HomeMy WebLinkAbout2011 RESULTS IIIIIIIIIIIIIIIIIIII 59 -lZ5
SWRCB,January 2002 IE Page of
Secondary Containment. Testing.Report Form
This form is intended for use by contractors performing periodic testing:of USTsecondwy containment systems. Use the
appropriate pages of thisform to report.results for all components tested The completed form,written lest procedures, and
printouts from tests(f applicable),should be provided to thefacility owner/operator for submittal'to.,the local regulatory agency.
1. FACILITY INFORMATION
Facility.Name: HOWARD'S MINI MART Date of Testing: 418/1.1 .
Facility Address: 4201 BELLE TERRACE,BAKERSFIELD
Facility Contact: Phone:
Date Local Agency Was NotIified of Testing.: 3/11/11
Name of Local Agency Inspector(f presew during testing):.
2. TESTING CONTRACTOR INFORMATION
Company Name: Rich Environmental
Technician.Conducting Test: . RICH PHILLIPS
Credentials: X CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C61/D40 A HAZ License Number: 80900
Manufacturer Training
Manufacturer Component(s) Date Training Expires
INCON TS=STS
3. SUMMARY OF TEST RESULTS
Component Pan Fail Not Repairs Component Pass Fail xot Repairs.
Tested Made Tested Made
DSL/PREM9.1 ANNULAR X ❑. ❑ C} UNL87 STP X I p 1 p
UNL87 ANNULAR X ❑. ❑ ❑ PREM91 STP X ❑ ❑ ❑
DSL,SEC.PIPE STP=UDC X ❑. ❑ ❑ UDC#1/2 X ❑ , ❑ ❑
IDSL•SEC PIPE VENT X ❑ ❑ p UDC#3/4 X ' D p ❑
UNL87 SEC PIPE STP-UDC X ❑. ❑ ❑ UDC#5/6; X ❑ ❑ ❑.
UNIA7 SEC PIPE STP-UDC X ❑ ❑ p UDC#74 X. ❑ ❑ ❑
PRW91 SEC PIPE STP-UDC X ❑ .❑ ❑ DSL FILL SUMP X. p' ❑ ❑
PREM91 SEC PIPE STP-UDC X ❑ ❑ ❑ UNL87 FILL.SUNT X 1 ❑ 11 ❑
UNL87 VENT SECONDARY X ❑ ❑ ❑ PREM91 FILL SUMP X ❑ p ❑
PREM91 VENT SECONDARY X 0 0 ❑ UNL87:VAPOR: X ❑. ❑
VAPOR RETURN UNL8T,STP X ❑ ❑ ❑ :PREM91 VAPOR X. p. ❑ ❑
DSL STP X ❑ ❑
0 11 ❑ ❑ ❑ .
If hydrostatic testing was performed,describe what was done with the water after completion of tests:
RECYCLE&REUSE
CERTIFICATION OF TECHNIC SPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the facts state WAI cument are accurate and In full compliance with legal requirements
Technician's Signature: Date: 4/8/1:1
IIIIIIIIIIIIIIIIIIII 60
IE
X01.25
SWRCB,January 2002 Page 7 of
4. TANK ANNULAR TESTING
Test Method Developed By: 0 Tank Manufacturer X Industry Standard D Professional Engineer
❑.Other(Spec)
Test Method Used: ❑Pressure X Vacuum ❑Hydrostatic
0 Other(Spec)
Test.Equipment Used:41N.DIAL GAUGE . Equipment Resolution:
Tank#DSL/PREM91 Tank#UNL87 Tank# Tank.#
Is Tank Exempt From Testing?` 0 Yes X No. J Yes. XNo 0 Yes ❑No 0 Yes ❑No
Tank Capacity: 1.0000 10000
Tank Material: STEEL; STEEL
Tank Manufacturer: UNKNOWN UNKNOWN
Product Stored: DSL/PREM91 UNL.87
Wait time between applying
pressurelvacuum/water and 30MIN 30MIN
starting test:
Test Start Time: 10:00 10:00
Initial Reading(Ri): 10HG 1 OHG
Test End Time: 11:00 1.1:00
l OHG l OHG
Test.Duration: 60 MIN' 60 MIN
Change_in:Reading(RF-RJ): 0 0
Pass/Fin Threshold or Criteria: 0.00±/- 0.00±/-
.
Was sensor removed for testing?. XYes. 0 No ❑NA. XYes DNo DNA ❑Yes D No DNA ❑Yes bNo ONA
Was sensor properly replaced and X Yes _❑No C]NA XYes 0No DNA DYes DNo ONA 0 Yes .❑No DNA
verified functional after testis
Comments-(include information on repairs made.prior to testing, and recommended follow-up for faile4 tests),
II I
1
I
Secondary ontainment stems where the continuous monitoring automatically monitors both the
dart' system g y Primary.and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. (California Code of Regulations,Title 23,Section 263:7(a)(6))
�{oZ�LS
SWRCB,January 2002 Page 3 of
S. SECONDARY PRETESTING
Test Method Developed By: ❑Piping Manufacturer X Industry Standard 0 Professional Engineer
0.Other(Specify)
Test.Method Used: X Pressure .. 0 Vacuum d Hydrostatic.
f, 'Other(specify)
Test Equipment Used:41N DIAL GAUGE Equipment.Resolution: .5%
Plpiug-Ron tiDSL Pipin&Run#DSL.VENT Piping Run#T1N18T Piping Ran:t�,iJNL8}
Piping Material: PLASTIC FIBERGLASS PLASTIC PLASTIC
TOTAL TOTAL TOTAL
Pipmg.Manufacturer: CONTAINMENT SMITH CONTAINMENT CONTAINMENT
Piping Diameter: 2" 3" 2" 2"
Length of Piping Run: 30' 20' 20' 204'
Product Stored: DSL VENT UNL87 UNL87
Method and location'of BOOT IN:SUMP
-run isolation: BOOT IN SUMP BOOT IN SUMP BOOT IN SUMP
Wait time between applying
preswre/vacuum/water.and 30 MIN 36 MIN 30 MIN .30 MIN
starting test:
Test Start Time: 9:30 9:30 10:45 10:45
Initial Reading(Rj): SPSI: 5.5P9I: SPSI 5.SPSI
Test End Time: 10:30 10:30 11:45 11:45
Final Reading(RF): 5PSI. 5.5PSI 5PSI 5.5P,SI
Test Duiation: fi0 MILT 60 MIN 60 MIN 60 MIN
Change',in Reading(Rx-Ro: 0 0 0 0
Pass/Fail Threshold or' 0 PSI 0 PSI O PSI 16 PSI
Criteria:
Comments—(include nfonnarion on repairs.made prior io testing and recommended follow-up for failed'tam)
SWRCB,January 2002 Page`T of
5. SECONDARY PIPE TESTING.
Test Netbod Developed By. ❑PipingManuf icturer X Industry Standard ❑Professional Engineer
❑Other-(Specify)
Test Method Used: X Pressure 0 Vacuum ❑Hydrostatic
D Other(Spec)
Test Equipment Used:4IN DIAL GAUGE Equipment Resolution;.5%
Piping Ran#UNL87 PipingRun#PREA19l. Piping Run#PREM41 Piping Run*PREM91
VENT
Piping Materiel: FIBERGLASS PLASTIC PLASTIC FIBERGLASS
Piping Manufacturer: SMITH SMITH
TOTAL SMITH
CONTAINTv1ENT CONTAINMENT
Piping Diameter: 3" 2" 211 3„
Length of Piping Run: 20" 25" 25" 20"
Product Stored: •VENT PREM91 PREM91 VENT
Method and location of BOOT IN FILL
=run isolation SUMP BOOT:IN SUMP BOOT IN SUMP BOOT,IN SUMP
Wait time between applying
pressure/vacuum/water and 30 MIN 30 MIN 30 MIN. 30 MIN-
test:
Test Start.Time: 10:45 .12:15 12:15 12:15
Initial Reading(11): SPSI 6PSI 5PSI 5PSI
Test End Time: 11:45 .1:15 1:15 1:15
Final Reading,(RF): 5PSI 6PSI 5PSI 5PSI
Test Duration: 66 NUN 60 MIN 60 MIN 60 MIN
Change m.Reading(Rk-N:. 0 Q .0 0
Pass/Fail Threshold or 0 PSI 0 PSI 0 PSI 0 PSI
i:;rteris:
Gp*ments;-(foelude information ogrepdirs made prior to,teslfng,.and recommended follow-up for failed rests)
I ,
• �dI25
SWRCB Jan Page January 2002 ag of
5. SECONDARY PIPE TESTING
Test Method Developed.By: ❑,Piping Manufacturer X Industry.Standard ❑Professional Engineer'
'❑Other(Spec)
Test Method Used: X Pressure- p Vacuum. ❑'Hydrostatic
❑Other•(Specify)
Test
Equipment Used:4IN DIAL GAUGE Equipment Resolution:_5%
Piping Run#VAPOR Piping.Run# Piping Run# Piping Run#
Piping Material: MERGLASS
Piping Manufacturer:. SMITH
Piping Diameter. 4"
Length of Piping Run: 30'
Product Stored: VAPOR RETURN
Method and location of CLAM:SHELL IN 87
piping-run isolation: STP
Wait time between applying
pressure/vacuum/water and 30 MTN 30 MIN 30 MIN 30 MIN
starting test
Test Start Time: 1:30
Initial Reading(Rj: 5.5PSI
Test End.Time: 2:30
Final Reading(RF): 5.5PSI
Test Duration: %MIN 60 MIN 60 MIN 60 MIN'
Change vi Reading(RF-R) 0
Pass/Fafl.Threshold,or O PSI O'PSI O PSI. 0 PSI
Craferia;
1
Conlih ltS-(include information on repairs made prior to testing, and recomn ended fellow-up or"failed tests)
y f ult. Il.d •r 1.�
•i
L4 01-215
SWRCB,January 2002 e f of
Pag r
6. PIPING SUMP TESTING
Test.Method Developed By: ❑Sump Manufacturer X Industry Standard O Professional Engineer
❑Other:(Specify)
Test Method Used-.,.,.,r:,,L„w• OPressure : 0`Wacuum X?Hydrostatic 1.
0 Other:(Sped)
Test Equipment Used:INCON TS-STS Equipment Resolution:
Samp#DSL Sump#UNL87 Samp#PREM91 Sump
Sump Diameter. 39” 39" 39"
Sump.Depth: 63"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Height,from Tank Top to Top of 20" 24" 22"
Highest Pi m Penetration:
Height from Tank Top to Lowest
Electrical Penetration: 12" 12" "
9
Condition of sump prior to:testing: CLEAN CLEAN CLEAN
Portion of Sump Tested' 22" 26" 24"
Does turbine shut down when
sump sensor detects liquid(both 0 Yes 0 No XNA ❑Yes ONO XNA D. Yes ❑No XNA ❑Yes 0 No DNA.
product and,water)?`
Turbine shutdown response time N/A N/A N/A
Js system pmgrammed'for fail-safe O Yes O No XNA ❑Yes ❑No XNA ❑Yes O No XNA`` ❑'Yes. ONo Cl NA
shutdown?`
Was fail-safe verified to be ❑Yes O No X NA ❑Yes ONo XNA ❑Yes 0 No XNA :D Yes O No DNA
o 'oaal?•
Wait time between applying
presslire/vactwi&wat'eeii I-SAtarting i• . 30-NM 36;MIIV 30 MIN
Start Time: 11:30 11:49 11:30 11:49 -12:21 12:50
Wtial Reading(: 2.487 2.490. 3:430 3.430 5.546 5.547
tesi End Time: 11:45 12:04 11:45 12:04 12:36 1:05
Final Reading(RF): 2.489 _2.491 3.430 3.430 5.547 5.547.
Test Duration: 15MIN 15MIN 15MINS 15MIN 15MIN 15�
Chan iri Readin ±.002 +:00.1 .000
Change g(RF-R�: .000 +.001 .000
Pass/Pail:Threshold or Criteria: -.002 -.002 -.002 -.002 -.002 -.002:
Was sensor removed for testing? X Yes D.No G NA XYes 090 ❑NA XYes :❑No: DNA ❑Yes O No 11 M
Was sensor properly replaced.and X Yes ❑No 11 NA X Yes 11 No 'DNA X Yes ONO.: .O NA O Yes G No C]NA
verified functional:after testin ?
Comments—(include information on repgirs made prior to testing, and recommended follow-up for failed tests)
'If the entire depth of the sump is nottested,specify how much was tested.. If the answer.to any of.the.questions indicated with an
asterisk(•)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160)
SWRCB January uary 2002 page of g
7. UNDER DISPENSER,CONTAINMENT TESTING
Test Method Developed By: D UDC.Manufacturer. X Industry Standard 0 Professional Engineer
0 Other(Specify)
Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic
0 Other-(Spec).
Test Equipment Used:INCON TS-STS Equipment Resolution:
UDC#1/2 UDC#3/4 UDC#516 UDC#718 ..
UDC Manufacturer. UNKNOWN. UNKNOWN UNKNOWN UNKNOWN
UDC'Material: FIBERGLASS . FIBERGLASS FIBERGLASS FIBERGLASS
UDC 26" 26" 26" 26"
Height from UDC Bottom to Top 10" 10" 12" 12"
Of Hi est Piping Penetration:
Height from UDC Bottom to 5" 5" 5" 5"
Lowest Electrical Penetration:
Condition of UDC prior to CLEAN CLEAN CLEAN, CLEAN
testing:
Portion of UDC Tested 12 . 12 12 :12
Does turbine shut down when
UDC.se,nsor detects liquid(both .0 Yes. 0 No XNA 0 Yes O.No XNA ❑Yes D No XNA 0Yes D No XNA
roduct�and water),?
TurbiriCshutdown re nse time N/A N/A N/A N/A
Is system progammed'for fail- D Yes D.No XNA ❑Yes D No XNA. ❑Yes D No XNA ❑.Yes 0140. XNA
safe shutdown!*
Was fail-safe verified to be 0 Yes 0 No :XNA 0 Yes 0 No X.NA 0 Yes .0 No XNA D Yes 0 No XNA
operational?* .
Wait time between applying
pressure/vacuum/water and 30MIN 30MIN 30MIN 30MiN
startin test
Test Start Time 3:17 3:37 3:54
Oat 3:I7 3:37 _ .3:37, ... .3:54, .
Initini R ' I : 1.002 1.002 2.786 2.786 4:84.7 4:848 4;267 4:267
Test End`Time 3:32 3:52 4:09 4:26 3:312 3:52 3:52: 4:09
Final.Readin ,(RF): 1.002 1.003' 2.786 2.787 4.848 4.849 4:267 4266
Test Duration: 15MIN 15MIN 15MIN 151VIIN I5MIN I5MIN 15MIN . 15MIN
Change in Reading RI): ..000 +:001 -.000 +.001' +:001 +;001 000 -:001
Pass/Fai7 Threshold or Criteria: -.002 .002 -.002 -:002. =:002 -.002 .-.002 -:002
Was sensor removed for testing? X Yes. 0 No D NA X Yes 0 No DNA X Yes 0 No DNA X Yes ❑No DNA
Was sensor properly replaced and X Yes D No D NA X Yes ❑No DNA X Yes D No 011A X Yes D No DNA..
verifie4t functional after testing!
Comments—('include infw?nadon;onrePa/rs:made prior to testing and recommended follow-upf ailed J
or .ailed tests
'If the.entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an
asterisk(w)is"NO"or"NA",the entire UDC must lie tested. (See SWRCB-LG-160)
i
SWRCB,January 2002 Page of
8. FELL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sumps ❑
Fill Riser Containment Sumps,are Present,.but were:Not Tested 0 ...
Test Method Developed By: 0 Sump Manuf6criuer X Industry:Standard D Professiqual•Engineer
i 0 Qther,(Spec6)
Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic
O.Other(Specify')
Test Equipment Used:INCON TS-STS Equipment'Resolution:
TFFil1Sump#DSL Fi0 Sump,#UNL87 FiU Samp#PREM91 iSump Sum Diameter: 3T' 3T' 37"
Sum' De 63" 63" 63"
Height.from Tank Top to Top o 12" 16" 1T,
Hixhest Piping Penetration:
Height from Tank Top to Lowest 12" 16" 15"
Electrical.Penetration:
Condition of sump prior to CLEAN. CLEAN CLEAN
testing:
Portion of Sump Tested 14" is" 19"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
''Plait time between applying
pressure/vacuum/water and M IIN 30MIN 30MIN 30MIN
starting test:
Test Start Time: 11;30 11:49 9:59: 10:19: 9:59 10:19
Innis ding(R}):.. .._ 5 304 .5:302 2.136 2,136 2.150 2,151
Test Ead Tihie' 11�AS 12:04 :10:14 10:34 10:14 .10:3.4
Final Reading(RF): 5302 5:302 2.136 2.136 2.150 2.15,1
Tpst Duration;1. 15MIN 15MIN 15MIN 15MIN 15MIN 15 NUN
Change.in Reading(RF-Rj): -.002 .000 .000 000 .000 .000
Pass/Fail Threshold or Criteria: -.002 '.002 .002 -.002 -.002 -.002
Is there a sensor fi the sump?. X Yes 0 No X Yes ❑No X Yes 11 No ❑Yes 0,No.
Does'.the sensor alarm when
either product or water is ❑Yes DNo X NA ❑Yes DNo X NA D Yes 11 No X NA 0 Yes O.No DNA
detected?
Was sensor removed for testing? XYes 0 No DNA :X Yes 0 No DNA X Yes ONO 'DNA. D Yes ❑No ❑NA .
Was sensor properlyL replaced and X Yes .O No O NA X Yes DNo O NA X Yes DNo ❑NA ❑Yes DNo 1
verified functional after,to ?
Comments (include information on repairs made prior to testing, and recommended follow-up for fa*d.tests)
14016
S"CB,January 2002 Page "\ of k
9. SPILUOVERFELL CONTAPUYIENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
SpilUOverfill Containment.Boxes are Present,but were Not,Tested ❑
Test Method Developed By: n Spill:Bucket Manufacturer. X Industry Standard O Professional Engineer
❑Other(Specify)
Test Method Used: b Pressure ❑Vacuum X Hydrostatic
i 0 Other(Specify)
Test Equipment Used:INCON TS-STS Equipment'Resolution:.
3pi11'Box;#UNL8Y VPR Spin Bcm, 4PEM91 VPR Spill.Box.# Spill BOX#
Bucket Diameter: 1'2" 12"
Bucket.Depth: 14" 14"
Wait time between applying
pressure/muum/water and 30MIN 30MIN 30N" 30MIN
startin k test:
Test Start Time: 9:59 10:19 9:59 10:49
Initial Reading(Ri): 2336 2.3,39 3.049 5M'o
Test End Time: 10:14 10:34 I0:14 1:0:34
Final Reading(RF): 2.337 2.337 5:049 5.050,
Test,Duration: 15MTN: 15MIN 15MIN 15MIN 15M1N 1SM1N 15M1N 15MIN
Change in Reading(F4-N: +.001 -.002 - -.000 -.000
Pass/Fail Threshold or 002 -:002 :002 -.00.2
Criteria:
Comments—(include,irtformation on repairs made prior to testing, and recommended follow=up for.faijed tests)
r. u •
� I
1'
'HOWARDS MINI MART H04lARDS MINI hff3RT
Y
4?01 BELLE TERRACE .4201 BELLE TERRACE t1�
6AERSFIELD CA y F
BAKERSF ELD ACA
04/08/2011 19:14 AM
@4r0$/2�►.11 t0:34 AM
SUMP LEAK'TE,zT REPORT
SUMP LEAK TEST 12EPORT
$70PR POOR '
TEST STARTED *0:59 AM NOWARDS MINI MART
420t BELLE TERRACE
TEST STARTED 04/08/2011 TEST:STARTED 10s19. RM
BEGIN LEVEL 2.3363 IN TEST STARTED' .04/68/2011 914KERSFIELD CA
END TIME IW14 AM BEGIN LEVEL 2.3391 .IN 04/Q8/2Eili 1:1;•46 AM .
END DATE 04.108/2011 END TIME 10 z 34: AM.
END LEVEL 2.3372 IN END DATE 0448,2611 DUMP LEAK TEST RtPfiRT
LEAK THRESHOLD 0.002, IN END LEVEL 2.3377 IN
TEST RESULT PASSED LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED 87STF
TEST STARTEb 11:3Q AM
8 7FILL WILL TEST STATED 04•%08/2011
BEGIN. LEVEL 3.43E IN
TEST STARTED 9:59.AM END TIME 11:45 RM
TEST STARTED 04/08/2011 TEST STARTED 1 @:.19 AM END, DATE
BEGIN LEVEL 2.1361 IN TEST STARTED @4/08/2011 64/@8/2011
END TIME 10:14 AM BEGIN LEVEL 2.1361. IN END LEVEL 3.4397 IN
END DATE 04/08/'2011 END TIME 10:34,AM _ LEAK 0.PA IN
END LEVEL 2.1361 IN END DATE - 04/08/2011 . PASSED
LEAK THRESHOLD 0.002 IN END LEVEL 2.ISO TN,
TEST.RESULT PASSED LEAK THRESHOLD 8.002 IN DSLFIZL
TEST RESULT PASSED
TEST STARTED 11:30 AM
;91UPR TEST STARTED 04/08/201:1
91UPR BEGIN LEVEL 5.3942 IN
TEST STAR"t"ED 959 AM END TIME 11:45 AM-
TEST STARTED 04/08/2011 TEST STARTED 10119 AM END DATE 04r0Sr20.i1
BEGIN LEVEL 5.0494 IN TEST STARTED 84!68!201.1 END LEVEL /0828 IN
ENE! TIME, 1014 AM BEGIN LEVEL 5.6560 IN
END DATE 04/08/2011 END TIME 10:34 AM LEAK THRESHOLD 0.6021H
END LEVEL 5.0497 IN END BATE 04/08/2611 TEST RESULT PASSED
LEAK THRESHOLD 0.002 IN END-LEVEL 5.0500 IN,
TEST RESULT PASSED LEAK THRESHOLD 0.062 IN
TEST RESULT PASSED, DSLSTF
T.E STARTED 11130:AM
91FILL 91FILL TEST 'STARTED 04n38/201I
TEST STARTED 9:59 AM BEGIN LEVEL 2.4872 IN
TEST STARTED 04,0$/2011. TEST STARTED 19:f9 RM END TIME 11.45 AM
BEGIN LEVEL 2.1505 IN TEST, STARTED WOB/2611. END DATE 04/08/'28./1
END. TIME 10:14 AM LEVEL 2.1512 'IN END LEVEL 2.4891 I.hl.
END DATE 0448/2 911 END TIME 10:34 AM LEAK THRESHOLD_. 0.M IN
END LEVEL 2.1508 IN END DATE: 04/08/261`1 TEST. RESULT I4MEA6E$
LEAK THRESHOLD 0..002 IN 'TD LEVEL 2..1511 1N
TEST RESULT PASSED 'LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED
1
HOWARDS1 MART
4291 BELLE TERRACE
BAKERSF ILD CA'.
r0g✓2011 1;2"04 PM
SUMP LEAK TEST REPORT
87STP
TES, STARTED ;11:49 AM
TEST STARTED 840812011
BEGIN LEVEL 3:4309 I.N
END TIME 12:04 PM
Nb Dom 8008/2011
END LEOL 3.4309 IN'
LEAK THRESHOLD 0.802 IN
TEST RESULT PASSED
'-OWHRDS MINI MART HOWARDS'MINI MART
5201. 'BEL 4201 BELLE' TERRACE DISPS-6
�.E TERRACE
BAKERSFIELD GA 86KLRSFIELD CA TEST' STARTED 3:37'PM
04/88/201.1 12:36 PM 04/08/3011 3:33 PM TEST STARTED 04/08/2011
BEGIN LEVEL ' 4:8484` IN
SUMP LEAK TEST REPORT END TIME 3452 PM
SUMP LEAK TEST REPORT END DATE 04/08/281.1
RISPI-2 END LEVEL 4.°84.91 IN
915TP LEAK THRESHOLD 0.002 IN
`EST STARTED •�r TEST STARTED 3:17 PM TEST RESULT PASSED
_2. PM TEST STARTED' 04/08%2011
TEST STARTED 04/03/2011
°EGI.T LEVEL 1.5469 IN BEGIN LEVEL 1.0021 IN DIGP7-8
END TIME 12:36 PM END TIME 3:32 PM
END DATE 94/08/,2011 END DATE 04/08/2411 TEST STARTED. 3:37'PM
END LEVEL 5.5474 IN END LEVEL 1.0025 IN TEST STARTED 04/08f2011
LEAK THRESHOLD 9,802 'LEAK THRESHOLD 0.002 IN
IN SEGIN LEVEL 4.2673 IN
TEST RESULT TEST RESULT PASSED
. PASSED END TIME 3352 PM
_. ,. ... _.... .. _ END DATE 04/08/2611
END LEVEL 4.2679 IN
HOWARDS' MINI MART LEAK THRESHOLD 0.052 IN.
4291 EELLE TERRACE TEST RESULT PASSED
BAKERSF-IELD Q4
04/06%2011 '3352 PM DISP5-6
SUMP ,! EAK. TEST REPORT TEST STARTED 3;17 PM
HOWARDS MINI MART TEST STARTED. 04/08/2011:
42A?. AELL.E TERRACE DISP1-2 BEGIN LEVEL 4.84.79. IN
BAKERSFIELD CA TEST STARTED END. TIME 3::32 PM
TEST 3:37 PM END!DATE 04/08%2011
04/08/2011 STARTED 04/08/2011. END LEVEL 4.8481 IN
?:05 PM, BEGIN LEUEL 1.0026 IN LEAK THRESHOLD 0.002 IN
END TIME 3:52 M TEST RESULT PASSED
S�J,^1G LEAK TES 'REPORT END DATE
END LEVE% 04/88/. 201'1.
91STP LEAK THRESHOLp 5,902 IN
' TEST STARTED 12:56 Pt9 TEST RESULT PASSED
TEST STARTED 04/08/2011x,
8EGINt LEVEL 5.5473 IN — DIS'7-8
END. TIME 1-`05 PM —
END DATE 04/08/2011 DSLPILL TEST STARTED 3:54:PM
END LEVEL.. 5.5474 IN TEST STRRTE'J. '04%08/2011
:EAK THRESHOLD 0.002 IN TEST STARTED 11::49'AM BEGIN LEVEL 4.2677 IN
TEST RESULT PASSED T STARTED 04/08 2011 4:139 PM
TEST END TIME.
BEGIN LEVEL 5.3020 IN END DATE 04/08/2011
DISP3-4
END TIME 12:04 PM. END LEVEL 4.2665 IN
END DATE 134/08/2011
TEST STARTED 3:54 PM END LEVEL 8.3020 IN LEA1c THRESHOLD 0.002 PASSED'
TEST STARTED 04/08/2011 LEAK THRESHOLD 9.002 IN TEST RESULT
BEGIN LEVEL. 2.7853 IM ~°:'TEST RESULT PASSED
END TIME 4:09 PM
END'. DATE 04/08/201.1
END LEVEL 2.7865 IN DSV.STP
LEAK THRESHOLD 0.002 IN
TEST RESULT PASSED TEST STARTED 11:49 AM
TEST STARTED 04V08/2011
BEGIN LEVEL 2.490 PM
END TIME 04/08!201%
DISP3-4 END DATE
END LEVEL 2:4915 IN
4:11 PM. .
TEST STARTED LEAK'THRESHOLD 0 002 ED
TEST STARTED 04/68611 N TEST RESULT
gEGTH LEVEL 4:26 PM
END TIME
FHD DATE 04/08/2011
E0 1—EUEL 2.7871 IN
LEAK THRESHOLD 0.002 IN
'TEST RESULT PASSED
- 401 Z5
SB989 TESTING FAILURE REPORT
SITE: NAME: HOWARDIS MINI MART DATE: 4/8/11
ADDRESS: 4201 BELLE TERRACE . TECHNICIAN: RICH PMLLIPS
CITY: BAKERSFIELD SIGNATURE:
THE.FOLLOWING COMPONENTS WERE REPLACED/REPAIRED TO COMPLETE
TESTING.
REPAERS:
LABOR•
PARTS INSTALLED::
NAME: TITLE:
SIGNATURE:
THE ABOVE NAMED PERSON TAKES FULL RESPONSIBIIITY OF NOTIFYING
THE APPROPRIATE PARTY TO HAVE CORRECTIVE ACTION TAKEN.T.O.REPAIR
THE ABOVE LISTED.PROBLEMS AND NOTIFYING RICH ENVIRONMANTAL FOR
ANY NEEDED RETESTING.:THIS ALSORELEASES RICH ENVIRONMENTAL OF
ANY FINES OR PENALTIES OCCURING FROM NON-COMPLIANCE.
A COPY OF THIS DOCUMENT HAS BEEN..LEFT ON-SITE FOR YOUR
CONVIENENCE.