HomeMy WebLinkAbout4050 Gosford Rd
B A K E R S F I E L D
www.bakersfieldcity.us
Development Services Department
Phil Burns, Building Director Jim Eggert, Planning Director
Building Division Planning Division
Phone: (661) 326-3720 Phone: (661) 326-3733
FAX: (661) 325-0266FAX: (661) 852-2135
July 8, 2011
Paul Anchordoquy
4009 Union Avenue
Bakersfield, CA 93305
RE: Notice of Decision – Site Plan Review (Project No. 11-0233)
Dear Mr. Anchordoquy:
The Planning Director, upon recommendation of the Site Plan Review Committee, has
approved your plans for a 687 square foot addition to a 1,272 square foot convenience market in a
C-2 (Regional Commercial) zone district at 4050 Gosford Road.
Your proposal, with corrections as noted, meets the minimum required codes, policies and
standards for development as adopted by the Bakersfield City Council. Specific items have been
identified (see attached Site Plan Compliance List) that you need to resolve before you can obtain
a building permit or be allowed occupancy. These items may include changes or additions that
need to be shown on the final building plans, alert you to specific fees, and/or are comments that
will help you in complying with the city’s development standards. Each item will note when it is to
be completed and they have been grouped by department so that you know who to contact if
you have questions.
Your next step is to either apply for necessary building permits to construct your project, or
begin your business activities depending on the request submitted. You must submit final building
plans to the Building Division. The Site Plan Review Committee will review these final plans while
building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List.
Please read them carefully. Failure to satisfy an item may delay your obtaining a building permit or
commencing your project.
After construction of your project but before the City can allow occupancy, the Building
Division must inspect the development to find if it complies with the approved plans, and any other
relevant permits and codes. If you have satisfied all of the requirements, the Building Director will
issue a certificate of occupancy; of not, the area inspector will give you a correction notice. Once
you have made all of the corrections, the Building Director can issue a certificate of occupancy.
You may not occupy a development until the Building Director has issued a certificate of
occupancy.
SPR# 11-0233 Page 2 of 7
INDEMNIFICATION CONDITION
In consideration by the City of Bakersfield for land use entitlements, including but not limited
to related environmental approvals related to or arising from this project, the applicant, and/or
property owner and/or subdivider (“Applicant” herein) agrees to indemnify, defend, and hold
harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or
boards (“City ” herein) against any and all liability, claims, actions, causes of actions or demands
whatsoever against them, or any of them, before administrative or judicial tribunals of any kind
whatsoever, in any way arising from, the terms and provisions of this application, including without
limitation any CEQA approval or any related development approvals or conditions whether
imposed by the City, or not, except for City’s sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any decision
by the City related to this project and the obligations of this condition apply regardless of whether
any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action, or proceeding, failing under
this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion,
shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and
expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by
another entity or party.
REVISIONS OF THE APPROVED PLAN
Any time after site plan approval but before the approval expires; you may submit revisions
to the plan. We will treat these revisions as a new site plan application subject to a new review and
required fees. The Planning Director can only approve minor changes to the original plan without a
new application if they are necessary to meet a condition, mitigation, or result from physical
obstacles or other comparable constraints.
EXPIRATION OF PLAN APPROVAL
Approval of this site plan expires on July 8, 2013 (2 years from the decision date), unless
building permits have been issued, or on projects not requiring a building permit, the use has
commenced. The project must be completed within 5 years from the decision date. If the
property is rezoned, site plan approval will expire upon the effective date for the rezoning unless
the use is permitted in the new zone.
The Planning Director may extend the expiration date up to one (1) year if you resubmit new
plans for check against the code requirements in effect at that time and include a written request
for the extension. We must receive this request expiration of the project approval. We will
before
not require a fee for this extension request; however, changes to the plans originally approved for
purposes other than code requirements shall be subject to a new site plan review, including
payment of all required fees.
ENVIRONMENTAL DETERMINATION
This site plan review has been found to be exempt from the provisions of the California
Environmental Quality Act (CEQA) according to Section 15332. This project is exempt because it is
an infill development that is consistent with the general plan and zoning regulations, is within an
SPR# 11-0233 Page 3 of 7
area predominantly developed with urban uses, is not identified as critical habitat for endangered
or threatened species, will not significantly affect traffic noise, air or water quality, and will be
adequately served by appropriate utilities and public services. A Notice of Exemption has been
prepared and is available for review at the Planning Division (see cover sheet for address).
APPEAL
Any person may appeal this decision. An appeal is limited to whether or not an adopted
development standard, zoning regulation, mitigation, or policy applied or not applied to the
project, was done consistent with the authority granted by city ordinances or the California
Environmental Quality Act (CEQA). The appeal must be in writing stating the precise basis or issue
as noted, include a $675 filing fee, and must be filed within of the decision date to the City
10 days
of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue,
Bakersfield, CA, 93301). The Planning Commission will hold a public hearing on the appeal and
their decision will be final unless their decision is appealed to the City Council.
Site plan approval is based on the statements made in the application and the plans you
submitted. Any errors or omissions on these plans could alter the compliance list and/or void this
decision. If you have questions about any of the items noted in the Site Plan Compliance List, you
must speak to the contact person representing the department requiring that item. If you have
other questions regarding general information about the site plan review process, please contact
the Planning Division at (661) 326-3733.
DECISION DATE: July 8, 2011
Sincerely,
JIM EGGERT, Planning Director
cc: All Interested Agencies – For your records.
rma
S:\BZA_SPR\Forms\spr_data\2011 spr\11-0233,spr,ltr.doc
SPR# 11-0233 Page 4 of 7
CONDITIONS AND ORDINANCE COMPLIANCE
The following are specific items that you need to resolve before you can obtain a
building permit or be allowed occupancy. These items include conditions and/or
mitigation required by previous site entitlement approvals (these will be specifically
noted), changes or additions that need to be shown on the final building plans, alert
you to specific fees, and other conditions for your project to satisfy the City’s
development standards. The item will usually need to be shown on the final building
plans or completed before a building permit is issued. Each has been grouped by
department so that you know whom to contact if you have questions.
A. DEVELOPMENT SERVICES – BUILDING (Staff contact – Steve Ewing 661-326-3677)
1. Prior to review of improvement plans by the City, the developer shall submit a grading
plan for the proposed site to be reviewed and approved by the City Engineer and
Building Official (Bakersfield Municipal Code Section 16.44.010). With the grading
plan, if the project is subject to the provisions of the National Pollutant Discharge
Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the
General Permit to Discharge Storm Water Associated with Construction Activity (WQ
Order No. 99-08-DWQ) must be filed with the State Water Resources Control Board in
Sacramento before the beginning of any construction activity. Compliance with the
general permit requires that a Storm Water Pollution Prevention Plan (SWPPP) be
prepared, continuously carried out, and always be available for public inspection
during normal construction hours.
2. Show on the final building plan how and where water will be drained from the
property. Show on the final building plan pedestrian access from the public way and
handicap parking. Private streets are not the public way.
3. Include with or show on the final building plans information necessary to verify that the
project complies with all disability requirements of Title 24 of the California Building
Code.
4. The developer shall obtain all required approvals from the Kern County Environmental
Health Services Department (2700 “M” Street, Bakersfield, CA., 93301; PH 661-862-
8700) for any food handling facility, (ie: market, delicatessen, café, concession,
restaurant) before building permits can be issued.
5. The Building Division will calculate and collect the appropriate school district impact
fee at the time they issue a building permit.
6.Final Building plans shall show pedestrian access pathways or easements for persons
with disabilities from public rights-of-ways that connect to all accessible buildings,
facilities, elements, and spaces in accordance with the California Building Code.
These pedestrian access ways shall not be parallel to vehicular lanes unless separated
by curbs or railings.
SPR# 11-0233 Page 5 of 7
B. DEVELOPMENT SERVICES – PLANNING (Staff contact – Wayne Lawson 661-326-3976)
1.The minimum parking required for this project has been computed based on use and
shall be as follows:
Square Parking Required
Use Footage Ratio Parking
Existing:
Main Building/Shops
First 35,000 sq. ft. 35,000 sq. ft. 1 space/200 sq. ft. 175 spaces
Additional area 79,059 sq. ft. 1 space/250 sq. ft. 316 spaces
Pads
Bank 4,950 sq. ft. 1 space/300 sq. ft. 17 spaces
Convenience market 1,272 sq. ft. 1 space/200 sq. ft. 6 spaces
Pump island credit 4 pump islands (2 spaces/pump island) (8 spaces)
Drive-thru restaurant 2,692 sq. ft. 1 space/75 sq. ft. 36 spaces
Drive-thru credit 1 window (2 spaces/window) (2 spaces)
Drive-thru restaurant 2,358 sq. ft. 1 space/75 sq. ft. 31 spaces
Drive-thru credit 1 window (2 spaces/window) (2 spaces)
Subtotal: 569 spaces
Proposed:
Convenience market addition 687 sq. ft. 1 space/200 sq. ft. 3 spaces
Total Required: 572 spaces
(Note: 605 parking spaces exist within the center pursuant to Site Plan Review No. 04-1405. By
ordinance, compact and tandem spaces cannot be counted toward meeting minimum parking
requirements.)
2. Business identification signs are under this review. A
neither considered nor approved
separate sign permit, reviewed by the Planning and Building Divisions and issued by
the Building Division, is required for all new signs, including future use and construction
signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield
Municipal Code).
3. Open storage of materials and equipment shall be surrounded and screened with a
solid wall or fence (screening also applies to gates). This fence shall be at least 6 feet
in height and materials shall not be stacked above the height of the fence. (Note:
Fences taller than 6 feet are allowed in commercial and industrial zones but they will
require a building permit).
4. Refuse collection bin enclosures and container areas are subject to all required
structural setback from street frontages, and shall not reduce any parking, loading or
landscaping areas as required by the Zoning Ordinance.
5. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control
District (Regulation VIII) concerning dust suppression during construction of the
project. Methods include, but are not limited to; use of water or chemical
stabilizer/suppressants to control dust emission from disturbed area, stock piles, and
access ways; covering or wetting materials that are transported off-site; limit
construction-related speed to 15 mph on all unpaved areas/washing of construction
SPR# 11-0233 Page 6 of 7
vehicles before they enter public streets to minimize carryout/track out; and cease
grading and earth moving during periods of high winds (20 mph or more).
6. Prior to receiving final building or site occupancy, you must contact the Planning
Division (staff contact noted above) for final inspection and approval of the
landscaping, parking lot, lighting and other related site improvements. Inspections will
not be conducted until all required items have been installed. Any deviations from
the approved plans without prior approval from the Planning Division may result in
reconstruction and delays in obtaining a building or site occupancy.
C. FIRE DEPARTMENT (Staff contact – Dave Weirather 661-326-3706)
1. All access (permanent and temporary) to and around any building under
construction must be at least 20 feet wide, contain no vehicle obstruction, and be
graded to prevent standing water. Barricades must be in place where ditches and
barriers exist in or cross roadways. Emergency vehicle access must always be reliable.
D. PUBLIC WORKS – ENGINEERING (Staff contact – George Gillburg 661-326-3997)
1.If a grading plan is required by the Building Division, building permits will not be issued
until the grading plan is approved by the Public Works Department and the
both
Building Division.
2. If the project generates industrial waste, it shall be subject to the requirements of the
Industrial Waste Ordinance. An industrial waste permit must be obtained from the
Public Works Department before issuance of the building permit. To find out what
type of waste is considered industrial, please contact the Wastewater Treatment
Superintendent at 661-326-3249.
3. Before any building or site can be occupied, the developer must reconstruct or repair
substandard off-site street improvements that front the site to adopted city standards
as directed by the City Engineer. Please call the Construction Superintendent at 661-
326-3049 to schedule a site inspection to find out what improvements may be
required.
4. A transportation impact fee for regional facilities shall be paid at the time a building
permit is issued, or if no building permit is required, before occupancy of the building
or site. This fee will be based at the rate in effect at the time the building permit is
issued. The Public Works Department will calculate an estimate of the total fee when
you submit construction plans for the project.
5. The developer shall form a new maintenance district.
SPR# 11-0233 Page 7 of 7
E. PUBLIC WORKS – SOLID WASTE (Staff contact – John Wilburn 661-326-3114)
1.
You must contact the staff person noted above before building permits can be issued
or work begins on the property to establish the level and type of service necessary for
Collection locations must provide
the collection of refuse and/or recycled materials.
enough containment area for the refuse that is generated without violating required
zoning or setback restrictions (see Planning Division conditions). Levels of service are
based on how often collection occurs as follows:
Cart service -- 1 cubic yard/week or less 1 time per week
Front loader bin services -- 1 cubic yard/week - 12 cubic yards/day
Roll-off compactor service -- More than 12 cubic yards/day
2. Show on the final building plans refuse bin enclosures. Each enclosure shall be
designed according to adopted city standard (Detail #ST25 A and B), at the size
checked below . Before occupancy of the building or site is allowed, two 3 cubic
yard front loading type refuse bin(s) shall be placed within the required enclosure(s).
6' deep x 8' wide (1 bin) 8' deep x 15' wide (3 bins)
8' deep x 10' wide (2 bins) 8' deep x 20' wide (4 bins)
If
NOTE: All measurements above are curb-to-curb dimensions inside the enclosure.
both refuse and recycling containers are to be combined in the same enclosure
area, this area must be expanded in size to accommodate multiple containers/bins
(contact the staff person above for the appropriate enclosure size).
3. Facilities that require infectious waste services shall obtain approval for separate
infectious waste storage areas from the Kern County Health Department. In no
instances shall the refuse bin area be used for infectious waste containment purposes.
4. Facilities that require grease containment must provide a storage location that is
separate from the refuse bin location. This shall be shown on the final building plans.
5. Facilities that participate in recycling operations must provide a location that is
separate from the refuse containment area.
6. Facilities with existing refuse service must improve the service location area(s) to
current adopted city standards (in accordance with Detail #ST25 A and B). These
improvements shall be clearly shown on the final building plans.