HomeMy WebLinkAbout10-07, 10-0050RESOLUTION NO. 10 -07
RESOLUTION OF THE BOARD OF ZONING ADJUSTMENT OF THE
CITY OF BAKERSFIELD APPROVING A CONDITIONAL USE PERMIT
TO CONSTRUCT A 1,200 SQUARE FOOT UNMANNED ELECTRICAL
EQUIPMENT BUILDING IN AN R -1 (ONE- FAMILY DWELLING) ZONE
DISTRICT. (FILE NO. 10 -0050)
WHEREAS, Bright House Networks filed an application with the City of Bakersfield Planning
Department requesting a conditional use permit to construct a 1,200 square foot unmanned electrical
equipment building. The proposal is located at 8911 Rockefeller Street and is within an R -1 (One -
Family Dwelling) zone district; and
WHEREAS, the Board of Zoning Adjustment, through its Secretary, set TUESDAY, March 9,
2010, at the hour of 3:00 p.m. in Conference Room A of City Hall North, 1600 Truxtun Avenue,
Bakersfield, California, as the time and place for a public hearing before them on the proposal, and
notice of the public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal
Code; and
WHEREAS, a public hearing was held before the Board of Zoning Adjustment on said date,
and no testimony was received either in support or opposition of the project; and
WHEREAS, the laws and regulations relating to the California Environmental Quality Act
(CEQA) and the City of Bakersfield's CEQA Implementation Procedures have been duly followed by
city staff and the Board of Zoning Adjustment; and
WHEREAS, the above described project is exempt from the requirements of CEQA in
accordance with Section 15061(b)(3); and
WHEREAS, the City of Bakersfield Planning Department (1715 Chester Avenue, Bakersfield,
California) is the custodian of all documents and other materials upon which approval of the
environmental determination is based; and
WHEREAS, the facts presented in the staff report, initial study, and evidence received both in
writing and by verbal testimony at the above referenced public hearing(s), support the findings
contained in this resolution; and
WHEREAS, at the above mentioned public hearing(s), the proposal was heard and all facts,
testimony and evidence was considered by the Board of Zoning Adjustment, and they made the
following findings regarding the proposed project:
All required public notices have been given. Hearing notices regarding the proposed
project were mailed to property owners within 300 feet of the project area and published
in a local newspaper of general circulation 10 days prior to the hearing.
2. The provisions of CEQA and City of Bakersfield CEQA Implementation Procedures
have been followed. Staff determined that the proposed project is exempt from CEQA
under Section 15061(b)(3), because the project does not have the potential to cause a
significant effect on the environment.
3. The proposed use is desirable and essential to the public convenience and welfare
since it will provide cable, phone, and data services for developing areas of southwest
Bakersfield.
4. The proposed use is in harmony with the goals, objectives and policies of the
Metropolitan Bakersfield General Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF ZONING ADJUSTMENT
OF THE CITY OF BAKERSFIELD as follows:
That the above recitals, incorporated herein, are true and correct.
2. That the proposed is a project that it is exempt from CEQA under Section 15061(b)(3).
3. That Conditional Use Permit No. 10 -0050 as described in this resolution, is hereby
approved subject to the conditions of approval and any mitigation measures as
contained in Exhibit "A -1 ".
On a motion by Board Member Lee, the Board of Zoning Adjustment approved this resolution
by the following roll call vote:
AYES: Haynes, Lee
NOES:
ABSENT: Rojas
HEREBY CERTIFY that the foregoing resolution was passed and adopted by the Board of
Zoning Adjustment of the City of Bakersfield at a regular meeting held on the 9th day of March, 2010.
DATED: March 9, 2010
CITY OF BAKERSFIELD
BOARD OF ZONING ADJUSTMENT
dLM&— �I"'442ze4-=
Darnell Haynes, Chair
Q
CONDITIONS OF APPROVAL
Conditional Use Permit No. 10 -0050
I. The applicant's rights granted by this approval are subject to the following provisions:
• The project shall be in accordance with all approved plans, conditions of approval, and other
required permits and approvals. All construction shall comply with applicable building codes.
• All conditions imposed shall be diligently complied with at all times and all construction
authorized or required shall be diligently prosecuted to completion before the premises shall be
used for the purposes applied for under this approval.
• This approval will not be effective until ten (10) days after the date upon which it is granted by
the BZA to allow for appeal to the City Council. Any permit or license for any approval granted
shall not be issued until that effective date.
• This approval shall automatically be null and void two (2) years after the effective date unless
the applicant or successor has actually commenced the rights granted, or if the rights granted
are discontinued for a continuous period of one (1) year or more. This time can be extended
for up to one (1) additional year by the approving body.
• The BZA may initiate revocation of the rights granted if there is good cause, including but not
limited to, failure to comply with conditions of approval, complete construction or exercise the
rights granted, or violation by the owner or tenant of any provision of the Bakersfield Municipal
Code pertaining to the premises for which the approval was granted. The BZA may also
consider under the revocation addition to or modification of any conditions if there is sufficient
cause, including but not limited to, complaints regarding the project or that the conditions are
not adequate for the intended purpose.
• Unless otherwise conditioned, this approval runs with the land and may continue under
successive owners provided all the above mentioned provisions are satisfied
II. The following conditions shall be satisfied as part of the approval of this project:
1. In consideration by the City of Bakersfield for land use entitlements, including but not limited to
related environmental approvals related to or arising from this project, the applicant, and /or
property owner and /or subdivider ( "Applicant" herein) agrees to indemnify, defend, and hold
harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners
or boards ( "City" herein) against any and all liability, claims, actions, causes of action or
demands whatsoever against them, or any of them, before administrative or judicial tribunals of
any kind whatsoever, in any way arising from, the terms and provisions of this application,
including without limitation any CEQA approval or any related development approvals or
conditions whether imposed by the City, or not, except for CITY's sole active negligence or
willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any decision by
the City related to this project and the obligations of this condition apply regardless of whether
any other permits or entitlements are issued.
3
The City will promptly notify Applicant of any such claim, action or proceeding, falling under this
condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion,
shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost
and expense of the Applicant and the City is not obligated to use any law firm or attorney
chosen by another entity or party.
2. This conditional use permit allows for the construction of an approximately 1,200 square foot
unmanned masonry electrical equipment building in an R -1 (One - Family Dwelling) zone district
at 8911 Rockefeller Street. Prior to issuance of a building permit, the proposed building design
and materials shall be approved by the Planning Director to ensure compatibility with existing
and future surrounding development.
3. Security lighting shall be directed downward and shielded to prevent light spillage onto
adjacent properties and public rights -of -way.
4. Signs and advertisement are prohibited, with the exception of required informational signs for
public safety.
III. The following are specific items that you need to resolve before you can obtain a
building permit or be allowed occupancy. These items include conditions and /or
mitigation required by previous site entitlement approvals (these will be specifically
noted), changes or additions that need to be shown on the final building plans, alert you
to specific fees, and other conditions for your project to satisfy the City's development
standards. The item will usually need to be shown on the final building plans or
completed before a building permit is issued. Each has been grouped by department so
that you know whom to contact if you have questions.
A. DEVELOPMENT SERVICES — BUILDING (Staff contact — Mark Fick 661- 326 -3437)
Prior to review of improvement plans by the City, the developer shall submit a grading
plan for the proposed site to be reviewed and approved by the City Engineer and
Building Official (Bakersfield Municipal Code Section 16.44.010). With the grading
plan, if the project is subject to the provisions of the National Pollutant Discharge
Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the
General Permit to Discharge Storm Water Associated with Construction Activity (WQ
Order No. 99- 08 -DWQ) must be filed with the State Water Resources Control Board in
Sacramento before the beginning of any construction activity. Compliance with the
general permit requires that a Storm Water Pollution Prevention Plan (SWPPP) be
prepared, continuously carried out, and always be available for public inspection during
normal construction hours.
2. A grading permit is required prior to final plan approval. The developer shall submit 4
copies of grading plans and 2 copies of the preliminary soils report to the Building
Division. A final soils report shall also be submitted to the Building Division before they
can issue a building permit. Please note that grading plans must be consistent with the
final building site plans and landscaping plans. Building permits will not be issued until
the grading permit is approved by the Building Division, Planning Division (HCP), and
Public Works Department.
H
3. The developer shall include fire resistive wall construction details with the final building
plans for all exterior walls of any building that is within 5 feet of property lines if used for
residential purposes, or if the distance between the exterior walls and the property lines
are within the distances set forth in Table 602 of the 2007 California Building code if
used for commercial or industrial purposes.
4. Include with or show on the final building plans information necessary to verify that the
project complies with all disability requirements of Title 24 of the California Building
Code.
5. The Building Division will calculate and collect the appropriate school district impact fee
at the time they issue a building permit.
6. Final Building plans shall show pedestrian access pathways or easements for persons
with disabilities from public rights -of -ways that connect to all accessible buildings,
facilities, elements, and spaces in accordance with the California Building Code. These
pedestrian access ways shall not be parallel to vehicular lanes unless separated by
curbs or railings.
B. DEVELOPMENT SERVICES — PLANNING (Staff contact — Paul Hellman 661 - 326 -3070)
1. Minimum parking stall dimensions shall be 9 -feet wide by 18 -feet long. Vehicles may
hang over landscape areas no more than 2 -1/2 feet provided required setbacks along
street frontages are maintained, and trees and shrubs are protected from vehicles.
2. All parking lots, driveways, drive aisles, loading areas, and another vehicular access
ways, shall be paved with concrete, asphaltic concrete (A. C.), or other paved street
surfacing material in accordance with the Bakersfield Municipal Code (Sections
15.76.020 and 17.58.060 A.).
3. The developer shall include a copy of a final landscape plan with each set of the final
building plans submitted to the Building Division. Building permits will not be issued
until the Planning Division has approved the final landscape plan for consistency with
approved site plans and minimum ordinance standards (please refer to the attached
landscaping requirements in Chapter 17.61).
(NOTE: At the time a final site inspection is conducted, it is expected that plants
will match the species identified and be installed in the locations consistent with
the approved landscape plan. Changes made without prior approval of the
Planning staff may result in the removal and /or relocation of installed plant
materials and delays in obtaining building occupancy.)
4. A solid masonry wall shall be constructed along the western property boundary. This
wall shall be constructed a minimum height of 6 feet as measured from the highest
adjacent finished property grade.
5. Rooftop areas of commercial buildings (e.g., office, retail, restaurant, assembly, hotel,
hospital, church, school), and industrial buildings adjacent to residentially zoned
properties, shall be completely screened by parapets or other finished architectural
features constructed to a height of the highest equipment, unfinished structural element
9
or unfinished architectural feature of the building.
6. Open storage of materials and equipment shall be surrounded and screened with a
solid wall or fence (screening also applies to gates). This fence shall be at least 6 feet
in height and materials shall not be stacked above the height of the fence. (Note:
Fences taller than 6 feet are allowed in commercial and industrial zones but they will
require a building permit).
7. Areas used for outside storage, shall be treated with a permanent dust binder or other
permanent dust control measure consistent with the regulations of the San Joaquin
Valley Air Pollution Control District. (Note: All passenger vehicle - parking areas must
be paved).
8. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control
District (Regulation VIII) concerning dust suppression during construction of the project.
Methods include, but are not limited to; use of water or chemical
stabilizer /suppressants to control dust emission from disturbed area, stock piles, and
access ways; covering or wetting materials that are transported off -site; limit
construction - related speed to 15 mph on all unpaved areas /washing of construction
vehicles before they enter public streets to minimize carryout/track out; and cease
grading and earth moving during periods of high winds (20 mph or more).
9. Prior to receiving final building or site occupancy, you must contact the Planning
Division (staff contact noted above) for final inspection and approval of the landscaping,
parking lot, lighting and other related site improvements. Inspections will not be
conducted until all required items have been installed. Any deviations from the
approved plans without prior approval from the Planning Division may result in
reconstruction and delays in obtaining a building or site occupancy.
C. FIRE DEPARTMENT (Staff contact — Dave Weirather 661- 326 -3706)
Show on the final building plans the following items:
a. All fire hydrants, both offsite (nearest to site) and on -site. Include flow data on
all hydrants. Hydrants shall be in good working condition and are subject to
testing for verification. Fire flow requirements must be met prior to construction
commencing on the project site. Please provide 2 sets of the engineered water
plans to Dave Weirather. (Note: All new fire hydrants must be purchased from
the Fire Department.)
2. The developer shall show on the final building plans a minimum 20 -foot wide all -
weather emergency access with an overhead clearance of 13 feet 6 inches within 150
feet of all buildings on the project site. The Fire Department must approve the final
location and design of the access prior to building permits being issued. This access
shall be constructed before building occupancy will be granted.
3. All access (permanent and temporary) to and around any building under construction
must be at least 20 feet wide, contain no vehicle obstruction, and be graded to prevent
standing water. Barricades must be in place where ditches and barriers exist in or
cross roadways. Emergency vehicle access must always be reliable.
R
4. If you handle hazardous materials or hazardous waste on the site, the Prevention
Services Division may require a hazardous material management and /or risk
management plan before you can begin operations. Please contact them at 661 -326-
3979 for further information.
5. If you treat hazardous waste on the site, the Prevention Services Division may require a
hazardous waste "Tiered" permit before you can begin operations. Please contact
them at 661- 326 -3979 for further information.
6. If you store hazardous materials on the site in either an underground or a permanent
aboveground storage tank, a permit from the Prevention Services Division is required to
install and operate these tanks. The Prevention Services Division may also require a
Spill Prevention Control and Countermeasure Plan for storage of petroleum products
above ground in quantities of 1,320 gallons or more. Please contact them a t 661 -326-
3979 for further information.
D. PUBLIC WORKS — ENGINEERING (Staff contact — George Gillburg 661 -326 -3997)
The developer shall construct curbs, gutters, cross gutters, 5 -foot 6 -inch wide
sidewalks, and street/alley paving along Rockefeller Street according to adopted city
standards. These improvements shall be shown on the final building plans submitted to
the Building Division before any building permits will be issued.
2. All on -site areas required to be paved (ie. Parking lots, access drives, loading areas,
etc.) shall consist of concrete, asphaltic concrete (Type B. A. C.) or other paved street
material approved by the City Engineer. Pavement shall be a minimum thickness of 2
inches over 3 inches of approved base material (ie. Class II A. B.). This paving
standard shall be noted on the final building plans submitted to the Building Division
before any building permits will be issued.
3. If a grading plan is required by the Building Division, building permits will not be issued
until the grading plan is approved by both the Public Works Department and the
Building Division.
4. Before any building or site can be occupied, the developer must reconstruct or repair
substandard off -site street improvements that front the site to adopted city standards as
directed by the City Engineer. Please call the Construction Superintendent at 661 -326-
3049 to schedule a site inspection to find out what improvements may be required.
5. A street permit from the Public Works Department shall be obtained before any work
can be done within the public right -of -way (streets, alleys, easements). Please include
a copy of this site plan review decision to the department at the time you apply for this
permit.
6. A transportation impact fee for regional facilities shall be paid at the time a building
permit is issued, or if no building permit is required, before occupancy of the building or
site. This fee will be based at the rate in effect at the time the building permit is issued.
The Public Works Department will calculate an estimate of the total fee when you
submit construction plans for the project.
7. The developer shall form a new maintenance district.
7
8. All storm water generated on the project site, including the street frontage shall be
retained onsite unless otherwise allowed by the Public Works Department (please
contact the Public Works Department — Subdivisions at 661- 326 -3576.
E. PUBLIC WORKS — TRAFFIC (Staff contact — George Gillburg 661- 326 -3997)
1. Show on the final building plans a 26 -foot wide (top -to -top) drive approach. Drive
approaches must be centered on drive aisles. All dimensions shall be shown on the
final building plans.
2. Show the typical parking stall dimension on the final building plans (minimum stall size
is 9 feet x 18 feet).
0
LO
0
0
I
0
75
ry
W
0-
fW
v
D
Z
0
Q
Z
0
U
GVON71V& 13SNnS
i J
w 21(I 31VE) ANVOW 3 -'
�o n W
z
J
Q
Q
Z
a
m
N
O
O �
O O
N �
W
I-
N
ry
Z -° LT O7
O
M
H
0
C?
Z>
MA SS32iJOW
CONDITIONAL USE PERMIT NO. 10 -0050
SITE PLAN - C
BRIGHTHOUSE NETWORKS - ROCKEFELLER COURT HUB
MILAZZO I ASSOCIATES 8487.0100 03- -04 -10