HomeMy WebLinkAboutSB989 2008 IIIIIIIIVIIIIIIIIII 59
IE °
SWRCB,January 2002 Page 1 of 6� S
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containments systems. Use the appropriate
pages of this form to report results for all components tested. The completed form, written test procedures, and printout from tests(if
applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility: Pacific Bell Telephone Co. dba AT&T California. Service Date: 10/01/2008
Facility Address: 1918 "M" STREET BAKERSFIELD CA 93301 GEO PAR#SA004
Facility Contact: Grant Armstrong Facility Phone:
Date Local Agency Was Notified of Testing: 08/29/2008 Test Type: 6 Month
Name of Local Agency Inspector if present during testing): Erne Medina Bakersfield F.D.
2. TESTING CONTRACTOR INFORMATION
Company Name: Tait Environmental Services
Technician Providing Test : Mclane Paul
Credentials ®CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
®ICC UST Service Technician
License Type: A B ASB C-10 HAZ I License Number: 588098
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON 38437237614 08/02/2009
ICC 5238651-UT 03/13/2009
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
Annular#SA004U001 ® ❑ ❑ ❑ ❑ ❑ I El
Supply Secondary#SA004U001 ® ❑ ❑ ❑ ❑ ❑ El
Return Secondary#SA0040001 ® ❑ ❑ ❑ ❑ ❑ El
Piping Sump#SA0040001 ® ❑ 1❑ Ej I ❑ ❑ ❑
Fill Sump#SA0040001 ® ❑ ❑ ❑ ❑ ❑
Transition Sump#SA004U001 ® ❑ ❑ ❑ ❑ ❑
Ll
❑ ❑ I❑ El ❑ ❑ ❑ El
❑ ❑ I❑ El I ❑ ❑ ❑ Fj
El El ❑ El ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ 10
L1_LLLL__EL__ 10 a_LLL_#�Ji
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
Left 4- 55 gallon drum of test water on-site. Labeled and sealed.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature Date 10/01/2008
i�II I II(IIII I�I IIII 60
IE
SWRCB,January 2002 Page 2 of 6
4. TANK ANNULAR TESTING
Test Method Developed by ❑ Tank Manufacturer N Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used N Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used: Dial Guage 4" Equipment Resolution: .2
Tank##SA004U001 Tank# Tank# Tank#
Is Tank Exempt From Testing?(1) ❑ Yes N No ❑ Yes N No ❑ Yes ❑ No ❑ Yes ❑ No
Tank Capacity: 20,000 gallon
Tank Material: Steel Clad
Tank Manufacturer: Modern Welding
Product Stored: Diesel
Wait Time between applying 1 Hour
pressure/vacuum/water and starting
test:
Test Start Time: 10:15am
Initial Reading(Ri): -10 HG
Test End Time. 11:15am
Final Reading(Rf): -10 HG
Test Duration: I Hour
Change in Reading(Rf- Ri): 0
Pass/Fail Threshold or Criteria: 0
Test Result N Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Was Sensor Removed for Testing. N Yes ❑ No ❑ NA ❑ Ycs ❑ No ❑ NA 110 Yes ❑ No ❑ NA 11E] Yes ❑ No ❑ NA
Was Sensor properly replaced and ❑ Ycs N No ❑ NA ❑ Ycs ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified after testing?
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
Sensor was re-installed at lowest point but not tested.
(1)Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as
sysrtems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of
Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page 3 of 6
5. SECONDARY PIPE TESTING
Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ® Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used: 4" Dial Gauge Equipment Resolution: .I
Piping Run#Sply Piping Run#Rtrn Piping Run# Piping Run#
#SA004U001 #SA004U001
Piping Material: Composite Composite
Piping Manufacturer: Western FG Wester FG
Piping Diameter: 1.5" 1.5"
Length of Piping Run: 50' 50'
Product Stored: Diesel Diesel
Method and location of piping-run Test Boot Test Boot
isolation:
Wait Time between applying 15 Min. 15 Min.
pressure/vacuum/water and starting
test:
Test Start Time: 9:20am 9:20am
Initial Reading(Ri): 5 PSI 5 PSI
Test End Time: 10:20am 10:20am
Final Reading(RO: 5 PSI 5 PSI
Test Duration: 1 Hour 1 Hour
Change in Reading(Rf-Ri): 0 0
Pass/Fail Threshold or Criteria: 0 0
Test Result ® Pass ❑ Fail J11 ® Pass ❑!!!!_jjj ❑ Pass ❑ Fail J1 ❑ Pass ❑ Fail
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
SWRCB,January 2002 Page 4 of 6
6. PIPING SUMP TESTING
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: INC TS-STS Test Unit Equipment Resolution: .0006
Sump# Piping Sump#Trans Sump# Sump#
#SA0040001 #SA0040001
Sump Diameter 48" 18"x 24"
Sump Depth 42" 22"
Sump Material Fiberglass Fiberglass
Height from Tank Top to Top of 14" 8"
Highest Piping Penetration
Height from Tank Top to Lowest 24" 20"
Electrical Penetration
Condition of sump prior to testing Good Good
Portion of Sump Tested(1) 2"above highest piping 2"above highest piping
penetration penetration
Does turbine shut down when
sump sensor detects liquid(both ❑ Yes ❑ No ® NA ❑ Ycs ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
product and water)?*
Turbine shutdown response time NA NA
Is sytem programmed for fail-safe ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
shutdown?*
Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
operational?*
Wait time between applying
pressure/vacuum/water and starting 30 Min. 30 Min.
test
Test Start Time 11:12am 11:27am 12:13 pm 12:29 pm
Initial Reading Ri) 5.0312 5.0318 2.0374 2.0381
Test End Time 11:27am 11:42am 12:29 pm 12:44 pm
Final Reading R 5.0319 5.0317 2.0381 2.0380
Test Duration 15 Min, 15 Min. 15 Min. 15 Min.
Change in Reading Rf-Ri .0007 .0001 .0007 .0001
Pass/Fail Threshold or Criteria .002 .002
Test Result ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Was sensor removed for testing? ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified functional after testing?_
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
Sensor re-installed to lowest point but not tested.
(1) If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page 5 of 6
8.FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps ❑
Fill Riser Containment Sumps are Present,but were Not Tested ❑
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: Incon Equipment Resolution: .0006
Fill Sump# Fill Sump# Fill Sump# Fill Sump#
SA004U001
Sump Diameter: 48"
Sump Depth: 54"
Height from Tank Top to Top of 25"
Highest Piping Penetration:
Height from Tank Top to Lowest 35"
Electrical Penetration:
Condition of sump prior to testing: Good
Portion of Sump Tested: 2"Above Piping
Sump Material. Fiberglass
Wait time between applying 30 Min.
pressure/vacuum/water and starting
test:
Test Start Time: 12:13 12:29
Initial Reading Ri): 3.4432 3.4448
Test End Time: 12:29 12:44
Final Reading(R f): 3.4445 3.4462
Test Duration: 15 Min. 15 Min.
Change in Reading Rf-Ri : .0013 .0014
Pass/Fail Threshold or Criteria: .002
Test Result: ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Is there a sensor in the sump? ® Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No
Does the sensor alarm when either ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
product or water is detected?
Was sensor removed for testing? ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was sensor properly replaced and ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified functional after testing? I I
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
The sensor was reinstalled to the lowest point but not tested.
SWRCB,January 2006
SPILL BUCKET TESTING REPORT FORM
This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printout from
tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Pacific Bell Telephone Co. dba AT&T California Date of Testing: 10/01/2008
Facility Address: 1918 "M" STREET BAKERSFIELD CA 93301 GEO PAR#SA004
Facility Contact: Grant Armstorong Facilit Phone:
Date Local Agency Was Notified of Testing: 08/29/2008
Name of Local Agency Inspector if present during testing): Ernie Medina Bakersfield F.D.
2.TESTING CONTRACTOR INFORMATION
Company Name: TAIT ENVIRONMENTAL SERVICES
Technician Conducting Test: McLane Paul
Credentials: ® CSLB Contractor ® ICC Service Tech ❑ SWRCB Tank ❑ Other(Specify) Incon 38437237614
Tester
License Number (s): A ASB HAZB C-10; 588098: 5238651-UT
3.SPILL BUCKET TESTING INFORMATION
Test Method Used ® Hydrostatic ❑ Vacuum ❑ Other
Test Equipment Used: Incon TS-STS Test Unit I Equipment Resolution: .0006
Identify Spill Bucket(By Tank Number, I #SA004UOO1 2 3 4
Stored Product, etc)
El Direct Bury El Direct Bury El Direct Bury ❑ Direct Bury
Bucket Installation Type ® Contained in Sump ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in Sump
Bucket Diameter inches 12"
Bucket Depth inches 30"
Wait Time between applying 30 Min.
vacuum/water and start of test
Test Start Time: 11:12am / 11:27am
Initial Reading Ri): 5.8210 / 5.7984
Test End Time: 11:27am / 11:42am
Final Reading 5.7985 / 5.7869
Test Duration: 15 Min. / 15 Min.
Change in Reading Rf-Ri : .0225 / .0115
Pass/Fail Threshold or Criteria: .002
Test Result Fail
Comments: Test water left on site in one of the 55 gallon drums along with the SB989 test water
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
i hereby certify that all the information contained in this report is true,accurate and in full compliance with legal requirements
Technician's Signature ��� Date 10/01/2008
i
HT7 '
1918 N ST.
8HKERSFIEU) HTT
CH. 191O IM ST'
9HKER9FTEL0
10/01/2008 11:+3 Am CH.
M7T � Si/MP LEAK, TEST REPORT z8/01/2008 12:13 PM
SAKERSFIELD plPSUMP SUMP LEVEL REPOR.'''
TEST STARTED z1:27 H�! |
TEST 10/01/2008 SUMP TR�N3MP 2.037 I�
' |
BEGI� �EoEL� 5.031G 1 SUMP FILSUMP 3.443 �N
SUMP LEAK TEST REPORT END TIME 11:42 �w
END DATE i0/01,0008 |
17_HD L[oEL 5.0317 iN /
LEAK THRESHOLD 0.002 lX
TEST STARTED il-12 AM TEST RESULT PASSED
TEST STARTED 10101z2008
LEVEL 5.0Z12 IN
'END TIME 11.27 AM, i
| SPILSKT \ '
END D�.TE 10/01/200S
END LEUEL 5'.0319 IN !
TEST STARTED 11:27 AM
I_Ef�K THRESHOLD 0.002 lN TEST STARTED 10/01/2008 | ATT
E ST RESULT PASSED BEGIN LEVEL 5.7984 IN . 1918 M ST,
END TlME 11:42 HM @HKERSFI[LD
END D*TE !0/01/2008 Cpl.:
END LEVEL 5.7869 IN
L[HK THRESHOLD 8.002 IN 10/0, /2008 12:29 PM
TEST �'TARTED li*12 AM TEST RESULT FHlLED
TEST STARTED 10/01/2008 SUMP LEAK TEST REPORT
:�ECJIH LEVEL 5.8210 IN
END TIME ilw27 AM TRHNSMP
END DATE 1001/20ROO
Ef-ifl) LEVEL 5.7985 IN {
TEST STARTED 12:13 P�
Lz'.'AK THRESHOLD 0.002 lN TEST STARTED l&/81/2888
TEST RESULT FAILED BEGIN LEVEL 2.037q IN
-ND TlM[ 12:29 PM
` END DATE 10/01/2008
| 'ND LEVEL 2.0381 IN
| !_EHK THRESHOLD 0.002
�
TEST RESULT P,�SSED |
ATT !
| 1918 N ST. /
| 8AKERSPl[LD FlLSAP
TEST ST6RTED 12:z3 PM
10/81/2808 12:07 PM TEST STO.RTEk 16/01/2008
�EGIN LEVEL 3.+432 lN
ALHRT! REPORT END TIME 12;29 PM
�@D DATE l0/§1/2008
10/01/2808 12:87 PM [ND LEVEL 3.4445 Ilk
LEHK THRESHOLD 8 �02 -N
POWER Up ) , ^
. TEST RESULT P��SE0
10/01/2008 n:43 HM
POWER DOWN \
TEST DATE: 10/1/2008 -CLIENT: AT&T, GEOPAR: SA004 PAGE OF
i
/ '7
WT
2918 )" W.
10/01/2�2 2'4 4 m
SUVIF LEhK TE.-.'.7 REPOR7
76NSOP
TEST STARTED 12'29 PFi
TE�.STARTED 10/01/2008
BEGD LEVEL 2.038'1 1H
TND TIME :.2t44 Pri
END DATE 10/01/200F.,
UID UEIJEL 2.0380 IN
LEAK THRESHOLD 621§
TEST RESULT PASSED
FILSUMP
EST STm TED 12"29 PN
TEST SYRTED 10/01/200C
8EGIN LEOEL 3.4081H
EN D TIME late QM
END LEOEL 3.4462 lN
LEAK THRESHOLD 0.002 IN
T REsum PASSED
TEST DATE: 101/2008 -CLIENT: AT&T, GEOPAR: SA004 PAGE OF
=� Tait Environmental Services
UST Construction • Design • Maintenance Compliance
October 8, 2008
VIA FED EX: 8664 6551 1461
Bakersfield Fire Department
1501 Truxtun Ave.
Bakersfield CA 93301
Re: Secondary Containment Testing Report Form
Pacific Bell Telephone Co. dba AT&T California
1918 "M" STREET, BAKERSFIELD CA
GEOPAR: SA004
To Whom It May Concern:
Enclosed are the results for the following tests completed on October 1 st, 2008:
■ Secondary Containment Testing Report Form
Please do not hesitate to call me if you have any questions.
Very Truly Yours,
Matthew L. Denison
Program Manager
MD
T:ICLIENTSIAT&T1ATT Document ManagementlAT RSA0041Cover Letters1 20081008_SA004_SBC2008-01_SB989 Cover
Letter Bakersfield.doc
CA Lic #588098 • AZ Lic #095984 • NV Lic #0049666
2131 South Dupont Drive • Anaheim, California 92806 • 714.560.8222 • 714.978.2615 Fax
11280 Trade Center Drive • Rancho Cordova, California 95742 • 916.858.1090 • 916.858.1011 Fax
www.talt.com
O�
SWRCB,January 2002 Page 1 of 6
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containments systems. Use the appropriate
pages of this form to report results for all components tested. The completed form, written test procedures,and printout from tests(if
applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility:Pacific Bell Telephone Co.dba AT&T California Service Date: 10/01/2008 m
Facility Address: 1918 "M"STREET BAKERSFIELD CA 93301 GEO PAR#SA004 2Z
Facility Contact: Grant Armstrong Facility Phone: �J
Date Local Agency Was Notified of Testing:08/29/2008 Test T : 6 Month
Name of Local Agency Inspector if present during testing):Erne Medina Bakersfield F.D.
JS
2.TESTING CONTRACTOR INFORMATION R
Company Name:Tait Environmental Services
Technician Providing Test:Mclane Paul
Credentials ®CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
®ICC UST Service Technician
License Type:A B ASB C-10 HAZ ILicense Number: 588098
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON 38437237614 08/02/2009
ICC 5238651-UT 03/13/2009
3.SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
Annular#SA004U001 ® ❑ ❑ El ❑ ❑ ❑
Supply Secondary#SA004U001 ® ❑ ❑ Q ❑ ❑ ❑
Return Secondary#SA004U001 ® ❑ 11❑ El ❑ ❑ ❑ El
Piping Sump#SA004U001 ® ❑ ❑ n ❑ ❑ ❑
Fill Sump#SA004U001 ® ❑ ❑ ❑ ❑ ❑
Transition Sump#SA004UO01 ® ❑ ❑ ❑ ❑ ❑ El
Ej
Spill Bucket#SAO04U001 ❑ ® ❑ ❑ ❑ ❑ El
❑ ❑ ❑ El ❑ ❑ ❑
El ID ❑ ❑ ❑ ❑ El
❑ El El E] ❑
❑ ❑ ❑ El ❑ ❑ ❑
If hydrostatic testing was perfonned,describe what was done with the water after completion of tests:
Left 4-55 gallon drum of test water on-site. Labeled and sealed.
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements
Technician's Signature �� Date 10/01/2008
SWRCB,January 2002 Page 2 of 6
4.TANK ANNULAR TESTING
Test Method Developed by ❑ Tank Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used E Pressure ❑ Vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used:Dial Guage 4" Equipment Resolution: .2
Tank##SA004U001 Tank# Tank# Tank#
Is Tank Exempt From Testing?(1) ❑ Yes E No ❑ Yes E No ❑ Yes ❑ No ❑ Yes ❑ No
Tank Capacity: 20,000 gallon
Tank Material: Steel Clad
Tank Manufacturer: Modern Welding
Product Stored: Diesel
Wait Time between applying 1 Hour
pressure/vacuum/water and starting
test:
Test Start Time: 10:15am
Initial Reading(Ri): -10 HG
Test End Time: 11:15am
Final Reading(RO: -10 HG
Test Duration: 1 Hour
Change in Reading(Rf-Ri): 0
Pass/Fail Threshold or Criteria: 0
Test Result E Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Was Sensor Removed for Testing? E Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was Sensor properly replaced and ❑ Ycs E No ❑ NA ❑ Ycs ❑ No ❑ NA ❑ Yes ❑ No C) NA 13 Yes ❑ No ❑ NA
verified after testing?
i
Comments include any information on repairs made prior to testing,and recommended f011OW-UP for failed tests
Sensor was re-installed at lowest point but not tested.
(t)Secondary containment systems where the`aontinuous monitoring automatically monitors both the Primary and secondary containment,such as
sysrtems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. iCalifomia Code of
Regulations,Title 23,Section 2637(a)(6)1
............................... ._......_............... ................................................_..................:..._.._._.._...................................................
........... ................. .. ..........................................._........:
SWRCB,January 2002 Page 3 of 6
5.SECONDARY PIPE TESTING
Test Method Developed by ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ® Pressure ❑ vacuum ❑ Hydrostatic
❑ Other(Specify)
Test Equipment Used:4"Dial Gauge Equipment Resolution: ,1
Piping Run#Sply Piping Run#Rtrn Piping Run# Piping Run#
#SA004U001 #SA004U001
Piping Material: Composite Composite
Piping Manufacturer: Western FG Wester FG
Piping Diameter: 1.5" 1.5"
Length of Piping Run: 50' 50'
Product Stored: Diesel Diesel
Method and location of piping-run Test Boot Test Boot
isolation:
Wait Time between applying 15 Min. 15 Min.
pressure/vacuum/water and starting
test:
Test Start Time: 9:20am 9:20am
Initial Reading(Ri): 5 PSI 5 PSI
Test End Time: 10:20am 10:20am
Final Reading(Rf): 5 PSI 5 PSI
Test Duration: 1 Hour 1 Hour
Change in Reading(Rf-Ri): 0 0
Pass/Fail Threshold or Criteria: 0 0
Test Result IL® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
SWRCB,January 2002 Page 4 of 6
6.PIPING SUMP TESTING
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: INC TS-STS Test Unit Equipment Resolution:.0006
Sump#Piping Sump#Trans Sump# Sump#
#SA004U001 #SA004U001
Sump Diameter 48" 18"x 24"
Sump Depth 42" 22"
Sump Material Fiberglass Fiberglass
Height from Tank Top to Top of 14" 8"
Highest Pioing Penetration
Height from Tank Top to Lowest 24" 20"
Electrical Penetration
Condition of surnp prior to testing Good Good
Portion of Sump Tested(1) 2"above highest piping 2"above highest piping
oration penetration
Does turbine shut down when
sump sensor detects liquid(both ❑ Yes ❑ No S NA ❑ Yes [] No S NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
product and water)?*
Turbine shutdown response time NA NA
Is sytem programmed for fail-safe ❑ Yes ❑ No S NA ❑ Yes ❑ No S NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
shutdown?*
Was fail-safe verified to be ❑ Yes ❑ No S NA ❑ Yes ❑ No S NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
operational?*
Wait time between applying
pressure/vacuum/water and starting 30 Min. 30 Min.
test
Test Start Time 11:12am 11:27am 12:13 pm 12:29 pm
Initial Reading Ri) 5.0312 5.0318 2.0374 2.0381
Test End Time 11:27am 11:42am 12:29 pm 12:44 pm
Final Reading R 5.0319 5.0317 2.0381 2.0380
Test Duration 15 Min. 15 Min. 15 Min. 15 Min.
Change in Reading Rf-Ri .0007 .0001 .0007 .0001
Pass/Fail Threshold or Criteria .002 .002
Test Result S Pass ❑ Fail S Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fall
Was sensor removed for testing? S Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑-NA
Was sensor properly replaced and ❑ Yes S No ❑ NA I❑ Yes S No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
verified functional after testing?
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
Sensor re-installed to lowest point but not tested.
(1)If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160)
SWRCB,January 2002 Page 5 of6
8.FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps ❑
Fill Riser Containment Sumps are Present,but were Not Tested ❑
Test Method Developed by ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer
❑ Other(Specify)
Test Method Used ❑ Pressure ❑ Vacuum ® Hydrostatic
❑ Other(Specify)
Test Equipment Used: Incon Equipment Resolution: .0006
Fill Sump# Fill Sump# Fill Sump# Fill Sump#
SA004U001
Sump Diameter: 48"
Sump Depth: 54"
Height from Tank Top to Top of 25"
Highest Piping Penetration:
Height from Tank Top to Lowest 35"
Electrical Penetration:
Condition of sump prior to testing: Good
Portion of Sump Tested: 2"Above Piping
Sw-np Material: Fiber-glass
Wait time between applying 30 Min.
pressure/vacuum/waler and starting
test:
Test Start Time: 12:13 12:29
Initial Readin F4(Ri : 3.4432 3.4448
Test End Time: 12:29 12:44
Final Reading(R f): 3.4445 3.4462
Test Duration: 15 Min. 15 Min.
Change in Reading Rf-Ri : 0013 .0014
Pass/Fail Threshold or Criteria: .002
Test Result: ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail
Is there a sensor in the sump? ® yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Cl Yes ❑ No
Does the sensor alarm when either ❑ Yes ® No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Ycs ❑ No ❑ NA ❑ Ycs ❑ No ❑ NA
product or water is detected?
Was sensor removed for testing? ® Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA
Was sensor properly replaced and ❑ Ycs ® No ❑ NA ❑ Ycs ❑ No ❑ NA ❑ Ycs ❑ No ❑ NA ❑ Yes ❑ No ❑.NA
verified functional after testin ?
Comments include any information on repairs made prior to testing,and recommended follow-up for failed tests
The sensor was reinstalled to the lowest point but not tested.
SWRCB,January 2006
SPILL BUCICET TESTING REPORT FORM
This form is intended for use by contractors pe►formhrg annual testing of UST spill containment structures. The completed form and printout from
tests(if applicable),should be provided to the facilio,otivner/operalorfor submittal to the local regulatory agency.
1.FACILITY INFORMATION
Facility Name:Pacific Bell Telephone Co. dba AT&T California Date of Testing: 10/01/2008
Facility Address: 1918"M" STREET BAKERSFIELD CA 93301 GEO PAR#SA004
Facility Contact:Grant Armstorong Facility Phone:
Date Local Agency Was Notified of Testing: 08/29/2008
Name of Local Agency Inspector if present during testing):Ernie Medina Bakersfield F.D.
2.TESTING CONTRACTOR INFORMATION
Company Name:TAIT ENVIRONMENTAL SERVICES
Technician Conductin Test:McLane Paul
Credentials: ® CSLB Contractor ® ICC Service Tech ❑ SWRCB Tank ❑ Other(Specify) Incon 38437237614
Tester
License Number(s):A ASB HAZB C-10. 588098:5238651-UT
3.SPILL BUCKET TESTING INFORMATION
Test Method Used ® Hydrostatic ❑ Vacuum ❑ Other
Test Equipment Used: Incon TS-STS Test Unit E ui ment Resolution: .0006
ldenO Spill Bucket(By Tank Number, I #SA004UOO1 2 3 4
Stored Product,etc)
El Direct Bury ❑ Direct Bury ❑ Direct Bury ❑ Direct Bury
Bucket Installation Type ® Contained in Sump ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in Sump
Bucket Diameter inches 12"
Bucket Depth inches 30"
Wait Time between applying 30 Min.
vacuum/water and start of test
Test Start Time: 11:12am / 11:27am
Initial Reading Ri): 5.8210 / 5.7984
Test End Time: 11:27am / 11:42am
Final Reading(R f): 5.7985 / 5.7869
Test Duration: 15 Min. / 15 Min.
Chan a in Readin Rf-Ri : 0225 / .0115
Pass/Fail Threshold or Criteria: 002
Test Result Fail
Comments:Test water left on site in one of the 55 gallon drums along with the SB989 test water
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true,accurate and In full compliance with legal requirements
Technician's Signature / � � � Date 10101/2008
_............_.............................._....._........... ........... _ .� ...
T•5�J ie r..
Wr.__RSP r_'U,,
yozoi/2008 lIZ43 011 Co.
1913 1 37,
7Af'ERS�pELi) aT % I,a;;, RUi*fir _EVQ iRrP" 0
TV87 STAWD 11;27 AF
411
1.0/01 x`'2058 :027 a;l 757 STARTED 0/01/2008 SUMP TRANSW 2.037 10
E=GEN LEUE'_ 51031S ly S_MD FI_SUMP 3.443 W:
SUMO LEAK TES7 REPOR° END TIME 11:12 AN
ENE? DPTE 0/91/2008
1psu'IP SO WEL 5.0317 IW.
LEAK THRESHOL) 0.0652 10;
-f%7 STARTED 11312 ArP TEST ?ES!LT TASSED
TEST STARTED 30/002008
SE01; LEVEL 5.0312 Ih
ND TIME 1%27 AM `B-
END DATE 10/01/2 c. -
END LW EL 5.0319 W ?,E ST WARTS) !W27 All
LEAK THRESHOLO 0.002 0 TES- STARTED 0/012006 07
TEST IESULT PASSED }SE IN :. .?tt:34 IN 1918 i' �� •
END it LEVEL AAKERSTAILD
END 047E it/01/2008
St=:'_8K_• END LEVEL 5.7845 T+`
.OAK THRESHOLD 0.092 IN ;I?/G;'t! jL:� ,2 ?9 Wo
TEST 17 l iA ::2AM TES- R_S : cM'..~D
TEST STARTED
SUMP YAK T '
1EW _FUEL 5.82!0 IN
END -IM.E 11,27 AM', 7RANSW
?ND BATE 10:01/20W
END -..`.t3EL 5,7985 YN •'I_S WARTED 010`. t
AK THRESHOLD 0.002 IPA "T ST STARTED 10/01/2008
TEST RESUE.- FAILED BEGIN :_EUQ 2.037' W
ZND TIME 12!29 M
END DATE 10/'21_%2 0Oc
14D LEVEL 2.03Gt ZN
LEAK THRESKOLD 0.002 Q�
TEST TES LLT PASSED
AT-
1910 x
AWS J,':-I_:)
7ST STARTED 0113 PM
i0f!j°/281P 1_;A ?_{,+ 'BEST STP.9,7ED
WIN LEUEL 3.402 714
ALARi' RE" END T ME 12;25 Q
='fito DATE :001/2008
W END L�EL :445 1�1
1�a;4�:./2t�6$ :2z:97 � - -- ,.
POWER U _EAK 'WESHOLD V 3.102 02 W.
7,SkEb ^n74•:h
_H
TEST DATE: 10/1/2008 CLIENT: AT&T, GEOPAR: SA004 PAGE I OF 2-
4�1•
e r
I ECG AR l"D 29 :l
iq;/01/2003
EE I r,' L=UEL 2,13381.1'. h
END si":T� tl���i1;I06
2.3380 ?`i
LEAK THRESHOLD '�.002
T'-_..- R L1 L- pRSS;7:)
F
,._r.
CNN) r i fliE -2.0 Ur:
If) LEVE1 w.`x+62
'JaV ?'HHRM4GL; 0.1 3�2 ?;:
_p
TEST DATE: 10/1/2008 CLIENT: AT&T, GEOPAR: SA004 PAGE OF
Tait Environmental Services
UST Construction • Design • Maintenance • Compliance
October 17, 2008
VIA FED EX: 8664 6539 0353
Bakersfield Fire Department
1501 Truxtun Ave.
Bakersfield CA 93301
Re: Secondary Containment Testing Report Form
Pacific Bell Telephone Co. dba AT&T California
1918 "M" STREET, BAKERSFIELD CA
GEOPAR: SA004
To Whom It May Concern:
Enclosed are the results for the following tests completed on October 1 st, 2008:
■ Secondary Containment Testing Report Form
This test was previously sent and has since been revised. Please do not hesitate to call me if
you have any questions.
Very Truly Yours,
Matthew L. Denison
Program Manager
MD
T:ICLIENTSIAT&71ATT Document Management\ATT1SA0041Cover Letters1 20081008_SA004_SBC2008-01_SB989 Cover
Letter_Bakersfield.doc
CA Lic #588098 - AZ Lic #095984 • NV Lic #0049666
2131 South Dupont Drive • Anaheim, California 92806 • 714.560.8222 • 714.978.2615 Fax
11280 Trade Center Drive • Rancho Cordova, California 95742 • 916.858.1090 • 916.858.1011 Fax
www.tait.com