Loading...
HomeMy WebLinkAboutRES NO 095-10 RESOLUTION NO. 0 9 5 10 RESOLUTION OF THE CITY OF BAKERSFIELD AMENDING THE MIRAMONTE DRIVE-CHASE AVENUE PLANNED MAJOR THOROUGHFARE AREA AND MAKING FINDINGS RELATIVE THERETO. WHEREAS, by Resolution of Intention No. 1670, adopted July 21, 2010, a public hearing was called for August 11, 2010, at the hour of 5:30 pm in the Council Chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of the Miramonte Drive-Chase Avenue Planned Major Thoroughfare Area; and, WHEREAS, notice of such hearing has been given to all affected property owners as such are shown on the latest equalized assessment roll; and, WHEREAS, such hearing has been duly and regularly held, and all persons interested have been given an opportunity to appear and be heard. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The foregoing recitals are true and correct and incorporated herein by reference. 2. The Miramonte Drive-Chase Avenue Planned Major Thoroughfare Area has been identified in the circulation element of the 2010 General Plan. 3. The Miramonte Drive-Chase Avenue Planned Major Thoroughfare Area is in addition to existing major thoroughfares serving the area. 4. No majority protest as to the formation of the Miramonte Drive- Chase Avenue Planned Major Thoroughfare Area exists. 5. The Council hereby finds that, as to the Miramonte Drive-Chase Avenue Planned Major Thoroughfare Area, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 6. The Amended Miramonte Drive-Chase Avenue Planned Major Thoroughfare Area Plan is hereby adopted. 0 0 0 0 0---------- AK 9 o<9) G:\GROUPDAT\RESOLUTI\MIRAMONTE-CHASE AMEND EST m ORIGINAL I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on 'AUG 1 1 2010 by the following vote: ✓ COUNCILMEMBER COUivH, CARSON, WEIR HANSON, SULLIVAN, SCRI NV ER NOES: COUNCILMEMBER _ryy~a A TAIN: COUNCILMEMBER Yl(SWI~ C!7 COUNCILMEMBER ROBERTA GAFFORD, C CITY CLERK and Ex Icio Clerk of the Council of the City of Bakersfield APPROVED: AUG 1 1 2010 By HARVEY L. HALL Mayor APPROVED AS TO FORM: VIRGINIA GE ARO, CITY ATTORNEY By 4, t0SHUA-fl RUDNICK Deputy City Attorney Attachments: Exhibit "A" Cost Estimate Exhibit "B" Fee Schedule Exhibit "C" Map of Improvements Exhibit "D" Map of Benefit Area Mps ~gAK6cq m G:\GROUPDAT\RESOLUTI\MIRAMONTE-CHASE AMEND EST `~ORIGINAL ENGINEER'S ESTIMATE OF PROJECT COSTS revised 5/18/2010 Project Title: Chase & Miramonte Bridge and Major Thoroughfare Area Project Limits: Chase, Comanche to Miramonte; Miramonte, north line of Sect 22/T29S, R29E to Chase Project Number: Prepared by: Date Prepared: Approved by: File Name / Sheet Name: SAPROJECTS\Bridge District\Exhibits\ Miramonte-Chase Exhibit A amend.xlsx]Eng'r E CONSTRUCTION COSTS s ma e n Item No. Quantity Measure Item Unit Price Extension Price 1 32250 cy Grading $12.00 $387,0 2 232640 sf 0.30'AC/1.30' CL-2 AB $6.30 $1,464,555 3 25848 sy Subgrade Preparation $2.25 $58,158 4 4 ea Standard Street Signs $300.00 $1,200 5 2 ea Stop Signs $300.00 $60 6 13 ea Traffic Signs $300.00 $3,90 7 21810 If Striping $2.00 $43,62 8 366 If 18" RCP Storm Drain $95.00 $34,770 9 700 If 4" PVC Conduit $22.00 $15,400 10 10.3 AC Land Acquisition $100,000.00 $1,030,00 11 12 $0 13 $ 14 $0 15 $0 16 $ 17 $0 Sub-total: $3,039,203 Contingency: 20% $607,800 CONSTRUCTION COSTS: $3,647,003 OTHER COSTS Design Engineering $80,bMl Construction Surveying $10,0 Soils Testing $10,00 Attorney costs - Condemnation $20, Sub-total: $120,00 Contingency: 10% $1210 OTHER COSTS: $132,000 ENGINEER'S ESTIMATE OF TOTAL PROJECT COST: $3,779,003 BMTA ACRES: 1019.61 BMTA PER ACRE FEE: $3,706.32 o 11 gAKF9 EXHIBIT 4- o - IgIGINAL. Exhibit "B" FEE SCHEDULE Miramonte Drive-Chase Avenue Major Thoroughfare Area $3,779,003 / 1019.61 Acres = $3,706.32/Gross Acre Note: Gross acre fee can be divided by Number of units being developed. Example: Tent Tract 6736 = 19.07 acres No. units = 185 19.07 x $3706.32 = $70,679.52 $70,679.52/185= $382.05/per unit o~0PKF9~-~ m S:\PROJECTS\Bridge District\Exhibits\Miramonte-Chase Exhibit B.doc r- ~,)RIGINAI EXHIBIT "C" I R- SHEET 1 OF 2 Gp , ~K. 1 ~ SEE DETAIL ON SHEET 2 SEC. 22, T.29 S. I SEC. 15, 1.29 S R. 29 E, M. D. M. R. 29 E., M. D. M. 40. omotA 1 SEC. 23, T.29 S. SEC. 14, T.29 S. R. 29 E., M. D. M. _ R. 29 E., M. D. M. y NOT TO SCALE MIRAMONTE DRIVE AND CHASE AVENUE LIMITS OF IMPROVEMENTS aKE. m. JORIGINAl EXHIBIT "C" SHEET 2 OF 2 R 1 t. ` r lip- p ~ tr< " G .p, T a Q O G JJ „ . S - . Al, f 25~ r• SCALE: 1"=20' MIRAMONTE DRIVE AND CHASE AVENUE LIMITS OF IMPROVEMENTS ~pPKF9 t~ lp } m '~IRI~INAi~ EXHIBIT "D" J\~~P GT 6 SGPN~' O~\G~` i `O'Pi t-_ L i Oe OR IN-i,• qCL i PEPK°~ ~ F~~T FR SOVIRIOLN SPN°ST°NE GT KNOgV14 °ATU -N 04N w pGE0 a I P~ Z I a fit. ~yh PARK PA-1SAOE09 DEL WEBB CT Q V~' V~~LAGE pR U VISTA GRANDE ~\~UZ GAS ~C~ TALON GROVE D Z PADERO CT ; • R~ BLOSSOM RIDGE DR Y COPPER CREST DR TERRAZZO D ~:::::•;C•:•:•:•; :•.•.:•:•:•R J :E HILLS DR O 14 > . l . . .x...........11 ~I/1 1~.i1 . Oi . • < D I 1 i CA SgCLU . • Cp B p R I I is / ' . . ( ~i \NPOP m 1 V\P F VIA /Vgpo1/oR j:.. - - - - v viii' Y'~ 'a~: iii o~ U I 1 i I I BARBERAA - Le end Benefit Area o •••rY••~ Boundary ~ ENR`OG~~ N 27 26 MIRAMONTE DRIVE AND CHASE AVENUE NOT TO SoALF%l MAJOR THOROUGHFARE BENEFIT AREA `~ORIGINAL