Loading...
HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIII VIII III IIII 39 Page of I Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems Use the appropriate pages of this form to report results for all components tested The completed form,written test procedures, and printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACII..TTY INFORMATION Facility Name: D&G 223 Date of Testing: — 3/15/11 Facility Address: 2732 Brundage Ln.Bakersfield,CA Facility Contact: Jaco Hill Phone: 661-393-7000 Date Local Agency Was Notified of Testing: 3/9/11 Name of Local Agency Inspector(fpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Condu Test: Scott Olinger Credentials: WCSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number: 589517 Manufacturer Traininn _ Manufacturer Co netts Date Training Expires Incon TS-STS hispection E ui merit 1/18/13 Veeder Root Monitorin System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component P� Fail Not Repairs Tested Made Tested Made UDC#1-2 ET ❑ ❑ ❑ ❑ ❑ ❑ ❑ SPILL#1 0 ❑ 0 ❑ ❑ ❑ ❑ SPILL#2 ❑ ❑ ❑ ❑ 1 ❑ 1 ❑ ❑ SPILL#3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ V SPILL#1 E ❑ ❑ ❑ ❑ ❑ ❑ ❑ V SPILL#2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ V SPILL 43 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0 0 ❑ 0 0 0 0 ❑ ❑ ❑ ❑ 0 ❑ 0 ❑ ❑ ❑ 0 0 ❑ 0 ❑ ❑ ❑ ❑ ❑ 0 0 0 0 ❑ ❑ ❑ 0 0 0 ❑ 0 ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, a ads stated in this document are accurate and in fuA compliance with legal requirements Technician's Sign Date:-3/15/1 IIIIIII VIII III IIII 40 IE SWRCB,January 2002 Page_of 4. TANK ANNULAR TESTING— Test Method Developed By- ❑Tank Manufacturer ❑industry Standard ❑Profmional Engineer ❑Other(Specify) Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic ❑Other(Specify) Test Equipment Used: Equipment Resolution: U,o" Tank#1 Tank#2 Tank#3 Tank# Is Tank Exempt From Testing?' G(Yes ❑No D(Yes ❑No dYes ❑No ❑Yes ❑No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading(RO: Test End Time: Final Reading(R.F): Test Duration: Change in Reading(RF-R4): Pass/Fail Threshold or Criteria: Test Result 0.Pass OFatif 0:Pass 6 Fad: ..O--PBSS-. 0,ftil ❑-;Pass- OTAH Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and es ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No DNA verified functional after testing? F—OY4 I I I I Comments—(include it formation on repairs made prior to testing, and recommended follow-up for failed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of Regulations,Tide 23,Section 2637(a)(6)) SWRCB,January 2002 -F Page_of 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic D Other(Specify) Test Equipment Used: Equipment Resolution: Piping Run# Piping Run# Piping Run# Piping Run# Piping Material: Piping Manufacturer: Piping Diameter. Length of Piping Run: Product Stored: Method and location of Pipt -run isolation: Wait time between applying presstuWvacuum/water and starting test.- Test Start Time: Initial Reading(R): Test End Time: Final Reading(Rf): Test Duration: Change in Reading(Rr.-R4): Pass/Fail.Threshold or Criteria: Test it it: O :Pass 0 Fail: b-Pass 0 0-Pass ..01aff. D Pass 0: ail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page_of 6. PIPING SUMP TESTING Test Method Developed By. 0 Sump Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 0 Vacuum 0 Hydrostatic 0 Other(Specify) Test Equipment Used: Equipment Resolution: Sump# Sump# Sump# Sump# Sump Diameter. .Sump Depth: Sump Material: Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing: Portion of Sump Tested' Does turbine shut down when sump sensor detects liquid(both OYes ONo DNA OYes ONo DNA OYes ONo OKA OYes ONo DNA product and water)?* Turbine shutdown response time Is system programmed for fail-safe shutdown'?* OYes ONo DNA DYes ONo DNA OYes ONo DNA DYes ONo DNA Was fail-safe verified to be OYes ONo, DNA OYes DNo DNA OYes ONo DNA 0 Yes 0 No 0 NA 2perationalf Wait time between applying press=/vacuum/water and starting test: Test Start Time: Initial Reading W: Test End Time: Final Reading(RF): Test Duration: Change in Reading(RF-RO: Pass/Fail Threshold or Criteria: Test Result: 0 0 Faq :0 Fail.--. .'D Paw,::1 Fail 0,Pgw: 0fail Was sensor removed for testing? 0 Yes 0 No 0 NA 0 Yes D No 0 NA 0 Yes 0 No 0 NA OYes DNo DNA Was sensor properly replaced and 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No DNA OYes ON6 DNA verified functional after testis ? Comments—(include it formation on repairs made prior to testing; and recommended follow-up forfailed lesls) If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*)is"140"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. UNDER ISPENSER CONTAINMENT C TESTING Test Method Developed By: 14 UDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum Aydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution: UDC#1-2 UDC#3-4 UDC# UDC# UDC Manufacturer. WESTERN UDC Material: FIGERGLASS UDC Depth: 12" Height from UDC Bottom to Top 0" of Highest Piping Penetration: Height from UDC Bottom to 0" Lowest Electrical Penetration: Condition of UDC prior to DRY testing: Portion of UDC Tested 9" Does turbine shut down when / UDC sensor detects liquid(both tq Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA product and water)?* Turbine shutdown response time Is system programmed for fail- Sp Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA safe shutdown?* Was fail-safe verified to be 91yes ❑No 0 NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA operational?* Wait time between applying 10 MIN pressure/vacuum/water and starting test Test Start Time: 221 Initial Reading K): 3.8748 Test End Time: 2:36 Final Reading 3.8761 Test Duration: 15 MIN Change in Reading(Rf .0013 Pass/Fail Threshold or Criteria: 002 .Test Result: Pass ❑Fail ❑:Pass" ❑Fail i7 Pass rj Evil ❑'Pass `' :Fail ' Was sensor removed for testing? 46 Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include it formation on repairs made prior to testing and recommended follow-up for failed tests) 'If the entire depth of the UDC is not tested,specify how much was tested If the answer to M of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested (See SWRCB LG-160) SWRCB,January 2002 Page_of 8. FILL RISER CONT SUMP TESTING Fac'q is Not Equipped With Fill Riser Containment Sumps S( Fill Riser Containment Sumps are Present,but were Not Tested ❑ Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 0 Vacuum ❑Hydrostatic 0 Other(Specify) Test Equipment Used- Equipment Resolution: ........... kd 0 Fin sump me# III SUME# # Fill Sump# Fill Su F Sump Diameter. Sump Depth- Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest Electrical Penetration: Condition of sump prior to testing- Portion of Sump Tested Sump Material: Wait time between applying pressure/vacuum/water and starting test: Test Start Time:___ Initial Reading(Rj: Test End Time: Final Reading(RF): Test Duration: Change in Reading Pass/Fail Threshold or Criteria: -. 0 ' 'O .P O-ft � 0. fl . . is there a sensor in the sump? ❑Yes ONo 0 Yes 0 No 0 Yes ❑No 0 Yes 0 No Does the sensor alarm when either product or water Is OYes 0 N DNA O Yes ONo DNA 0 Yes ❑No 0 NA OYes ONO LINA detected? Was sensor removed for testing? 0 Yes 0 No ❑NA ❑Yes ❑No 0 NA 0 Yes 0 No 0 NA ❑Yes 0 No 0 NA Was sensor properly replaced and 2=1 1 verified functional after!E!�M? D Yes ❑No ❑NA 0 Yes ❑No DNA OYes ONo DNA D Yes ❑No ❑NA Comments—(include reformation on repairs made prior to testing and recommended follow-up for failed tests) SWRCB,January 2002 page—Of 9. SPILL/OVERFILL CONTAINMENT BOXES Facilit y is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are PT-gent,but were Not Tested ❑ Test Method Developed By 9 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum IYHydrostatic ❑Other(Specify) Test Equipment Used.INCON TS-STS Equipment Resolution: -g Spill Box#1 Spill Box#V1 SpiH Box#2 Spill Bog;ffv2 =0 Bucket Diameter. 12" 12" 12 12" Bucket Depth: 12" 12" 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test Test Start Time: 2:21 2:21 2:21 3:00 Initial Reading(Pq): 5.0963 7.0579 4.4369 5.3044 Test End Time: 2:36 2:36 2:36 3:15 Final Reading(RF): 5.0973 7.0581 4.4377 5.3045 Test Duration: 15 N41N 15 MIN 15 MIN 15 N41N Change in Reading(RfAj: .001 .002 .0008 .0001 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: 4 On 'Test 1p* 01iff il Pass dpais 0 Pass-: Fall COMMentS—(include information on repairs made prior to testing and recommended follow-upfor failed tests) SWRCB,January 2002 Page_of 9. SPILUOVERFUL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ * Spill/Overfill Containment Boxes are Prpsent,but were Not Tested ❑ Test Method Developed By: dSpill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum ydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution: �2!,z Spill Box#3 Spill Box W3 Spill 8 Bucket Diameter: 12" 12" Bucket Depth. 12" 12" Wait time between applying pressure/vacuum/water and 10 NUN 10 MIN starting test: Test Start Time: 3:00 3:00 Initial Reading(R4)- 5.0289 6.0877 Test End Time: 3:15 3:15 Final Reading(RF): 5.0300 6.0877 Test Duration: 15 MIN 15 MIN Change in Reading(RF-R�: .0011 0 Pass/Fail Threshold or .002 .002 Criteria- Test Result' irPass' u Fail C(:Pass,` ❑Fail- D -Pass; 11 ikit ❑ 0 t Fa!I Comments—flinclude information on repairs made prior to testing; and recommended follow-up for f ailed tests) U AND G 223 D AND G 223 D AND G 223 2732 SFIELDGC LN 2732 BRUNDAGE LN 2732 BRUNDAGE LN B SUNSET CO CA BAKE'SFIELD CA BAKERSFIELD CA 5'800-9 CONST SUNSET CONST SUNSET CONST 1-800-984-6266 1-800-984-6266 1-800-984-6266 03/15/2011 2:59 PM 33/15/2011 2:36 PN 03/15/2011 2:20 PM . SUMP LEAK TEST REPORT Sly LEAK TEST REPORT SUMP LEAK TEST REPORT USPILL2 SPILLI SPILLI TEST STARTED 2:44 PM TEST STARTED 2:21 PM TEST STARTED 2:05 PM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 5.3044 IN BEGIN LEVEL 5.0963 IN BEGIN LEVEL 5:0953 IN END TIME 2:59 PM END TIME 2:36 PM END TIME 2:20 PM END DATE 03/15/2011 END DATE 03/15/2011 END DATE 03/15/2011 - END LEVEL 5.3044 IN END LEVEL 5.0973 IN END LEVEL 5.0957 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED . SPILL3 VSPILLI VSPILLI TEST STARTED 2:44 PM TEST STARTED. 2:21 PM TEST STARTED 2:05 PM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 5.0281 IN BEGIN LEVEL 7.0579 IN BEGIN LEVEL 7,0579 IN END TIME 2:59 PM END TIME 2:36 PM END TIME 2:20 PM END DATE 03/15/2011 END DATE 03/15/2011 END DATE 03/15/2011 END LEVEL 5.0289 IN END LEVEL - 7,0581 IN END LEVEL 7.0580 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED VSPILL3 SPILL2 SPILL2 TEST STARTED 2:44 PM TEST STARTED 2:21 PM TEST STARTED 2:05 PM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 6.0875 IN BEGIN LEVEL 4,4369 IN BEGIN LEVEL 4,4363 IN END TIME 2:59 PM END TIME 2:36 PM END TIME 2:20 PM END DATE 03/15/2011 END DATE 03/15/2011 END DATE 03/15/2011 END LEVEL 6,0876 IN END LEVEL 4,4377 IN END LEVEL 4.4366 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED . -- ..............:. . . UDCI-2 UDCI-2 TEST STARTED 2:21 PM TEST STARTED 2:05 PM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 3,8748 IN BEGIN LEVEL 3.8733 IN END TIME 2:36 PM END TIME 2:20 PM END DATE 03/15/2011 END DATE 03/15/2011 END LEVEL 3.8761 IN END LEVEL 3.8750 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED D AtUG 223 2732 BRUNDAGE LN BAKERSFIELD CA SUNSET CONST 1-800-984-6266 03/15/2011 3:15 PM SUMP LEAK TEST REPORT VSPILL2 TEST STARTED 3:00 PM TEST STARTED 03/15/2011 BEGIN LEVEL 5,3044 IN END TIME 3:15 PM END DATE 03/15/2011 END LEVEL 5,3045 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED SPILL3 TEST STARTED 3:00 PM TEST STARTED 03/15/2011 BEGIN LEVEL 5,0289 IN END TIME 3:15 PM END DATE 03/15/2011 END LEVEL 5.0300 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED VSPILL3 TEST STARTED 3:00 PM TEST STARTED 03/15/2011 BEGIN LEVEL 6.0877 IN END TIME 3:15 PM END DATE 03/15/2011 END LEVEL 6.0877 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED