HomeMy WebLinkAboutSB989 2011 IIIIIIIIVIIIIIIIIII 43
SWRCB,January 2002 1 Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(if applicable),should be provided to the facility ownerloperator for submittal to the local regulatory agency:
1. FACILITY INFORMATION
Facility Name: Fastrip#773 Date of Testing: 3/21/11
Facility Address: 3501 Mt.Vernon Ave.
Facility Contact: Jamieson Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 17,2011
Name of Local Agency Inspector(tfpresent during testing)-
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Condu g Test: Scott Olinger
Credentials: 9f CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS Inspection Equipment 1/18/13
Veeder Root Motoring System 1/15/12
ICC Cal UST Service Tech 1/18/13 El
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component P� Fail Not Repairs
Tested Made Tested Made
UDC 1-2 Et ❑ ❑ ❑ V SPILL#2 ❑ ❑ ❑
UDC 3-4 Rf, ❑ ❑ SPILL#3 ❑ ❑ ❑
UDC 5-6 Pf, ❑ ❑ ❑ V SPILL#3 0 ❑ ❑
UDC 7-8 pf, ❑ ❑ ❑ SPILL#3 ❑ ❑ ❑
TRANS#1 ❑ ❑ V SPILL#3 ❑ ❑ ❑
STP#1 ❑ ❑ ANN SPACE#1 ❑ ❑ ❑
STP#2 ❑ ❑ ANN SPACE#2 &K ❑ ❑ ❑
STP#3 ❑ ❑ ANN SPACE#3 ❑ ❑ ❑
FILL#1 ❑ ❑ ❑ PIPING RUN#1 CK ❑ ❑ ❑
FILL#2 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑
FILL#3 ❑ ❑ ❑ PIPING RUN#3 ❑ ❑ p
SPILL#1 &t ❑ ❑ ❑ PIPING RUN#4 ❑ ❑ ❑
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECBMCL4 N RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the ads stated in this document are accurate and in full compliance with legal requiremeans
Technician's Signature- Date: Y21111
IIIIIIII(IIIIIIIIIII 44
IE
SWRCB,January 2002 Page of
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form,written test procedures, and
printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#773 Date of Testing: 3/21/11
Facility Address: 3501 Mt Vemon
Facility Contact: Jamieson Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 17,2011
Name of Local Agency Inspector(#present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduc - Test: Scott Olinger
Credentials: VCSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number. 589517
Manufacturer Trainins
Manufacturer Component(s) Date Training Expires
Incon TS-STS Inspection Equipment 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
3. SUMMARY OF TEST RESULTS
Component Pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
PIPING RUN#5 ❑ ❑ ❑ ❑ ❑ ❑ ❑
PIPING RUN#6 ❑ ❑ ❑ ❑ 0 ❑ 0
PIPING RUN#7 50 ❑ ❑ 1 ❑ ❑ 1 ❑ ❑ ❑
PIPING RUN 08 ❑ ❑ ❑ ❑ ❑ ❑ ❑
PIPING RUN#9 ❑ ❑ ❑ ❑ ❑ 0 0
❑ ❑ ❑ ❑ ❑ ❑ 0 ❑
a o 0 0 ❑ ❑ ❑ ❑
❑ 0 ❑ ❑ ❑ ❑ ❑ ❑
0 0 ❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ 0 [1 El 11 C1 C1 ❑ - -- ❑ ❑ ❑ ❑
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,tJ stated M this document are accurate and in full compliance with legal requirements
Technician's Si Date: 3/21/11
SWRCB,January 2002 Page_of
4., TANK ANNULAR TESTING
Test Method Developed By N(Tank Manufacturer 0 Industry Standard 0 Professional Engineer
❑Other(Specify) 4
Test Method Used: ❑Pressure dvacuum ❑Hydrostatic
0 Other(Specify)
Test Equipment Used:4"GEL FELLED GAUGE WICERTS Equipment Resolution:0-30
Tank Tank 3 Tank Tank#1 Ta
Is Tank Exempt From Testing?' 0 Yes ❑No ❑Yes ❑No ❑Yes ONo ❑Yes DNo
Tank Capacity: 12,000 12,000 12,000
Tank Material: FIBERGLASS FIBERGLASS FIBERGLASS
STEEL STEEL STEEL
Tank Manufacturer. JOOR JOOR JOOR
Product Stored: UNL DIESEL PREM
Wait time between applying
pressure/vacuum/water and 10 MW 10 MIN 10 NUN
starting test:
Test Start Time: 9:15 9:15 10:40
Initial Reading(IQ: 8 HG 8 HG 9 HG
Test End Time: 10:15 10:15 11:40
Final Reading(RF): 8 HG 8 HG 9 HG
Test Duration. I HR I HR I HR
Change in Reading(RF-RO: 0 0 0
Pass/Fail Threshold or Criteria: 0 0 0
-TestReiu1t-. Pass . OFail P us D:Fafl Pass —0 Fa.fl ❑.Pa
ss' O'Fail
Was sensor removed for testing? WYes DNo DNA P(Yes ONO DNA Yes ❑No 0 NA ❑Yes 0 No ❑NA
Was sensor properly replaced and ZZ 0 No ❑NA DNA I/Yes ❑No DNA 0 Yes 0 No ❑NA
verified functional after testing? I
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. {California Code of Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page_of
4 5. SECONDARY PIPE TESTING
Test Method Developed By G(Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑ er(Specify)
Test Method Used' Ef Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used.4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15
Piping Run#I Piping Run#2 Piping Run#3 Piping Ran#4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH
Piping Diameter. 3" 3" 3" 3"
Length of Piping Run: "1 40' 40' 60'
Product Stored: UNL DIESEL PREM UNL
Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT
pipin,g-run isolation: UDC&TRAN#1 UDC&TRAN#1 UDC&TRAN#1 UDC&TRAN#1
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 NflN 10 MIN
starting test
Test Start Time: 8:00 8:00 8:00 10:45
Initial Reading(Ri): 5.2 5.3 5.1 5.1
Test End Time: 9:00 9:00 9:00 11:45
Final Reading 52 5.3 5.1 5.1
Test Duration: I HR I HR I HR I HR
Change in Reading(RF-R,): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria: I I
Test Result:`: Pass
1. ''d Pass.: ,0
Pass 0.fag'. Fail:
Comments—(include it formation on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page_of
4 S. SECONDARY PIPE TESTING
Test Method Developed By: WPiping Manufacturer ❑Industry Standard ❑Professional Engineer
❑P!her(Specify)
Test Method Used af Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4-GEL FELLED GAUGE W/CERTS Equipment Resolution: 0-15
%V.,
6
Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH
Piping Diameter. 321 3" 3" 3"
Length of Piping Run: 40' Q, 09 60'
Product Stored: UNL DIESEL PREM UNL
Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT
piping-run isolation: UDC&TRAN#1 UDC&TRAN#1 UDC&TRAN#1 UDC&TRAN#1
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
auting test.
Test Start Time: 8:00 8:00 8:00 10-45
Initial Reading(R4): 5.2 53 5.1 5.1
Test End Time: 9:00 9:00 9:00 11:45
Final Reading(k): 52 5.3 5.1 5.1
Test Duration: I HR I HR I HR I HR
Change in Reading(RF-R4): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria: 4
Tot, tat.; Pass '1 Fail' ass ;.�.O'Fail ❑.F*i; 7Pass —O!
n
Comments—(include information on repairs made prior to testing; recommended follow-up for failed tests)
SWRCB,January 2002 Page_of
5. SECONDARY PIPE TESTING
Test Method Developed By: UPiping Manufacturer 0 Industry Standard 0 Professional Engineer
0 Mer(Specify)
Test Method Used: a(Pressure 0 Vacuum 0 Hydrostatic
0 Other(Specify)
Test Equipment Used:4?'GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15
g?,
Piping Run#5 Piping Run#6 Piping Run#7 Piping Run#4
Piping Material: FIBERGLASS FIBERGLASS
Piping Manufacturer. AO SMITH AO SMITH
Piping Diameter: 3?' 3"
Length of Piping Run: 60' 601
Product Stored-- DIESEL PREM
Method and location of TEST BOOT AT TEST BOOT AT
piping-run isolation: UDC&TRAN 41 UDC&TRAN#I
Wait time between applying
pressure/vacuum/water and 10 N41N 10 MIN
starting test:
Test Start Time: 10:45 10:45
Initial Reading(RO: 5.1 5.3
Test End Time: 11:45 11:45
Final Reading(RF): 5.1 5.3
Test Duration: I HR I HR
Change in Reading(RF-&): 0 0
Pass/Fail Threshold or 0 0
Criteria:.
Test-Result: Pass P,Fiil Pass :dFaiV' --, EiPass OFAil Fail
Comments—(include information on Npmirs made prior to testing, and I recommended follow-upfor failed tests)
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By- dPiping Manufacturer ❑Industry Standard 0 Professional Engineer
❑ er(Specify)
Test Method Used 5(Pressure ❑Vacuum ❑Hydrostatic
❑Other(Specify)
Test Equipment Used:4-GEL FELLED GAUGE W/CERTS Equipment Resolution: 0-15
.71
Piping Run#7 Piping Run#8 Piping Run#9 Piping Run#4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer. AO SMITH AO SMITH AO SMITH
Piping Diameter. 3" 3" 3"
Length of Piping Run: 20' 30' 40'
Product Stored: UNL DIESEL PREM
Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT
piping-run isolation: &TRAN#1 &TRAN#1 STP&TRAN#1
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
starting test
Test Stan Time: 12:00 12:00 12:00
Initial Reading W: 5-3 5.5 5.4
Test End Time: 1:00 1:00 1:00
Final Reading(RF): 5.3 5.5 5.4
Test Duration: I HR I HR I HR
Change in Reading(RF-RO: 0 0 0
Pass/Fail Threshold or 0 0 0
Criteria:
Test.ResWL, Pass ❑0 FSg: 1ass O:Fail. Fail GPass-
Comments—(include information on repairs made prior to testing, and recommended follow-up for_fail e tests)
SWRCB,January 2002 Page_of
6. PIPING SUMP TESTING
Test Method Developed By- &(Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum &(Hydrostatic
❑Other(Specify)
Test Equipment Used:JNCON TS-STS Equipment Resolution:0.0000
R4 SUMP#2 SUMP#Tra
SUMP#1 SUMP#3 us 1
Sump Diameter. 48" 48" 48" X 3'
Sump Depth: 67" 61" 59" 30"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS PLASTIC
Height from Tank Top to Top of 30" 24" 24" 20"
Highest Piping Penetration:
Height from Tank Top to Lowest 16" 16" 16" 25"
Electrical Penetration:
Condition of sump prior to testing- DRY DRY DRY DRY
Portion of Sump Tested' 32" 26" 26" 22"
Does turbine shut down when
sump sensor detects liquid(both Wyes ❑No ❑NA E/Yes ❑No ❑NA @(Yes DNo DNA Ukes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail-safe JYes . ❑No ❑NA Q(Yes ONo DNA Q(Yes DNo DNA 9/Yes DNo (INA
shutdown?*
—X
Was fail-safe verified to b,e
0 onal? Yes ❑No ❑NA G/Yes. ❑No ❑NA es 0 No ❑NA 9 es ONo DNA
*
Wait time between applying
pressure/vacuum/water and starting 10 YM 10 MIN 10 MIN 10.AM
test.
Test Start Time: 1:12 2:56 2:56 1:12
Initial Reading W: 3.5452 6.6485 4.2505 5.3456
Test End Time: 1:27 3:11 3:11 1:27
Final Reading(RF): 3-5451 6.6482 4.2501 SJUSS
Test Duration: 15 KIN 15 MIN 15 MIN 15 MIN
Change in Reading(Rp-110: .0001 .0003 .0004 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Test Resuilt: P
G(P fl .
: :�
dPiss Pass- .0 Fi
Was sensor removed for testing? iR(Yes QNo DNA &'Yes DNo DNA -Z�Ve—s DNo DNA OeYes ONo DNA
Was sensor properly replaced and i/Yes ONo DNA R(Yes DNo ❑NA ig/Yes ONo DNA As ❑No ❑NA
verified functional after Lestin ? I
C 0 MMelats—(include information on repairs made prior to testing and recommended follow-up for failed tests)
STP#1 2-1"ELE.RETO BOOTS&2-3"RETO BOOTS
ST?93 3"ELE RETO BOOTS
TRANS#1 TIGHTEN HOSE CLAWS&RETEST
-STP-#2 V,ELE RETO BOOTS&2-3-RETO BOOTS
If the entire depth of the sump is not tested,specify how much was tested. If the answer to my of the questions indicated with an
asterisk(*)is"NO"or-NA",the entire sump must be tested. (See SWRCB LG-1 60)
SWRCB,January 2002 Page_of
7. UM=-DISPENSER CONTAINMENT QTQ TESTING
Test Method Developed By: 9 UDC Manufacturer ❑industry Standard ❑Professional Engineer
❑Other(Specify) 4
Test Method Used: ❑Pressure ❑Vacuum rfHydrostatic
❑Other(Specify)
Test Equipment Used: INCON TS-STS —FEquipment Resolution: 0.0000
UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8
UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 28" 28" 28" 28
Height from UDC Bottom to Top 831 811 8 10;;
of Highest Piping Penetration:
Height from UDC Bottom to 8" 10" 10" 12"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing;.
Portion of UDC Tested 10" 101, 10" 12"
Does turbine shut down when
UDC sensor detects liquid(both M/Yes ❑No ❑NA W(Yes ❑No DNA &�es ❑No DNA As ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SE
Is system programmed for fail- [;(Yes ❑No DNA 9/Yes ONo DNA 9(Yes ❑No DNA 19'Yes ONo DNA
safe shutdown?* I
Was fail-safe verified to be iYes ❑No ❑NA dYes ❑No DNA @/Yes ❑No DNA 9'Yes DNo DNA
operational?*
Wait time between applying 1.0 MIN 10 MIN 10 MIN 10 MIN
pressure/vacuum/water and
starting test
Test Start Time: 8:58 9.45 8:58 8:58
Initial Reading(R4): 7.1999 3.4368 3.1302 5.6926
Test End Time: 9:13 10:01 9:13 9:13
Final Reading(RF): 7.1998 3.4368 3.1302 5.6925
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-Rj: .0001 .0000 .0000 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
.. OFail g-Piss D�.Fail ❑Fail
.... `Pass a'0 Fil, Pass
Was sensor removed for testing? ElYes E]No DNA ElYes ONo DNA Ef)(es ONo DNA A Yes ❑No ❑NA
Was sensor properly replaced and d ❑ — Yes ❑No ❑NA
verified fimetional after testing? 5/yes DNo DNA Yes ONo NA Yes ONo DNA
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
3-4 TIGHTEN CLAWS&RETEST
If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page_of
8. FELL RISER CONTAMIENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps ❑
Fill Riser Containment Sumps are Pres2nt,but were Not Tested ❑
Test Method Developed By: 4 Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify) 4
Test Method Used: ❑Pressure ❑Vacuum 9'Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
FFill Sump#1 Fill Sum p#2 Fill Sump#3 Fill Swinp#4
Sump Diameter: 4211 42' 42"
Sump Depth: 63" 5821 55"
Height from Tank Top to Top of 0 0 0
Highest Piping Penetration:
Height from Tank Top to Lowest 0 0 0
Electrical Penetration:
Condition of sump prior to 4"WATER 2"WATER DRY
tin .
Portion of Sump Tested 12" 12" 12"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Wait time between applying 10 MIN 10 MIN 10 MIN
pressure/vacuum/water and
-starting test
Test Start Time: 10:55 10:55 10:55
Initial Reading(R O: 1.7733 3.5980 3.6093
Test End Time: 11:10 11:10 11:10
Final R dm�(RF): 1.7734 3.5981 3.6094
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-Rj): .000 .0001 .0001
Pass/Fail Threshold or Criteria: .002 .002 .002
T, .0.]PH d Pais -0-Fail 0 INS.S -�dlifi-
�it.R n,ult-.: 9f pa ❑Fa
Is there a sensor in the sump? DYes G/No ❑Yes No ❑Yes No ❑Yes ❑No
Does the sensor alarm when
either product or water is 0 Yes 0 No dNA ❑Yes ❑No 91NA ❑Yes ❑No AA ❑Yes ❑No ❑NA
detected? 1 4
Was sensor removed for testing? ❑Yes ❑No NA ❑Yes ❑No &tjA ❑Yes ❑No WMA ❑Yes ❑No ❑NA
Was sensor properly replaced and ❑Yes ❑No 9/NA D Yes DNo AA O Yes ONo �A D Yes ONo DNA
verified functional after te
Comments—(include information on repairs made prior to testing', and recommended follow-up for failed tests)
SWRCB,January 2002 Page_of
9. SPIIJUOVERFUL CONTAPMENT BOXES
Facility is Not Equipped With SpiII/Overfill.Containment Boxes ❑
Spill/Overfill Containment Boxes are ent,but were Not Tested ❑
Test Method Developed By: d Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum G(Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#1 Spill Box ffV1 Spill Box#2 Spill Box#V2
Bucket Diameter 12" 12" IT, 1211
Bucket Depth. IT, 12" 12" 12"
Wait time between applying
pressure(vacuum/water and 10 NUN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 10:55 10:39 10:39 11:57
Initial Reading(RO: 22428 1.4624 4.3907 4.0487
Test End Time: 11:10 10:54 10:54 12:12
Final Reading(P.F): 22429 1.4634 4-3918. 4.0486
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R4): .0001 .0001 .0011 .0001
Pass/Fail Threshold or .002 .002 .002 .002
Criteria: oe 4
Test Ik At P.
Comments—(include information on repairs made prior to testing; and recommended follow-up fofailed tests)
SWRCB,January 2002 Page—of
9. SPnJJOVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are E4ent,but were Not Tested ❑
Test Method Developed By: fig Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
0 Other(Specify) 0C
Test Method Used: ❑Pressure ❑Vacuum [9'Hydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
M,-777. 7 I M 777M
-a
M',
Spill Box#3 Spill Box#V3 Spill Box Spill Box
Bucket Diameter: 1271 1217
Bucket Depth. 12" 123'
Wait time between applying
pressure/vacuum/water and 10 NUN 10 MIN
starting test:
Test Start Time: 11:57 11:57
Initial Reading N): 2.9162 2.3575
Test End Time: 12:12 12:12
Final Reading(RF): 2.9149 2.3572
Test Duration: 15 MIN 15 MIN
Change in Reading(F. -Rj): .0013 .0003
Pass/Fail Threshold or .002 .002
Criteria:
U Test Result: Pass -:.0 Fafl, Pass ❑ ❑ Pass ', F ail 1*i? Fail"
Comments—(include it formation on repairs made prior to testing, and recommended follow-up for failed tests)
i
FASTRIP FASTRIP
3501 MT VERNON 3501-MT VERNON 354-APITR 1 py? VERNON
BAKERSFIELD 93305 BAKERSFIELD 93306 BAKERSEIELD 9306
SUNSET CONST SUNSET CONST SUNSET ��GNST
1-800-984-6266 i-800-984-6266
1-800-984-6266
013/21/201,-, 10:5-,. Aft
03/21/2011 10:54 AM 03/21/2011 11:10 AM
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT USPILLI
TEST STARTED 10:39 AM
FILL1
FILL1 TEST ST'ARTED 03/21/2011
BEGIN LEVEL 1.4624 IN
TEST STARTED 10:38 AM TEST STARTED 10:55 AM END TIME 10:54 AM
TEST STARTED 03/21/2011 TEST STARTED 03/21/2011 END DATE 3/212011
HRE
T
BEGIN LEVEL 1.7732 IN LE i. THRESHOLD 0-002 IN�
BEGIN LEVEL 1.7733 IN LEAK .-
END TIME 10:53 AM END TIME 11:10 AM TEST RESULT PASSED
END DATE 03/21/2011 END DATE 03/21/2011
END LEVEL 1.7734 IN END LEVEL 1.7734 IN SPiLL2
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED TEST STARTED 10•3' AM
TEST STARTED 03/21/2011
BEGIN! LEVEL 4.3907 IN
END TIME 10:54 AM
FILL2 FILL2 END DATE 03/21,,2011
END LEVEL 4.3918 IN
LEAK THRESHOLD 0.072 IN
TEST STARTED 10:38 AM TEST STARTED 10:55 AM TEST RESULT PASSED
TEST STARTED 03/21/2011 TEST STARTED 03/21/2011
BEGIN LEVEL 3.5975 IN BEGIN LEVEL 3.5980 IN
END TIME 10:53 AM END TIME 11:10 AM
END DATE 03/21/2011 END DATE 03/21/2011
END LEVEL 3.5979 IN END LEVEL 3,5981 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
ASTRIP
3501 MT UEPNON
FILL3 FILL3 SAK5SFIELD 9366
SUNSET CGN£:T
1-800-984-6266
TEST STARTED 10:38 AM TEST STARTED 10:55 AM
TEST STARTED 03/21/2011 TEST STARTED 03/21/2011 03%21/20'-1 li.-1 ' AN
BEGIN LEVEL 3,6094 IN BEGIN LEVEL 3.6093 IN
SUMP LEAK TEST REPORT
END TIME 10:53 AM END TIME 11:10 AM
END DATE 03/21/2011 END DATE 03/21/2011 VSPILLi
END LEVEL 3,6093 IN END LEVEL 3,6094 IN
LEAK THRESHOLD 0.002 IN TEST STARTED 1,7155 1
LEAK THRESHOLD 0.002 IN TEST STARTED 03/21/2011
TEST RESULT PASSED TEST RESULT PASSED SEGIN LE)JEL i.4634 IN
END TIME 1i:i0 AM
'ND DATE +3/21/2911
END LEVEL 1.4617 IN
SPILLI SPILLI LEAK THRESHOLD 0.00' IN
TEST RESULT PASSED
TEST STARTED 10:38 AM TEST STARTED 10:55 AM
TEST STARTED 03/21/2011 TEST STARTED 03/21/2011 SPiLL2
BEGIN LEVEL 2,2414 IN BEGIN LEVEL 2.2428 IN
END TIME 10:53 AM END TIME 11:10 AM TEST STARTED 10:55
TEST STARTED 03/21/201 1
f
END DATE 03/21/2011 END DATE 03/21/2011 BEGIN LEVEL 4.3918 IN
END LEVEL 2,2425 IN END LEVEL 2.2429 IN END TIME i1:10 AM
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END DATE 03/21/2011
END '•DUEL 4.3919 IN
TEST RESULT PASSED TEST RESULT PASSED LEA" THRESHOLD 0.00' I!
------.------ -___-- -- -_-- - --_-_._ TEST RESULT PASSED
FASTRIP
3501 MT VERNON FASTRIP
BAKERSFIELD 93306 3501 MT VERNON
SUNSET CONST BAKERSFIELD 93306
1-800-984-6266 SUNSET CONST.
1-800-984-6266
03/21/2011 11:57 AM
03/21/2011 12:12 PM
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT FASTRIP
VSPILL2 3501 MT VERNON
VSPILL2 BAKERSFIELD 93306
TEST STARTED 11:41 AM SUNSET CONST
TEST STARTED 03/21/2011 TEST STARTED 11:57 AM 1-800-984-6266
BEGIN LEVEL 4,0487 IN TEST STARTED 03/21/2011
END TIME 11:56 AM BEGIN LEVEL 4,0487 IN 03/21/2011 1;27 PM
END DATE 03/21/2011 END TIME 12:12 PM
END LEVEL 4.0488 IN END DATE 03/21/2011 SUMP LEAK TEST REPORT
LEAK THRESHOLD 0.002 IN END LEVEL 4,0486 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TRANSI
TEST RESULT PASSED
TEST STARTED 1:12 PM
SPILL3 TEST STARTED 03/21/2011
SPILL3
TEST STARTED 11:41 AM BEGIN LEVEL 5.9456 IN END TIME 1:27 PM
TEST STARTED 03/21/2011 TEST STARTED 11:57 AM END DATE 03/21/2011'
BEGIN LEVEL 2.9160 IN TEST STARTED 03121/2011 END LEVEL 5,3455 IN
END TIME 11:56 AM BEGIN LEVEL 2,9162 IN
LEAK THRESHOLD 0,002 IN
END DATE 03/21/2017
END TIME 12:12 PM TEST RESULT PASSED
END LEVEL 2.9153 IN END DATE 03/21/2011
LEAK THRESHOLD 0.002 IN END LEVEL. 2.9149 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
STP1
TEST RESULT. PASSED
TEST STARTED 1:12 PM
USPILL3 TEST STARTED 03/21/2011
USPILL3 BEGIN LEVEL 3,5452 IN
TEST STARTED 11:41 AM END TIME 1:27 PM
TEST STARTED 03/21/2011 TEST STARTED 11:57 AM END DATE 03/21/2011
BEGIN LEVEL 2.3570 IN TEST STARTED 03/21/2011 END LEVEL 3,5451 IN
END TIME 11:56 AM BEGIN LEVEL 2,3575 IN LEAK THRESHOLD 0,002 IN
END DATE 03/21/2011 ENO TIME 12:12 PM TEST RESULT PASSED
END LEVEL 2.3576 IN END DATE 03[21/2011
LEAK THRESHOLD 0,002 IN END LEVEL - 2.3572 IN
_TEST.RESULT PASSED LEAK THRESHOLD 0.002 IN'
-- ' - TEST RESULT PASSED
FASTRIP
FASTRIP 3501 MT VERNON
3501 MT VERNON FASTRIP BAKERSFIELD 93306
BAKERSFIELD 93306 3501 MT VERNON SUNSET CONST
SUNSET CONST BAKERSFIELD 9'3306 1-800-984-6266
1-800-384-6266 SUNSET CONST
1-800-984-6266 03/21/2011 3:11 PM
03/21/2011 1:12 PM
03/21/2011 2:56 PM SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT STP2
TRANSI
STP2 TEST STARTED 2:56 PM
TEST STARTED 12:57 PM TEST STARTED 03/21/201
TEST STARTED 03/21/2011 TEST STARTED 2:41 PM BEGIN LEVEL 6,6485 IN
BEGIN LEVEL 5.3447 IN TEST STARTED 03/21/2011 END TIME 3:11 PM
END TIME 1:12 PM BEGIN LEVEL 6.6488 IN END DATE 03/21/2011
END DATE 03/21/2011 END TIME 2:56 PM END LEVEL 6,6482 IN
END LEVEL 5,3455 IN END DATE 03/21/2011 LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN END LEVEL 6.6485 IN TEST RESULT PASSED
TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
STP3
STP1
STP3 TEST.STARTED 2:56 PM
TEST STARTED 12:57 PM TEST STARTED 03/21/2011
TEST STARTED 03/21/2011 TEST STARTED 2:41 PM BEGIN LEVEL 4,2505 IN
BEGIN LEVEL 3,5448 IN TEST STARTED 03/21/2011 END TIME 3:11 PM
END TIME 1:12 PM BEGIN LEVEL 4,2508 IN END DATE 03/21/2011
END DATE 03/21/2011 END TIME 2:56 PM END LEVEL 4.2501 IN
END LEVEL 3,5451 IN END DATE 03/21/2011 LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0.002 IN END LEVEL 4.2505 IN TEST RESULT PASSED
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
---- - -------- ---- -------_ TEST RESULT PASSED
FASTRIP
3501 MT VERNON FASTRIP FASTRIP 3501 3AKERSFIELD 93306 3501 MT VERNON KERS MT VERNON
SUNSET CONST BAKERSFIELD 93306 BAKERSFIELD 93306 CONST
1-800-984-6266 SUNSET CONST SUNSET
1-$00-984-6266 1-800-984 4-626-626
6
21/2011 9:44 All 03/21/2011 8:53 AM
03/21/2011 9:13 AM
IP LEAK TEST REPORT
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
UDC3-4
UDC1-2 UDC1-2
T STARTED 9:29 AM
T STARTED 03/21/2011 TEST STARTED 8:58 AM TEST STARTED 8:37 AM
IN LEVEL 3,4367 IN TEST STARTED 03/21/2011 TEST STARTED 03/21/2011
TIME 9:44 AM BEGIN LEVEL 7,1999 IN BEGIN LEVEL 7,2036 IN
9:13 AM - END TIME 8:52 AM
DATE 03/21/2011 END TIME END DATE 03/21/2011
LEVEL 3.4368 IN END DATE 03/21/2011 END LEVEL 7,2028 IN
K THRESHOLD 0,002 IN ENO LEVEL 7,1998 IN
T RESULT PASSED LEAK THRESHOLD 0,002 IN LEAK RESULT 0,002 IN
TEST RESULT
PASSED TEST RESULT PASSED
UDC3-4 UDC3-4
TEST STARTED 8:58 AM TEST STARTED 8:37 AM
TEST STARTED 03/21/2011 TEST STARTED 03/21/2011
BEGIN LEVEL 4,5878 IN BEGIN LEVEL 4.5969 IN
END TIME 9:13 AM END TIME 8:52 AM
END DATE 03/21/2011 END DATE 03/21/2011
FASTRIP END LEVEL 4,5850 IN END LEVEL 4.5906 IN
3501 MT VERNON LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0, AI IN
F
BAKERSFIELD 93306 TEST RESULT FAILED TEST RESULT FAILED
SUNSET CONST
1-800-984-6266 UDC5-6
UDCS-6
21/2011 10:01 AM TEST STARTED 8:37 AM
TEST STARTED 8:58 AM STARTED 03/21/2011
TEST MP LEAK TEST REPORT TEST STARTED 03/21/2011 TEST LEVEL 3, 1305 IN
- BEGIN LEVEL 3,1302 IN END TIME 8:52 AM
M-4 END TIME 9:13 AM END DATE 03/21/2011
END DATE 03/21/2011 ENO LEVEL 3,1303 IN
T STARTED 9:45 AM END LEVEL 3,1302 IN LEAK THRESHOLD 0.002 IN
T STARTED 03/21/2011 LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
IN LEVEL 3,4368 IN TEST RESULT PASSED
TIME 10:01 AM
DATE 03/21/2011 UDC7-8
LEVEL 3,4368 IN UDC7-8
K THRESHOLD 0,002 IN TEST STARTED 8:37 AM
T RESULT PASSED TEST STARTED 8:58 AM TEST STARTED 03/21/2011
TEST STARTED 03/21/2011 BEGIN LEVEL 5,6927 IN
BEGIN LEVEL 5.6M IN END TIME 8:52 AM
END TIME 9.13 AM END DATE 03/21/2011
END DATE 03/21/2011 END LEVEL 5,6926 IN '
END LEVEL 5,6925 IN LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
TEST RESULT PASSED ^-.-_-- -------_-. -