HomeMy WebLinkAbout2008 SB989 RESULTS IIIIIIIIVIIIIIIIIII 55
SWRCB,January 2002 IE Pagel of 5
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containments systems. Use the appropriate
pages of this form to report results for all components tested. The completed form, written test procedures, and printout from tests(f
applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility:AT&T Corporation Service Date: 08/19/2008
Facility Address: 1520 20th St. Bakersfield CA 93301 GEO PAR#CAKO10
Facility Contact: Grant Armstrong Facility Phone:
Date Local Agency Was Notified of Testing: 05/19/2008 Test T e: 36 Month
Name of Local Agency Inspector if present during testing):None
2. TESTING CONTRACTOR INFORMATION
Company Name:Tait Environmental Services
Technician Providing Test: AGUILAR ADOLFO
Credentials ®CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
®ICC UST Service Technician
License Type: A B ASB C-10 HAZ License Number: 588098
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Icc Technician 5238610-UT 02/24/2009
Incon TS-STS Test Unit 2957353761 01/13/2010
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
Annular#CAK010U001 ® ❑ ❑ 0 ❑
Fill Sump#CAKOI OU001 ® ❑ ❑ ❑ ❑ ❑ El
Piping Sump#CAKOIOU00I M ❑ ❑ ❑ ❑ ❑
Return Secondary Line#CAKOI OU001 El ❑ ❑ ❑
Supply Secondary Line#CAKOI OU001 FE ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑❑ ❑ ❑❑ ❑ ❑❑ ❑ ❑❑ ❑ 10
-0- :Rdl I Fj F I F-1 I LL-1
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
Left Non-Haz Test Water @ Site Properly Labeled And Secured.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated i s doc ment are accurate and in full compliance with legal requirements
Technician's Signature Date 08/19/2008
111111
11111 lil 1111 56
IE
SWRCB,January 2002 Page 2 of 5
4. TANK ANNULAR TESTING
Test Method Developed by ❑ Tank Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ® Vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used:4"Dial Guage Equipment Resolution: .2
Tank# Tank# Tank# Tank#
#CAKO10U001
Is Tank Exempt From Testing?(1) ❑ Yes N No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No
Tank Capacity: 8,002 Gallons
Tank Material: Steel Clad
Tank Manufacturer: Joor
Product Stored: Diesel
Wait Time between applying One Hour
pressure/vacuum/water and starting
test:
Test Start Time: 10:20 AM
Initial Reading(Ri): -10 HG
Test End Time. 11:20 AM
Final Reading(RO: -10 HG
Test Duration: One Hour
Change in Reading(Rf-Ri): 0
Pass/Fail Threshold or Criteria: 0
Test Result ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Was Sensor Removed for Testing? ® Ya ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was Sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified after testing?
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
Re-Installed Sensor To Lowest Point But Not Tested.
(1)Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as
sysrtems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of
Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page 3 of 5
5. SECONDARY PIPE TESTING
Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ® Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used:4"Dial Gauge Equipment Resolution: .l
Piping Run#Supply Piping Run#Return Piping Run# Piping Run#
#CAK01OU001 #CAK01OU001
Piping Material: Fiberglass Fiberglass
Piping Manufacturer: Amoron Amoron
Piping Diameter: 3" 3"
Length of Piping Run: Approx. 170' Approx. 170'
Product Stored: Diesel Diesel
Method and location of piping-run Test Boot @ Turbine Test Boot @ Turbine
isolation: Sump Sum
Wait Time between applying N/A 15 Minutes
pressure/vacuum/water and starting
test:
Test Start Time: N/A 9:30 AM
Initial Reading(Ri): N/A 5 PSI
Test End Time: N/A 10:30 AM
Final Reading(Rf): N/A 5 PSI
Test Duration: N/A One Hour
Change in Reading(Rf-Ri): N/A 0 PSI
Pass/Fail Threshold or Criteria: 0 0 PSI
Test Result ❑ Pa ® Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Comments include any information on repairs ma a rior to testing,and recommended follow-up for failed tests
Visual Fail On Supply Sec.Line,Needs A Coupling Clamshell On Secondary LIne In Order To Sustain Pressure.
SWRCB,January 2002 Page 4 of 5
6.PIPING SUMP TESTING
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: Incon TS-STS Test Unit Equipment Resolution: .0006
Sump#Piping Sump# Sump# Sump#
#CAKO10U001
Sump Diameter 44"
Sump Depth 35"
Sump Material Fiberglass
Height from Tank Top to Top of 14"
Highest PiDing Penetration
Height from Tank Top to Lowest 15"
Electrical Penetration
Condition of sump prior to testing OK
Portion of Sump Tested(1) 2"above piping penetration
Does turbine shut down when
sump sensor detects liquid(both ❑ Yes ❑ No U NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
product and water)?*
Turbine shutdown response time N/A
Is sytem programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
shutdown?*
Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
operational?*
Wait time between applying
pressure/vacuum/water and starting 15 Minutes
test
Test Start Time 11:27 AM 11:46 AM
Initial Reading Ri) 6.1859" 6.1860"
Test End Time 11:42 AM 12:01 PM
Final Reading 6.1860" 6.1859"
Test Duration 15 15
Change in Reading Rf-Ri +.0001" -.0001"
Pass/Fail Threshold or Criteria .002"
Test Result ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Was sensor removed for testing? N Yes ❑ No ❑ NA Cl Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ❑ No DNA 110Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified functional after testing?
Comments include any information on repairs made prior to testing,and recommended follow-tip for failed tests
Re-Installed Sensor To Lowet Point But Not Tested.
(1)If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160)
SWRCB,January 2002 Page 5 of 5
8.FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps ❑
Fill Riser Containment Sumps are Present,but were Not Tested ❑
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: Incon TS-STS Test Unit Equipment Resolution: .0006
Fill Sump# Fill Sump# Fill Sump# Fill Sump#
#CAK01 OU001
Sump Diameter: 44"
Sump Depth: 32"
Height from Tank Top to Top of N/A
Highest Piping Penetration:
Height from Tank Top to Lowest 21"
Electrical Penetration:
Condition of sump prior to testing: OK
Portion of Sump Tested: 2"Above Collar
Sump Material: Fiberglass
Wait time between applying 15 Minutes
pressure/vacuum/water and starting
test:
Test Start Time: 11:27 AM 11:46 AM
Initial Reading Ri): 2.6116" 2,6115"
Test End Time: 11:42 AM 12.01 PM
Final Reading 2.6114" 2.6114"
Test Duration: 15 15
Change in Reading Rf-Ri : -.0002" -.0001"
Pass/Fail Threshold or Criteria: .002"
Test Result: ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Is there a sensor in the sump? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No
Does the sensor alarm when either ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
product or water is detected?
Was sensor removed for testing? ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified functional after testin ?
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
Re-Installed Sensor To Lowest Point But Not Tested.
s
ATT
ATT 1520 20TH ST. ATT i
' BAKERSFIELD 1520,20TH ST.
BAKERSFIELD
1520 20TH S CA BAKERSFIELU
-
6A rA 08/19/2008. 11:42 AM
08/19/2068 11:05 AM ' 08/19/2008 12:01 PM
St1MP'LEAK"TEST REPORT
SUMP LEVEL REPORT SUMP LEAK TEST REPORT
PIPING i
i TEST STARTED. 11 .27,AM PIPING
SUMP PIPING 6.186 IN 8/19/266$ TEST STARTED 11:46 AM
SUMP FILL 2.611 IN TEST STARTED 6
BEGIN LEVEL 6.1859 IN•, TEST STARTED 08/19/2668
END.TIME 11:42 AM :I BEGIN LEVEL 6.1866 IN
END' DATE 98/19/2668 END TIME 12:61 PM
END LEVEL 6.1866 IN END DATE 68/19/2668
LEAK THRESHOLD 6.662 IN END LEVEL 6.1859 IN
TEST RESULT PASSED I LEAK THRESHOLD 0.692 IN
TEST RESULT PASSED
FILL
ATT TEST STARTED_ 11:27 AM
FILL
152P 20TH ST. TEST STARTED 08/19/2008" ! TEST STARTED 11:46 AM
BAKERSFIELD - -I BEGIN LEVEL . 2.6116 IN TEST STARTED 08/19/2008
GA END-TIME '�= 11:42 AM BEGIN LEVEL 2.6115 IN
END DATE" 98/19/2068 ;. END TIME 12:01 PM
08/19/290$ 11:26 AM END LEVEL 2,:611'4 IN END DATE 08/19/2008
LEAK THRESHOLD• -.0.002 IN END LEVEL 2.6114 IN
SUMP LEVEL REPORT TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
i
SUMP PIPING 6.186 IN
Y SUMP FILL. 2.612 IN
TEST DATE: 08/19/2008 CLIENT: AT&T, GEOPAR: CAK010 PAGE 1 OF 1
Tait Environmental Services a O�
UST Construction • Design • Maintenance • Compliance 7f
September 2_2008
V/A FED EX 8664 6551 1152 / ✓ f\���
Bakersfield Fire Department
1600 Truxton Avenue, Suite 401
Bakersfield, CA 9330.1
Re: Secondary Containment Testing Report Form
AT&T Corporation
1520 20th Street, Bakersfield, CA
GEOPAR: CAK010
To Whom it May Concern:
Enclosed are the test results for the location listed above completed on August 19th, 2008:
■ Secondary Containment Testing Report Form
Please do not hesitate to call me if you have any questions.
Very Tr ly Yours,
i
M tthew L. Denison
Program Manager
MD
T:\ATT Document Management\Legacy T Sites\CAK010\Cover Letters\CAK010_SB989 Cover Letter Bakersfield
FD 09022008.doc
CA Lic #588098 • AZ Lic #095984 • NV Llc #0049666
2131 S. Dupont Drive • Anaheim, California 92806 • 714.560.8222 • 714.685.0006 Fax
11280 Trade Center Drive • Rancho Cordova, California 95742 • 916.858.1090 • 916.858.1011 Fax
www.tait.com