In order to save fuel and improve efficiency, the Solid Waste Division is planning to reroute
some residential refuse and greenwaste routes in those areas where City crews do the
collection. This rerouting project will save about 1,000 gallons of LNG fuel per month, and
about 20 hours of driving per week. We plan to hold a workshop for you at the regular Council
meeting of January 27th
Residents will be notified of their new pickup days through several means:
• Postcards mailed a few days beforehand;
• The City's "Rapid Notify" phone system will call affected households; and,
• Flyers will be attached to refuse carts or placed on doorsteps.
Staff plans to make the transition during February since it is the best time of year to reroute.
Refuse and greenwaste are less bulky in the winter after the holiday peak which makes it
easier to accommodate extra pickups for those residents who may forget their new pickup
day. During the transition, residents won't have to wait more than one extra day between
pickups. This will be similar to the normal one day delay for holidays.
There are three tree planting events planned for this month at the following locations, dates
and times:
• Jastro Park on January 16th at 2:00 p.m.
• Aera Park on January 23rd at 9:00 a.m.
• Hart Park on January 30th at 9:00 a.m.
The locations were selected with the help of the Tree Foundation, County of Kern, and City of
Bakersfield. Trans-West is donating the trees and supplying volunteers to assist with the
plantings. The enclosed flyer contains more information.
The Fire Department's year-end status report of contaminated sites being addressed in the
City is enclosed.
-� In an earlier "General Information" memo, we indicated that the Police towing list issue would
be on the agenda for January 13th. Due to timing and workload related problems it has been
delayed until January 27tH
Honorable Mayor and City Council
January 8, 2010
Page 2
—� The following reports are enclosed:
• Streets Division's weekly work schedule.
• Construction Division's weekly roadway paving projects update.
AT:rs:rk
cc: Department Heads
Roberta Gafford, Acting City Clerk
Help us p lant a tree !
You are invited to Participate in three tree piantings,
hosted by TRANS-WEST and
supported the of Kern.
Trans-West has adopted a GO GREEN philosophy and participates in various programs
and utilizes processes that respect the environment! This includes internal processes
as well as external in the field. These efforts include, but are not limited to:
C. Increasing fleet of hybrid vehicles
Use environmentally friendly, certified cleaning products
Transition to a paperless reporting, documentation and information
sharing system
` Reduction of waste through an aggressive recycling g gg y g program within the
office and with products used.
Management of waste/materials in a safe and environmentally friendly
manner.
In lieu of candy and gifts , year AND as a part of our commitment
z.
to the environmen forts to go green, TRANS-WEST has
purchased and will plant 80 trees in Kern.
We invite you to join us and use this as a perfect opportunity to test out your
gardening skills and get a little dirty. Morning refreshments will be provided.
The sites for the trees were selected with the help of the Tree Foundation and the
County of Kern and City of Bakersfield Parks Departments. The trees are being
planted at the selected sites to add to the base of trees and to diversify the age of
the trees by having varied stages of growth.
Date Time Location
January 16th 2
astro Park
January 23rd 9arri,, Aera Park (Jewetta St.)
January 30th gam Hart Park
To participate in any of these events, please RSVP to
Joy Jordan at ioy(@twsecurity com or by calling the TRANS-WEST office at 834-0711.
"RTN BA City of Bakersfield
4th Quarter Environmental Clean-up Status IFO
as of 12/30/2009
Underground Petroleum Storage Tank Release Corrective Actions:
Ld Agency Site Name Location Photo Status
BFD Freeway Liquors MTBE(295 ug/1),Benzene(95 ug/l) &gasoline
Since 1999 2030 E.Brundage Ln (2,049 ug/1)detected in groundwater(126')
a beneath site. No water supply wells are within
(MTBE&Benzene one mile. Vapor extraction in operation since
originally detected in Nov. `02. Since remedial system startup
groundwater is now no 388,055 lbs of fuel hydrocarbons have been
longer present) removed from the soil and groundwater. Latest
groundwater monitoring shows non-detect for
Update: Latest groundwater constituents of concern.Vapor extraction system
monitoring shows non-detect was reported to have had problems and will be
for constituents of concern. put back in-service when natural gas is
Recommending continued established.
monitoring.
BFD Shell Service Station : 50 cu.yds.of impacted soil excavated&
Since 2004 4050 Gosford Rd. a removed during product piping upgrade.
z Detectible MTBE still present in soil. Vapor
Update:Drilled for
q' extraction approved&pilot test completed.
conformation samples and Based on pilot test results,a program of
awaiting report. continued vapor sampling is underway. The
levels of MTBE have significantly decreased
during the post-remediation monitoring phase.
BFD Market Express
Since 2005 2500 Wible Rd. Soil contamination detected during recent
dispenser island upgrades. A request for a work
�.., ,• plan to investigate the extent of the impact has
Update: Work Plan been sent. With approval of State Clean-up
submitted however,State funding,the work plan and soil investigation
rejected funding in should be forthcoming.
September 2008.No activity
since then
Hazardous Waste Corrective Actions:
Ld A enc Site Name&Address Location Photo Environmental Status
BFD Kern Bluff Oilfields: Oilfield contamination cleanup for future
Since 2005 Clean-up for Residential housing tract developments. Soils are impacted
Tract Developments with petroleum in various areas where new
housing tracts are proposed. Abandoned oil
Update: There have been t' wells to be excavated and tested for possible gas
nine(9)separate oilfield leaks. Older oil well abandonment's to be re-
clean-up efforts occurring abandoned to current Div.of Oil&Gas
however no new activity has standards. No new houses can be built within 10
occurred past year. No new feet of any abandoned well,per City Ordinance
activity. for safety reasons.
Ld Agency Site Name&Address Location Photo Environmental Status
BFD Walker Fuels Soil contamination was discovered after samples
Since 2009 4600 Stine Rd were taken during the upgrade of the fueling
dispensers.The contaminate levels were low and
Update:The dispenser site over excavation was the mitigation of choice.
has been over excavated and
the excess contaminated soil
will be left on site for bio- •• °'� -
remediation.
Kern County Environmental Health Corrective Actions Cases:
Ld A enc Site Name&Address Location Photo Environmental Status
KCEH KHSD Maint.Yard Over-excavation performed for remediation of
Since 1995 3100 Chester Av. Underground Injection Well. G/W monitoring
was in progress. No further records have been
(No MTBE Detected) „ found in the County's file. This case appears to
No activity •, have had no new action in the past year. The
City has brought the lack of action to the
County's attention.
KCEH 7-Eleven G/W monitoring since 1988. Request for
Since 1988 1701 Pacheco Rd. !` I closure was denied by KCEH&7-Eleven was
asked to perform confirmation sampling&risk
UPDATE:Minimal changes assessment prior to requesting closure. Vapor
so monitoring will continue 41 extraction equipment has been removed from
along with bimonthly site,but vapor wells and piping still remain in
periodic oxygen injections. - the ground.
KCEH McKenny's Air Cond. t. G/W monitoring in progress. Vapor extraction
Since 1988 2323 R St. 2 has been completed. Groundwater monitoring
continues to occur on a quarterly basis. Minor
(No MTBE Detected) amount of petroleum impacted groundwater
No Activity remains directly beneath the site.
RWQCB Corrective Actions Cases:
Ld Agencl Site Name&Address Location Photo Environmental Status
RWQCB KL Aviation Pesticide contamination assessment still
Since 2002 2014 S.Union Av. continuing as an open case from previous
Former Garriot Crop practice of rinsing crop duster tanks into a
BFD Dusters former sump.Additional monitoring well to be
Initiated in installed downgradient. Abandoned UST's
2001 (Soil assessment req'd) removed on 12/01/00. Gasoline detected in soil
between former tank and dispenser locations and
Update: no activities referred to RWQCB for coordination with their
initiated by RWQCB this existing investigation.
past year.
RWQCB PG&E Kern Steam Hexavalent Chrome was retested and detected at
Since 2002 Plant 3 ppb(drinking water standard is 50 ppb)in the
2401 Coffee Rd. groundwater near the cooling towers. Water
BFD supply wells are non-detect for chrome
Initiated in (MTBE in groundwater) elsewhere on site.80 tons of soil containing
2001 (Benzene in hazardous levels of heavy metals was removed
groundwater) in Nov. `01 from a former incinerator area.
(Chromium VI detected) Additional soil and groundwater sampling for
petroleum impacts around fuel oil storage tanks
Update: Sunland's to be conducted.
groundwater monitoring
extends through this site.
Ld Agency Site Name&Address Location Photo Environmental Status
BFD Howards Mini Mart r A leak in a product delivery line was discovered
Since 2006 3300 Planz Rd after investigating an alarm.During the piping
r repairs soil samples were performed and soil
Update:Work Plan for contamination was discovered.
additional drilling to
define plum.Case being
referred to RWQCB due
to proximity of MTBE
and water table
RWQCB Sunland Refinery Free product removal,air sparging&vapor
Since 1997 2150 Coffee Rd. extraction in progress.Sunland(World Oil)has
�\ a total of 100 groundwater,air sparging,and soil
(MTBE in groundwater) i y vapor extraction wells,mostly on their property
(Benzene in (including Pan Pacific Transportation,also
groundwater) owned by World Oil)but 15 of those wells are
located on the PG&E site too. The floating
City well CBK-25 product is confined to the Sunland/Pan Pacific
impacted and out of property,but trace benzene,MTBE,TPH is in
service. the groundwater beneath the PG&E site as well.
Update: New The clean up is continuing into its 9th year with
groundwater monitoring over 1.4 million gallons of petroleum extracted
wells installed on off the water table to date. City's Water Agency
western edge of the well#CBK-25-01,SW of Brimhall&Coffee,is
PG&E site.Additional not in service due to contamination in the area.
SVE being installed
week of 10/12/09.
RWQCB Downtown Chevron Thousands of gallons of gas leaked through a
Since 2000 2317 L Street hole in an underground pipe before the leak was
detected and confirmed. Initial detectable
BFD (MTBE in groundwater) °A' benzene(2400 ug/1),and MTBE(4,000,000
Initiated in ug/1)is in the shallow groundwater below the
1999 Cal Water Service well site. After 3 years of vapor extraction,the
#64 impacted "
MTBE levels have dropped to 31,000 ug/l.
approximately 2,200 ft. Groundwater"pump&treat"with air stripper
downgradient. and air sparging to be installed once the Kern
Community College District(KCCD)and
Update: downgradient KGET-TV complete an adjacent property
monitoring wells to be transfer. PG&E installed a larger transformer on
installed during 3nd site to handle all the additional remediation
quarter and continue equipment power demands. Soil vapor
monitoring of existing extraction was initiated on Oct.8,2002. An
wells as well. equivalent of 139,121 lbs(21,738gallons)of
gasoline has been removed from the subsurface
to date. Cal Water well#64 was impacted by
MTBE(12.3 ug/1),2,200 ft.downgradient,and
has been made inactive.
RWQCB Shell Service Station Voluntary groundwater analysis shows MTBE
Since 2003 3605 Rosedale Hwy i�,i!,I e d 6 detected at 2800 ugh under the site. Work plan
approved to install groundwater monitoring
BFD (MTBE groundwater wells. A pilot vapor extraction test was
Referral to site)
performed oomed and determined there weren't
sufficient vapors to be feasible. Oxygen
Update: Property injection pilot project underway to treat MTBE
owners to be notified in groundwater beneath the site.
that case has closed.No
other activity
RWQCB Mr.Fast Gas Leak from former UST's stopped in 1995.Vapor
Since 1995 600 Brundage Ln. extraction system and add'l groundwater
BFD monitoring wells have been installed and
(Gasoline operating. Second vapor extraction system is
Initiated in groundwater) installed on the south side of Brundage Lane
1993 u((ul��' l 4li which is used only for groundwater extraction at
Cal Water Service well this time. All USTs were eventually removed
app impacted in 2003. A previous RWQCB Order has been
approximately 3000 ft. rescinded for installing an additional monitoring
downgradient. well on the south side of Hwy 58.
Biostimulation being proposed as a remediation
Update: Work plan method.
peing prepared to
introduce oxygen into
the subsurface to
enhance degradation of
hydrocarbons.No
activity at this time.
Ld Agency Site Name&Address Location Photo Environmental Status
RWQCB Minit Stop Market Gasoline detected in groundwater at 21,200 ug/1
Since 2002 2900 Union Ave. and MTBE detected at 20,900 ug/1. Case has
been referred to RWQCB for further
BFD (MTBE groundwater P' investigation. Three additional groundwater
Initiated in site) !�'''�'li� monitoring wells installed in Feb.2003. Soil
2000 vapor extraction system currently being operated
Cal Water Service well since April,2004. Approximately 27,523
#22 impacted gallons of gasoline removed from soil to date.
approximately 2500 ft. Contaminants have greatly decreased since soil
downgradient. vapor extraction was implemented. Cal Water
well#22 was impacted by MTBE approximately
Update: 3rd report 2500 ft.downgradient(according to KC Water
received and a request Agency maps).
from RWQCB for No
Further Action Letter.
RWQCB Kangs 34th Street Arco UST lining inspection uncovered petroleum
Since 2003 1102 34th St. impacted soil surrounding two of the three UST
turbine pump areas. UST's are emptied and
BFD (MTBE groundwater ,~ temporarily abandoned since 2002. Referred to
Initiated in site) RWQCB for their investigation in connection to
2001 Cal Water well#22 impacted by MTBE
Cal Water Service well approximately 2800 ft downgradient. Soil
#22 impacted borings and groundwater monitoring wells
approximately 2800 ft. installed. MTBE detected in the groundwater.
downgradient. Work plan for further assessment will be
conducted with the future removal of the
Update:Approved by abandoned USTs on site.
State Clean-up Fund,
after several appeal
processes.No activity
RWQCB Lucky 7#3 Previous leak investigation from 1994-1998 did
Since 2002 726 S.Union Av. not require analysis for MTBE at that time. Four
groundwater monitoring wells and vapor
BFD (MTBE groundwater extraction system installed. Possible primary or
Referral to site) f �' secondary source of MTBE impact to Cal Water
RWQCB »> Service well#75 approximately 500 ft.
Cal Water Service well downgradient. Mr Fast is additionally 3000 ft.
#75 impacted upgradient from well#75. An unlined canal
y,
approximately 500ft. A adjacent to the site is possibly introducing
downgradient. perched water through the contamination zone
and into the water table. Property owners within
Update: SVE restart has 200 ft.of the site identified for pending closure
been advised. notifications.
RWQCB Car Wash of America Unreported release in 1997 has not yet been
Since 2001 1701 Stine Rd. fully defined,but max.MTBE of 2.8 mg/kg
detected in soil at 85'below surface(that's deep
BFD (MTBE groundwater B for max.MTBE). USTs were removed in March
Initiated in site) a'°`z' 2003.A monitoring well and vapor extraction
1999 system has been installed and expanded as
Cal Water Service well required. A total of 7,800 lbs(1,418 gallons)of
#136 impacted approx. gasoline removed from the subsurface. Cal
3000 ft.downgradient. Water well#136 was impacted with MTBE
approximately 3000 ft.downgradient. MTBE
Update: Case closure originally detected at 102 ug/1 in groundwater
being requested. below the site, No MTBE remains detected in
the water beneath the site at this time.
Ld Agency Site Name&Address Location Photo Environmental Status
RWQCB Former Mobil Station Max.MTBE of 16,000 ug/L in groundwater at
Since 2001 4456 California Av 36'beo]w surface. Monitoring well was
installed on south side of California Ave.in July
BFD (MTBE groundwater 2003,but did not adequately define the extent of
Initiated in site) the plume. Floating product originally detected
1998 on the water table. Groundwater flow direction
No Cal Water wells reported last quarter was anomalous. Soil vapor
currently affected in extraction began in June 2003. 12,0961bs
area. (1,890 gal)of gasoline removed in total.
Update: Case closure Influent concentrations declined enough to
issued on November 24, discontinue vapor extraction. Groundwater
2009 monitoring completed. Closure notifications
pending.
RWQCB Beacon Truck Stop Vapor extraction started on Oct. 15, 1999 and
Since 1995 3225 Buck Owens Blvd ! 4,462 lbs(822 gal)of gasoline removed to date.
BFD MTBE has not been detected in the groundwater
(minor levels of diesel do during the past two years. Vapor extraction
Initiated in reappeared in completed. However,diesel concentrations in
1993 groundwater,and are the groundwater continue to increase from a
now increasing over large mass of residual contaminated soils
time) extending off-site beneath Hwy 99. The
impacted shallow groundwater is traveling west
Update: RWCQB under Hwy 99 for an unknown distance.
requested monitoring Groundwater monitoring well to be installed on
wells be drilled deeper. west side of Hwy 99. Cal-Trans has
Continue groundwater subsequently denied the encroachment permit to
monitoringinstall the well.
DTSC Corrective Actions Cases:
Ld Agency Site Name&Address Location Photo Environmental Status
DTSC Gibson Oil Refinery Not in City,but within area of concern.
Since 1999 End of Commercial St. Corrective Action Branch of the Permitting
(Not in City Limits) Program(Berkeley Office)is handling the
clean-up oversight. All hazardous liquids&
Update: Work plan for soil tanks have been removed. Soils have been
removal near final approval. stabilized with a dust suppressant. Soil
Removal of contaminated removal to begin in early 2007&will take
soil will occur in 2007.No several months to complete the clean-up.
new activity
DTSC K&D Salvage DTSC has removed solid wastes from K&D
Since 1990 600 S.Union site,and has performed further assessment.
Update Clean-up Removal of 710 cubic yards of soil impacted
with leachable concentrations of lead and
completed in 2003,but PCBs and placement of an asphalt covering
certain deed restrictions over part of the site to prevent percolation of
will apply to future uses. rainwater in progress. Cost of State funded
No new activit . cleanup estimated to exceed$1,300,000.
US EPA Corrective Actions Cases:
Ld Agency Site Name&Address Location Photo Environmental Status
USEPA Double D Recycling USEPA repaired fence&returned April 25,
Since 2000 Former Benham-Johnson "y '
340 Daniels Ln qtr' ` i' ' i{I 2002 to conduct further assessment. Double
D has shown high levels(19 ppm)of DDT in
(located behind 600 Union) soil(hazardous threshold=1ppm). All
hazardous waste removed from the surface.
U date:no new activities Junk removed by City Code Enforcement in
this past year. cooperation with EPA soil sampling activities.
Cases Currently Under Investigation Pending Clean-Up Determinations:
LAAgency Site Name Location Status
BFD Fastrip 1200 Coffee Rd. Soil contamination detected during piping
upgrade.
BFD Gas-n-Save 830 Union Av Soil contamination detected during piping
upgrade.Tanks to be removed.
BFD Bernard&Sons 4011 Jewett Av. Aboveground tank removal w/underground
piping to fuel dispenser found leaking.Work
plan has been developed.No additional
information.
BFD Afana Option Kern Bluff Oilfield Oil contaminated soil moved to this site for
bio-remediation.No action at this time.
BFD Dunmore Property North of Morning&Paladino Removal of oilfield wastes for development
BFD Tract 6383 Phoenix Homes Hwy 178&Morning Dr. Removal of oilfield wastes for development.
BFD Tract 6577 Centex Homes Buena Vista&McCutchen Soil clean-up from farm wastes on site.
BFD Tract 6758 Centex Homes 5938 Taft Hwy Soil clean-up from farm wastes on site.
BFD Cal-Kern III,Kern Bluff Wells-McGregor Lease Removal of oilfield wastes for development.
BFD 34 Street Carwash 930 34 Street Eandd2t 20000 gallon fuel tank,dispensers
lines.Soil sample results are
Case Closure/No Further Action:
Ld Agency Site Name Location Photo Environmental Status
BFD CVS Soil investigation from tank removal detected
2009 9628 Rosedale HwyI !i contamination that came from a leaking
dispenser.
Update:Contaminated soil {i° Ali
was over excavated and
replaced with clean soil. „Pw Case Closed.
No Further Action Letter
2009
BFD Three way Chevrolet Soil samples obtained following tank removal.
2009 3800 California Ave
Update:No Further Letter Case Closed
issued September 2,2009
BFD Tract 6610 Cal.Homes Soil investigation from former fuel tank&
Former Mesa Marin Case Closed petroleum product use on site still pending.
Racetrack Closure Letter Issued 2009
Key:
BFD = Bakersfield Fire Department(Office of Environmental Services)
DTSC = Department of Toxic Substances Control
KCEH = Kern County Environmental Health
RWQCB = Regional Water Quality Control Board
USEPA = United States Environmental Protection Agency
Page 1 of 2
STREETS DIVISION — WORK SCHEDULE
WEEK OF JANUARY 11, 2010 — JANUARY 15, 2010
Resurfacing/Reconstructing streets in the following areas:
Preparing streets for reconstruction (lowering utility manholes) in the area between
District Boulevard & White Lane, west of Gosford Road
Crack sealing streets in the area between Stockdale Highway and Truxtun Avenue, east
of Coffee Road (Quailwood Area).
Miscellaneous Streets Division projects:
Installing curb & gutters in the area between California Avenue & 4th Street, east of
Chester Avenue (CDBG FUNDED PROJECT).
Working on the Ming Avenue widening project.
THIS SPACE INTENTIONALLY LEFT BLANK
Week of January 11_2010_Work Schedule
Page 2 of 2
STREETS SWEEPING SCHEDULE
MondaV, 11, 2010
Between So. "H" St. & Union Avenue — Pacheco Rd. & Hosking Rd.
Between Stockdale Hwy. & Truxtun Ave. (ext.) — Coffee Rd & Partridge Ave.
Tuesday, 12, 2010
Between 99 Hwy. & So. "H" St. — Ming Ave. & Panama Ln.
Cul-De-Sacs on the north side of Magdelena Ave., west of So. "H" St.
Wednesday, 13, 2010
City areas between Brundage Ln. & Ming Ave. — So. "H" St. & Union Ave.
City areas between Wilson Rd. & Pacheco Rd. — So. "H" St. & Union Ave.
Between Casa Loma Dr. & Planz Rd. — Madison Ave. & Cottonwood Dr.
Between Planz Rd. & Brook St. — Madison Ave. & Hale St.
Thursday, 14, 2010
Between Carr St. & California Ave. — Mohawk St. & Stockdale Hwy.
Between Stockdale Hwy. & Marella Wy. — California Ave. & Montclair St.
Between La Mirada Dr. & Chester Ln. — Montclair St. & No. Stine Rd.
Between California Ave. (ext.) & Stockdale Hwy. — No. Stine Rd. & 99 Hwy.
Between Stockdale Hwy. & Ming Ave. — New Stine Rd. & Ashe Rd.
Between Mountain Ridge Dr. & Ashe Rd. — Taft Hwy. & Berkshire Rd.
Friday, 15, 2010
Between Stockdale Hwy. & Ming Ave. — Allen Rd. & Old River Rd.
Between Old River Rd. & Coffee Rd. — Ming Ave. & Ridge Oak/Westwold Dr.
Between Ridge Oak/Westwold Dr. & White Ln. — Old River Rd., east to the PG&E easement.
Between White Ln. & Asperata Dr. — Gosford Rd„ west to the PG&E easement.
Between White Ln. & Cederwood Dr. — Stine Rd. & Wilson Rd. (ext.)
Week of January 11_2010_Work Schedule
CONSTRUCTION DIVISION WEEKLY UPDATES
ROADWAY PAVING PROJECTS
Status update of the roadway paving projects currently awarded as of January 8, 2010:
Stockdale Highway - California to Wetherly and Country Club Lane to Ashe Road
Work has resumed on the median islands between California and Wetherley. Traffic is currently
open to thee lanes in each direction with some lane closures occurring between the hours of
8:30 AM and 4:30 PM on weekdays. The scheduled completion date of this project is February
10, 2010.
AMERICAN RECOVERY AND REINVESTMENT ACT PROJECTS:
Ashe Road -White Lane to Mina Avenue
The area of failed paving is being repaired by the contractor. These repairs should be
complete by Monday. Once these repair are complete, striping operations will resume
(weather permitting). This project is expected to be complete in January 2010.
Wilson Road -White Lane to Planz Road
Paving operations on Wilson Road are complete. Striping of the street is nearly complete;
however, weather conditions are preventing the contractor from completing the striping of the
street. This project is expected to be complete in January 2010.
Hushes Lane -White Lane to Planz Road
Paving operations on Wilson Road are complete. Striping of the street is nearly complete;
however, weather conditions are preventing the contractor from completing the striping of the
street. This project is expected to be complete by January 2010.
Wible Road - Pacheco Road to White lane
The paved area on the east side of Wibie Road has been pulverized and rehabilitation
operations are being done at this time. Currently all traffic has been diverted to one lane in
each direction on the west half of the roadway. All work on the project is currently being done
between the hours of 7:00 PM to 4:00 AM. This project is expected to be complete in January
2010.
CADOCU ME-1\RKIRKW-1\LOCALS-1\Temp\XPgrpWse\RoadwayProjectsUpdates_January 10 2010.doc