September 2, 2011
Bob Easterday
San Joaquin Community Hospital
2615 Chester Avenue
Bakersfield, CA 93301
RE: Notice of Decision – Site Plan Review (Project No. 11-0303)
Dear Mr. Easterday:
The Planning Director, upon recommendation of the Site Plan Review Committee, has
approved your plans for four patient family guest suites on the San Joaquin Community Hospital
campus in a C-2 (Regional Commercial) zone district at 2830 Eye Street.
Your proposal, with corrections as noted, meets the minimum required codes, policies and
standards for development as adopted by the Bakersfield City Council. Specific items have been
identified (see attached Site Plan Compliance List) that you need to resolve before you can obtain
a building permit or be allowed occupancy. These items may include changes or additions that
need to be shown on the final building plans, alert you to specific fees, and/or are comments that
will help you in complying with the city’s development standards. Each item will note when it is to
be completed and they have been grouped by department so that you know who to contact if
you have questions.
Your next step is to either apply for necessary building permits to construct your project, or
begin your business activities depending on the request submitted. You must submit final building
plans to the Building Division. The Site Plan Review Committee will review these final plans while
building plan check occurs to ensure that you satisfy the items in the Site Plan Compliance List.
Please read them carefully. Failure to satisfy an item may delay your obtaining a building permit or
commencing your project.
After construction of your project but before the City can allow occupancy, the Building
Division must inspect the development to find if it complies with the approved plans, and any other
relevant permits and codes. If you have satisfied all of the requirements, the Building Director will
issue a certificate of occupancy; of not, the area inspector will give you a correction notice. Once
you have made all of the corrections, the Building Director can issue a certificate of occupancy.
You may not occupy a development until the Building Director has issued a certificate of
occupancy.
SPR# 11-0303 Page 2 of 9
INDEMNIFICATION CONDITION
In consideration by the City of Bakersfield for land use entitlements, including but not limited to
related environmental approvals related to or arising from this project, the applicant, and/or property
owner and/or subdivider (“Applicant” herein) agrees to indemnify, defend, and hold harmless the City of
Bakersfield, its officers, agents, employees, departments, commissioners or boards (“City ” herein) against
any and all liability, claims, actions, causes of actions or demands whatsoever against them, or any of
them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms
and provisions of this application, including without limitation any CEQA approval or any related
development approvals or conditions whether imposed by the City, or not, except for City’s sole active
negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any decision
by the City related to this project and the obligations of this condition apply regardless of whether
any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action, or proceeding, failing under
this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion,
shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and
expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by
another entity or party.
REVISIONS OF THE APPROVED PLAN
Any time after site plan approval but before the approval expires; you may submit revisions
to the plan. We will treat these revisions as a new site plan application subject to a new review and
required fees. The Planning Director can only approve minor changes to the original plan without a
new application if they are necessary to meet a condition, mitigation, or result from physical
obstacles or other comparable constraints.
EXPIRATION OF PLAN APPROVAL
Approval of this site plan expires on September 1, 2013 (2 years from the decision date),
unless building permits have been issued, or on projects not requiring a building permit, the use has
commenced. The project must be completed within 5 years from the decision date. If the
property is rezoned, site plan approval will expire upon the effective date for the rezoning unless
the use is permitted in the new zone.
The Planning Director may extend the expiration date up to one (1) year if you resubmit new
plans for check against the code requirements in effect at that time and include a written request
for the extension. We must receive this request expiration of the project approval. We will
before
not require a fee for this extension request; however, changes to the plans originally approved for
purposes other than code requirements shall be subject to a new site plan review, including
payment of all required fees.
SPR# 11-0303 Page 3 of 9
ENVIRONMENTAL DETERMINATION
This site plan review has been found to be exempt from the provisions of the California
Environmental Quality Act (CEQA) according to Section 15332. This project is exempt because it is
an infill development that is consistent with the general plan and zoning regulations, is within an
area predominantly developed with urban uses, is not identified as critical habitat for endangered
or threatened species, will not significantly affect traffic noise, air or water quality, and will be
adequately served by appropriate utilities and public services. A Notice of Exemption has been
prepared and is available for review at the Planning Division (see cover sheet for address).
APPEAL
Any person may appeal this decision. An appeal is limited to whether or not an adopted
development standard, zoning regulation, mitigation, or policy applied or not applied to the
project, was done consistent with the authority granted by city ordinances or the California
Environmental Quality Act (CEQA). The appeal must be in writing stating the precise basis or issue
as noted, include a $675 filing fee, and must be filed within of the decision date to the City
10 days
of Bakersfield Planning Commission (c/o Bakersfield Planning Director, 1715 Chester Avenue,
Bakersfield, CA, 93301). The Planning Commission will hold a public hearing on the appeal and
their decision will be final unless their decision is appealed to the City Council.
Site plan approval is based on the statements made in the application and the plans you
submitted. Any errors or omissions on these plans could alter the compliance list and/or void this
decision. If you have questions about any of the items noted in the Site Plan Compliance List, you
must speak to the contact person representing the department requiring that item. If you have
other questions regarding general information about the site plan review process, please contact
the Planning Division at (661) 326-3733.
DECISION DATE: September 2, 2011
Sincerely,
JIM EGGERT, Planning Director
cc: All Interested Agencies – For your records.
rma
S:\BZA_SPR\Forms\spr_data\2011 spr\11-0303,spr,ltr.doc
SPR# 11-0303 Page 4 of 9
CONDITIONS AND ORDINANCE COMPLIANCE
The following are specific items that you need to resolve before you can obtain a
building permit or be allowed occupancy. These items include conditions and/or
mitigation required by previous site entitlement approvals (these will be specifically
noted), changes or additions that need to be shown on the final building plans, alert
you to specific fees, and other conditions for your project to satisfy the City’s
development standards. The item will usually need to be shown on the final building
plans or completed before a building permit is issued. Each has been grouped by
department so that you know whom to contact if you have questions.
A. DEVELOPMENT SERVICES – BUILDING (Staff contact – Steve Ewing 661-326-3677)
1. Prior to review of improvement plans by the City, the developer shall submit a grading
plan for the proposed site to be reviewed and approved by the City Engineer and
Building Official (Bakersfield Municipal Code Section 16.44.010). With the grading
plan, if the project is subject to the provisions of the National Pollutant Discharge
Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the
General Permit to Discharge Storm Water Associated with Construction Activity (WQ
Order No. 99-08-DWQ) must be filed with the State Water Resources Control Board in
Sacramento before the beginning of any construction activity. Compliance with the
general permit requires that a Storm Water Pollution Prevention Plan (SWPPP) be
prepared, continuously carried out, and always be available for public inspection
during normal construction hours.
2. A grading permit is required prior to final plan approval. The developer shall submit 4
copies of grading plans and 2 copies of the preliminary soils report to the Building
Division. A final soils report shall also be submitted to the Building Division before they
can issue a building permit. Please note that grading plans must be consistent with
the final building site plans and landscaping plans. Building permits will not be issued
until the grading permit is approved by the Building Division, Planning Division (HCP),
and Public Works Department.
3. An approved site utilities plan is required prior to final plan approval.
4. The developer shall include fire resistive wall construction details with the final building
plans for all exterior walls of any building that is within the distance as set forth in Table
602 of the California Building Code.
5. Include with or show on the final building plans information necessary to verify that the
project complies with all disability requirements of Title 24 of the California Building
Code.
6. An acoustical consultant, approved by the Building Division, shall be contacted to
prepare and include with the final building plans measure that mitigate noise
exposures for all buildings on the project site that are subject to noise levels of 65 db or
greater as delineated by the CNEL contour maps of the city. These implementation
measures shall comply with the requirements of Title 24 of the California Building
Code.
SPR# 11-0303 Page 5 of 9
7. Residential buildings or structures shall require installation of an automatic fire sprinkler
system.
8. Before the Building Division can allow occupancy of this apartment complex, they
must inspect and approve the placement and colors of the address numbers
identifying each unit and/or building, and on-site building/unit location maps so that
emergency personnel can easily find a specific unit when responding to the site
during an emergency.
9. The Building Division will calculate and collect the appropriate school district impact
fee at the time they issue a building permit.
10. Final Building plans shall show pedestrian access pathways or easements for persons
with disabilities from public rights-of-ways that connect to all accessible buildings,
facilities, elements, and spaces in accordance with the California Building Code.
These pedestrian access ways shall not be parallel to vehicular lanes unless separated
by curbs or railings.
B. DEVELOPMENT SERVICES – PLANNING (Staff contact – Wayne Lawson 661-326-3976)
1.The minimum parking required for this project has been computed based on use and
shall be as follows:
Number Parking Required
Use of Units Ratio Parking
Hospital patient family guest suites 4 0.5 space/suite 2 spaces
(Note: More than two on-street parking spaces exist along the subject property’s 29
th
Street and Eye Street frontages.)
2. The developer shall include a copy of a final landscape plan with each set of the final
building plans submitted to the Building Division. Building permits will not be issued
until the Planning Division has approved the final landscape plan for consistency with
approved site plans and minimum ordinance standards (please refer to the attached
landscaping requirements in Chapter 17.61).
(NOTE: At the time a final site inspection is conducted, it is expected that plants will
match the species identified and be installed in the locations consistent with the
approved landscape plan. Changes made without prior approval of the Planning
staff may result in the removal and/or relocation of installed plant materials and
delays in obtaining building occupancy.)
3. Our records show that the project is contained on more than one parcel (Lot 11 and
a portion of Lot 12, Block 526, City of Bakersfield Tract). These parcels shall be merged
into one parcel because parking must be on the same site as the project (Section
17.58.010B of the B.M.C.), building setbacks cannot be met based on the design
layout, and/or a parcel line bisects a building. A parcel merger or lot line adjustment
application removing or relocating property lines shall be submitted to the Planning
Division before building permits can be issued. Recordation of the map shall occur
SPR# 11-0303 Page 6 of 9
before final building or site occupancy can be granted. If our records are in error and
these parcels have been merged, please provide a copy of the parcel map,
subdivision map, or certificate of compliance showing the property as one parcel.
(Note: An Assessor’s map is not acceptable since it is only for tax purposes and does
not verify legal parcel status).
4. Business identification signs are under this review. A
neither considered nor approved
separate sign permit, reviewed by the Planning and Building Divisions and issued by
the Building Division, is required for all new signs, including future use and construction
signs. Signs must comply with the Sign Ordinance (Chapter 17.60 of the Bakersfield
Municipal Code).
5. Refuse collection bin enclosures and container areas are subject to all required
structural setback from street frontages, and shall not reduce any parking, loading or
landscaping areas as required by the Zoning Ordinance.
6. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control
District (Regulation VIII) concerning dust suppression during construction of the
project. Methods include, but are not limited to; use of water or chemical
stabilizer/suppressants to control dust emission from disturbed area, stock piles, and
access ways; covering or wetting materials that are transported off-site; limit
construction-related speed to 15 mph on all unpaved areas/washing of construction
vehicles before they enter public streets to minimize carryout/track out; and cease
grading and earth moving during periods of high winds (20 mph or more).
7. Prior to receiving final building or site occupancy, you must contact the Planning
Division (staff contact noted above) for final inspection and approval of the
landscaping, parking lot, lighting and other related site improvements. Inspections will
not be conducted until all required items have been installed. Any deviations from
the approved plans without prior approval from the Planning Division may result in
reconstruction and delays in obtaining a building or site occupancy.
8. The proposed use is accessory to San Joaquin Memorial Hospital. If in the future the
suites are proposed to be utilized as residential dwellings, a conditional use permit to
allow a residential use in a commercial zone district will be required.
C. FIRE DEPARTMENT (Staff contact – Dave Weirather 661-326-3706)
1.
Show on the final building plans the following items:
a. All fire hydrants, both offsite (nearest to site) and on-site. Include flow data on
all hydrants. Hydrants shall be in good working condition and are subject to
testing for verification. Fire flow requirements must be met prior to construction
commencing on the project site. Please provide 2 sets of the engineered
water plans to Dave Weirather. (Note: All new fire hydrants must be
purchased from the Fire Department.)
SPR# 11-0303 Page 7 of 9
b. All fire sprinkler and/or stand pipe systems, fire alarms and commercial hood
systems. These suppression systems require review and permits by the Fire
Department. The Fire Department will issue guidelines for these various items as
they may apply to this project.
c. Project address, including suite number if applicable. If the project is within a
shopping or business center, note the name and address of the center.
2. The developer must request an inspection of any underground sprinkler feeds at least
24 hours before they are buried. The Prevention Services Division (1501 Truxtun
Avenue, Bakersfield CA, Ph. 661/326-3979) must complete all on-site inspections of fire
sprinkler systems and fire alarm systems before any building is occupied.
3.All access (permanent and temporary) to and around any building under
construction must be at least 20 feet wide, contain no vehicle obstruction, and be
graded to prevent standing water. Barricades must be in place where ditches and
barriers exist in or cross roadways. Emergency vehicle access must always be reliable.
D. PUBLIC WORKS – ENGINEERING (Staff contact – George Gillburg 661-326-3997)
1. The developer shall construct standard handicap ramps at the southeast corner of
29 and Eye Street and the southwest corner of 29 Street and the alley according to
thth
adopted city standards. These improvements shall be shown on the final building
plans submitted to the Building Division before any building permits will be issued.
2. The developer shall install new connection(s) to the public sewer system. This
connection shall be shown on the final building plans submitted to the Building
Division before any building permits will be issued.
3. If a grading plan is required by the Building Division, building permits will not be issued
until the grading plan is approved by the Public Works Department and the
both
Building Division.
4. Before any building or site can be occupied, the developer must reconstruct or repair
substandard off-site street improvements that front the site to adopted city standards
as directed by the City Engineer. Please call the Construction Superintendent at 661-
326-3049 to schedule a site inspection to find out what improvements may be
required.
5. A street permit from the Public Works Department shall be obtained before any work
can be done within the public right-of-way (streets, alleys, easements). Please
include a copy of this site plan review decision to the department at the time you
apply for this permit.
6. A sewer connection fee shall be paid at the time a building permit is issued. We will
base this fee at the rate in effect at the time a building permit is issued.
7. A transportation impact fee for regional facilities shall be paid at the time a building
permit is issued, or if no building permit is required, before occupancy of the building
SPR# 11-0303 Page 8 of 9
or site. This fee will be based at the rate in effect at the time the building permit is
issued. The Public Works Department will calculate an estimate of the total fee when
you submit construction plans for the project.
8. The developer shall form a new maintenance district.
9. All storm water generated on the project site, including the street frontage shall be
retained onsite unless otherwise allowed by the Public Works Department (please
contact the Public Works Department – Subdivisions at 661-326-3576.
10. This project may be located within a Planned Sewer Area. Please contact the Public
Works Department – Subdivisions at 661-326-3576 to determine what fees may apply.
11. This project may be located within a Planned Drainage Area. Please contact the
Public Department – Subdivisions at 661-326-3576 to determine what fees may apply.
12. This project may be subject to Bridge and Major Thoroughfare fees. Please contact
the Public Works Department – Subdivisions at 661-326-3576 to determine what fees
may apply.
E. PUBLIC WORKS – SOLID WASTE (Staff contact – John Wilburn 661-326-3114)
1.
You must contact the staff person noted above before building permits can be issued
or work begins on the property to establish the level and type of service necessary for
Collection locations must provide
the collection of refuse and/or recycled materials.
enough containment area for the refuse that is generated without violating required
zoning or setback restrictions (see Planning Division conditions). Levels of service are
based on how often collection occurs as follows:
Cart service -- 1 cubic yard/week or less 1 time per week
Front loader bin services -- 1 cubic yard/week - 12 cubic yards/day
Roll-off compactor service -- More than 12 cubic yards/day
2. Show on the final building plans refuse bin enclosures. Each enclosure shall be
designed according to adopted city standard (Detail #ST25 A and B), at the size
checked below . Before occupancy of the building or site is allowed, one 2 cubic
yard front loading type refuse bin shall be placed within the required enclosure.
6' deep x 8' wide (1 bin) 8' deep x 15' wide (3 bins)
8' deep x 10' wide (2 bins) 8' deep x 20' wide (4 bins)
If
NOTE: All measurements above are curb-to-curb dimensions inside the enclosure.
both refuse and recycling containers are to be combined in the same enclosure
area, this area must be expanded in size to accommodate multiple containers/bins
(contact the staff person above for the appropriate enclosure size).
3. Facilities that require infectious waste services shall obtain approval for separate
infectious waste storage areas from the Kern County Health Department. In no
instances shall the refuse bin area be used for infectious waste containment purposes.
SPR# 11-0303 Page 9 of 9
4. Facilities that require grease containment must provide a storage location that is
separate from the refuse bin location. This shall be shown on the final building plans.
5. Facilities that participate in recycling operations must provide a location that is
separate from the refuse containment area.