Loading...
HomeMy WebLinkAboutSB989 2011 ' 11MIN 13 SWRCB,January 2002 IE Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures, and printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#705 Date of Testing: 3/17/11 Facility Address: 1200 Coffee Rd.Bakersfield CA Facility Contact: Jamieson Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 10,2011 Name of Local Agency Inspector(f present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conduct Test: Scott Olinger Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number: 589517 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made UDC 1-2 ❑ ❑ ❑ SPILL#2 ❑ ❑ ❑ UDC 3-4 ❑ ❑ ❑ V SPILL#2 ❑ ❑ ❑ UDC 5-6 ❑ ❑ ❑ SPILL#3 ❑ ❑ ❑ UDC 7-8 V ❑ ❑ ❑ I V SPILL#3 ❑ ❑ ❑ STP#1 V ❑ ❑ ❑ PIPING RUN#1 ❑ ❑ ❑ STP#2 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑ STP#3 ❑ ❑ PIPING RUN#3 ❑ ❑ ❑ FILL#1 ❑ ❑ ❑ PIPING RUN#4 C ❑ ❑ ❑ FILL#2 ❑ ❑ ❑ PIPING RUN#5 ❑ ❑ ❑ FILL#3 ❑ ❑ ❑ PIPING RUN#6 ❑ ❑ ❑ SPILL#1 ❑ ❑ ❑ PIPING RUN#7 ❑ ❑ ❑ V SPILL#1 ❑ ❑ ❑ ANN SPACE#1 ❑ ❑ ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, a is stated in this document are accurate and in full compliance with legal requirements Technician's Signature Date:-3/17/11 IIIIIIIIIIIIIIIIIIII 14 IE SWRCB,January 2002 Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures, and printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#705 Date of Testing: 3/17/11 Facility Address: 1200 Coffee Rd.Bakersfield,CA Facility Contact: Jamieson Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 10,2011 Name of Local Agency Inspector(fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conducting Test: Scott Olinger Credentials: ❑CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number. 589517 Manufacturer Trainine Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made ANN SPACE#2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ANN SPACE#3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ 1 ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ N ❑ ❑ ❑ ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the 11� stated In this document are accurate and in full compliance with legal requirements Technician's Signa Date:-3/17/11 SWRCB,January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"GEL FILLED GAUGE W/CERTS Equipment Resolution:0-30 Tank#1 Tank#2 Tank#3 Tank# Is Tank Exempt From Testing?' ❑Yes WfNo ❑Yes No ❑Yes o ❑Yes ❑No Tank Capacity: 12,000 12,000 12,000 Tank Material: FIBERGLASS/ FIBERGLASS/ FIBERGLASS/ STEEL STEEL STEEL Tank Manufacturer: JOOR JOOR JOOR Product Stored: UNL PREM DIESEL Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN startin test: Test Start Time: 10:00 10:00 11:15 Initial Reading(R,): 8 HG 8 HG 8 HG Test End Time: 11:00 11:00 11:00 Final Reading(RF): 8 HG 8 HG 8 HG Test Duration: 1 HR 1 HR 1 HR Change in Reading(RF-R,): 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 Test-ResultAPass _ OFail _ Pass C_Fail Pass_ ;Fail ❑ Pass ❑,Fail,' . Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA EXes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑Mer(Sped) Test Method Used: Pressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15 Piping Run#I Piping Run#2 Piping Run#3 Piping Run#4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter: 3" 3" 3" 3"&4" Length of Piping Run: 40' 50' 60' 80' Product Stored: UNL PREM DIESEL VAPOR Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT piping-run isolation: UDC&STP UDC&STP UDC&STP UDC&STP Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 9:30 9:30 9:30 9:30 Initial Reading(Rj): 5.4 5.2 5.1 5.1 Test End Time: 10:30 10:30 10:30 10:30 Final Reading(RF): 5.4 5.2 5.1 5.1 Test Duration: 1 HR 1 HR I HR 1 HR Change in Reading(RF-R,): 0 0 0 0 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: oe Test Results Pass ❑Fail Pass ❑Fail Pass ❑Fail Pass ❑"Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑Pther(Spec) Test Method Used: dPressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15 Piping Run#5 Piping Run#6 Piping Run#7 Piping Run 0 4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH Piping Diameter: 3" 3" 3" Length of Piping Run: 100' 100' 100' Product Stored: UNL PREM DIESEL Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT piping-run isolation: &VR &VR STP&VR Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 10:45 10:45 10:45 Initial Reading(RI): 5.2 5.3 5.2 Test End Time: 11:45 11:45 11:45 Final Reading(RF): 5.2 5.3 5.2 Test Duration: 1 HR 1 HR l HR Change in Reading(RF-Rj): 0 0 0 Pass/Fail Threshold or 0 0 0 Criteria: Test Result: Pass,,, ❑'Fail.. Pass - ❑Fail li,.Oass. ❑';Fail, ❑ Pass ❑Fail Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: hl Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000 SUMP#1 SUMP#2 SUMP#3 Sump Diameter: 48" 48" 48" Sump Depth: 54" 50" 48" Sump Material: Height from Tank Top to Top of 12" 10" 10" Highest Piping Penetration: Height from Tank Top to Lowest 20" 25" 25" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY Portion of Sump Tested' 14" 12" 12" Does turbine shut down when // / sump sensor detects liquid(both As El No ❑NA /Yes ❑No ❑NA RYes ❑No ❑NA ❑Yes ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe 2/yes ❑No ❑NA &'Yes ❑No ❑NA [I/Yes ❑No ❑NA ❑Yes ❑No ❑NA shutdown?* Was fail-safe verified to be yes ❑No ❑NA Yes ❑No ❑NA [(Yes ❑No ❑NA ❑Yes ❑No ❑NA operational?* Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN test: Test Start Time: 11:01 11:01 1:51 Initial Reading(Ri): 7.7223 2.1924 5.0840 Test End Time: 11:16 11:16 2:06 Final Reading(RF): 7.7224 2.1920 5.0839 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-&): .0001 .0004 .0001 Pass/Fail Threshold or Criteria: .002 .00 .002, _ Test Result: Pass -❑Fail _ Pass ❑'Fail `c Pass (J�Esil ❑ Pass ❑'Fail Was sensor removed for testing? W Yes ❑No DNA Wyes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and verified functional after testing? Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) STP 3 REPLACED 3"ENTRY BOOT&RETEST. `If the entire depth of the sump is not tested,specify how much was tested. If the answer to Any of the questions indicated with an asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. UND R-DISPENSER CONTAINMENT(U1DQ TESTING Test Method Developed By: YUDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 UDC Manufacturer: WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 31" 31" 31" 31" Height from UDC Bottom to Top 10" 12" 10" 10" of Highest Piping Penetration: Height from UDC Bottom to 8" 8" 8" 8" Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testing: Portion of UDC Tested 12" 14" 12" 12" Does turbine shut down when // / UDC sensor detects liquid(both YYes ❑No ❑NA U Yes ❑No ❑NA 9�Yes ❑No ❑NA i kes ❑No ❑NA product and water)? Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail- yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA safe shutdown?* Was fail-safe verified to be o e ional?* Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA rat Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test Test Start Time: 9:35 9:35 9:35 9:35 Initial Reading I): 5.2130 5.1072 5.3874 4.9208 Test End Time: 9:51 9:51 9:51 9:51 Final Reading(RF): 5.2128 5.1065 5.3871 4.9209 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-n: .0002 .0007 .0003 .0001 Pass/Fail Threshold or Criteria: .002 .002 -002 .002 :.Test Result:' Pass ❑Fail Pass'-=❑Fail A(e_s::C P 0 Fail'- Pass r :D.Feil° Was sensor removed for testing? es ❑No ❑NA es ❑No ❑N No ❑NA ❑No ❑NA Was sensor properly replaced and yes ❑No ❑NA t/Yes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Eq ipped With Fill Riser Containment Sums ❑ Fill Riser Containment Sumps are Pre nt,but were Not Tested ❑ Test Method Developed By: W Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum WHydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Fill Sump#1 Fill Sump#2 Fill Sump#3 Fill Sump#4 Sump Diameter: 42" 42" 42" " Sump Depth: 54" 50" 48" Height from Tank Top to Top of 0 0 0 Highest Piping Penetration: Height from Tank Top to Lowest 24" 24" 24 Electrical Penetration: Condition of sump prior to DRY DRY DRY testing: Portion of Sump Tested 12" 12" 12" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test: Test Start Time: 11:01 11:01 12:01 Initial Reading(Ri): 5.4966 2.5971 1.6416 Test End Time: 11:16 11:16 12:16 Final Reading(RF): 5.4964 2.5970 1.6414 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading Rj): .0002 .0001 .0002 Pass/Fail Threshold or Criteria: .002 .002 .002 Test Result: ass: DFAiV, dais ❑Fail ass ❑Fail �-,^D Pass 0-Fail Is there a sensor in the sump? 4Yes ❑No &Yes ❑No Yes ❑No ❑Yes ❑No Does the sensor alarm when / / / either product or water is L�Yes ❑No ❑NA C7 Yes ❑No ❑NA ( 'Yes ❑No ❑NA ❑Yes ❑No ❑NA detected? Was sensor removed for testing? 91 Yes ❑No ❑NA Rf Yes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA verified functional after test Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA in ? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9. SPILLlOVERFILL CONTAINMENT BOXES Facility is Not E ui ed With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ Test Method Developed By: El Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Specify) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 Spill Box#1 Spill Box#V1 Spill Box#2 Spill Box#V2 Bucket Diameter: 12" 12" 12" 12" Bucket Depth: 12" 12" 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 10:35 10:35 11:19 11:19 Initial Reading(RI): 5.3070 3.3003 2.4222 4.3930 Test End Time: 10:50 10:50 11:34 11:34 Final Reading(RF): 5.3069 3.3002 2.4213 4.3927 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-RO: .0001 .0001 .0009 .0003 Pass/Fail Threshold or 002 .002 .002 .002 Criteria: Test Result: Pass` O Fail �'. Pass ..p Fail Pass ❑Fail Pass D Fail_` Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9. SMIJOVERFH L CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Pr sent,but were Not Tested ❑ Test Method Developed By: Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum 4Hydrostatic ❑Other(Spec) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Box#3 Spill Box#V3 Spill Box Spill Box Bucket Diameter: 12" 12" Bucket Depth: 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN starting test: Test Start Time: 12:31 12:31 Initial Reading(RO: 2.8484 6.1794 Test End Time: 12:46 12:46 Final Reading(RF): 2.8479 6.1794 Test Duration: 15 MIN 15 MIN Change in Reading(RF-Ri): .0005 .0000 Pass/Fail Threshold or .002 .002 Criteria: TesfResult: `.Pass ❑-Fail` Rass ❑Fa>l ❑��Pass,. ❑Fail s_0 Pass ❑Fa.il Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) FASTRIP 705 1200 COFAEE RD BAKERSFIELDI 3308 FASTRIP 705 SUNSET CONST - 1200 COFFEE RD FASTRIP 705 BKERSFIELD 93308 120+ COFFEE RD 1-800-98$-6266 SUNSET CONST t3RKERSFIELD 93308 1-800-984-6266 SUNSET CONST 03/17/2011 1:50 PM 07,/17/2011 10:16 AM 1-800-984-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST ?DEPORT 03/17/2011 10:50 AM SPILLI SUMP LEAK TEST REPORT STP3 SPILL! ' TEST STARTED 10:01 AM TEST STARTED 03/17/2011 TEST STARTED 10'35 AM TEST STARTED 1:35 PM BEGIN LEVEL 5.3055 IN / TEST STARTED 03/17/2011 END TIME 10:16 AN TEST STARTED 03 1r/2-11 IN BEGIN LEVEL 5.0840 IN _END DATE X73.3055 11 BEGIN !FUEL 5.3S70A AM END LEVEL 5.305` IN END TIME 10:5_ END TIME 1:50 PM END DATE 03/17/2011 END DATE 03/17/2011 LEAK THRESHOLD 0.002 IN END LEVEL 5.3069 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN END LEVEL 5,0841 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN USPILLI TEST RESULT PASSED TEST STARTED 10:01 AM U^PILL1 TEST STARTED 03/17/2011 TEST STARTED 13:35 AM 10: BEGIN LEVEL 212 IN TEST STARTED 03/17/2011 END TIME 10: BEGIN LEVEL 3.3003 IN END DATE 03/17/2011 END LEVEL 2.8912 IN END TIME 10:50 Rid END DATE 03/17/2011 LEAK THRESHOLD 0.00-4 PASSED END LEVEL 3.3002 IN TEST RESULT LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRIP 705 1200 COFFEE RD BAKERSFIELD 93308 SUNSET CONST 1-800-984-6266 03/17/2011 2:06 PM SUMP LEAK TEST REPORT STP3 TEST STARTED 1:51 PM TEST STARTED 03/17/2011 BEGIN LEVEL 5,0840 IN END TIME 2:06 PM END DATE 03/17/2011 END LEVEL 5.0839 IN `r LEAK THRESHOLD 0,002 IN _ TEST-RESULT PASSED AP," 2011 1200 COFFEE RD BAKERSFIELD 93308 FASTRIP 705 SUNSET CONST 1200 COFFEE RD 1-800-984-6266 BAKERSFIELD 93308 SUNSET CONST FASTRIP 705 03/1 7/2011 12:31 Ph SUNSET 1200 COFFEE RD SUMP LEAK TEST REPORT 03/17/2011 11:17 Art BAKERSFIELD 93308 SUNSET CONST SPILLS SUMP LEAK TEST REPORT 1-800-984-6266 TEST STARTED 12:15 PM SPiLL2 03/17/2011 12:16 PM TEST STARTED 03/17/2011 BEGIN LEVEL 2.3490 IN TEST STARTED 11:02 AM END TIME 12'31 PM TEST STARTED 03/17/2011 SUMP LEAK TEST REPORT END DATE 03/17/2011 BEGIN LEVEL 2.4229 IN END LEVEL 2.8485 IN END TIME 11:17 AM LEAK THRESHOLD 0.002 IN END DATE 03/17/2011 STP1 TEST RESULT PASSED END LEVEL 2.4224 IN LEAK THRESHOLD 0.002 IN TEST STARTED 12:01 PM VSPILL3 TEST RESULT PASSED TEST STARTED 03/17/2011 BEGIN LEVEL 7,7224 IN TEST STARTED 12:15 PM USPILL2 END TIME 12:16 PM TEST STARTED 03/17/2011 END DATE 03/17/2011 BEGIN LEVEL '6.1797 IN TEST STARTED 11:02 AM END TIME 12:31 PM TEST STARTED 03/17/2011 END LEVEL 7,7223 IN END DATE 03117/2011 BEGIN LEVEL 4.3941 IN END LEVEL 6.1794 IN END TIME 11:17 AM LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN END DATE 03/17/2011 TEST RESULT PASSED TEST RESULT PASSED END LEVEL 4.3933 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED. STP3 TEST STARTED 12:01 PM TEST STARTED 03/17/2011 BEGIN LEVEL 4,6008 IN END TIME 12:16 PM FASTRIP 705 END DATE 03/17/2011 1200 COFFEE RD END LEVEL 4,5829 IN BAKERSFIELD 93308 FASTRIP 705 LEAK THRESHOLD 0,002 IN SUNSET CONST 1200 COFFEE RD TEST RESULT FAILED 1-800-984-6266 BAKERSFIELD 93308 SUNSET CONST 03/17/2011 12:47 PM 1-800-984-6266 FILL3 SUMP LEAK TEST REPORT 03/17/2011 11:135 Arl SPILL3 SUMP LEAK TEST REPORT TEST STARTED 12:01 PM TEST STARTED 03/17/2011 TEST STARTED 12:31 PM SP IL L2 BEGIN LEVEL 1,6416 IN TEST STARTED 03/17/2011 BEGIN LEVEL 2.8484 IN TEST STARTED 11:19 AM END TIME 12:16 PM END TIME 12:46 PM TEST STARTED 03117/2011 END DATE 03/17/2011 END DATE 03/17/2011 BEGIN LEVEL 2.4222 IN END LEVEL 1,6414 IN END LEVEL 2.8479 IN END TIME 11:34 AM LEAK THRESHOLD 0.002 IN END DATE 03/17/2011 LEAK THRESHOLD 0,002 IN TEST RESULT PASSED END LEVEL 2.4213 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN ----- - - TEST RESULT PASSED VSPILL3 TEST STARTED 12:31 PM USPILL2 TEST STARTED .03/17/2011 BEGIN LEVEL 6.1794 IN TEST STARTED 11:19 AM END TIME 12:46 PM TEST STARTED 03/17/2011 END DATE 03/17/2011 BEGIN LEVEL 4.3930 IN END LEVEL 6.1794 IN END TIME 11:34 AM LEAK THRESHOLD 0.002 IN END DATE 03/17/2011 TEST RESULT PASSED END LEVEL 4.3927 IN -- -- - --- LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRIP 705 FASTRIP 705 1200 COFFEE RD 1200 COFFEE RD BAKERSFIELD.93308 BAKERSFIELD 93308 SUNSET CONST FASTRIP 705 SUNSET CONST 1-800-984-6266 1200 COFFEE RD 1-800-984-6266 BAKERSFIELD 93308 03/17/2011 10:58 AM 03/17/2011 11:16 AM SUNSET CONST 1-800-984-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 03/17/2011 11:59 AM STP1 STP1 SUMP LEAK TEST REPORT TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP1 BEGIN LEVEL 7.7261 IN BEGIN LEVEL 7.7223 IN END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011 END LEVEL 7,7223 IN END LEVEL 7.7224 IN BEGIN LEVEL 7,7224 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END TIME 11:59 AM TEST RESULT FAILED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 7,7225 IN LEAK THRESHOLD 0,002 IN STP2 STP2 TEST RESULT PASSED TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP3 BEGIN LEVEL 2, 1927 IN BEGIN LEVEL 2.1924 IN END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011 END LEVEL 2, 1924 IN END LEVEL 2,1920 IN BEGIN LEVEL 4,6 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN END TIME 11::559 9 AM TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 4,6092 IN LEAK THRESHOLD 0,002 IN FILL1 FILL1 TEST RESULT FAILED TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 FILL3 BEGIN LEVEL 5.4957 IN BEGIN LEVEL 5,4966 IN END TIME 10:57 AM � END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 0 .6420011 1 END LEVEL 5,4967 IN END LEVEL 5.4964 IN BEGIN LEVEL 1,6420 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002. IN END TIME 11:59 AM TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 1.6417 IN LEAK THRESHOLD 0,002 IN FILL2 FILL2 --JEST RESULT PASSED -_- TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 BEGIN LEVEL 2,5973 IN BEGIN LEVEL 2,5971 IN END TIME 10:57 AM END TIME 11:16 AM END DATE 03/17/2011 END DATE 03/17/2011 END LEVEL 2,5971 IN END LEVEL 2.5970 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED FASTRIP 705 FASTRIP 705 1200 COFFEE RD 1200 COFFEE RD BAKERSFIELD 93308 BAKERSFIELD 93308 SUNSET CONST SUNSET CONST 1-800-984-6266 1-800-9$4-62fi6 03/17/2011 9:35 AM 03/17/2011 9:51 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT UDC1-2 UDC1-2 9:19 AM TEST STARTED 9:35 AM TEST STARTED TEST STARTED 03/17/2011 TEST STARTED 03(17/2011 BEGIN LEVEL 5,2154 IN BEGIN LEVEL 5,2130 IN ENO TIME 9:34 AM END TIME 9:51 AM 03/17/2011 END DATE 03/17/2011 END DATE END LEVEL 5,2128 IN END LEVEL 5.2154 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED UOC34 UDC3-4 TEST STARTED 9'19 AM TEST STARTED 9:35 AM TEST STARTED 03/17/2011 TEST STARTED 035 1066 IN BEGIN LEVEL 5,1072 IN BEGIN LEVEL 9:34 AM END TIME 9:51 AM END TIME 03/17(2011 END DATE 03/17/2011 END DATE END LEVEL 5,1065 IN END LEVEL 5,i0fi8 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED UDC5-6 UDC5-6 TEST STARTED 9:19 At TEST STARTED 9:35 AM TEST STARTED 03/17/2011 TEST STARTED 03(17(2011 BEGIN LEVEL 5,3882 IN BEGIN LEVEL 5,3874 IN END TIME 9:34 AM END TIME 9:51 AM END DATE 03/17/2011 END DATE 03/17/2011 END LEVEL 5.3877 IN END LEVEL 5.3871 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED UDC7-8 UDC7-8 TEST STARTED 9:35 AM TEST STARTED 9:19 AM TEST STARTED 03/17/2011 TEST STARTED 03/17J2011 BEGIN LEVEL 4,9194 IN BEGIN LEVEL 4,9208 IN END TIME 9;34 AM END TIME 9:51 AM END DATE 03/17/2011 END DATE 03/17/2011 END LEVEL 4.9196 IN END LEVEL 4,9209 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED w _ES_____. ___