Loading...
HomeMy WebLinkAbout2010 SB989 RESULTS IIIIIIIIIIIIIIIIIIII 47 SWRCB January 2002 IE. page of- Secondary Containment Testing Report Form Fp-; This orn9 is intended for use by contractors performing periodic testing of U,ST secondary containment syslems. Use the appropriate pages of this form to report results for all components tested. The completedform, wriilen tev1 procedures, and printouts from Pests (f applicable), should be provided to the facility ownerloperator for submittal to the local regulatory agenci-. 1. FACILITY INFORMATION Facility Name: MOBIL I Date of1'esting: 3_/1/2010 Facility Address: 2524 OSWELL ST,BAKERSFIELD,CA 93306 Facility Contact: LONGE CHAO Phone: i~ _ Date Local Agency Was Notified of Testing: 02/03/2010 Name of Local Agency Inspector(rf present during testing): ERNIE MEDINA 2. TESTING CONTRACTOR INFORMATION Company Name: Rich Environmental Technician Conducting Test: BRANDON MASON T _ Credentials: X CSLB Licensed Contractor G SWRCB Licensed Tank'Yester License Type: C61ID40 A HAZ License Number: 809850 Manufacturer Training Manufacturer Component(s) Date Trainin«Exc i�_es INCON TS-STS 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made S7 ANNULAR X ❑ ❑ ❑ UDC 1-2 0 X ❑ C 91 ANNULAR. X ❑ ❑ ❑ UDC 3-4 _ 0 X C; _j DIESEL ANNULAR X ❑ .❑ 1 ❑ UDC 5-6 _ ❑ X ❑ C _ 87 PRODUCT SEC X ❑ p ❑ UDC 7-8 X f _ i 87 V ENT SEC X ❑ . ❑ O UDC 9-10 _ X _❑ 91 PRODUCT SEC X ❑ ❑ ❑ 87 FILL STP ❑ X -� 91 VENT SEC X ❑ ❑ 91 FILL STP ❑ ❑ X� DIESEL PRODUCT SEC X. ❑ ❑ ❑ DIESEL FILL STP ❑ E, X' _ C_ 1, DIESEL VENT SEC X ❑ 0 ❑ 87 VPR BOX X C� Li ❑ 87 STP X ❑ ❑ ❑ 91 VPR BOX X ❑ �:1 91 STP X ❑ ❑ 0 0 L' DIESEL STP x ❑ ❑ ❑ _ ❑ U —Cl- if hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING ` To the best of my knowledge,the facts stated in this document are.accurate and In full compliance 4,11h legal requirements Technician's Signature: Date:_ ` d __ ._- IIIIIIIIVIIIIIIIIII 48 lE SWRCB,January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: D Tank Manufacturer X Industry Standard U Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure X Vacuum D Hydrostatic ❑Other(Specify) _ Test Equipment Used:4 IN DIAL GAUGE Equipment Resolution:0.5% Tank#87 Tank#91 Tank# DIESEL Tank# Is Tank Exempt From Testing?' 0 Yes X No G Yes X No ❑Yes X No U Yes LI No Tank Capacity: UNKNOWN UNKNOWN UNKNOWN Tank Material: STEEL. STEEL STEEL Tank Manufacturer: UNKNOWN UNKNOWN UNKNOWN Product Stored: GASOLINE GASOLINE GASOLINE Wait time between applying pressure/vacuum/water and 30MINS 30MINS 30.MINS 30MINS starting test: Test Start Time: 9:30AM 9:30AM 9:30AM Initial Reading(Rj): =10 HG -10 HG -10 HG Test End Time: 10:30AM 10:30AM 10:30AM Final Reading(RF): -IOHG -.IOHG -I OHG — Test Duration: 60 MINS 60 MINS 60 MINS 60MINS Change in Reading(RF-Rj): OHG OHG OHG Pass./Fail Threshold or Criteria: 07171G 0"HG 0"HG 0" HG Si•Ii°T rEk.' :•'g.'.',I..T p$.�.R.ie_.:•1::�::-.�:I,,,.,..,'<'d t:t,l:7,:a.!;,4 i7tEj:'-.;.4.,.;;;k-.7I::lr i i„,.<Y.r E�!'f"Ef!ia:"z:��-'�.'�.Ir'liit.;,.li:l,,qr:i'c::. NIXON 1't '�':i�.1Rha:; ,1i,.-,!�'`:i.�'�•L.. �',t .'R'f?E,;!i 1�• 'ri ;i•!:u•�.t''h'"i'i>'ri'r:'l,.:�'4C+ii i i '':E '';:u.b l� i �'.1Tr.i'�2 v u!..,„,l7 lr;.n.k�.!:'4'.;✓ J�F:a t, 4-•-.-i k �•.a.-e —�l• -,t Was sensor removed for testing? X Yes ❑No DNA X Yes ❑No D NA X Yes ❑No DNA C-Ycs ❑No NA Was sensor properly replaced and X Yes ONO DNA X Yes ❑No ❑NA X Yes ❑No DNA CI Yes 11 No ❑NAJ� verified functional after testing? ��11 Comments— (include inforination on repairs made prior to testing, and recommende (follow-up for failed tests) ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) SWRCB,January 2002 Page j_of 1 5. SECONDARY PIPE TESTLNG Test Method Developed By: 0 Piping Manufacturer X Industry Standard 0 Professional Engineer !1 ❑Other(Specify) Test Method Used: X Pressure p Vacuum. 0 hydrostatic ❑Other(Spec) Test Equipment Used:41N DIAL GAUGE Equipment Resolution: 0-5% Piping Run#87 Piping Run#87 Piping Run#91 Piping Ran#91 PRODUCT VENT PRODUCT VENT _ Piping Material: PLASTIC PLASTIC PLASTIC PLASTIC a Piping Manufacturer: UNKNOWN. UNKNOWN UNKNOWN UNKNOWN Piping Diameter: 21N 31N 2IN 41N Length of Piping Run: 90FT 90FT I OOFT 100FT Product Stored: Method and location of BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP piping-run isolation: Wait time between applying pressure/vacuum/water and 30 MINS 30 MINS 30 MINS 30 M WS starting test: Test Start.Time: 9:30AM 9:30AM 11:OOAM 11:00AM Initial Reading(Rj): SPSI 5PSI 5PSI 5PSI Test End Time: 10:30AM 10:30AM 12:OOPM 12:OOPM Final Reading(RF): SPSI 5PSI_ 5PSI 5PSI Test Duration: 60 MINS 60 MINS 60 MINS 60 MINS Change in Reading(RF-RI): OPSI OPSI OPS1 OPSI Pass/Fail Threshold or 0'PSI O PSI 0 PSI 0 PSI Criteria: - ,.tulC:j; � _ �• 1¢�; +a ,��,=,,�:�:;�••:���!���s+�,: •::��:.:-;;,,l��I1=,Sh �lit!�;;:f 'Ili�lji - f!( r .Pi• +�� � �1,` '� '� ,1 Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING _ Test Method Developed By: ❑Piping Manufacturer X Industry Standard D Professiona{ Engineer D Other(Spec fig) "Pest Method Used- X Pressure G Vacuum ❑Nydrostatic _ 0 Other(Specify) _ Test Equipment Used:4 IN DIAL GAUGE Equipment Resolution:0.511/o ITEM — Piping Run# Piping Run# DIESEL SEC DIESEL VENT Piping Run# Piping Ron# Piping Material: PLASTIC PLASTIC Piping Manufacturer: UNKNOWN UNKNOWN Piping Diameter: 21N 31N -- Length of Piping Run: 150FT 5OFT Product Stored: DIESEL DIESEL Method and location of BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP ipin -nm isolation: _ Wait time between applying pressure/vacuutr0water and 30 MINS 30 MINS 30 MINS 30 MINS starting test: Test Start Time: 11:OOAM 11:OOAM Initial Reading(Ri): 5PSI 5PSI i 'Pest End Time: 12:OOPM 12:OOPM Final Reading(RF): 5PSI 5PSI Test Duration: 60 MINS 60 MINS 60 MINS 60 MINS Change in Reading(RF-R,): OPSI OPSI Pass/fail'Threshold or 0 PSI 0 PSI 0 PSI �. 0 PSI Criteria: :!:';^-,;.:::ri;:;r::..� �d!AP''::•':::: ra,j:,,�.k .,-. :u.i:' I ',r•i'i+ ;: ii'r: :_:i' ... .'i't '".:'!"'f� ,,.:•;r i a..•:r. i i J.i r+i. L�S?r;u!f.'n + ;::il+:::::u:iy i' .:GSF'a::;+a':P:ir�^••i. �„�?.g', �';a { +','";`y '?•::,,±+,.� and ,fir.tl,i.`;r, ''♦ �'?:j , f tip" .le�ii;•a•i,li 'h S;?;; ` " '.I. r, F'" ! S�i .)`S�8LI .l u. ..�1";•:.e... r .:�I l.:k r11,'_. �• .� .7kr J - }l,i�.rt�: r)i'k nfl �+. ...:r+:i.•''•:.!';.._.+ _ _,- Comments— (include.information on repairs)vdde prior to testing, and recommended follow-up fa•failed tests) `� SWRCB,January 2002 Page 5 of- l 6. PIPING SUMP TESTING _ Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard L7 Professional Engineer ❑Other(Specify) _ Test Method Used: D Pressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used: Equipment Resolution: Sump#87 Sump#91 Sump#DIESEL. Sump# Sump Diameter: 38IN 38IN 38IN � �~ Sump Depth: 471N 431N 471N Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank 1'op to Top of 15IN 141N 161N Highest Piping Penetration: Height from Tank Top to Lowest 151N 121N 181N Electrical Penetration: Condition of sump prior to.testing: CLEAN CLEAN CLEAN Portion of Sump Tested' 17IN" .161N 18iN _ Does turbine shut down when sump sensor detects liquid(both X Yes ❑No DNA X Yes ❑No C_NA X Yes 0 No DNA 1?Yes C No ❑NA product and water)?* Turbine shutdown response time 2SEC 2SEC 2SEC Is system programmed for fail-safe X Yes ❑No DNA X Yes DNo DNA X Yes UNo DNA U Yes GNo DNA shutdown? Was fail-safe verified to be operational?` X Yes ❑No DNA X Yes ❑No ❑NA X Yes ❑No D NA G Yes ❑No DNA Wait time between applying pressure/vacuum/water and starting 30 MINS 30 MILNS 30 MINS 30 N'IINS test: _ Test Start Time: 10:33A 10:49A 11:59A 12:15P 11:59A 12:15P Initial Reading(R,): 4.908 4.908 0.285 0.285 7.465 7.463 _ Test End Time: 10:48A 11:04A 12:15P 12:30P 12:15P 12:30P Final Reading(RF): 4.908 4.908 0.285 0.286 7.463 7.463 Test Duration: 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS Change in Reading(RF-RI): .0001N .000 .000 .000_ .002 .000 Pass/Fail Threshold or Criteria: .0021N .0021N .0021N .0021N .0021N .002IN .0021N .002IN ,.,•, .,;!•+.,_ °iwi" '. ,;5:'3°i .en:'iL:r,t.l•L...7.,. t. Pali;;,,..' i• iili ia:ii .._b..r•+1.-F...,:a;t�•,,...,B:k ,„4.&•:g.• !. ,,i.f. : r.....j 171i)t :�;;�• .tl r,l'i ?�,! .•z' ! ..L:.•u•: s;i:l:: ;;f:!?? • �: f ;n�ii+ N..• ttif'a,t f :•'�1is�liel:d�7;Fi�l;t ��It�., ! :'�,.,r�t'{#;?: `� 'tt�. '� `:>•'!:+ fr..r!:$���il�;`�i!,i,l;!lr,.,�i1!FiLi,.� .:5�, ,.�. ?t,� � i `t ��A�I t;. Was sensor removed for testing? X Yes ❑No D.NA X Yes ❑No DNA X Yes D No DNA D Yes ❑No �,NA Was sensor properly replaced and X Yes DNo ❑NA X Yes ❑No G NA X Yes ❑No DNA ❑Yes E No ❑NA verified functional after testing? Comments— (include information on repairs made prior to testing, and recotnmended follotiv-up for failed tests) i If the entire depth of the sump is not tested,specify how much was tested. If the answer to arry of the questions indicated with an asterisk(*)is"NO"or`TNA",the.entire sump must be tested. (See SWRCB LG-160) SWRC$,January 2002 Page iC of 7. UNDER-DISPENSER CONTAINMENT DQ TESTING Test Method Developed By: D UDC Manufacturer D Industry Standard D Professional Engineer D Other(Specify) _ Test Method Used: D Pressure ❑Vacuum D Hydrostatic ❑Other(Spec) Test Equipment Used:_ Equipment Resolution! ILK UDC#1-2 UDC#34 UDC#5-6 UDC#7-8 FUDC Manufacturer: UNKNOWN UNKNOWN UKNOWN UNKNOWN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS _ UDC Depth: 271N 271N 281N 1)291N _ Height from UDC Bottom to Top 81N 81N 81N� 8IN Of Highest Piping Penetration: Height from UDC Bottom to 61N 61N 61N 3IN Lowest Electrical Penetration: Condition of UDC prior to CLEAN CLEAN CLEAN � CLEAN testing: Portion of UDC Tested l OIN LOIN l OIN LOIN Does turbine shut down when UDC sensor detects liquid(both X Yes DNo DNA XYes DNo DNA XYes DNo DNA XYes ❑No E NA product and water)?* Turbine shutdown response time 2 SEC 2 SEC 2 SEC 2 SEC Is system programmed for fail- safe shutdown?* X Yes DNo ]NA X Yes DNo DNA X Yes ❑No DNA X Yes G No CI NA Was fail-safe verified to be X Yes 0 No DNA XYes DNo DNA X Yes DNo DNA X Yes F_-No DNA operational!* Wait time between applying pressure/vacuum/water and 30MINS 30MINS 30MINS 30MINS starting-test ' Test Start Time: _ initial Reading(R,): Test End Time: _ Final Reading(RF): _ FfS_M1NS_*Test Duration: 15MINS 15MINS 15MINS 15MINS 15M1NS 15MINS 15MINS Change in Reading RF-Rs): Pass/Fail Threshold ,,......,;; .,,...;,...i.r or L:Criteria:.<r.r::r(r; a:� .r0l 02,1tN.o.. : .0021i N.t, .. .).2...:1..N••✓^i? ! .00 2!1N iauai t„{.00?21N 4021N l0a0�2d111 N .. r:r — asp,.....T"�t.j — :3 Was sensor removed for testing? D Yes D N.o DNA D Yes D No DNA C Yes DNo DNA D Yes D No D NA Was sensor properly replaced and D Yes DNo DNA G Yes DNo DNA D Yes DNo DNA D Yes D No DNA verified functional after testing? _Comments— (include information on repairs made prior to testing, and recommended foltou,-up for failed tests ALL UDUS ARE VISUAL FAILURES DUE TO NOT HAVING DONUTS` INSTALLED IN THE PIPING PENETRATIONS. ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*) is"NO"or"NA", the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page ( of 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard D Professional Engineer ❑Other(Specify) Test Method Used: 11 Pressure ❑Vacuum Q Hydrostatic ~i 0 Other(Speci& _ 'Pest Equipment Used: Equipment Resolution: UDC#9-10 UDC# UDC# UDC# UDC Manufacturer' UNKNOWN UDC Material: FIBERGLASS UDC Depth: 29LN _ Height from UDC Bottom to Top 61N ~ of Highest Piping Penetration: Height from UDC.Bottom to 31N Lowest Electrical Penetration: _ Condition of UDC prior to CLEAN testing: Portion of UDC Tested SIN Does turbine shut down when UDC sensor detects liquid(both X Yes D No. DNA C Yes 0 No ❑NA ❑Yes ❑No D NA D Yes C No ❑NA product and water)?' Turbine shutdown response time 2SEC _ Is system programmed for fail- safe shutdown? �X Yes ❑No ❑NA ❑Yes ❑No ❑NA D Yes ❑No ❑NA ❑Yes ❑No DNA _ Was fail-safe verified to be o erational?' X Yes ❑No DNA ❑Yes D No DNA D Yes D No ❑NA ❑Yes ❑No t NA _ Wait time between applying pressure/vacuum/water and 30MINS 30MINS 30MINS 30MINS starting test _ Test Start Time: 229E 2:45P Initial Reading(R;): 5.121 5.120 Test End Time: 2:44P 3:01 P Final Reading(RF): 5.120 5.120 _ Test Duration: 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS ISMINS Change in Reading(RF-R,): .001 .000 Pass!Fail Threshold or Criteria: .0021N .0021N .0021N .0021N .0021N .0021N .0021N .0021N BSS�I t{ �. ; f ,1t l, �a IN' .; Q. Was sensor removed for testing? [],Yes ❑No DNA ❑Yes ❑No ❑NA 0 Yes ❑No DNA D Yes U No DNA Was sensor properly replaced and verified functional after testin ? 0 Yes ❑No DNA d Yes 0 No ❑NA ❑Yes D No D NA D Yes L]No ❑NA Comments— (include information onrepairs made prior to testing, and recommended follow-up for f riled tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*)is"NO"or'NA",the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page Of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps X _ Fill Riser Containment Sumps are Present,but were Not Tested D Test Method Developed By 0 Sump Manufacturer D Industry Standard C1 Professional Engineer D Other.(Specify) Test Method Used: D Pressure 0 Vacuum D Hvdrostatic 0 Other(Spec). Test Equipment Used: Equipment Resolution: Fill Sum # Fill Sump# Fill Sump# Fill Sump# _ _ Sump Diameter: �� Sump Depth: Height from Tank Top to Top of Hi hest Pi in Penetration: _ Height from Tank Top to Lowest !� Electrical Penetration. Condition of sump prior to ~ testing: _ Portion of Surnp Tested _ Sump Material: _ Wait time between applying pressure/vacuum/water and 30MINS 30MINS 30MINS 30MINS starting test: _ Test Start Time: _ Initial Reading(R,): Test End Time: Final Reading(RF): Test Duration: 1. 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS Change in Reading(RF-R,): _ Pass/Fail Threshold or Criteria: .002IN A02IN 0021N .0021N .0021N .0021N .0021N .0021N ;�W^ !f :..�y+:a ,t,t ',; ,.... ;: •!.^t #iii; • "r ;,t::,t`: `!frIGP, i 1,:9.r '' .:uS�d i;'r i�I,., J.N? s , ;.t_�f.`,�y, ti+,«•?s8: 1! ,; i Is there a sensor in the sump? ❑Yes DNo D Yes D No C Yes D No O Yes D No Does the sensor alarm when either product or water is D Yes D No DNA D Yes C No DNA D Yes ❑No DNA D Yes DNo DNA detected? Was sensor removed for testing? DYes .DNo DNA DYes DNo DNA DYes DNo DNA DYes DNo ❑NA Was sensor properly replaced and D Yes D No 0 NA D Yes D No 0 NA D Yes D No D NA FO Yes D No D NA verified functional after testin ? Comments—(include f ormation on repairs made prior.to testing and recommended ollaw-up for failed tests) NO FILL SUMPS INSTALLED _� tj�k25 SWRCB,January 2002 Page ofq 9. SPILLIOVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ Test Method Developed By: D Spill Bucket Manufacturer ❑industry Standard D Professional Engineer 13 Other(Speck) Test Method Used: p Pressure ❑Vacuum D Hydrostatic D Other(,Spec) Test Equipment Used: Equipment Resolution: { Spill Box#87VPR Spill Box 491 VPR Spill Box# Spill Box# Bucket Diameter: 121N 121N Bucket Depth: 16TN 161N Wait time between applying pressure/vacuum/water and 30MINS 301V1NS 30MINS 30MINS starting test: _ Test Start Time: 10:33A 10:49A 11:59A 12:15P Initial Reading(Rj): 6.899 6.898 5.358 5.358 Test End Time: 10:48A 11:04A 12:15P 12:30P Final Reading(RF): 6.898 6.898 5.537 5.357 Test Duration: 15MINS 15MINS 15MINS 151V1INS 15MINS 1 SMINS 15MINS 15MINS Change in Reading(RF-R,): 001 .000 .001 .001 Pass/Fail Threshold or .0021N .0021N 0021N .0021N .0021N .0021N .0021N .0021N Criteria: ,. i . •t. , ,,�. ., .rl l., !:n 1 � .,.,. r,< �+#s.�y;;,tt� it+'�L="sa: �`�:• irt,� 1 s; . . hl, `' ,L� 1, 1 p iSiai'i:`:- Er.�:•:� n�t:F'rpFf!d a;i�. ,�.+r(.. ;.t„�^.f� �'f '�,t t.- �.: :.�•.1?., ! �,+� 6`';i'r, :h '�•.i Ni - �1� ,t.8�su�...:......: . ..�•.. .. : ... ...,�1 <'.., .,. h .,�� ?ir�l;,l..,,� Url ;;ll„ �,,:._��•s;,..:�;h,�,:..:.�.�,Pasa, l Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) 2524 OSWELL ST RiCER$FiELD L _ 2524 OSWELL ST MOBIL 0;/d1/2010 10:48 AM N 2524 "GSWELL PrKERBFIELD SAKERSFIELD SUl9P LEAK TEST REPORT 03/01/2010 12:15 PM 03/01/2E+i0 12:31 Pt 07 VPR SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT TEST"rTARTE;) 10:33 AM DSLSTP TEST STARTED 03/01/201@ DSLSTP BEGIN LEVEL R991 IN TEST STARTED 11:59 AM END TIME 10144 AM TEST STARTED 12:15 P'1 TEST STARTED @3/41/2010 END DATE 103/01/201@ TEST STARTED l3rEt1/�?t�1ca 6,$983 IN BEGIN LEVEL 7.4653 IN BEGIN LEVEL 7.4634 IN END t-EVE.L END TIME 12:15 PM LEAK THRESHOLD 8.002 G N END DATE 03/01/2010 END TIME 12:30 PN TEST RESULT PASSED END LEIS /01/2 IN END DATE 03/01/'2010 LEAK THRESHOLD 0.002 IN END LEVEL 7.4632 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN g;:riTP TEST RESULT PASSED TEST STARTED 10133 A0 G f STF' 91 STP TEST STAKED ' W/ /201 BEGIN LEVEL 4.9089 IN TEST STARTED 11:59 AM END TIME 1048 AM TEST STARTED .03/01/2010 7 EST 8TARTED 12:15 PM END DATE 03/01/2010 BEGIN LEVEL 0.2853" IN EST STARTED 03/01/2010 END LEVEL 4.9085 IN END TIME 12'15 PM BEGIN LEVEL 0.2859 Iry LEAP THRESHOLD 0•P SSED END DATE 03/01/2010 END TIME 12:30 PM TEST RESULT END LEVEL. 0.2$57 IN END DATE 03/01/2010 END LEVEL 0.2861 IN LEAK THRESHOLD 0.002 IN T LEAK RESULT THRESHOLD 0.002 IN EST RESULT PASSED TEST RESULT PASSED MOBIL. 91VPR 252.4 OSWELL ST 91UPR BAK,ERSFIEL,D TEST STARTED 11:59 AM TEST STARTED 03/01/2010 TEST STARTED 12:15 PM 03/0112010 11:04 AIM BEGIN LEVEL 5.3583 IN TEST STARTED 03/01/2010 END TIME 12:15 PM BEGIN LEVEL 5.3580 IN SUMP LEAK TEST REPORT END DATE &VOI/2010 END TIME 12:30 PM END LEVEL 5.3574 IN END DATE 03/01/2010 END LEVEL 5.3579 IN LEAK' TNRESHOLD 0.002 IN LEAK. THRESHOLD 0.002 IN TEST RESULT PASSED TES :ST,f1RTED 10:49 AM TEST RESULT PASSED TE :.;�TARTED 03/01/2010 BERN 14VEL 6:8981 I14 EN6-T1TM9' 11:04 :Aid -— — - -- END`I?rT 03/01'rze10 — DbD LtUEL 6.8980. IN MOBIL LEAK. THRESHOLD 0.`002 .IN 2524 OSWELL ST '•?OB IL TEST RESULT PASSED BAKERSFIELD 2 24 OSWELL ST BAKERSFIELD 03/01/2010 3:01 P['i $7STP. 03/01/2010 2:44 Pis SUMP LEAK TEST REPORT TEST STARTED 1 @:49 AM SUMP LEAK BEST REPORT TEST STARTED 03/01/2010 9-10 BEGIN LEVEL 4.90$5 IN 9 10 END TIME 11:04 AM TEST STARTED 2:45 PM END DATE 03/01/2010 TEST STARTED 03/01/2010.. TEST STARTED 2:29 PM END LEVEL 4.9080 IN BEGIN LEVEL 5.°1"?0?''I'N" '-T-ES1' STARTED 03/01/2010 LEAK THRESHOLD 0.90? IN END TIME 3:01 PM BEGIN LEVEL 5.1210 IN TEST RESULT PASSED END DATE 03/131/2010 END TIME 2:44 PM END LEVEL 5.1207 IN END DATE 03/01/2010 1LEAK THRESHOLD 0.002 IN END LEVEL 5.1200 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN _, TEST RESULT PASSED D-i> %1 SB989 TESTING FAILURE REPORT SITE NAME: /nO 3rc- DATE: ADDRESS: p��7 ��'SV•SEL� TECHNICIAN: rs�jl�ti 1✓�f�$d�' CITY: rL5 SIGNATURE: rJ ' 1— THE FOLLOWING COMPONENTS WERE REPLACEDIREPAIRED TO COMPLETE TESTING. REPAIRS: Au_ silk)P k., 9-to. AU, rjT'At- 14AyL LABOR: NO PARTS INTALLED: NAME: TITLE• SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMENTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON-COMPLIANCE. A COPY OF THIS DOCUMENT'HAS BEEN LEFT ON-SITE FOR YOUR CONVIENENCE. 2 PA SWRCB,January 2002 Page __of y_ Secondary Containment Testing Report'Form g�o�rhr � C-a"'►D►�Z�t.ar This form is intended for use bJ,contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The coinpletedform, ivritten test procedures, af7d printouts from tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY_INFORMATION_ Facility Name: OSWELL.MOBIL Date of Testing: � 04/22/2010 Facility Address: 2524 OSWELL ST,BAKERSFIELD,CA Facility Contact: LONGE CHAO Phone: _ Date Local Agency Was Notified of Testing: Name of Local Agency Inspector(if present during testing): _ 2. TESTING CONTRACTOR INFOR_ MATION Company Name: Rich.Environmental Technician Conducting Test: BRANDON MASON Credentials: X CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C61/D40 A HAZ License Number: 809850 Manufacturer Training Manufacturer Component(s) Date Training Expires INCON TS-STS 3. SUMMARY OF TEST RESULTS _ Not Rep Component Pass Fail Component Not Repairs ponent Pass will J Tested Made Tested Made UDC 1-2 X ❑ ❑ X f! ❑ D _❑ UDC 3-4 X ❑ ❑ X CI ❑ _❑_ UDC 5-6 X ❑ ❑ X — C:I ❑ 1i _ UDC 7-8 X ❑ ❑ X - ❑ r-i ❑ E) 0 El C1 LI_ _I G ❑ u ❑ _ � �l _ L� CI _ i= - - ❑ ❑ ❑ ❑ -- D ❑ 'D L-i El If hydrostatic testing was perfon-ned,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature:_ _�` Date:_ 'e;ICy Jd _ SWRCB,January 2002 Page ._of_`� 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING Test Method Developed Tay: O UDC Manufacturer ❑Industry Standard CI Professional Engineer _ ❑Other(Spec) 'Pest Method Used: ❑Pressure 0 Vacuum i C Hydrostatic _ ❑Other(Specib) "Pest Equipment Used: Equipment Resolution: NO 4. n UDC#1-2 UDC#3-4 UDC 95-6 _ UDC#7-8 _ UDC Manufacturer: UKNOWN UKNOWN UKNOWN UKNOWN UDC Material: _ FIBERGLASS FIBERGLASS FIBERGLASS F_IBERGI_.ASS UDC Depth: 281N 32IN 331N� 331N Height from UDC Bottom to Top 91N 81N 91N� 91N _^ of Highest Piping Penetration: Height from UDC Bottom to 141N 141N 141N 141N Lowest Electrical Penetration: Condition of UDC prior to CLEAN CLEAN CLEAN testing: Portion of UDC Tested 11IN IOIN 1 HN 1 l IN Does turbine shut down when UDC sensor detects liquid(both X Yes O No ❑NA X Yes ONo ONA X Yes ❑No DNA XYes, DNo DNA PT duct and water)?' Turbine shutdown response time 5SEC 5SEC 5SEC 5SEC Is system programmed for fail- safe shutdown?* XYes ONo DNA XYes ONo DNA XYes DNo DNA XYes ONo ❑NA Was fail-safe verified to be X Yes ONo ❑NA XYes ONo DNA X Yes ONo DNA XYes DNo -'NA o erational2* _ Wait time between applying f pressure/vacuum/water and 30MINS 30MINS 30MINS 30MINS starting test _ Test.Start Time: 10:14A 10:29A 10:14A 10:29A 11:08A 11:24A 12:28P 12:43P Initial Reading(R,): 4.800 4.801 5.363 5.363 5.520 5.520 5.122 5.122 `Pest Lnd Time: 1.0:29A 10:44A 10:29A 10:44A 11:23A 11:39A 12:43P 12:58P Final Reading(RF): 4.801 4.801 5.363 5.363 5.520 5.52_0 5.122 5.122_ Test Duration: 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS Change in Reading(RF-R,): .001 .000 .000 .000 .000 .000 .000 .000 Pass/Fail Threshold or Criteria: 002IN .0021N .0021N .0021N ,0021N .0021N 0021N U021N 1est.ResU�t »l::y� l t7 ;.r. + �1 1'; # „f!'`?�::11 . ',t. 4.r,I t .. ', :r Was sensor removed for testing? XYes ONo DNA XYes DNo DNA XYes ONo DNA_ XYes D'No DNA Was sensor properly replaced and X Yes ❑No ❑NA X Yes D No O NA X Yes G No D NA X Yes C.No DNA verified functional after testing? Comments— (include information on repairs made prior to testing, and recommended fellow-up for failed tests) f If the entire depth of the UDC is not tested,.specify how much was tested. if the answer to as of the questions indicated with an asterisk(*) is"NO"or"NA",the entire UDC must be tested. .(See SWRCB LG-160) 2524 O&JELL ST OSW£LL MOBIL BAKERSFIELD 2524 OSWELL ST 04/22/2010 12:43 Phi BAKERSFIELD, OaJEL+_ MOBIL 04/22/2010 11:23 AM SUMP LEAK TEST REPORT 2524 OSWEI_L ST 7-8 BAKERS�FIELD SUMP LEAK TEST REPORT 04!2 r2A10 16:29 AM TEST STARTED I?: 8 PM ''' TEST STARTED 64/ 2/2010 SUMP LEAK TEST REPORT STARTED 11:68 AM BEGIN LEVEL 5.1' 26 IN TEST S�ART,_ TEST STARTED 04-122/2010 END TIME 12:43 Ph? 1-2 END DATE 04/22/2010 BEGIN LEVEL 5.5208 IN END TIME 11:23 AM END LEUEL 5.1^27 IN TEST STARTED 10:14 AM END DATE 04/22/2010 LEAK THRESHOLD @.@02 IN TEST STARTED 04/22/`2010 END LEVEL 5.5206 IN TEST RESULT PASSED SEGItl LEUEL 4.80 04 IN LEAK. THRESHOLD 0.002 IN END TIME 10:29 AM TEST RESULT PASSED EMC DATE 04/22/20101 END LEUEL 4.8014 IN LEAF- THRESHOLD 0.002 IN TE^T P,ESULT PASSED -4 TEST STARTED 10:14 AM 0SWEL!_ MOBIL TiFS'T ^TARTE'D 04/22/2010 2524 OSWELI.. ST REGTN LEVEL 5:3634 IN OSWELi_ MOBIL BAKERSFIELD Eun TTME 10:29 AM 2524 OSNELL ST FND DOTE 04.22/2.010 BAKERSFIELD. 04/22/2010 12:5_ Ph? E«r; 5.3630 IN I_EA}` THRESHOLD 0.002 IN SUMP LEAK PEST REPORT 04/2'2/261@ 11:39 AM TF'S'r RESIlL.T PASSED SUMP LEAK TEST REPORT 7-8 5-6 TEST STARTED 12:43 PM TEST STARTED 04/22/2010 TEST .STARTED 11:24 AM BEGIN LEVEL 5.1226 IN TEST STARTED 04.'22/2010 END TIME 12:58 PM BEGIN -LEVEL 5.5206 IN END DATE 04/22/2010 END TIME 11:39 AM END LEVEL 5.1224 IN END DATE 04/22/2010 LEAK THRESHOLD 0.002 IN END LEUEL 5.52051H TEST RESULT PASSED OSWELL MOBIL LEAK THRESHOLD 0.002 IN 2524 OSWELL.ST TEST RESULT PASSED L'AKER'SF I ELD 04/22/2,010 10:44 AM 3�Jt?P LEAK TEST REPORT 1-2 TENT STARTED 10:29 AM TEST STARTED 04/22/2010 BEGIN LEUEL 4.8012 IN END TIME 1044 AM EMC? DATE 04/22/2010 END LEVEL 4.8012 IN LEAl< THRESHOLD 0.002 IN TEST RESULT PASSED ..-4 TEST STARTED 10:29 AM TEST STARTED 04/22/2010 BEGIN LEVEL 5.3631 IN END TIME 10:44 AM END DATE 04/22/2010 END LEVEL 5.3630 IN LEAK THRESHOLD 0.00^2 IN TEST RESULT PASSED SB989 TESTING FAILURE REPORT SITE NAME: ���.EU-- (`� �' L- DATE: L) ADDRESS: 25Q A 05t,16U- 6E TECHNICIAN: 3YL,A AT)dtJ MA_p,,J CITY: ZA�t-cI(LSr°=.s C(_. SIGNATURE: THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE TESTING l REPAIRS• 44EC OL-(A v c_ 3.-L . E z ! o x,�)- 0 3L U G L-r,,,3�5 ALL LABOR: , {�ic22. yX /. � PARTS INTALLE l �tjg_ 6LZc7v_t_c_AL- NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING. THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES O'CCURING FROM NON-COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON-SITE FOR YOUR CONVIENENCE. SWRCB,January 2002 Page oi.:3 Secondary Containment Testing Report Form 1 his.form iS intended firr use by contractors performing periodic Testing gf°U,S'T secondurtr containment s--ten?s. 1 se the uppropri rte pages•nJ this form 10 report results for 1711 components lesled, The completc el firm, rtlr•illen 1c-.rt J:rr� eclrtr ca, eruct printouts fi-om tests (if apt)licahle), should he provided to the facility ovvnerloperatorf)> submillul to the local r<< id(ilori:(1t 0171: _ 1. FACILITY INFORMATION _ Facility Name: OSWELL MOBIL Dale of'1 csting- --06!rt4'2010_! Facility Address: 2524 OSWELL ST, BAKERSFIEL:D,CA Facility Contact: LONGE.CHAO Phone: Date Local A4^ency Was Notified of Testinb Name of Local Agency Inspector(ifpresenl duHng testing): ESTHER 2. TESTING CONTRACTOR INFORAIATION _ Company Name: Rich Environmental Technician Conductino Test: RYAN MASON Credentials: X CSLB Licensed Contractor i:;SWRCB Licensed Tank"festerA� �_ License Type: C61/D40 A HAL License Number: 809850 Manufacturer Training Manufacturer Component(s) Date F.kx- res INCON TS-STS 3. SUMMARY OF TEST RESULTS Not Repairs Not y Repait•s t Component Pass Fail Component P fai ass l '. Tested Made tested A1ada UDC 1-2 X _ UDC 3-4 X r; X i UDC -6 X CI i X UDC 7-8 X C.I X f;7 Li 1 F I I I C.I. Li It'hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTINC: To the hest o f'nq knowledge,the facts stated in this document are accurate and in full eomplianee ivith legal requirenterttc Technician's Signature: j _�_ — -._-_-- Date,.--- 06,'•04!?010 SWRCB, January 2002 1'a,c of ,J 7. UNDER-DISPENSER CONTAINMENT UDC TESTING Test Method Developed By: LI UDC Manufacturer 1.1 Industry Standard I Professional Engineer f 1 Other(Specify) 'Kest Method Used: 1 Pressure i_.I Vacuum I I Hydrostatic Other(Specs& I' 'I est Equipment Used: Equipment Resolution: I. r- ,a tit• CI DC##1-2 U DC.-43-4 U DC 95-6 U DC 47-8 _ UDC Manufacturer-: UKNOWN UKNOWN UKNOWN UKNC)WN �I UDC Material: FIBERGLASS FIBERGLASS FIBFRGLASS �FIBF.RG[;ASS UDC. Depth: _ 281N 321N 331N �- — — 331it' Height from UDC Rottom to "fop 91N SIN 91N — �— 91N — tof 1hi hest Pipinb Penetration. Heightfrorri UDC Bottom to 141N 141N 14IN 141N Lowest Electrical Penetration: _ Condition of UDC prior to CLEAN CLEAN CLEAN CLEAN testing: Portion of UDC Tested' I I IN LOIN I I IN 1 1 IN Does turbine shut.down when UDC sensor detects liquid(both X Yes No I NA X Yes [:No, I:ANA X Yes `: :No I NA X Yes I !No NA -product and water))* _- _- Turbine shutdown response time 5SEC 5SEC 5SEC _ 5.SFC-1. I Is system programmed For fail- safe shutdown?' X Yes 1:1 No 11 NA X Yes [iNo i INA X Yes ! I No l ,NA X Yes I No NA Was fail-safe verified to be - —�---___-__---�' X Yes .i No I I NA X Yes Ci No i NA X Yes : I No I NA X Yes I I No . NA operational"' ' Wait time between applying pressure./vacuum/.water and 30MINS 30MINS 30MINS 30WNS r. starting test 'Pest Start Time: 9:35AM 9:51 AM 9:35AM 9:51 AM 9:35AM 9:51 ANN 10:51 A _ I I:066__ Initial Reading.(Rj): 5.7631N 5.7631N 4.0021N 4.001 IN 5.036IN 5.0351N `.3.032_1N 3.0321N 1 `Pest End Time: 9:50AM 10:07A 9:50AM 10:07A 9:50AM 10:07A 11:06A 1 1:2IA Final Readine(R3): 5.7631N 5,7621N 4.001IN 4.000IN 5.035IN 5.0351N 3.0321N 3.0321N Test Duration: 15MINS ISMINS. 15MINS 15MINS 15MINS 15MINS I5M[NS 15MINS Change in Reading(R,:-R,): OOUIN 0011N QQiIN 09 I1N QQ11N 000 OOOIN --.000IN PassTail Threshold or Criteria: .0021N .0021N .0021N .0021N .0021N .0021N .0021N .0021N Test:Result a X;:Pass ' E7,>�atl'i X;,Pass �1 Fail.:- X Pass _ R Fail X Pass FI Fail . Was sensor removed for testing`' X Yes I..,No C: NA X Yes %1No CINA X Yes I 'No i I NA X Ycs I No ! :NA Was sensor properly replaced and verified functional after testin>;? X Yes LJ No I NA X Yes I:iNo ,1NA X Yes i INo NA X Y'es�I No� ;N;� Comments —(include it?jur)?7aiion on repairs made prior to lesling, and recvmrrrejrded Ji�llow`-uJ�fi r fuilccl le,rJ.sj ' Ifthe entire depth of the UDC is not tested,specify how much was tested. ]f the answer to a of the grrestions indicated with an asterisk ( .)'is"NO" or"NA",the entire UDC must be tested. (See SWRCB LG-160) Su'RCB,January 2002 Page �_of� 7. UNDER-.DISPENSER CONTAINMENT UDC)TESTING Test.Method Developed By: ! UDC Manufacturer tJ Industry Standard I Professional Fri-ineet��s i I Other("Specify) Test Method Used: I.:.Pressure fl Vacuum I Hydrostatic U Other(.Spec��j . Test Equipment Used; Equipment Resolution: limit UDC#9-10 UDC#. C1DC# _ UDC# UDC Manufacturer: UNKNO;T'N l UDC Material: FIBERGLASS I UDC Depth: 291N ------ ------..—_._.... Height fr UDUDC Bottom to Top 61N — { of Highest lint Penetration: !-!eight from UDC Bottom to 31N Lowest Electrical Penetration: _ Condition of UDC prior to CLEAN _^f testing: _ Portion of UDC Tested 8[N — T� Does turbine shut down when UDC sensor detects Iiquid (both X Yes CI No C 1.NA U Yes D No L NA l Yes I !No I'NA :Yes i No 'NA product and water)?' Turbine shutdown response time 2SEC Is system programmed for fail- safe shutdown?, X Yes 1";No [ NA EYes UNo i.7NA l: Yes ! INo '.INA Yes No i NA Was tail-safe verified to be operational?* X Yes U No 1.1 NA. 1!Yes ❑No DNA 1 Yes I 'No I:NA !Yes INo NA Wait time between applying pressure!vacuum!water and 30MINS 30MINS 30MINS 30MINS starting.test Test Start Time: 10:51 A 11:06A Initial Readinu(Ri): 5.8771N 5.8771N Test End"rime: 11:06A 1 1:21A v Final Reading(R,:): 5.8771N 5.8771N --�- Test Duration: 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 15MINS 1 15MINS Charge in Reading(R,:-R,): .0001N 0001N _ Pass/Fail Threshold or Criteria: 002IN 0021N .0021N 0021N .0021N .0021N -.0021N .00-111\' Test Result X+;PASS : ', ark l 3 Pais„ CI Fsik rl Pass.:; il n 'Pass D Fail Was sensor removed for testing? J Yes C I.No F!NA J Yes U No C-1 NA C'Yes :.INo ' INA I 1 Yes I 'No 1 1 N_A_ Was sensor properly replaced and verified functiona) after testing? is Yes '_i No iJ NA L Yes O No `J NA I I Ye.s I.'No I.:NA Yes -1 No NA Comments— (b7C1Ude information on.repccirs grade prior io testing, and rectimrnended follot,�up Ji�r f7iled rests}— If the entire depth of the UDC is not tested, specify how-much was tested. If the answer to any of the questions indicated with.an asterisk (*) is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) MOBIL 2524 OSWELL BAKER::F I ELD MOBIL MOBIL 06/04/2010 11:0h AP 2524 0SWELL 2524 OSWELL �?At;£RSFIELD SAKERSFIELD :..t}t1F' BEAK 'j£S= REPORT 06/04.12010 9:51 AM 06/04./2010 10:07 AN <-C, SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT TEST STARTED 10:51 r1M TEST STARTED 06/04/2010 -2 1-2 BEGIN LEVEL 3.0.325 IN END TIME 11:06 AN TEST STARTED 9:35 AM TEST STARTED 9:51 AM END tti.AT{ 26/04/2010 TEST STARTED 06/04/2010 TEST STARTED 06/04/2019 END LEVEL 3.0322 IN. NEGIN LEVEL 5.7634 IN BEGIN LEVE'::. 5.7630 IN LEAK THRESHOLD 0.002 IN END TIME 9:50 AM END TIME 10:07 AM TEST RESULT PASSED END DATE 06/04/2010 END GATE 06/04/2019 END LEVEL 5.7632 IN END LEVEL 5.7628 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN 'Z±-i9 TEST RESULT PASSED TEST RESULT PASSED TEST STARTED 10:15 Ahi EST STARTED 06/34/2019 BEGIN: LEVEL 5.8776 1 END TIME 11:06 AM TEST STARTED 9:35 AM TEST STARTED 9:51 AN END DATE 06/64f2010 TEST STARTED 06/04/2010 TEST STARTED 06/04/2019 END LEVEL 5.8779 IN BEGIN LEVEL 4.0020 IN BEGIN LEVEL. 4.0011 IN LEAF, THRESHOLD 0.002 IN END TIME 9:50 AM END TIME 10:07 AM TEST RESULT PASSED END PATE 06/04/2010 END DATE 06:/04/2010 END LEVEL 4.0013 IN END LEVEL 4.0005 iN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST =RESULT PASSED TEST RESULT PASSED 5 5-6 TEST STARTED 9:35 Aft TEST :STARTED 9:51 AM TEST STARTED 06/04/2010 TEST STARTED 06/04/-2010 BEGIN LEVEL 5.0361 iN BEGIN LEVEL 5.0355 IN "CE,IL END TIME 9:50 AM END TIME 10:07 AM 2524 CISWELL END DATE 06/04/2019 END DATE 06/04/2010 tWERISFIELD END LEVEL 5.035? IN END LEVEL 5.0354 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD, 0.+002 IN 06/04/2010 11:21- AN TEST RESULT PASSED TEST RESULT PASSED SUMP LEAK TEST REPORT 7-6 TLST STARTED 11:06 51m TEST STARTED 06/04/2010 BEGIN LEVEL 3.0321 IN END TIME 11:21 AM END DATE 06/04/2010 END LEVEL 3.9321 IN LEAK THRESHOLD 0.002 IPA TEST RESULT PRSS•ED 9-10 TEST STARTED 11:96 RN1 TEST STARTED 06•/04/2010 BEGIN LEVEL 5.5777 IN END TIME 11:21 AM END DATE 06/04/2010 END LEVEL 5.8779 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SB989 TESTING FAILURE REPORT SITE NAME: OSWELL MOBIL DATE: 6-4-10 ADDRESS: 2524 OSWELL TECHNICIAN: RYAN MASON CITY: BAKERSFIELD SIGNATURE: THE :FOLLOWING COMPONENTS WERE REPLACED/R RE O COMPLETE TESTING, REPAIRS:. REINSTALL ALL PENETRATION DONUTS LABOR: NONE PARTSINTALLED: NONE NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN TO REPAIR THE ABOVE,LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING.THIS ALSO RELEASES RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING FROM NON-COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON-SITE FOR YOUR CONVIENENCE.