HomeMy WebLinkAboutUST-MONITORING SYS. 11/3/2008 MONITORING SYSTEM CERTIFICATION
For Use By All Jurisdictions Within the State of California
Authority Cited:Chapter 6.7,Health and Safety Code;Chapter 16,Division 3 Tale 23, California Code of Regulations
This form must be used to document testing and servicing of monitoring equipment. If more than one monitoring system control panel is installed at the facility,a separate
certification or report must be prepared for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank
system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date.
A.General Information
Facility Name: CHEVRON 98109 City: BAKERSFIELD CA Zip:93304
Site Address: 1131 OAK ST.X/ST CALIFORIA AVE Contact Phone No: 324-7621
Date of Testing/Service: 11/03/2008
Facility'Contact Person: MANAGER-JALED 111111UII
Make/Model of Monitoring System:TLS-350 Work Order Number: 3162952 37
B.Inventory of Equipment Tested/Certified (E
Check the appropriate boxes to indicate specific equipment inspected/serviced
TanklD: 87 TanklD: 89
X In-Tank Gauging Probe. Model: MAG 1 X In-Tank Gauging Probe. Model: MAG 1
X Annular Space or Vault Sensor. Model: V/R 409 Annular Space or Vault Sensor. Model: V/R 409
X Piping Sump/Trench Sensor(s). Model: V/R 208 Piping Sump/Trench Sensor(s). Model: V/R 208
X Fill Sump Sensor(s). Model: V/R 206 V/R 208
Fill Sump Sensor(s). Model:
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
3( Electronic Line Leak Detector. Model: V/R PLLD 11 Electronic Line Leak Detector. Model: V/R PLLD
X1 Tank Overfill/High-Level Sensor. Model: ATG 71 Tank Overfill/High-Level Sensor. Model: ATG
Other(specify equipment type and model in Section E on page 2). 11 Other(specify equipment type and model in Section E on page 2).
TanklD: 91 TanklD:
In-Tank Gauging Probe. Model: MAG 1 in In-Tank Gauging Probe. Model: MAG 1
X Annular Space or Vault Sensor. Model: V/R 409 Annular Space or Vault Sensor. Model: V/R 409
X Piping Sump/Trench Sensor(s). Model: V/R 208 X Piping SumplTrench Sensor(s). Model: V/R 208
X Fill Sump Sensor(s). Model: V/R 208 71 Fill Sump Sensor(s). Model: V/R 208
Mechanical Line Leak Detector. Model: Mechanical Line Leak Detector. Model:
X Electronic Line Leak Detector. Model: V/R PLLD X Electronic Line Leak Detector. Model: V/R PLLD
Tank OverfillfHigh-Level Sensor. Model: ATG Tank Overfill/High-Level Sensor. Model: FLAPPER
Other(specify equipment type and model in Section E on page 2). Other(specify equipment type and model in Section E on page 2).
Dispenser ID: 1-10 Dispenser ID:
®Dispenser Containment Sensor(s) Model:V/R 208 Dispenser Containment Sensor(s) Model:
X❑Shear Valve(s). Shear Valve(s)
ElDispenser Containment Float(s)and Chain(s). Dispenser Containment Float(s)and Chain(s).
Dispenser ID: Dispenser ID:
❑Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model:
❑ Shear Valve(s). Shear Valve(s).
Dispenser Containment Float(s)and Chain(s). Dispenser Containment Float(s)and Chain(s).
Dispenser ID: Dispenser ID:
❑ Dispenser Containment Sensor(s) Model: Dispenser Containment Sensor(s). Model:
Shear Valve(s). Shear Valve(s).
❑ Dispenser Containment Float(s)and Chain(s). Dispenser Containment Float(s)and Chain(s).
*If the facility contains more tanks or dispensers,copy this form.Include information for every tank and dispenser at the facility.
C. Certification
I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers'guidelines.
Attached to this certification is information(e.g manufacturers'checklists)necessary to verify that this information is correct.
and a Site Plan showing the layout of monitoring equipment. For any equipment capable of generating such reports,I have also attached
a copy of the(Check all that apply): ❑System set-up X❑Alarm history report
Technician Name(print): TIMOTHY COULTER Signature:
Certification No.: B34132 License. No.: 743160(Class'A'General Enginering Contractor License)
Testing Company Name:Tanknology Phone No.: (800)800-4633
Site Address: 8501 N.MoPac Expressway,suite 400,Austin,TX 78759 Date of Testing/Servicing: 11/03/2008
IIIIIIIIIIIIIIIIIIII 38
IE
Monitoring System Certification Page 1 of 3 Based on CA form dated 03/01
Monitoring System Certification
Site Address 1131 OAK ST.X/ST CALIFORIA AVE Date of Testing/Service: 11/03/2008
D. Results of Testing/Servicing
Software Version Installed: 327.04
Complete the following checklist:
x Yes No' Is the audible alarm operational?
❑x Yes No Is the visual alarm operational?
❑x Yes No• Were all sensors visually inspected,functionally tested,and confirmed operational?
Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not
❑ Yes ❑No'
interfere with their proper operation?
x Yes I D No' N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational?
For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment
[F] Yes ❑No• ❑NIA monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive
shut-down?(check all that apply) ❑X Sump/Trench Sensors; ❑x Dispenser Containment Sensors.
Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑x Yes No
❑
x Yes ❑No• ❑N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical
overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating
properly? If so,at what percent of tank capacity does the alarm trigger? so
Yes' ❑No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the
manufacturer name and model for all replacement parts in Section E,below.
❑ Yes' ❑x No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product;
❑ Water. If yes,describe causes in Section E,below.
❑x Yes ❑No Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable.
❑x Yes ❑No' Is all monitoring equipment operational per manufacturers'specifications?
In Section E below,describe how and when these deficiences were or will be corrected.
E. Comments:
REPLACED 89 ANNULAR SENSOR(V/R 409)
Page 2 of 3 Based on CA form dated 03/01
Monitoring System Certification
Site Address: 1131 OAK ST.X/ST CALIFORIA AVE Date of Testing/Service: 11/03/2008
F. In-Tank Gauging /SIR Equipment
Check this box if tank gauging is used only for inventory control.
Check this box if no tank gauging or SIR equipment is installed.
Check this box if no tank gauging or SIR equipment is installed.
This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring.
Complete the following checklist:
El Yes ❑No Has all input wiring been inspected for proper entry and termination, including testing for ground faults?
Q Yes ❑No• Were all tank gauging probes visually inspected for damage and residue buildup?
0 Yes ❑No' Was accuracy of system product level readings tested?
QYes ❑No• Was accuracy of system water level readings tested?
X Yes ❑No• Were all probes reinstalled properly?
❑x Yes E]No*I Were all items on the equipment manufacturers'maintenance checklist completed?
In the Section H,below,describe how and when these deficiencies were or will be corrected.
G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed.
Complete the following checklist:
For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?
0 Yes ❑No* E]NIA (Check all that apply)Simulated leak rate: Q 3 g.p.h❑0.1 g.p.h []0.2 g.p.h
r7j Yes ❑No• Were all LLDs confirmed operational and accurate within regulatory requirements?
X Yes ❑No' Was the testing apparatus properly calibrated?
❑Yes ❑No' ®N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak?
0 Yes ❑No• ❑NIA For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak?
Q Yes ❑No• ❑NSA For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
0 Yes ❑No' ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test?
M Yes ❑No• ❑NIA For electronic LLDs,have all accessible wiring connections been visually inspected?
LJ Yes ❑No' Were all items on the equipment manufacturers'maintenance checklist completed?
•In the Section H,below,describe how and when these deficiencies were or will be corrected.
H. Comments:
Page 3 of 3 Based on CA form dated 03/01
SWRCB,'January 2002 Page 1.
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CHEVRON 98109 Date of Testing: 11/03/2008
Facility Address: 1131 OAK ST. X/ST CALIFORIA AVE , BAKERSFIELD, CA, 93304
Facility Contact: MANAGER - JALED Phone: (6 61) 3 2 4-7 62 1
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector(if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: TIMOTHY COULTER
Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester
License Type: SERVICE TECHNICIAN License Number: 5295244UT
Manufacturer Training
Manufacturer Component(s) Date Training Expires
3. SUMMARY OF TEST RESULTS
Not Repairs Not Repair
Component Pass Fail Tested Made Component Pass Fail Tested Made
Spill Box 3 REG FILL M ❑ ❑ ❑ ❑ ❑ ❑ ❑
Spill Box 2 PLU FILL X 0 ❑ 0 0 0 0 0
Spill Box 1 SUP FILL X ❑ ❑ ❑ ❑ ❑ ❑ ❑
Spill Box 4 DIE FILL 0 ❑ 0
0 0 0 0 0 0 0 El-
101 l ❑ I ❑ 0 ❑ I ❑
0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0 M-
10101 0 I ❑ 1 0 0 ❑ 0
0 0 0 0 0 0 0
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature: G �- - Date: 11/03/2008
SWRCB,January 2006
9. Spill Bucket Testing Report Form
This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: CHEVRON 98109 Date of Testing: 11/03/2008
Facility Address: 1131 OAK ST. X/ST CALIFORIA AVE , BAKERSFIELD, CA, 93304
Facility Contact: MANAGER - JALED Phone: (661) 324-7621
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector(if present during testing): ERNIE MEDINA
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY, INC.
Technician Conducting Test: TIMOTHY COULTER
Credentials): ❑CSLB Contractor ❑ICC Service Tech. ❑SWRCB Tank Tester ❑Other(Specify) SERVICE
License Number: 5295244UT
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: Hydrostatic ❑ Vacuum ❑ Other
Test Equipment Used:VISUAL Equipment Resolution:
Identify Spill Bucke0y Tank 1 3 REG FILL Z 2 PLU FILL 3 1 SUP FILL 4 4 DIE FILL
Number, Stored Product, etc.)
❑
Bucket Installation Type: Direct Bury F-1 Direct Bury ❑Direct Bury F-1 Direct Bury
❑X Contained in Sump X❑ Contained in Sump ❑X Contained in Sump X❑Contained in Sump
Bucket Diameter: 10 10 10 10
Bucket Depth: 10 10 10 10
Wait time between applying 10 MINS 10 MINS 10 MINS 10 MINS
vacuum/water and starting test:
Test Start Time(TI ): 1015 1015 1015 1015
Initial Reading(RI ): 9 9 9 9
Test End Time(TF ): 1115 1115 1115 1115
Final Reading(RF ): 9 9 9 9
Test Duration: 1 HR 1 HR 1 HR 1 HR
Change in Reading(R F-RI ): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
es esult: ass ® ail ® ass ® R®Pass ® ail ®Pass ® ail
Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements.
Technician's Signature: Date: 11/03/2008
I State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements
0p Mmknology
8501 N MOPAC EXPRESSWAY,SUITE 400
AUSTIN,TEXAS 78759
(512)451-6334
FAX(512)459-1459
TEST DATE:11/03/08 WORK ORDER NUMBER3162952
CLIENT:CHEVRON PRODUCTS COMPANY SITE:CHEVRON 98109
COMMENTS
Conducting Annual Monitor certification with City of Bakersfield. Replaced (1) VR 409 Annular
sensor, (2) Hours labor for partsd replacement and Troubleshooting.
PARTS REPLACED
QU TITY ESGRI TION
1 INTERSTITIAL SENSORS FOR FIBERGLASS TANKS-10',10'6",11',12'
HELIUM PINPOINT TEST RESULTS (IF APPLICABLE) .
ITEMS TESTED
HEL U PINPOI T TEST RESULTS
Printed 11107/2008 14:11 KOHLMEYER
SITE DIAGRAM
i Tar*rwfogy
8501 N MOPAC EXPRESSWAY,SUITE 400
AUSTIN,TEXAS 78759
(512)451-6334
FAX(512)459-1459
TEST DATE:11/03/08 WORK ORDER NUMBER3162952
CLIENT:CHEVRON PRODUCTS COMPANY SITE: CHEVRON 98109
E
Chevron#98109 DSL L10 TNM
1131 Oak St. FL—�� Oj#1 Bakersfield, CA 1 10K L O
93304
=tlOKSUP A L( 1
UL
#1 STP A n 99
• # #5 # 3 10K L8 L
PLU
STP 10K S . _ L
cas VENT
Printed 11/07/2008 14:11 KOHLMEYER
Work Order: 3162952
(M)k(ESV)Tegieg Form-Venioa 1-67SMW
Emergency Shut Off(ESO) &
Dispenser Emergency Shutoff Valve (ESV)
ANNUAL TEST RECORD LOCATIONS AND TEST DATA
Testing -0, 4'
Company: // /f D,yLt D� mw q1/j— 3 —0 Sr
Location Name: C /E V�'�'"V -,r Store k: [r/ Stet:m m.
Address: 11131 oxff /. City: .tff1 s,a�: ew.
Emergency Shut Off(ESO)Testing Results
On 1/-3 1 in accordance with"ESO Vendor Letter(3-21-05).doc",from Valero's Retail
Compliance Department,as a part of annual compliance testing,this representative tested the
Emer cy Shut Off SO switches indicated on this sketch:Findings listed below:
Emergency Shut Off(ESO) "o,Provide
Operational? N Maintenance Log# Date Called
Dispenser Emergency Shutoff Valve (ESV) Testing Results
On //-3—o in accordance with NFPA 30A this representative tested the automatic-closing feature
of the Dispenser Emergency Shutoff VALVE(S)(ESV)located in the supply lines at the base of each
individual island type dispenser indicated on the diagram below.Each device(#) in all,
would automatically close.Findings listed below:
Disp.Emergency Shut Off IfNo,Provide
Valve(ESV)Operational? p Maintenance Log# _ Date Called
Site Map Of location and Placmcm of Dorieas Testod:
Sit_nature Of Representative: I
Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759
Work Order: 3162952
T 1:SUPREME T 3:PEGULAR -
--SENSOR ALARM -----
HIGH WATER ALARM O 2:PLUS
-NOV 3, 2003 10:31 AM HIGH WATER ALARM PLLD SHUTDOWN ALARM
NOV 3, 2008 10:30 AM NOV 3. 2008 12:15 PM
LOW PRODUCT ALARM OVERFILL ALARM
NOV 3. 2008 10:34 AM NOV 3, 2008 10:44 AM PLLD SHUTDOWN ALARM
AUG 30, 2008 6:55 AM NOV 3. 2008 12:13 PM
SUDDEN LOSS ALARM AUG 27. 2008 7:58 AM
NOV 3, 2008 10:34 AM o
NOV 3, 2008 10:2'' AM LOW PRODUCT ALARM PLLD SHUTDOWN ALARM
2 NOV 3. 2008 10:34 AM NOV 3, 2006 12:03 PH
HIGH PkO00 ALARM 24, 2008 5:34 Ptl
NOV 3, 2008 10:37 H SEP 28, 2006 1:22 PM
INVALID FUEL LEVEL PLLD,SHUTr<Am-ALARM
SUDDEN LOSS ALARM
NOV 3, 2008 10:34 AM NOV 3. 2008 11:47 AM
NOV 3. 2008 10:23 AM NOV 3, 2008 10:34 AM
NOV 3. 2008 10:21 AM
PROBE OUT PLLD SHUTDOWN ALARM
HIGH PRODUCT ALARM NOV 3. 2006 11:46 F11
NOV 3. 2008 10:39 AM NOV 3. 2008 10:41 AM
NOV 3, 2008 10:22 AM
INVALID FUEL LEVEL F'LLD SHUTDOWN ALARM
HIGH WATER. WARNING NOV 3. 2008 10:34 AM NOV 3. 2008 11:43 AM
NOV 3. 2008 10:31 AM
PROBE OUT
NOV 3, 2008 10:44 AM PLLD SHUTDOWN ALARM
DELIVERY NEEDED NOV 3. 2008 10:21 AM NOV 3. 2008 11:23 AM
NOV 3. 2006 10:34 AM
OCT 18, 2000 6:19 PM HIGH WATER WARNING
MAX PRODUCT ALARM NOV 3. 2008 10:30 AM GROSS LINE FAIL
NOV 3, 2008 10:37 AM NOV 3. 2008 11:23 AM
DELIVERY NEEDED
NOV 3. 2008 10:34 AM PLLD SHUTDOWN ALARM
LOW TEMP WARNING OCT 24. 2008 4:17 PM NOV 3. 2006 10:34 AM
NOV 3, 2008 10:40 AM OCT 23. 2008 3:53 PM
T 2:FLUS MAX PRODUCT ALARM PLLD SHUTDOWN ALARM
NOV 3. 2006 10:41 AM NOV 3, 2008 10:24 AM
HIGH WATER, ALARM _ _
- - _
NOV 3. 2008 10:24 hV1 ----- SENSOR ALARM ----- - ----- SENSOR ALARM -----
OVERFILL ALARM G 1:6UPREME L I:SUPREME ANNULAR
PLLD SHUTDOWN ALARM ANNULAR SPACE
NOV 3. 2008 10:48 AM NOV 3. 2006 11:27 AM SENOR OUT ALARM
NOV 3. 2008 lo:DI AM
LOW PRODUCT ALARM
NOV 3. 2008 10:34 AM GROSS LINE FAIL FUEL ALARM
SUDDEN LOSS ALARM NOV 3, 2008 11:27 AM NOV 3, 2008 9:51 AM
NOV 3. 2008 10:20 AM FUEL ALARM
PLLD SHUTDOWN ALARM NOV 3. 2008 9:49 AM
HIGH PRODUCT ALARM NOV 3. 2008 10:34 AM
NOV 3. 2008 10:46 At9
----- SENSOR ALARM -----
INVALID FUEL LEVEL, PLLD SHUTDOWN ALARM L 2:SUPREME FILL SUMP
NOV 3. 2008 10:34 AM NOV 3, 2008 10:31 AM PIPING SUMP
SENSOR OUT ALARM
PROBE OUT NOV 3. 2008 10:01 AM
NOV 3, 2008 10:48 AM PLLD SHUTDOWN ALARM
NOV 3. 2008 10:20 AM NOV 3. 2008 10'01 AM NOEL ,ALA 2006 8:47 AM
HIGH WATER WARNING
NOV 3. 2008 10:24 API PLLD SHUTDOWN ALARM ------SENSOR ALARM -----
NOV 3. 2008 9:59 AM
L 3:SUPREME TURBINE SUMP
DELIVERY NEEDED STP SUMP.
NOV 3. 2008 10:34 AM PI1D SHUTDOWN ALARM SENSOR OUT ALARM }
OCT 25. 2008 6:24 PM NOV 3, 2008 9:56 AM NOV 3. _008 10:0 AM
SEP 14, 2008 4:13 FM FUEL ALARM
MAX PRODUCT ALARM PLLD SHUTDOWN ALARM NOV, 3, 2008 8:48 AM
NOV 3. 2008 10:46 AM NOV 3, 2008 9:57 AM
PLLD SHUTDOWN ALARM
NOV 3. 2008 9:56 Ali
PLLD SHUTDOWN ALARM
NOV 3. 2008 9:55 AM
Tanknology Inc. 8501 N.MoPac Expressway,Suite 400,Austin,Texas 78759
Work Order: 3162952
-- SENSOR ALARM - - ----- SENSOR. ALARM ----
L 4:PLU8 ANNULAR Lll:DIESEL FILL SLHP
ANNULAR SPACE PIPING SUMP
FUEL ALARM SENSOR OUT ALARM
NOV 3, 2008 12:15 PM NOV 3. 2008 10:02 AM
FUEL ALARM FUEL ALARM
NOV 3. 2008 12:13 PM NOV 3. 2008 8:37 AM
SENSOR OUT ALARM - _ _
NOV 3. 2008 12:03 PM SENSOR ALARM --
L12:DIESEL TURBINE SLIMP
_ - STP SUMP
-- SENSOR ALARM -- -- SENSOR OUT ALARM
L 5:PLUS FILL SLAP NOV 3. 2008 10:02 AM
PIPING SUMP
SENSOR OUT ALARM FUEL ALARM
NOV 3, 2008 10:01 AM NOV 3, 2008 8:34 AM
FUEL ALARM
NOV 3, 2008 9:42 AM _
--- SENSOR ALARM ---
- ----- SENSOk ALARM L13:DISPENSER 1-2
DISPENSER PAN
L 6:PLUS TURBINE SUMP FUEL ALARM
5'TF' SUIlF' NOV 3. 2008 9:56 AM A Pm ENSOR O2008LA AM
NOV FUEL ALARM - - SENSOR ALARM ---
NOV 3, 2008 9:43 AM L14:DISPENSER 3-4
_. - - DISPENSER PAN
- -- SENSOR ALARM FUEL ALARM
L7:REGULAk ANNULAR NOV 3. 2008 9:55 AM
ANNULAR SPACE
SENSOR OUT ALARM
NOV 3, 2008 10:02 Aht
----- SENSOR ALHRPI -----
L15:DISPENSER 5-6
FUEL ALARM DISPENSER PAN
NOV 3, 2008 9:03 AM FUEL ALARM
FUEL ALARM
NOV. 3, 2008 9:57 AM
NOV 3, 2008 6:51 AM
-- SENSOR ALARM ----- ----- SENSOR ALARM -----
L 8:REGULAR FILL SUMP L16:DISPENSER 7-8
PIPING SUMP DISPENSER PAN
SENSOR OUT ALARM FUEL ALARM
NOV 3. 2008 10:01 All NOV 3. 2008 9:58 AM
FUEL ALARM
NOV 3. 2008 8:50 AM ------ SENSOR ALARM -
_ L17:UISPENSER 9-10
- SENSOR. ALARM - -- DISPENSER PAN
SENSOR OUT ALARM
L 9:REGULAR TURBINE SUMP NOV 3, 2008 10:02 AM
STP SUMP
SENOR OUT ALARM FUEL ALARM
NOV 3. 2008 10:02 AM NOV 3. 2008 9:59 AM
FUEL ALARM
NOV 3. 2008 8:49 41 --
----- SENSOR. ALARM ----- CHEVRON C.S.I. 1920
1131 OAK ST.
LIO:DIESEL ANNULAR BAKERSFIELD.CA.
ANNULAR SPACE 9-8109PH661-324-7621
SENSOR OUT ALARM
NOV 3, 2008 10:02 AM NOV 3, 2008 1:15 PM
FUEL ALARM
NOV 3. 2008 8:40 AM
SYSTEM STATUS REPORT
h l 4:DEGRLr COLLECT WARN
Tanknology Inc. 8501 N.MoPac Expressway, Suite 400,Austin,Texas 78759
JFPP Tanknology
8501 N. MoPac Expressway, Suite 400
Austin,Texas 78759
Phone: (512)451-6334
Fax: (512)459-1459 Date Printed and Mailed: 11/07/2008
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR STEVE UNDERWOOD
1501 TRUXTUN AVE.
.BAKERSFIELD, CA. 93301
Test Date: 11/03/2008
Order Number: 3162952
Dear Regulator,
Enclosed are the results of recent testing performed at the following facility:
CHEVRON 98109
1131 OAK ST. X/ST CAL IFORIA AVE
BAKERSFIELD, CA. 93304
Testing performed:
Leak detector tests
Monitor Certification
Secondary Containment-Spill Container
Sincerely,
o KAY
Dawn Kohlmeyer
Manager, Field Reporting
TANKNOLOGY CERTIFICATE OF TESTING
8501 N MOPAC EXPRESSWAY,SUITE 400 AUSTIN,TEXAS 78759
TELEPHONE(512)451-6334 FAX(512)459-1459
PURPOSE: COMPLIANCE TEST RESULT SUMMARY REPORT
TEST DATE: 11103/08 WORK ORDER NUMBER: 3162952
CUSTOMER PO: 4691008
CLIENT: CHEVRON PRODUCTS COMPANY SITE:CHEVRON 98109
145 S.STATE COLLEGE BLVD 1131 OAK ST.X/ST CALIFORIA AVE
SUITE 400 BAKERSFIELD,CA 93304
BREA,CA 92821
TINA SCOLARO MANAGER-JAILED
(714)671-3356 (661)324-7621
Product Pi a Ti htness Test Results
LIN LINE LIN mg�B IMPACT
ID ROD CT MATERIAL TE T RESULT FINAL L �RA� (gph) VALVE
D A B C D FUNGT►O
1 1 SUPREME DW FIBERG PRESSURE Y
2 2 PLUS DW FIBERG PRESSURE Y
3 3 REGULAR DW FIBERG PRESSURE Y
4 4 DIESEL DW FIBERG PRESSURE Y
Existing Line Leak Detector Test
IS1 NG LEAKED_.T,ECTOR#z1 EXISTIN_G EAK�ETETSOR�#Z
LINE MANUFACTURER MODEL# SERIAL RESULT MANUFACTURER MODE # SERIi4L# RESULT
ID
1 1 VEEDERROOT ELECTRONI 4690 P
2 2 VEEDERROOT ELECTRONI 001106 P
3 3 VEEDERROOT ELECTRONI 001095 P
4 4 VEEDERROOT ELECTRONI 001107 P
New Replacement Line Leak Detector Test
,:. I
urlE '�*��� -'
ID M U R6R MOD L# S RIAL RESU MANUP-A =URE MODEL# SERIAL# RESUL
For owner detailed report information,visit www.tanknology.com and select On-Line Reports-WRAP,or contact your local Tanknology office.
Tester Name:TIMOTHY COULTER Technician Certification Number:5295244-UT
Printed 11/07/2008 14:11 KOHLMEYER
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
TEST DATE: 11/03/08 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 3162952
AUSTIN,TEXAS 78759(512)451-6334
CLIENT: CHEVRON PRODUCTS SITE: CHEVRON 98109
Tr ANKjINFQRMi4llON
Tank ID: 1 1 Tank manifolded: No Bottom to top fill in inches: 156.0
Product: SUPREME Vent manifolded: YES Bottom to grade in inches: 161.0
Capacity in gallons: 9,842 Vapor recovery manifolded: YES Fill pipe length in inches: 56.0
Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 354 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CID installed on:
COMMENTS
MAN TEST RESULTS Test Method: LEAK l)ETECTbR TEST RE
TrA SULTS est method:
PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced
Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2
UFT/OFT: Make: VEEDERROOT
Fluid volume in gallons: Model: ELECTRONIC
Tank water level in inches: S/N: 4690
Test time: NOT Open time in sec:
Number of thermisters: TESTED Holding psi: NOT
Specific gravity: Resiliency cc: TESTED
Water table depth in inches: Test leak rate ml/m:
Determined by(method): Metering psi:
Leak rate in gph: Calib. leak in gph: 3.00
Result: Results: PASS
COMMENTS COMMENTS
ULLAG TEST RES LTSTest Meth d: LINE TEST RESULT, Tes pe:
Test time: Material: Dw FIBERG
Ullage volume: Diameter(in): 3.0
Ullage pressure: Length (ft): 250.0
Results: Test psi:
Bleedback cc:
DATA FOR UTS-4T ONLY: Test time(min):
Test 1:Start time:
Time of test 1: Finish psi: NOT NOT NOT NOT
Temperature: NOT Vol change cc:
Test 2:Start time: TESTED TESTED TESTED TESTED
Flow rate(cfh): TESTED Finish psi:
Time of test 2: Vol change cc:
Test 3:Start time: -
Temperature: Finish psi:
Flow rate(cfh): Vol change cc:
Time of test 3: Final gph:
Temperature: Result:
Flow rate(cfh): Pump type: PRESSURE
COMMENTS Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/07/2008 14:11 KOHLMEYER
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
i'TWlaK )gy
TEST DATE: 11/03/08 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 3162952
AUSTIN,TEXAS 78759(512)451-6334
CLIENT: CHEVRON PRODUCTS SITE: CHEVRON 98109
TANKiINFQRMATIQ_
Tank ID: 2 2 Tank manifolded: NO Bottom to top fill in inches: 155.0
Product: PLUS Vent manifolded: YES Bottom to grade in inches: 160.0
Capacity in gallons: 9,842 Vapor recovery manifolded: YES Fill pipe length in inches: 55.5
Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 354 Overspill protection: YES Stage I vapor recovery: DUAL
Material: DW FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
TAN- TEST RESUL Test MethodT DEl ECTO `LEST RESULTS T st method.
PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced
Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2
LIFT/OFT: Make: VEEDERROOT
Fluid volume in gallons: Model: ELECTRONIC
Tank water level in inches: S/N: 001106
Test time: NOT Open time in sec:
Number of thermisters: TESTED Holding psi: NOT
Specific gravity: Resiliency cc: TESTED
Water table depth in inches: Test leak rate ml/m:
Determined by(method): Metering psi:
Leak rate in gph: Calib. leak in gph: 3.00
Result: Results: PASS
COMMENTS COMMENTS
ULLAGE TEST RESULTS Test Method: 'LINE TEST RESULTS est type:
Test time: Material: Dw FIBERG
Ullage volume: Diameter(in): 3.0
Ullage pressure: Length (ft): 250.0
Results: Test psi:
Bleedback cc:
DATA FOR UTS-4T ONLY: Test time(min):
Test 1:Start time:
Time of test 1: Finish psi: NOT NOT NOT NOT
Temperature: NOT Vol change cc:
Test 2:Start time: TESTED TESTED TESTED TESTED
Flow rate(cfh): TESTED Finish psi:
Time of test 2: Vol change cc:
Test 3:Start time:
Temperature: Finish psi:
Flow rate(cfh): Vol change cc:
Time of test 3: Final gph:
Temperature: Result:
Flow rate(cfh): Pump type: PRESSURE
COMMENTS Pump make: FE PETRO
IL
COMMENTS Impact Valves Operational: YES
Printed 11/07/2008 14:11 KOHLMEYER
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
pp M
8501 N MOPAC EXPRESSWAY,SUITE 400
TEST DATE: 11/03/08 AUSTIN,TEXAS 78759(512)451-6334 WORK ORDER NUMBER: 3162952
CLIENT: CHEVRON PRODUCTS SITE: CHEVRON 98109
T00-NIF.ORMATI61
Tank ID: 3 3 Tank manifolded: No Bottom to top fill in inches: 155.0
Product: REGULAR Vent manifolded: YES Bottom to grade in inches: 160.0
Capacity in gallons: 9,842 Vapor recovery manifolded: YES Fill pipe length in inches: 55.5
Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 354 Overspill protection: YES Stage I vapor recovery: DUAL
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: ASSIST
CP installed on:
COMMENTS
STANK T,ESiTWRESUL S est lethod: LEAK DETECTOR 7ESTIRESU TS_ T st?imetho
PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced
Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2
UFT/OFT: Make: VEEDERROOT
Fluid volume in gallons: Model: ELECTRONIC
Tank water level in inches: S/N: 001095
Test time: NOT Open time in sec:
Number of thermisters: TESTED Holding psi: NOT
Specific gravity: Resiliency cc: TESTED
Water table depth in inches: est leak rate ml/m:
Determined by(method): Metering psi:
Leak rate in gph: Calib. leak in gph: 3.00
Result: Results: PASS
COMMENTS COMMENTS
ULLAGE TEST RESULTS est Method' LINEm SU Test
Test time: Material: Dw FIBERG
Ullage volume: Diameter(in): 3.0
Ullage pressure: Length (ft): 250.0
Results: Test psi:
Bleedback cc:
DATA FOR UTS-4T ONLY: Test time (min):
Test 1:Start time:
Time of test 1: Finish psi: NOT NOT NOT NOT
Temperature: NOT Vol change cc:
Test 2:Start time: TESTED TESTED TESTED TESTED
Flow rate(cfh): TESTED Finish psi:
Time of test 2: Vol change cc:
Test 3:Start time:
Temperature: Finish psi:
Flow rate(cfh): Vol change cc:
Time of test 3: Final gph:
Temperature: Result:
Flow rate(cfh): Pump type: PRESSURE
COMMENTS Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/07/2008 14:11 KOHLMEYER
INDIVIDUAL TANK INFORMATION AND TEST RESULTS
Mr Tin
TEST DATE: 11/03/08 8501 N MOPAC EXPRESSWAY,SUITE 400 WORK ORDER NUMBER: 3162952
AUSTIN,TEXAS 78759(512)451-6334
CLIENT: CHEVRON PRODUCTS SITE: CHEVRON 98109
TANiZ41NFQRM'ATION
Tank ID: 4 4 Tank manifolded: NO Bottom to top fill in inches: 155.5
Product: DIESEL Vent manifolded: NO Bottom to grade in inches: 160.5
Capacity in gallons: 9,842 Vapor recovery manifolded: NO Fill pipe length in inches: 57.0
Diameter in inches: 91.00 Overfill protection: YES Fill pipe diameter in inches: 4.0
Length in inches: 354 Overspill protection: YES Stage I vapor recovery: _ NONE
Material: Dw FIBERG Installed: ATG Stage II vapor recovery: NONE
CP installed on:
COMMENTS
ANK�TEST>fRESULTS Test Metho BLEAK DETEC:OR TES RESU T$ est method:
PSI at tank bottom: New/passed Failed/replaced New/passed Failed/replaced
Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2
UFT/OFT: Make: VEEDERROOT
Fluid volume in gallons: Model: ELECTRONIC
Tank water level in inches: S/N: 001107
Test time: NOT Open time in sec:
Number of thermisters: TESTED Holding psi: NOT
Specific gravity: Resiliency cc: TESTED
Water table depth in inches: Test leak rate ml/m:
Determined by(method): Metering psi:
Leak rate in gph: Calib. leak in gph: 3.00
Result: Results: PASS
COMMENTS COMMENTS
ULLAG WT EST RESULTSTest ethod: ELINE TEST RESULTS Tes type:
Test time: Material: Dw FIBERG
Ullage volume: Diameter(in): 3.0
Ullage pressure: Length ffi): 250.0
Results: Test psi:
Bleedback cc:
DATA FOR UTS-4T ONLY: Test time(min):
Test 1:Start time:
Time Of test 1: Finish psi: NOT NOT NOT NOT
Temperature: NOT Vol change cc:
Test 2:Start time: TESTED TESTED TESTED TESTED
Flow rate (cfh): TESTED Finish psi:
Time of test 2: Vol change cc:
Test 3:Start time:
Temperature: Finish psi:
Flow rate(cfh): Vol change cc:
Time of test 3: Final gph:
Temperature: Result:
Flow rate(cfh): Pump type: PRESSURE
COMMENTS Pump make: FE PETRO
COMMENTS Impact Valves Operational: YES
Printed 11/07/2008 14:11 KOHLMEYER