiration Date
THE REPRESENTATIONS t4ADE HEREIN ARE MADg UNDER pENAI,Ty OF
PERJURY.
D23:51008.32 Page 2 of 2
I The Extension Price has been calculated by multiplying the Estimated Quantity by the Unit Price. In the case of lump sum items the Estimated
' Quantity shall be unity. The Bid Total is the sum of all Extension Prices.
Bidder agrees that in case of any discrepancy between the Unit Price(s) and the
respective Extension Price(s) and/or the Bid Total, the Unit Price(s) shall
prevail, and the bid su~cni.tted shall be the correctl co
correctl c Y mputed sum of all y ~nputed Extension Prices, provided, havever, if the amount set forth
as a Unit Price is unintelligible or omitted, then the amount set forth in the Extension Price coltunn for the item shall be used to determine the correct Unit
Price in accordance with the following:
(1) As to liunp sum items, the amount set forth in the Extension Price
column shall be the Unit Price.
(2) As to unit basis items, the amount set forth in the Extension Price
column shall be divided by the estimated quantity for the item and the
price thus obtained shall be the Unit Price.
LIST OF SUB~OlVTRAC'TnRS
All persons or parties submitting a bid proposal on the project shall complete
the following form, setting forth the name and the location of the mill, shop
or office of each subcontractor who will perform work or labor or render
service to the Contractor in or about the construction of the work or
improvement in excess of one-half of one (1$) percent of prime Contractor's
total bid, or TEN THpUSAND DpLLA~tg ($10,000), whichever is greater, and the portion of the work which will be done by each subcontractor. This list is to
be completed and submitted with said bid proposal.
Subcontractor's Name Description of portion
and Street Address (City, State, Zip) of work subcontracted
(attach additional sheets if needed)
If this proposal is accepted and the undersigned fails to execute the aforesaid contract and to provide surety bonds and evidence of insurance
acceptable to the City as is required within eight (8) days, not including
Saturdays, Sundays and legal holidays, after the bidder receives notice from the
City that the contract is ready for signature, the City may, at its option,
determine that the bidder has abandoned the bid proposal and the bidder's
security shall be forfeited and shall became the property of the City. City shall then be free to accept the bid of another bidder.
D23:51008.33 -33-
(This form shall be ccxnpleted by all Bidders and sutamitted with the Bidl
TRAFFIC SIC~IAL SYSTEM IX~T FAIRVIEW RQAD AT SOp'I'H "H"
NONCOLLiJSION AFFIDAVIT T'0 BE EXECUTED BY BIDDER AND
StTBMITTED WITH BID
State of California
ss:
County of
being first duly sworn, deposes and
Name says that he or she is of
Title eo~any
the party making the foregoing bid that the bid is not made in the interest of,
or on behalf of, any undisclosed person, partnership, company, association,
organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other
bidder to put in a false or sham bid, and has not directly or indirectly
colluded, conspired, connived, or agreed with any bidder or anyone else to put
in a sham bid, or that anyone shall refrain fr~n bidding; that the bidder has
not in any manner, directly or indirectly, sought by agreement, communication, or
conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of
' any other bidder, or to secure any advantage against the public body awarding
the contract of anyone interested in the proposed contract; that all statements
contained in the bid are true; and, further, that the bidder has not, directly
or indirectly, su~nitted his or her bid price or any breakdown thereof, or the
contents thereof, or divulged information or data relative thereto, or-paid, and
will not pay, any fee to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof to effectuate a
collusive or sham bid.°
Signature of Bidder
Business Address
Place of Residence
Subscribed and sworn to before me
this day of , lg .
D23:51008.34 -34- CG:lh
Accompanying this proposal is
'r
(NOTICE: Insert the words "cash "cashier's check," "certified
check," or "bidder's bond," as the case may be), in ampunt equal to at least ten
percent of the total of the bid.
The names of all persons interested in the foregoing proposal as principals
are as follows:
IMPORTANT NOTICE If bidder or their interested person is a corporation, state
legal name of corporation, also names of the president, secretary, treasurer, and manager thereof; if a
copartnership, state true name of firm, also names of all individual copartners
composing firm; if bidder or other interested person is an individual, state
first and last names in full.
Licensed in accordance with an act providing for the registration of
m Contractor's License No.
SIGN
HERE
Signature of Bidder
NOrI'E--If bidder is a corporation, the legal name of the corporation
shall be set forth abe~ve toc,~ther with the signature of the officer or
officers authorized to sign contracts on behalf of the corporation; if
bidder is a copartnership, the tr~ie name of the firm shall be set
forth above together with the signature of the partner or partners
authorized to sign co~tractg in behalf of the copartnership; and if
bidder is an individual, his signattire shall be placed above.. If signature is by an agent, other than ari officer of a corporation or a
member of a partnership, a Pawner of Attorney must lac on file with
the City Clerk of the City of Bakersfield prior to opening bids or
sulmi.tted with the bid.; otherwise, the bid will be disregarded as
irregular and unauthorized.
Business Address
Telephone No .
Place of Residence
Dated 19.....
D23:51008.35 -35-
BIDDER' S BOND T~0 ACCOI~ANY PROP06AL, (Not necessary if cash or certified check is with bid)
IOW ALL ME~L~11 BY THESE PRESELQTS :
That we
as principal, and
as surety,
are held and firmly bound unto the City of Bakersfield, a body politic and
corporate of the State of California, in the sum of
dollars
to be paid to said City, for which payments, well and truly to be made; we bind
ourselves, our heirs, executors and administrators, successors or assigns,
jointly and severally by these presents.
THE CONDITION OF TfiIS OBLIGATI~T IS SOQi:
That if the certain proposal, hereunto annexed, to construct
in the City of Bakersfield as referred to in the NOTICE T~0
CoNTRACPORS attached hereto, is accepted by the Council of said City and if the
above bounden principal, heirs, executors, administrators, successors and
assigns, shall duly enter into and execute a contract, to construct said
improvements aforementioned, and shall execute and deliver the two bonds
required by law, within ten days (not including Sunday) from the date of a notice
to the above bounden principal, that said contract is ready for execution, then
this obligation shall become null and void, otherwise it shall be and remain in
full force and effect.
IN WITNESS WHEREOF, we have hereunto set our hands and seals this day
of , 19
(Seal)
(Seal)
(Seal)
D23:51008.36 Page 1 of 2 ~
STATE OF CALIFORNIA
ss.
COUNTY OF
On this day of 19......, before me,
a notary public in and for the County of State of
California, personally appeared
% / personally known to me proved to me on the basis of
satisfactory evidence
to be the person whose name is subscribed to the within instnunent as
the Attorney in Fact of
and acknowledged to me that he subscribed the name of
. ............................thereto as surety, and his awn
name as Attorney in Fact.
IN WITNESS (~iER~OF I have hereunto set my hand and affixed my
official seal the day and year in this certificate first above written.
Notary Public in and for said County and State
D23: 51008.37 Page 2 of 2 ~
G U A R A N T E E
_ TRAFFIC SIGNAL EQUIPMENT
CITY OF BAKERSFIELD
Department of Public Works
1501 Truxtun Avenue, Annex Building
Bakersfield, California 93301
In accordance with the terms of Contract No. , for:
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD AT SOUTH "H" STREET
awarded on , between the City of Bakersfield (hereinafter referred to as the City), and the undersigned, which contract provides for the
installation of lighting and/or traffic signal system , and
under which contract the undersigned has furnished and installed such system,
the following guarantee of fine said system is hereby made.
Should any of the equipment installed pursuant to said contract, except lighting elements, prove defective or should the system as a whole prove
defective, due to faulty workmanship, material furnished, or method of installa-
tion, or should said system or any part thereof fail to operate properly, as
planned, due to any of the above causes, all within (1) year after date on which
said contract is accepted by the City, the undersigned agrees to reimburse the
City, upon demand, for its expenses incurred in restoring said systems to the
condition contemplated in said contract, including the cost of any equipment or materials replaced, or, upon demand by the City, to replace any such equipment
and repair said systems ccxnpletely without cost to the City, so that they will
operate successfully as originally contemplated.
The City shall have the option to make any needed repairs or replace-
ments itself or to have such replacements or repairs done by the undersigned. Prior to such replacement or repair work being done by the City, the undersigned
shall have the option to make any needed repairs or replacements. In the event
the City elects to have said work performed by the undersigned, the undersigned
agrees that the repairs shall cam~nence to be made and such materials as are nec-
essary shall cadence to be furnished and installed within Twenty-Four (24)
hours of the date specified in the City's written notification. Contractor
shall prosecute with due diligence to complete the work within a reasonable period of time, as specified in the City's written notification.
Said system will be deemed defective within the meaning of this guar-
antee in the event that they fail to operate as originally intended by the manu-
facturers thereof and in accordance with the plans and specifications included
in said contract.
Date Contractor's Signature
Finn
Address
D23:51008.38 -38- GG:lh
G U A R A N T E E
MATERIAL AND Wt~RKMANSHIP
CITY OF BAKERSFIELD
Department of Public Works
1501 Truxtun Avenue, Annex Building Bakersfield, CA 93301
In accordance with the terms of the Contract for:
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD AT SOUTH "H" STREET
awarded on between the City of Bakersfield (hereinafter referred to as "City"), and the undersigned, which contract provides for the
installation of
and other facilities and under which contract the undersigned has installed such
facilities, the following guarantee of the said facilities is hereby made:
When the project is ccxnpleted and accepted, we guarantee the
same to be free from imperfect workmanship and/or materials, and we agree to repair and/or replace at our own cost and expense, any and
all such work, and/or materials which may prove defective in
workmanship or materials within a period of one (1) year from the date
of acceptan#e of the above named construction project, ordinary wear
and tear or neglect excepted. We also agree to repair and/or replace,
at our own cost and expense, any work and/or materials that we may disturb or displace in making good such defects.
Within twenty-four (24) hours after being notified in
writing by the City or-the City's representative, or the agent of
either of them, of any defects in said work or materials, we agree to
coimnence and prosecute with due diligence, all work necessary to
fulfill the terms of this guarantee and to complete the work within a reasonable period of time, and in the event of our failure to so
ccxnply, we collectively and expressly do hereby authorize the City
and/or the City's representative, or the agent of either of them, to
proceed to have such work done at our expense and we will honor and
pay the cost and charges therefor upon demand.
This guarantee is made expressly for and runs to the benefit of both
the City of the above mentioned construction project and the City's
representative, and shall be enforceable by either of them.
LIATED
Contractor's Name
Authorized Signature
D23:51008.39 -39- GG:lh
HOLD HARMLESS AGREEMENT
CITY OF BAKERSFIELD
IT IS HEREBY AGREED that , agrees to
indemnify and hold harmless the City of Bakersfield, its agents, employees or any
other persons against loss or expense including attorneys fees, by reason of the
liability imposed by law upon the City, except in cases of the City's sole
negligence, for damage because of bodily injury, including death at any time
resulting therefrom, sustained by any person or persons, or on account of damage
to property arising out of or in consequence of
(agreement name)
IT IS FURTHER UAIDERSTOOD AND AGREED that the Contractor shall (at the
option of the City), defend the City of Bakersfield with appropriate counsel and
F shall further bear all costs and expenses, including the expense of counsel, in
the defense of any suit arising hereunto.
DATED Contractor's Name
Authorized Signature
D23:51008.40 -40- GG:lh
corrr~,cr r~o.
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW SAD
AT SOUTH "H" -CITY OF BAKERSFIELD
THIS AGREEMENT, made and entered into on , by
and between the CITY OF BAKERSFIELD, a municipal corporation, herinafter called
"City," and ,hereinafter called "Contractor";
W I T N E S S E T H:
WHEREAS, City has duly advertised for sealed proposals for
within the City of Bakersfield. On , the contract was
awarded to Contractor upon his properly executed bid; and
WHERF~S, one of the conditions of said award required a formal contract
to be executed by and between City and Contractor.
NCJW, THEREFORE, it is mutually agreed by and between the parties hereto
as follows:
ARTICLE I
Contractor agrees to furnish supplies, equipment, labor and materials
for
within the City of Bakersfield.
ARTICLE II
The following shall be deemed to be part of this contract as if fully
set forth herein:
1. Notice to Contractors
2. Special Provisions 3. Bid Proposal
4. Bidder's Bond
5. Performance Bond
6. Material and Labor Bond
7. Letters of transmittal, if any
8. All provisions required by law to be inserted in this
contract whether actually inserted or not. 9. Hold Harmless Agreement
10 Current PW1 (if required by Specifications)
D23:51008.41 -1- GG:lh
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed, the day and year first-above written.
CITY OF AFIELD
BY
Mayor
(NAME OF CONTRACI~OR)
BY Contractor
APPFl~1VED AS Ti0 FORM:
BY
City Attorney
COUNTERSI(~IED:
BY Finance Director
D23:51008.42 _2_
ESCROi~I AGREEMENT
FOR
SECURITY DEtp(C~ITS IN LIEU OF RETENTION
THIS ESCROW AGREEMENT is made and entered into by and between CITY OF
BARERSFIELD, a municipal corporation, hereinafter called "Owner,"
whose address is
and hereinafter called "Contractor",
whose address is
and ,
hereinafter called "Escrow Agent",
whose address is
For the consideration hereinafter set forth, the Owner, Contractor, and
Escraa Agent agree as follows:
1. Pursuant to Section 4590 of Chapter 13 of Division 5 of Title 1 of
the Goverrunent Code of the State of California, Contractor has the option to
deposit securities with Escrow Agent as a substitute for retention earnings
required to be withheld by Owner pursuant to the Construction Contract entered
into between the Owner and Contractor for TRAFFIC SIGNAL SYSTEM ON FAIRVIEW
ROAD AT SOiJ'TH "H" STREET.
in the amount of dated (hereinafter referred to
as the "Contract"). When Contractor deposits the securities as a substitute for
Contract earnings, the Escrow Agent shall notify the Owner within ten (10) days
of the deposit. The market value of the securities at the time of the
substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract between the Owner and
Contractor. Securities shall be held in the name of
and shall designate the Contractor as the beneficial owner.
2. The Owner shall make progress payments to the Contractor for such
funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that the Escrav Agent hold securities in the form
and amount specified above.
3. Alternatively, the Owner may make payments directly to Escrow Agent
in the amount of retention for the benefit of the Owner until such time as the
escrow created hereunder is terminated.
D23:51008.43 -1- GG:lh
4. Contractor shall be res nsible for Po paying all fees for the
expenses incurred by Escrow Agent in achninistering the escrow account. These
expenses and payment terms shall be determined by the Contractor and Escrow Agent.
5. The interest earned on the securities or the money market accounts
held in escrow and all interest earned on that interest shall be for the sole
account of Contractor and shall be subject to withdrawal by Contractor at any time
and from time to time without notice to the Owner.
6. Contractor shall have the right to withdraw all or any part of the
principal in the Escrow Account only by written notice to Escrow Agent
accompanied by written authorization from Owner to the Escrow Agent that Owner
consents to the withdrawal of the amount sought to be withdrawn by Contractor.
7. The Owner shall have a right to draw upon the securities in the event of default by the Contractor. Upon seven (7) days' written notice to the
Escrow Agent from the Owner of the default, the Escrow Agent shall immediately
convert the securities to cash and shall distribute the cash as instructed by the
Owner.
8. Upon receipt of written notif ication fran the Owner certifying that the Contract is final and ccxnplete, and that the Contractor has complied
with all requirements and procedures applicable to the Contract, Escrow Agent shall
release to Contractor all securities and interest on deposit less escrow fees and
charges of the Escraw Account. The escrow shall be closed immediately upon
disbursement of all moneys and securities on deposit and payments of fees and
charges.
9. Escraw Agent shall rely on the written notifications from the
Owner and the Contractor pursuant to Sections (4) to (6), inclusive, of this
agreement and the Owner and Contractor shall hold Escrow Agent harmless fr~n
Escrow P,gent's release and disbursement of the securities and interest as set
forth above.
10. The names of the persons who are authorized to give written notice or to receive written notice on behalf of the Owner and on behalf of Contractor
in connection with the foregoing, and exemplars of their respective signatures,
are as follows:
On behalf of Owner: On behalf of Contractor:
Title Title
Name Name
Signature Signature
Address Address
D23:51008.44 _2_
i
On behalf of Escrow Agent:
I
Title
i Name
Signature
Address
At the time the Escrow Account is opened, the Owner and Contractor
shall deliver to the Escrow Agent a fully executed counterpart of this Agreement.
IN WITNESS WHEREOF, the parties have executed this Agreement by their
proper officers on the date first set forth above.
Owner Contractor
Title Title
Name N~
Signature Signature
D23:51008.45 -3- GG:lh
FAITfiFUL PERFORMANCE BOND
;I - RNOTn1 ALL MEN BY TAESE PRESEN'PS, THAT,
WHERF~AS, the CITY OF BAKERSFIELD, California, a munici 1 co
hereinafter designated the "Owner," has, on ~ gyration,
awarded to ~ 19
corporation organized and doing business under and by virtue of the laws of the
~ State of California, hereinafter designated as the "Principal," a contract
i for the TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD AT SOLTTFI "H" STREET; and
WHEREAS, said Principal is required under the terms of said contract
to furnish a bond for the faithful performance of said contract:
N~~ T~1~EFOREr WEB the Principal, and
as Surety, are held and firmly bound unto the Owner in the sum of (100$ OF AMOUNT p,4~,RDED AT COUNCIL MEETING)
lawful money of the United States, for the payment of which sum, well and truly
to be made, we bind ourselves, our heirs, executors, ac~ninistrators, and
successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS StTCH, that if the above mentioned Principal, his or its heirs, executors, administrators, successors, or assigns,
shall in all things stand to and abide by, and well and truly keep and
faithfully perform the covenants, conditions, and agreements in the said
contract and any alterations made as therein provided, on his or their part, to
be kept and perfornied at the time and in the manner therein specified, and in
all respects according to their true intent and meaning, and shall indemnify and save harmless, the Owner, its officers and agents as therein stipulated, then
this obligation shall become null and void; otherwise it shall be and remain in
full force and virtue and Principal and Surety, in the event suit is brought on
this bond, will pay to the Owner such reasonable attorney's fees as shall be
fixed by the court.
As a condition precedent to the satisfactory completion of the said contract, the above obligation in the said amount shall hold good for a period
of one (1) year after the completion and acceptance of the said work, during
which time if the above mentioned Principal, his or its heirs, executors,
administrators, successors, or assigns shall fail to make full, complete, and
satisfactory repair and replacements or totally protect the said Owner from loss
of damage made evident during said period of one year from the date of acceptance of said work, and resulting from or caused by defective materials
and/or faulty workmanship in the prosecution of the work done, the above
obligation in the said amount shall remain in full force and effect. However,
anything in this paragraph to the contrary notwithstanding, the obligation of
the Surety hereunder shall continue so long as any obligation of the Principal
remains.
D23 :51008.46 Page 1 of 2 ~
And the said Surety, for value received, hereby stipulates and agrees
_ that no change, extension of time, alteration, or addition to the terms of the
contract or to the work to be performed thereunder or the specifications
accompanying the same shall, in any way, affect its obligations on this bond,
and it does hereby waive notice of any such change, extension of time, alteration,
or addition to the terms of the contract or to the work or to the specifications.
Said Surety hereby waives the provisions of Sections 2819 and 2945 of the Civil Code of the State of California.
As a part of the obligation secured hereby and in addition to the
amount specified therefor, there shall be included costs and reasonable expenses
and fees, including reasonable attorney's fees, incurred by the Owner in
successfully enforcing such obligation, all to be taxed as costs and included in any judgement rendered.
IN WITNESS f~kiEREOF, the above mentioned parties have executed this
instrument under their seals this day of , the
name and corporate seal of each corporate party being hereto affixed and these
presents duly signed by its undersigned representative, pursuant to authority of
its governing body.
Principal
(Seal) Signature for Principal Title
Surety
By:
(Seal) Signature for Surety Title
(Attach notarization form for each required signature.)
Page 2 of 2
D23:51008.47
MATERIAL -LABOR BOIJD
,E I~10W ALL MQ~I BY THESE PRESENTS, THAT, WHEREAS, the CITY OF
BAKERSFIELD, County of Kern, State of California, hereinafter designated the
"Owner," has, on (II~TE OF COUNCIL MEETING) , awarded to
(NAME OF CONTRACTOR)
hereinafter designated as the "Principal," a contract for the construction of
TRAFFIC SIGNAL SYSTEM ON FAIRVIEW ROAD AT SOUTH "H" STREET
WHEREAS, said Principal is required to furnish a bond in connection
and with said contract, providing that if said Principal, or any of his or its
subcontractors, shall fail to pay for any materials, provisions, or other supplies used in, upon, for, or about the performance of the work contracted to
be done, or for any work or labor done thereon of any kind, the Surety of this
bond will pay the same to the extent hereinafter set forth:
NOW, THEREFORE, WE, the Principal, and (LEAVE BLANK FOR
BONDING CQMPANY) , as Surety, are held and firmly bound unto the
Owner the penal sum of (50$ OF AMOUNT AWARDED AT COUNCIL MEETING) dollars ) lawful money of the United States, for the payment of which sum
well and truly to be made, we bind ourselves, our heirs, executors,
administrators, and successors, jointly and severally, firmly by these
presents.
THE CONDITION OF ZHIS OBLIGATION IS SUCH, that if said Principal, his or its heirs, executors, administrators, successors, or assigns, shall fail to
pay for any materials, provisions, or other supplies used in, upon, for, or
about the performince of the work contracted to be done, or for any work or
labor thereon of any kind or for any amount due under the Unemployment Insurance
Code with respect to work or labor performed under the contract, or for any
amounts due, or to be withheld pursuant to Sections 18806 of the Revenue and
Taxation Code of the State of California with respect to such work or labor, as required by-the provisions of Chapter III, Division V, Title I of the Government
Code of the State of California, or with respect to any work or labor for which
a bond is required by the provisions of Sections 3247 through 3252 of the Civil
Code of the State of California, and provided that the persons, companies, or
corporations so furnishing said materials, provisions, or other supplies,
appliances, or power use, in, upon, for, or about the performance of the work contracted to be executed or performed, or any person who performs work ,or labor
upon same, or any person who supplies both work and materials, thereto, shall
have ccxnplied with the provisions of said Civil Code, then said Surety will pay
the same in or to an amount not exceeding the amount hereinabove set forth, and
also will pay in case suit brought upon this bond, such reasonable attorney's
fees to the Owner as shall be fixed by the court.
D23:51008.48 1 GG:lh
This bond shall inure to the benefit of the Owners and any and all
persons, companies, and corporations and their respective assigns entitled to
file claims under applicable State law, including, but not limited to, California Civil Code Section 3181, so as to give a right of action to them or
their assigns in any suit brought upon this bond.
And the said Surety, for value received, hereby stipulates and agrees
that no change, extension of time, alteration, or addition of the terms of the
contract or to the work to be performed thereunder or the specifications
accompanying the same shall, in any way, affect its obligations of this bond, and it does hereby waive notice of any change, extension of time, alteration, or
addition to the terms of the contract or to the work or to the specifications.
Said Surety hereby waives the provisions of Sections 2819 and 2845 of the Civil
Code of the State of California.
IN WITNESS 4JfiEREOF, the above bounded parties have executed this instrument under their seals this day of , 19
the name and corporate seal of each corporate party being hereto affixed and
these presents duly signed by its undersigned representative, pursuant to
authority of its governing body.
Principal
(Seal)
Signature for Principal Title
Surety
(Seal)
Signature for Surety Title
D23:51008.49 -49- GG:lh
Date:
To:
RE: REQ[TEST FOR AN APPLICATION FOR A CERTIFICATE OF
APPRt7VAL T~0 EMPLAY AND TRAIN APPREbT'TICES ON
PUBLIC WORRS
Firm:
(Name)
Address:
{Number and Street)
(City) (State) (Zip Code)
Telephone No.:
Location of Public Works Job Site:
Project/Contract No.: Total Contract/Project Amount:
Project Start Date: Project Completion Date:
Awarding Body:
Apprenticeable Occupation:
The official whose signature follows applies on behalf of the above
named firm for a Certificate of Approval to employ and train
apprentices in the designated occupation in accordance with the
provisions of Labor Code Section 1777.5.
By: (Signature)
Date:
(Title)
D23:51008.50 -50- GG:lh
1