HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIIIVIIIIIIIIII 71 Page of
IE
Secondary Containment Testing Report Form
This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested The completed form, written test procedures, and
printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#785 Date of Testing: 3/15/11
Facility Address: 3701 Ming Ave.Bakersfield,CA 93304
Facility Contact: Jamieson Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 9,2011
Name of Local Agency Inspector(rfpresent during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduct g Test: Scott Olinger
Credentials: 16 CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type. 'C-36 C-10 License Number. 589517
Manufacturer Training
Manufacturer Component(s) Date Training Expires
Incon TS-STS Inspection E ui ment 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
3. SUMMARY OF TEST RESULTS
Component pass Fail Not Repairs Component P� Fail Not Repairs
Tested Made Tested Made
UDC 1 &2 ❑ ❑ ❑ V SPILL#3 ❑ 1 ❑ ❑
UDC 3 &4 ❑ ❑ ❑ FILL#1 ❑ ❑ ❑
UDC 5 &6 ❑ ❑ ❑ FILL#2 ❑ ❑ ❑
LTDC 7 & 8 ❑ ❑ ❑ FILL#3 ❑ ❑ ❑
STP#1 ❑ ❑ ❑ V.B ❑ ❑ ❑
STP#2 ❑ ❑ ❑ PIPING RUN 41 ❑ ❑. ❑
STP#3 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑
SPILL#1 ❑ ❑ ❑ PIPING RUN#3 ❑ ❑ ❑
SPILL#2 ❑ ❑ ❑ PIPING RUN#4 ❑ ❑ ❑
SPILL#3 ❑ ❑ ❑ PIPING RUN#5 ❑ ❑ ❑
• SPILL#1 wl ❑ ❑ ❑ PIPING RUN#6 ❑ ❑ ❑
•SPILL#2 6t jo ❑ ❑ PIPING RUN#7 ❑ ❑ ❑
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
CERTIFICATION OF TECBMCIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the fads stated in this document are accurate and in full compliance with legal requirements
Technician's Signs Date:-3/15111
IIIIIIilllllllllilll 72
IE
77"
SWRCB,January 2002 Page_of
4. TANK ANNULAR TESTING
Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used. ❑Pressure ❑Vacuum. ❑Hydrostatic
❑Other(Specs
fy)
Test Equipment Used- Equipment Resolution:
-.z W.
V 5
Tank#1 Tank 2 Tan #3 Tank#
Is Tank Exempt From Testing?' N(Yes ❑No MYes ❑No 5(Yes ❑No ❑Yes ONo
Tank Capacity:
Tank Material:
Tank Manufacturer.
Product Stored:
Wait time between applying
pressure/vacuum/water and
starting test:
Test Start Time:
Initial Reading(RD:
Test End Time:
Final Reading(RF):
Test Duration:
Change in Reading(RrN:
Pass/Fail Threshold or Criteria:
Test.ResWt: ❑ Pass .0 Fail ❑-Pass 0 Fail 0 Pass: D Fill U.Piiis 0,10an
Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA OYes ONo CINA
Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ONA
verified functional after testing? I
Comments—(include information on repairs made prior to testing; and recommended follou-upfor failed tests)
1 Secondary containment systems where the continuous monitoring automatic ally monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page of
5. -SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer 0 Industry Standard 0 Professional Engineer _
0 Other(Specify)
Test Method Used: dPressure O Vacuum 0 Hydrostatic
❑.Other(Spec)
Test Equipment Used:4'GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15
iY�44 x-'A�:;f�+r" -�t�':�i''� �+1' �. '.s_:?°i7_s;:!H�-Xa _ ." tt',G'4G _it '�F�cc':.�-!q�Y: `-. Ru7I'#is"r• _;.Y d. ;e,�_'3t�i•., �H+ '� ^a :,+C�a5:;4:F-°:M.;S'a
`; Piping
—n#1 Piping Run#2 Piping Run#3 Piping Run#
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH
Piping Diameter. 3' 3' 3'
Length of Piping Run: 89 9(P 100?
Product Stored: UNL PREM DIESEL
Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT
i in -run isolation: &V.B &V.B STP&V.B
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 11:00 11:00 11:00
Initial Reading(RO: 5.2 LB 5.1 LB 5.2 LB
Test End Time: 12:00 12:00 12:00
Final Reading(RF): 5.2 LB 5.1 LB 5.2 LB
Test Duration: 1 HR 1 HR 1 HR
Change in Reading(RF-R): 0 0 0
Pass/Fail Threshold or 0 0 0
Criteria:
.Test Result.. -Pass _.,.0 Fap..: Pass O Fail Pass 14iil —13—:Pass. .D Faif
Comments—(mclude information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
---_ .. _. 5. SECONDARY PIPE TESTING
Test Method Developed By: V.Piping Manufacturer ❑Industry Standard ❑Professional Engineer
er(Spec)
Test Method Used Pressure 0 Vacuum 0 Hydrostatic
0 Other(Specify)
Test Equipment Used 4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15
� ;�te'�� - .�s�-���„ ��t�;-r�, s:r-':-��.:j:a_:::.�.,:��r. �s. _ rs ;a,,:t•,•a�-, .�.�.rti --�r:,v;_,'.�.:.......rt.:_..�sr.'.a�:a%-"-.::t�,;... .:::�rrr,�-<a;x .:':�c.�'�:�ad:�•
Piping Run#1 Piping Run#2 t Piping Run#3 Piping Run,#
Piping Material: 3"FIBERGLASS 3"FIBERGLASS 3"FIBERGLASS 3"FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH
Piping Diameter. 3" 3" 3" 3"&4"
Length of Piping Run: r 90' 100' 110' 120'
Product Stored: UNL PREM DIESEL VAPOR
Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT
_piping-ran isolation: UDC&ST? UDC&STP UDC&ST? UDC&ST?
Wait time between applying
pressuretvacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test
Test Start Time: 8:45 8:45 8:45 8:45
Initial Reading W: 52 LB 53 LB 5.1 LB 5.2 LB
Test End Time: 9:45 9:45 9:45 9:45
Final Reading(RF): 52 LB 53 LB 5.1 LB 52 LB
Test Duration: 1 HR 1 HR 1 HR 1 HR
Change in Reading(RF-R): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test Resnlh Pass �;Fai1 Pass _t7 Fait<.:.: Pass. D:Fail ;Pass QFuiil
Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
SV,rRCB,January 2002 Page Of
4 6.PIPING SUMP TESTING
Test Method Developed By: N Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify) 4
Test Method Used: ❑Pressure ❑Vacuum MHydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
#1 SUMP#2 SUMP#3 SUMP#4
N.;
Sump Diameter, 48" 48" 48" 30"X 18"
Sump Depth: 67" 65" 59" 25"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of 17" 17" 17" 16"
Highest Piping Penetration:
Height from Tank Top to Lowest 19" 19" 19" 16"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY DRY
Portion of Sump Tested' 20" 20" 20" 18"
Does turbine shut down when
sump sensor detects liquid(both dyes ❑No ❑NA iYes ❑No 13 NA dYes ❑No [INA V�es ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail-safe S(Yes ONo DNA 7Z ❑No [INA R"Yes ❑No ❑NA dYes ❑No ❑NA
shutdown?*
Was fail-safe verified to be
o rational?* dyes ONo DNA DNA @kes ❑No ❑NA No DNA
pe
Wait time between applying
pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN 10 MIN
test:
Test Start Time: 10:20 10:20 10:20 1:10
Initial Reading W: 6.2582 5.0986 6.7089 3.1575
Test End Time: 10:35 10:35 10:35 1:25
Final Reading(RF): 6.2571 5.0986 6.70" 3.1575
Test Duration: 15 YM 15 AM 15 MIN 15 MIN
Change in Reading(RFRj): .0011 .0000 .0001 .0000
Pass/Fail Threshold or Criteria: .002 .002 .002 .002
Oc
'Pass ❑Fail nm D Fail alpa :Fail .,
Test Result Pass 0
NA
Was sensor removed for testing? _dYes 11 No ❑ 9(Yes [IWO [INA R'Yes ❑No DNA es ONo DNA
Was sensor properly replaced and
M//,es ❑No ❑NA 9(Yes ONo DNA &/Yes ❑No DNA WYes ❑No DNA
verified functional after testing!
Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an
asterisk(*)is"140"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page_of
7. ER DISPENSER CONTAINMENT(kTDQ TESTING
Test Method Developed By: Ef UDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify) 4
Test Method Used- ❑Pressure ❑Vacuum 12(Hydrostatic
❑Other(Specify)
Test Equipment Used- INCON TS-STS Equipment Resolution: 0.0000
#1-2 UDC#3-4 UDC#5-6 UDC#7-8
UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 35" 34" 35" 35'1
Height from UDC Bottom to Top 13" 12" 13" ITT
of Highest Piping Penetration-.
Height from UDC Bottom to 10" 10" 101, 13"
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testing:
Portion of UDC Tested 15" 15" 15" 15"
Does turbine shut down when
UDC sensor detects liquid(both S'Yes ❑No ❑NA S/Yes DNo DNA Yes ❑No DNA El Yes ONo DNA
product and water)?*
Turbine shutdown EMnse tone 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail- d(Yes ❑No ❑N. iYes ❑No DNA C(Yes ❑No DNA E(Yes ❑No ❑NA
safe shutdown?*
Was fail-safe verified to be G/Yes ❑No DNA Yes ❑No DNA JYes ONo DNA es ❑No DNA
operationalf
Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN
pressurelvacuum/water and
starting test
Test Start Time: 9:03 9:03 9:03 9:58
Initial Reading(R4): 5.1997 5.4970 4.3629 4.8658
Test End Time: 9:18 9:18 9:18 10:13
Final Reading(R ): 5.1986 5.4968 43630 4.8657
.Test Duration: . . 15 MIN 15 MIN 15 A41N 15 MIN
Change in Reading(RF-Rj): .0011 .0002 .0001 .0001
Pass/Fail Threshold or Criteria: .002 4 '002 002
Test Result: -- :
Pass_,::,Q Fail Pan �❑Fa11 ' OFAR PAss ❑-Fidl
Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA [;Nes ❑No ❑NA 9'Yes ❑No ❑NA
Was sensor properly replaced and Yes ❑No ❑NA G&es ❑No ❑NA &�es ONo DNA OY� ❑No
verified functional after teE�W? I I F
Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests)
If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LO-1 00)
��
SW98CB,Jauuu�'3O02 Page___-oo___—
8. FILL RISER CONTAINBIENT SUMIP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps 0
Fill Riser Containment Sumps are Preynt,but were Not Tested 0
Test Method Developed By: 16 Sump Manufacturer 0 Industry Standard 0 Professional Engineer
0 Other(Specify) I
Test Method Used: 0 Pressure 0 Vacuum Q&ydrostatic
0 Other(Specify)
Test Equipment Used-INCON TS-STS Equipment Resolution:0.0000
Sump Diameter. 42" 42" 42"
Height from Tank Top tc)Top of 0 0 0
Highest Piping Penetration:
Height fi-om Tank Top to Lowest 24" 2,C' 24"
Electrical Penetration:
Condition of sump prior to DRY DRY DRY
Portion of Sump Tested
Sump Material: FIBERGLASS F113ERGLASS FIBERGLASS
Wait time between applying IOMIN 10 NUN 10 MIN
pressurelvacuum/water and
Test Start Time: 11:50 11:28 11:28
-Initial Reading(Rj): 1.3229 1.9053 5.0788
Test End Time: 12:05 11-44 11:44
Final Reading(RF): 1.3228 1.9052 5.0787
Test Duration: 15 N41N 15 MIN 15 MN
Change in Reading(RF-RO: .0001 .0001 .0001
Pass/FailThreshold or Criteria: .002 .002 A .002
Is there a sensor in the sump? 3;�_es 0 No E(Yes 11 No @tYes 11 No 0 Yes ONo
Does the sensor alarm when
either product or water is A, 11 No 0 NA ad(�Os 11 No 0 NA 34s 0 No 0 NA 0 Yes 0 No 0 NA
Was sensor properly replaced and 9/Yes 0 No 0 NA S(Yes 0 No 0 NA R/Yes 0 No 0 NA 0 Yes 0 No 0 NA
�
�
Comments_
SWRCB,January 2002 Page_of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Ment,but were Not Tested ❑
Test Method Developed By: d Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
0 Other(Specify) 4
Test Method Used: ❑Pressure ❑Vacuum [YHydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
4
Spill Box#V1 Spill Box#V2 Spill Box W3 Spill Box
Bucket Diameter. 12" 12'?
Bucket Depth: 12" 12"
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN
startin g test
Test Start Time: 12:31 . 12:31
Initial Reading W: 4.0692 3.0693
Test Rind Time: 12:46 12:46
Final Reading(RF): 4.0699 3.0689
Test Duration: 15 N41N is MM
Change in Reading(RF-1Q: .0003 .0004
Pass/Fail Threshold or
Criteria: .0 02 .002
Test Results. F b",:Pass:._:0 Fail
Fail
d Pass, 074 -_dPass .0 0 Pass 3 0 Rd[
Comments—(include information on repairs made prior to testing, and recommended follaw-up for failed tests)
SWRCB,January 2002 Page_of
9. SPILUOVERFUL CONTAEVAIENT BOXES
Fac*jjy is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/OverfiH Containment Boxes are t;but were Not Tested ❑
Test Method Developed By: 61 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum E(Hydrostatic
❑Other(Specify)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#1 Spill Box#V1 Spill Box#2 Spill Box#V2
Bucket Diameter: 12" 12" 12" 12"
Bucket Depth: 14?' 14" 13" 13"
Wait time between applying
pressure/vacuum/water and 10 WN 10 NUN 10 MIN 10 MIN
starting test
Test Start Time: 11:50 1.1:09 12:12 12:12
Initial Reading(Rj: 1.7328 2.3274 1.6781 1.6781
Test End Time: 12:05 11:25 12:27 1 12:27
Final Reading(RF): 1.7326 23273 1.6788 1.6788
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0002 .0001 .0007 .0007
Pass/Fail Threshold or .002 .002 .002 .002
Criteria:
Tist Risuh: -:0 Fai -
. ,
Pass ❑Fa Nss Fail Pass 0" ail
Comments—(include h1fonnation on repairs made prior to testing and recommended upfor failed tests)
3701 MING AVE ""
BAKERSFIELD 93309 3701 MING AVE
SUNSET CONST BAKERSFIELD,93309 FASTRIP 785
SUNSET CONST 3701 MING AVE
1-800-984-6266 1-800-984-6266 BAKERSFIELD 93309
SUNSET CONST
03/15/2011 12:27 PM 03/15/2011 12:46 PM 1`800-984-6266
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 03/15/2011 1:09 PN
SPILL3 SPILL3 SUMP LEAK TEST REPORT
TEST STARTED 12:12 PM TEST STARTED 12:31 PM VB1
TEST STARTED 09/15/2011 TEST STARTED 03/15/2011
BEGIN LEVEL 4,0703 IN BEGIN LEVEL 4,0692 IN TEST STARTED 12:54 PM
ENO TIME 12:27 PM END TIME 12:46 PM TEST STARTED 03/15/2011
END DATE 03/15/2011 END DATE 03/15/2011 BEGIN LEVEL 3, 1557 IN
END LEVEL. 4,0694 IN END TIME
LEAK THRESHOLD 0,002 IN END LEVEL 4,4689 IN END DATE 1.09 PM
TEST RESULT PASSED TEST THRESHOLD 4,002 IN END LEVEL 43!15/2011
TEST RESULT PASSED 3, 1575 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
SPILL2 SPILL2
TEST STARTED 12:12 PM TEST STARTED 12:31 PM
TEST STARTED 03/15/2011 TEST STARTED 03/15/2011
BEGIN LEVEL 1,6781 IN BEGIN LEVEL 1,6788 IN
END TIME 12:27 PM END TIME 12:46 PM
END DATE 03/15/2011 END DATE 03/15/2011
END LEVEL 1.6788 IN END LEVEL 1.6787 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
FASTRIP 785
3701 MING AVE
USPILL2 VSPILL2 BAKERSFIELD 93309
TEST STARTED 12:12 PM TEST STARTED 12:31 PM 1SUNSET CONST
-M-984-6266
TEST STARTED 03/15/2011 TEST STARTED 03/15/2011
BEGIN LEVEL 2,0832 IN BEGIN LEVEL 2,4827 IN 03/15/2011 1:25 PM
END TIME 12:27 PM 2.0827 I N END TIME 12:46 PM
END LEVEL 2,0827
END DATE Q END DATE 03/15/2011 SUMP LEAK TEST REPORT LEAK THRESHOLD 0,002 IN END LEVEL 2,0823 IN LEAK THRESHOLD 0,042 IN V61
TEST RESULT PASSED TEST RESULT PASSED
TEST STARTED 1:10 PM
TEST STARTED 03/15/2011
USPILL3 VSPILL3 BEGIN LEVEL 3, 1575 IN
END TIME 1;25 PM
TEST STARTED 12:12 PM TEST STARTED 12:31 PM END DATE 03/15/2011
TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 END LEVEL 311575 IN
BEGIN LEVEL 3,0695 IN BEGIN LEVEL 3.0693 IN LEAK THRESHOLD 0,002 IN
END TIME 12:27 PM END TIME 12:45 PM TEST RESULT_ __ P_ASSED
END DATE 03/15/2011 END DATE 03/15/2011 �~ __ --
END LEVEL 3,0687 IN END LEVEL 3.0689 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED TEST RESULT PASSED
3701 MING AVE 1 MI ND 833 FASTRIP 785
37701 01
BAKERSFIELD 93309 BAKERSFIELD 93309 3701 MING AVE
SUNSET CONST SUNSET CONST BAKERSFIELD 93309
1-800-984-6266 1-800-984-6266 SUNSET CONST
1-800-984-6266
03/15/2011 11:25 AM 03/15/201. 11:44 AM
03/15/2011 12:45 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
FILLI F1LL1
FILL1
TEST STARTED 11:09 AM TEST STARTED 11:28 AM
TEST STARTED 03%15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM
BEGIN LEVEL 4,6862 IN BEGIN LEVEL 4,6900 IN TEST STARTED 03/15/2011
END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 1,3229 IN
END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM
END LEVEL 4,6906 IN END LEVEL 4.6902 IN END DATE 03/15/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN END LEVEL 1.3228 IN
TEST RESULT: INCREASED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FILL2 FILL2
SPILL2
TEST STARTED 11:09 AM TEST STARTED 11:28 AM
TEST STARTED 03/15/2011 TEST-STARTED 03/15/2011 TEST STARTED 11:50 AM
BEGIN LEVEL 1.9059 IN BEGIN LEVEL 1,9053 IN TEST STARTED 03/15/2011
END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 1,6768 IN
END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM
END LEVEL . 1,9052 IN END LEVEL 1,9052 IN END DATE 03/15/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 1,6768 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FILL3 FILLS
VSPILL2
TEST STARTED 11:09 AM TEST STARTED 11:28 AM
TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM
BEGIN LEVEL 5,0785 IN BEGIN LEVEL 5,0788 IN TEST STARTED 03/15/2011
END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 2,0836 IN
END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM
END LEVEL 5,0786 IN END LEVEL 5,0787 IN END DATE 03/15/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 2,0829 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
VSPILLI SPILLI
SPILLI
TEST STARTED 11:09 AM TEST STARTED 11:28 AM
TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM
BEGIN LEVEL 2,3274 IN BEGIN LEVEL 1,7332 IN TEST STARTED 03/15/2011
END TIME 11:25 AM END TIME 11:44 AM BEGIN-LEVEL 1,7328 IN
END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM
END LEVEL 2,3273 IN END LEVEL 1,7330 IN END DATE 03/15/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 1,7326 IN
TEST RESULT PASSED TFSr�FSI�TPASO _ LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
FASTRIP 785
3701 MING AVE FASTRIP 785
BAKERSFIELD 93309 3701 MING AVE
SUNSET CONST BAKERSFIELD 93309
1-800-984-6266 SUNSET CONST FASTRIP 785
1-800-984-6266 3701 MING AVE
03/15/2011 9:00 AM BAKERSFIELD 93309
03115/2011 10:13 AM SUNSET CONST
SUMP LEAK TEST REPORT 1-800-984-6266
SUMP LEAK TEST REPORT
UDC1-2 03/15/2011 10:35 AM
STP1
TEST STARTED 8:44 AM SUMP LEAK TEST REPORT
TEST STARTED 03/15/2011 TEST STARTED 9:58 AM
BEGIN LEVEL 5.1997 IN TEST STARTED 03/15/2011 STP1
END TIME 8:59 AM BEGIN LEVEL 6.2584 IN
END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM
END LEVEL 5, 1999 IN END DATE 03/15/2011 TEST STARTED 03/15/2011
LEAK THRESHOLD 0.002 IN END LEVEL 6.2583 IN BEGIN LEVEL 6.2582 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM
TEST RESULT PASSED END DATE 03/15/2011
END LEVEL 6,2571 IN
UOC3-4 LEAK THRESHOLD 0,002 IN
STP2 TEST RESULT PASSED
TEST STARTED 8:44 AM
TEST STARTED 03/15/2011 TEST STARTED 9:58 AM
BEGIN LEVEL 5.4981 IN TEST STARTED 03/15/2011 STP2
END TIME 8:59 AM BEGIN LEVEL 5.0982 IN
END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM
END LEVEL 5.4975 IN END DATE 03/15/2011 TEST STARTED 03/15/2011
LEAK THRESHOLD 0.002 IN END LEVEL 5.0983 IN BEGIN LEVEL 5,0986 IN
TEST RESULT PASSED LEAK THRESHOLD 0,002 IN END TIME 10:35 AM
TEST RESULT PASSED END DATE 03/15/2011
END LEVEL 5,0986 IN
UDC5-6 LEAK THRESHOLD 0,002 IN
STP3 TEST RESULT PASSED
TEST STARTED 8:44 AM
TEST STARTED 03/15/2011 TEST STARTED 9:58 AM
BEGIN LEVEL 4.3628 IN TEST STARTED 03/15/2011 STP3
END TIME 8:59 AM BEGIN LEVEL 6,7124 IN
END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM
END LEVEL 4.3639 IN END DATE 03/15/2011 TEST STARTED 03/15/2011
LEAK THRESHOLD 0,002 IN END LEVEL 6.7140 IN BEGIN LEVEL 6.7089 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM
TEST RESULT PASSED END DATE 03/15/2011
END LEVEL 6.7090 IN
UDC7-8 LEAK THRESHOLD 0.002 IN
UOC7-$ TEST RESULT PASSED
TEST STARTED 8:44 AM
TEST STARTED 03/15/2011 TEST STARTED 9:58 AM
BEGIN LEVEL 4,7206 IN TEST STARTED 03/15/2011 VSPILLI
END TIME 8:59 AM BEGIN LEVEL 4,8658 IN
END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM
END LEVEL 4,7236 IN END DATE 03/15/2011 TEST STARTED 03/15/2011
LEAK THRESHOLD 0.002 IN END LEVEL 4.8657 IN BEGIN LEVEL 3.7378 IN
TEST RESULT INCREASED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM
-- "- ��-- - - ---- TEST RESULT PASSED END DATE 03/15/2011
END LEVEL 3,7378 IN
LEAK THRESHOLD 0,002 IN
_. TEST RESULT PASSED
FASTRiP 785
3701 MING AVE
BAKERSFIELD 93309
SUNSET CONST
1-800-984-6266
03/15/2011 9:18 AM
SUMP LEAK TEST REPORT
UDC1-2
TEST STARTED 9:03 AM
TEST STARTED 03/15/2011
BEGIN LEVEL 5,1997 IN
END TIME 9:18 AM
END DATE 03/15/2011
END LEVEL 5,1986 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
UDC3-4
TEST STARTED, 9:03 AM
TEST STARTED 03/15/2011
BEGIN LEVEL 5,4970 IN
END TIME 9:18 AM
END DATE 03/15/2011
END LEVEL 5.4968 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
UDC5-6
TEST STARTED 9:03 AM
TEST STARTED 03/15/2011
BEGIN LEVEL 4.3629 IN
END TIME 9:18 AM
END DATE 03/15/2011
END LEVEL 4.3630 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED,
UDC7-8
TEST STARTED 9:03 AM
TEST STARTED 03/15/2011
BEGIN LEVEL 4,8712 IN
END TIME 9:18 AM
END DATE 03/15/2011
ENO LEVEL 4,8715 IN
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED