Loading...
HomeMy WebLinkAbout2011 REPAIR RESULTS IIIIIII VIII III IIII 45 SVJRCB,January 2002 IE Page of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures and printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency: 1. FACII.ITY INFORMATION Facility Name: Fastrip#562 Date of Testing: 318/11 Facility Address: 1640 Chester Ave.Bakersfield,CA. Facility Contact: Jaco Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 4,2011 Name of Local Agency Inspector(rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Condu Test: Scott Olinger Credentials: YCSLB Licensed Contractor O SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number. 589517 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection Equipment 1/18/13 Veeder Root Monitorin System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made UDC 1 &2 ❑ ❑ ❑ FILL#1 ❑ ❑ ❑ UDC 3 &4 ❑ ❑ ❑ FILL#2 ❑ ❑ ❑ UDC 5 &6 ❑ ❑ ❑ FILL#3 ❑ ❑ ❑ UDC 7& 8 ❑ ❑ ❑ FILL#4 ❑ ❑ ❑ TRAN#1 ❑ ❑ ❑ ANN SPACE#1 ❑ ❑ ❑ STP#1 ❑ ❑ ANN SPACE#2 ❑ ❑ ❑ STP#2 ❑ ❑ ❑ ANN SPACE#3 ❑ ❑ ❑ STP#3 ❑ ❑ ❑ ANN SPACE#4 ❑ ❑ ❑ STP#4 ❑ ❑ ❑ SPILL#3 ❑ ❑ ❑ TR.AN#2 ❑ ❑ ❑ SPILL#4 ❑ ❑ ❑ SPILL#1 ❑ ❑ ❑ V SPILL#1 (�' ❑ ❑ ❑ SPILL#1 - ❑ 1 ❑ ❑ V SPILL 42 ❑ ❑ ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: Date: d 3 �S 1111111111111 46 IE SWRCB,January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: Tank Manufacturer 0 Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4"GEL FILLED GAUGE W/CERTS ;���Equipment Resolution:0-30 Tank#1 Tank#2 Tank# Tank# Is Tank Exempt From Testing?' 0 Yes No ❑Yes RNo ❑Yes iNo ❑Yes dNo Tank Capacity: 12,000 12,000 12,000 12,000 Tank Material: STEEL/GLASS STEEL/GLASS STEEL/GLASS STEEL/GLASS Tank Manufacturer. MODERN MODERN MODERN MODERN Product Stored: UNL UNL PREM DIESEL Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN startin test: Test Start Time: 9:00 9:00 10:30 10:30 Initial Reading(RO: 10 HG 10 HG 10 HG 10 HG Test End Time: 10:00 10:00 11:30 11:30 Final Reading(RF): 10 HG 10 HG 10 HG 13 HG Test Duration: 1 HR 1 HR 1 HR 1 14R Change in Reading(R,-R): 0 0 0 0 Pass/Fail Threshold or Criteria: 0 0 0 0 ,Test Resglt ;Pass ❑Fail Pass; ❑Fail Pass []:Fad T __ Pass []Fail Was sensor removed for testing? QfYes ❑No ❑NA IlYes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA Was sensor properly replaced and Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA verified functional after testin ? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. (California Code of Regulations,Title 23,Section 2637(ax6)} SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: 4 Piping Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other(Spec) Test Method Used: 0 Pressure 0 Vacuum Hydrostatic 0 Other(Specify) Test Equipment Used. INCON TS-STS Equipment Resolution: 0.0000 � �,. Piping Run# � Piping Run#Z. Piping Ran#3 Piping Run# Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer. AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter: 3" 3" 3" 3" Length of Piping Run: 80' 90' 110, 120' Product Stored: UNL UNL PREM DIESEL Method and location of TEST BOOT AT in -run isolation: TEST BOOT AT STP TEST BOOT AT STP S�, TEST BOOT AT STP Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 9:02 9:02 9:02 9:02 Initial Reading(RO: 3.3639 4.8298 4.1486 4.7274 Test End Time: 9:17 9:17 9:17 9:17 Final Reading(RF): 3.3637 4.8297 4.1486 4.7272 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-RI): .0002 .0001 0 .0002 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: Te t Result Pass O Fail' Pass ❑Fail '- Pass: . ❑Eail Pass, l7'Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Specify) Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000 STP#1 STP#2 STP#3 STP#4 Sump Diameter. 42" 42" 42" 42" Sump Depth: 46". 56" 47" 50" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of 16" 16" 15" 15" Highest Piping Penetration: Height from Tank Top to Lowest 12" 12" 12" 14" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY DRY Portion of Sump Tested' 18" 18" 18" 18" Does turbine shut down when // sump sensor detects liquid(both f(Yes 11 No ❑NA AY 11 No ❑NA C(Yes ❑No ❑NA /Yes ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe shutdown? /Yes ❑No ❑NA Yes ❑No ❑NA C(Yes ❑No ❑NA ff'�es ❑No ❑NA ` Was fail-safe verified to be 17/ yes operational?* 'Yes ❑No ❑NA Yes ❑No ❑NA 6(Yes ❑No ❑NA es ❑No ❑NA Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN 10 MIN test: Test Start Time: 1:30 T 12:07 10:40 10:17 Initial Reading(Rl 4.4236 4.3310 5.9467 2.2926 Test End Time: 1:45 12:22 10:55 10:32 Final Reading(Rr): 4.4241 4.3310 5.9456 2.2921 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-R.1): .0005 0 .0011 .0005 Pass/Fail Threshold or Criteria: .002 .002 .002 .002 Test Result Pass; O Fall (.✓Pass ❑:Fail LY Pass O Fail " Pass O Fail Was sensor removed for testing? Yes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA Was sensor properly replaced and verified fimctional after testin ? q/Yes ❑No ❑NA Yes ❑No El NA [ Yes ❑No ❑NA Yes ❑No ❑NA . Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) Install one Blueline elect entry boot in STP#1 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an asterisk(')is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 6. PIPING SUMP TESTING Test Method Developed By: CjSump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 TRAN#1 TRAN#2 Sump Diameter. 18"X 24" 18"X 24" Sump Depth: 29" 29" Sump Material: FIBERGLASS FIBERGLASS Height from Tank Top to Top of 14" 14" Highest Piping Penetration: Height from Tank Top to Lowest 14" 14" Electrical Penetration: Condition of sump prior to testing: DRY DRY Portion of Sump Tested' 16" 16" Does turbine shut down when / / sump sensor detects liquid(both dyes ❑No ❑NA 471 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA product and water)?` Turbine shutdown response time 20 SEC 20 SEC Is system programmed for fail-safe Zj Yes ❑No ❑NA (9 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA shutdown?` Was fail-safe verified to be Yes ❑No ❑NA 9Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA operational?* Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN test: Test Start Time: 10:40 10:40 Initial Reading(R,): 63812 4.1870 Test End Time: 10:55 10:55 Final Reading(RF): 63815 4.1871 Test Duration: 15 MIN 15 MIN Change in Reading(RF-RI): .0003 .0001 Pass/Fail Threshold or Criteria: .002 .002 'Test Result:' Pass. ':❑Fail Pass O Fail Pass �.Fail pass 0`Fatl Was sensor removed for testing? dyes ❑No ❑NA dYes El No p NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testin ? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to an of the questions indicated with an asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. UND -DISPENSER CONTAINMENT C TESTING Test Method Developed By: EtUDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum WHydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 ' UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 UDC Manufacturer: AM CON AM CON AM CON AM CON UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC the 29" 29" 29" 29" Height from UDC Bottom to Top 12" 12" 12" 12" of Highest Piping Penetration: Height from UDC Bottom to 16" 16" 16" 16" Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testing: Portion of UDC Tested 14" 14" 14" 14" Does turbine shut down when / / / UDC sensor detects liquid(both dyes ❑No ❑NA L/Yes ❑No ❑NA 9/Yes ❑No ❑NA As ❑No ❑NA product and water)?. Turbine shutdown responsc time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail- dYes ❑No ❑NA CYVes ❑No ❑NA 13//Yes ❑No ❑NA Q!!Yes ❑No ❑NA safe shutdown?* Was fail-safe verified to be [/Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA operational'?* Wait time between applying 20 MIN 20 MIN 20 MIN 20 MIN pressure/vacuum/water and starting test Test Start Time: 8:46 8:46 8:46 8:46 Initial Reading ): 3.3638 4.8298 4.1486 4.7273 _Test End Time: 9:01 9:01 9:01 9:01 Final Readin (RF 3.3638 4.8298 4.1486 4.7273 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Readin (RF-N: .0001 0 0 0 Pass/Fail Threshold or Criteria: .002 .002 .002 .002 Test Resait:. ,' ';Pass_ ❑Fail :. Pass;:<O-Fail Pass 0 v Was sensor removed for testing? Yes 0 No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA QfYes ❑No ❑NA Was sensor properly replaced and dyes ❑No ❑NA U(Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA verified functional after testing! Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 8. FILL RISER CONTAINMENT SUMP TESTING Facili ty is Not Equipped With Fill Riser Containment Sumps ❑ Fill Riser Containment Sumpg are Present,but were Not Tested ❑ Test Method Developed By: Qf Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum ZHydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 _ �,,�`-. . Fill Sump#1 Flll Sump#2 Fill Sum #3 Fill Sump#4 Sump Diameter: 42" 42" 42" 42" Sump Depth: 46" 47" 47" 50" Height from Tank Top to Top of N/A N/A N/A N/A Hi hest Piping Penetration_ Height from Tank Top to Lowest N/A N/A N/A N/A Electrical Penetration: Condition of sump prior to DRY DRY DRY DRY testing: Portion of Sump Tested 12" 12" 12" 12" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test: Test Start Time: 11:19 11:19 10:17 10:17 Initial Reading(Ri): 4.2427 2.7140 3.8192 5.7824 Test End Time: 11:34 11:34 10:32 10:32 Final Reading RF): 42423 2.7134 3.8189 5.7821 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-Rj: .0004 .0006 .0003 .0003 Pass/Fail Threshold or Criteria: .002 .002 .002 .002 Test Resulf:;` Pass ❑Fail `, ass ❑`Fail Pass O Fad Pass ail ..: Is there a sensor in the sump? C1 Yes o ❑Yes No El Yes o ❑Yes VNo Does the sensor alarm when // J either product or water is ❑Yes ❑No 4;/NA 13 Yes El No AA 11 Yes ❑No dNA ❑Yes ❑No H NA detected? Was sensor removed for testing? ❑Yes ❑No NA ❑Yes ❑No A ❑Yes ❑No AA ❑Yes ❑No YNA Was sensor properly replaced and ❑Yes ❑No NA ❑Yes ❑No ❑Yes ❑No A ❑Yes ❑No NA verified functional after testing? Comments—(include information on repairs made prior to testing: and recommended follow-up for failed tests) SWRCB,January 2002. Page of 9. SPILIJOVERFILL CONTAROIEW BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Dmnt,but were Not Tested ❑ Test Method Developed By: E6 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum ahydrostatic _ 0 Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Box# Spill Box# 2 Spin Box# 3 Spill Box# 4 Bucket Diameter. 12" 12" 12" 12" Bucket Depth: 16" 16" 16" 16" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN qmtng test: Test Start Time: 1:30 1:30 1:02 1:02 Initial Reading 4.8027 6.6780 4.5552 4.7095 Test End Time: 1:45 1:45 1:18 1:18 Final Reading(RF): 4.8027 6.6780 45554 4.7094 Test Duration: I5 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-R1): 0 0 .0002 .0001 Pass/Fail Threshold or 002 .002 .002 .002 Criteria: Test Result Ps s [7 Fail Pass C Fail Pass.,, [IF ail Pass ,_ O Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRACB,January 2002 Page of 9. SPHIJOVERFILL CONTAE"IENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present,but were Not Tested Test Method Developed By: EfSpill Bucket Manufacturer 0 Industry Standard 0 Professional Engineer D Other fSpeci#y) Test Method Used: ❑Pressure ❑Vacuum ydrostatic ❑Other(Spec) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Boa# V j Spill Boa# V2 Spin Box# V7j Spill Box# Vq Bucket Diameter: 12" 12" 12" 12" Bucket Depth: 16" 16)T 16" 16" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 1:30 2:09 1:02 1:02 Initial Reading(Rj): 5.6571 3.7185 3.6881 4.2578 Test End Time: 1:45 2:24 1:18 1:18 Final Reading(k): 5.657 3.7169 3.6881 4.2580 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(Rr-R): 0 .0016 0 .0002 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: 4 11 Test Result Pass: ~D Fail Pass Fail <' Pass -.❑Fail Pass, ❑:Fail, ;: COI1 MOAS—(include information on repairs made prior to testing; and reco)nntertded follow-up for failed tests) FASIKIF t)U FASIKIN t& 1640 CHESTER AVE FASTRIP 562 1640 CHESTER AVE BAKERSFIELD CA 1640 CHESTER AVE BAKERSFIELD CA SUNSET CONST BAKERSFIELD CA SUNSET CONST 1-800-984-6266 SUNSET CWj 1-800-984-6266 1-800-984-6266 03/08/2011 10:32 AM 03/08/2011 2:24 PM 03/08/2011 10:16 AM SUMP LEAK TEST REPORT SIB LEAH TEST R90T SUMP LEAK TEST REPORT STP 3 STP 3 VSPILL2 TEST STARTED 10:17.AM TEST STARTED 2:09 PM TEST STARTED 03/08/2011 TEST STARTED 10:CO A,"1 TEST STARTED 03/08/2011 BEGIN LEVEL 5,9512 IN TEST STARTED 03/0812011 BEGIN LEVEL 3.7185 IN END TIME 10:32 AM BEGIN LEVEL 5,9543 IN END TIME 2:24 PM END DATE 03/08/2011 END TIME 10:16 AM END DATE 03/08/2011 END LEVEL 5.9490 IN END DATE 03/08/2011 END LEVEL 3,7169 IN LEAK THRESHOLD 0,002 IN END LEVEL 5.9524 IN LEAK THRESHOLD 0.002 IN TEST RESULT FAILED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED FILL3 FILL3 TEST STARTED 10:17 AM TEST STARTED 03/08/2011 TEST STARTED 10:00 AM BEGIN LEVEL 3,8192 IN TEST STARTED 03/08/2011 END TIME 10:32 AM BEGIN LEVEL 3,8197 IN END DATE 03/08/2011 END TIME 10:16 AM END LEVEL 3,8189 IN END DATE 03/08/2011 LEAK THRESHOLD 0,002 IN END LEVEL 3.8193 IN FASTRIP 562 TEST RESULT PASSED LEAK THRESHOLD 0.002 IN 1640 CHESTER AVE - TEST RESULT PASSED BAKERSFIELD CA SUNSET CONST STP 4 1-800-984-6266 STP 4 TEST STARTED 10:17 AM 03/08/2011 2:46 PM TEST STARTED 03/08/2011 TEST STARTED 10:00 AM BEGIN LEVEL 2,2926 IN TEST STARTED 03 108/2011 SUMP LEAK TEST REPORT END TIME 10:32 AM BEGIN LEVEL 2,2934 IN END BATE 03/08/2011 END TIME 10:16 AM VSPILL2 END LEVEL 2.2921 IN END DATE 03/08/2011 LEAK THRESHOLD 0.002 IN END LEVEL 2.2929 IN TEST STARTED 2:30 PM TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST STARTED 03/08/2011 BEGIN LEVEL 3.7159 IN END TIME 2:45 PM FILL4 FILL4 END DATE 03/08/2011 END LEVEL 3,7156 IN TEST STARTED 10:17 AM LEAK THRESHOLD 0,002 IN TEST STARTED 03/08/2011 TEST STARTED 10:00 AM TEST RESULT PASSED BEGIN LEVEL 5,7824 IN TEST STARTED 03/08/2011 END TIME 10:32 AM BEGIN LEVEL 5.7822 IN END DATE -03/08/2011 END TIME 10:16 AM END LEVEL 5.7821 IN END DATE 03/08/2011 LEAK THRESHOLD 0.002 IN END LEVEL 5.7821 IN LEAK THRESHOLD 0,002 IN -- --- TEST RESULT PASSED TEST RESULT PASSED r FASTRIP 562 FASTRIP 562 1640 CHESTER AVE 1640 CHESTER AVE FASTRIP 562 BAKERSFIELO CA BAKERSFIELD CA 1640 CHESTER AVE OSET CONST SUNSET CONST BAKERSFIELD CA 1-800-984-6266 1-800-984-6266 SUNSET CONST 1-M-984-6266 03/08/2011 1:18 PM 03/08/2011 1:45 PM 03/08/2011 2:05 PM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT - VSPILL3 USPILLI VSPILLI TEST STARTED 1:02 PM TEST STARTED 1:30 PM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 TEST STARTED 1:50 PM BEGIN LEVEL 3,6881 IN BEGIN LEVEL 5.6571 IN TEST STARTED 03/08/2011 END TIME 1:18 PM END TIME 1:45 PM BEGIN LEVEL 5.6572 IN ENO DATE 03/08/2011 END DATE 03/08/2011 END TIME 2:05 PM ENO LEVEL 3,6881 IN END LEVEL 5.6571 IN END DATE 03/08/2011 LEAK THRESHOLD 0,002 IN LEAK-THRESHOLD 0,002 IN END LEVEL 5,6571 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED SPILL4 SPILL1 SPILLI TEST STARTED 1:02 pM TEST STARTED 1:30 PM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 TEST STARTED 1:50 PM BEGIN LEVEL 4.7095 IN BEGIN LEVEL 4.8027 IN TEST STARTED 03/08/2011 END TIME 1:18 PM END TIME 1:45 PM BEGIN LEVEL 4.8029 IN END DATE 03/08/2011 END DATE 03/08/2011 END TIME 2:05'PM END LEVEL 4,70941N END LEVEL 4,8027 IN END DATE 03/08/2011 LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4..8031 IN TEST RESULT PASSED .TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED VSPILL4 STP 1 TEST STARTED 1:02 PM TEST STARTED 1:30 PM STP 1 TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 TEST STARTED 1:50 PM BEGIN LEVEL 4,2578 IN BEGIN LEVEL 4.4236 IN TEST STARTED 03/08/2011 END TIME 1:18 PM _ END TIME 1:45 PM BEGIN LEVEL 4.4314 IN END DATE 43/08/2011 END DATE 03/08/2011 END TIME 2:05 PM END LEVEL 4,2580 IN END LEVEL 4,4241 IN END DATE 03/08/2011 LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,4311 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SPILL3 SPILL2 SPILL2 . TEST STARTED 1:02 PM TEST STARTED 1:30 PM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 TEST STARTED 1:50 PM' BEGIN LEVEL 4,5552 IN BEGIN LEVEL 6.6780 IN TEST STARTED 03/08/2011 END TIME 1:18 PM END TIME 1:45 PM BEGIN LEVEL 6.6781 IN END DATE 43/08/2011 END DATE 03/08/2011 END TIME 2:05 PM END LEVEL 4.5554 IN END LEVEL 6,6780 IN END DATE 03/08/2011 LEAK THRESHOLD 01002 IN LEAK THRESHOLD 0.002 IN END LEVEL 6,6782 IN TEST RESULT PASS TEST RESULT PASSED LEAK THRESHOLD 0,002 IN - `--_---- ------ TEST RESULT PASSED 1644 CHESTER AVE 1640-CHESTER AVE BAKERSFIELD CA BAKERSFIELD CA SUNSET CONST FASTRIP 562 SUNSET CONST 1-800-984-6266 1640 CHESTER AVE 1-800-984-6266 BAKERSFIELD CA 03/08/2011 11:34 AM- SUNSET CONST 03/08/2011 1:01 PM 1-800-984-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT STP 2 03/08/2011 11:58 AM USPILL3 SUMP LEVEL REPORT TEST STARTED 11:19 AM TEST STARTED 12:46 PM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 BEGIN LEVEL 5,2236-IN SUMP STP 2 4.332 IN BEGIN LEtE, 3.6887 IN END TIME 11:34 AM END TIME 1:01 PM END DATE 03 108/2011 END DATE 03/08/2011 END LEVEL 5.2277 IN END LEVEL 3.6881 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED STP 1 SPILL4 TEST STARTED 11:19 AM TEST STARTED 03/08/2011 TEST STARTED 12:46 PM BEGIN LEVEL 4,7453 IN FASTRIP 562 TEST STARTED 03/08/2011 END TIME 11:34 AM 1640 CHESTER AVE BEGIN LEVEL 4.7099 IN END DATE 03/08/2011 BAKERSFIELD CA END TIME 1:01 PM END LEVEL 4.7301 IN SUNSET CONST END DATE 03/08/2011 1-800-984-6266 END LEVEL 4.7094 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT FAILED 03/08/2011 12:22 PM TEST RESULT PASSED SUMP LEAN. TEST REPORT FILL2 VSPILL4 STP 2 TEST STARTED 11:19 AM TEST STARTED 12:46 PM TEST STARTED 03/08/2011 TEST STARTED . 12:07 PM TEST STARTED 03/08/2011 BEGIN LEVEL 2.7140 1N END TIME 11:34 AM TEST STARTED 03/08/2011 BEGIN LEVEL 4.2580 IN END DATE 03/08/2011 BEGIN LEVEL 4.3310 IN END TIME 1:01 PM END LEVEL 2,7134 IN END TIME 12.22 PM END DATE 03/08/2011 LEAK THRESHOLD 0.002 IN END DATE 03/08/2011 END LEVEL 4,2576 IN TEST RESULT PASSED LEAK LEVEL 4,3310 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLr� 0,002 IN TEST RESULT PASSED TEST RESULT PASSED FILLI SPILL3 TEST STARTED 11:19 AM TEST STARTED 03/0812011 TEST STARTED 12:46 PM TEST STARTED 03/08/2011 BEGIN LEVEL 4.2427 IN BEGIN LEVEL. 4,5557 IN END TIME 11:34 AM END TIME 1:01 PM END DATE 03/08/2011 END DATE 03/08/2011 END LEVEL 4.2423.IN LEAK THRESHOLD 0.002. IN END LEVEL 4,5553 IN TEST RESULT PASSE LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRIP 562 FASTRIP 562 FASTRIP 552 1640 CHESTER AVE 1640 CHESTER AVE BAKERSFIELD CA 1640 CHESTER AVE BAKERSFIELD CA SUNSET CONST BAKERSFIELD CA SUNSET CONST 1-800-984-6266 SUNSET 1-800-984 4-626-626 6 1-800-984-6266 03/08/2011 03/08/2011 10:55 AM 03/08/2011 11:50 AM 71:72 AM SUMP LEAN TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT STP 3 STP 2 STP 3 TEST STARTED 10:40 AM TEST STARTED 11:35 AM TEST STARTED 10:56 AM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 TEST STARTED 03/08/2077 BEGIPI LEVEL 5,9467 IN BEGIN LEVEL 5,2271 IN BEGIN LEVEL 5,9455 IN END TIME 10:55 AM END TIME 11:11 AM --- END DATE 03108/2011 END TIME 11:50 AM END DATE 03/08/2011 END LEVEL 5,9456 IN END DATE 03/08/2011 END LEVEL 5,9442 IN LEAK THRESHOLD 0,002 IN END LEVEL 5,2168 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TL ;:ESULT FAILED TRAN1 TRAN1 STP 1 TEST STARTED 10:40 AM TEST STARTED 11:35 AM TEST STARTED 10:56 AM TEST STARTED 03/08/2011 011 TEST STARTED 03/08/2011 BEGIN LEVEL 6,3812 IN BEGIN LEVEL TEST STARTED 03/48/2 3/08/2 IN BEGIN LEVEL 6,3816 IN END TIME 10:55 AM END TIME 11:11 AM END DATE 03/08/2011 END TIME 11:50 AM END DATE 03/08/2011 END LEVEL 6,3815 IN END DATE 03/08/2011 END LEVEL 6.3816 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,6644 IN T PASSED LEAK THRESHOLD 0,002 IN TEST RESULT LEAK THRESHOLD 0,002 IN T TEST RESULT PASSED EST RESULT FAILED R TRAN2 TRAN2 FILL2 TEST STARTED 10:40 AM TEST STARTED 03/08/2011 TEST STARTED 11:35 AM TEST STARTED 10:56 AM TEST STARTED 03/08/2011 TEST STARTED 03/08/2011 BEGIN LEVEL 4, 1870 IN BEGIN LEVEL 2,7135 IN BEGIN LEVEL 4, 1871 IN END TIME 10:55 AM - END DATE 03/08/2011 END TIME 11:50 AM END TIME 11:11 AM END DATE 03/08/2011 END DATE 03/08/2011 END LEVEL 4, 1871 IN END LEVEL 2,7130 IN END LEVEL 4, 1870 IN LEAK THRESHOLD 0,002 IN TEST RESULT - PASSED LEAK THRESHOLD 0,00 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED FILL1 TEST STARTED 11:35 AM TEST STARTED 03/08/2011 BEGIN LEVEL 4,2422 IN END TIME 11:50 AM END DATE 03/08/2011 END LEVEL 4,2419 IN _ LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FASTRIP 562 1640 CHESTER;-AVE BAKER�IELD CA FASTRIP 562 SUNSET CDNST 1640 CHESTER AVE 1-800-984-6266 BAKERSFIELG CA SUNSET CONST 03/08/2011 9:18 AM 1-800-984-6265 SUMP LEAK TEST REPORT 03/08/2011 9:01 AM UDC 1-2 SUMP LEAK TEST REPORT TEST STARTED 9:02 AM UDC 1-2 TEST STARTED 03/08/2011 TEST STARTED 8:46 AM BEGIN LEVEL 3,3639 IN TEST STARTED 03/08/2011 END TIME 9:17 AM END DATE 03/08/2011 BEGIN LEVEL 3.3638 IN END LEVEL 3,3637,IN END TIME 9:01 AM LEAK THRESHOLD 0,002 IN END DATE 03/08/2011 TEST RESULT PASSED END LEVEL 3.3639 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC 3-4 TEST STARTED 9:02 AM UDC 3-4 TEST STARTED 03/08/2011 TEST STARTED 8:46 AM BEGIN LEVEL 4,8298 IN TEST STARTED 03/08/2011 END TIME 9:17 AM END DATE 03/08/2011 BEGIN LEVEL 4,8298 IN END LEVEL 4.8297 IN END TIME 9:01 AM LEAK THRESHOLD 0,002 IN END DATE 03/08/2011 IN TEST RESULT PASSED END LEVEL 4,8298 LEAK THRESHOLD 0,002 IN TEST RESULT PASSED UDC 5-5 TEST STARTED 9:02 AM UDC 5-6 - TEST STARTED 03/08/2011 TEST STARTED 8:46 AM BEGIN LEVEL 4,1486 IN TEST STARTED 03/08/2011 END TIME 9:17 AM BEGIN LEVEL 4,1486 IN END DATE 03/08/2011 END TIME 9:01 AM END LEVEL 4,1486 IN END DATE 03/08/2011 LEAK THRESHOLD 0,002 IN END LEVEL 4.1486 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED UDC 7-8 TEST STARTED 9:02 AM UDC 7-8 TEST STARTED 03/08/2011 TEST STARTED 8:46 AM BEGIN LEVEL 4,7274 IN TEST STARTED 03/08/2011 END TIME 9:17 AM BEGIN LEVEL 4,7273 IN END DATE 03/08/2011 END TIME 9:01 AM END LEVEL 4,7272 IN . END DATE 03/08/2011 LEAK THRESHOLD 0,002 IN END LEVEL 4,7273 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED