HomeMy WebLinkAboutSB989 2011 SWRCB,January-2002 IIIIIIIIIIIII II IIII 77 Page of IE Secondary Containment Testing Report Form This form is intendedfor use by contractors performingperiodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: Fastrip#326 Date of Testing: 3/7/11 Facility Address: 6401 South H St.Bakersfield,Ca Facility Contact: Jamieson Hill Phone: 1-661-393-7000 Date Local Agency Was Notified of Testing: March 3,2011 Name of Local Agency Inspector(if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Sunset Mechanical Technician Conduc ' g Test: Scott Olinger Credentials: CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester License Type: C-36 C-10 License Number: 589517 Manufacturer TraininE Manufacturer Component(s) Date Training Expires Incon TS-STS Inspection Equipment 1/18/13 Veeder Root Monitoring System 1/15/12 ICC Cal UST Service Tech 1/18/13 3. SUMMARY OF TEST RESULTS Component pass Fail Not Repairs Component Pass Fail Not Repairs Tested Made Tested Made UDC 1 &2 ❑ ❑ ❑ PIPING RUN#1 ❑ ❑ ❑ UDC 3 &4 ❑ ❑ ❑ PIPING RUN#2 ❑ ❑ ❑ UDC 5 &6 ❑ ❑ ❑ I PIPING RUN#3 ❑ ❑ ❑ UDC 7 & 8 ❑ ❑ ❑ PIPING RUN 94 ❑ ❑ ❑ ❑ ❑ ❑ ❑ PIPING RUN#5 ❑ ❑ ❑ STP#1 Ir ❑ ❑ ❑ PIPING RUN#6 ❑ ❑ ❑ STP#2 ❑ ❑ ❑ PIPING RUN#7 ❑ ❑ ❑ STP#3 Mr ❑ ❑ ❑ SPILL#1 9f, ❑ ❑ ❑ V SPILL#3 1 ❑ ❑ ❑ SPILL #2 ❑ ❑ ❑ FILL#1 ❑ ❑ ❑ SPILL #3 IV ❑ ❑ ❑ FILL#2 ❑ ❑ ❑ V SPILL#1 ❑ ❑ ❑ FILL#3 ❑ ❑ ❑ V SPILL#2 ❑ ❑ ❑ If hydrostatic testing was performed,describe what was done with-the water after.completion.of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge,the cts stated In this document are accurate and in full compliance with legal requirements Techniciads Signa Date:-3/7/11 IIIIIII VIII III IIII 78 IE SWRCB,January 2002 Page of 4. TANK ANNULAR TESTING Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used: Equipment Resolution: Tank#1 Tank#2 Tank#3 Tank# Is Tank Exempt From Testing?' Yes ❑No Yes ❑No Yes ❑No ❑Yes ❑No Tank Capacity: Tank Material: Tank Manufacturer: Product Stored: Wait time between applying pressure/vacuum/water and startin test: Test Start Time: Initial Reading(Rj): Test End Time: Final Reading(RF): Test Duration: Change in Reading(RF-&): Pass/Fail Threshold or Criteria: Te§t'Resnit k ❑;;Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail s, ❑ Pass ❑Fail Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) 'Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) SWRCB,January 2002 Page of 5. SECONDARY PIPE TESTING Test Method Developed By: Piping Manufacturer ❑Industry Standard ❑Professional Engineer ❑ er(Spec) Test Method Used: VPressure ❑Vacuum ❑Hydrostatic ❑Other(Spec) Test Equipment Used:4'GEL FILLED GAUGE W/CERTS Equipment Resolution: Piping Run#1 Piping Run#2 Piping Run#3 Piping Run#4 Piping Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS Piping Manufacturer: AO SMITH AO SMITH AO SMITH AO SMITH Piping Diameter: 3' 3' 3' 3' Length of Piping Run: 110 129 130 13(P Product Stored: UNL PREM DIESEL VAPOR Method and location of TEST BOOT AT TEST BOOT AT TEST BOOT AT TEST BOOT AT piping-run isolation: UDC&STP UDC&STP UDC&STP UDC&STP Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 9:00 9:00 9:00 9:00 Initial Reading(Rj): 5.2 LB 5.4 LB 5.1 LB 5.1 LB Test End Time: 10:00 10:00 10:00 10:00 Final Reading(RF): 5.2 LB 5.4 LB 5.1 LB 5.1 LB Test Duration: 1 HR 1 HR 1 HR 1 HR Change in Reading(RF-RI): 0 0 0 0 Pass/Fail Threshold or 0 0 0 0 Criteria: Test Result . ,.n. Pass . p Esil' Pass :;p Fail; Pass :_.❑,Fait Pass , ❑Fail Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 6.PIPING SUMP TESTING Test Method Developed By: MSump Manufacturer ❑Industry Standard ❑Professional Engineer ❑.Other(Spec) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 1 STP 2 STP 3 STP Sump Diameter: 48" 48" 48" Sump Depth: 50" 51" 51" Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Height from Tank Top to Top of 18" 16" 16" Highest Piping Penetration: Height from Tank Top to Lowest 14" 12" 12" Electrical Penetration: Condition of sump prior to testing: DRY DRY DRY Portion of Sump Tested' 20" 20" 20" Does turbine shut down when sump sensor detects liquid(both dYes ❑No ❑NA Yes ❑No ❑NA 1�J Yes ❑No ❑NA ❑Yes ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC 20 SEC 20 SEC Is system programmed for fail-safe shutdown?* Yes ❑No ❑NA Yes ❑No ❑NA dYes ❑No 11 NA ❑Yes ❑No ❑NA Was fail-safe verified to be y� ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA operational?* Wait time between applying pressure/vacuum/water and starting 10 MIN 10 MIN 10 MIN test: Test Start Time: 11:00 11:00 11:00 Initial Reading(RI): 5.3940 6.9899 5.1081 Test End Time: 11:15 11:15 11:15 Final Reading(RF): 5.3931 6.9900 5.1073 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-R,): .0009 .0001 .0008 Pass/Fail Threshold or Criteria: .002 .002 .002 Test,Result Pass p Fail Pass; .,❑Fail Pass. .;O FaiL.• 11 Pas§ Was sensor removed for testing? Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and t l Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an asterisk(*)is"NO'or"NK,the entire sump must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 7. ER-DISPENSER CONTAINMENT 02g TESTING Test Method Developed By: 4 UDC Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Specify) Test Method Used: ❑Pressure ❑Vacuum WHydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution: 0.0000 UDC#1-2 UDC#3-4 UDC#5-6 UDC#7-8 UDC Manufacturer: WESTERN WESTERN WESTERN WESTERN UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS UDC Depth: 29' 29' 29' 29' Height from UDC Bottom to Top 9' 9' 9' 9' of Highest Piping Penetration: Height from UDC Bottom to 3' 5' 6' 3' Lowest Electrical Penetration: Condition of UDC prior to DRY DRY DRY DRY testin Portion of UDC Tested 12' 12' 12' 12' Does turbine shut down when UDC sensor detects liquid(both I/Yes ❑No ❑NA W/Yes ❑No ❑NA (/Yes 11 // No ❑NA 5 Yes ❑No ❑NA product and water)?* Turbine shutdown response time 20 SEC 20 SEC 20 SEC 20 SEC Is system programmed for fail- yes ❑No ❑NA S/Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA safe shutdown?* Was fail-safe verified to be yes ❑No ❑NA Yes ❑No ❑NA Wes ❑No ❑NA Yes ❑No ❑NA operational?* Wait time between applying 10 MIN 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test Test Start Time: 10:19 10:19 10:19 10:19 Initial Reading 4.9730 4.4831 3.5556 5.3299 Test End Time: 10:34 10:34 10:34 10:43 Final Reading(RF): 4.9742 4.4828 3.5557 5.3295 Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN Change in Readin F-91): .0012 .0003 .0001 .0004 Pass/Fail Threshold or Criteria: .002 .W2 .002, W2 Test;Result: " Pass: `❑Fail Pass ,r.❑Feil Pass` .❑RFail Pass ❑Eall _. .r Was sensor removed for testing? Yes ❑No ❑NA 14 Yes ❑No ❑NA es ❑No ❑NA Yes ❑No ❑NA Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an asterisk(*)is"NO'or"Ng,the entire UDC must be tested. (See SWRCB LG-160) SWRCB,January 2002 Page of 8. FILL RISER CONTAINMENT SUMP TESTING Facility is Not Equipped With Fill Riser Containment Sums ❑ Fill Riser Containment Sumps are PrejEnt,but were Not Tested ❑ Test Method Developed By: 9 Sump Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum MHydrostatic ❑Other(Spec) Test Equipment Used: INCON TS-STS Equipment Resolution:0.0000 Fill Sump#1 Fill Sump#2 Fill Sump#3 Fill Sum #4 Sump Diameter: 42' 42' 42' Sump Depth: 50' 53' 53' Height from Tank Top to Top of N/A N/A N/A Highest Piping Penetration: Height from Tank Top to Lowest 22' 20' 24' Electrical Penetration: Condition of sump prior to DRY DRY DRY testing: Portion of Sump Tested 12' 12' 12' Sump Material: FIBERGLASS FIBERGLASS FIBERGLASS Wait time between applying 10 MIN 10 MIN 10 MIN pressure/vacuum/water and starting test: Test Start Time: 11:00 12:15 12:15 Initial Reading(Rj): 3.2814 4.7753 5.8434 Test End Time: 11:15 12:30 12:30 Final Reading(RF): 3.2820 4.7755 5.8437 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-R,): .0006 .0002 .0003 Pass/Fail Threshold or Criteria: .002 .002 .002 Test Result: ass ❑Feil' Pass' ❑Fail ass 0 Fail ❑ Pass ❑Fair Is there a sensor in the sump? Yes ❑No Yes ❑No Yes ❑No ❑Yes ❑No Does the sensor alarm when —L_ / either product or water is LTV Y es 11 No ❑NA C7 Yes ❑No ❑NA 4/Yes ❑No ❑NA ❑Yes ❑No ❑NA detected? Was sensor removed for testing? es ❑No ONA--Vy es ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA Was sensor properly replaced and yes ❑No ❑NA Yes ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA verified functional after testing? Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9. SPILL/OVERFILL CONTAINMENT BOXES Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are sent,but were Not Tested ❑ Test Method Developed By: VSpill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Sped) Test Method Used: ❑Pressure ❑Vacuum Hydrostatic ❑Other(Spec) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Box#1 Spill Box#2 Spill Bog#3 Spill Box# Bucket Diameter: 12' 12' IT Bucket Depth: 13' 13' 13' Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 12:15 1:13 1:31 Initial Reading(R,): 5.3587 3.1877 4.6411 Test End Time: 12:30 1:28 1:46 Final Reading(RF): 5.3583 3.1880 4.6405 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-R,): .0004 .0003 .0006 Pass/Fail Threshold or .002 .002 .002 Criteria: Test Result: Pass ❑Fail pan. ❑.Fail. Passe: D Fail 0,Pass ❑Fail,:_ Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) SWRCB,January 2002 Page of 9. -SPILL/OVERFILL CONTAINMENT BOXES Facility-is Not Equipped With Spill/Overfill Containment Boxes ❑ Spill/Overfill Containment Boxes are Pr sent,but were Not Tested ❑ Test Method Developed By: Spill Bucket Manufacturer ❑Industry Standard ❑Professional Engineer ❑Other(Spec) Test Method Used: ❑Pressure ❑Vacuum dHydrostatic ❑Other(Sped) Test Equipment Used:INCON TS-STS Equipment Resolution:0.0000 Spill Bog#V1 Spill Box#V2 Spill Box#V3 Spill Box# Bucket Diameter: 12' 12' 12' Bucket Depth: 16' 16' 16' Wait time between applying pressure/vacuum/water and 10 MIN 10 MIN 10 MIN starting test: Test Start Time: 1:13 1:31 1:31 Initial Reading(Rj): 5.1788 5.1793 4.6411 Test End Time: 1:28 1:46 1:46 Final Reading(RF): 5.1791 5.1787 4.6405 Test Duration: 15 MIN 15 MIN 15 MIN Change in Reading(RF-RO: .0003 .0006 .0006 Pass/Fail Threshold or .002 .002 .002 Criteria: Test Result: 1kPkss ❑Fads Pass. b'Fail Pass 0,Fail ❑'.Pass ❑Fail Comments—(include information on-re ,Eairs made prior-to-testing and recommended follow-up for failed tests) BAKERSFIELD CA BAKERSFIELD CA 6401 S H ST SUNSET CONST SUNSET CONST BAKERSFIELD CA FASTRIP 326 FASTRIP 326 SUNSET CONST 1-800-984-6266 1-800-984-6266 FASTRIP.326 1-800-984-6266 03/07/2011 12:14 PM 03/07/2011 12:49 PM 03/07/2011 12:30 PM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT FILL 2 FILL 2 FILL 2 TEST STARTED 11:59 AM TEST STARTED 12:34 PM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM BEGIN LEVEL 4,7751 IN BEGIN LEVEL 4,7755 IN TEST STARTED 03/07/2011 END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 4,7753 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 12:30 PM END LEVEL 4,7753 IN END LEVEL 4,7754 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,7755 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FILL 3 FILL 3 FILL 3 TEST STARTED 11:59 AM TEST STARTED 12:34 PM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM BEGIN LEVEL 5,8376 IN BEGIN LEVEL 5,8436 IN TEST STARTED 03/07/2011 END TIME 12:14 PM END TIME 12:49 PM BEGIN `=VEL 5,81'-34 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 107/2 PM END LEVEL 5,8420 IN END LEVEL 5,8437 IN END LL. 05.8437011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LL.EL 5,8437 IN TEST RESULT INCREASED TEST RESULT PASSED LEAK THRESHOLD O,PAS IN TEST RESULT PASSED SPILLI SPILLI SPILLI TEST STARTED 11:59 AM TEST STARTED 12:34 PM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 12:15 PM BEGIN LEVEL 5,3586 IN BEGIN LEVEL 5,3588 IN TEST STARTED 03/07/2011 END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 512:30 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 107 PM END LEVEL 5,3583 IN END LEVEL 5,3589 IN END DATE 03/07/2/2011 LEAK THRESHOLD 0,002 IN LEAK THK,-jHOLD 0.002 IN END LEVEL 5,3583 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED VSPILLI VSPILLI USPI LL 1 TEST STARTED 11:59 AM TEST STARTED 12:34 PM TEST STARTED 03/07/2011 TEST STARTED. 03/07/2011 TEST STARTED 12:15 PM BEGIN LEVEL 3.0879 IN BEGIN LEVEL 3, 1362 IN TEST STARTED 03/07/2011 END TIME 12:14 PM END TIME 12:49 PM BEGIN LEVEL 3, 1349 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 12:30 PM END LEVEL 3,1128 IN END LEVEL 3,1466 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 3, 1291 IN TEST RESULT INCREASED TEST RESULT INCREASED. LEAK THRESHOLD 0,002 IN JEST RESULT FAILED APR - 52011 • �,,�-• ',r �i v��`� !ICES - 34'� �n�nt„ ..;. ids.c.f:Y},• 04vi O 11 " 6401 S H ST BAKERSFIELD CA BAKERSFIELD CA BAKERSFIELD CA SUNSET CONST SUNSET CONST SUNSET CONST FASTRIP 326 FASTRIP 326 FASTRIP 326 1-800-984-5266 1-800-984-6266 1-800-984-6266 03/07/2011 1:28 PM 03/07/2011 1:46 PM 03/07/2011 11:31 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT STP 1 SPILL2 SPILL2 TEST STARIc.j 1:13 PM TEST STARTED 1:31 PM TEST STARTED 11:16 AM TEST STARTED 03/07/201 TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 5,3936 IN BEGIN LEVEL 3.1877 IN BEGIN' LEVEL 3,1883 IN END TIME 11:31 AM END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011 END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 5.3923 IN END LEVEL 3,1880 IN END LEVEL 3,1877 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED STP 2 VSPILL2 VS?ILL2 TEST STARTED 11:16 AM TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 6,9900 IN BEGIN LEVEL 5,1788 IN BEGIN LEVEL 5,1793 IN END TIME 11:31 AM END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011 END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 6.9903 IN END LEVEL 5,1791 IN END LEVEL 5.1787 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT PASSED TEST RESULT PASSED STP 3 SPILL3 SPILL3 TEST STARTED 11:16 AM TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/0712011 TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 5.1066 IN BEGIN LEVEL 4,6411 IN BEGIN LEVEL 4.6411 IN END TIME 11:31 AM END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011 END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 5,1065 IN END LEVEL 4,6409 IN END LEVEL 4,6405 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED .TEST RESULT PASSED TEST RESULT PASSED FILL 1 USPILL3 USPILL3 TEST STARTED 11:16 AM TEST STARTED 1:13 PM TEST STARTED 1:31 PM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 BEGIN LEVEL 3.2821 IN BEGIN LEVEL 7,4628 IN BEGIN LEVEL 7,4451 IN END TIME 11:31 AM END TIME 1:28 PM END TIME 1:46 PM END DATE 03/07/2011 END DATE 03/07/2011 END DATE 03/07/2011 END LEVEL 3,2822 IN END LEVEL 7,4445 IN END LEVEL 7.4436 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0.002 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED TEST RESULT FAILED TEST RESULT PASSED _ " uaui J n JI BAKERSFIELD CA BAKERSFIELD CA 6401 S H ST SUNSET CONST SUNSET CONST BAKERSFIELD CA FASTRIP 326 FASTRIP 326 SUNSET CONST 1-800-984-6266 1-800-984-6266 FASTRIP 326 1-800-984-6266 03/07/2011 11:16 AM 03/07/2011 10:34 AM 03/07/2011 10:18 AM SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT SUMP LEAK TEST REPORT STP 1 UDC 1 2 UDC 1 2 TEST STARTED 11:00 AM TEST STARTED 10:19 AM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM BEGIN LEVEL 5,3940 IN BEGIN LEVEL 4,9730 IN TEST STARTED 03/07/2011 END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 4,9721 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 10:18 AM END LEVEL 5,3931 IN END LEVEL 4,9742 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,9730 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED STP 2 UDC 3 4 UDC 3 4 TEST STARTED 11:00 AM TEST STARTED 10:19 AM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM BEGIN LEVEL 6,9899 IN BEGIN LEVEL 4,4831 IN TEST STARTED 03/07/2011 END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 4,4826 IN END DATE 03/07/2011 END DATE 03/07/2011 END TIME 10:18 AM END -LEVEL 6,9900 IN END LEVEL 4,4828 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 4,4831 IN TEST RESULT PASSED TEST RESULT PAID LEAK THRESHOLD 0,002 IN TEST RESULT PASSED STP 3 UDC 5 6 UDC 5 6 TEST STARTED 11:00 AM TEST STARTED 10:19 AM TEST STARTED 03/07/2011 TEST'STARTED 03/07/2011 TEST STARTED 10:03 AM BEGIN LEVEL 5, 1081 IN BEGIN LEVEL 3,5555 IN TEST STARTED 03/07/2011 END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 3,5546 IN END DATE 03/07/2011 - END DATE 03/07/2011 END TIME 10:18 AM END LEVEL 5, 1073 IN END LEVEL 3,5557 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 3,5554 IN TEST RESULT PASSED TEST RESULT PASSED LEAK THRESHOLD 0,002 IN TEST RESULT PASSED FILL 1 UDC 7 8 UDC 7 8 TEST STARTED 11:00 AM TEST STARTED 10:19 AM TEST STARTED 03/07/2011 TEST STARTED 03/07/2011 TEST STARTED 10:03 AM BEGIN LEVEL 3,2814 IN BEGIN LEVEL 5,3299 IN TEST STARTED 03/0712011 END TIME 11:15 AM END TIME 10:34 AM BEGIN LEVEL 5,3300 IN END DATE 03/07/2011 END DATE 0310712011 END TIME 10:18 AM END LEVEL 3,2820 IN END LEVEL 5,3295 IN END DATE 03/07/2011 LEAK THRESHOLD 0,002 IN LEAK THRESHOLD 0,002 IN END LEVEL 5,3299 IN TEST RESULT PASSED _TEST RESULT PASSED LEAK THRESHOLD 0,002 IN ______ -----_PASSED RESULT PASSED 640 5 H 51 BAKERSFIELD CA SUNSET CONST FASTRIP 326 1-800-984-6266 03/07/2011 1:11 PM SUMP LEAK TEST REPORT SPILL2 TEST STARTED 12:55 PM TEST STARTED 03/07/2011 BEGIN LEVEL 2,8922 IN END TIME 1:11 PM END DATE 03/07/2011 END LEVEL 3.2249 IN LEAK THRESHOLD 0,002 IN TEST RESULT INCREASED VSPILL2 TEST STARTED 12:55 PM TEST STARTED 03/07/2011 BEGIN LEVEL 5,1809 IN END TIME 1:11 PM END DATE 03/07/2011 END LEVEL 5.1792 IN LEAK THRESHOLD 0,002 IN TEST RESULT PASSED I SPILL3 TEST STARTED 12:55 PM TEST STARTED 03/07/2011 BEGIN LEVEL 4,6272 IN END TIME 1:11 PM END DATE 03/07/2011 END LEVEL 4.6245 IN LEAK THRESHOLD 0,002 IN TEST RESULT FAILED r VSPILL3 TEST STARTED 12:55 PM TEST STARTED 03/07/2011 BEGIN LEVEL 7,5126 IN END TIME 1:11 PM END DATE 03/07/2011 END LEVEL 7.4706 IN LEAK THRESHOLD 0,002 IN TEST RESULT FAILED