Loading...
HomeMy WebLinkAboutTANK INTEGRITY TEST RESULTS 1-29-2009 IIIIIIIIVIIIIIIIIII 29 IE RICH ENVIRONMENTAL 5643 BROOKS CT.- BAKERSFIELD, CA 93308 OFF. (661)392-8687 FAX(661)392-0621 ALERT 1000 UNDERFILL& 1050X ULLAGE SYSTEM& ACURITE TM, PRECISION UNDERGROUND STORAGE TANK SYSTEM LEAK TEST TEST RESULTS DATE: 1-29-09 BILLING: COLLEGE HEIGHTS SITE: COLLEGE HEIGHTS 3711 MT. VERNON AVE. 3711 MT.VERNON AVE. BAKERSFIELD, CA BAKERSFIELD, CA PRODUCT VOLUME %FULL WETTED NON-WETTED PRODUCT LEAK WATER IN (GAL) PORTION PORTION LINE DETECTOR TANK UNL-87 10,000 82% +0.035-PASS PASS N/A N/A 0" PREM 91 10,000 80% +0.031-PASS PASS N/A N/A 0" DIESEL 10,000 76% -0.004-PASS PASS N/A N/A 0" COMMENTS WATER FINDING PASTE WAS USED TO VERIFIED THE ABSENCE OF WATER IN THE TANK. SHANE BOURKE WITH CEMML VERIFIED THAT WATER IN THE BACKFILL AREA AT THE TIME OF TESTING WAS BELOW TANK BOTTTOM,AND THEREFORE NOT A FACTER IN TEST DETERMINATION.A MONITORING WELL OR A WELL POINT WAS DRIVEN IN THE BACKFILL AREA WAS NOT USED TO DETERMINE THAT THERE IS NO WATER IN THE BACKFILL AT TANK BOTTOM. A PRECISION TEST WAS PERFORMED ON TANKS AT THE ABOVE LOCATION USING THE ALERT 1000 UNDERFILL SYSTEM AND THE ALERT 1050 ULLAGE SYSTEM. I HAVE REVIEWED THE DATA PRODUCED IN CONJUNCTION WITH THIS TEST PURPOSE OF VERIFYING THE RESULTS AND CERTIFYING THE TANK SYSTEMS.THE TESTING WAS PERFORMED IN ACCORDANCE WITH ALERT PROTOCOL, AND THEREFORE SATISFIES ALL REQUIREMENTS FOR SUCH TESTING AS SET FORTH BY NFPA-329-92 AND USEPA 40 CFR PARTS 280. THE RESULTS OF TESTING ARE SHOWN ON THE FOLLOWING PAGE, AND INDICATE WHETHER THE WETTED AND NON-WETTED PORTION PASSED OR FAILED.INCLUDED WITH THE REPORT ARE REPRODUCTION OF DATA COMPLIED DURING THE TEST WHICH FORMED THE BASIS FOR THESE CONCLUSIONS.THIS INFORMATION IS STORED IN A PERMANENT FILE IF FUTURE VERIFICATION OF TEST RESULTS IS NEEDED. I DECLARE UNDER PENALTY OF PERJURY THAT I AM A LICENSED TANK TESTER IN THE STATE OF CALIFONIA AND THAT THE INFORMATION CONTAINED IN THIS REPORT IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. TEST CERTIFIED BY RICH PHILLIPS CERT#91-1071 1111111 VIII III IIII 30 IE 7T 6 3 a maw M E 0 d E 0 3 r Q T Sample Time (in Hrs.) Client/Operator Data Tank and Test Parameters Client: COLLEGE HEIGHTS Test Date: 29-Jan-09 Address: 3711 MT VERNON AVE City, St: BAKERSFIELD,CA Tank Identification: 87 Telephone: 37 Product Type: UNL-87 Tank Capacity: 10,000.0 Gal. Contractor: RICH ENVIRONMENTAeroduct Level: 70.0 in. Address: 5643 BROOKS CT. Water in Tank: 0 City, St: BAKERSFIELD, CA Water Level ATB: 0 in. Telephone: 661-392-8687 Tank Material: Tank #: 1 Tank Address: 3711 MT VERNON Load Cell S/N: 269900000330 City, St: BAKERSFIELD,CA Probe S/N: 28 Test Duration: 2.06 Hours Sample Time: 1.93 Hours Product SGU: .75 Leak Rate G/H: 0.035 RICH ENVIRONMENTAL PLOT OF ULLAGE TEST DATA COLLEGE HEIGHTS. 3711 MT VERNON BAKERSFIELD, CA UNL-87 5.00 _ . ._ _ . . �. 5.00 ........................................................................................................................................ ................... 4.00 4.00 O O H w 3.00 3.00 Z H H J J a a Q 2.00 Q 2.00 N � N Y Y N L 1.00 1.00 ..111.1 .> _ :: 0.00 <;.... >. >. ;. 0.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1:1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 MINUTES MINUTES 12KHz DETECTION RATIO=0.91 25KHz DETECTION RATIO = 1.04 TEST RESULT= GOOD DATE AND TIME OF TEST: 01/29/09 02:45PM BEGINNING BOTTLE PRESSURE=2000.0 ENDING BOTTLE PRESSURE= 1600.0 BEGINNING TANK PRESSURE= 1.5 - ENDING TANK PRESSURE = 1.5 7T 2 1 0 E 0 Y E a -1 v Sample Time (in Hrs.) Client/Operator Data Tank and Test Parameters Client: COLLEGE HEIGHTS Test Date: 29-Jan-09 Address: 3711 MT VERNON AVE City, St: BAKERSFIELD,CA Tank Identification: 2 Telephone: 37 Product Type: UNL-91 Tank Capacity: 10,000.0 Gal. Contractor: RICH ENVIRONMENTA2roduct Level: 69.0 in. Address: 5643 BROOKS CT. Water in Tank: 0 City, St: BAKERSFIELD, CA Water Level ATB: 0 in. Telephone: 661-392-8687 Tank Material: Tank #: 2 Tank Address: 3711 MT VERNON Load Cell S/N: 269900001000 City, St: BAKERSFIELD,CA Probe S/N: 28 Test Duration: 6.28 Hours Sample Time: 1.59 Hours Product SGU: .75 Leak Rate G/H: 0.031 RICH ENVIRONMENTAL PLOT OF ULLAGE TEST DATA COLLEGE HEIGHTS. 3711 MT VERNON BAKERSFIELD, CA UNL-91 5.00 _-.. 5.00 ............................................................................................................................................°............. 4.00 4.00 O O 0 3.00 0 3.00 H H Q 2.00 Q 2.00 _ _ `1 Y N N to 1.00 1.00 0.00 0.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 MINUTES MINUTES 12KHz DETECTION RATIO= 1.01 25KHz DETECTION RATIO= 1.21 TEST RESULT= GOOD DATE AND TIME OF TEST: 01/29/09 02:45PM BEGINNING BOTTLE PRESSURE= 1600.0 ENDING BOTTLE PRESSURE= 1300.0 BEGINNING TANK PRESSURE= 1.5 ENDING TANK PRESSURE= 1.5 TT 20 10 4 0 c 0 d E 0 -10 •20 0 Sample Time (in HFs.) Client/Operator Data Tank and Test Parameters Client: COLLEGE HEIGHTS Test Date: 29-Jan-09 Address: 3711 MT VERNON AVE City, St: BAKERSFIELD,CA Tank Identification: 3, Telephone: 37 Product Type: DIESEL Tank Capacity: 10,000.0 Gal. Contractor: RICH ENVIRONMENTAI'roduct Level: 65.0 in. Address: 5643 BROOKS CT. Water in Tank: 0 City, St: BAKERSFIELD, CA Water Level ATB: 0 in. Telephone: 661-392-8687 Tank Material: Tank #: 3 Tank Address: 3711 MT VERNON Load Cell S/N: 272700000165 City, St: BAKERSFIELD,CA Probe S/N: 28 Test Duration: 0.98 Hours Sample Time: 0.98 Hours Product SGU: .83 Leak Rate G/H: -0.004 RICH ENVIRONMENTAL PLOT OF ULLAGE TEST DATA COLLEGE HEIGHTS. 3711 MT VERNON BAKERSFIELD, CA DIESEL 5.00 _. ...__.._.__._.w .:....::::..H _ _ _� 5.00 ............................°---..................---...........---...............................-----........................ ........................... 4.00 4.00 O O 3.00 3.00 � H J J Q 2.00 Q 2.00 N N Y Y N Lo 1.00 N 1.00 0.00 °: ;. 0.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 MINUTES MINUTES 12KHz DETECTION RATIO= 1.01 25KHz DETECTION RATIO =0.98 TEST RESULT= GOOD DATE AND TIME OF TEST: 01/29/09 02:45PM BEGINNING BOTTLE PRESSURE= 1300.0 ENDING BOTTLE PRESSURE = 1000.0 BEGINNING TANK PRESSURE= 1.5 ENDING TANK PRESSURE= 1.5