Loading...
HomeMy WebLinkAboutSECONDARY CONTAINMENT TESTING FORM 10-20-08 • I IIIIIII VIII III IIII 15 IE c S W PCB,January 2002 Page of_ Secondary Containment Testing Report Form This form is intendad for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report resultsfor all components tested The completed form,written test procedures. and printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency !. FACILITY INFORMATION Date Facility Name: NEV",,, of Tessin /d-a!9 O Facility Address: a •Jty t_v ^��' C 9 Facility Contact: Phone: Date Local Agency Was Notifled of Testing: Name of Local Agency Inspector(ifpresent during testing): 2. TESTING CONTRACTOR INFORMATION Com any Name:RICH ENVIRONMENTAL Tcchnician Conducting Test: Q� Credentials: 3 CSLB Licensed Contractor ❑S WRCB Licensed Tank'('ester License Type. C621D40 License Number: 809850 Manufacturer Training Manufacturer Component(s) Date Training Expires INCON INCON TS-STS 3. SUMMARY OF TEST RESULTS Component Pass Fall Not I Repairs Component Pass Fall Not Repairs ITested Made Tested Made [] 1 ❑ 1 ❑ ,( ❑ ❑ ❑ t r7 9r D ❑ ❑ v 7- ❑ ❑ L'1 4 9 ❑ ❑ ❑ a ILL le,,P ❑ ❑ X Q v L E . IMc ❑ ❑ ❑ PLW 9/ FiLt_ 0 ❑ 4 ❑ See. 0,&7 0 ❑ ❑ Fit- u.-, 0 ❑ D 16 . 6&c 0 D ❑ ttv t W11(Z ❑ 0 ❑ ✓k y tJ2 S6C. f ❑ Q U 91 t/ 0 ❑ D ❑ ❑ D d ❑ Q f 9 r 0 0 0 0 11 ❑ 0 ❑ ❑ ❑ ❑ 0 ❑ 0 D 0 ❑ 0 ❑ ❑ 1j- 0 0 ❑ 1 ❑ ❑ 0 ❑ ❑ If hydrostatic testing was perfbrmed,describe_what was done with the water after completion of tests; RECYCLE AND RE S CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the hest of my knowledge,the facts.stated in this document are accurate and in futt compliance with legal requirements Technician's Signature: Date: )0-0\-O-o LE Q -- IIIIIII VIII III IIII 16 IE SWRCB,January 2002 page a of'? ,. 4. TANK ANNULAR TESTING 'Pest Method Developed ey: 0'Dank Manu&cturer Industry Standard 0 Professional.Engineer 0 Other(Spec) Test Method Used: 0 Pressure z Vacuum 0 Hydrostatic ❑Other(Specify) Test Equipment Used: 4in. DIAL GAUGE Equipment Resolution: .596' Tank# 7 Tank# g/ Tank# QS L Tank# F: Is Tank Exempt From Testing?' 0 Yes XNo U Yes �dNo Cl Yes ) No 0 Yes G No Tank Capacity: Tank Material: L- STEEL Tank Manufacturer: Product Stored: ow t-e,7 �t$•-+9J /fig Wait time between applying pressure/vacuum/water and 30 .v startin<,test: Test Start Time: Initial Reading(Rr): 1f7 j 119A / Test End Time: Jju Final Reading(R,:): )Qzlf jam f Test Duration: Change in Reading(Rr-Rj): Pass/Fail Threshold or Criteria: Q Test Result: )d Pass ❑Fall -Z Pass ❑Fail -Z Pass ❑Fail 0 Pass 0 Fail Was sensor removed for testing? ,ffiYes 0 N 0 N Yes 0 N 0 N j9Yes ONo DNA 0Yes 0 N. 0 N Was sensor properly replaced and JS yes D No DNA JdYes ONo DNA AYes 0No DNA ❑Yes 0 N 0 N verified functional after testing? Comments—(include information on repairs made prtor to resting, and recommendedjollaw-upfor failed testa) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. (California Code of Regulations,Title 23,Section 2637(a)(6)1 SWRCR January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By. 0 Piping Manufacturer :0 Industry Standard 0 Professional Engineer 0 Other(Specl&) Test Method Used: 9 Pressure 0 Vacuum D Hydrostatic 0 Other(Specify) Test Equipment Used: 41n. DIAL GAUGE Equipment Resolution: .5% Piping Ran q Piping Ron g I/ Piping Run#p <, Piping Rua� Piping Material: •7-j �- Piping Manufacturer: t, �1L^�Ow^J .Jr✓aJ UN J v ^J Piping Diameter: �,/. J y.� �v Si v Length of Piping Run: 22O Product Stored: U 2J(.k� ,° 9/ /tESEC. ( OLt vF v9♦I;Q Method and location of i in -run isolation: AgOT ,V fu ti aM ip AVOK,v J T e/l Wait time between applying pressurelvacuum/water and ��M stanin test: Test Start Time: p e3 r w(yt7' W U'T �✓OV`T Initial Reading(RI): Test End Time: P/�£$ dr[fe' r vt<E Final Reading(Rr): Test Duration: (> Change in Reading(RP-Ri): Pass/Fail Threshold or Criteria: Test Result: 0 Pala AFail ❑ Pass AFall 0 Pass 9Fail 0 Pass .Fail Comments—(include information on repairs mode prior to testing, and recommended Jollaw-yp forfaded tests) �'�'LC. S�r!� �I�� ��L FG+e. �c•%tG,rb•✓'V �TC>� /¢ /��LJ U�''+ 1' ej SWRCB,January 2002 Page ttf of 6. PIPING SUMP TESTING Test Method Developed By: ❑Sump Manufacturer Z Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum YI Hydrostatic 0 Other(Spec) Test Equipment Used: INCON T5—STS Equipment Resolution:.000in. Sump# Y7 Sump# Sump# p L Sump q Sump Diameter; 2 7,-,.! 27.__+ Sump Depth: ,•,! nn -✓ r1v Smnp Material: �/ (� I uC 7 1 ��"ab Height from Tank Top to Top of . Highest Piping Penetration: / !'`� a�' v Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: L Lg/1 v 1) c 'L1 Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid(both )%Yes QNo 0 N ,AYes ❑No DNA <Yes 0No DNA 0Yes 0 N 0 N product and water)?' Turbine shutdown response time 's-Ac F Cr Is system programmed for fail-safe Yes 0 No 0 NA ZYes ❑No DNA -4Yes ONo DNA 0Yes 0 N 0 N shutdown?* Was fail-safe verified to be %fires ❑No O NA )EYes 0 No ❑NA 14Yes 0 No ❑NA 0 Yes ❑No 0 NA operational')* Wait time between applying pressure/vacuurn/water and starting >✓ J Q 0.1 test: Test Start Time: Initial Reading(Rj): �. ✓ �/, ;� 7 771.^' .y ,N Test End Time: 6 Q: !d 1 I Final Reading(Rr): ,t*07,a y. a Test Duration: t5►�t�v ,,,.•✓ v r ,ti 1 �-1,U 1 + ^� Change in Reading(Rp-R); CJm.,.1 .tea v �)0)•V 000. Pass/Fail Threshold or Criteria: O �, ti app, ✓ .,. Test Result: A Pass 0 Fall 9 Pass 0 Fall 9 Pass ❑Fail ❑ Pass O Fau Was sensor removed for testing? ItLYes ❑No DNA PdYes ONo DNA JOYes ❑No DNA ❑Yes ONo DNA Was sensor properly replaced and A Yes O No DNA 9 Yes 0 No ❑NA ,Yes 0 No ❑NA O Yes ❑No ❑NA verified functional after testin ? Comments—(include information an re airs made prior to testing,and recommended follow-up for foiled lesls) 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(0)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) aa-�Sa S WRCB,January 2002 Page of 7 7. UNDER-DISPENSER CONTAINMENT TESTING Test Method Developed By: 0 UDC Manufacturer 5a Industry Standard O Professional Engineer O other(Specify) Test Method Used: 0 Pressure 0 Vacuum 19 Hydrostatic O Other(Sped Test Equipment Used: INCON TS-STS EquipmentResolution: .000in. 11 in UDC# -a UDC# UDC# UDC# - U DC Manufacturer: (Z1•i UDC Material: $ L_ t_ f L UDC Depth: -✓ `� 'ti Height from UDC Bottom to Top of Highest Piping Penetration: Height from UDC Bottom to Q Lowest Electrical Penetration: Condition.of UDC prior to testing: Portion ofUDC Tested Does turbine shut down when UDC sensor detects liquid(both 0 Yes ❑No ONA ❑Yes DNo DNA ❑Yes 0 N DNA ❑Yes ❑No DNA .product and water)?' Turbine shutdown response time Is system programmed for fail- 0Yes ❑No ONA OYes ONo ONA 0Yes 0 N DNA ❑Yes 0 N 13 NA safe shutdown? Was fail-safe verified to be 0 Yes 0 No ONA ❑Yes ❑No 0 NA 0 Yes 0 No DNA D Yes 0 No ❑NA operational?' Wait time between applying pressure/vacuum/water and �O.•�1 �Q,v7� .1 3 i,i t v startin test Test Start Time: ..> :y7 Initial Reading(R, ... is 1 1 .•+ / -o S• v .� .^+ Test End Time: •a Final Readin , . J• l , Test Duration, t ,,,,1-/ •• v J ,Av Change in Reading(RF-Rt): OCLZa .p a .044— 617yaA.; .00/— . 0001-0 OOO.v 001,,v Pass/Fail Threshold or Criteria: a,,� 0 ,- A., epA.ti Test Result: 18 Pass 0 Fail A Pass 0 Fail N'Pass 0 Fail 9 Pass 0 Fail Was sensor removed for testing? ❑Yes ❑No ONA 0 Yes 0 No PtNA 0 Yes ❑No QNA ❑Yes ❑No ,4NA Was sensor properly replaced and ❑Ye verified functional after testing? s O No XNA 0 Yes 0 N JO NA O Yes O No ®NA 0 Yes 0 No R NA Comments- include information on repairs made prior to testing,and recommendedfollow-upfor failed rests) 'if the entire depth of the UDC is not tested,specify how much was tested. If the answer to a_y of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) a3�5a- SWRCB,January 2002 Page of 7 S. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sums 0 Fill Riser Containment Sumps are Present,but were Not Tested ❑ Test Method Developed By; 0 Sump Manufacturer IS Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic 0 Other(Spec) Test Equipment Used: INCON TS—STS Equipment Resolution. .000in. Fill Sump# Fill Sum p# Fill Sume# Fill Sump# Sump Diameter: Sump Depth; Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested Sump Material: Wait time between applying r 1 pressure/vacuum/water and (� starting test: Test Start Time: Initial Reading(R,): Test End Time: Final Reading(R F): Test Duration: Change in Reading R R, : Pass/Fail Threshold or Criteria Test Result: ❑ Pass 0 Fail ❑ Pass 0 Fail 0 Pass 0 Fail 0 Pass D Fail Is there a sensor in the sump? 0 Yes 0 No 0 Yes 0 No 0 Yes ❑No 0 Yes ❑No Does the sensor alarm when either product or water is ❑Yes ❑No DNA 0 Yes ❑No 0 NA 0 Yes ❑No DNA ❑Yes ❑No 11 NA detected? Was sensor removed for testing? ❑Yes ❑No DNA 0 Yes ❑No DNA ❑Yes ❑No DNA ❑Yes ❑No DNA Was sensor properly replaced and verified functional after testin ? Oyes 0 No ❑NA ❑Yes ❑No 0 NA ❑Yes ❑No 0 NA ❑Yes ❑No 0 NA Comments—(include information on repairs made prior io testing and recommended follow-upforfafled tests) aa�sa SWRCB,January 2002 Page -7 of 7 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not ui ed With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present,but were Not Tested 0 Test Method Developed By: 0 Spill Bucket Manufacturer 5d Industry Standard 0 Professional Engineer 0 Other(Spec) Test Method Used: 0 Pressure 0 Vacuum Z hydrostatic 0 Other(Spec) Test Equipment Used INCON TS-STS Equipment Resolution: .000in. 7 Spill Box NVP(L 91 Splll Box#VP Spill Box# Spill Box N Bucket Diameter. Bucket Depth; Wait time between applying �� h pressurelvacuum/waterand ^I,"J starting test: Test Stan Time: /O,t Initial Reading(R,); . 7, y! v Test End Time: r/):D / :D, lD f/ Final Reading(R}): -v Ob•7 H• ,v 41 W. v Test Duration; ,tiI ,,n i 1/ ,•V to I Change in Reading(RF-1Q: M).V 1,00/.'v Pass/Fail Threshold or Criteria: Qp .ti "10A Cba.-/ Test Result: .r4 Pass 0 Fail ,WPW 0 Fall 0 Pass 0 Fail D Pass 0 Fail Comments-(include ii1 ormatlon on repairs made prior to testing,and recommended follow-up for jailed tests) TES-T STARTED 1;38 PM TEST STARTED 25,10/2006 ?,ECJlN Lt 2.1029 IN F.ND TTPIE 2:53 PPI -ND DATE 20/10/2008 CHEVRON END LFQEL 2.1019 IN '17525 WHITE LN i-C- EAK THRESHOLD 0.00-7 IN TEST RESULT PASSED 2@/10/2008 12:58 P11 SUMP LEAK TEST REPORT TEST STARTED 12:43 PN CHEVRON 3-4 TZS.7' STARTED 20/10/2008 2525 WHITE LN RE610 LEVEL 5.6074 IN 11:41 AM EST STARTED 1:5.5 PM END TIME 1258 Pti 20/io/2W TEST STARTED 20/10/2068 END DATE 20/10/200?- BEGIN LE!Tl 2.1022 IN END LEVEL 5.6087 IN somP LEAK TEST REPORT END TIME 2:10 Pt", LEAK THRESHOLD 0.002 IN END DATE END LEVEL 2,1020 IN TEST RESULT PASSED iaSLSTP LEAK THRESHOLD 0.002 IN TEST STARTED 11:26 Ar,'t fLST RESULT PASSED TEST STARTED 20/10/2008 BEGIN I-EUEL 5.6503 IN TEST STARTED 12-'43 PM END TIME 11!41 A14 TEST STARTED 20110/200F� END DATE 20/10/2008 BEGIN LEVEL 1.4820 IN END LEVEL 5,6502 IN END TIME I LEAK THRESHOLD 0.002 IN 2:5P, P),) F14D ?ATE 20/10/2008 TEST RESUL-T PhSSED END LEVEL 1.4821 IN LEAK. THRESHOLD 0.002 IN TEST RESULT PASSED CHEVRON 4525 WHITE ;-N 20/10/2000 2-10 ?M SI-IMP LEAK TEST REPORT cHE'JRON 2525 WHITE LN 1-2 20/10/2008 11:56 AM TEST STARTED 1:55 PM TEST STARTED 20x1012 RT 008 SUMP LEAK TEST REPO 6EC,IN LEVEL 6,6621 IN CrCVRGN END TIME 2:13 PM DSLSTP END DATE 2920@Fj WHITE LN END LEVEL 6.6628 IN 1 TEST STARTED 11:41 W LEAK THRESHOLD 1:14 PM 0.002 IN TEST STARTED 213/10/200'3 'r EST RESULT PASSED SUM' LEAK TEST RE:p,3p- BEGIN LEVEL 5.6506 4 Ali END TIME 11-5M END DATE 20/10/1-7008 5-6 Fi4D LEVEL 5.65E42 IN TF'7 STARTED LEAK THRESHOLD 0-002 IN pfi TEST STARTED 2@/lt3/2008 TEST RESULT PASSED BEGIN LCUEL 5,6087 J�� END TIME 1'14 PM END DATE 20/10/200e- END LEVEL 6089 IN LEAK THRESHOLD 0'.002 IN 0 EVRON 7FST RESULT PASSED '41525 WHITE LF-41 t:-,6 pti 7-8 K TEST REPORT START-ED 12.,59 pm SUMP LEA TEST STARTED 20-'10/2008 1,3EIiIN LEVE-1 1.4821 IN 1-2 END TIME 1:14 PM END DATE 20/10/2008 TEST STARTED 2:11 Ptl END LFUEL 1.4837 IN TEST STARTED 20/10/2008 LFAK THRESHOLD i-002 IN BCGIN LEVEL. 6.6628 IN 7-"T RESULT END TIME 2:'16 PM PASSED END DATE 20-110/200ti, END LEVEL 6.6628 IN � 'EAKTHRESHOLD 0.00" IN TEST REVALT PASS-ED 91 STP �a a15a. 7'E-ST STARTED TEST STARTED 2010:34 A(l BEGIN LE4j 2/1 END TIME - 46 IN 'NC DATE 10:15 qhi "7VPR END LEVEL 20/10/Y00S LEAK THRESHOLp 2-7740 1 TEST STARTED 9:48 AM TEST RESULT 0.002 N TEST STARTED 20/10/2008 PASSED BEGIN LEVEL 5.0287 IN END TIME 10:03 AM _ END DATE 20/10/2008 END LEVEL 5.0286 IN 915TP LEAK THRESHOLD 0.002 IN TEST STARTED TEST RESULT PAVED TEST STARTED 20/10/2@98 10:20 AM BEGIN LEVEL .7 39 N END TIME 0:35 IN 41VPR END ,DATE � 18:35 AP END LEVEL 0/1:3r?430g TEST STARTED 9:48 AM LEAK THRESHOLD 2.7728 IN TEST STARTED 20/18/200,F TEST THRESHOLD 0.002 IN BEGIN LEVEL 4.0079 IN PASSED END TIME 10:03 AM END DATE 20/10/2008 END LE;EL 4.8593 IN LFAK THRESHOLD 0.002 IN TEST RESt_4LT PASSED 2525 WHITE Lh± .. . .,..... 20:10/2 ; 10:03 Ara $7VPR t ip)F LEA, TEST REPOT " TES? STARTED 19:54 AM c_,'7STP TEST STARTED 20/10/2008 BEC;IN LEVEL 5.04 IN TEST STARTED 9:48 A1,1 END TIME 10:19 AM TEST STARTED 20/10/208, END DATE 20/10/2008 BEGIN LEVEL 4x393 IN END LEVEL 5.927, IN , END TIME LEAK THRESHOLD 0.002 IN END DATE 10:03 AM 20/10/2008 TEST RESULT PASSED FEND LEVEL 4.6,373 IN THRESHOLD 0.002 IN TEST RESULT PASSED 91UPP TEST STARTED 10:04 AM TEST STARTED 26/10/2008 -. BEGIN LEVEL 4.3091 IN - END TIME 10:19 AM END DATE 20/10/2008 END LEVEL 4.6068 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 4NEVRON 's52S WHITE L.N 10:55 AM SUMP LEAK TEST REPOP,T E?STP TEST STARTED 10:40 Ahi TEST STARTED 20/19/,�oQg BEGIN LEVEL 4.6052 IN END TIME 10:55 AM END DATE 20/10/2008 END LEVEL 4.6052 IN LEAK THRESHOLD 0.002 IN TEST RESULT f'r1SSED SB989 TESTING FAILURE REPORT SITE NAME: G1 VU'J DATE: Ia'a0'O�r ADDRESS ��� h11�'f]� L TBCmuclAN• �W�ti � Gtil CITY: 819CA6 SIGNATURE: L=" SITE CONTACT: THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE THE SB989 TESTING. LIST OF PARTS REPLACED/REPAIRED: REPAIRS: OS L •4 D T.�.� .�yi -���J2 SSG ///leis CSC sr f CE LABOR: 1SL� PARTS INSTALLED: