Secondary Containment Testing Report Form
Thu form is intendedfor use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of thisform to report results for all components tested The completed form,written test procedures,and
printouts from tests(if applicable),should be provided to the facility awner/operator for submittal to the local regulatory agency.
1. FACH=INFORMATION
Facility Name: Fastrip#705 Date of Testing: 3/17/11
Facility Address: 1200 Coffee Rd.Bakersfield CA
Facility Contact: Jamieson Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 10,2011
Name of Local Agency Inspector(if present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Cond Test: Scott Olinger
Credentials: CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS 'on-E pi meat 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
UDC 1-2 ❑ ❑ ❑ SPILL#2 Et ❑ ❑ ❑
UDC 3-4 19 ❑ 0 0 V SPILL#2 fl ❑ 0 ❑
UDC 5-6 0 0 1 ❑ SPILL#3 ❑ ❑ ❑
UDC 7-8 0 0 ❑ V SPILL#3 ❑ ❑ ❑
ST?#1 5f ❑ ❑ 0 PIPING RUN#1 0 ❑ 0
STP#2 ❑ ❑ 0 PIPING RUN#2 7 ❑ ❑ 0
ST?#3 ❑ ❑ PIPING RUN#3 t ❑ ❑ ❑
FILL#1 ❑ ❑ 0 PIPING RUN#4 ❑ ❑ 0
FILL#2 ❑ ❑ ❑ PIPING RUN#5 ❑ 0 ❑
FILL#3 ❑ ❑ I ❑ PIPING RUN#6 ❑ ❑ ❑
SPILL#1 0 0 ❑ PIPING RUN#7 0 0 0
V SPILL#1 0 ❑ ❑ ANN SPACE#1 ❑ ❑ 0
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the stated in this anent are accurate and in full compliance with legal requirements
Technician's Signature: Date: 3/17/11
IIIIIII VIII III IIII 68
IE
SWRCB,January 2002 Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of USTsecondary containment systems. Use the
appropriate pages of thisform to report results for all components tested The completed form,written test procedures, and
printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#705 TIED ate of Testing: 3/17/11
Facility Address: 1200 Coffee Rd.Bakersfield,CA
Facility Contact: Jamieson Hill I Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 10,2011
Name of Local Agency Inspector(rfpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conducting Test: Scott Olinger
Credentials: ❑CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer Trainine
Manufacturer Component(s) Date Training Expires
Incon TS-STS Inspection Equipment 1/18/13
Veer Root Monitorin System 1/15/12
ICC Cal UST Service Tech 1/18/13
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
ANN SPACE#2 ❑ ❑ ❑ ❑ ❑ ❑ ❑
ANN SPACE#3 ❑ ❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ 0 ❑ ❑ ❑ D ❑
❑ D 0 ❑ ❑ ❑ ❑ ❑
❑ ❑ D D 0 ❑ O ❑
0 ❑ ❑ ❑ ❑ ❑ ❑ ❑
❑ D 0 0 0 0 0 0
❑ ❑ D ❑ ❑ D D 0
❑ ❑ ❑ D ❑ ❑ D 0
0 ❑ ❑ ❑ ❑ 0 0 ❑
❑ 0 ❑ D D D 0 ❑
0 ❑ 1 0 0 0 ❑ ❑ 0
If hydrostatic testing was performed,describe what was done with the water after completion of Nests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of m:knowledge,the r stated m this document are accurate and in full compliance with legal requirements
Technician's Si Date: 3/17/11
SWRCB,January 2002 Page_of
4..,TANK ANNULAR TESTING
Test Method Developed By: EYTank Manufacturer ❑industry Standard 0 Professional Engineer
0 Other(Specify) I
Test Method Used. 0 Pressure fi(Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used 4-GEL FILLED GAUGE W/CERTS Equipment Resolution:0-30
Tank#1 Tank#2 Tank#3 Tank#
Is Tank Exempt From Testing?' ❑Yes No ❑Yes No 0 Yes 9'No 0 Yes ❑No
Tank Capacity: 12,000 12,000 12,000
Tank Material: FIBERGLASS FIBERGLASS FIBERGLASS
STEEL STEEL STEEL
Tank Manufacturer. JOOR JOOR JOOR
Product Stored: UNL PREM. DIESEL
Wait time between applying
pressure/vacuum/water and IOMIN 10 MIN 10 MIN
starting test.
Test Start Time: 10:00 10:00 11:15
Initial Reading(Rj: 8 H 8 HG 8 HG
Test End Time: 11:00 11:00 11:00
Final Reading(RF): 8 HG 8 HG 8 HG
Test Duration: I HR I HR I HR
Change in Reading(RF-Ri): 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0
TWke A 1-FAil- Pan 0 Fail Pass Fail ❑ Pa SO 0 Fafl,'
Was sensor removed for testing? -dYes DNo, DNA es 0 No DNA es 0 No 0 NA 0 Yes ❑No DNA
Was sensor properly replaced and Yes ONo DNA WYes ONo DNA Yes O No DNA ❑Yes 0 No DNA
verified functional after te
CO MMeUtS—(include it formation on repairs made prior to testing; and recommended follow-up for failed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 2637(aX6))
SWRCB,January 2002 Page_of
5. SECONDARY PIPE TESTING
Test Method Developed By: lPiping Manufacturer ❑industry Standard ❑Professional Engineer
❑pther(Specify)
Test Method Used IS/Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4"GEL FELLED GAUGE W/CERTS Equipment Resolution- 0-15
Piping Run#I Piping Run#2 Piping Run#3 Piping Run'#4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer. AO SMITH AO SMITH AO SMITH AO SMITH
Piping Diameter. 3" 3" 3" 31'&4"
Length of Piping Run: Q, 50, 60' 80,
Product Stored: UNL PREM DIESEL VAPOR
Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT
piping-run isolation: UDC&STP UDC&ST? UDC&STP UDC&ST?
Wait time between applying
pressure/vacuum/water and 10 MIN 10 NUN 10 MEN 10 MIN
starting test
Test Start Time: 9:30 9:30 9:30 9:30
Initial Reading(RL): 5.4 5.2 5.1 5.1
Test End Time: 10:30 10:30 10:30 10.30
Final Reading(Rf): 5.4 52 5-1 5.1
Test Duration- I HR I HR I HR I HR
Change in Reading(RF-R4): 0 0 0 0
Pass/Fail Threshold or .002 .002 .002 .002
Criteria:
4
7W, Pass ❑Fail P&ss a pisi
al Pass
COMMentS—(include information on repairs made prior to testing, and recommended
follow-up for failed tam)
SWRCB,January 2002 Page_of
5. SECONDARY PIPE TESTING
Test Method Developed By: K(Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑ether(Spec)
Test Method Used: dPressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15
Piping Run#5 Piping Run#6 Piping Ran#7 Piping Run 0 4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH
Piping Diameter. 3" 3"
Length of Piping Run: 100, 1001 100,
Product Stored: UNL PREM DIESEL
Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT
piping-run isolation: &VR &VR STP&VR
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
starting test
Test Start Time: 10:45 10:45 10:45
Initial Reading(RO: 5-2 5.3 52
Test End Time: 11:45 11:45 11:45
Final Reading(RF): 52 5.3 52
Test Duration: I HR I HR 1 HR
Change in Reading(Rf-Rj): 0 0 0
Pass/Fail Threshold or 0 0 0
Criteria:
'Test Result: Id Pass. b'Faii Passe Fail ]' --:.G(Pass --[]:Fail-I O -Pass'`. []Fail
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page_of
6. PIPING SUW TESTING
Test Method Developed By: 5f Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used. ❑Pressure D Vacuum N(Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
SUMP#1 SUMP#2 SUMP#3
Sump Diameter: 48" 48" 48"
Sump Depth: 54" 50" 48"
Sump Material:
Height from Tank Top to Top of 12" 10" 10"
Highest Piping Penetration:
Height from Tank Top to Lowest 20" 25" 25"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY
Portion of Sump Tested' 14" 12" 12"
Does turbine shut down when
sump sensor detects liquid(both VYes ❑No ❑NA {/Yes ❑No ❑NA U/Yes ❑No DNA DYes DNo DNA
product and water)?0
Turbine shutdown response time 20 SEC 20 SEC 20 SEC
Is system programmed for fail-safe /!❑No ❑NA &Yes 0 No 11 NA 5/
shutdown?* Yes ❑No ❑NA 0 Yes ❑No ❑NA
Was fail-safe verified to be No DNA _WYes ONo DNA (/Yes DNo [INA 0 Yes ❑No ❑NA
operational?*
Wait time between applying
pressure/vacuum/water and starting 10 MIN 10 MIN 10 bm
test
Test Start Time: 11:01 11:01 1:51
Initial Reading(RO: 7.7223 2.1924 5.0840
Test End Time: 11:16 11:16 2:06
Final Reading(RF): 7.7224 2.1920 5.0839
Test Duration: 15 WN 15 MIN 15 NIIN
Change in Reading(Rf-": .0001 .0004 .0001
Pass/Fail Threshold or Criteria: .002 .001 .002,
-'Test kesult.- Pass _0 FAff- Pass rass'� :.D:FaU Pais -0❑Fail:
-0 ail , P,
Q( 1P 10asi
Was sensor removed for testing? 9(Yes DNo ❑NA WYes ONo DNA es ONo DNA DYes ONo DNA
Was sensor properly replaced and LVyes 0 No ❑NA Yes ONo nNA OYes ❑No DNA ❑Yes ❑No 0 NA
verified functional after testis -
CommentS—(include irk afion on repairs made prior to testing: and recommended follow-up for failed tests)
STP 3 REPLACED 3"ENTRY BOOT&RETEST.
If the entire depth of the sump is not tested,specify how much was tested. If the answer to my of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page_of
7. -DISPENSER CONTAINMENT(UDC)TESTING
Test Method Developed By: IYUDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum &(Hydrostatic
❑Other(Specify)
Test Equipment Used: INCON TS-ST'S Equipment Resolution: 0.0000
K'� ✓-11'-UDC#1-2 UDC N 3-4 UDC#5-6 UDC 4 7-8
21
UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 31" 31" 31" 3137
Height from UDC Bottom to Top 10" 12" 10" 10"
of Highest Piping Penetration:
Height from UDC Bottom to 8" 8" 8" 811
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 12" 14" 12" 12"
Does turbine shut down when
UDC sensor detects liquid(both C4/Yes 11 No ❑NA As ❑No DNA &/Yes ❑No DNA Rkes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC r 20 SEC 20 SEC 20 SEC
Is system programmed for fail- Q(Yes 0 No 0 NA 5/Yes 0 No DNA &(Yes 0 No DNA Q(Yes ❑No 0 NA
safe shutdown?*
Was fail-safe verified to be
operational?' �Yes ❑No 0 NA 5/Yes ❑No DNA R Yes ❑No DNA OY(Yes 11 No DNA
Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN
pressurelvacuum/water and
starting test
Test Start Time: 9:35 935 9:35 9:35
Initial Reading(R4): 52130 5.1072 5.3874 4.9208
Test End Time: 9:51 9:51 9:51 9:51
Final Reading(RF): 52128 5.1065 5.3871 4.9209
Test Duration: 15 NUN 15 MIN 15 MIN 15 MIN
Change in Readm (RF-Rj: .0002 .0007 .0003 .0001
Pass/Fail Threshold or Criteria: .002 .002 002 .002
0 Fall Fail a.
Tist Wsuft: Pass.. Pass DYAH .".-- �--,*Pass ��-O
I wm� Pass; t7 Fail
Was sensor removed for testing? Qf es ❑No ❑NA StYes ❑No 0 NA dYes ONo, DNA ONo DNA
Was sensor properly replaced and FT
VYes ❑No DNA Yes ONo DNA S/Yes DNo DNA es ONo DNA
verified functional after testis ?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
If the entire depth of the UDC is not tested,specify how much was tested. If the answer to m of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-1 60)
SWRCB,January 2002 Page of
8. FILL RISER CONTAM[EW SUW TESTING
FaciHty is Not Equipj)ed With Fill Riser Containment Sumps ❑
Pill Riser Containment Sumps are EMpt,but were Not Tested ❑
Test Method Developed By EtSump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used- ❑Pressure ❑Vacuum WHydrostatic
❑Other(Specify)
Test Equipment Used,INCON TS-STS Equipment Resolution:0.0000
Sump Diameter 42" 42" 42"
Sump Depth: 54" 50" 48"
Height from Tank Top to Top of 0 0 0
Highest Piping Penetration:
Height from Tank Top to Lowest 2412 24" 24
Electrical Penetration:
Condition of sump prior to DRY DRY DRY
-testis 9;
Portion of Sump Tested 12" 12" 12"
_S ump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Wait time between applying 10 MIN 10 MIN 10 MIN
pressure/vacuum/water and
starting test.
Test Start Time: 11.01 11:01 12:01
Initial Reading 5.4966 2.5971 1.6416
Test End Time: 11:16 11:16 12:16
Final Readin g 5.4964 2.5970 1.6414
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-N: .0002 .0001 .0002
Pass/Fail Threshold or Criteria: .002 .002 .002
]Fail.
OF Vpas`s�-�-,b Fair D,
Ail Pass
Is there a sensor in the sump? 9(Yes ❑No If Yes ❑No &Yes ❑No ❑Yes ❑No
Does the sensor alarm when
either product or water is Wyes ❑No ❑NA 2/yes ❑No ❑NA R/Yes DNo DNA ❑Yes ❑No ❑NA
detected? 1 4 1
Was sensor removed for testing? @I yes ❑No ❑NA slYes DNo DNA Sfyes ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and 5(yes ❑No ❑NA &(Yes, ❑No DNA U(Yes ❑No DNA ❑Yes ❑No ❑NA
verified functional after testis ? I
Comments—('include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page_of
9. SPHLUOVERYELL CONTAE4AWNT BOXES
Facility is Not Equiged With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes we Present,but were Not Tested ❑
Test Method Developed By 61 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used. ❑Pressure ❑Vacuum 5(Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
,_ sn3' Spill Box#1 Spill Boa#V1 Spill Bog#2 Spill Boz W2
Bucket Diameter. 12" 12" 12" 12"
Bucket Depth: 12" 12" 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test.
Test Start Time: 10:35 10:35 11:19 11:19
Initial Reading(Ri): 5.3070 3.3003 2.4222 43930
Test End Time: 10:50 10:50 11:34 11:34
Final Reading(RF): 5.3069 33002 2.4213 43927
Test Duration: 15 MIN 15 NUN 15 MIN 15 NEN
Change in Reading(RF-Ri): .0001 .0001 .0009 .0003
Pass/Fail Threshold or
Criteria: 4 .002 4 .002 .002 .002
Test Result G Pass % Pass, G al Pass.
4Pass`
COMMentS—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9. SPRUOVERFELL CONTAENMENT BOXES
Facility is Not Eg With Spill/Overfill Containment Boxes ❑
_Spill/Overfill Containment Boxes are sent,but were Not Tested ❑
Test Method Developed By: 16 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used. ❑Pressure ❑Vacuum 4Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#3 Spill Box#V3 Spill Box Spill Box
Bucket Diameter. 12" 12"
Bucket Depth. 12" 12"
Wait time between applying
pressurelvacuum/water and 10 MIN 10 MIN
-st in test
Test Start Time: 12:31 12:31
Initial Reading(Rj): 2.8494 6.1794
Test End Time: 12:46 12-46
Final Reading(RF): 2.8479 6.1794
Test Duration: 15 MIN 15 MIN
Change in Reading(RF-PQ: .0005 .0000
Pass/Fad Threshold or .002 .002
Criteria:
Test Res61t 0 FAil,
Pass '13i Fail V ,.G-Pass,..,
COMMeUtS—(include information on repairs made prior to testing; and recommended follow-up for faded tests)
FASTRIP 705
1200 COFFEE RD
BAKERSFIELV93308 FASTRIP 705
SUNSET C011 . 1200 COFFEE RD FASTRIP 705
aAKERSFIELD 93308 i20E, COFFEE RD
1-800-984-6266 SUNSET CONST BAKERSFIELD 93308
1-800-984-6266 SUNSET CONST-
03/17/2011 1:50 PM 03/17/2011 i0:16 AM 1-800-584-6266
SUMP LEAK TEST REPORT SUMP LE.W, TEST REPORT 03/17/24011 16:50 AM
SPILLi SUMP LEAK TEST REPORT
STP3
TEST STARTED 10:01 Ail SPILLI
TEST STARTED 1:35 PM TEST STARTED 03/1"?/2011
BEGIN LEVEL T IN TEST STARTED 10:35 AM
TEST STARTED 03/17/2011 END TIM 10:16 AEA TEST STARTED 03/17/201
BEGIN LEVEL 5.0840 IN ENt� GATE 03/17/2x11 BEGIN LEVEL 5.3076 IN
END TIME 1'50 PM END LEVEL 5.3055 IN END TIME 10:50 AM
END DATE 03/"7/2011
LEAK THRESHOLD 0.002 IED END LEVEL 5.3069 IN END DATE 03/17/2011 TEST RESULT
END LEVEL 5.0841 IN
LEAK T RESULT ��PASSED
LEAK THRESHOLD 0.002 IN VSPILL"
TEST RESULT PASSED
TEST STARTED
10:01 AM USPILLI
TEST STARTED 03/17/2011 TEST STARTED 10:35 Art
BEGIN LEVEL
FAD TIt"E 10:16 AM TEST STARTED 03/17/2011
ENa DATE 03/17/2011 BEGIN LEVEL 3.3603 IN
END ��VEL '2.891.2 IN END TIME 10:50 AM
LEAK THRESHOLD 0,002 IN END LEVEL 03/17/2011
LEAK
TEST RESULT LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
FASTRIP 705
1200 COFFEE RD
BAKERSFIELD 93308
SUNSET CONST
1-800-984-6266
03/17/2011 2:06 PM
SUMP LEAK TEST REPORT
STP3
TEST STARTED 1:51 PM
TEST STARTED 03/17/2011
BEGIN LEVEL 5,0840 IN
END TIME 2:06 PM
END DATE 03/17/2011
END LEVEL 5.0839 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
1200 COFFEE RD
BAKERSFIELD 93308 FASTRIP 775
SUNSET CON�T 1202 COFFEE RD
1-800-984-6266 BAKERSFIELD 93308
FASTRIP 705 03/17/201' 12:31 Ph' 1 SUNSET 984-6266
1200 COFFEE RQ
BAKERSFIELD 93308 SUMP LEAK TEST REPORT 63/17/2611 11:17 Rh.
SUNSET CONST SPILLS SUMP LEAK TEST REPORT
1-800-984-6266
TEST STARTED 12:15 Phi SPILL2
�3J17/2011 12:16 PM TEST STARTED 03.17/2011
BEGIN LEVEL 2.8490 IN TEST STARTED 11:02 AM
END TIME 12:31 Phi TEST STARTED 03/17/20/1
SUMP LEAK TEST REPORT END DATE 03/17/2011 BEGIN LEVEL 2.4229 IN
END LEVEL 2.8485 IN END TIME 11:17 AM
LEAK THRESHOLD 0.002 IN END DATE 93/17/2011
STP1 TEST RESULT PASSED END LEVEL 2.4224 IN
LEAK THRESHOLD 0.002 IN
TEST STARTED 12:01 PM USRILL3 TEST RESULT PASSED
rEST STARTED 03/17/2011
3EGIN LEVEL 7.7224 IN TEST STARTED 12:15 Phi VSPILL2
_ND TIME 12:16 PM TEST STARTED 03/17/2011
BEGIN LEVEL 6.1797 IN TEST STARTED 11:02 AM
:ND DATE 03/17/2011 END TIME 12:31 PM TEST STARTED 03/17/2011
END LEVEL 7.7223 IN END DATE 03/17/2011 BEGIN LEVEL 4.3941 IN
-EAK THRESHOLD 0.002 IN -34D LEVEL 6.1794 IN END TIME 11:17 AM
TEST RESULT PASSED LEAK THRESHOLD 6.062 IN END DATE 03/17/2011
TEST RESULT PASSED END LEVEL 4.3933 IN
LEAK THRESHOLD 0.002 Iii
TEST RESULT PASSED_
STP3
TEST STARTED 12:01 PM
TEST STARTED 03/1712011
BEGIN LEVEL 4.6008 IN
END TIME 12:16 PM
END DATE 03/17/2011 -27FASTRIP E
1200 60 COFFEE EE RD
END LEVEL 4.5829 IN BAKERSFIELD 93308 FASTRIP 705
LEAK THRESHOLD 0.002 IN SUNSET CONS' 1200 COFFEE RD
TEST RESULT FAILED 1-500-984-6266 BAKERSFIELD 93308
SUNSET CONST
03/17/2011 12:47 Phi 1-800-954-6266
FILL3 SUMP LEAK TEST REPORT 03/17/2911 11:35 ANA
SPILLS SUMP LEAK TEST REPORT
TEST STARTED 12:01 PM
TEST STARTED 03/17/2011 TEST STARTED 12.31 1-1 SPILL2
TEST STARTED 03/17/2011
BEGIN LEVEL 1.6416 IN BEGIN LEVEL 2.8484 IN TEST STARTED 11:19 AM
END TIME 12:16 PM END TIME 12:46 PM TEST STARTED 03/17/2011
END DATE 03/17/2011 END DATE 93/17e2Ofl BEGIN LEVEL 2.4222 IN
END LEVEL 1.6414 IN END LEVEL 2.8479 IN END TIDE 1134 AM
BEAK THRESHOLD 0.002 IN END DATE 03/17/2011
LEAK THRESHOLD 0.002 IN TEST RESULT PASSED END LEVEL 2.4213 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
---—-- --- ------- TEST RESULT PASSED
VSPILL3
TEST STARTED 12:31 PM USPI;_LZ
TEST STARTED .03/17/2011
BEGIN LEVEL 6.1794 IN TEST STARTED 11:19 AM
END TIME 12:46 PM TEST STARTED 03/17/2011
END DATE 03/17/2011 BEGIN LEVEL 4.3930 IN
END LEVEL 6.1794 IN END TIME 11:34 AM
LEAK THRESHOLD 0.002 IN END DATE 03/17/2011
TEST RESULT PASSED END LEVEL 4.3927 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
FASTRiP 705 FASTRIP 705
1200 COFFEE RD 1200 COFFEE RD
BAKERSFIELD 93308 BAKERSFIELD 93308
SUNSET CONST SUNSET CONST FASTRIP 705
1-800-984-6266 1-800-984-6266 1200 COFFEE RD
BAKERSFIELD 93308
03/17/2011 10:58 AM 03/17/2011 11:16 AM SUNSET CONST
1-800-984-6266
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
43/17/2011 11:59 AM
STP1 STP1
SUMP LEAK TEST REPORT
TEST STARTED 10:42 AM TEST STARTED 11:01 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP1
BEGIN LEVEL 7.7261 IN BEGIN LEVEL 7.7223 IN
END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM
END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011
END LEVEL 7,7223 IN END LEVEL 7,7224 IN BEGIN LEVEL 7,7224 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END TIME 11:59 AM
TEST RESULT FAILED TEST RESULT PASSED END DATE 03/17/2011
END LEVEL 7,7225 IN
LEAK THRESHOLD 0.002 IN
STP2
STP2 TEST RESULT PASSED
TEST STARTED 10:42 AM TEST STARTED 11:01 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 STP3
BEGIN LEVEL 2, 1927 IN BEGIN LEVEL 2. 1924 IN
END TIME 10:57 AM END TIME 11:16 AM TEST STARTED 11:44 AM
END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 03/17/2011
4.6 9 IN
7/2d11
BEGIN LEVEL 4
END LEVEL 2, 1924 IN END LEVEL 2,1920 IN 1:5
1
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN END TIME 11:59 AM
TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011
END LEVEL 4,6092 IN
LEAK THRESHOLD 0,002 IN
FILL1
FILL1 TEST RESULT FAILED
TEST STARTED 10:42 AM TEST STARTED 11:01 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011 FILL3
BEGIN LEVEL 5,4957 IN BEGIN LEVEL 5.4966 IN
END TIME 10:57 AM � END TIME 11:16 AM TEST STARTED 11:44 AM
END DATE 03/17/2011 END DATE 03/17/2011 TEST STARTED 01.6420 IN
011
BEGIN LEVEL 1,6
END LEVEL 5,4967 IN END LEVEL 5,4964 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002- IN END TIME 11::59 59 AM
TEST RESULT PASSED TEST RESULT PASSED END DATE 03/17/2011
END LEVEL 1,6417 IN
LEAK THRESHOLD 0,002 IN
FILL2
FILL2 _TEST RESULT— PASSED
TEST STARTED 10:42 AM TEST STARTEO 11:01 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011
BEGIN LEVEL 2,5973 IN BEGIN LEVEL 2,5971 IN
END TIME 10:57 AM END TIME 11:16 AM
END DATE 03/17/2011 END DATE 03/17/2011
END LEVEL 2,5971 IN END LEVEL 2,5970 IN -
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST RESULT PASSED
FASTRIP 705 FASTRIP 705
1200 COFFEE RD 1200 COFFEE RD
BAKERSFIELD 93308 BAKERSFIELD 93308
SUNSET CONST SUNSET CONST
1-800-984-6266 1-800-984-6266
03/17/2011
9;35 AM 03/17/2011 9:51 AM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
UDC1-2 UDC1-2
TEST STARTED 9:19 AM TEST STARTED 9:35 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011
BEGIN LEVEL 5.2154 IN BEGIN LEVEL 5.2130 IN
9:34 AM END TIME 9:51 AM
END TIME 03/17/2011 END DATE 03/17/2011
END DATE E
END LEVEL 5.2150 IN ND LEVEL 5.2128 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT
PASSED TEST RESULT PASSED
UDC34 UDC3-4
TEST STARTED 9:19 AM TEST STARTED 9:35 AM
TEST STARTED 03/17/2011 TEST STARTED 03/17/2011
5.1066 IN BEGIN LEVEL 5. 1072 IN
BEGIN LEVEL 9:34 AM END TIME 9:51 AM
END TIME 03/17/2011 END DATE 03/17/2011
END DATE E
END LEVEL 5,1068 IN ND LEVEL 5,1065 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST RESULT PASSED
UDC5-6 UDC5-6
TEST STARTED 9:19 RM TEST STARTED 9:35 AM
TEST STARTED 03117/2011 TEST STARTED 03/17/2011
BEGIN LEVEL 5,3882 IN BEGIN LEVEL 5,3874 IN
END TIME 9:34 AM END TIME 9:51 AM
03/17/2011 END DATE 03/17/2011
END DATE E
ENO LEVEL 5,3877 IN ND LEVEL 5.3871 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
UDC7-8 UDC7-8
TEST STARTED 9:19 AM TEST STARTED . AM
TEST STARTED 03/17/2011 TEST STARTED 3/17/2011
BEGIN LEVEL 4.9194 IN BEGIN LEVEL 4.9208 IN
END TIME 9;34 AM END TIME 9:51 AM
END DATE 03/17/2011 END DATE 03/17/2011
END LEVEL 4.9196 IN END LEVEL 4,9209 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED _ _ __TEST-RESULT-__ PASSED