Secondary Containment Testing Report Form
This form is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the
appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and
printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: Fastrip#326 Date of Testing: 3/7/11
Facility Address: 6401 South H St.Bakersfield,Ca
Facility Contact: Jamieson Hill Phone: 1-661-393-7000
Date Local Agency Was Notified of Testing: March 3,2011
Name of Local Agency Inspector(if present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: Sunset Mechanical
Technician Conduc ' g Test: Scott Olinger
Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester
License Type: C-36 C-10 License Number: 589517
Manufacturer TraininE
Manufacturer Component(s) Date Training Expires
Incon TS-STS Inspection Equipment 1/18/13
Veeder Root Monitoring System 1/15/12
ICC Cal UST Service Tech 1/18/13
3. SUMMARY OF TEST RESULTS
Component pass Fail Not Repairs Component Pass Fail Not Repairs
Tested Made Tested Made
UDC 1 &2 ❑ ❑ ❑ PIPING RUN#1 ❑ ❑ ❑
UDC 3 &4 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑
UDC 5 &6 ❑ ❑ ❑ I PIPING RUN#3 ❑ ❑ ❑
UDC 7 & 8 ❑ ❑ ❑ PIPING RUN 94 ❑ ❑ ❑
❑ ❑ ❑ ❑ PIPING RUN#5 ❑ ❑ ❑
STP#1 Ir ❑ ❑ ❑ PIPING RUN#6 ❑ ❑ ❑
STP#2 ❑ ❑ ❑ PIPING RUN#7 ❑ ❑ ❑
STP#3 Mr ❑ ❑ ❑ SPILL#1 9f, ❑ ❑ ❑
V SPILL#3 1 ❑ ❑ ❑ SPILL #2 ❑ ❑ ❑
FILL#1 ❑ ❑ ❑ SPILL #3 IV ❑ ❑ ❑
FILL#2 ❑ ❑ ❑ V SPILL#1 ❑ ❑ ❑
FILL#3 ❑ ❑ ❑ V SPILL#2 ❑ ❑ ❑
If hydrostatic testing was performed,describe what was done with-the water after.completion.of tests:
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
To the best of my knowledge,the cts stated In this document are accurate and in full compliance with legal requirements
Techniciads Signa Date:-3/7/11
IIIIIII VIII III IIII 78
IE
SWRCB,January 2002 Page of
4. TANK ANNULAR TESTING
Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used: Equipment Resolution:
Tank#1 Tank#2 Tank#3 Tank#
Is Tank Exempt From Testing?' Yes ❑No Yes ❑No Yes ❑No ❑Yes ❑No
Tank Capacity:
Tank Material:
Tank Manufacturer:
Product Stored:
Wait time between applying
pressure/vacuum/water and
startin test:
Test Start Time:
Initial Reading(Rj):
Test End Time:
Final Reading(RF):
Test Duration:
Change in Reading(RF-&):
Pass/Fail Threshold or Criteria:
Te§t'Resnit k ❑;;Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail s, ❑ Pass ❑Fail
Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA
verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary
containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment
testing. {California Code of Regulations,Title 23,Section 2637(a)(6))
SWRCB,January 2002 Page of
5. SECONDARY PIPE TESTING
Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer
❑ er(Spec)
Test Method Used: VPressure ❑Vacuum ❑Hydrostatic
❑Other(Spec)
Test Equipment Used:4'GEL FILLED GAUGE W/CERTS Equipment Resolution:
Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4
Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH
Piping Diameter: 3' 3' 3' 3'
Length of Piping Run: 110 129 130 13(P
Product Stored: UNL PREM DIESEL VAPOR
Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT
piping-run isolation: UDC&STP UDC&STP UDC&STP UDC&STP
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 9:00 9:00 9:00 9:00
Initial Reading(Rj): 5.2 LB 5.4 LB 5.1 LB 5.1 LB
Test End Time: 10:00 10:00 10:00 10:00
Final Reading(RF): 5.2 LB 5.4 LB 5.1 LB 5.1 LB
Test Duration: 1 HR 1 HR 1 HR 1 HR
Change in Reading(RF-RI): 0 0 0 0
Pass/Fail Threshold or 0 0 0 0
Criteria:
Test Result . ,.n. Pass . p Esil' Pass :;p Fail; Pass :_.❑,Fait Pass , ❑Fail
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
6.PIPING SUMP TESTING
Test Method Developed By: MSump Manufacturer ❑Industry Standard ❑Professional Engineer
❑.Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
1 STP 2 STP 3 STP
Sump Diameter: 48" 48" 48"
Sump Depth: 50" 51" 51"
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Height from Tank Top to Top of 18" 16" 16"
Highest Piping Penetration:
Height from Tank Top to Lowest 14" 12" 12"
Electrical Penetration:
Condition of sump prior to testing: DRY DRY DRY
Portion of Sump Tested' 20" 20" 20"
Does turbine shut down when
sump sensor detects liquid(both dYes ❑No ❑NA Yes ❑No ❑NA 1�J Yes ❑No ❑NA ❑Yes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC
Is system programmed for fail-safe
shutdown?* Yes ❑No ❑NA Yes ❑No ❑NA dYes ❑No 11 NA ❑Yes ❑No ❑NA
Was fail-safe verified to be y� ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
operational?*
Wait time between applying
pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN
test:
Test Start Time: 11:00 11:00 11:00
Initial Reading(RI): 5.3940 6.9899 5.1081
Test End Time: 11:15 11:15 11:15
Final Reading(RF): 5.3931 6.9900 5.1073
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R,): .0009 .0001 .0008
Pass/Fail Threshold or Criteria: .002 .002 .002
Test,Result Pass p Fail Pass; .,❑Fail Pass. .;O FaiL.• 11 Pas§
Was sensor removed for testing? Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and t l Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an
asterisk(*)is"NO'or"NK,the entire sump must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
7. ER-DISPENSER CONTAINMENT 02g TESTING
Test Method Developed By: 4 UDC Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Specify)
Test Method Used: ❑Pressure ❑Vacuum WHydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000
UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8
UDC Manufacturer: WESTERN WESTERN WESTERN WESTERN
UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS
UDC Depth: 29' 29' 29' 29'
Height from UDC Bottom to Top 9' 9' 9' 9'
of Highest Piping Penetration:
Height from UDC Bottom to 3' 5' 6' 3'
Lowest Electrical Penetration:
Condition of UDC prior to DRY DRY DRY DRY
testin
Portion of UDC Tested 12' 12' 12' 12'
Does turbine shut down when
UDC sensor detects liquid(both I/Yes ❑No ❑NA W/Yes ❑No ❑NA (/Yes 11 //
No ❑NA 5 Yes ❑No ❑NA
product and water)?*
Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC
Is system programmed for fail- yes ❑No ❑NA S/Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA
safe shutdown?*
Was fail-safe verified to be yes ❑No ❑NA Yes ❑No ❑NA Wes ❑No ❑NA Yes ❑No ❑NA
operational?*
Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN
pressure/vacuum/water and
starting test
Test Start Time: 10:19 10:19 10:19 10:19
Initial Reading 4.9730 4.4831 3.5556 5.3299
Test End Time: 10:34 10:34 10:34 10:43
Final Reading(RF): 4.9742 4.4828 3.5557 5.3295
Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN
Change in Readin F-91): .0012 .0003 .0001 .0004
Pass/Fail Threshold or Criteria: .002 .W2 .002, W2
Test;Result: " Pass: `❑Fail Pass ,r.❑Feil Pass` .❑RFail Pass ❑Eall
_. .r
Was sensor removed for testing? Yes ❑No ❑NA 14 Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA
Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA
verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an
asterisk(*)is"NO'or"Ng,the entire UDC must be tested. (See SWRCB LG-160)
SWRCB,January 2002 Page of
8. FILL RISER CONTAINMENT SUMP TESTING
Facility is Not Equipped With Fill Riser Containment Sums ❑
Fill Riser Containment Sumps are PrejEnt,but were Not Tested ❑
Test Method Developed By: 9 Sump Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum MHydrostatic
❑Other(Spec)
Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000
Fill Sump#1 Fill Sump#2 Fill Sump#3 Fill Sum #4
Sump Diameter: 42' 42' 42'
Sump Depth: 50' 53' 53'
Height from Tank Top to Top of N/A N/A N/A
Highest Piping Penetration:
Height from Tank Top to Lowest 22' 20' 24'
Electrical Penetration:
Condition of sump prior to DRY DRY DRY
testing:
Portion of Sump Tested 12' 12' 12'
Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS
Wait time between applying 10 MIN 10 MIN 10 MIN
pressure/vacuum/water and
starting test:
Test Start Time: 11:00 12:15 12:15
Initial Reading(Rj): 3.2814 4.7753 5.8434
Test End Time: 11:15 12:30 12:30
Final Reading(RF): 3.2820 4.7755 5.8437
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R,): .0006 .0002 .0003
Pass/Fail Threshold or Criteria: .002 .002 .002
Test Result: ass ❑Feil' Pass' ❑Fail ass 0 Fail ❑ Pass ❑Fair
Is there a sensor in the sump? Yes ❑No Yes ❑No Yes ❑No ❑Yes ❑No
Does the sensor alarm when —L_ /
either product or water is LTV Y es 11 No ❑NA C7 Yes ❑No ❑NA 4/Yes ❑No ❑NA ❑Yes ❑No ❑NA
detected?
Was sensor removed for testing? es ❑No ONA--Vy es ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA
Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA
verified functional after testing?
Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9. SPILL/OVERFILL CONTAINMENT BOXES
Facility is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are sent,but were Not Tested ❑
Test Method Developed By: VSpill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Sped)
Test Method Used: ❑Pressure ❑Vacuum Hydrostatic
❑Other(Spec)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Box#1 Spill Box#2 Spill Bog#3 Spill Box#
Bucket Diameter: 12' 12' IT
Bucket Depth: 13' 13' 13'
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 12:15 1:13 1:31
Initial Reading(R,): 5.3587 3.1877 4.6411
Test End Time: 12:30 1:28 1:46
Final Reading(RF): 5.3583 3.1880 4.6405
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-R,): .0004 .0003 .0006
Pass/Fail Threshold or .002 .002 .002
Criteria:
Test Result: Pass ❑Fail pan. ❑.Fail. Passe: D Fail 0,Pass ❑Fail,:_
Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests)
SWRCB,January 2002 Page of
9. -SPILL/OVERFILL CONTAINMENT BOXES
Facility-is Not Equipped With Spill/Overfill Containment Boxes ❑
Spill/Overfill Containment Boxes are Pr sent,but were Not Tested ❑
Test Method Developed By: Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer
❑Other(Spec)
Test Method Used: ❑Pressure ❑Vacuum dHydrostatic
❑Other(Sped)
Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000
Spill Bog#V1 Spill Box#V2 Spill Box#V3 Spill Box#
Bucket Diameter: 12' 12' 12'
Bucket Depth: 16' 16' 16'
Wait time between applying
pressure/vacuum/water and 10 MIN 10 MIN 10 MIN
starting test:
Test Start Time: 1:13 1:31 1:31
Initial Reading(Rj): 5.1788 5.1793 4.6411
Test End Time: 1:28 1:46 1:46
Final Reading(RF): 5.1791 5.1787 4.6405
Test Duration: 15 MIN 15 MIN 15 MIN
Change in Reading(RF-RO: .0003 .0006 .0006
Pass/Fail Threshold or .002 .002 .002
Criteria:
Test Result: 1kPkss ❑Fads Pass. b'Fail Pass 0,Fail ❑'.Pass ❑Fail
Comments—(include information on-re
,Eairs made prior-to-testing and recommended follow-up for failed tests)
BAKERSFIELD CA BAKERSFIELD CA 6401 S H ST
SUNSET CONST SUNSET CONST BAKERSFIELD CA
FASTRIP 326 FASTRIP 326 SUNSET CONST
1-800-984-6266 1-800-984-6266 FASTRIP.326
1-800-984-6266
03/07/2011 12:14 PM 03/07/2011 12:49 PM
03/07/2011 12:30 PM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
FILL 2 FILL 2
FILL 2
TEST STARTED 11:59 AM TEST STARTED 12:34 PM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM
BEGIN LEVEL 4,7751 IN BEGIN LEVEL 4,7755 IN TEST STARTED 03/07/2011
END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 4,7753 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 12:30 PM
END LEVEL 4,7753 IN END LEVEL 4,7754 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,7755 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FILL 3 FILL 3
FILL 3
TEST STARTED 11:59 AM TEST STARTED 12:34 PM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM
BEGIN LEVEL 5,8376 IN BEGIN LEVEL 5,8436 IN TEST STARTED 03/07/2011
END TIME 12:14 PM END TIME 12:49 PM BEGIN `=VEL 5,81'-34 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 107/2 PM
END LEVEL 5,8420 IN END LEVEL 5,8437 IN END LL. 05.8437011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LL.EL 5,8437 IN
TEST RESULT INCREASED TEST RESULT PASSED LEAK THRESHOLD O,PAS IN
TEST RESULT PASSED
SPILLI SPILLI
SPILLI
TEST STARTED 11:59 AM TEST STARTED 12:34 PM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM
BEGIN LEVEL 5,3586 IN BEGIN LEVEL 5,3588 IN TEST STARTED 03/07/2011
END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 512:30 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 107 PM
END LEVEL 5,3583 IN END LEVEL 5,3589 IN END DATE 03/07/2/2011
LEAK THRESHOLD 0,002 IN LEAK THK,-jHOLD 0.002 IN END LEVEL 5,3583 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
VSPILLI VSPILLI
USPI LL 1
TEST STARTED 11:59 AM TEST STARTED 12:34 PM
TEST STARTED 03/07/2011 TEST STARTED. 03/07/2011 TEST STARTED 12:15 PM
BEGIN LEVEL 3.0879 IN BEGIN LEVEL 3, 1362 IN TEST STARTED 03/07/2011
END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 3, 1349 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 12:30 PM
END LEVEL 3,1128 IN END LEVEL 3,1466 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 3, 1291 IN
TEST RESULT INCREASED TEST RESULT INCREASED. LEAK THRESHOLD 0,002 IN
JEST RESULT FAILED
APR - 52011
• �,,�-• ',r �i v��`� !ICES -
34'�
�n�nt„ ..;. ids.c.f:Y},•
04vi O 11 "
6401 S H ST BAKERSFIELD CA
BAKERSFIELD CA BAKERSFIELD CA SUNSET CONST
SUNSET CONST SUNSET CONST FASTRIP 326
FASTRIP 326 FASTRIP 326 1-800-984-5266
1-800-984-6266 1-800-984-6266
03/07/2011 1:28 PM 03/07/2011 1:46 PM
03/07/2011 11:31 AM
SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
STP 1
SPILL2 SPILL2
TEST STARIc.j 1:13 PM TEST STARTED 1:31 PM
TEST STARTED 11:16 AM
TEST STARTED 03/07/201
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 5,3936 IN
BEGIN LEVEL 3.1877 IN BEGIN' LEVEL 3,1883 IN END TIME 11:31 AM
END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011
END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 5.3923 IN
END LEVEL 3,1880 IN END LEVEL 3,1877 IN LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
TEST RESULT PASSED TEST RESULT PASSED
STP 2
VSPILL2 VS?ILL2
TEST STARTED 11:16 AM
TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/07/2011
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 6,9900 IN
BEGIN LEVEL 5,1788 IN BEGIN LEVEL 5,1793 IN END TIME 11:31 AM
END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011
END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 6.9903 IN
END LEVEL 5,1791 IN END LEVEL 5.1787 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
TEST RESULT PASSED TEST RESULT PASSED
STP 3
SPILL3 SPILL3
TEST STARTED 11:16 AM
TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/0712011
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 5.1066 IN
BEGIN LEVEL 4,6411 IN BEGIN LEVEL 4.6411 IN END TIME 11:31 AM
END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011
END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 5,1065 IN
END LEVEL 4,6409 IN END LEVEL 4,6405 IN LEAK THRESHOLD 0,002 IN
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
.TEST RESULT PASSED TEST RESULT PASSED
FILL 1
USPILL3 USPILL3
TEST STARTED 11:16 AM
TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/07/2011
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 3.2821 IN
BEGIN LEVEL 7,4628 IN BEGIN LEVEL 7,4451 IN END TIME 11:31 AM
END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011
END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 3,2822 IN
END LEVEL 7,4445 IN END LEVEL 7.4436 IN LEAK THRESHOLD 0.002 IN
LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED
TEST RESULT FAILED TEST RESULT PASSED _
" uaui J n JI
BAKERSFIELD CA BAKERSFIELD CA 6401 S H ST
SUNSET CONST SUNSET CONST BAKERSFIELD CA
FASTRIP 326 FASTRIP 326 SUNSET CONST
1-800-984-6266 1-800-984-6266 FASTRIP 326
1-800-984-6266
03/07/2011 11:16 AM 03/07/2011 10:34 AM
03/07/2011 10:18 AM
SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT
SUMP LEAK TEST REPORT
STP 1 UDC 1 2
UDC 1 2
TEST STARTED 11:00 AM TEST STARTED 10:19 AM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM
BEGIN LEVEL 5,3940 IN BEGIN LEVEL 4,9730 IN TEST STARTED 03/07/2011
END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 4,9721 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 10:18 AM
END LEVEL 5,3931 IN END LEVEL 4,9742 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,9730 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
STP 2 UDC 3 4
UDC 3 4
TEST STARTED 11:00 AM TEST STARTED 10:19 AM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM
BEGIN LEVEL 6,9899 IN BEGIN LEVEL 4,4831 IN TEST STARTED 03/07/2011
END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 4,4826 IN
END DATE 03/07/2011 END DATE 03/07/2011 END TIME 10:18 AM
END -LEVEL 6,9900 IN END LEVEL 4,4828 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,4831 IN
TEST RESULT PASSED TEST RESULT PAID LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
STP 3 UDC 5 6
UDC 5 6
TEST STARTED 11:00 AM TEST STARTED 10:19 AM
TEST STARTED 03/07/2011 TEST'STARTED 03/07/2011 TEST STARTED 10:03 AM
BEGIN LEVEL 5, 1081 IN BEGIN LEVEL 3,5555 IN TEST STARTED 03/07/2011
END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 3,5546 IN
END DATE 03/07/2011 - END DATE 03/07/2011 END TIME 10:18 AM
END LEVEL 5, 1073 IN END LEVEL 3,5557 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 3,5554 IN
TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
FILL 1 UDC 7 8
UDC 7 8
TEST STARTED 11:00 AM TEST STARTED 10:19 AM
TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM
BEGIN LEVEL 3,2814 IN BEGIN LEVEL 5,3299 IN TEST STARTED 03/0712011
END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 5,3300 IN
END DATE 03/07/2011 END DATE 0310712011 END TIME 10:18 AM
END LEVEL 3,2820 IN END LEVEL 5,3295 IN END DATE 03/07/2011
LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 5,3299 IN
TEST RESULT PASSED _TEST RESULT PASSED LEAK THRESHOLD 0,002 IN
______ -----_PASSED RESULT PASSED
640 5 H 51
BAKERSFIELD CA
SUNSET CONST
FASTRIP 326
1-800-984-6266
03/07/2011 1:11 PM
SUMP LEAK TEST REPORT
SPILL2
TEST STARTED 12:55 PM
TEST STARTED 03/07/2011
BEGIN LEVEL 2,8922 IN
END TIME 1:11 PM
END DATE 03/07/2011
END LEVEL 3.2249 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT INCREASED
VSPILL2
TEST STARTED 12:55 PM
TEST STARTED 03/07/2011
BEGIN LEVEL 5,1809 IN
END TIME 1:11 PM
END DATE 03/07/2011
END LEVEL 5.1792 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT PASSED
I
SPILL3
TEST STARTED 12:55 PM
TEST STARTED 03/07/2011
BEGIN LEVEL 4,6272 IN
END TIME 1:11 PM
END DATE 03/07/2011
END LEVEL 4.6245 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT FAILED
r
VSPILL3
TEST STARTED 12:55 PM
TEST STARTED 03/07/2011
BEGIN LEVEL 7,5126 IN
END TIME 1:11 PM
END DATE 03/07/2011
END LEVEL 7.4706 IN
LEAK THRESHOLD 0,002 IN
TEST RESULT FAILED