1. FACILITY INFORMATION
Facility Name: Shell I Date of Testing: 9/24/10
Facility 4700 Coffee Bakersfield,CA 93308
Facility Contact: Matt Jeffries Phone: 661-496-7006
Date Local Agency Was Notified of Testing: 8/26/2010
Name of Local Agency Inspector(fpresent during testing): Ernie Medina
2. TESTING CONTRACTOR INFORMATION
Company Name: Confidence UST Services,Inc.
Technician Conducting Test: Bryan A Self
Credentials: ❑x CSLB Contractor Z ICC Service Tech. ❑SWRCB Tank Tester ❑Other (Specify)
License Number(s): CSLB# 804904 ICC# 8022804-UT
3. SPILL BUCKET TESTING INFORMATION
Test Method Used: 0 Hydrostatic ❑Vacuum ❑Other
Test Equipment Used: Lake Test Equipment Resolution: 0.0625'
Identify Spill Bucket(By Tank 1 South Regular Fill 2 3 4
Number, Stored Product, etc.)
Bucket Installation Type: ❑Direct Bury ❑Direct Bury ❑Direct Bury ❑Direct Bury
0 Contained in Sump ❑Contained in Sump ❑Contained in Sump ❑Contained in Sum
Bucket Diameter: 13.00"
Bucket Depth: 12.00"
Wait time between applying 5 Min.
vacuum/water and start of test:
Test Start Time(Tj): 9:15 am
Initial Reading(Rj): 10.00"
Test End Time(TF): 10:15 am
Final Reading(RF): 10.00"
Test Duration (TF—Ti): 1 Hour
Change in Reading(RF-R,): 0.00"
Pass/Fail Threshold or 0.0625'
Criteria:
Test Result _ ?' ® Pass ❑RFail ® Pass 1 k® Pas`s, DF ' (3 Pass®Fail
Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is trueya4wurate,and in full compliance with legal requirements.
Technician's Signature: Date: 9/24/2010
State laws and regulations do not currently requir testing to be performed by a qualified contractor.However,local requirements
may be more stringent.
111111111 58
IE
4O�F`4
Ust
• o�.. Invoice No.: 24436
Site: Shell
4700 Coffee Rd
Bakersfield, CA 93308
Repairs Requested: Retest the Regular south fill spill bucket, and retest the
relay for the super turbine.
Repairs completed: I first had to wait because when I arrived on site there
was a fuel drop. I then shut down the site and verified that the super relay was
replaced and functioning properly. After the fuel truck left I then ran a lake test
and verified the spill bucket was passing.
Required Repairs, Still Pending:
Technician Name: Bryan A Self
Signature:
Date: 09-24-10
v •
ooA�tD4 Ust
TZY
• Invoice No.: 24436
Site: Shell
4700 Coffee Rd
Bakersfield, CA 93308
Repairs Requested: Replaced the Regular south fill spill bucket
Repairs completed:
Required Repairs, Still Pending:
Technician Name: Bryan A Self
Signature: A, &L