HomeMy WebLinkAboutRES NO 095-10
RESOLUTION NO. 0 9 5 10
RESOLUTION OF THE CITY OF BAKERSFIELD AMENDING THE
MIRAMONTE DRIVE-CHASE AVENUE PLANNED MAJOR
THOROUGHFARE AREA AND MAKING FINDINGS RELATIVE
THERETO.
WHEREAS, by Resolution of Intention No. 1670, adopted July 21, 2010, a
public hearing was called for August 11, 2010, at the hour of 5:30 pm in the Council
Chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the
establishment of the Miramonte Drive-Chase Avenue Planned Major Thoroughfare
Area; and,
WHEREAS, notice of such hearing has been given to all affected property
owners as such are shown on the latest equalized assessment roll; and,
WHEREAS, such hearing has been duly and regularly held, and all persons
interested have been given an opportunity to appear and be heard.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield
as follows:
1. The foregoing recitals are true and correct and incorporated
herein by reference.
2. The Miramonte Drive-Chase Avenue Planned Major Thoroughfare
Area has been identified in the circulation element of the 2010 General Plan.
3. The Miramonte Drive-Chase Avenue Planned Major Thoroughfare
Area is in addition to existing major thoroughfares serving the area.
4. No majority protest as to the formation of the Miramonte Drive-
Chase Avenue Planned Major Thoroughfare Area exists.
5. The Council hereby finds that, as to the Miramonte Drive-Chase
Avenue Planned Major Thoroughfare Area, as described in the plans and maps
attached hereto and incorporated herein by reference, subdivision and development
of property within each such area will require construction of facilities, described in
each such area either on the basis of benefits conferred on property for subdivision or
on the need for such facilities created by the proposed subdivision and development
of other property within such area, and that the fees provided within the schedule
attached, are fairly apportioned.
6. The Amended Miramonte Drive-Chase Avenue Planned Major
Thoroughfare Area Plan is hereby adopted.
0 0 0 0 0----------
AK
9
o<9)
G:\GROUPDAT\RESOLUTI\MIRAMONTE-CHASE AMEND EST m
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted,
by the Council of the City of Bakersfield at a regular meeting thereof held on
'AUG 1 1 2010 by the following vote:
✓
COUNCILMEMBER COUivH, CARSON, WEIR HANSON, SULLIVAN, SCRI NV ER
NOES: COUNCILMEMBER _ryy~a
A TAIN: COUNCILMEMBER Yl(SWI~
C!7 COUNCILMEMBER
ROBERTA GAFFORD, C
CITY CLERK and Ex Icio Clerk of the
Council of the City of Bakersfield
APPROVED: AUG 1 1 2010
By
HARVEY L. HALL
Mayor
APPROVED AS TO FORM:
VIRGINIA GE ARO, CITY ATTORNEY
By 4,
t0SHUA-fl RUDNICK
Deputy City Attorney
Attachments:
Exhibit "A" Cost Estimate
Exhibit "B" Fee Schedule
Exhibit "C" Map of Improvements
Exhibit "D" Map of Benefit Area
Mps
~gAK6cq
m
G:\GROUPDAT\RESOLUTI\MIRAMONTE-CHASE AMEND EST `~ORIGINAL
ENGINEER'S ESTIMATE OF PROJECT COSTS revised 5/18/2010
Project Title: Chase & Miramonte Bridge and Major Thoroughfare Area
Project Limits: Chase, Comanche to Miramonte; Miramonte, north line of Sect 22/T29S, R29E
to Chase
Project Number:
Prepared by:
Date Prepared:
Approved by:
File Name / Sheet Name: SAPROJECTS\Bridge District\Exhibits\ Miramonte-Chase Exhibit A amend.xlsx]Eng'r E
CONSTRUCTION COSTS
s ma e n
Item No. Quantity Measure Item Unit Price Extension Price
1 32250 cy Grading $12.00 $387,0
2 232640 sf 0.30'AC/1.30' CL-2 AB $6.30 $1,464,555
3 25848 sy Subgrade Preparation $2.25 $58,158
4 4 ea Standard Street Signs $300.00 $1,200
5 2 ea Stop Signs $300.00 $60
6 13 ea Traffic Signs $300.00 $3,90
7 21810 If Striping $2.00 $43,62
8 366 If 18" RCP Storm Drain $95.00 $34,770
9 700 If 4" PVC Conduit $22.00 $15,400
10 10.3 AC Land Acquisition $100,000.00 $1,030,00
11
12 $0
13 $
14 $0
15 $0
16 $
17 $0
Sub-total: $3,039,203
Contingency: 20% $607,800
CONSTRUCTION COSTS: $3,647,003
OTHER COSTS
Design Engineering $80,bMl
Construction Surveying $10,0
Soils Testing $10,00
Attorney costs - Condemnation $20,
Sub-total: $120,00
Contingency: 10% $1210
OTHER COSTS: $132,000
ENGINEER'S ESTIMATE OF TOTAL PROJECT COST: $3,779,003
BMTA ACRES: 1019.61
BMTA PER ACRE FEE: $3,706.32
o
11 gAKF9
EXHIBIT 4-
o
- IgIGINAL.
Exhibit "B"
FEE SCHEDULE
Miramonte Drive-Chase Avenue Major Thoroughfare Area
$3,779,003 / 1019.61 Acres = $3,706.32/Gross Acre
Note: Gross acre fee can be divided by Number of units being developed.
Example: Tent Tract 6736 = 19.07 acres No. units = 185
19.07 x $3706.32 = $70,679.52
$70,679.52/185= $382.05/per unit
o~0PKF9~-~
m
S:\PROJECTS\Bridge District\Exhibits\Miramonte-Chase Exhibit B.doc r-
~,)RIGINAI
EXHIBIT "C"
I R- SHEET 1 OF 2
Gp ,
~K.
1 ~
SEE DETAIL
ON SHEET 2
SEC. 22, T.29 S.
I SEC. 15, 1.29 S
R. 29 E, M. D. M. R. 29 E., M. D. M.
40.
omotA
1
SEC. 23, T.29 S. SEC. 14, T.29 S.
R. 29 E., M. D. M. _ R. 29 E., M. D. M.
y
NOT TO SCALE
MIRAMONTE DRIVE AND CHASE AVENUE
LIMITS OF IMPROVEMENTS aKE.
m.
JORIGINAl
EXHIBIT "C"
SHEET 2 OF 2
R
1 t. ` r
lip-
p ~ tr< " G
.p, T a Q
O G JJ „ . S - .
Al,
f
25~
r•
SCALE: 1"=20'
MIRAMONTE DRIVE AND CHASE AVENUE
LIMITS OF IMPROVEMENTS
~pPKF9
t~ lp
} m
'~IRI~INAi~
EXHIBIT "D"
J\~~P GT 6
SGPN~' O~\G~` i `O'Pi
t-_
L
i Oe OR IN-i,• qCL
i PEPK°~ ~ F~~T
FR
SOVIRIOLN SPN°ST°NE GT KNOgV14
°ATU -N 04N w pGE0 a
I P~ Z I
a fit.
~yh PARK PA-1SAOE09
DEL WEBB CT Q
V~' V~~LAGE pR U VISTA GRANDE
~\~UZ GAS ~C~ TALON GROVE D Z PADERO CT ; • R~
BLOSSOM RIDGE DR Y
COPPER CREST DR
TERRAZZO D ~:::::•;C•:•:•:•; :•.•.:•:•:•R
J :E HILLS DR O 14 > .
l . . .x...........11 ~I/1 1~.i1 . Oi . • <
D
I
1
i CA SgCLU .
• Cp B p
R
I
I is / '
. . (
~i \NPOP
m 1 V\P F VIA
/Vgpo1/oR j:..
- - - -
v
viii' Y'~ 'a~: iii
o~
U I
1 i
I I
BARBERAA -
Le end
Benefit Area o
•••rY••~ Boundary ~ ENR`OG~~ N
27
26
MIRAMONTE DRIVE AND CHASE AVENUE NOT TO SoALF%l
MAJOR THOROUGHFARE BENEFIT AREA
`~ORIGINAL