Loading...
HomeMy WebLinkAboutSB989 RESULTS 2009 .. � JIM 33 S W RCB,January 2002 Page of Secondary Containment Testing Report Form This form)s intended for use by contractors perform ing periodic testing of UST secondary containment syokims. Use tha appropriate pages of this form to report resv/ts for all components tested. The completedform, written test procedures, and prinrouls from tests(rf applicable),should be provided to the facility ownerloperator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: TA Date of Testing: Facility Address: Co ,J 4 Facility Contact: E J Phone: Date Local Agency Was Notified of Testing: Name of Local Agency inspector(ifpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name:RICH ENVIRONMENTAL Technician Conducting Test: Credentials: 0 CSLB Licensed Contractor 0 SWRCB Licensed Tank Tester License Type. C611D40 License Number: 809850 Manufac(�r Training Manufacturer om onen s Date Training Expires INCON INCON TS—STS 1 12—o�3r 3. SUMMARY OF TEST RESULTS Component Pass Fall Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made 17 A;r y ura vt- o ❑ v erq- ❑ ❑ a Xi A 1J r,1uLA+2 U 0 Q 7 TP ❑ ❑ LI ►� �� Q ❑ Q 34 6TP 11 0 .SST ❑ ❑ ❑ C r+ r v o ❑ ❑ ❑ ❑ ❑ 3"+ 5C�a d-bkfuj o o ❑ 1 Ux 1--�)_ J4- ❑ 1 ❑ ❑ EC-0 t, ❑ ❑ ❑ U-Z4- a.`-1 !f- o ❑ ❑ t—g>E L- C W, -,)K&L� j& ❑ ❑ ❑ D C,:- -(.o 0 ❑ r 87 o o ❑ a o D i r�1 c W nit�f�li ❑ 13 ❑ $rI _ _L- Jr�P 13 ❑ ❑ ❑ ❑ 0 4 r=u- So mP ❑ C G I V tta. QE.�U2 .SE ,�ZyQ ❑ ❑ ❑ g1 F� 1.� ❑ a Q If hydrostatic testing was performed,describe what was done with the water after completion of tests: RECYCLE AND REU�D CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the facts.stated in this document are accurate and in full compliance with legal requirements Technician's Signature:_/—'�— Date: ��—(� I I�IIII�M I III 34 I SWRCB,January 1,002 Page?.-of �b Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment.systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written rest procedures, and printouts from tests(if applicable),should be provided to the facility owner/operalor for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: NEL` � -,ZV Date of Testing: �p Facility Address: (o t— A j A Facilitv Contact: �Phne: Date Local Agency Was Notified of Testing: Namc of Local Agency Inspector(ifpresent during testing): W iE 2. TESTING CONTRACTOR INFORMATION Company Name:RICH ENVIRONMENTAL _ Technician Conducting Test: _ Credentials: 3CSLB Licensed Contractor 0 SWKCB Licensed Tank'Cester License Type C611D90 LicenssNurnber: 609850 Manufacturer Iraining Manufacturer Corn nent s Date Trainin Expires INCON INCON TS—STS 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested i Made ❑ a ❑ n ❑ n �. V P2 ---- El ❑ O _ U L C J J❑ El D ❑ ❑ ❑ n a n P- P ❑ ❑ o c� c CJ 0 ❑ ❑ D 11 0 ❑ 1.1 ❑ ❑ ❑ U 1 11 ;j } ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: RECYCLE ANC REUSED D CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements Technician's Signature: ___ Date: > SWRCB,January 2002 Page of v_ 4, TANK ANNULAR TESTING Test Method Developed By: ❑Tank Manufacturer ja Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 9 Vacuum 0 Hydrostatic 0 Otfter(Spec) Test Equipment Used: 4 i n. DIAL GAUGE Equipment Resolution: . 5% J� o. Tank# 7 A,4 j Tank#14 jj .. Tank#9 Tank# fs Tank Exempt From Testing?' es ❑No es 0 No es —O No es C No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressurOvacuum/water and starting test: Test Start Time: Initial Reading(Rj): Test End Time: Final Reading(RF): Test Duration: Change in Reading(RF-Rr): Pass/Fail Threshold or Criteria: Test Result: 0 Pass 0 Fail 0 Pass 0 Fail ❑ Pass 0 Fail 0 Pass 0 Fail Was sensor removed for testing? 0 Yes 0 No 0 NA 0 Yes ❑No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No f'NA Was sensor properly replaced and 0 Yes D No 0 NA OYes 0 N 0 N OYes 0No DNA OYes ❑No ONA verified functional after testis 7 COM tnentS—(include it formation on repairs made prior io testing;and recommended follow-u for jailed tests) Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of Regulations,Title 23,Section 2637(a)(6)} SWRCB,January 2002 Page y of S. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer :0 Industry Standard 0 Professional Engineer 0 Other(Spec) Test Method Used: 9 Pressure 0 Vacuum 0 Hydrostatic 0 Other(Specify) Test Equipment Used: 41 n. DIAL GAUGE Equipment ResoIut'ion: .5% Piping Run# Piping Run 4 'cir Piping Run#9/ Piping Run 9iF,5� Piping Material: Piping Manufacturer: t; �!it Q"j rJ L i IL-.U W '4 t)n1 Piping Diameter. d rrI S, ,I Length of Piping Run: FT p FT `FU t=T �r Product Stored: &fi-sour. N G t.s'I-J ' E - �- Method and location of piping-run isolation: &cT =-I sum(' Z m i Y,� 50 r1\0 POOT rt m Wait time between applying pressure/vacuum/water and starting test: 3L, {l�T^) aU (rl IJ m— rf Test Start Time: GO N(Yl :Ci0 A»'t UGC] A P►'1 M Initial Reading(Ri): Test End Time: CIO H =C,o Am l AM IO' R Final Reading(RF): H67 _j 1't GI Test Duration: ) 1i(/- �$H f— l h t2 12 Change in Reading(RF-R,): C oti� Pass/Fail Threshold or Criteria: C) (,n I l G NC. Test Result: ,9-Pass 0 Fall ass 0 Fall ass 0 Fail ss 0 Fail Comments—(include information on repairs made prior to testing, and recommendedfollow-up jorfailed tests) S W RCB,January 2002 Page S of J�� 5. SECONDARY PIPE TESTING Test Method Developed By: 0 Piping Manufacturer k Industry Standard 0 Professional Engineer C Other(Specify) 'nest Method Used: k pressure 0 Vacuum ❑Hydrostatic 0 Other(Specify) Test Equipment Used: 4 in. DIAL GAUGE Equipment Resolution: .5% — .; Piping Run#t7 aT Piping Run# �T Piping Run#91 EA; Piping Run#91 Piping Material: F �Z$ � T O—A Piping Manufacturer: U t "C) %C.A°J^j Piping Diameter: _� 2~rJ DTF-3 'aT 2 4 - Length of Piping Run: T 75 T- 90 ICT za- Fr Product Stored C-�N�t_��►E �CTr1 E 11 I'd L= t T 4 Method and location of ipit�-run isolation_ _ — _, _�r1 ��P = 4 cStJpP T=� SU rn1 St/r�P Wait time between applying T pressure/vacuum/water and starting test: C-n- O ff�Tr-j AJ rn�,-j Test Start Time: //. p f}rrl / Ark Art1 Initial Reading(Rt);� _ Tes j O Pi►'1 _ Final Reading(RF): (.1 Ids Test Duration �.— i Nit— Change in Reading(Rr-Rt): O NC 0"6,7 O tL6 C> Pass/Fail Threshold or Criteria: U Test Result: Pass 0 Fail ass 0 Fail y-Pass 0 Fail *—Pass 0 Fail Comments—(include information on repuirs made prior to testing, and recommended/o(low�for jailed less} SWRCB,January 2002 Page U_of 5. SECONDARY PIPE TESTING Test Method Developed By: ❑Piping Manufacturer k Industry Standard U Professional Engineer G Other(Spec) Test Method Used: k Pressure ❑Vacuum ❑Hydrostatic C Other(Specify) Test Equipment Used: 4 i n. DIAL GAUGE Equipment Resolution:.5% Piping Run# Piping Run# Piping Run# Piping Run# Piping Material: Piping Manufacturer: Piping Diameter: y ry _ Length of Piping Run: Product Stored: }7i L Method and location of piipirt,run isolation: 7 -r.� .!5, Wait time between applying pressure/vacuum/water and l starting test: /`► Test Start Time: AVO Initial Reading(RO: Test End Final Reading(RF): — 'rest Duration: _ _— _t_ Change in Reading(RF-R,): Pass/Fail Threshold or Criteria: 0 _ Test Result: ass ❑Fail: ❑ Pass ❑Fail ❑ Pass ❑Fail D Pass ❑Fail Comments—(include iryforma/ion on repairs evade prior to testing, and recwnmendS!LfiolloK:j�for jailed teas) ___� SWRCB,January 2002 Page?of 6. PIPING SUMP TESTING Test Method Developed By: D Sump Manufacturer &Industry Standard D Professional Engineer ❑Other(Specify) Test Method Used: 0 Pressure D Vacuum 91 Hydrostatic 0 Other(Specify) Test Equipment Used: INCON T,5-STS Equipment Resolution:,000in. Sump# 7 Sump# 4 Sutnp# 91 Sump# 1 � Sump Diameter: Ig _ Sump Depth: 3'-5-, Swnp Material: FZ CV2-U F LP,SS gK-C-> � (Z n Height from Tank Top to Top of Highest Piping Penetration: Height from Tank Top to Lowest n Electrical Penetration: x U Z 4 ��_Condition of sump prior to testing: Gl.cf� C_�rj A, Portion of Sump Tested` ILA V-1 Does turbine shut down when sump sensor detects liquid(both -Yes 0 N DNA Yes 0 N DNA )4.Yes 0No DNA Yes ❑No DNA roduct and water?' Turbine shutdown response time C-7 c a C_ IS system programmed for fail-safe es ❑No Cl NA es ❑No ❑NA es DNo DNA .dyes DNo DNA shutdown?* / - / - Was fail-safe verified to be o erational7' ;9-Yes DNo DNA A-Yes D No DNA #Yes C No DNA ft�*es DNo DNA Wait time between applying pressurelvacuum/water and staring test: 3c, ��rN C) ,,J rn�,� ml: Test Start Tune: /V•' / A /0'5_561 A 9:' A . A 91 A 9. Initial Reading(R,): Y,`l!r y 3.970 974P LA 8 0 Test End Time: !! 1D l l A �} 9:HN /U:u ?..H AA R 1/04:23& Final Reading(Rr): y-`ill 14 r 3 Q 71,o 3..97(0 4 B(Pg bB A�q 9 Test Duration: / r-1 15 mrj K, enr I Change in Reading(RF-Ro: CXx) 0,601 O- 000 0 Qpl 0.600 UGI Pass/Fail Threshold or Criteria: 0. 0. � O vU� (�, O,00? U•!� Test Result: Pass 0 Fail Pass 0 Fail Pass 0 Fail ass D Fail Was sensor removed for testing? -Ycs DNo DNA es ONo DNA. es DNo DNA 10Yes 0 N 0 N Was sensor properly replaced and yes DNo O NA O-ves 0 No ❑NA Yes 0 No 0 NA -Yes 0 No DNA verified functional after testing? .� /- - COMMentS—(include tnformarion an repairs made prior ro testing and recommendedfollow-up forfailed tests) `If the entire depth of the sump is not tested,specify how much was tested. if the answer to any of the questions indicated with an asterisk(")is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. UNDER-DISPENSER CONTAINMENT UDC TESTING Test Method Developed By: D UDC Manufacturer Ba Industry Standard D Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 0 Vacuum f9 Hydrostatic G Other(Spec) Test Equipment Used: INCON TS—STS Equipment Resolution: .000in. UDC# UDC# UDC# UDC# UDC Manufacturer, n1k.N ^t" UDC Material: S F2 I LAS UDC Depth: z 4 $1 _ Height from UDC Bottom to Top of Highest Piping Penetration: G) Height from UDC Bottom to Lowest Electrical Penetration: Condition of UDC prior to testing: GL O—ArJ CLA,k J L-6 JQ Portion of UDC Tested' Does turbine shut down when UDC sensor detects liquid(both J�fes DNo DNA jiffies DNo [INA Yes DNo 0 N ;6-Yes ONo DNA product and water)?' Turbine shutdown response time er is system programmed for fail. safe shutdown?� Yes DNo DNA f-1'es DNo DNA $-Yes 0 N DNA ;&Yes 0 N 0 N Was fail-safe verified to be es ❑No D NA es D No 0 NA es ❑No D NA $Yes ❑No ❑NA operational?* Wait time between applying pressure/vacuum/water and 2�, starting test L2x) fYIT,-S ,hT rf +ML rl &0 fY�s nI Test Start Time: -"/ � 9 %4 ti -v0 % Initial Readin R : 4 13 L 3 S Test End Time ,S e F? 5Lp 1410 Final Reading RF): Test Duration: r r- lht M.Zrj -Chang in Reading(R,-Rr): 0.001 a•vc_41 a.oU a 0•Ctrs O. Uud b•cx>t O.M •00 Pass/Fail Threshold or Criteria: 0.o C)9 cno p O.peg vo a In.0c,2� Test Result: Pass D Fail $Pass ❑Fail ass 0 Fail Pass ❑Fail Was sensor removed for testing? Yes D No ❑NA Ayes 0 N DNA es ❑No DNA es ❑No DNA Was sensor properly replaced and �A Yes ❑No DNA jKYes DNo DNA Yes ❑No DNA t'es 0 No 0 NA verified functional after testin ? T` Comments—(include information on repairs made prior to testing and recommendedfollow-up for failed tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to gM of the questions indicated with an asterisk(•)is"NO"or"NA",the entire UDC must be tested, (See SWRCB LG-160) S W RCB,January 2002 Page 7—of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sumps 0 Fill Riser Containment Sumps are Present,but were Not Tested 0 Test Method Developed By: 0 Sump Manufacturer 18Industry Standard 0 Professional Engineer 0 Other(Specify) Test Method Used: 0 Pressure 0 Vacuum 9 Hydrostatic 0 Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: .000in. Fill Sump# FIII Sum # Fill Sump# Fill Sum q E Sump Diameter: I Sump Depth:_ X r Height from Tank Top to Top of Hi lest Piping Penetration: Height from Tank Top to Lowest _ Electrical Penetration: Condition of sump prior to testing: LC 1_A t`t' C.lrcp " CA til C Portion of Sump Tested / r l i /'I=nl ILI roj Sump Material: FS i ,4&1- -1.. "( -I A Wait time between applying pressure/vacuum/water and -starting test: <30 (Y\T- mr,-, 0 M•C/J 'rest Start Time: ,ay P / :L4 law P I.,;)a VA9 P 9 P Initial Readin ,): 5 3.9 P31 3. a 3. .'37(o ' S. 74 Test End Time: Jal; !° P 4162e V 64 P 1 P Final Reading(R 5 a? Test Duration: Change in Reading R R,): OCA 0-ool ,C)OO acx)l o O.UOI .0 1 Pass/FaU Tlueshold or Criteria: �, vp a.00 GG 7,h I r),09 a (3-00 O.00 Test Result: 0 Fail ass 0 Fail ass 0 Fail jir-Pass 0 Fail Is there a sensor in the sump? 94es ONO es 0 No es 0 No 901es 0 No Does the sensor alarm when either product or water is Yes 0 No 0 NA OYes 0 No 0 NA )es 0 No 0 NA 4it.Yes ❑No 17 NA detected? Was sensor removed for testing? es ❑No ❑NA es ❑No 0 NA es O No 0 NA Yes ❑No ❑NA Was sensor properly replaced and es 0 No 0 NA 0 N 0 N es 0 N 0 N $Xes 0 N r,NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) S WRCB,January 2002 9. SPILLlOVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes 0 Spill/Overfill Containment Boxes are Present,but were Not Tested 0 Test Method Developed By 0 Spill Bucket Manufacturer 2 Industry Standard 0 Professional Engineer 0 Other(Spec) Test Method Used: 0 Pressure 0 Vacuum N Hydrostatic O Other(Sped y) Test Equipment Used: INCON TS—STS Equipment Resolution: .000in. f`+ Spill Box# 87,, Spill Box# v Spilt Box#q I U Spill Box h Bucket Diameter: a Z•rl � Ssa DT Bucket Depth: Z►`S 1 znl LO TJd Wait time between applying pressure/vacuum/water and starting test: 3O f Y,-x+J So f'(\T rJ 3o rr'c�r-) Test Stan Time: 1a:a4 P / •`3 e la: j1,)-3p /:;Lp p I m. P Initial Reading(Rj): 6.q09 •ulV g 6:7 q q 16.7q Ll 0 Wk-7 Test End Time: e l�)/5 P 1 Q I° / e Q Final Reading(RF): to'&J b.LJ09 .'7N (p•7 foU 6-0.;7 Test Duration: .5 rN i-tJ / T t•i Change in Reading(RF-R[): 0,piti:_1 I Q.f� -000 0•C�o Pass/Fail Threshold or Criteria: O.ex •a0a 0.00'A .Uj G•LX) O-CX�7 Test Result: Zfass 0 Fail Wass 0 Fail ass 0 Fail D Pass 0 Fail Comments—(include Informatlon on repalrs made prior to testing;and recommendedfollow-up forjailed Jests) G;HLL.L STATION 3698 'MINE AVE BAKERSFIELD SHELL STATION 11/02/2009 11:1? AM 3698 MING AVE SHELL STATION BAKERSFIELD SUMP LEAK TEST REPORT 3698 MING AUE BAKERSFIELD 11/02/2009 9:44 AM 87 STP 11/02/2009 12:43 PM SUMP LEAK TEST REPORT TEST STARTED 10:55 AM DSL STP TEST STARTED 11/02/2009 SUMP LEAK TEST REPORT BEGIN LEVEL 4.4113 IN TEST STARTED 9:29 AM END TIME 11:10 AM 87 FILL TEST STARTED 11/02/2009 END DATE 11/02/2009 TEST STARTED 12:24 PM BEGIN LEVEL 3.0924 IN END LEVEL 4,4110 IN TEST STARTED 11/02/2009 END TIME 9:44 AM LEAK THRESHOLD 0.092 IN BEGIN LEVEL 6.5856 IN END DATE 11/02/2009 TEST RESULT PASSED END TIME 12:39 PM END LEVEL 3.0937 IN END DATE 11/02/2809 LEAK THRESHOLD 0.002 IN END LEVEL 6.5863 IN TEST RESULT PASSED 89 STP LEAK THRESHOLD 0.002 IN TEST STARTED 10:55 AM TEST RESULT PASSED 91 STP TEST STARTED 11/02/2009 BEGIN LEVEL 3.9766 IN 89 FILL TEST STARTED 9:29 AM END TIME_ 11 10 AM TEST STARTED 11/02/2009 END STATE 11/02/2099 TEST STARTED 12:24 PM BEGIN LEVEL 4.8691 IN END LEVEL 3.9764 IN TEST STARTED 11/82/2009 END TIME 9:44 AM LEAK THRESHOLD 0.002 IN BEGIN LEVEL 3.9232 IN END DATE 11/02/2609 TEST RESULT PASSED END TIME 12:39 PM END LEVEL_ 4.8685 IN END DATE 11/02/2809 LEAK THRESHOLD 0.002 IN END LEVEL 3.9228 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED _. .__ __ ---------�----- 87 UPR TEST STARTED 12:24 PM TEST STARTED 11/02/2009 BEGIN LEVEL 6.4099 IN END-TIME 12:39 PM END DATE 11/02/2089' SHELL STATION END LEVEL 6.4089 IN 3698 MING, AUE LEAK THRESHOLD 0.002 IN SHELL STATION BAKERSFIELD TEST RESULT PASSED 3698 MING AVE 11/02/2009 11:35 AM BAKERSFIELD 89 UPR SjJMP j_EAK TEST REPORT 11/02/2009 10:03 AM TEST STARTED L'?:24 PM 87 STP TEST STARTED 1.:/02/2009 SUMP LEAK TEST REPORT BEGIN LEVEL 6.7440 IN TEST STARTED 11:12 END TIME 12:39 PM DSL STP TEST STARTED 11/02/2090 9 END DATE 11/02/2009 GIN LEVEL 4.4109 IN END LEVEL 6.7433 IN TEST STARTED 02/ AM D TIME 11'27 API LEAK THRESHOLD 0.002 IN TEST STARTED 11/0955 IN END DATE 11/02/2009 TEST RESLU_T PASSED BEGIN LEVEL 3.0955 IN END LEVEL 4.4112 IN END TIME 10:03 AM LEAK THRE-LLD 0.002 IN END DATE 11/02/2009 TEST RESULT PASSED END LEVEL 3.0956 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED 89 STP TEST STARTED 11:12 AM 91 STP TEST STARTED 11/02/2009 BEGIN LEVEL 3.9763 IN TEST STARTED 9:48 AM TIME 11:27 AM TEST STARTED 11/02/2009 END DATE 11/0209 BEGIN LEVEL 4.8684 IN END LEVEL 3,9765 IN END TIME 10:03 AM THRESHOLD 0.002 IN LEAK END DATE 11/02/2009 TEST THRE RESULT END LEVEL 4.8682 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED SHELL, STATION SHELL STATION SHELL STATION 3698 MING AVE 3698 MING AVE 3698 MING AVE BAKERSFIELD BAKERSFIELD BAKERSFIELD 11/02/2009 1:38 PM 11/02/2009 1:54 PM 11/02/2009 12:59 PM TEST REPORT SUMP LEAK SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 91 FILL 91 FILL 87 FILL TEST STARTED 1;22 PM TEST STARTED 1:39 PM TEST STARTED 12:43 PM TEST STARTED 11/02/2009 TEST STARTED 11/02/2009 TEST STARTED 11/02/2009. BEGIN LEVEL 3.9753 IN BEGIN LEVEL 3.9763 IN BEGIN LEVEL 6.5862 IN END TIME END TIME 1:54 PM 11/02/28 END TIME 12:58 PM END DATE 1:38 IN PM END DATE 11/02/2809 END LEVEL 3.9766 IN END DATE 11/02/2089 END LEVEL 3.9762 IN LEAK THRESHOLD 8.802 IN END LEVEL 6.5863 IN LEAK THRESHOLD 0.082 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED DSLFILL DSLFILL 89 FILL TEST STARTED 1:22 PM TEST STARTED 1:39 PM TEST STARTED 12:43 PM TEST STARTED 11/02/2009 TEST STARTED 11/02z2009 TEST STARTED 11/02/2009 BEGIN LEVEL 5.4784 IN BEGIN LEVEL 5.4794 IN BEGIN LEVEL 3.9229 IN END TIME 1:38 PM END TIME 1:54 PM END TIME 12:58 PM END DATE 11/02/2009 END DATE 11/02/2009 END DATE 11/02/2009 END LEVEL 5.4795 IN END LEVEL 5.4800 IN END LEUEL 3.9229 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED 91VPR 91VPR 87 VPk TEST STARTED 1:22 PM TEST STARTED 1:39 PM TEST STARTED 12:43 PM TEST STARTED 11/82/2009 TEST STARTED 11/02/2009 TEST STARTED 11/02/2009 BEGIN LEVEL 6.0278 IN BEGIN LEVEL 6.0277 IN BEGIN LEVEL 6.4888 IN END TIME 1:38 PM END TIME 1:54 PM END TIME 12:58 PM END DATE 11/02/2009 END DATE 11/02/2069 END DATE 11/02/2009 END LEVEL 6.0277 IN END LEVEL 6.0274 IN END LEVEL 6.4090 IN LEAK THRESHOLD 8.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED 89 VPR TEST STARTED 12:43 PPi TEST STARTED 11/02/2009 BEGIN LEVEL 6.7440 IN END TIME 12:58 PM END DATE 11/02/2009 END LEVEL 6.7433 IN LEAK THRESHOLD 0.802 IN TEST RESULT PASSED 3-4 SHELL STATION TEST STARTED TEST STARTED 3:19 PM 3698 MING AVE `! 11/02/2009 BAKERSFIELD SHELL STATION BEGIN LEVEL 3,2354 IN 3598 MING AVE END TIME 3,34 PM 11/02/2-009 i t3AKERSFIELD tf END DATE 11/02/2009 2:56 PM END LEVEL 3,2339 IN SUMP LEAK TEST REPORT 11/02/2009 3:16 PM :%:'' TEST THRESHOLD 0,902 IN j`: RESULT 1-2 SUMP LEAK TEST REPORT PASSED TEST STARTED 1-2 TEST STARTED 11/2.41 PM <` BEGIN LEVEL 02/2009 TEST STARTED 3:00 PM END TIME 4'2865 IN TEST STARTED 11/02/2009 END DATE 2:56 PM f"� ;�4; BEGIN LEVEL 4.2853 IN ` END LEVEL 11/02/2009 r};yi END TIME 3:15 PM 7-8 LEAK THRESHOLD 6.002 IN ?'"' END DATE 11/02/2009 TEST RESULT h` END LEVEL 4.2835 IN TEST STARTED 3:19 PM PASSED ' LEAK THRESHOLD 0.002 IN r TEST STARTED 11/02/2009 %`. TEST RESULT PASSED ' BEGIN LEVEL 3.2545 IN v ys END TIME 3.34 PM END DATE 11/02/2009 1° . 3-4 f %�. END LEVEL 3.2539 IN r� LEAK THRESHOLD 0.002 IN 5-6 r, ' TEST STARTED 3:00 PM Y= TEST RESULT PASSED TEST STARTED TEST STARTED 11/02/2009 fir TEST STARTED 11/022069 BEGIN LEVEL 3.2382 IN1 l .BEGIN LEVEL 3,9538 IN ,% END TIME 3:15 PM END TIME 2:56 PM END DATE 11/02/2009 END DATE 11/02/2009 END LEVEL 3.2364 IN LEAK THRESHOLD 0.002 IN END LEVEL 3.9537 IN /=,�'� LEAK THRESHOLD 0.002 IN TEST RESULT PASSED TEST RESULT PASSED 5-6 TEST STARTED 3:00 PM TEST STARTED TEST STARTED 11/02/2009 TEST STARTED 2'41 PMT BEGIN LEVEL 3.9538 IN 11/02/2009 END TIME 3:15 PM BEGIN LEVEL 3.3174 IN T;r� END DATE 11/02/2009 END TIME 2:56 PM END LEVEL 3.9525 IN /02/2 END DATE ''" 11 009 %" END LEVEL + LEAK THRESHOLD 0.002 -IN LEAK THRESHOLD 3.3163 IN TEST RESULT PASSED 0.002 IN TEST RESULT PASSED i L7 SB989 TESTING FAILURE REPORT SITE NAME• tTpTLo3 hI DATE: ADDRESS• 'Mm mzz-3LQ TE'CHNICIAN:�/�rIJ1�cy/J SIGNATURE: SITE CONTACT: THE FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE THE SB989 TESTING. LIST OF PARTS REPLACED/REPAIRED REPAIRS: WE LABOR: A-to L�. PARTS INSTALLED: 1\-bf