Loading...
HomeMy WebLinkAboutBUSINESS PLAN 4/11 Work Order: 3183011 111111113 61 IE NEW San Joaquin Valley HEALTHY LIVING AIR POLLUTION CONTROL DISTRICT E.O. VR-201/202 Healy Clean Air Separator Static Pressure Performance Test Report Form Permit Number:S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date City:BAKERSFIELD Zip:93307 District:SJV-0012 01-22-12 Date/Time of Test:04-26-11 0900 Franklin(Healy):0874053702 10-1-12 TEST INFORMATION Calibration date for digital manometer(must be within 180 days of the test) 3-10-11 Ending value for digital manometer drift test(must be 0.01 in.w.c.or less) 0.00 VACUUM TEST Vacuum at start of test,inches of water column(in.w.c.) -3.00 Vacuum at one minute,in_w.c. -2.99 Vacuum at two minutes,in.w.c. -2.99 Vacuum at three minutes,in.w.c. -2.98 Vacuum at four minutes,in.w.c. -2.99 Final vacuum at five minute,in.w.c. -3.00 Allowable minimum vacuum,in w.c.(from shaded area below) -1.50 Allowable 5-Minute Vacuum Decay for Clean Air Separator Vacuum at start of test, 8.0 7.0 6.0 5.0 4.0 3.0 2.0 in,w.c. Mmtmum vacuum after 5.5 4.7 3.8 3.0 2.2 1.5 0.8 five Min.,in.W.C. POSITIVE PRESSURE TEST Nitrogen introduction flow rate(must be between 2 and 4 CFM) NA' Pressure at start of test,in.w.c. NA Pressure at one minute,in w.c. NA Pressure at two minutes,in.w.c. NA Pressure at three minutes,in.w.c. NA Pressure at four minutes,in.w.c. NA Final pressure at five minute,in.w.c. NA Allowable minimum pressure,in.w.c. 1.77 1 declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry,the statements and information provided in this document are true,accurate,and complete. Signature of Technician: Date: y- z 6- 1 Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 IIIIIIIIVIIIIIIIIII 62 1 E Work Order: 3183011 Exhibit 8 Required Items in Conducting TP-201.3 (Executive Orders VR-201-E and VR-202-E) The instructions below are required when conducting TP-201.3 for these systems. The tester shall document that each step was followed as indicated below and shall include this page of the Exhibit with the submission of TP-201.3 test results. Note that districts may require use of an alternate form to meet these requirements, provided the alternate form includes the same minimum parameters. 1. Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air Separator(CAS)shall be closed,as shown in Figure 1 or Figure 1 H, to isolate it from the Underground Storage Tank(UST)system to permit the pressurization of the UST system. Figure 1 applies to vertical CAS installations and Figure 1 H applies to horizontal CAS installations. 2. Conducting TP-201.3 with any dispenser piping test valve in the closed position is not permitted. Any dispenser with a dispenser piping test valve in the closed position while conducting TP-201.3 will bias the test towards compliance. 3. After conducting TP-201.3, the four ball valves on the Healy Clean Air Separator (CAS)shall be locked in their normal operating positions as shown in Figure 213-2 or 26-2H, Exhibit 2 of Executive Orders VR-201-E and VR-202-E. Figure 2B-2 applies to vertical CAS installations and Figure 213-2H applies to horizontal CAS installations. Required Steps Verification (please circle) 1.All four CAS ball valves closed before conducting TP-201.3 Ye 'No 2.All dispenser piping test valves open before conducting Yes No TP-201.3 3.All four CAS ball valves in normal operating positions after conducting TP-201.3. Yes No Test Company: Facility Name: -.31551 z o (Iei O - Z b t f Print Name (Technician) ignature Date 6S'7 °105570Z tc (- ' Z Technician Certification Number and Expiration Date (ICC or District Training Certification, as applicable) Items Required in Conducting TP-201.3, Exhibit 8—Executive Orders VR-201-E and VR-202-E Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 ban rAAMA � VaHey � �L i V I t G" AIR POLLUTION CONTROL DISTRICT TP 2013 UST Static Pressure Performance Test Report Form Permit Number:S-3735-1-3 Test Company:TANKNOLOGY Site Name:CHWVRON#355920 Technician:MARK AYUSO Site Address:10 UNION AVE Certification Number Expiration Date City BAKERSFrF►.n Zip:93307 District:SJV 0012 01-22-12 Date/Time of Test 04-26-11 0900 TEST INFORMATION Total number of nozzles: 12 Are the tanks mandolded? ®Yes ❑No Phase I vapor recovery system executive order.(as referenced on Permit to Operate) VR 102 Phase LI vapor recovery system executive order(as referenced on Permit to Operate) VR 202 Nitrogen introduction point ©Phase I vapor coupler ❑Phase lI vapor riser Pressure measuring device ❑incline manometer px digital manometer ❑mechanical gauge Calibration date for pressure measuring device(must be within 90 days of the test) 03-10-11 Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c.or less) 0.00 Initial tank ullage pressure(vent if over 0.5 in.w.c.) -6.55 Nitrogen introduction flow rate,F(must be between 1 and 5 CFM) 3 Calculated ullage fill-time t2(t2=V/1522 x F) 1.35 Actual fill-time 1.10 Number of hoses with over 100 ml(balance hoses must be drained prior to testing) NA TANK INFORMATION Tank No. 1 2 3 4 ALL Product grade unleaded premium Actual tank capacity(gallons) 19703 10369 Gasoline volume(gallons) 15477 7294 Ullage,V(gallons) 4226 3075 If tanks are not mamfolded,number of nozzles NA NA 2 IN.W.C.STATIC PRESSURE TEST Test No. 1 2 3 4 5 Start time 1000 Initial Pressure,inches of water cohmm(in.w.c.) 2.00 Pressure at one minute,in.w.c. 1.99 Pressure at two minutes,in.w.c. 1.99 Pressure at three minutes,in w.c. 1.98 Pressure at four minutes,in.w.c. 2.00 Pressure at five minutes,in.w.c. 2.00 Allowable minimum pressure,in.w.c. 1.86 Pass/Fail(enter"GF°for gross failure) PASS I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements c!irrfaatlon provided in this document are true,accurate,and complete. Signature of Technician: Date: y—Z6 Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Mom Joaquin Valley H ; iHY LIV It!G AIR POLLUTION CONTROL DISTRICT TP-201.1 C/D Leak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill Protection Devices and Spill Container Drain Valves Report Form X Permit Number:S-3725-1-3 Test Company:TANKNOLOGY 1 Site Name:CHEVRON#355929 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date Ci :BAKERSFIELD Zip:93307 District:SJV-0012 01-22-12 0 Datet7ime of Test:04-26-11 0900 ° *k DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTERGTTY TEST ❑x Straight Drop Tube' ❑Drop Tube with an Overfill Protection Device' j Pressure measuring device p digital manometer ❑ mechanical gauge Calibration date for pressure measuring device(must be within 180 days of the test) 03-10-11 0 Ending value for digital manometer drift test if applicable(must be 0.01 in,w.c.or less) 0.00 Drop Tube Drain Valve Pressure Test: Drop Tube Overfill Device Pressure Test: z Flow rate 80 mL*in Flow rate 200 ml/ndn "Corrected"Overfill Device Leak Rate o 0 Time to reach 2 is Drain valve Final Time to reach 2 in. Overfill Final Overfill Minus Equals ° w.c.at 80 ml/min leak rate' pressure w.c.at 200 ml/min leak rate' pressure Device Drain Valve Corrected ci Leak Rate Leak Rate Leak Rate Tank Grade rains. ml/min in.w.c. mins. ml/min in.w.c. mUmin ml/min mUmin 1 91 9 SEC 0.10 2.00 0 2 87 8 SEC 0.00 2.00 0 3 4 F" NOTES: A straight drop tube must be tested with a bladder in place and using a flow rate of 80 mUmin. 'The bladder section of TP-201AD may be skipped if the entire drop tube passes with a leak rate below 80 mUmin. 'Leak rate=nitrogen flow rate needed to maintain a constant pressure(at least 2 in.w.c.)for 30 seconds. m M 1 declare, under penalty of perjury under the laws of the state of California that based on information and beliefformed after reasonable inquiry, the statements and information provided in this; rent are true,accurate,and complete. Signature of Technician: Date: -Z-6- I/ a� b O 0 3 ' Work Order: 3183011 hawii"n� ll 1 AIR POLLUTION CONTROL DISTRICT TP-201.0 Static Torque of Rotatable Phase I Adaptors Report Form Permit Number.S-2725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Technician:MARL AYUSO Site Address: 10 UNION AVE Certification Number E 'ration Date City:BAKERSFMW Zip:93307 District:SJV-0012 01-22-12 Date/rune of Test:04-26-11 0900 TEST INFORMATION Mearnre_mentunits: ®pound-inch ❑pound-foot Vapor Adaptor I Vapor Adaptor 2 Vapor Adaptor 3 Vapor Adaptor 4 Brand:PHILTITE Brand:PHILTITE Brand: Brand: Model:SW-101B Model:SWV-101B Model: Model: Product grade:91 Product grade:87 Product grade: Product grade: Torque 1:30 Torque 1: 10 Torque 1: Torque 1: Torque 2:30 Torque 2: 10 Torque 2: Torque 2: Torque 3:30 Torque 3: 10 Torque 3: Torque 3: Average:30 Average:10 Average: Average: 360°rotation:Yes❑x No❑ 360°rotation:Yes©No❑ 360°rotation:Yes❑No❑ 360°rotation:Yes❑No❑ Product Adaptor 1 Product Adaptor 2 Product Adaptor 3 Product Adaptor 4 Brand:PHMTITE Brand:PHILTI77E Brand: Brand: Model:SWF-100B Model:SWF-100B Model: Model: Product grade:91 Product grade:87 Product grade: Product grade: Torque 1:15 Torque 1:20 Torque 1: Torque 1: Torque 2:15 Torque 2:25 Torque 2: Torque 2: Torque 3:15 Torque 3:20 Torque 3: Torque 3: Average: 15 Average:21.6 Average: Average: 360°rotation:Yes®No❑ 360°rotation:Yes©No❑ 3600 rotation:Yes❑No❑ 360°rotation:Yes❑No❑ I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and information provided in this document are true,accurate,and complete. Signature of Technician: Date: Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 ban i0 n VaHey HEAUHMY 11 11V«NU AIR POLLUTION CONTROL DISTRICT E.O. VR-201/202 Healy Dispenser Vapor Line Integrity Test Report Form Permit Number:S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON 4 355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date City:BAKERSFW-LD r Zip:93307 District:SJV-0012 01-22-12 DaWrime of Test:04-26-11 0900 Franklin(Healy):0874053702 10-1-12 DISPENSER VAPOR LM INTEGRITY TEST Initial Vacuum After Final Vacuum After 60 Pass/Fail Dispenser# Closing the Ball Valve seconds(in. H2O) (vacuum reading cannot fall (in- H2O) more than 4 m.H2O) 1/2 94 94 PASS 3/4 94 94 PASS 5/6 88 98 PASS 7/8 80 so PASS 9/10 90 90 PASS 11/12 86 96 PASS I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry,the statements and information vided in this document are true,accurate,and complete. Signature of Technician: i 14d Date: L-26 —/ t Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 rSan Jon-auin VaHey .IR POLLUTION CONTROL DISTRICT TP-201.4 Dynamic Back Pressure Test Report Form Permit Number:S-3735-1-3 Test Company:TANKNOLOGY Site Name:CBEVRON#355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date City:BAKERSFIE D Zip:93307 District:SJV-0012 01-22-12 Date/Time of Test:04-26-11 0900 TEST INFORMATION Phase II vapor recovery system executive order(as referenced on Permit to Operate) VR 202 Pressure measuring device ©digital manometer ❑mechanical gauge Calibration date for pressure measuring device(must be within 90 days of the test) 03-10-11 Ending value for digital manometer drift test if applicable(must be 0.01 in.w.c.or less) 0.00 Pass/Fail Back pressure test assembly leak check(must decay<0.2 in.w.c.in 5 min.at 50%of the scale of the PASS assembly's highest range) BACK PRESSURE LEMM(in,w.c.)BY EXECUTIVE ORDER FOR PRE-PHASE H EVR SYSTEMS G-70-52(balance for AST&UST)&G-70-139(Hirt VCS-200) 0.15 @ 20 CFH 0.45 @ 60 CFH 0.95 @ 100 CFH G-70-177&181(Hirt VCS400) 0.50 @ 60 CFH G-70-191(Healy ORVR) 0.50 @ 60 CFH BACK PRESSURE LIMITS(in.w.c.)BY EXECUTIVE ORDER FOR PHASE 11 EVR SYSTEMS VR-201&202(Healy Phase R EVR) 0.50 @ 60 CFH VR-203(VST balance Phase II EVR) 0.35 @ 60 CFH I 0.62 @ 80 CFH Nozzle Nu Fuel Grade 20 CFH 60 CFH 80 CFH 100 CFH mbe r 1/2 under disp 0.12 3/4 under disp 0.10 5/6 under disp 0.12 7/8 under disp 0.12 9/10 under disp 0.12 11/12 under disp 0.13 I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements information provided in this document are true,accurate,and complete. IL Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 REV � San Joaquin Valley 11,ri11-1HY L.IVING AID POLLUTION CONTROL DISTRICT E.O. VR-201/202 Vapor-to-Liquid (V/L) Volume Ratio Test Report Form kn tl- 00 Permit Number:S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date Ea: City:BAKERSFIELD Zip:93307 District:SIV-001 01-22-12 Date/Time of Test:04-26-11 0900 Franklin(Healy):0874053702 10-01-12 Q TEST INFORMATION °° Gas volume meter type(i.e.,Roots meter or Tri-Tester) Tri-Tester Gas volume meter serial or identification number: 0744079 Tri-Tester software version,if applicable(must be version 2.01) 2.01 W Calibration date for Gas volume meter(must be within 180 days of the test) 12-22-10 U Gas volume meter correction factor,y(Roots meter) Tri-Tester .4 Pre-test leak check for Roots meter: itial pressure: 0 sec.pressure: I Pre-test leak check for Tri-tester: e-inflate in 30 sec.❑Yes®No Post-test leak check for Roots meter: Vhitial pressure: P0 sec.pressure: Post-test leak check for Tri-tester: -inflate in 30 sec.❑Yes xQ No Z ° Initial Final ° Total Gas Initial Meter Final Meter Nozzle Fuel Nozzle Model& Dispenser Dispenser Dispensed Time Dispensing Reading(ft'), Reading V/L Pass/Fail Number Grade Serial No. Reading Reading (�) (sec) Rate(gal.) V; (ft'),V (P� G. (gal.),Gr r 1 87 4505014 2.043 9.04 1,13 P 1 89 2.079 8.88 1.14 P o 1 91 2.034 8.67 1.11 P 2 87 45080272 2.026 9.04 1.11 P 2 89 2.023 7.46 1.14 P H 2 91 2.029 8,98 1.11 P 3 87 30081094 2.025 8.67 1.09 P rn 3 89 2.028 1 7,77 1.08 P 00 (n I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and information provided in this do enI are true,accurate,and complete. Signature of Technician: _ Z141 t✓ti Date: 24, a� b O 0 Initial Final Total Gas Initial Meter Final Meter Nozzle Fuel Nozzle Model& Dispenser Dispenser Dispensed Time Dispensing Reading(ft'), Reading y/L Pass/Fail Number Grade Serial No. Reading Reading (sec) Rate(gal.) (P/F) (gal.),G; l.),Gr (gal.) V; (ft'),Vr 3 91 2.032 9.74 1.02 P 4 87 30081007 2.017 9.32 1.07 P 4 89 2.027 1 7.81 1.10 P 4 91 2.036 8.88 1.07 P 5 87 03081771 2.039 9.09 1.06 P rn 5 89 2.054 7.32 1.08 P 5 91 2.047 9.43 1.02 P 6 87 43080733 2.027 9.49 1.01 P 6 89 2.059 9.74 1.00 P axi 6 91 2.052 8.15 1.06 P F" 7 87 2505100 2.043 9.32 1.09 P 7 89 2.043 7.58 1.05 P 7 91 2.041 9.26 1.03 P 8 87 42081901 2,055 . 9.09 1.07 P ° 0 8 89 2.050 8.29 1.06 P 4t 8 91 2.032 9.20 1.02 P 9 87 36080029 2.064 8.72 1.15 P o. 9 89 2.029 6.91 1.13 P W 9 91 2.034 8.52 1.05 P Cc 10 87 30080013 2.041 8.88 1.07 P o 10 89 2.038 6.47 0.98 P 10 91 2.020 8.62 1.02 P Z 11 87 19081000 2.020 9.32 1.05 P o 11 89 2.011 7.85 1.04 P °o 11 87 2.029 8.82 1.05 P 12 87 2306141 2.010 1 9.55 1.09 P 12 89 2.022 7.61 1.04 P 12 91 2.010 9.04 1.05 P o 0 NOTE: The V/L ratio shall be 0.95 to 1.15,measured at a flow rate between 6.0-10.0 gpm. Any fueling point whose VIL ratio is determined to be at or below H 0.80 shall be deemed defective and removed from service. r°n I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the 00 statements and information provided in thisfloc+ t are true,accurate,and complete. rn Signature of Technician: Date: 1/- 2 l f w a� -b O .x . 0 Work Order: 3183011 ban Jodoqulon VaHey E ALT H Y t lei=. AIR POLLUTION CONTROL DISTRICT E.O.VR-202 Veeder-Root In-Station Diagnostics Vapor Flow Meter Operability Test Report Form Permit Number.S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Tecbracian:MARK AYUSO Site Address:10 UNION AVE Certification Number Expiration Date City:BAKERSFIELD Zip:93307 District:SJV-0012 01-22-12 Date/Time of Test 04-26-11 0900 1 Veeder Root:0874053702 10-01-12 VAPOR FLOW METER OPERABILITY TEST Vapor flow meter serial number 22220 22220 Dispenser fueling point numbers FP:1 FP:2 Low grade V/L result#1 1.13 1.11 ISD A/L value#1 1.21 1.12 Difference between V/L result 41 and AIL value#1(V/L—AIL) 0.08 0.01 Pass/Fail(Pass=difference within±0.15),if fail continue PASS PASS Low grade V/L result#2 Low grade V/L result#3 Average of 3 V/L results ISD A/L value#2 ISD AIL value#3 Average of 3 ISD A/L results Difference between Average V/L and Average A/L values(A V/L—Avers AIL) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry,the statements and''n n provided in this document are true,accurate,and complete. Signature of Technician: Date: l�-'z� i i i I Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 VAPOR FLOW METER OPERABILITY TEST Vapor flow meter serial number 13044 13044 Dis user fueling 22mt numbers FP:3 FP:4 Low grade V/L result#1 1.09 1.07 ISD AIL value#1 1.08 1.12 Difference between V/L result#1 and A/L value#1(V/L—A/L) 0.01 0.05 Pass/Fail(Pass=difference within±0.15),if fail continue PASS PASS Low grade V/L result#2 Low grade V/L result 43 Average of 3 V/L results ISD A/L value#2 ISD A/L value#3 Average of 3 ISD A/L results Difference between Average V/L and Average A/L values(Averse V/L—Average AIL) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser VAPOR FLOW METER OPERABIIdTY TEST Vapor flow meter serial number 22232 22232 Dis r fueling point numbers FP:5 FP:6 Low grade V/L result#1 1.06 1.01 ISD A/L value#1 1.02 1.07 Difference between V/L result 91 and A/L value#1(V/L—A/L) 0.04 0.06 Pass/Fail(Pass=difference wahin±0.15),if fail continue PASS PASS Low grade V/L result#2 Low grade V/L result#3 Average of 3 V/L results ISD A/L value#2 ISD A/L value#3 Average of 3 ISD A/L results Difference between Average V/L and Average A/L values(Average V/L—Average A/L) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and information provided in this document are true,accurate,and complete. Signature of Technician: Date: 41 Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 f--Aan JoaqUl3n Valley q AIR POLLUTION CONTROL DISTRICT E.O.VR-202 Veeder-Root In-Station Diagnostics Vapor Flow Meter Operability Test Report Form Permit Number:S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date City:BAKERSF)ELD Zip:93308 District:SJV-0012 01-22-12 Date/Time of Test:04-16-11 0900 Veeder-Root:0874053702 10-01-12 VAPOR FLOW METER OPERABILITY TEST Vapor flow meter serial number 22067 22067 Di user fueling point numbers FP:7 FP:8 Low grade V2 result 41 1.09 1.07 ISD A/L value#1 1.09 1.10 Difference between V/L result#1 and AIL value 41(V/L—A/L) 0.00 0.03 Pass/Fail(Pass=difference within f0.15),if fail continue PASS PASS Low grade V/L result#2 Low grade V/L result#3 Average of 3 V/L results ISD AIL value#2 ISD A/L value#3 Average of 3 ISD A/L results Difference between Average VIL and Average A/L values(Avers V/L—Average A/L) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser I declare, under penalty ofpe6ury under the laws of the state of California that based on information and belief formed after reasonable inquiry, the statements and information provided in this document are true,accurate,and complete. Signature of Technician: 1, Date: y-2.6- t/ Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 VAPOR FLOW METER OPERABILITY TEST Vapor flow meter serial number 22247 22247 Dispenser fueling point numbers FP:9 FP:10 Low grade V/L result#1 1.15 1.07 ISD AIL value#1 1.04 1.09 Difference between V/L result#1 and A/L,value#I(V/L—A/L) 0.11 0.02 Pass/Fail(Pass=difference within f0.15),if fail continue PASS PASS Low grade V/L result 42 Low grade V/L result#3 Average of 3 V/L results ISD AIL value 42 ISD A/L value#3 Average of 3 ISD A/L results Difference between Average V/L and Average A/L values(Average V/L—Average A/L) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser VAPOR FLOW METER OPERABILITY TEST Vapor flow meter serial number 22136 22136 Dispenser fueling point numbers FP: 11 FP:12 Low grade V/L result#1 1.05 1.09 ISD A/L value#1 1.13 0.89 Difference between V/L result#1 and A/L value#1(V/L—A/L) 0.08 0.20 Pass/Fail(Pass=difference within A.15),if fail continue PASS FAIL Low grade V/L result#2 Low grade V/L result#3 Average of 3 V/L results ISD A/L value#2 ISD AIL value#3 Average of 3 ISD AIL results Difference between Average V/L and Average A/L values(Average V/L—Average A/L) Pass/Fail(Pass=difference within±0.15) If fail,repeat steps for the second fueling point on the dispenser 1 declare, under penalty ofperjury under the laws of the state of California that based on information and belief formed after reasonable inquiry,the statements and information provided in this document are true,accurate,and complete. Signature of Technician: Date: 1/— 2 6- // Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 "Az ban haquin v �HY AIR POLLUTION CONTROL DISTRICT E.O.VR-202 Veeder-Root In-Station Diagnostics Vapor Pressure Sensor Reference Test& Site Shutdown Test Report Form Permit Number:S-3725-1-3 Test Company:TANKNOLOGY Site Name:CHEVRON#355920 Technician:MARK AYUSO Site Address: 10 UNION AVE Certification Number Expiration Date City:BAKERSFIELD Zip:93307 District:SJV-0012 01-22-12 Date/Time of Test:04-26-11 0900 Veeder-Root:0874053702 10-01-12 VAPOR PRESSURE SENSOR UST PRESSURE TEST Calibration date for digital manometer(must be within 12 months of the test) 03-10-11 Ending value for digital manometer drift test(must be 0.01 in.w.c.or less) 0.00 Digital manometer ullage pressure,inches of water column(in.w.c.) 2.00 TLS console pressure sensor value,inches of water column(in.w.c.) 1.96 Is pressure value between-0.20 and+0.20 in.w.c.? YES VAPOR PRESSURE SENSOR AMBIENT REFERENCE TESTi2 Pressure sensor located at dispenser number(s) 3/4 Pressure sensor number 4497 Non-calibrated pressure sensor value,inches of water column(in.w.c.) -0.042 Is pressure value between-0.20 and+0.20 in.w.c.? YES SITE SHUTDOWN TEST' Test Parameter Test Result(Y/1) Was power removed from the TLS-350 console? Y Was power to the submersible pump(s)removed by file TLS-350? Y Was power restored to TLS-350 console? Y COMMENTS(Include Description of Repairs Made) NOTES: Valve must be returned to normal operating position after testing is completed. 'The ambient refertmce port cap must be in place after testing is completed. 'A certified Veeder-Root technician must perform this test I declare, under penalty of perjury under the laws of the state of California that based on information and belief formed after reasonable inquiry,the statements and information provided in this document are true,accurate,and complete. Signature of Technician: Date: y-Z 6— 1/ Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 VR-201-C and VR-202-C - Quarterly Inspection and Testing Checklist Checklist results may be used to assist with filling out GDF maintenance log. Date: y-z6 // Page I of 3 ch Weekly vP1000 Product Clean Air Separator � Dispenser Unihose or Fuel Grade Inspection Dispensing Fuel Grade Tested Number (circle one) Complete Inspection Rate(gallons (circle one) Configuration (circle one) (circle one) per minute) (see figure on back) a� H nihose 87 89 91 Other Yes No Pas Fail 9.p�/ gpm 89 91 Other_ Valve Circle One A nihose 87 89 91 Other Ye No Pas Fail gpm 87 8 91 Other A Open Closed Q / nihose 87 89 91 Other Y No Pas Fail J�7 gpm 87 89 9 Other 8 Open Closed o 0 v-� 2 §t-Si-11 87 89 91 Other Ye No a Fail d gpm 87 89 91 Other C Open Clo tn 2 niho 87 89 91 Other` Ye No Pa Fail c� gpm 87 91 Other D Open Closed Z niho 87 89 91 Other r_ Yes No Pa Fail �S gpm 87 89 9 Other- 3, nihose 87 89 91 Other_ Ye No NPa's Fail 7 gpm 7 89 91 OtFier_ Plug ircle One 3 Unihos 67 89 91 Other Yes No Fail 7�7 gpm 87 89 91 Other_ E In I Missing Z nih 87 89 91 Other es No Fail' 7th gpm 87 89 9 Other F Install Missing o 0 Uniho 87 89 91 Other e No Fail �2 gpm g7 89 91 Other y Unihos 87 89 91 Other a No P Fail 7�t gpm 87 9 91 Other S [( Unihos 87 89 91 Other a No Pas Fail g gpm 87 89 9 Other o 5 Unihose,87 89 91 Other_ Y No Pas Fail 0 gpm 89 91 Other„ 0 S Unihos 87 89 91 Other Ye No Pa Fail .3Z gpm 87 91 Other. H Uni 87 89 91 Other Y No Pass Fail y3 gpm 87 8 91 Other_ o _ Unihose 87 89 91 Other Yes No Pass Fail gpm 8789 91 Other- co en b w O 0 3 i VR-201-C and VR-202-C - Quarterly Inspection and Testing Checklist Checklist results may be used to assist with filling out GDF maintenance log. Date: 4-2 G- rI Page L of 3 Weekly VP1000 Product Clean Air Separator 0000 Dispenser Unihose or Fuel Grade Inspection Dispensing Fuel Grade Tested Inspection Configuration Number (circle one) Complete Rate(gallons (circle one) (circle one) (circle one) per minute) (see figure on back) F nihose 7 89 91 Other_ QeP Noss Fail 9 gpm 8 89 91 Other_ Valve Circle One ihose 7 89 91 Other_ No Fail 7th gpm 87 8 91 Other A Open -Closed ihose 87 89 91 Other Y No as Fail gpm 87 89 9 Other B Open Ct C kn 7 nihos 87 89 91 Other CYeo No a�Fail 9-32 gpm 7 89 91 Other C Open Closed -7 nihos 87 89 91'Other Y No ' Fail 7 rS gpm 87 g9l Other D jOpen Clo k W '7 nihos 87 89 91 Other Yes No Pas Fail 26 gpm 87 89 9 Other a nihose 87 89 91 Other_ Yes) No Pass Fail pq gpm E589' 91 Other Plug Circle One g nihos 87 89 91 Other_ Yes No Fail Za gpm 87 OF91 Other E Install Missing Z 0 8 nihose,87 89 91 Other Yes No Pas Fail' ,ZO gpm 87 89 91 Other F stall Missing o C, _ Unihose;87 89 91 Other Yes No F(7 Fail 72 gpm 8 89 91 Other U cr Uniho 87 89 91 Other Yes No Fail m 87 8 91 Other ,q( gp Unihos 87 89 91 Other Ye No Pa Fail g,SZ gpm 87 89(0 Other ° 0 nihose 87 89 91 Other No Fail gpm 10 89 91 Other f O di 87 89 91 Other Ye No Pas Fail �,�(� gpm 87 91 Other F cf 0 87 89 91 Other_ e No Pa Fail g�-L gpm 87 89 91 > her co Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other cn O o i VR-201-C and VR-202-C - Quarterly Inspection and Testing Checklist Checklist results may be used to assist with filling out GDF maintenance log. Date:!�-26-/( Page of 3 kn kn Weekly VP1000 Product Clean Air Separator 00 Dispenser Unihose or Fuel Grade Inspection Dispensing Fuel Grade Tested r- Inspection Configuration Number (circle one) Complete Rate(gallons (circle one) (circle one) (see figure on back) (circle one) per minute) H nihose 7 89 91 Other_ Y _ No Pa Fail 3Z gpm 89 91 Other, Valve Circle One r� UnihOSe 7 89 91 Other 4(Y7e No as Fail 7 5 gpm 87� 91 Other A Open Closed 87 89 91 Other s No Fail pm 87 89 9 Othe► B Open ed o Unihoie 87 89 91 Other e No Pas Fail .s S gpm 187 89 91 Other C Open (-Closed) /Z nihose 7 89 91 Other a No Pa Fail 7.(,( gpm 87(8 91 Other D Open Closed x w 1 2 nings �7 89 91 Other a No Pas Fail �j 0 gpm 87 89 9 Other a Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other Plug rcle One 0 Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other_ E Ins Missing Z 0 Unihose 87 89 91 Other Yes No Pass Fail' gpm 87 89 91 Other F Ins Missing o Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other a Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other ° 0 Unihose 87 89 91 Other_ Yes No Pass Fail gpm 87 89 91 Other ­ M Uriihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other F" o Unihose 87 89 91 Other Yes No Pass Fail gpm 87 89 91 Other CD Unihose 87 89 91 Other Yes No Pass Fail gpm i87 89 91 Other M a� b O 0 m VR-201-C and VR-202-C -Weekly Inspection and Testing Checklist Checklist results may be used to assist with filling out GDF maintenance log. Date: Page-_of co co Nozzle Hose Breakaway � Dispenser Unihose or Fuel Grade VP 1000 Vacuum Pump Normal Operation I ca 8 Number (circle one) Inspection Inspection Inspection k (circle one) (circle one) (circle one) (circle one) i I Uniho 87 89 91 Other as Fail (F�a4 Fail Y No Z mhos 87 89 91 Other— Pa Fail Pas ail Pass Fail a No Q 0 3 Unihose. 87 89 91 Other asy Fail a Fail Pas Fail es No 1 ° t� n' 87 89 91 Other_ Pa Fail as Fail as Fail es No SS Unihos 97 89 81 Other Pa Fail P Fail P Fail Yes No W Uni 87 89 91 Other_ Pas Fail P Fail Fad Ye No '7 mhos 87 89 91 Other_ as�q Fail Pass`Fail aaa Fail es No 10 19 S nihose 87 89 91 Other_ Pa Fail Pas Fail Pa Fail Ye No Z 41 Uni 87 89 91 Other_ Pa Fail P Fail Pa Fail a No °o 0 7O Unihos 87 $9 91 Other_ Pas Fail P Fail a Fail Ye No Uni 87 89 91 Other_ Pa Fail Pas Fail Pass Fad Ye No 0 Z UniholZ 87 89 91 Other Pas ail ass ail Paa Fail es No 6�n � — o Unihose 87 89 91 Other__ Pass Fail Pass Fail Pass Fail Yes No Unihose 87 89 91 Other Pass Fail Pass Fail Pass Fail Yes No o Unihose 87 89 91 Other_ Pass Fail Pass Fail Pass Fail Yes No c Unlhose 87 89 91 Other_ Pasa Fat? Pass Fail Pass Fail Yes No M C I r M a� -a O i x 0 0 , l v o_ VR-201-C and VR-202-C Annual Inspection and Testing Checklist Checklist results may be used to assist with filling out GDF maintenance log. Date'. Page i of r °i Clean Air Pressure Decay Dispenser Separator Test,TP-201.3 Dispenser Vapor Line Dispenser Fuel Grade Tested Nozzle VIL Test, Exhibit 5 k c Test, Exhibit 4 &Exhibit 8 Number Tightness Test Number (circle one) � (circle one) (circle one) (circle one) (circle one) A q t Pass Fail J 7 89 91 ther Pass Fail 3 Pass Fail Z 89 91-)Other Pass Fail °o C, ass Fail 3 7 89 91 Other Pass Fail 7/ Pas Fail 5r 7 89 91 ther Pass Fail U Pas Pass ` w o ��� y/�o Fail 5 other Pass Fail Complete Complete J�/JZ as Fail 7 89 91.Other Pass Fail o > Weekly Quarterly v Pass Fail 7 7 8�3 91 Other Pass Fail Inspection Inspection Checklist Checklist o v Pass Fail g 87 89 91 Other Pass Fail o 0 Pass Fail _- 7 8 9 Other Pass Fail N > Pass Fail !0 7 89 91 ther Pass Fail aPass Fail 87 8 1 ther Pass Fail o Pass Fail ,2 87 89 91 ther Pass Fail y U al Fail Pass Fail 87 89 91 Other Pass Fail m w Pass Fail 87 89 91 Other Pass Fail i c Pass Fail 87 89 91 Other Pass Fail O 00 "' Pass Fail 87 89 91 Other Pass Fail � � t r� a 0 n q I � m -b tx O ¢ I H 0 � PP T�i*rKll W 8501 N MOPAC EXPRESSWAY,SUITE 400 AUSTIN,TEXAS 78759 (512)451-6334 FAX(512)459-1459 TEST DATE:04/26/11 WORK ORDER NUMBER3183011 CLIENT:CHEVRON PRODUCTS COMPANY SITE:CHEVRON # 355920 COMMENTS COCO SITE, PTO # S-3725-1-3, Confirmation # 11-17180. Vapor Recovery Testing, Site contacted 4/19/11 and confirmed with "MINTA", technician checked in with 2ndSite and WO # 110426-060 was given. All tests passed. PARTS REPLACED QU/HNTITY DESCRIPTION HELIUM PINPOINT TEST RESULTS (IF APPLICABLE) ITEMS TESTED HELIUM PINPOINT L TEST RESULTS Printed 05/16/2011 07:57 MTUTTLE t - SITE DIAGRAM Tan 8501 N MOPAC EXPRESSWAY,SUITE 400 AUSTIN,TEXAS 78759 (512)451-6334 FAX(512)459-1459 TEST DATE: 04/26/11 WORK ORDER NUMBER3183011 CLIENT:CHEVRON PRODUCTS COMPANY SITE: CHEVRON # 355920 v/r JITB C-STORE #9 #5 #1#6j#10 L13 L11 42 L9 #11 dsl #7 \FdK#3 dsl 8 #12 L14 #8 L12 dsl #4 <5 L10 m dsl z -i cn :L3 UL L2 STP OI L1 O L8 L7 L6 jP CAS STP I L4 ESO DSL S Printed 05/16/2011 07:57 MTUTTLE Work Order: 3183011 i i I 3183011.txt 200 CHEVRON 2000 10 UNION AVE. BAKERSFIELD station 3SS920 APR 26, 2011 1:39 PM TANK PRODUCT GALLONS INCHES WATER DEG F ULLAGE 1 UNLEADED 15476 85.26 0.0 73.8 4227 2 PREMIUM 7260 76.32 0.0 71.0 3109 3 DIESEL 1619 32.95 0.0 73.3 5410 APR 26, 2011 1:40 PM AFM BUSY EVENTS: FLOWMETER 1 INDEX START DATE-TIME OUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:39:03 265 0.97 22.6 23.2 2 0032 01802 00801 0991 11-04-26 08:50:36 52 0.78 1.1 1.4 1 0037 02 01 0992 11-04-26 09:02:17 77 0.46 1.1 2.4 1 0037 02 01 0993 11-04-26 09:13:01 86 0.97 8.5 8.8 1 002E 02 01 0994 11-04-26 12:19:23 28 1.21 2.5 2.1 1 0037 01 00 0995 11-04-26 12:20:17 36 1.06 2.2 2.0 1 0037 01 00 0996 11-04-26 12:22:12 28 0.00 2.3 349832.5 1 0037 02 01 0997 11-04-26 12:23:06 32 1.12 2.3 2.1 1 0037 02 01 0998 11-04-26 12:23:58 38 1.08 2.2 2.0 1 0037 02 01 0999 11-04-26 13:16:30 17 0.00 0.0 0.0 1 0015 02 01 1000 11-04-26 13:27:11 19 0.31 0.0 0.1 1 0037 02 01 I&1802 APR 26, 2011 1:40 PM AFM BUSY EVENTS: FLOWMETER 2 INDEX START DATE-TIME DUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:04:31 63 0.29 1.7 5.9 1 003E 04 03 0991 11-04-26 08:35:03 38 .1.05 1.0 0.9 1 0037 03 02 0992 11-04-26 08:36:49 73 0.96 5.7 5.9 1 002E 04 03 0993 11-04-26 08:46:11 51 1.02 2.9 2.8 1 0037 03 02 0994 11-04-26 09:05:32 110 0.56 5.3 9.5 1 002E 04 03 0995 11-04-26 09:10:42 72 1.05 3.7 3.6 1 002E 03 02 0996 11-04-26 12:27:18 32 1.08 2.2 2.0 1 0037 03 02 0997 11-04-26 12:28:20 40 1.08 2.2 2.0 1 0037 03 02 0998 11-04-26 12:30:16 27 1.12 2.3 2.0 1 0037 04 03 0999 11-04-26 12:30:58 30 1.26 2.6 2.0 1 0037 04 03 1000 11-04-26 12:32:27 35 1.10 2.2 2.0 1 0037 04 03 1&1803 APR 26, 2011 1:40 PM AFM BUSY EVENTS: FLOWMETER 3 INDEX START DATE-TIME DUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:28:33 198 0.43 9.3 21.8 1 003E 05 04 0991 11-04-26 08:46:16 65 0.47 3.7 7.8 1 003E 05 04 0992 11-04-26 09:03:58 83 0.99 7.1 7.1 1 002E 06 OS 0993 11-04-26 09:08:31 98 0.95 11.8 12.4 1 002E 05 04 0994 11-04-26 09:18:53 218 0.30 7.8 26.2 2 0032 05&06 04&05 Page 1 Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 3183011.txt 0995 11-04-26 12:35:25 29 0.00 2.2 649031.3 1 0037 05 04 0996 11-04-26 12:36:13 36 1.02 2.1 2.1 1 0037 05 04 0997 11-04-26 12:37:44 35 1.04 2.1 2.0 1 0037 05 04 0998 11-04-26 12:39:23 29 0.00 2.2 647058.9 1 0037 06 05 0999 11-04-26 12:40:25 33 1.07 2.2 2.1 1 0037 06 05 1000 11-04-26 12:41:17 36 1.07 2.2 2.1 1 0037 06 05 I&1804 APR 26, 2011 1:40 PM AFM BUSY EVENTS: FLOWMETER 4 INDEX START DATE-TIME DUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:17:28 54 0.94 2.2 2.4 1 0037 07 06 0991 11-04-26 08:19:41 348 0.62 19.1 30.7 2 0033 07808 06&07 0992 11-04-26 08:29:40 37 0.85 0.6 0.7 1 0037 07 06 0993 11-04-26 08:34:06 39 0.72 0.9 1.2 1 0037 08 07 0994 11-04-26 09:14:44 67 0.70 3.3 4.6 1 002E 08 07 0995 11-04-26 12:43:01 27 1.09 2.2 2.0 1 0037 07 06 0996 11-04-26 12:43:49 35 1.08 2.2 2.0 1 0037 07 06 0997 11-04-26 12:44:40 46 1.49 3.0 2.0 1 0037 07 06 0998 11-04-26 12:47:40 29 1.10 2.3 2.1 1 0037 08 07 0999 11-04-26 12:48:27 34 1.11 2.3 2.1 1 0037 08 07 1000 11-04-26 12:49:29 36 1.12 2.3 2.0 1 0037 08 07 I&1805 APR 26, 2011 1:41 PM AFM BUSY EVENTS: FLOWMETER 5 INDEX START DATE-TIME DUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:11:50 45 0.27 0.5 1.8 1 0037 12 11 I 0991 11-04-26 08:17:13 169 0.20 3.9 18.9 2 0032 11&12 10&11 0992 11-04-26 08:24:18 166 1.06 18.1 17.0 2 0032 11&12 10&11 0993 11-04-26 08:32:08 94 0.99 9.4 9.5 1 002E 12 11 0994 11-04-26 09:00:26 141 1.17 21.6 18.5 1 002E 12 it 0995 11-04-26 09:17:50 74 0.64 3.8 5.9 1 002E 11 10 0996 11-04-26 13:05:13 31 1.04 2.1 2.0 1 0037 11 10 0997 11-04-26 13:06:11 31 1.00 2.0 2.0 1 0037 11 10 0998 11-04-26 13:07:59 27 1.09 2.2 2.0 1 0037 12 11 0999 11-04-26 13:08:53 34 0.98 2.0 2.0 1 0037 12 11 1000 11-04-26 13:10:05 36 1.02 2.1 2.0 1 0037 12 11 i < I&1806 APR 26, 2011 1:41 PM AFM BUSY EVENTS: FLOWMETER 6 INDEX START DATE-TIME DUR A/L VAPOR FUEL #EV FLAGS FPS HOSES 0990 11-04-26 08:17:46 43 0.30 0.7 2.4 1 0037 10 09 0991 11-04-26 08:22:01 58 0.56 1.5 2.7 1 0037 09 08 0992 11-04-26 08:34:24 111 0.94 13.1 14.0 1 002E 10 09 0993 11-04-26 09:02:07 152 0.70 11.4 16.3 1 002E 10 09 0994 11-04-26 09:08:40 79 1.09 7.7 7.1 1 002E 09 08 0995 11-04-26 09:16:37 82 0.92 9.2 9.9 1 002E 10 09 0996 11-04-26 12:55:36 30 1.13 2.3 2.1 1 0037 09 08 0997 11-04-26 12:56:37 34 1.12 2.3 2.0 1 0037 09 08 0998 11-04-26 12:57:44 33 1.06 2.2 2.0 1 0037 09 08 0999 11-04-26 13:01:33 39 0.89 1.8 2.0 1 0037 10 09 1000 11-04-26 13:02:26 40 0.96 1.9 2.0 1 0037 10 09 Page 2 i i I Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 Work Order: 3183011 I . I I CHEVRON 2000, 10 UNION AVE. .. BAKI:`RSF 1FiLD Stctton 355920 APR 26. 2011 9:17 AM SYSTEM •STATUS REPORT r ALL FUNCTIONS NORMAL INVENTORY REPORT ,I T ':UNLEADED VOLUME a 15477 GALS { ULLAGE = 4226 GALS ` 90% ULLAGE-. 2255 GALS l TC'VOLUME. s 15328.GALS HEIGHT = 85.26 INCHES WATER VOL - 0 GALS }> WATER.. a..:..O flCt..11lCNIS, TEMP 73.7 DEG F T 2:PREMIUM VOLUME = 7294 GALS ULLAGE -90% ULLAGE- .3075 038 GA TC VOLUME 7240 GALS HEIGHT . 76.63 1N H 0 WATER WATER VOL 1 0.00 INCHES 7` TEMP 70.4 DEG F l T 3:DIESEL VOLUME 1629 GALS ULLAGE .. 5400 GALS 90X 6ELAGE° 4697 GALS TC VOLUME = 1619 GALS HEIGHT 33.10 INCH WATER ES WATER VOL = 0.00 INCHES TEMP = 73.4 DEG F * * * * xEND xxxxx Tanknology Inc. 11000 N.MoPac Expwy#500,Austin,Texas 78759 JLX�'Tanknoiogy 11000 N. MoPac Expressway, Suite 500 Austin,Texas 78759 Phone: (512)451-6334 Fax: (512)459-1459 Date Printed and Mailed: 05/16/2011 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR CRAIG PERKINS 1501 TRUXTUN AVE. BAKERSFIELD, CA. 93301 Test Date: 04/26/2011 Order Number: 3183011 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: CHEVRON #355920 J ITB #7723 10 UNION AVENUE BAKERSFIELD, CA. 93307 Testing performed: EVR-Stage I Pressure Integrity Drop Tube EVR-Stage I Static Torque tests Healy Clean Air Separator Healy ISD (Exhibit 9) Healy Line Integrity Healy Quarterly Inspection Healy Vapor/Liquid Stage II pressure decay tests Sincerely,' -1)aprv" KAY Dawn Kohlmeyer Manager, Field Reporting