Loading...
HomeMy WebLinkAboutSB989 2008 IIIIIIIIIIIIIIII�II 35 >xx IE o SWRCB,January 2002 Page_L of Secondary COntain.ment Testing Report Form 7'h Is form is intended for use by contractors performing periodic testing of UST secondary containment systems, Use the appropriate pages of tha form to report results for all componenis tested. Ae completed form,written test procedures,and printouts fmm testa rf applicable),should be provided to thefacility owner/operator for.submitral to the local regulatory agency, I. FACILI'T'Y INFORMATION Facility Name: Date of Tes' _j Facility Address: Facility Contact; fa Phone: Date Local Agency Was Notified of Testing: Nanw of Local Agency Inspector(ifpresent during testing): 2. 'TESTING CONTRACTOR INFORMATION Company Name: Tcchniclan Conduetin Test Credentials: 9<8LB Lio=td Contractor 0 SWRCS Liocnsed Tank Tester License Type: C Lt, 4 License Nutnber. 7,?c//7'D MamtFaetarer Training; Manufacturer Cote ens Date Training-Expires 3. SUMMARY OF TEST RESULTS Component pass Fail Not Repalm Component Pau Pall Not Repairs Tested Made Tested Rude ❑ ❑ ❑ ❑ n o ❑ ❑ 0 ❑ U ❑ 0 ❑ 0 ❑ 0 ❑ D ❑ D G 0 ❑ 0 ❑ rJ ❑ L7 0 ❑ C7 ❑ n 0 D 0 ❑ D ❑ 0 ❑ 0 ❑ ❑ ❑ 0 ❑ 0 0 ❑ 0 D n ❑ u ❑ n n ❑ 0 ❑ 0 ❑ ❑ ❑ n ❑ 00 0 n fl f ❑ 0 0 ❑ ❑ a ❑ ❑ ❑ 0 0 ❑ G rJ ❑ [1 1. ❑ ❑ ❑ If bydrostadc testing was performed,describe what was done with the water after completion of tests: W f 0,s— CER'[WICATION OF TEC>i NICTAN RESPONSJULE FOR CONDUCTING TIUS TESTING ro the bc_rI of tity km7Wedge;ibefacts.W.Y in this document are aecurata and in full compliance with legdl requirements Technician's Signature: It Date:�l/ya IIIIIII IIIII III IIII 36 1 E SWRCR.January 20Q2 page �—of-7 4. TANK ANNULAR TESTING Test Method Developed By: 0 T�anis Manufacturer F1 industry Standard 0 Professional Engineer Pc er(Speooy) Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic ❑Other(Speci Test Equipment Used: Equipment Resolution: 7Tatik# Tank# Tank# Tank# is Tank Exempt From Tcstirtg?' n No O Yes O No rJ Yes 0 No 0 Yes ❑No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting teat: Test Start Time: Initial Reading Test End Time: Final Reading(Rp): Test Duration: Change in Reading(RrR�: Pass/Fail Threshold or Criteria Test Result: ❑ miss ❑FAU 17 Pass I?VAH. 0 Pass 13#44. 0 Pass ❑Fiiil Was sensor removed for test ne. 0 Ycs C No O NA O Yes O No DNA n Yes O No O NA ❑Yes 0 No 0 NA Was sensor properly replaced and D Yes O No 0 NA C7 Yes 0 No 0 NA O Yes O No O NA D Yes 0 No 0 NA verified functional after testin ? Comments—(1w1ude information tin repairs made prior to resting,and recommendedfollow-upforfailed tests} Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing_ {California Codc of Regulations,Title 23,Section 2637(x)(6)} SWRCB,January 2002 rage of 7 S. SECONDARY PIPE TESTING Test Method Developed By: p Piping Manufacturer WfhQustry Standard ❑Professional Zngincer Other(Sped Tect Method Used: sum 0 Vacuum D Hydrostatic Q Other(S ecjfy Test Equipment Used; rr- Equipment Resolution: Piping Run 0 Piping Run N Plping Run# Piping Ran# Piping Material: Piping Manufacturer: Piping Diameter. Length of Piping Run; Men Product Stored Method and location of piping-run isolation: Wait time between applying prossure/vacuum/watcr and starting test: Test Start Time: Initial Reading(Rt): Test End Time: t Final Reading(RF): ' Test Duration: Change in Reading Pass/Fail Threshold or Criteria: 0.2 Test Result: Pass U PAR, El Pass 0 I$ni1 D Pass ❑1r5i31 A p Pan d Fell Co11 MCnts—(inc Jude!hCa maaor7 on repairs made prior to eesli ,and reET ndedfollow-u2&failed wts) S WRCB,January 2002 page-5 of 6. PIPING SUMP TESTING Test Method Developed By: 0 Sump Manufacturer 10dustry Standard ❑Professional Engineer 0 Other('Specify Test Method Used: 0 Pressure U Vacuum ydrostatic 0 0tbor(SpeC.ify) Te.4t Equipment Used: Equipment Resolution: MIN Snmp i's{ Sump# 5amp ii Sump# Sump Diameter: Sump Depth: Sump Material: Height from Tank Top to"fop of Hfghosrt Piping Penetration.- Height from Tank Top to lowest Electrical Penetration: Condition of sump prior to testing: C 1 Portion of Sump Tested' C' Does turbine shut down when ees 0 No 0 NA sump sensor detects liquid(both ❑Yee 0 No 0 NA 0 Yes n No 0 NA 0 Yes 0 No 0 NA product and water)?' Turbine shutdown response time Is system programmed for fail-safe des ❑No CJ NA 0 Yes C No ❑NA, 0 Yes C No n NA n Yts ❑No O NA shutdown? Was fail-safe verified to be Q'!cs J No DNA 0 Yes n No D NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA operational?* Wait time between applying pressure/vacuum/water and starting test: Test Start Tirane: Initial Reading(Q., Test End Time: j Final Reading('Rf): Test Duration: 'AN PACIFIC; PETROLEUM le5O COFFEE RD SAKERSPIELD CA 9;,3@8 11/14/2088 11:37 AM ?AN 1850FCOFFEERRDEUM Sr�1P LEAK TEST P,EFORT BAKERSFIELD CA 93308 DSL. STP ^1/14/21908 19:19 A0 TEST STARTED 11:22 AM TEST STARTED 11/14/2508 SUMP LEAK TEST REPORT BEGIN LEVEL 5.9998 IN END TIME 11:37 Aft UDC 1-2 END DATE 11/14/2098 END LEVEL 5.0986 IN TEST STARTED 10°02. AN LEAK 'THRESHOLD 0.892 IN TCST STARTED 11/14•/2008 TEST RESULT PASSED BEGIN LEVEL S.A LS D DATE IJr14/200JB DSL STP END LEVEL LEAK. THRESHOLD 0.002 IN TES ARTEO 11:22 AM TES; REGULT TEST BTA 11/14/2998 FIEGIN �_F'�1E. IN END TIME 7 Ail DSL Fa END DA 11/14/ END L ¢.1853 IH •�$T STARTED 18 82 AM THRESHOLD 0.092 IN TEST STAP,TED 11Ila 02 AM _ ST RESULT 1WREASED SECIN LEVEL END TIME 10, 6 AM END DATE 11/114/2008 END LEVEL 4.9517 IN LEAK THRESHOLD 8.002 IN TEST RESULT PASSED DSL F8 TEST STARTED 18 62 AM DAN °ACIFIC PETROLEUM TEST STARTED 11/14/280$ 1850 COFFEE RD BEGIN LEVEL 3.5753 IN SAIKERSFIELD CA END TIME • 1 i�4i200�1 9330£ A's END D EHD LEVEL 3.5757 IN 11,114/2F$ 11:56 AM} LEAK THRESHOLD 8,002 It' TEST RESULT SUMP LEAK TEST REF15RT �JSL STP TEST STARTED 11:41 AM TEST STARTED 11/14/2808 BEGIN LEUEL 5.09$2 IN END TIME 11:56 HM END DOTE 1:1114/2 068 END LEVEL 5.0982 IN LEAK THRESHOLD @.082 IN TEST RESULT PASSED DSL STP TEST STARTED :41 AM >TIMED /14/26@8 L 4.1882 IN 11:56 AM 11/14/2008 19;15 IN HOL ID 0.T 14MASED CAL-VALLEY EQUIPMENT 3500 GILMORE AVE. BAKERSFIELD, CA 93308 CAL-VALLEY (661)327-9341 FAX (661)325-2529 EQUIPMENT CONTRACTOR'S LIC.#784170 A HAZ Fax Ta Frorrc 46622 Fax; Pages: INCLUDING COYER Ate Date: Re: CC: 0 Urgent O For Review D Please Comment Q Please Reply ❑Please Recycle Comments: