Loading...
HomeMy WebLinkAboutSB989 2010 I IIIIIIII IIIII III 1111 47 751 All f SWRCB,January 2.002 IE Page 1 of Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form:to report results for altcomponents'tested The completedform,written testprocedures, and printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the.local regulatory agency. 1. FACILITY INFORMATION Facility Name: HAPPY GAS lbate of Testing: 8/9/10 Facility Address: Ml TAFT HWY Facility Contact: AMITA Phone: Date Local Agency Was Notified of Testing;; :Name of Local Agency Inspector(if present during tesringd: 2. TESTING CONTRACTOR INFORMATION Company Name: RICH ENVIRONAffiNTAL Technician Conducting Test:, RICH PHILLIPS Credentials: X CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type: C61/D40 A:HAZ License Number: 5284980-UT Manufacturer Training Manufacturer Component(s) Date Training Expires INCON TS=STS 6111/12 3. SUMMARY-OF TEST RESULTS Component. Pass'.Fail Not Repairs Component `Pass: Fts] Repairs Tested 'Made Made UNL 87 VAPOR BOX X' p D. p 5/6"UDC X UNL 91 VAPOR BOX X Z/8"UDC X RED DYE FILL SUMP X ❑ ❑ ❑ 9 UDC X ❑' 87-FELL SUMP X ❑ ❑ ❑ 87 SECONDARY p X p p 91-FILL SUMP X` ❑ p ❑ 91 SECONDARY ❑ X ❑ ❑ DIESELTILL SUMP X ❑ ❑ ❑ DIESEL SECONDARY ❑ X ❑ ❑ RED DYE ST? SUMP X ❑ ❑ ❑ RED DYE SECONDARY ❑; X ❑ p 87 STP SUMP x ❑ ❑ p ❑ ❑ ❑ 91 STP SUMP X . ❑ ❑ ❑ p p ❑ ❑ DIESEL STP SUMP X ❑ 0 ❑ 0 ❑ ❑ 112 UDC X "❑ ❑ ❑ 0. ❑. 0 ❑ 3/4 UDC X ❑ ❑ ❑ ❑ ❑ ❑ ❑ If hydrostatictesting was performed,.describe what was done with the:water after completion of tests: ALL TEST BOOTS:IN STP SUMP"BAD AND-NEED TO BE REPLACED CERTIFICATION OF TECHNI SPONSIBLE FbR,CUNDUCTING TAI$:,TESTING To the best of my knowledge,thefka s., document are accurate and m full compliance with legal requirements Technician's Signature: Date: 08/09/10 IIIINI VIII III IIII 48 IE (ov SWRCB,January 2002 Page L_,of 4. TANK ANNYJLAR TESTING Test Method.Developed By: l'i Tank Manufacturer (;.Industry,Standard I i Professional Engineer tJ Other(Spec) Test Method Used: �;t Pressure_ .I Vacuum r:Hydrostatic i .Other($�ecif) Test Equipment Used: Equipment Resolution': Tank# Tank.# Tank# Tank.# ]s Tank Exempt From Testing?' Yes [;No Yes I :No I Yes [No : 'Yes No Tank Capacity Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading(RI): Test End Time: Final Reading(Rr): Test Duration: Change in Reading(Rr-R,): Pass/Fail Threshold or Criteria: 'IE'est ReSU1 " ;;1€' II _:i asI' i t 'lF�a1'X41 f� #� : D Fait Was sensor removed for testing? Yes :I No [I NA:: f 1 Yes i (No l:NA r_i Yes ;.'I No 1 NA. : I`Yes i No I NA Was sensor„properly replaced and verified:functional.aftertestin ? f1Yes U.No 1-:NA ;!;Yes i;;No "INA ;.I Yes r:No 1:;NA ` I:Yes !:1No :lNA Commetits— (include information on repairs made prior 1o.tes1 iag, and:recominegded follrnv-up fur failediesZs) SINGLETANKS / SINGLE:WALL TANKS—NOTE ST ' Secondary.containment'systems where the continuous monitoring automatically monitors both the:primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt.from periodic containment testing. (Cal ifornia.Code of Regulations,Title 23;.Sectiom"2637(a)(6)} SWRCB,January 2002 Page of _ 5. SECONDARY PIPE TESTING Test Method Developed By: I .P.ipingManufacturer i;Industiy'Standard I I Professional Engineer V1 Other(Specifvj . Test.Method Used: ICI Pressure [1 Vacuum f Hydrostatic I Other(Spec) Test Equipment Used: Equipment Resolution: Piping.Run## Piping.Run:#1 Piping Run# Piping Run# Piping Material: Piping 1Vlanufacturer: Piping Diameter: Length of Piping Run: Product.Stored: Method and location of pip;n -run isolation: IJ Wait time between,applying PressureNacuum/water and, starting test: Test Start Time: 'Initial Reading(R!): Test End Time: Final Reading(RF): Test.Duration: Change in Reading,(Rj:-R!): Pass/Fail Threshold or Criteria: iarF° Ct Puss Kati Comments—(include i?f rmdtion on repairs made prior to test ng, and recommended fallow-up fe)r failed lesq) VISUAL FAILURE ALL TEST BOOTS NEED'I)0 BE REPLACED ALL PRODUCTS. SWRCB Janus 2002 o Q January Page�of 0 6. PIPING SUMP TESTING Test Method Developed By: i:,Sump Manufacturer X Industry Standard I I Professional Engineer Li Other(Speci,�) Test Method Used: I Pressure is Vacuum X.Hydrostatic. i Other(Specify) Test Equipment Used:. Equipment Resolution: Sump.#1-RED DYE Sump#2-87 Sump#3-.91 Sump#4—DIESEL Sump Diameter: 37" 37" 37" 37" Sump Depth: 6199 62" 62" — 61" Sump'Material: FIBERGLASS FIBERGLASS FIBERGLASS )FIBERGLASS Height from Tank Top to Top of 32" 20" 20" 20" Highest Piping Penetration: Height from Tank.Top to Lowest 21" 22" 2l" 22" Electrical Penetration: Condition of.sump prior to•testing: GOOD GOOD GOOD GOOD Portion:of Sump Tested' 34" 22" 22" 22" Does turbine shut down when sump sensor detects liquid(both i-1 Yes U No X NA: _I Yes i No X.NA is Yes C No X..NA _L Yes L"1'No. X NA product and water)? Turbine shutdown response.time Is system programmed for fail-safe shutdown?` 0.Yes 11 No X NA H Yes I No. X NA (I Yes : ;No X NA i I Yes I iNo. X NA Was fail-safe verified to be o erational"* - Yes D No X NA D,Yes t-No X.NA C1 Yes L I No X.NA t. Yes INo X NA Wait time between applying pressure/vacuum/water and starting 30MIN 30MIN 30MIN 30MIN. test: Test Start Time: 1:221PM, ,,,1:45PM 2:27PM. 2:45PM 3:32PM 3:40PM 3:12P4' 3:49PM Initial Reading(Rj): 4.631 4.499 4.947 4.947 4.295 4.295 3834 3.835 Test End Time: 1::37PM 2:00PM 2:42PM 3:001PM 3:47PM 4:04PM 3:47P.M` 4:04PM Final Reading(RF•): 4.6706 4.499 4.947 4.947 4.295 4.295 3.834 3.835 Test Duration: 15MIN. 15MIN 15MIN 15MIN ISMIN 15MIN 15MIN 15.MIN Change in Reading(RF R,): .001 .000 .000 .000 000 .000 .000 .000 Pass/Fail Threshold or Criteria: :.:.... Fai1,,. . Was sensor removed for testing? X Yes Ll No (_;NA X Yes I,INo LrNA X Yes ;'I:No I NA, X Yes. t. No it NA Was sensor properly replaced.an,d X Yes J No d NA X Yes INo I tNA X Yes I, No 1. NA_ X.Yes 1'1,N61 NA ` verified functional after testin ? commitnts—:.(include information.on repairs made prior to testing; and recoininepded.fo 116VI'-up.for failed iesls) ' If the entire depth.of the sump is not aested,specify how much was tested. If the answetto.any of the questions indicated with an asterisk(*)is"NO"or"NA",the.entire sump must be tested. (See SWRGB LG-1.60) . SWRCB,January 2002 Page of" 7. UNDEWDISPENSER CONTAINWNT(UDC TESTING Test Method Developed By: LJ UDC Manufacturer X Industry Standard (:Professional Engineer Other(Sped) Test Method Used: U.Pressure .J Vacuum X Hydrostatic LOther(Specify) Test Equipment Used: INCON Equipment.Resolution: UDC,# 1/2 UDC#3/4 UDC 4,5/0 UDC#718 UDC Manufacturer: UNKNOWN" UNKNOWN UNKNOWN. UNKNOWN UDC .Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 30" 30" 25" 30" Height from UDC Bottom to Top 7" 7" 67' 7" of Highest Piping Penetration: Height from UDC Bottom to T' 6" 9" 6" Lowest.Electrical Penetration': Condition.of UDC prior to GOOD GOOD GOOD GOOD testing: Portion of UDC"Tested 9" 9" " 8" 9" Does turbine shut down when UDC.sensor detects 1 iquid(both I Yes J N:o :XNA �I Yes._ I No XNA L Yes ; I No XNA I I Yes i :No XNA. product and water)? Turbine shutdown response time Is system programmed for fail- ;I Yes ❑No XNA 5J Yes C_No XNA ["Yes I:I No X.NA I Yes :::No XNA safe shutdown? Was faikafe verified to be "operational?' I Yes _]No: l I NA L I Yes :_I No t-:NA i_i Yes I I No Is I.NA i Yes : I No °. NA Wait time between applying pressure,'vacuum/water and 30MIN .3O MIN 30MIN 30MIN, startin .test Test Start Times VISUAL FAILURE I2:1.2PM I2 3OPM 5:419PM 6.'06,PM 1:45PM 2 go 04PM Initial:Reading(Ri):` 3:108. 3:108 3.122 3.122 3.006 3:006 Test End Time. 12:28PM 12:46PM 6`04PM =6:21 PM 2:OOPM 2 29PM Final Reading(RF): 3:108 x.10.8 3.122 3.'l22 3.006. x:006: Test Duration: 15MiN 15MIN 15MIN 15MIN 16 MIN 15MIN Change in Reading(RF-R,): 000' 000 .000 .000 ,000 ..000 Pass/Fail`Threshold or Criteria:. 602IN I :0021N .0027N 0021N.. .00211N .002IN Fait; bass' Ci F8i1 . Was sensor removed for testing? F Yes 1 No -,jr NA X Yes" I:,No C!NA X Yes ' fNo I tN.A X Yes: i :No I NA Was sensor properly replaced and L.I Yes' CI No I NA X Yes Il NO L I NA X Yes I 'No 1 I NA X Yes. f I No .:;NA verified functional after testing? Comments—.(include information on repairs.made prior to lesfing:.and;recommendetf follow-up fr)r faikd,tcslsj UNABLE TO INSTALL AND TIGHTEN:TEST BOOT ON DISP 11,/2 ' If the entire depth of the UDC-is not tested,specify how much.was;tested. If the�answer to any of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must'be tested .(See SW.,RCB':L'G-160). SWRCB,January Page of 7. UNDER-DISPENSEWC0NTAR4WNT;2Mg TESTING Test Method.Developed:By: 13 UDC Manufacturer A Industry Standard [].Professional Engineer ❑Other(SpecrY). Test.Method Used:, 0 Pressure ❑`Vacuum X Hydrostatic 0 Other(Specify) TestEquipment Used: INCON Equipment Resolution: .002: UDC;#9 UDC_# UDC# UDC# UDC Manufacturer:: UNKNOWN. UDC Material: FIBERGLASS UDC the 29" Height from UDC Bottom to Top 6" of Highest Pipi4 Penetration: Height from UDC Bottom to 6" Lowest Electrical Penetration: Condition of UDC prior to GOOD Portion of UDC Tested T, Doesturbine it,down when UDC sensor detects liquid(both 0 Yes ❑No: X NA ❑Yes ONO, ❑NA ❑Yes 0 No fl NA 0 Yes: ❑Na ❑NA. product,and water)?* Turbine shutdown response time Is system programmed for fail- p Yes ONO X NA 0 Yes ❑No.. O NA pYes ❑No ❑NA 0 Yes ❑'No DNA safe shutdown?' Was fail-safe verified to be O Yes 0 No X NA 0 Yes 0 No DNA O Yes []No ❑NA Q Yes ❑No ❑NA operational? Wait time between applying pressure/vacuum/water and 30M1N. test Test Start Time; 5 49,PM I 6:06PM Initial Reading W: 5:2191 5:219 Test End Time: 6:04PM 6:21PM Final Reading ): 5.219 5119- Test:Duration: 15M[N 15MIN Chaup in R .000 .000 Pass/Fail Thidshold of Criteria:... .002,1.1...002 MEM Was sensor removed fnr testing? X Yes_ D No. c NA ❑Yes ❑No ❑NA ❑Yes ❑No DNA 0 Yes El No I NA Was sensor properly replaced and, XYes ❑No DNA ❑Yes ❑NO .DNA ❑Yes' ❑No DNA 0 Yes ONO DNA verified functional after testin Comments—(Include informatiomon rep ris made prior to'testing.;and recommended follow-up for failed tests) 'If the entire depth of the UDC is not"tested,specify how much.was:.tested. If the answer to.my of the questions.indicated with an asterisk(')is"NO"or." NA',.the.entire UDC'must.be tested: (See SWRCB 6-160) r7io -I 1 SWRCB,January 2002 Page l of 8. FILL,RISER CONTAINMENT SUMP.TESTING Facili .is Not_E. uipped With.FiEI RiserContainment Sumps ; I Fill Riser Containment Sumps are Present,but-,were Not Tested X Test Method Developed,By: FI Sump:Manufacturer, X Industry Standard I'+Professional:Engineer LOther(,Specify} Test Method Used: L.I Pressure �Ih Vacuum X.Hydrostatic C Other(Specify) Test Equipment Used: 1NCON Equipment Resolution: .002• Fill Sump#1 RED Fill'Surnp#2-87 Fill Sump 43:-91 FiKSump#oi rrs DYE Sump Diameter: 37 37 37 37 Sump Depth: 62" 62" 62" 62" Height from Tank Top to Top of 0 0 0 0 Hi hest Pi in Penetration: Height from Tank Top to Lowest 14" IV 14" 1.4" Electrical Penetration: Condition:of sump prior to GOOD GOOD GOOD GOOD testing: Portion of Sump Tested 12" 12 12" .. _ 12" Sump Material: FIBERGLASS. .FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying press ure!.vacuumAvater and. 301v11N 30MIN 30MIN 30M.IN. starting test: Test Start Time: M5A 10:47A. M. I 1:22AM 1 I:40AM I I:221AN1 11,:40.AM 10:25AM' 10A7AM. Initial Reading(R,): 3.794 2:967 2.9.68 2.814. 2.814 3.44$ 3.446 Test End Time: 3l:00AlVl 11:37AM 1 i:SSAM 1.1:37AIv1 11:55AM :`:10:47AM ;11:02AM Final Reading(RI:}: 3.793 2.968 2;969 2.814 : 2.914 3.448 3:445 Test Duration: 1.5M1N 15MIN 1.5.MIN. i5MIN 15MIN 15MIN. 15M1N.Change in Reading(R,:-RO: .001 .001 .,001 .000 _ .;000 .000 .0011 PassiFail Threshold:or Criteria: Id >P 1 1?t1i>F 74 Pis C1,Fat� X Pass C7'Fsit: Is-there:a sensor in the sum_ p? X Yes f:No X Yes I I No. X Yes r No X.Yes No Does the sensor alarm when either product or water is X Yes i,''No. 1.1 NA X Yes ]No ;'I NA X Yes .I No ' LNA.. XYes;, : !No C1 NA detected? _ Was sensor removed f o r testing? X Yes L i No f 1 NA . X Yes I I No L.NA , X'Yes i:No 1 iNA XYes L I No :NA Was sensor properly replaced and verified functional after testing? X Yes: ?°1 No G1 NA X Yes �I No I:IN.4 XYes No I NA XYes _'No I-,NA Comments— (include rnf"alipn on repairs made prior to testing;and recommended follow-up fc�r failed Jews) 31 b$1 R 02 SW CB,January 20 Page f of- ..-.-- , 9. . SPIWOVERFILL CONTAINM':ENT BOXES Facilit ,is.Not E u3) ped With Spill/Overfill.Containment Boxes 1`.1 Spill/Overfill Containment Boxes are Present;but were Not.Tested `:I Test Method Developed By: 1:,Spill Bucket Manufacturer 'Xlndustry'Standard I :Professional Engineer l Other(Spec) Test Method Used: I Pressure 1:I Vacuum X.Hydrostatic L. Other(4peCify) OBucket ment Used: Equipment:Resolution. �jj MIDI Spill Box.#2=87 Spi1C.Box#3-91 Spill Box# Spill Box# ameter: 12" 12" Bucket Depth.: 12" 12" Wain time between applying pressure/vacuum/water and 30M,IN 3.OMIN startin test: Test-Start Time: 12:12PM 12:30PM, 10-.25AM 10 47AM Initial Reading(R): 5.10, 5.761 5.23)6 5.2:33 Test End'Time: 12:28PM 12:46P1v1 f6:41 AM IA-02AM Final Reading(RF): 5.762 5').762 5.234 5:232 Test Duration. 1.$MIN 15MIN 15MIN 15M1N Change in-Reading(Rr-R,): .000. .001 .002 :001 .Pass/Fail Threshold or .0021N .0021N .0021N .0021N: Criteria: ... ....... ....... . Ll Fail Comments—(include information on repairs„made ppion to tes;ink;and recommended fvl low-up for fulled lc ctcJ 87FILL 31(o Vl TEST STARTED ll:22 AM TEST STARTED 08/09!2@1 BEGIN LEVEL 2.9672 IN - END TIME 11:37 ,AM HAPPY END )ATE 08/09!26.10 3221 TAF.- HWY, END.LE.V L - 2.96.$1 IN SAKERSFIELD LEAK THRESHOLD 0.002 IN' TEST RESJL'' PASSED 08/09/2©,1g 2:00 PM SUMP LEAK TEST REPORT 7-8 TEST STARTED 1:45 PM TEST STARTED 08/09,2019 BEGI N LEVEL i O862 IN END TIME 2:00.oM END DATE HAPPY GAS END LEVEL 3,005 3221 TAFT HWY B=EAK THRESHOLD :0,.002 IN 9AKERSFIELD TEST RESULT PASSED 0$/09/2016 ll':55 AM RDSLSTP SUMP`LEAK,'TEST,REPORT TEST STARTED 1:45 PM 91FiLL TEST STARTED '08,99/2 @19 BEGIN LEVEL 4'.4993 IN: TEST STARVED 11.-'40..AM END TIME 2:'Q9 PM TEST STARTED 08/0942010 END:DATE 08/ 0,16 BEGIN LEVEL 2.8147 IN END LEVEL 4..4995 IN IM END TE 11'55 ;AM LEnK THRESHOLD 0.0 I,N tND DATE OVO 2910. TEST RESULT PASSED END LEVEL 2.614.7 IN LEAK THRES146LD 0:002 IN TEST RESULT PASSED NAPPY GAS 322.1 TAFT HWY �r--- .._._._._._._.- BAKERSIEL(} - 8gi @9i7g.1A 91STP 1:1:02 AM TEST STARTED 3:32 PM OVMP LEAK TEST REPORT TEST STARTED 08,09.2010 BEBIN :LEVEL 4.:2953 .IN DSLFILL END TIME 3:.47 P.M STARTED END DATE 08/09/2010 TES1 rsr 1 @:47 END LEVEL 4.2953 IN BEGIN AEU TED ft,09.126 is TEST RESULT£ HOLD 0.002 PRSSED END TIME 3.4465..IN I END DATE 11:.82 Am END LEVEL 88�ggy2916 DSLSTP LEST THRESHOLD 3. 1 7N TEST RESf1LT 0..982 'IN TEST STARTED 3:32 PM PASSED TEST_STARTED 08x09,/2010 BEG i N°LEVEL 3.9348 IN 91UPR END TIME 3,47 O TEST END. 'DATE 0"9/2010 TEST STARRTED 19:4? AM EhfD.LEVEL, 3.8349 IN BEGIN LEVEL 8810.471 6 LEAK THRESHOLD 0:802.IN END rl,pl S.2336 'IN TEST .RESULT PASSED END' D' . E' l l;02 AM. END LEVEL 8Br89,2610 LEAK T1fRESFfOLO S 2325 IN TEST RESULT 04002 IM PAgSEp RDSLFIL TEST TEST STAR I&:47 AM BEGIN LEVEL D 60261@ END'TIhIE 3.?9441 TN END DATE. I1:02. Art END LEVEL 9d/09i2819 LEAK: Tl L .3-7037 'IN TES RES(lt r D 0.682 .IN 91STP 87UPR 11 ' TEST STARTED 3:49 PM TEST STARTED 12:30; PM TEST STARTED 08/09/2010 TEST STARTED 08/09/2010 BEGIN LEVEL 4.2952 IN BEGIN LEVEL 5.7619 IN END TIME 4.:04 :PM END TIDE 12:46 PM HAPPY OAS END GATE 08!09x2010 6ND DATE 88x0912016 3221 TAFT HW.Y END LEVEL 4.2951 IN END LEuEL 5:7621 IN BAKERSFIELD LEAK THRESHOLD ,0 082 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED 08/09/2010 10:41 SUMP LEAK TEST REPOF DSLSTP 3-4 aSLFzLL TEST STARTED 3:49 Pt2 TEST STARTED 12:30 PM TEST STARTED 08/09/2010 TEST STARTED 0849/2010 TEST STARTED 10:2° BEGIN LEVEL 3.8351 14 BEGIN LEVEL 3.1089 IN TEST STARTED 0,8/09/2 END TIME 4--,04 PM END TIME 12:46 PM BEGIN` LEVEL 3.448 END DATE 8$ 09 2610 END DATE 08/09/2010 END TIME 10:41' END LEVEL 3.8352 IN END LEVEL 3.1087 IN END DATE "4 LEAK THRESHOLD 8.002 IN LEAK THRESHOLD 0.002 IN END.LEVEL. ., 3..4481 TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0.002 TEST RESULT PAS 91 UPR 870PR TEST: STARTED: 10:25 TEST.STARTED 88/09/2 TEST STARTED 12.12.PM k0k LEVEL 5.2361 TEST STARTED 08x99/2010 END TIME 10:41 BEGIN LEVEL. 5:7620 :IK E140 06TE 08/09/21 END TIME 12:28 PM END..:LE�JEL 5.2349 END DATE @8/8912010 : 1�— --- 'LEAK THRESHOLD 9.002 END LEVEL 5.:7620 IN ___.-• TESTA-SULT PAS LEAK THRESHOLD 0.002 IN $7STP TEST RESULT PASSED 2:27 PM RDSLF.LL TEST STARTED 09{201:0 3-4 TEST GTARTED 8475 IN TEST STARTEi? 19:25 BEGIN L-VET 2;:42 Pt9 TEST STARTED 08/09/2{ TEST STARTED 12:12 PM. EHD TIME 08 x2glEt $.01H,-LEVEL 3.7954. TEST STARTED 08/09/2®1;0: END DATE 4.9474 YN •END TIj 10.41 BEGIN LEVEL 3-10$7 IN END LEVEL _ E7 END'TIME 12:28 `Phl LEA} TFil2ESHOLD ,0'pSSED ENQ, �£VEL 3x1 END DATE 08/99!2.010 LEST RESUL LEAk THRESHOLD . END. LEVEL 3.1889 IN _ TEST RESULT PAS'. LEAK THRESHOLD 0.002 IN �- TEST RESULT `PASSED HAPPY PiRS ' 3.221 TAFT HWY 9AKERSFIELD _..._..-.�� -8/0942010-. -37 A1, rssr .SUMP LEAK TEST REPORT rFST :..Tq ZD_ 9. /FILL EN�r LE L D Bg4` pti TEST STARTED 11:22 AM ENO rlMf 4.g4 81 g. TEST.STARTED 08169!2 AM 3:ge rN. BEGIN. 2.89/ IN L£qK t� 9869 PM :END 'TIME resT H 44� END DATE 11:3-r Ark tES 4. ire �—� RES1j�T�d 0.002 �N END LEVEL 08/09,'20,10 87FI1.1- PA 2..6148 IN 40 AM LEAK: THRESHOLD 0.:002 IN 11' /2.910 TEST RESULT T STARS:ED 08�g IN — PASSED TES- S[AR D 2,g�,SB AM. HAPPY GAS, �ZN .LE�yEL 11', 1 3221 TAFT HWY EKD YtiME 08!e9b92 IN BAKERSFIELD gAfE 2• IN _-- - EEND L��S�{gt?R 0' pp�caSED ,p--:---- -___. 0'8/9912018 2::14 PM SUMP :LEAK; TEST REPWT Esr srTR;rEt} �' 7-8 TEST S. �EGIN:'LE �p 98 08, TEST STARTED 2:04:.PM END i 4; TEST STARTED 88/09/2010 AND Doc 6 3� IN BEGIN LEVEL 3.0661 IN END 9Sr 1'M END TIME 2:19.RhI LEAK r n/ .4,'� 010 END' DATE 08/09/2010 4fAPPY GAS 3220 TAET HUY BAKERSFIELD 98/09/2010 €*i PM 3U.MP-LEAK TEST REPORT 5-6 TEST STARTED 5:49 NO, TEST STARTED '08/09/2010 BEGIN LEVEE 3.1227 IN END TIME 6:04 PM END DATE 9$,/09!2910 END LEVEL 3.1225 IN LEAK THRESHOLD 0.002 .IN TEST RESULT- PASSED 9 • TEST STARTED 5:49 pm TEST STARTED.: 08/09/2016 BEGIN_LEUEL 5.21im IN END TIME'. 6:04 Pty!. END DATE 00/91{2910 END LEVEL .5.2190" IN LEAK THRESHOLD 0.002 TN TEST RESULT 1pfissEb HAPPY>.GAS 3221 TAET `HWY. BAKEP.SF T ELD 08%09/2010. 6:21 OM SUMP LEAK TEST REPORT S-6 TEST STARTED 6,06 P.m TEST STARTED 08/09,/2010 8E5IN LEVEL 3.:122? `IN END TIME 6:21 PM ENID :DATE 08/09/201@ END LEVEL 3.1227 IN LEAK THRESHOLD_ 0:892 iN TEST RESULT PASSED 9 TEST STARTED 6.:06 Pr'r TEST STARTED OV89,12 8,10 BEGIN LEVEL 5.21.90 Its END `TIME 6:21 PM END DATE e$/09;�2010 END LEVEL 5.2191 IN LEAK THRESHOLD 0.002 IN TEST'-RESULT PASSED' SB989 TESTING FAILURE REPORT SITE NAME: HAPPY GAS DATE: 8/9/10 ADDRESS: 3221 TAFT HWY TECHNICIAN: RI PHILLIPS CITY: BAKERSFIELD. SIGNATURE:. THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED,TO COMPLETE TESTING. REPAIRS: ALL TEST BOOTS(7)1N STP SUMP VISUAL FAILURES NEED:T.O BE REPLACED: LABOR: PARTS INSTALLED: NAME: TITLE: SIGNATURE: THE ABOVE NAMED PERSON TAKES FULL RESPONSIBILITY OF NOTIFYING THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN.TO REPAIR THE ABOVE:LISTED PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR ANY NEEDED RETESTING-THIS ALSO RELEASES-RICH ENVIRONMENTAL OF ANY FINES OR PENALTIES OCCURING'FROM NON-COMPLIANCE. A COPY OF THIS DOCUMENT HAS BEEN LEFT ON-SITE.FOR YOUR CONVIENENCE.