Loading...
HomeMy WebLinkAboutSB989 2011 SWRCB,January 2002 I IIIIIIIVIIIIIIIIII 71 Page of IE Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested The completed form, written test procedures, and printouts from tests(rf applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#785 Date of Testing: 3/15/11 Facility Address: 3701 Ming Ave.Bakersfield,CA 93304 Facility Contact: Jamieson Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 9,2011 Name of Local Agency Inspector(rfpresent during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conduct g Test: Scott Olinger Credentials: 16 CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type. 'C-36 C-10 License Number. 589517 Manufacturer Training Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection E ui ment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component pass Fail Not Repairs Component P� Fail Not Repairs Tested Made Tested Made UDC 1 &2 ❑ ❑ ❑ V SPILL#3 ❑ 1 ❑ ❑ UDC 3 &4 ❑ ❑ ❑ FILL#1 ❑ ❑ ❑ UDC 5 &6 ❑ ❑ ❑ FILL#2 ❑ ❑ ❑ LTDC 7 & 8 ❑ ❑ ❑ FILL#3 ❑ ❑ ❑ STP#1 ❑ ❑ ❑ V.B ❑ ❑ ❑ STP#2 ❑ ❑ ❑ PIPING RUN 41 ❑ ❑. ❑ STP#3 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑ SPILL#1 ❑ ❑ ❑ PIPING RUN#3 ❑ ❑ ❑ SPILL#2 ❑ ❑ ❑ PIPING RUN#4 ❑ ❑ ❑ SPILL#3 ❑ ❑ ❑ PIPING RUN#5 ❑ ❑ ❑ • SPILL#1 wl ❑ ❑ ❑ PIPING RUN#6 ❑ ❑ ❑ •SPILL#2 6t jo ❑ ❑ PIPING RUN#7 ❑ ❑ ❑ If hydrostatic testing was performed,describe what was done with the water after completion of tests: CERTIFICATION OF TECBMCIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the fads stated in this document are accurate and in full compliance with legal requirements Technician's Signs Date:-3/15111 IIIIIIilllllllllilll 72 IE 77" SWRCB,January 2002 Page_of 4. TANK ANNULAR TESTING Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used. ❑Pressure ❑Vacuum. ❑Hydrostatic ❑Other(Specs fy) Test Equipment Used- Equipment Resolution: -.z W. V 5 Tank#1 Tank 2 Tan #3 Tank# Is Tank Exempt From Testing?' N(Yes ❑No MYes ❑No 5(Yes ❑No ❑Yes ONo Tank Capacity: Tank Material: Tank Manufacturer. Product Stored: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading(RD: Test End Time: Final Reading(RF): Test Duration: Change in Reading(RrN: Pass/Fail Threshold or Criteria: Test.ResWt: ❑ Pass .0 Fail ❑-Pass 0 Fail 0 Pass: D Fill U.Piiis 0,10an Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA OYes ONo CINA Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ONA verified functional after testing? I Comments—(include information on repairs made prior to testing; and recommended follou-upfor failed tests) 1 Secondary containment systems where the continuous monitoring automatic ally monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. (California Code of Regulations,Title 23,Section 2637(a)(6)) SWRCB,January 2002 Page of 5. -SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer 0 Industry Standard 0 Professional Engineer _ 0 Other(Specify) Test Method Used: dPressure O Vacuum 0 Hydrostatic ❑.Other(Spec) Test Equipment Used:4'GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15 iY�44 x-'A�:;f�+r" -�t�':�i''� �+1' �. '.s_:?°i7_s;:!H�-Xa _ ." tt',G'4G _it '�F�cc':.�-!q�Y: `-. Ru7I'#is"r• _;.Y d. ;e,�_'3t�i•., �H+ '� ^a :,+C�a5:;4:F-°:M.;S'a `; Piping —n#1 Piping Run#2 Piping Run#3 Piping Run# Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH Piping Diameter. 3' 3' 3' Length of Piping Run: 89 9(P 100? Product Stored: UNL PREM DIESEL Method and location of TEST BOOT AT STP TEST BOOT AT STP TEST BOOT AT i in -run isolation: &V.B &V.B STP&V.B Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 11:00 11:00 11:00 Initial Reading(RO: 5.2 LB 5.1 LB 5.2 LB Test End Time: 12:00 12:00 12:00 Final Reading(RF): 5.2 LB 5.1 LB 5.2 LB Test Duration: 1 HR 1 HR 1 HR Change in Reading(RF-R): 0 0 0 Pass/Fail Threshold or 0 0 0 Criteria: .Test Result.. -Pass _.,.0 Fap..: Pass O Fail Pass 14iil —13—:Pass. .D Faif Comments—(mclude information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of ---_ .. _. 5. SECONDARY PIPE TESTING Test Method Developed By: V.Piping Manufacturer ❑Industry Standard ❑Professional Engineer er(Spec) Test Method Used Pressure 0 Vacuum 0 Hydrostatic 0 Other(Specify) Test Equipment Used 4"GEL FILLED GAUGE W/CERTS Equipment Resolution: 0-15 � ;�te'�� - .�s�-���„ ��t�;-r�, s:r-':-��.:j:a_:::.�.,:��r. �s. _ rs ;a,,:t•,•a�-, .�.�.rti --�r:,v;_,'.�.:.......rt.:_..�sr.'.a�:a%-"-.::t�,;... .:::�rrr,�-<a;x .:':�c.�'�:�ad:�• Piping Run#1 Piping Run#2 t Piping Run#3 Piping Run,# Piping Material: 3"FIBERGLASS 3"FIBERGLASS 3"FIBERGLASS 3"FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter. 3" 3" 3" 3"&4" Length of Piping Run: r 90' 100' 110' 120' Product Stored: UNL PREM DIESEL VAPOR Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT _piping-ran isolation: UDC&ST? UDC&STP UDC&ST? UDC&ST? Wait time between applying pressuretvacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test Test Start Time: 8:45 8:45 8:45 8:45 Initial Reading W: 52 LB 53 LB 5.1 LB 5.2 LB Test End Time: 9:45 9:45 9:45 9:45 Final Reading(RF): 52 LB 53 LB 5.1 LB 52 LB Test Duration: 1 HR 1 HR 1 HR 1 HR Change in Reading(RF-R): 0 0 0 0 Pass/Fail Threshold or 0 0 0 0 Criteria: Test Resnlh Pass �;Fai1 Pass _t7 Fait<.:.: Pass. D:Fail ;Pass QFuiil Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) SV,rRCB,January 2002 Page Of 4 6.PIPING SUMP TESTING Test Method Developed By: N Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) 4 Test Method Used: ❑Pressure ❑Vacuum MHydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 #1 SUMP#2 SUMP#3 SUMP#4 N.; Sump Diameter, 48" 48" 48" 30"X 18" Sump Depth: 67" 65" 59" 25" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of 17" 17" 17" 16" Highest Piping Penetration: Height from Tank Top to Lowest 19" 19" 19" 16" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY DRY Portion of Sump Tested' 20" 20" 20" 18" Does turbine shut down when sump sensor detects liquid(both dyes ❑No ❑NA iYes ❑No 13 NA dYes ❑No [INA V�es ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe S(Yes ONo DNA 7Z ❑No [INA R"Yes ❑No ❑NA dYes ❑No ❑NA shutdown?* Was fail-safe verified to be o rational?* dyes ONo DNA DNA @kes ❑No ❑NA No DNA pe Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN 10 MIN test: Test Start Time: 10:20 10:20 10:20 1:10 Initial Reading W: 6.2582 5.0986 6.7089 3.1575 Test End Time: 10:35 10:35 10:35 1:25 Final Reading(RF): 6.2571 5.0986 6.70" 3.1575 Test Duration: 15 YM 15 AM 15 MIN 15 MIN Change in Reading(RFRj): .0011 .0000 .0001 .0000 Pass/Fail Threshold or Criteria: .002 .002 .002 .002 Oc 'Pass ❑Fail nm D Fail alpa :Fail ., Test Result Pass 0 NA Was sensor removed for testing? _dYes 11 No ❑ 9(Yes [IWO [INA R'Yes ❑No DNA es ONo DNA Was sensor properly replaced and M//,es ❑No ❑NA 9(Yes ONo DNA &/Yes ❑No DNA WYes ❑No DNA verified functional after testing! Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an asterisk(*)is"140"or"NA",the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page_of 7. ER DISPENSER CONTAINMENT(kTDQ TESTING Test Method Developed By: Ef UDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) 4 Test Method Used- ❑Pressure ❑Vacuum 12(Hydrostatic ❑Other(Specify) Test Equipment Used- INCON TS-STS Equipment Resolution: 0.0000 #1-2 UDC#3-4 UDC#5-6 UDC#7-8 UDC Manufacturer. WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 35" 34" 35" 35'1 Height from UDC Bottom to Top 13" 12" 13" ITT of Highest Piping Penetration-. Height from UDC Bottom to 10" 10" 101, 13" Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testing: Portion of UDC Tested 15" 15" 15" 15" Does turbine shut down when UDC sensor detects liquid(both S'Yes ❑No ❑NA S/Yes DNo DNA Yes ❑No DNA El Yes ONo DNA product and water)?* Turbine shutdown EMnse tone 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail- d(Yes ❑No ❑N. iYes ❑No DNA C(Yes ❑No DNA E(Yes ❑No ❑NA safe shutdown?* Was fail-safe verified to be G/Yes ❑No DNA Yes ❑No DNA JYes ONo DNA es ❑No DNA operationalf Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN pressurelvacuum/water and starting test Test Start Time: 9:03 9:03 9:03 9:58 Initial Reading(R4): 5.1997 5.4970 4.3629 4.8658 Test End Time: 9:18 9:18 9:18 10:13 Final Reading(R ): 5.1986 5.4968 43630 4.8657 .Test Duration: . . 15 MIN 15 MIN 15 A41N 15 MIN Change in Reading(RF-Rj): .0011 .0002 .0001 .0001 Pass/Fail Threshold or Criteria: .002 4 '002 002 Test Result: -- : Pass_,::,Q Fail Pan �❑Fa11 ' OFAR PAss ❑-Fidl Was sensor removed for testing? Yes ❑No ❑NA es ❑No ❑NA [;Nes ❑No ❑NA 9'Yes ❑No ❑NA Was sensor properly replaced and Yes ❑No ❑NA G&es ❑No ❑NA &�es ONo DNA OY� ❑No verified functional after teE�W? I I F Comments—(include information on repairs made prior to testing; and recommended follow-up for failed tests) If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LO-1 00) �� SW98CB,Jauuu�'3O02 Page___-oo___— 8. FILL RISER CONTAINBIENT SUMIP TESTING Facility is Not Equipped With Fill Riser Containment Sumps 0 Fill Riser Containment Sumps are Preynt,but were Not Tested 0 Test Method Developed By: 16 Sump Manufacturer 0 Industry Standard 0 Professional Engineer 0 Other(Specify) I Test Method Used: 0 Pressure 0 Vacuum Q&ydrostatic 0 Other(Specify) Test Equipment Used-INCON TS-STS Equipment Resolution:0.0000 Sump Diameter. 42" 42" 42" Height from Tank Top tc)Top of 0 0 0 Highest Piping Penetration: Height fi-om Tank Top to Lowest 24" 2,C' 24" Electrical Penetration: Condition of sump prior to DRY DRY DRY Portion of Sump Tested Sump Material: FIBERGLASS F113ERGLASS FIBERGLASS Wait time between applying IOMIN 10 NUN 10 MIN pressurelvacuum/water and Test Start Time: 11:50 11:28 11:28 -Initial Reading(Rj): 1.3229 1.9053 5.0788 Test End Time: 12:05 11-44 11:44 Final Reading(RF): 1.3228 1.9052 5.0787 Test Duration: 15 N41N 15 MIN 15 MN Change in Reading(RF-RO: .0001 .0001 .0001 Pass/FailThreshold or Criteria: .002 .002 A .002 Is there a sensor in the sump? 3;�_es 0 No E(Yes 11 No @tYes 11 No 0 Yes ONo Does the sensor alarm when either product or water is A, 11 No 0 NA ad(�Os 11 No 0 NA 34s 0 No 0 NA 0 Yes 0 No 0 NA Was sensor properly replaced and 9/Yes 0 No 0 NA S(Yes 0 No 0 NA R/Yes 0 No 0 NA 0 Yes 0 No 0 NA � � Comments_ SWRCB,January 2002 Page_of 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Ment,but were Not Tested ❑ Test Method Developed By: d Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer 0 Other(Specify) 4 Test Method Used: ❑Pressure ❑Vacuum [YHydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 4 Spill Box#V1 Spill Box#V2 Spill Box W3 Spill Box Bucket Diameter. 12" 12'? Bucket Depth: 12" 12" Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN startin g test Test Start Time: 12:31 . 12:31 Initial Reading W: 4.0692 3.0693 Test Rind Time: 12:46 12:46 Final Reading(RF): 4.0699 3.0689 Test Duration: 15 N41N is MM Change in Reading(RF-1Q: .0003 .0004 Pass/Fail Threshold or Criteria: .0 02 .002 Test Results. F b",:Pass:._:0 Fail Fail d Pass, 074 -_dPass .0 0 Pass 3 0 Rd[ Comments—(include information on repairs made prior to testing, and recommended follaw-up for failed tests) SWRCB,January 2002 Page_of 9. SPILUOVERFUL CONTAEVAIENT BOXES Fac*jjy is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/OverfiH Containment Boxes are t;but were Not Tested ❑ Test Method Developed By: 61 Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum E(Hydrostatic ❑Other(Specify) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Box#1 Spill Box#V1 Spill Box#2 Spill Box#V2 Bucket Diameter: 12" 12" 12" 12" Bucket Depth: 14?' 14" 13" 13" Wait time between applying pressure/vacuum/water and 10 WN 10 NUN 10 MIN 10 MIN starting test Test Start Time: 11:50 1.1:09 12:12 12:12 Initial Reading(Rj: 1.7328 2.3274 1.6781 1.6781 Test End Time: 12:05 11:25 12:27 1 12:27 Final Reading(RF): 1.7326 23273 1.6788 1.6788 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Reading(RF-RO: .0002 .0001 .0007 .0007 Pass/Fail Threshold or .002 .002 .002 .002 Criteria: Tist Risuh: -:0 Fai - . , Pass ❑Fa Nss Fail Pass 0" ail Comments—(include h1fonnation on repairs made prior to testing and recommended upfor failed tests) 3701 MING AVE "" BAKERSFIELD 93309 3701 MING AVE SUNSET CONST BAKERSFIELD,93309 FASTRIP 785 SUNSET CONST 3701 MING AVE 1-800-984-6266 1-800-984-6266 BAKERSFIELD 93309 SUNSET CONST 03/15/2011 12:27 PM 03/15/2011 12:46 PM 1`800-984-6266 SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT 03/15/2011 1:09 PN SPILL3 SPILL3 SUMP LEAK TEST REPORT TEST STARTED 12:12 PM TEST STARTED 12:31 PM VB1 TEST STARTED 09/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 4,0703 IN BEGIN LEVEL 4,0692 IN TEST STARTED 12:54 PM ENO TIME 12:27 PM END TIME 12:46 PM TEST STARTED 03/15/2011 END DATE 03/15/2011 END DATE 03/15/2011 BEGIN LEVEL 3, 1557 IN END LEVEL. 4,0694 IN END TIME LEAK THRESHOLD 0,002 IN END LEVEL 4,4689 IN END DATE 1.09 PM TEST RESULT PASSED TEST THRESHOLD 4,002 IN END LEVEL 43!15/2011 TEST RESULT PASSED 3, 1575 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED SPILL2 SPILL2 TEST STARTED 12:12 PM TEST STARTED 12:31 PM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 1,6781 IN BEGIN LEVEL 1,6788 IN END TIME 12:27 PM END TIME 12:46 PM END DATE 03/15/2011 END DATE 03/15/2011 END LEVEL 1.6788 IN END LEVEL 1.6787 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED FASTRIP 785 3701 MING AVE USPILL2 VSPILL2 BAKERSFIELD 93309 TEST STARTED 12:12 PM TEST STARTED 12:31 PM 1SUNSET CONST -M-984-6266 TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 BEGIN LEVEL 2,0832 IN BEGIN LEVEL 2,4827 IN 03/15/2011 1:25 PM END TIME 12:27 PM 2.0827 I N END TIME 12:46 PM END LEVEL 2,0827 END DATE Q END DATE 03/15/2011 SUMP LEAK TEST REPORT LEAK THRESHOLD 0,002 IN END LEVEL 2,0823 IN LEAK THRESHOLD 0,042 IN V61 TEST RESULT PASSED TEST RESULT PASSED TEST STARTED 1:10 PM TEST STARTED 03/15/2011 USPILL3 VSPILL3 BEGIN LEVEL 3, 1575 IN END TIME 1;25 PM TEST STARTED 12:12 PM TEST STARTED 12:31 PM END DATE 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 END LEVEL 311575 IN BEGIN LEVEL 3,0695 IN BEGIN LEVEL 3.0693 IN LEAK THRESHOLD 0,002 IN END TIME 12:27 PM END TIME 12:45 PM TEST RESULT_ __ P_ASSED END DATE 03/15/2011 END DATE 03/15/2011 �~ __ -- END LEVEL 3,0687 IN END LEVEL 3.0689 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED 3701 MING AVE 1 MI ND 833 FASTRIP 785 37701 01 BAKERSFIELD 93309 BAKERSFIELD 93309 3701 MING AVE SUNSET CONST SUNSET CONST BAKERSFIELD 93309 1-800-984-6266 1-800-984-6266 SUNSET CONST 1-800-984-6266 03/15/2011 11:25 AM 03/15/201. 11:44 AM 03/15/2011 12:45 PM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT FILLI F1LL1 FILL1 TEST STARTED 11:09 AM TEST STARTED 11:28 AM TEST STARTED 03%15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM BEGIN LEVEL 4,6862 IN BEGIN LEVEL 4,6900 IN TEST STARTED 03/15/2011 END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 1,3229 IN END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM END LEVEL 4,6906 IN END LEVEL 4.6902 IN END DATE 03/15/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0.002 IN END LEVEL 1.3228 IN TEST RESULT: INCREASED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FILL2 FILL2 SPILL2 TEST STARTED 11:09 AM TEST STARTED 11:28 AM TEST STARTED 03/15/2011 TEST-STARTED 03/15/2011 TEST STARTED 11:50 AM BEGIN LEVEL 1.9059 IN BEGIN LEVEL 1,9053 IN TEST STARTED 03/15/2011 END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 1,6768 IN END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM END LEVEL . 1,9052 IN END LEVEL 1,9052 IN END DATE 03/15/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 1,6768 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FILL3 FILLS VSPILL2 TEST STARTED 11:09 AM TEST STARTED 11:28 AM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM BEGIN LEVEL 5,0785 IN BEGIN LEVEL 5,0788 IN TEST STARTED 03/15/2011 END TIME 11:25 AM END TIME 11:44 AM BEGIN LEVEL 2,0836 IN END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM END LEVEL 5,0786 IN END LEVEL 5,0787 IN END DATE 03/15/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 2,0829 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED VSPILLI SPILLI SPILLI TEST STARTED 11:09 AM TEST STARTED 11:28 AM TEST STARTED 03/15/2011 TEST STARTED 03/15/2011 TEST STARTED 11:50 AM BEGIN LEVEL 2,3274 IN BEGIN LEVEL 1,7332 IN TEST STARTED 03/15/2011 END TIME 11:25 AM END TIME 11:44 AM BEGIN-LEVEL 1,7328 IN END DATE 03/15/2011 END DATE 03/15/2011 END TIME 12:05 PM END LEVEL 2,3273 IN END LEVEL 1,7330 IN END DATE 03/15/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 1,7326 IN TEST RESULT PASSED TFSr�FSI�TPASO _ LEAK THRESHOLD 0.002 IN TEST RESULT PASSED FASTRIP 785 3701 MING AVE FASTRIP 785 BAKERSFIELD 93309 3701 MING AVE SUNSET CONST BAKERSFIELD 93309 1-800-984-6266 SUNSET CONST FASTRIP 785 1-800-984-6266 3701 MING AVE 03/15/2011 9:00 AM BAKERSFIELD 93309 03115/2011 10:13 AM SUNSET CONST SUMP LEAK TEST REPORT 1-800-984-6266 SUMP LEAK TEST REPORT UDC1-2 03/15/2011 10:35 AM STP1 TEST STARTED 8:44 AM SUMP LEAK TEST REPORT TEST STARTED 03/15/2011 TEST STARTED 9:58 AM BEGIN LEVEL 5.1997 IN TEST STARTED 03/15/2011 STP1 END TIME 8:59 AM BEGIN LEVEL 6.2584 IN END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM END LEVEL 5, 1999 IN END DATE 03/15/2011 TEST STARTED 03/15/2011 LEAK THRESHOLD 0.002 IN END LEVEL 6.2583 IN BEGIN LEVEL 6.2582 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM TEST RESULT PASSED END DATE 03/15/2011 END LEVEL 6,2571 IN UOC3-4 LEAK THRESHOLD 0,002 IN STP2 TEST RESULT PASSED TEST STARTED 8:44 AM TEST STARTED 03/15/2011 TEST STARTED 9:58 AM BEGIN LEVEL 5.4981 IN TEST STARTED 03/15/2011 STP2 END TIME 8:59 AM BEGIN LEVEL 5.0982 IN END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM END LEVEL 5.4975 IN END DATE 03/15/2011 TEST STARTED 03/15/2011 LEAK THRESHOLD 0.002 IN END LEVEL 5.0983 IN BEGIN LEVEL 5,0986 IN TEST RESULT PASSED LEAK THRESHOLD 0,002 IN END TIME 10:35 AM TEST RESULT PASSED END DATE 03/15/2011 END LEVEL 5,0986 IN UDC5-6 LEAK THRESHOLD 0,002 IN STP3 TEST RESULT PASSED TEST STARTED 8:44 AM TEST STARTED 03/15/2011 TEST STARTED 9:58 AM BEGIN LEVEL 4.3628 IN TEST STARTED 03/15/2011 STP3 END TIME 8:59 AM BEGIN LEVEL 6,7124 IN END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM END LEVEL 4.3639 IN END DATE 03/15/2011 TEST STARTED 03/15/2011 LEAK THRESHOLD 0,002 IN END LEVEL 6.7140 IN BEGIN LEVEL 6.7089 IN TEST RESULT PASSED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM TEST RESULT PASSED END DATE 03/15/2011 END LEVEL 6.7090 IN UDC7-8 LEAK THRESHOLD 0.002 IN UOC7-$ TEST RESULT PASSED TEST STARTED 8:44 AM TEST STARTED 03/15/2011 TEST STARTED 9:58 AM BEGIN LEVEL 4,7206 IN TEST STARTED 03/15/2011 VSPILLI END TIME 8:59 AM BEGIN LEVEL 4,8658 IN END DATE 03/15/2011 END TIME 10:13 AM TEST STARTED 10:20 AM END LEVEL 4,7236 IN END DATE 03/15/2011 TEST STARTED 03/15/2011 LEAK THRESHOLD 0.002 IN END LEVEL 4.8657 IN BEGIN LEVEL 3.7378 IN TEST RESULT INCREASED LEAK THRESHOLD 0.002 IN END TIME 10:35 AM -- "- ��-- - - ---- TEST RESULT PASSED END DATE 03/15/2011 END LEVEL 3,7378 IN LEAK THRESHOLD 0,002 IN _. TEST RESULT PASSED FASTRiP 785 3701 MING AVE BAKERSFIELD 93309 SUNSET CONST 1-800-984-6266 03/15/2011 9:18 AM SUMP LEAK TEST REPORT UDC1-2 TEST STARTED 9:03 AM TEST STARTED 03/15/2011 BEGIN LEVEL 5,1997 IN END TIME 9:18 AM END DATE 03/15/2011 END LEVEL 5,1986 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED UDC3-4 TEST STARTED, 9:03 AM TEST STARTED 03/15/2011 BEGIN LEVEL 5,4970 IN END TIME 9:18 AM END DATE 03/15/2011 END LEVEL 5.4968 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED UDC5-6 TEST STARTED 9:03 AM TEST STARTED 03/15/2011 BEGIN LEVEL 4.3629 IN END TIME 9:18 AM END DATE 03/15/2011 END LEVEL 4.3630 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED, UDC7-8 TEST STARTED 9:03 AM TEST STARTED 03/15/2011 BEGIN LEVEL 4,8712 IN END TIME 9:18 AM END DATE 03/15/2011 ENO LEVEL 4,8715 IN LEAK THRESHOLD 0.002 IN TEST RESULT PASSED