HomeMy WebLinkAboutFMC 2011 SWRCB,January 2002 I IIIIIII VIII IIIIIII 67 Page of IE Secondary Containment Testing Report Form Thu form is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of thisform to report results for all components tested The completed form,written test procedures,and printouts from tests(if applicable),should be provided to the facility awner/operator for submittal to the local regulatory agency. 1. FACH=INFORMATION Facility Name: Fastrip#705 Date of Testing: 3/17/11 Facility Address: 1200 Coffee Rd.Bakersfield CA Facility Contact: Jamieson Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 10,2011 Name of Local Agency Inspector(if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Cond Test: Scott Olinger Credentials: CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number: 589517 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS 'on-E pi meat 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made UDC 1-2 ❑ ❑ ❑ SPILL#2 Et ❑ ❑ ❑ UDC 3-4 19 ❑ 0 0 V SPILL#2 fl ❑ 0 ❑ UDC 5-6 0 0 1 ❑ SPILL#3 ❑ ❑ ❑ UDC 7-8 0 0 ❑ V SPILL#3 ❑ ❑ ❑ ST?#1 5f ❑ ❑ 0 PIPING RUN#1 0 ❑ 0 STP#2 ❑ ❑ 0 PIPING RUN#2 7 ❑ ❑ 0 ST?#3 ❑ ❑ PIPING RUN#3 t ❑ ❑ ❑ FILL#1 ❑ ❑ 0 PIPING RUN#4 ❑ ❑ 0 FILL#2 ❑ ❑ ❑ PIPING RUN#5 ❑ 0 ❑ FILL#3 ❑ ❑ I ❑ PIPING RUN#6 ❑ ❑ ❑ SPILL#1 0 0 ❑ PIPING RUN#7 0 0 0 V SPILL#1 0 ❑ ❑ ANN SPACE#1 ❑ ❑ 0 If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the stated in this anent are accurate and in full compliance with legal requirements Technician's Signature: Date: 3/17/11 IIIIIII VIII III IIII 68 IE SWRCB,January 2002 Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of USTsecondary containment systems. Use the appropriate pages of thisform to report results for all components tested The completed form,written test procedures, and printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#705 TIED ate of Testing: 3/17/11 Facility Address: 1200 Coffee Rd.Bakersfield,CA Facility Contact: Jamieson Hill I Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 10,2011 Name of Local Agency Inspector(rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conducting Test: Scott Olinger Credentials: ❑CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number: 589517 Manufacturer Trainine Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection Equipment 1/18/13 Veer Root Monitorin System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made ANN SPACE#2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ANN SPACE#3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ D ❑ ❑ D 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ D D 0 ❑ O ❑ 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ D 0 0 0 0 0 0 ❑ ❑ D ❑ ❑ D D 0 ❑ ❑ ❑ D ❑ ❑ D 0 0 ❑ ❑ ❑ ❑ 0 0 ❑ ❑ 0 ❑ D D D 0 ❑ 0 ❑ 1 0 0 0 ❑ ❑ 0 If hydrostatic testing was performed,describe what was done with the water after completion of Nests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of m:knowledge,the r stated m this document are accurate and in full compliance with legal requirements Technician's Si Date: 3/17/11 SWRCB,January 2002 Page_of 4..,TANK ANNULAR TESTING Test Method Developed By: EYTank Manufacturer ❑industry Standard 0 Professional Engineer 0 Other(Specify) I Test Method Used. 0 Pressure fi(Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used 4-GEL FILLED GAUGE W/CERTS Equipment Resolution:0-30 Tank#1 Tank#2 Tank#3 Tank# Is Tank Exempt From Testing?' ❑Yes No ❑Yes No 0 Yes 9'No 0 Yes ❑No Tank Capacity: 12,000 12,000 12,000 Tank Material: FIBERGLASS FIBERGLASS FIBERGLASS STEEL STEEL STEEL Tank Manufacturer. JOOR JOOR JOOR Product Stored: UNL PREM. DIESEL Wait time between applying pressure/vacuum/water and IOMIN 10 MIN 10 MIN starting test. Test Start Time: 10:00 10:00 11:15 Initial Reading(Rj: 8 H 8 HG 8 HG Test End Time: 11:00 11:00 11:00 Final Reading(RF): 8 HG 8 HG 8 HG Test Duration: I HR I HR I HR Change in Reading(RF-Ri): 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 TWke A 1-FAil- Pan 0 Fail Pass Fail ❑ Pa SO 0 Fafl,' Was sensor removed for testing? -dYes DNo, DNA es 0 No DNA es 0 No 0 NA 0 Yes ❑No DNA Was sensor properly replaced and Yes ONo DNA WYes ONo DNA Yes O No DNA ❑Yes 0 No DNA verified functional after te CO MMeUtS—(include it formation on repairs made prior to testing; and recommended follow-up for failed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. (California Code of Regulations,Title 23,Section 2637(aX6)) SWRCB,January 2002 Page_of 5. SECONDARY PIPE TESTING Test Method Developed By: lPiping Manufacturer ❑industry Standard ❑Professional Engineer ❑pther(Specify) Test Method Used IS/Pressure ❑Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used:4"GEL FELLED GAUGE W/CERTS Equipment Resolution- 0-15 Piping Run#I Piping Run#2 Piping Run#3 Piping Run'#4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer. AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter. 3" 3" 3" 31'&4" Length of Piping Run: Q, 50, 60' 80, Product Stored: UNL PREM DIESEL VAPOR Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT piping-run isolation: UDC&STP UDC&ST? UDC&STP UDC&ST? Wait time between applying pressure/vacuum/water and 10 MIN 10 NUN 10 MEN 10 MIN starting test Test Start Time: 9:30 9:30 9:30 9:30 Initial Reading(RL): 5.4 5.2 5.1 5.1 Test End Time: 10:30 10:30 10:30 10.30 Final Reading(Rf): 5.4 52 5-1 5.1 Test Duration- I HR I HR I HR I HR Change in Reading(RF-R4): 0 0 0 0 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: 4 7W, Pass ❑Fail P&ss a pisi al Pass COMMentS—(include information on repairs made prior to testing, and recommended follow-up for failed tam) SWRCB,January 2002 Page_of 5. SECONDARY PIPE TESTING Test Method Developed By: K(Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑ether(Spec) Test Method Used: dPressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15 Piping Run#5 Piping Run#6 Piping Ran#7 Piping Run 0 4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH Piping Diameter. 3" 3" Length of Piping Run: 100, 1001 100, Product Stored: UNL PREM DIESEL Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT piping-run isolation: &VR &VR STP&VR Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN starting test Test Start Time: 10:45 10:45 10:45 Initial Reading(RO: 5-2 5.3 52 Test End Time: 11:45 11:45 11:45 Final Reading(RF): 52 5.3 52 Test Duration: I HR I HR 1 HR Change in Reading(Rf-Rj): 0 0 0 Pass/Fail Threshold or 0 0 0 Criteria: 'Test Result: Id Pass. b'Faii Passe Fail ]' --:.G(Pass --[]:Fail-I O -Pass'`. []Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page_of 6. PIPING SUW TESTING Test Method Developed By: 5f Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used. ❑Pressure D Vacuum N(Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 SUMP#1 SUMP#2 SUMP#3 Sump Diameter: 48" 48" 48" Sump Depth: 54" 50" 48" Sump Material: Height from Tank Top to Top of 12" 10" 10" Highest Piping Penetration: Height from Tank Top to Lowest 20" 25" 25" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY Portion of Sump Tested' 14" 12" 12" Does turbine shut down when sump sensor detects liquid(both VYes ❑No ❑NA {/Yes ❑No ❑NA U/Yes ❑No DNA DYes DNo DNA product and water)?0 Turbine shutdown response time 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe /!❑No ❑NA &Yes 0 No 11 NA 5/ shutdown?* Yes ❑No ❑NA 0 Yes ❑No ❑NA Was fail-safe verified to be No DNA _WYes ONo DNA (/Yes DNo [INA 0 Yes ❑No ❑NA operational?* Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN 10 bm test Test Start Time: 11:01 11:01 1:51 Initial Reading(RO: 7.7223 2.1924 5.0840 Test End Time: 11:16 11:16 2:06 Final Reading(RF): 7.7224 2.1920 5.0839 Test Duration: 15 WN 15 MIN 15 NIIN Change in Reading(Rf-": .0001 .0004 .0001 Pass/Fail Threshold or Criteria: .002 .001 .002, -'Test kesult.- Pass _0 FAff- Pass rass'� :.D:FaU Pais -0❑Fail: -0 ail , P, Q( 1P 10asi Was sensor removed for testing? 9(Yes DNo ❑NA WYes ONo DNA es ONo DNA DYes ONo DNA Was sensor properly replaced and LVyes 0 No ❑NA Yes ONo nNA OYes ❑No DNA ❑Yes ❑No 0 NA verified functional after testis - CommentS—(include irk afion on repairs made prior to testing: and recommended follow-up for failed tests) STP 3 REPLACED 3"ENTRY BOOT&RETEST. If the entire depth of the sump is not tested,specify how much was tested. If the answer to my of the questions indicated with an asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page_of 7. -DISPENSER CONTAINMENT(UDC)TESTING Test Method Developed By: IYUDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum &(Hydrostatic ❑Other(Specify) Test Equipment Used: INCON TS-ST'S Equipment Resolution: 0.0000 K'� ✓-11'-UDC#1-2 UDC N 3-4 UDC#5-6 UDC 4 7-8 21 UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 31" 31" 31" 3137 Height from UDC Bottom to Top 10" 12" 10" 10" of Highest Piping Penetration: Height from UDC Bottom to 8" 8" 8" 811 Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testing: Portion of UDC Tested 12" 14" 12" 12" Does turbine shut down when UDC sensor detects liquid(both C4/Yes 11 No ❑NA As ❑No DNA &/Yes ❑No DNA Rkes ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC r 20 SEC 20 SEC 20 SEC Is system programmed for fail- Q(Yes 0 No 0 NA 5/Yes 0 No DNA &(Yes 0 No DNA Q(Yes ❑No 0 NA safe shutdown?* Was fail-safe verified to be operational?' �Yes ❑No 0 NA 5/Yes ❑No DNA R Yes ❑No DNA OY(Yes 11 No DNA Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN pressurelvacuum/water and starting test Test Start Time: 9:35 935 9:35 9:35 Initial Reading(R4): 52130 5.1072 5.3874 4.9208 Test End Time: 9:51 9:51 9:51 9:51 Final Reading(RF): 52128 5.1065 5.3871 4.9209 Test Duration: 15 NUN 15 MIN 15 MIN 15 MIN Change in Readm (RF-Rj: .0002 .0007 .0003 .0001 Pass/Fail Threshold or Criteria: .002 .002 002 .002 0 Fall Fail a. Tist Wsuft: Pass.. Pass DYAH .".-- �--,*Pass ��-O I wm� Pass; t7 Fail Was sensor removed for testing? Qf es ❑No ❑NA StYes ❑No 0 NA dYes ONo, DNA ONo DNA Was sensor properly replaced and FT VYes ❑No DNA Yes ONo DNA S/Yes DNo DNA es ONo DNA verified functional after testis ? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to m of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-1 60) SWRCB,January 2002 Page of 8. FILL RISER CONTAM[EW SUW TESTING FaciHty is Not Equipj)ed With Fill Riser Containment Sumps ❑ Pill Riser Containment Sumps are EMpt,but were Not Tested ❑ Test Method Developed By EtSump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used- ❑Pressure ❑Vacuum WHydrostatic ❑Other(Specify) Test Equipment Used,INCON TS-STS Equipment Resolution:0.0000 Sump Diameter 42" 42" 42" Sump Depth: 54" 50" 48" Height from Tank Top to Top of 0 0 0 Highest Piping Penetration: Height from Tank Top to Lowest 2412 24" 24 Electrical Penetration: Condition of sump prior to DRY DRY DRY -testis 9; Portion of Sump Tested 12" 12" 12" _S ump Material: FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test. Test Start Time: 11.01 11:01 12:01 Initial Reading 5.4966 2.5971 1.6416 Test End Time: 11:16 11:16 12:16 Final Readin g 5.4964 2.5970 1.6414 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-N: .0002 .0001 .0002 Pass/Fail Threshold or Criteria: .002 .002 .002 ]Fail. OF Vpas`s�-�-,b Fair D, Ail Pass Is there a sensor in the sump? 9(Yes ❑No If Yes ❑No &Yes ❑No ❑Yes ❑No Does the sensor alarm when either product or water is Wyes ❑No ❑NA 2/yes ❑No ❑NA R/Yes DNo DNA ❑Yes ❑No ❑NA detected? 1 4 1 Was sensor removed for testing? @I yes ❑No ❑NA slYes DNo DNA Sfyes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and 5(yes ❑No ❑NA &(Yes, ❑No DNA U(Yes ❑No DNA ❑Yes ❑No ❑NA verified functional after testis ? I Comments—('include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page_of 9. SPHLUOVERYELL CONTAE4AWNT BOXES Facility is Not Equiged With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes we Present,but were Not Tested ❑ Test Method Developed By 61 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used. ❑Pressure ❑Vacuum 5(Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 ,_ sn3' Spill Box#1 Spill Boa#V1 Spill Bog#2 Spill Boz W2 Bucket Diameter. 12" 12" 12" 12" Bucket Depth: 12" 12" 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test. Test Start Time: 10:35 10:35 11:19 11:19 Initial Reading(Ri): 5.3070 3.3003 2.4222 43930 Test End Time: 10:50 10:50 11:34 11:34 Final Reading(RF): 5.3069 33002 2.4213 43927 Test Duration: 15 MIN 15 NUN 15 MIN 15 NEN Change in Reading(RF-Ri): .0001 .0001 .0009 .0003 Pass/Fail Threshold or Criteria: 4 .002 4 .002 .002 .002 Test Result G Pass % Pass, G al Pass. 4Pass` COMMentS—(include information on repairs made prior to testing; and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9. SPRUOVERFELL CONTAENMENT BOXES Facility is Not Eg With Spill/Overfill Containment Boxes ❑ _Spill/Overfill Containment Boxes are sent,but were Not Tested ❑ Test Method Developed By: 16 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used. ❑Pressure ❑Vacuum 4Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Box#3 Spill Box#V3 Spill Box Spill Box Bucket Diameter. 12" 12" Bucket Depth. 12" 12" Wait time between applying pressurelvacuum/water and 10 MIN 10 MIN -st in test Test Start Time: 12:31 12:31 Initial Reading(Rj): 2.8494 6.1794 Test End Time: 12:46 12-46 Final Reading(RF): 2.8479 6.1794 Test Duration: 15 MIN 15 MIN Change in Reading(RF-PQ: .0005 .0000 Pass/Fad Threshold or .002 .002 Criteria: Test Res61t 0 FAil, Pass '13i Fail V ,.G-Pass,.., COMMeUtS—(include information on repairs made prior to testing; and recommended follow-up for faded tests) FASTRIP 705 1200 COFFEE RD BAKERSFIELV93308 FASTRIP 705 SUNSET C011 . 1200 COFFEE RD FASTRIP 705 aAKERSFIELD 93308 i20E, COFFEE RD 1-800-984-6266 SUNSET CONST BAKERSFIELD 93308 1-800-984-6266 SUNSET CONST- 03/17/2011 1:50 PM 03/17/2011 i0:16 AM 1-800-584-6266 SUMP LEAK TEST REPORT SUMP LE.W, TEST REPORT 03/17/24011 16:50 AM SPILLi SUMP LEAK TEST REPORT STP3 TEST STARTED 10:01 Ail SPILLI TEST STARTED 1:35 PM TEST STARTED 03/1"?/2011 BEGIN LEVEL T IN TEST STARTED 10:35 AM TEST STARTED 03/17/2011 END TIM 10:16 AEA TEST STARTED 03/17/201 BEGIN LEVEL 5.0840 IN ENt� GATE 03/17/2x11 BEGIN LEVEL 5.3076 IN END TIME 1'50 PM END LEVEL 5.3055 IN END TIME 10:50 AM END DATE 03/"7/2011 LEAK THRESHOLD 0.002 IED END LEVEL 5.3069 IN END DATE 03/17/2011 TEST RESULT END LEVEL 5.0841 IN LEAK T RESULT ��PASSED LEAK THRESHOLD 0.002 IN VSPILL" TEST RESULT PASSED TEST STARTED 10:01 AM USPILLI TEST STARTED 03/17/2011 TEST STARTED 10:35 Art BEGIN LEVEL FAD TIt"E 10:16 AM TEST STARTED 03/17/2011 ENa DATE 03/17/2011 BEGIN LEVEL 3.3603 IN END ��VEL '2.891.2 IN END TIME 10:50 AM LEAK THRESHOLD 0,002 IN END LEVEL 03/17/2011 LEAK TEST RESULT LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRIP 705 1200 COFFEE RD BAKERSFIELD 93308 SUNSET CONST 1-800-984-6266 03/17/2011 2:06 PM SUMP LEAK TEST REPORT STP3 TEST STARTED 1:51 PM TEST STARTED 03/17/2011 BEGIN LEVEL 5,0840 IN END TIME 2:06 PM END DATE 03/17/2011 END LEVEL 5.0839 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED 1200 COFFEE RD BAKERSFIELD 93308 FASTRIP 775 SUNSET CON�T 1202 COFFEE RD 1-800-984-6266 BAKERSFIELD 93308 FASTRIP 705 03/17/201' 12:31 Ph' 1 SUNSET 984-6266 1200 COFFEE RQ BAKERSFIELD 93308 SUMP LEAK TEST REPORT 63/17/2611 11:17 Rh. SUNSET CONST SPILLS SUMP LEAK TEST REPORT 1-800-984-6266 TEST STARTED 12:15 Phi SPILL2 �3J17/2011 12:16 PM TEST STARTED 03.17/2011 BEGIN LEVEL 2.8490 IN TEST STARTED 11:02 AM END TIME 12:31 Phi TEST STARTED 03/17/20/1 SUMP LEAK TEST REPORT END DATE 03/17/2011 BEGIN LEVEL 2.4229 IN END LEVEL 2.8485 IN END TIME 11:17 AM LEAK THRESHOLD 0.002 IN END DATE 93/17/2011 STP1 TEST RESULT PASSED END LEVEL 2.4224 IN LEAK THRESHOLD 0.002 IN TEST STARTED 12:01 PM USRILL3 TEST RESULT PASSED rEST STARTED 03/17/2011 3EGIN LEVEL 7.7224 IN TEST STARTED 12:15 Phi VSPILL2 _ND TIME 12:16 PM TEST STARTED 03/17/2011 BEGIN LEVEL 6.1797 IN TEST STARTED 11:02 AM :ND DATE 03/17/2011 END TIME 12:31 PM TEST STARTED 03/17/2011 END LEVEL 7.7223 IN END DATE 03/17/2011 BEGIN LEVEL 4.3941 IN -EAK THRESHOLD 0.002 IN -34D LEVEL 6.1794 IN END TIME 11:17 AM TEST RESULT PASSED LEAK THRESHOLD 6.062 IN END DATE 03/17/2011 TEST RESULT PASSED END LEVEL 4.3933 IN LEAK THRESHOLD 0.002 Iii TEST RESULT PASSED_ STP3 TEST STARTED 12:01 PM TEST STARTED 03/1712011 BEGIN LEVEL 4.6008 IN END TIME 12:16 PM END DATE 03/17/2011 -27FASTRIP E 1200 60 COFFEE EE RD END LEVEL 4.5829 IN BAKERSFIELD 93308 FASTRIP 705 LEAK THRESHOLD 0.002 IN SUNSET CONS' 1200 COFFEE RD TEST RESULT FAILED 1-500-984-6266 BAKERSFIELD 93308 SUNSET CONST 03/17/2011 12:47 Phi 1-800-954-6266 FILL3 SUMP LEAK TEST REPORT 03/17/2911 11:35 ANA SPILLS SUMP LEAK TEST REPORT TEST STARTED 12:01 PM TEST STARTED 03/17/2011 TEST STARTED 12.31 1-1 SPILL2 TEST STARTED 03/17/2011 BEGIN LEVEL 1.6416 IN BEGIN LEVEL 2.8484 IN TEST STARTED 11:19 AM END TIME 12:16 PM END TIME 12:46 PM TEST STARTED 03/17/2011 END DATE 03/17/2011 END DATE 93/17e2Ofl BEGIN LEVEL 2.4222 IN END LEVEL 1.6414 IN END LEVEL 2.8479 IN END TIDE 1134 AM BEAK THRESHOLD 0.002 IN END DATE 03/17/2011 LEAK THRESHOLD 0.002 IN TEST RESULT PASSED END LEVEL 2.4213 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN ---—-- --- ------- TEST RESULT PASSED VSPILL3 TEST STARTED 12:31 PM USPI;_LZ TEST STARTED .03/17/2011 BEGIN LEVEL 6.1794 IN TEST STARTED 11:19 AM END TIME 12:46 PM TEST STARTED 03/17/2011 END DATE 03/17/2011 BEGIN LEVEL 4.3930 IN END LEVEL 6.1794 IN END TIME 11:34 AM LEAK THRESHOLD 0.002 IN END DATE 03/17/2011 TEST RESULT PASSED END LEVEL 4.3927 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRiP 705 FASTRIP 705 1200 COFFEE RD 1200 COFFEE RD BAKERSFIELD 93308 BAKERSFIELD 93308 SUNSET CONST SUNSET CONST FASTRIP 705 1-800-984-6266 1-800-984-6266 1200 COFFEE RD BAKERSFIELD 93308 03/17/2011 10:58 AM 03/17/2011 11:16 AM SUNSET CONST 1-800-984-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 43/17/2011 11:59 AM STP1 STP1 SUMP LEAK TEST REPORT TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP1 BEGIN LEVEL 7.7261 IN BEGIN LEVEL 7.7223 IN END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011 END LEVEL 7,7223 IN END LEVEL 7,7224 IN BEGIN LEVEL 7,7224 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END TIME 11:59 AM TEST RESULT FAILED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 7,7225 IN LEAK THRESHOLD 0.002 IN STP2 STP2 TEST RESULT PASSED TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP3 BEGIN LEVEL 2, 1927 IN BEGIN LEVEL 2. 1924 IN END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011 4.6 9 IN 7/2d11 BEGIN LEVEL 4 END LEVEL 2, 1924 IN END LEVEL 2,1920 IN 1:5 1 LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN END TIME 11:59 AM TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 4,6092 IN LEAK THRESHOLD 0,002 IN FILL1 FILL1 TEST RESULT FAILED TEST STARTED 10:42 AM TEST STARTED 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 FILL3 BEGIN LEVEL 5,4957 IN BEGIN LEVEL 5.4966 IN END TIME 10:57 AM � END TIME 11:16 AM TEST STARTED 11:44 AM END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 01.6420 IN 011 BEGIN LEVEL 1,6 END LEVEL 5,4967 IN END LEVEL 5,4964 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002- IN END TIME 11::59 59 AM TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011 END LEVEL 1,6417 IN LEAK THRESHOLD 0,002 IN FILL2 FILL2 _TEST RESULT— PASSED TEST STARTED 10:42 AM TEST STARTEO 11:01 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 BEGIN LEVEL 2,5973 IN BEGIN LEVEL 2,5971 IN END TIME 10:57 AM END TIME 11:16 AM END DATE 03/17/2011 END DATE 03/17/2011 END LEVEL 2,5971 IN END LEVEL 2,5970 IN - LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED FASTRIP 705 FASTRIP 705 1200 COFFEE RD 1200 COFFEE RD BAKERSFIELD 93308 BAKERSFIELD 93308 SUNSET CONST SUNSET CONST 1-800-984-6266 1-800-984-6266 03/17/2011 9;35 AM 03/17/2011 9:51 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT UDC1-2 UDC1-2 TEST STARTED 9:19 AM TEST STARTED 9:35 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 BEGIN LEVEL 5.2154 IN BEGIN LEVEL 5.2130 IN 9:34 AM END TIME 9:51 AM END TIME 03/17/2011 END DATE 03/17/2011 END DATE E END LEVEL 5.2150 IN ND LEVEL 5.2128 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED UDC34 UDC3-4 TEST STARTED 9:19 AM TEST STARTED 9:35 AM TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 5.1066 IN BEGIN LEVEL 5. 1072 IN BEGIN LEVEL 9:34 AM END TIME 9:51 AM END TIME 03/17/2011 END DATE 03/17/2011 END DATE E END LEVEL 5,1068 IN ND LEVEL 5,1065 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED UDC5-6 UDC5-6 TEST STARTED 9:19 RM TEST STARTED 9:35 AM TEST STARTED 03117/2011 TEST STARTED 03/17/2011 BEGIN LEVEL 5,3882 IN BEGIN LEVEL 5,3874 IN END TIME 9:34 AM END TIME 9:51 AM 03/17/2011 END DATE 03/17/2011 END DATE E ENO LEVEL 5,3877 IN ND LEVEL 5.3871 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED UDC7-8 UDC7-8 TEST STARTED 9:19 AM TEST STARTED . AM TEST STARTED 03/17/2011 TEST STARTED 3/17/2011 BEGIN LEVEL 4.9194 IN BEGIN LEVEL 4.9208 IN END TIME 9;34 AM END TIME 9:51 AM END DATE 03/17/2011 END DATE 03/17/2011 END LEVEL 4.9196 IN END LEVEL 4,9209 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED _ _ __TEST-RESULT-__ PASSED